DECEMBER2012 Asbestos Update Report For the Rapid Creek Business Village.

Similar documents
Asbestos Policy ASBESTOS POLICY. Version 2 / Jun 2015 Page 1 of 11 Asbestos Policy

Sprayed vermiculite ceiling coating management plan, Condell Park High School, Condell Park, NSW

ASBESTOS in state and local government

Asbestos Survey Report

ASBESTOS CONTAINING MATERIALS POLICY

Policy for the Management of Asbestos in the Workplace

HAVEBURY HOUSING PARTNERSHIP

Asbestos in Grounds Management Plan, Excelsior Public School, Castle Hill, NSW

Accommodation Officers Information Booklet. Asbestos The Asbestos Abatement Programme and the Asbestos Management Policy

How To Manage Asbestos At A University

Asbestos Management Procedure

ASBESTOS MATERIALS IN SCHOOLS

POLICY Contents. 1.0 Introduction Statement

BEDFORD DESIGN GROUP REPORT NUMBER ASBESTOS SURVEY AT: ALL HALLOWS CAR PARK GREENHILL BEDFORD

Policy on the Management of Asbestos

Asbestos in your home

2009 Housing Provider Forum. Ontario Environmental & Safety Network Ltd.

Asbestos Policy Lead officer: Date agreed: Review date: Working together to deliver quality homes and a better environment for all

H2 Opening Statement Asbestos

Appendix 1: Asbestos Register 5 High Wycombe Campus 5 Windsor House 6 Brook Street 6 Hughenden Student Village 6 Missenden Abbey 6 Uxbridge Campus 6

Dealing with. Dealing with Asbestos STROUD DISTRICT COUNCIL WARNING CONTAINS ASBESTOS

Asbestos in the home. for you - for your community - not for profit

Contents. 04 What is asbestos? 05 How we manage asbestos. 08 Are you at risk? 11 Things to remember

Author G Morton July Newcastle University Asbestos Management Plan 2015

Asbestos Management Policy

TRU Asbestos Management

Policy for the Management of Asbestos in Buildings

AsbestosSurveyingNationwide

Control of Asbestos Policy

ASBESTOS MANAGEMENT PLAN

Management of Asbestos. Darren Arkins Senior Inspector Occupational Hygiene Unit Chemical Business Services Division

UBC Plant Operations Asbestos Work Procedures April 2004

How to Safely Remove Asbestos

HOW TO SAFELY REMOVE ASBESTOS

ROYAL HOLLOWAY, UNIVERSITY OF LONDON

HOW TO MANAGE AND CONTROL ASBESTOS IN THE WORKPLACE

Version Introduction page 3. Our Commitment Page 4. Will I be exposed? Page 6. Where will it be? Page 8. Translation page 12

ASBESTOS MANAGEMENT POLICY

How to Manage and Control Asbestos in the Workplace

ASBESTOS POLICY MANAGEMENT PLAN

FREEPHONE: Asbestos Awareness. Toolbox Talk

ASBESTOS MANAGEMENT SURVEY REPORT

Asbestos

Asbestos Policy & Procedure

The Control of Asbestos Regulations 2006

Managing Asbestos Policy

Asbestos Awareness at the University of Toronto

The Management of Asbestos containing Materials

Asbestos at work guide

CONTRACTOR SAFETY MANAGEMENT PROCEDURE

Manage buildings? You must manage asbestos. Manage buildings? You must manage asbestos. Why manage asbestos?

Asbestos frequently asked questions

UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN

We are pleased to submit the Asbestos Management Plan for 60 Marine Pde, Southport, QLD 4215.

Asbestos Procedures. Asbestos Products

Vibixa Ltd, Vibixa Ltd, Kingsditch Lane, Cheltenham, GL51 9FG

Asbestos Management Plan

Asbestos Policy. Planning, Performance Management and Support Services. Legacy Causeway Asbestos Policy (Ref: CHSST/04/211)

Asbestos Management Policy

A Guide to Asbestos in your Home

Northwards Housing. Asbestos Management Plan. October 2014

ASBESTOS CONTAINING MATERIALS OPERATIONS & MAINTENANCE PLAN 2015

Regulatory Services. Asbestos in the Home. What is asbestos?

Property Services information sheet - number 3. Asbestos. December 2008 rev 1. You may have materials that contain asbestos in your house.

Asbestos Management Policy (Version 3)

AHERA 3-Year Asbestos Re-Inspection

WYG Asbestos Demolition Survey Report

Asbestos Management Plan

ABClean Frequently Asked Questions (FAQ)

ASBESTOS POLICY AND MANAGEMENT PLAN

ASBESTOS BUILDING INSPECTION REPORT. for. Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823

Policy on Asbestos Safety

ASBESTOS BUILDING INSPECTION REPORT. for the. City of East Lansing Waste Water Treatment Plant East Lansing, Michigan

Asbestos in the home. WHERE it may be found WHAT to do if you find it. Date: 15/08/14

STRATEGIC PLANNING & PLACE BUILDING CONTRACT DIRECTIVE

Leasing Commercial Premises

Transcription:

DECEMBER2012 Asbestos Update Report For the Rapid Creek Business Village Email: admin@iccaustcomau

ICC Australia Pty Ltd Copyright in the Drawings, information and data recorded in this document ( The information ) is the property of ICC Australia Pty Ltd This Document and the Information are solely for the use of the authorised recipient and this document may not be used, copied or reproduced in whole or part for any purpose other than that for which it was supplied by ICC Australia Pty Ltd ICC Australia Pty Ltd makes no representation, undertakes no duty and accepts no responsibility to any third party who may use or rely upon this document or the information ABN: 72147634366 66 Albatross Street, Winnellie, NT 0812 PO Box 227, Berrimah NT 0828 Phone: 08 8984 4883 Fax: 08 8984 4050 Email: admin@iccaustcomau Web Site: wwwiccaustcomau Our Reference 3095 Monday 10 th December 2012 Dear Sir / Madam, RE: Asbestos Inspection of Rapid Creek Business Village The inspections were carried out throughout 2012 by Asbestos licence holders Brad Paton and Joseph Fallas The Visual inspections undertaken updates the current condition of the previously identified asbestos utilising the survey information form the AGAL asbestos register Job Number 3031 Remediation of damaged asbestos has taken place as arranged by Center Management We have included an Updated Asbestos Register Section 5 All items in section 5 reflect the current condition of the building We have also included an annual review update page and access control log sheets As part of the review assessment, ICC Australia Pty Ltd also undertook an assessment with respect to the potential risk of exposure to airborne asbestos fibres The findings of our assessment are provided in section 7 of this document This report must be read in conjunction with existing reports and documentation of asbestos materials for these buildings Please do not hesitate to contact the undersigned should you require any further information Yours Faithfully Shane Horton Operations Manager ICC Australia Pty Ltd Page 2

Asbestos Register Annual Review Updates For Rapid Creek Business Village Review Dates Date of Inspection Auditor / Inspector Report Number 1/6/12 2/6/12 Brad Paton #2012 1/12/12 Joseph Fallas #2117 1/6/13 Page 3

CONTENTS 1 Introduction & Scope 2 Limitations 3 References 4 Managing Consultants 5 Asbestos Register update (Incorporating s) Page 4

1 INTRODUCTION & SCOPE ICC Australia Pty Ltd was engaged by Rapid Creek Business Village Management to conduct an inspection of the property at 48 Trower Road, Millner NT The inspection involves a visual inspection of the asbestos as identified in the Asbestos Register to ascertain the following: I If adequate signage is required to be affixed and is sufficient to meet the requirements of the code of practice; II If any deterioration of asbestos material has occurred in the previous years; III If the report information is still current, ie have any removals been undertaken; The building was visually inspected on 2/6/12 and 1/12/12 Nothing contained within this report may be considered to alter or modify guidelines as set down in Asbestos Code Of Practice and Guidance Notes Work Health & Safety Act 2011, or the requirements laid down under the relevant Northern Territory Legislation No one section or part of a section, of this report should be taken as giving an overall idea of this report Each section must be read in conjunction with the whole of this report, including its appendices and attachments Included in this report are s It should be noted that the actions are recommended only and that implementation is the responsibility of the building Owner / Manager The recommended action(s) must be carried out to ensure statutory compliance We recommend that a copy of this report is made available to the Occupier of the building and updated at least annually Page 5

2 LIMITATIONS In many instances, asbestos may be present in inaccessible areas such as: Wall cavities; Beneath floors; Slabs; Integral parts of boilers, pumps, machinery, plant & pipe work; Reheat units within air-conditioning ducts; and Fire doors Confirmation of lagged pipe work in wall cavities and that which may be chased into walls is not possible within a visual inspection in a non-destructive survey Should any demolition or upgrading work be undertaken, then it is possible that asbestos containing materials may be found in these areas Unless otherwise mentioned, samples were not taken of phenolic based co-polymer product (commonly known as zelemite ) which is known to contain asbestos, within electrical and / or control boards which may have been live at the time of inspection Unless otherwise mentioned, inspections were not undertaken beneath carpets for the presence of other floor covering The following locations were not visually inspected: Internal sections of the disused Sanitary Disposal Units; Internal Sections of air conditioning ductwork Buildings/Shops There had been a full refurbishment in Shop #3; non Asbestos products have been used Any reference in this report to materials other than asbestos containing materials are not to be taken as necessarily accurate, since identification of such materials is not included within the scope of this report Measurements and Quantities mentioned in this report are approximately only No Asbestos audit can guarantee to identify all asbestos containing materials present in a building ICC Australia Pty Ltd warrant to conduct their work with the degree of skill, care and diligence normally exercised by consultants in similar circumstances, but there is no guarantee, expressed or implied, that all asbestos has been identified in this report / register (refer Appendix D) All audit activities are undertaken in accordance with the ICC Australia Pty Ltd Occupational Health and Safety Policy This report must be read in conjunction with existing reports and documentation of asbestos materials for this building This report has been prepared for the use of the client, and is not to be relied upon by any third party without prior consultation with ICC Pty Ltd This report is not to be used as a contractual document If copies are required, all relevant parts of this report must be produced in full Page 6

3 REFERENCES It is recommended that the following documents be read in conjunction with this report Work Health & Safety Act 2011 NT Worksafe How To Remove Asbestos Code of Practice Page 7

4 MANAGING CONSULTANTS DIRECTOR Desmond Mcleod PROJECT MANAGER Shane Horton QUALITY ASSURANCE Desmond McLeod INSPECTORS Brad Paton Joseph Fallas Page 8

5 ASBESTOS REGISTER UPDATE (Incorporating s) All work / actions recommended in the recommended actions should be carried out in accordance with the work safe Australia code of practice for the safe removal of asbestos and Work Health & Safety Act 2011 Materials reported as similar to sample are based on a visual inspection and comparison to a sample taken for analysis Action taken sections are provided for building owner / manager to note any works carried out altering status or condition of products listed, eg sheeting removed may 1998, lagging removed from boiler Feb 1999 Page 9

Page 10

51 48 TROWER ROAD, Rapid Creek Shops 1-33 511 SHOP 1 HAPPY FOOD LAND Floor Tiles Floor tiles contain Chrysotile Asbestos, approximately 140 damaged tiles Ceiling Tiles Ceiling tiles contain Chrysotile Asbestos, 5 x tiles with minor damage Removal of all damaged floor tiles and ceiling tiles Quote provided for removal of damaged tiles Page 11

512 SHOP 2 RAPID CAFE NO ASBESTOS Nil All asbestos materials have been removed 513 SHOP 3 MLA Nil Asbestos Nil All asbestos material has been removed 514 SHOP 4 RENE S PIZZA Ceiling Tiles Half of the asbestos ceiling tiles have been replaced, the remaining are in good condition Asbestos Warning Labels to be affixed Damaged tiles replaced Page 12

515 SHOPS 5 & 6 SENSIS/EVEREST/GROCERIES SUPPLIES All tiles are in good condition Asbestos Warning Labels to be affixed Asbestos Warning Labels to be affixed 516 SHOP 7 H & R BLOCK All ceiling tiles in good condition Asbestos Warning Labels to be affixed Asbestos Warning Labels affixed Page 13

517 SHOP 8 NOC MASSAGE All ceiling tiles in good condition WALLS All walls in good condition Asbestos Warning Labels to be affixed Asbestos Warning Labels affixed 518 SHOP 10 AFRICAN BEAUTY All ceiling tiles in good condition Asbestos Warning Labels to be affixed Asbestos Warning Labels affixed Page 14

519 SHOP 11 LIFE WITHOUT BARRIERS 4 X damaged ceiling tiles have been removed and replaced All remaining ceiling tiles in good condition Asbestos Warning Labels to be affixed Asbestos Warning Labels affixed 5110 SHOPS 12-13-14 GREENIES REAL FOOD 12 X Ceiling tiles in shop 12 water damaged and need replacing All other ceiling tiles in good condition Remove damaged ceiling tiles Damaged ceiling tiles removed and replaced Page 15

5111 SHOP 15 MAMMAS KITCHEN 3 X Tiles replaced to enable fans to be attached Remaining ceiling tiles in good condition Asbestos Warning labels to be affixed Asbestos warning labels affixed 5112 SHOP 16 DOWN SYNDROME All ceiling tiles in good condition 7 x ceiling sheets replaced after unlawful entry 2012 Asbestos Warning Labels to be affixed Asbestos Warning Labels affixed Page 16

5113 SHOP 17 PARENTS CHOICE FAMILY DAY CARE All ceiling tiles in good condition Asbestos Warning Labels to be affixed Asbestos Warning Labels affixed 5114 SHOP 18 ARTHRITIS & OSTEOPOROSIS 1 X Ceiling tile with hole removed and replaced All other ceiling tiles in good condition 1 x ceiling tile to be removed 1 x ceiling tile removed and replaced Page 17

5115 SHOPS 19 & 20 SIDS AND KIDS 3 X tiles in shop 19 and 4 x tiles in shop 20 with damage have been removed and replaced Remaining damaged tiles repaired Asbestos Warning Labels to be affixed Asbestos Warning Labels affixed 5116 SHOP 21 DOCTORS SURGERY 8 X damaged ceiling tiles removed and replaced All remaining ceiling tiles in good condition 8 x damaged ceiling tiles to be replaced 8 x damaged ceiling tiles removed and replaced Page 18

5117 SHOP 22 DARWIN FISH MARKET 6 X Damaged ceiling tiles replaced Remaining ceiling tiles in good condition 6 x damaged ceiling tiles to be removed 6 x damaged ceiling tiles removed and replaced 5118 SHOP 23 PLAN ACTION NETWORK NO ASBESTOS Nil NIL Page 19

5119 SHOPS 24 & 25 ASIAN SARI - SARI All ceiling tiles in good condition Asbestos Warning Labels to be affixed Asbestos Warning Labels affixed 5120 SHOP 26 MISSION AUSTRALIA 1 X Damaged ceiling tile removed and replaced All remaining ceiling tiles in good condition 1 x damaged ceiling tile to be replaced 1 x damaged ceiling tile removed and replaced Page 20

5121 SHOPS 30-33 MELALEUCA + PATIO 6 X Damaged ceiling tiles removed and replaced All remaining ceiling tiles in good condition 6 x damaged ceiling tiles to be removed 6 x damaged ceiling tiles removed and replaced 5122 POWER ROOM/TOILETS CEILING CEILING DAMAGED AND REPLACED POWER BOARD Backing board contains asbestos in good condition Ceiling to be replaced Ceiling removed and replaced Page 21

7 RISK ASSESMENT 71 General The inspection of the building(s) and subsequent sample analysis of materials suspected of containing asbestos located at the Rapid Creek Business Village identified the following types of asbestos containing materials: Asbestos cement products; Electrical backing boards (ie zelemite ); The products do not pose a risk from exposure to airborne fibres so long as the materials are not disturbed or worked upon, ie, cut, sawn, drilled, etc (Appendix D provides a summary of the health risks of asbestos materials that have been identified in this register) 72 Removal The inspection of the building revealed a number of items that although is unlikely that these asbestos materials will pose a health risk from exposure to airborne asbestos fibres we consider they should be removed and replaced as soon as is practicable All damaged ceiling tiles have been removed These items are as follows: Ceiling tiles Floor tiles 73 LABELLING In accordance with the Work safe Australia Code of Practice asbestos warning signs have to be affixed to or adjacent to identified asbestos materials ICC Australia PTY LTY sells Asbestos Warning Labels, which conform to AS 1319-1994, Safety signs for Occupational Environment However we recommend that additional and more prominent warning signs be affixed to the asbestos materials 8 LEGISLATIVE REQUIREMENTS The current Northern Territory Regulations require that the owner of a building or plant, which contains any asbestos, ensures that: Page 22

Asbestos which is unstable or poses a significant health risk is removed as soon as reasonably practicable; and Policies and procedures are established to control the asbestos and to prevent (or where not reasonably practical to minimize) the exposure of any person to airborne asbestos fibres The policies must address the following: An assessment of the degree of stability of the asbestos; The steps that can be taken to restrict access to the place where the asbestos is situated; The steps that can be taken to prevent disturbance of the asbestos; The use of labels and signs to warn of asbestos; Regular inspections of the asbestos; and Work practices in the vicinity of the asbestos Any asbestos removal work done is required by legislation to be in accordance with the Work Health & Safety Act 2011 It is necessary to ensure that all asbestos products are removed prior to any demolition, removal, maintenance, operational or construction work, which may damage or disturb asbestos product(s) Page 23