AsbestosSurveyingNationwide www.asbestossurveyingnationwide.co.uk



Similar documents
Asbestos Survey Report

LEGISLATIVE GUIDANCE NOTES Refurbishment/Demolition

ASBESTOS MANAGEMENT SURVEY REPORT

BEDFORD DESIGN GROUP REPORT NUMBER ASBESTOS SURVEY AT: ALL HALLOWS CAR PARK GREENHILL BEDFORD

H2 Opening Statement Asbestos

Management of Asbestos. Darren Arkins Senior Inspector Occupational Hygiene Unit Chemical Business Services Division

Control of Asbestos. Blue crocidolite Brown amosite White chrysotile

Policy on the Management of Asbestos

WYG Asbestos Demolition Survey Report

ASBESTOS CONTAINING MATERIALS POLICY

The Control of Asbestos Regulations 2006

ASBESTOS SAMPLING REPORT. Urban Design. Louisa Ryland House Sampling to Ceiling in Room Newhall Street Birmingham B3 3PL

Detailed Survey Inspection Reports & Photographs. Material Assessment Algorithm & Asbestos Register

HAVEBURY HOUSING PARTNERSHIP

How To Manage Asbestos At A University

Asbestos: Notifiable Non-Licensed Work. A Minor Change or a Significant Challenge

Policy for the Management of Asbestos in the Workplace

ASBESTOS MATERIALS IN SCHOOLS

Asbestos Policy and Management Plan

Managing asbestos in buildings:

Asbestos Policy & Procedure

Policy on Asbestos Safety

ASBESTOS MANAGEMENT POLICY

Asbestos is found naturally in rock formations around the world. It is made up of lots of small fibres.

Summary of the main steps in managing asbestos (from HSG264) Find out if ACMs present: Check plans/ drawings. Carry out survey (2)

Asbestos Management Plan

Asbestos Containing Materials Survey And Register Moil Shopping Centre

Asbestos at work guide

UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN

UNIVERSITY HOSPITALS OF LEICESTER NHS TRUST POLICY FOR THE MANAGEMENT OF ASBESTOS

The Management of Asbestos containing Materials

Asbestos - Frequently Asked Questions

Asbestos Awareness Syllabus (Category A)

ASBESTOS MANAGEMENT POLICY AND GUIDANCE

STRATEGIC PLANNING & PLACE BUILDING CONTRACT DIRECTIVE

Contents. 04 What is asbestos? 05 How we manage asbestos. 08 Are you at risk? 11 Things to remember

Tenants` Asbestos Handbook Guide

Property Services information sheet - number 3. Asbestos. December 2008 rev 1. You may have materials that contain asbestos in your house.

UKATA. Certificate in Asbestos Awareness. Category A

Managing Asbestos Policy

Asbestos Management Program

Asbestos awareness. University of Brighton 2016

asbestos in your home

Asbestos in the home. for you - for your community - not for profit

Vibixa Ltd, Vibixa Ltd, Kingsditch Lane, Cheltenham, GL51 9FG

A Guide to Asbestos in your Home

Asbestos Policy ASBESTOS POLICY. Version 2 / Jun 2015 Page 1 of 11 Asbestos Policy

Dealing with. Dealing with Asbestos STROUD DISTRICT COUNCIL WARNING CONTAINS ASBESTOS

KEEP ASBESTOS YOUR QUICK GUIDE DON T BE AN EASY TARGET THIS GUIDE

FREEPHONE: Asbestos Awareness. Toolbox Talk

Asbestos Awareness Training Requirements

ASBESTOS REGISTER NTB00340 DOI COMPLEX TENNANT CREEK NT

Asbestos Management Procedure

managing asbestos in church buildings

Manage buildings? You must manage asbestos. Manage buildings? You must manage asbestos. Why manage asbestos?

Version Introduction page 3. Our Commitment Page 4. Will I be exposed? Page 6. Where will it be? Page 8. Translation page 12

Asbestos Policy. Planning, Performance Management and Support Services. Legacy Causeway Asbestos Policy (Ref: CHSST/04/211)

WASTE ASBESTOS. Asbestos is often bonded into a matrix of cement or resins. Typical bonded asbestos products include -

Northwards Housing. Asbestos Management Plan. October 2014

UBC Plant Operations Asbestos Work Procedures April 2004

SAFETY RESPONSIBILITIES AND ARRANGEMENTS IN RESPECT OF ASBESTOS MANAGEMENT (ASBESTOS MANAGEMENT PLAN)

Asbestos in your home

Control Provisions under the Air Pollution Control Ordinance

Management Consultancy Training. Asbestos Materials. Residential Guide

Asbestos awareness for Craftsman. Presented by Bob Miller & Andrew Knight

Health & Safety Training: Asbestos Awareness. What is asbestos? The nature of fire. Types of asbestos. Crocidolite. Anthophylite Tremolite.

Asbestos Policy Lead officer: Date agreed: Review date: Working together to deliver quality homes and a better environment for all

Asbestos in your home. Information on living with Asbestos

ASBESTOS AWARENESS. Steve Adamthwaite PEHO City of York Council

Asbestos in the home. A guidance booklet for tenants. Please keep this document as a reference guide- It contains important safety information

Beech Housing Association Asbestos Management Policy

ASBESTOS WORKING WITH IN BUILDINGS. *Building maintenance. *Building repair. *Building refurbishment

Bield Housing and Care POLICY, PROCEDURES. and MANAGEMENT PLAN ASBESTOS CONTAINING MATERIALS

Policy for the Management of Asbestos

ASBESTOS BUILDING INSPECTION REPORT. for the. City of East Lansing Waste Water Treatment Plant East Lansing, Michigan

If you own, occupy, manage or have responsibilities for

Asbestos Procedures. Asbestos Products

ASBESTOS POLICY AND PROCEDURES

Asbestos Policy. Ymddiriedolaeth GIG Gwasanaethau Ambiwlans Cymru Welsh Ambulance Service (NHS) Trust. November All Staff.

Asbestos Management Policy

POLICY Contents. 1.0 Introduction Statement

Asbestos Update on Regulations, Risks, Management and Obligations

Efficiently Maintaining Commercial Buildings. Asbestos Awareness

Asbestos Policy and Guidance

Control of Asbestos Policy

SECTION EXISTING HAZARDOUS MATERIALS CONDITIONS

MAIDENHEAD AND DISTRICT HOUSING ASSOCIATION TITLE: PAGE:

e a Advice on non-licensed work with asbestos ssentials Why is asbestos a problem? Introduction to Asbestos essentials task sheets Non-licensed tasks

All You Need to Know About Asbestos

ABClean Frequently Asked Questions (FAQ)

RSPH Level 3 Certificate in Asbestos Project Management. February Guided Learning Hours 2 Prior Learning Hours

ASBESTOS BUILDING INSPECTION REPORT. for. Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823

Report to Cabinet Item 25 June 2014

ASBESTOS POLICY AND MANAGEMENT PLAN

Asbestos

Asbestos Management Policy

ASBESTOS POLICY MANAGEMENT PLAN

The Newcastle upon Tyne Hospitals NHS Foundation Trust. Asbestos Management Policy and Action Plan

Asbestos Management Plan. Policy Owner: Head of Repairs Policy Author: Alan Assheton Date adopted: Review Date: Purpose

Transcription:

AsbestosSurveyingNationwide www.asbestossurveyingnationwide.co.uk Mencap Office, 4 Mount Folly Square, Bodmin, Cornwall. PL31 2DG. Management Survey and Asbestos Register January 2011 (Two of the samples taken in this survey returned after analysis as Asbestos Detected in Sample see Pages 10-11) Asbestossurveyingnationwide Page 1 of 26

Report type: Survey and Assessment of Asbestos Containing Materials Report issue: Final File number: 2602 Report Date: January 2011 Survey Date: January 2011 Surveyor: Mark Andrews Signed: Report checked by: Managing Director Carolynne Ward Signed: This report cannot be used for contractual or engineering purposes unless this sheet is signed where indicated by both the surveyor and assistant. The report must also be designated final on the signatory sheet. Please note that asbestos surveying nationwide cannot be held responsible for the way in which a client interprets or acts upon the results. This report must be read in its entirety including any appendices. Asbestos surveying nationwide accepts no responsibility for sub-division of this report. Asbestos Surveying Nationwide Limited 55-57 Bristol Road Edgbaston Birmingham B5 7TU T: 0845 607 6813 F: 0121 446 4960 Asbestossurveyingnationwide Page 2 of 26

TABLE OF CONTENTS Page Cover sheet 1 Signatory Sheet 2 Table of Contents 3 1. Introduction 4-5 2. Detailed Site Description 6 3. Summary of Asbestos Incidence 7 4. Recommendations 8 5. Method of Risk Assessment 9 Appendix A Register of Asbestos Containing Materials 10-11 Appendix B Register of Non-Asbestos Containing Materials 12-13 Appendix C Areas Around the Survey Site 14-20 6. Sampling & Analytical Techniques 21 7. Asbestos Survey Definition 22-23 8. Specific Notes 24 Appendix D Floor Plans 25 Appendix E Bulk Sample Reports 26 Asbestossurveyingnationwide Page 3 of 26

1. INTRODUCTION A (Management survey) of the premises was carried out at the request of Jacqueline Best, Mencap, 123 Golden Lane, London, EC1Y 0RT. The survey and all sampling was carried out in accordance with the requirements of the HSE document Asbestos, the survey guide HSG264 (2010). All areas of the premises were surveyed on January 2011 for materials suspected of containing asbestos. 1.2 The scope of the survey was to consider and report on; a. The type, condition and extent of asbestos containing materials (ACMs) in the building in all reasonably accessible areas. b. Provide recommendations to ensure that areas of concern are made safe and that all ACMs are managed safely. c. To assess the risk from the ACMs and to derive risk ratings. 1.3 All areas of the premises were surveyed. These are; a. All of the external areas of the building. b. All of the internal areas of the building. All areas from which samples were taken are shown in the site plans in Appendix D. 1.4 Areas that were excluded from the survey. See paragraph 1.5 below. 1.5 Specific exclusions relating to the surveying; 1.5.1 No inspection was carried out of flues, chutes, ducts, lift shafts, voids and any similar enclosed areas, the access to which would necessitate the use of specialist equipment or tools, or which would have caused damage to decoration, fixtures, fittings or the structure of the building. We are therefore unable to report on the presence of asbestos in these areas, and accept no responsibility for the presence of asbestos in these areas. 1.5.2 No inspection of live electrical or mechanical plant or similar requiring the attendance of a specialist engineer was carried out. 1.5.3 No inspection of any area requiring specialist access equipment other than stepladders was carried out. Asbestossurveyingnationwide Page 4 of 26

1.5.4 No report has been made on any concealed spaces, which may exist within the fabric of the building where the extent and presence of these is not evident due to inaccessibility or insufficient knowledge of the structure of the building at the time of the survey. 1.6 Specific exclusions relating to sampling; 1.6.1 Samples have not been taken where the act of sampling would endanger the surveyor or affect the functional integrity of the item concerned e.g. fuses within electrical boxes, fire doors, gaskets, glazing and power plant. 1.6.2 Samples have not been taken where prohibited by the client. 1.6.3 Samples have been taken from all materials which, upon initial visual inspection, appeared to contain asbestos with the exception of some items of mastic, resin or rubber, which contain asbestos where the quantity of those materials and the content of asbestos within the material is insignificant in terms of risk to health and safety. 1.6.4 Materials have been referred to as Asbestos Insulation Board or Asbestos Cement based on their asbestos content and visual appearance alone. Density checks have not been carried out unless otherwise stated. 1.7 Caveat This report is based on a non-destructive survey of an unfamiliar site. Every effort was made to locate the presence of all ACMs within the areas included in the survey. It is recognised that construction techniques often create inaccessible void spaces, which without destructive sampling techniques being employed, would not be accessed during this survey. It must therefore be presumed that ACMs other than those located within the survey may exist within the building. It was not possible both in terms of time and cost to sample each and every panel, tile or material of similar type. Where these exist, only a percentage of similar type materials were sampled, on the assumption that other like materials were of an identical composition. It is therefore possible that some other materials of apparently identical composition may vary and as such could contain asbestos not detected in the samples taken. For the reasons set out above, we cannot give assurances that all asbestos containing materials have been located and as such we recommend that further sampling be undertaken should these areas become accessible during the course of any future refurbishment or demolition works. An HSG264- (Refurbishment & Demolition survey) will be necessary prior to any major refurbishment or demolition work. Asbestossurveyingnationwide Page 5 of 26

2. DETAILED SITE DESCRIPTION The External Area of the Building and Site This is a three storey building with an apex natural slate roof, rendered walls, wooden sash windows (1 blanked with plywood), a wooden front door and plastic rain ware. The rear courtyard and rear elevation has natural stone and rendered walls, plastic and metal pipe work, a slate roof and hanging tiles, wooden window frames (some with slate sills and lead flashings) and wooden exit doors. As a result of a full inspection of all external areas no samples were taken from the exterior of the building. The Internal Area of the Building Internally the building has three floors and there are various rooms to each floor including store and meeting rooms on the ground floor, a staff room, toilets and offices on the first floor and offices on the second floor. As a result of a full inspection of all internal areas the following samples were taken:- - Sample 2602.01 was taken from the sash window cord in meeting room number 11 on the ground floor (coverage is to 1 window). The sample showed that no asbestos was detected. - Sample 2602.02 was taken from the fibre ceiling panels in store room number 8 on the ground floor (coverage is approximately 4 metres x 2.5 metres). The sample showed that no asbestos was detected. - Sample 2602.03 was taken from the inner insulation board door panel in staff room number 7 on the first floor (coverage is approximately 2 metres x 1 metre and also on the doors to rooms 4, 5 and 6). The sample showed that Amosite asbestos fibres were detected. - Sample 2602.04 was taken from the fire place blanking panel in room number 6 on the first floor (coverage is approximately 1 metre square). The sample showed that Chrysotile asbestos fibres were detected. - Sample 2602.05 was taken from the broken sash cord on the window on the stairs from the first to the second floor (coverage is to 1 window). The sample showed that no asbestos was detected. Photographs and details of areas around the exterior and interior of the building can be found at Appendix C of this report. Overall All areas of the building were examined. From the 5 samples taken around the property, 2 tested positive for asbestos fibres:- 1. Sample 2602.03 - inner insulation board door panel in staff room 7 on the first floor (also to doors 4, 5 and 6) 2. Sample 2602.04 - fire place blanking panel in room 6 on the first floor. Further details of the sample locations and materials are given in Appendix A and Appendix B of this report. See page 10 onwards. Asbestossurveyingnationwide Page 6 of 26

3. SUMMARY OF ASBESTOS INCIDENCE (Me Mencap Office, 4 Mount Folly Square, Bodmin, Cornwall, PL31 2DG). 3.1 Asbestos coatings Artex textured materials No items detected. 3.2 Asbestos insulation No items detected. 3.3 Asbestos insulating board (A.I.B.), millboard, gaskets, rope and paper Sample 2602.03 - inner door panel (A.I.B - asbestos insulation board) to door of room 7 on first floor (also to doors of rooms 4, 5 and 6). Sample 2602.04 - fire place blanking panel in room 6 on the first floor. 3.4 Asbestos cement products No items detected. 3.5 Bonded asbestos products bitumen, plastics, vinyl floor tiles etc No items detected. 3.6 Materials suspected to contain asbestos, which could not be sampled No items detected. Asbestossurveyingnationwide Page 7 of 26

4. RECOMMENDATIONS 4.1 The recommendations detailed in the register in Appendix A are based on each item s potential for releasing fibres as described in the Health and Safety Executive guideline HSG264. 4.2 A quantifiable assessment of the risk of fibre release has been made by using an algorithm which takes into account all factors relevant to the item. Recommendation will then normally involve removal, encapsulation or management as described below; a. Removal of items vulnerable to damage or in such poor condition that removal is the only practical option, or where refurbishment or demolition work is planned whereby the work will affect the asbestos materials present and render removal necessary. b. Enclosure or encapsulation where the material is in poor condition or is vulnerable to damage. c. Management of the asbestos material present by labelling, registering and periodic inspection as necessary. 4.2.1 Definition of terms; i. Enclosure Provision of a physical barrier to provide mechanical protection of the material to prevent it being disturbed or damaged. ii. Encapsulation iii. Labelling iv. Registering Provision of paint type coating to create a continuous seal to the surface of the material and thereby prevent fibre release. Fixing of labels to the surface of the material to warn of the hazard Entering the details, including type, location and extent in a register which is bought to the attention of all persons who might plan or undertake works in the building. v. Periodic inspection Inspection of the material at defined intervals to check that its condition hasn t deteriorated to require enclosure, encapsulation or removal. vi. Repair vii. Removal Addition of a seal to the material to prevent the further deterioration of the material. Carried out in conjunction with labelling. Complete removal of a material in compliance with CAWR 1998. viii. Manage in place A policy of regular inspections to ensure that the ACM is maintained in good condition. Asbestossurveyingnationwide Page 8 of 26

Asbestossurveyingnationwide Page 9 of 26

Appendix A Register of Asbestos Containing Materials Samples taken where the presence of asbestos has been proved Sample no: 2602.03 Item: Location: Inner Door Panel Room 7 - First Floor Staff Room Lab result: Amosite Material Risk Score: 6 Product Type: 2 Damage/deterioration: 1 Surface treatment: 1 Asbestos type: 2 Total Risk Score: 6 Low Risk Recommended action: Manage in place. Periodic inspection. Label to identify. Comments: This sample was taken from the inner door panel in room 7 - first floor staff room (coverage is approximately 2 metres x 1 metre and also on doors to rooms 4, 5 and 6). The sample returned as positive Amosite asbestos detected. These inner door panels are A.I.B. - asbestos insulation board - that can be quite soft and easily damaged, so the potential to release asbestos is high. At the moment the panels are painted with some minor damage. They must not be disturbed, drilled or cut into. Do not use coat hangers or add locks to the door in this room, or rooms 4, 5 and 6. In the future only a licensed asbestos contractor can remove and correctly dispose of these inner wall panels. In the meantime, label the inner door panels in rooms 4, 5, 6 and 7 to identify their nature. Labels enclosed with this report. Warning: Asbestos material. Asbestossurveyingnationwide Page 10 of 26

Sample no: 2602.04 Item: Location: Fire Place Blanking Panel Room 6 - First Floor Lab result: Chrysotile Material Risk Score: 4 Product Type: 1 Damage/deterioration: 1 Surface treatment: 1 Asbestos type: 1 Total Risk Score: 4 Very Low Risk Recommended action: Label to identify. Future removal by a licensed asbestos contractor. Comments: This sample was taken from the fireplace blanking panel in room 6 on the first floor (coverage is approximately 1 metre square in a good and painted condition). The sample returned as positive Chrysotile asbestos detected. Chrysotile fibres are a common material in this type of board and as long as they are well maintained and not disturbed by either drilling or scraping then they are managed correctly. In the future to remove these sheets would require a licensed asbestos contractor to carry out the work. In the meantime, keep well labelled to identify their nature. Labels enclosed with this report. Warning: Asbestos material. Asbestossurveyingnationwide Page 11 of 26

Appendix B Register of Non-Asbestos Containing Materials Samples taken where the presence of asbestos has been refuted Sample no: 2602.01 Item: Sash Window Cord Location: Meeting Room 11 Ground Floor Lab result: NAD (no asbestos detected) Material Risk Score: 0 Product Type: 0 Damage/deterioration: 0 Surface treatment: 0 Asbestos type: 0 Comments: This sample was taken from the sash window cord in meeting room 11 on the ground floor (coverage is to 1 window in good condition). The sample showed that no asbestos was detected. Asbestossurveyingnationwide Page 12 of 26

Appendix C - Areas Around The Survey Site Areas In and Around the Building Exterior of the Building The above picture shows the exterior of the building with an apex natural slate roof, rendered walls, wooden sash windows, 1 blanked window with plywood, a wooden front door and plastic rain ware. There were no sample points here. Interior of the Building The above picture shows meeting room 11 with carpet over wood to the floor, plaster to the walls and ceiling, a standard wooden door, wooden sash windows and sash cord (sampled - see Sample 2602.01 at Appendix B). Asbestossurveyingnationwide Page 13 of 26

The above pictures show the electric supply in the hallway with all modern equipment mounted on a board and plastic covered cabling. There were no sample points here. The above pictures show the staircase and cupboard which are of wooden construction with plaster under the ceilings, carpet and metal nosings. There were no sample points here. Asbestossurveyingnationwide Page 14 of 26

The above picture shows meeting room 10 with carpet over concrete to the floor, paper and plaster to the walls, wood blanking to the fireplace, a modern window frame and a standard wooden door. There were no sample points here. The above pictures show store rooms 8 and 9 with wood and slate to the floors, the ceiling of room 8 has fibre ceiling panels (sampled - see Sample 2602.02 at Appendix B), other surfaces are plastered, there is a ceramic sink in room 9 with ceramic tiles and foam insulated plumbing. There is a cast iron door to the stone lined chimney and painted wooden doors. Asbestossurveyingnationwide Page 15 of 26

First Floor The above picture shows the staff rest room with carpet over wood to the floor, plaster to the walls and ceiling, wooden windows and sills, an inner panel on the wooden door (sampled - see Sample 2602.03 at Appendix B, there is similar material on the doors to rooms 4, 5 and 6) and there are laminate cupboards and worktops. The above picture shows the male toilets with white ceramic sanitary ware, a wood panelled door, plaster to the walls, a wooden cupboard to the modern foam lagged hot water tank. There were no sample points here. Asbestossurveyingnationwide Page 16 of 26

The above picture shows the roof void above the male toilets with wooden joists, a modern water proof membrane, glass fibre insulation, foam insulation to pipe work and a wooden hatch. There were no sample points here. Second Floor Area The above pictures show offices 1, 2 and 3 with carpet over wood to the floor, panelled wooden doors, wooden blanks to the fire places, plaster to the walls and ceilings and sash window cords as sampled elsewhere in the building. Asbestossurveyingnationwide Page 17 of 26

The above pictures show the roof voids with modern waterproof membranes, wooden joists, some chipboard flooring, lathe and plaster and brick work walls, glass fibre insulation and a plastic water tank. There were no sample points here. Asbestossurveyingnationwide Page 18 of 26

6. SAMPLING & ANALYTICAL TECHNIQUES Bulk samples of suspect asbestos containing material were extracted to determine the nature and extent of the material, and the results of their laboratory analysis are given in Appendix E. Bulk sampling was carried out in accordance with documented in-house methods and HSE guidance note HSG264 entitled Asbestos: The survey guide (2010). At the discretion of the surveyor, where instances of asbestos containing material appeared to be extensive, only representative samples were taken for analysis. Samples were collected in self-sealed bags and, where appropriate, an adhesive label has been affixed which bears the sample number for cross-reference with this report. The sample point has then been safely sealed to reduce the risk of airborne asbestos fibre release. Please note that the presence of a label does not necessarily indicate that asbestos has been detected. Bulk sample analysis was carried out in accordance with documented in-house methods, based upon HSE Guidance Note HSG248, under Scopes Asbestos Analysis Services Limited (2 Nobel Square, Courtauld Road, Burnt Mills Industrial Estate, Basildon, Essex, SS13 1LS) UKAS accreditation No. 2707. The three most commonly used types of asbestos are: CHRYSOTILE - White. AMOSITE - Brown. CROCIDOLITE - Blue. NAD - No Asbestos Detected. Or NADIS No Asbestos Detected In Sample Asbestossurveyingnationwide Page 19 of 26

7. ASBESTOS SURVEY DEFINITION Asbestos surveying nationwide (surveys) are carried out in accordance with the requirements of HSG264 Asbestos: The survey guide (2010). This survey was carried out under the heading Asbestos Management survey, the requirements of which are as follows: Management Sampling Survey A Management Survey is the standard survey. Its purpose is to locate, as far as reasonably practicable, the presence and extent of any suspect ACMs in the building which could be damaged or disturbed during normal occupancy, including foreseeable maintenance, and to assess their condition. Management surveys will often involve intrusive work and some disturbance. The extent of intrusion will vary between premises and depend on what is reasonably practicable for individual properties, i.e. it will depend on factors such as the type of building, the nature of construction, accessibility etc. A management survey should include an assessment of the condition of the various ACMs and their ability to release fibres into the air if they are disturbed in some way. This material assessment (See appendix 4: Material Assessment Algorithm) will give a good initial guide to the priority for managing ACMs as it will identify the materials which will most readily release airborne fibres if they are disturbed. The survey will usually involve sampling and analysis to confirm the presence or absence of ACMs. However a management survey can also involve presuming the presence or absence of asbestos. A management survey can be completed using a combination of sampling ACMs or, indeed, just presuming. Any materials presumed to contain asbestos must have their condition assessed (i.e. a material assessment). Refurbishment and Demolition Surveys A refurbishment and demolition survey is needed before any refurbishment or demolition work is carried out. This type of survey is used to locate and describe, as far as reasonably practicable, all ACMs in the area where refurbishment work will take place or in the whole building if demolition is planned. The survey will be fully intrusive and involve destructive inspection, as necessary, to gain access to all areas, including those that may be difficult to reach. A refurbishment and demolition survey may also be required in other circumstances, e.g. when more intrusive maintenance and repair work will be carried out or for plant removal or dismantling. Asbestossurveyingnationwide Page 20 of 26

There is a specific requirement in CAR 2006 (regulation 7) for all ACMs to be removed as far as reasonably practicable before major refurbishment or final demolition. Removing ACMs is also appropriate in other smaller refurbishment situations which involve structural or layout changes to buildings (e.g. removal of partition walls, units etc). Under CDM, the survey information should be used to helping the tendering process for removal of ACMs from the building before work starts. The survey report should be supplied by the client to designers and contractors who may be bidding for the work, so that the asbestos risks can be addressed. In this type of survey, where the asbestos is identified so that it can be removed (rather than to manage it ), the survey does not normally assess the condition of the asbestos, other than to indicate areas of damage or where additional asbestos debris may be present. However, where the asbestos removal may not take place for some time, the ACMs condition will need to be assessed and the materials managed. On all types of survey, where "NO ACCESS" is used, it indicates that the area specified was not accessible at the time of the survey. The client must be aware of the possibility that there may be asbestos materials in the area. In this situation a recommendation is made to further inspect these areas once they become accessible. Only those areas defined within the specification and report are covered within this survey. Those areas not identified should be considered as not accessed for the purpose of this survey. Asbestossurveyingnationwide Page 21 of 26

8. SPECIFIC NOTES General Once asbestos materials have been identified it is essential that appropriate management and remedial measures be introduced. In general, asbestos materials that are in good condition should not be disturbed. Their location should be recorded and their existence made known to contractors, staff and others who may be affected. Warning labels advising of the presence of asbestos may be appropriate together with periodic condition inspections. For materials in poor condition remedial action (encapsulation or removal) may be required. Access to areas containing asbestos in poor condition may need to be restricted until remedial measures have been completed. Any person undertaking work within the building should be informed of the presence of asbestos. This briefing also applies to any other person associated with the site, including staff, sub contractors and others. All the asbestos removal works should be carried out by a contractor licensed to work with asbestos (under the Asbestos (Licensing) Regulations 1983) and in accordance with the control of Asbestos at Work Regulations 2002, and the associated Approved Codes of Practice. Statutory Regulations/Requirements and Codes of Practice The Health and Safety at Work Act 1974. The Control of Asbestos at Work Regulations 2002. L27 - ACoP Work with asbestos which does not normally require a licence (Fourth Edition). L28 ACoP Work with asbestos insulation, asbestos coating and asbestos insulating board (Fourth Edition). L127 ACoP The Management of asbestos in non-domestic premises. Asbestos (Licensing) Regulations 1983 (Amended 1998). A guide to the Asbestos (Licensing) Regulations 1983 as amended (second edition). Asbestos (Prohibitions) Regulations 1992. Health & Safety The Control of Asbestos in the Air Regulations 1990. Special Waste Regulations 1996. The Control of Substances Hazardous to Health Regulations 1999. The Construction Design and Management Regulations 1995. Waste Management Licensing Regulations 1994. HSE Guidance note EH 10 - Asbestos: exposure limits and measurement of airborne dust concentrations. HSE Guidance note EH 47 - The provision, use and maintenance of hygiene facilities for work with asbestos insulation and coatings. Asbestos The Survey Guide, HSG 264 (2010), this updates MDHS100 (Surveying, Sampling and assessment). Asbestossurveyingnationwide Page 22 of 26