10200 Girard Ave Suite B229 Denver, CO 80231 Initial Here



Similar documents
Lighthouse Engineering, L.L.C.

Basement Moisture Problems

How To Install An Overhead Sewer

Basement & Foundation Damage

October 30, Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR. Report of Findings, Structural Investigation, Benton, Arkansas, Dear Mr.

WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

7 Crucial Questions to Ask Before Repairing Your Home s Foundation

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE

Foundation Repair Fundamentals And how they relate to the Real Estate Industry in the DFW Area

INSPECTION PROPERTY ADDRESS: Fort Bend County, Texas

Estimating Database Checklist

Steve Brinkman Alain Pinel Realtors 167 S San Antonio Road Los Altos, CA RE: Foundation Inspection for 162 Del Monte Ave. Los Altos, CA 94022

Chapter 3 Pre-Installation, Foundations and Piers

RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training

Elevating Your House. Introduction CHAPTER 5

Notice to Property Owners

Investigation of Foundation Failure. Step 1 - Data Collection. Investigation Steps

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

Residential Foundations and Basements

Metropolitan Builders Association Masonry & Concrete Standard

TOWN of NEW BOSTON. Bid Package. Refurbishment and Upgrade of Basement of the New Boston Town Hall

Texas Building Pros Foundation Repair Services

SEWER BACKUP PREVENTION PROGRAM

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

Inspecton Report. Property Address:

ENGINEERED FOUNDATIONS. Department of Public Works Jeff Hill, PE

REQUEST FOR QUALIFICATIONS FROM FOUNDATION REPAIR CONTRACTORS BROOMFIELD DEPOT FOUNDATION REHABILITATION PROJECT

Baton Rouge Foundation Repair

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

Vision Home Inspection

Proposed Minimum Subterranean Termite Treatment Standards

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Lighthouse Engineering, L.L.C.

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

A Century of Progress with Pride

Structure Survey Findings:

symptoms of a faulty foundation

Cold Weather Concrete Practices

Homeowner s Guide Foundation Water PenetrationTips TIPS TO IDENTIFY WATER PENETRATION PROBLEMS / CRACKING BASEMENTS

Engineered Wood Foundations

Lighthouse Engineering, L.L.C.

SECTION 1 GENERAL REQUIREMENTS

EFFECTIVE FEBRUARY note: drainage permit required to call for a dampproof inspection

WARRANTY ADDENDUM TO RESIDENTIAL CONSTRUCTION SALE CONTRACT

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

Protect Your Home From Flooding. A guide for Lethbridge Residents

5006 Cherry Ridge Road Richmond, Texas LIMITATIONS AND DISCLAIMERS

Texas Premier Homes LIMITED BUILDER S WARRANTY COVERAGE

How To Build A House

NAHB PRODUCT DEFINITION

For a period of one (1) year beginning on the Closing ( Warranty Period ), Builder warrants to Purchaser, and only Purchaser, that:

Name of course: Residential Construction Site Management (RCSM) Level 1

Chapter 9 Remedial Measures

Building Code Inspections and Fees

Estimated Cost of Repair

Residential Plan Routing Information

PEPPER VINER HOMES WARRANTY GUIDELINES

City of Shelbyville Site Inspection Checklist

PROPERTY EVALUATION AND RESERVE FUND STUDY

Lighthouse Engineering, L.L.C.

What Causes Foundation Leaking?

Self-Home Inspection Checklist

National Home Builder - Name Wednesday, August 20, 2014 Regional Customer Care Manager 1234 Main Street Houston, Texas 77067

Building Condition Assessment: West Lexington Street Baltimore, Maryland

Cost of Repair Worksheet

Construction Agreement For Residential Home Renovation (Cost-Plus Agreement)

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW

R E S I D E N T I A L H O U S I N G

Lowering Basement Floors (Underpinning, Benching)

Single Family Residential Building Permit Questions & Answers

Important Information for Owners of Buildings in Flood Zones

MODULAR HOME PURCHASE & CONSTRUCTION AGREEMENT

Designed and Engineered to Perform

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

SUBSTANTIAL IMPROVEMENT/DAMAGE NOTICE TO PROPERTY OWNERS

CITY OF SELMA, TEXAS Inspection Checklist: Commercial

Preventing water damage in the basement

EAST LYME HIGH SCHOOL

NEW HOME LIMITED WARRANTY. Healy Homes LLC KINGSTON PIKE SUITE 250 KNOXVILLE TN office fax

HEDDERMAN ENGINEERING, INC. Office , Fax

Extreme Wet Weather in Brookfield. How to Keep Your Basement Dry During Heavy Rains and Floods

How To Repair A House

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE APPLICATION REVIEW

In many parts of the country, foundations and basement. Repair Options for Cracked CMU Foundations

October 5, 2015 Dear Client,

Memorandum Potentially Affected AIA Contract Documents AIA Document A AIA Document B Important Information

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

Exterior Elevated Elements Inspection Guidelines

Foundation Evaluation Report for PROPERTY ADDRESS Houston, Texas August 30, Prepared for:

Simplify. Homeownership

BEST MANAGEMENT STANDARDS FOR FOUNDATION REPAIR MARCH 2003 REVISED JUNE 13, 2012

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

Transcription:

Date Of Inspection: 17-Jan-13 Property Address: 2137 E 16th Ave Denver, CO 80206 Client Information: Name Tom LaRocque Phone Number 303-522-1669 Thank you again for the opportunity to be of service to you. Pinnacle Structural Services does not employ licensed Structural Engineers. Therefore the following repair plan is contingent on the review of a third party licensed Structural Engineer. The final repair plan amount may vary based on that review. This inspection was non-invasive and was conducted based on visual access only. Our inspections represent the professional opinions of this company based on the observations made at the time of inspection. Email larocque3000@msn.com Inspected By: Mike Schmidt All Repair plans are valid 30 days from the Inspection date listed above

Observation Checklist: Poured Footing Grade Beam/Drilled Piers Grade Beam on Dirt Intermittent Spread Footing Slab Only Slab with Footing Post Tension Brick Wall Poured Wall Stone Wall CMU Wall Clay Block Wall Basement Finished Basement Dirt Cellar Dirt Crawl Sub-crawl Upper Crawl Single Family Multi Family Commercial Single Story Multi Story Single Garage Multi Garage Veritical Cracks Diagonal Cracks Horizontal Cracks Negative Grading Poor Drainage Interior Drain Present Eterior Drain Present Additional Observations: The client asked Pinnacle to inspect this property because of concerns of significant cracking on the interior of the Unit. This is one unit of a two story row house structure. The townhouse is showing signs of settlement at the front of the unit. The brick foundation in the rear of the basement looks to be fair to good condition. The foundation in the front upper crawl is showing signs of mortar and brick deterioration which causes the foundation to settle and shift. The damage has been ongoing based on the amount of crack repairs and the repairs failing. The cracks are as much as a 1/2"

Site Review Eterior Install Interior Install Landscape Removal Only Landscape R&R Lawn R&R Concrete Removal Only Deck R&R Fence R&R Eterior AC R&R Furnace R&R Water R&R Stairs R&R Repair Recommendations: The debris in the crawl will need to be replaced before work can commence. A full crawl space poured concrete footing will be installed The front of the crawl space will have perpendicular 44 posts added to the joist to spread the load of the new beams Steel I-beams will be added to relieve some load from the brick foundation. Steel support posts will be used to support the steel I-beams Basement Access Interior Only Eterior Only Both Crawl Access Interior Only Eterior Only Special Instructions: Tree Removal Only Patio Removal Only Rail Tie Removal Only Decorative Items Removal Only Pinnacle Structural Services does not conduct any filed testing such as load or compression test and or soils testing. This work if required is contracted to a third party firm. R&R = Remove and Replace

Quanity Item Desciption Cost 0 Per- Drill up to 30 feet. This will be required if a specific depth is required by the engineer Each $750.00 $0.00 0 Helical Piers up to 30 feet in depth. Additional charges will apply for etra depth Each $1,500.00 $0.00 0 New Construction Helical Pier up to 30 feet. Additional charges will apply for etra depth Each $950.00 $0.00 0 Resistance Pier Each $1,300.00 $0.00 0 Micropile up to 50 feet. Each $2,500.00 $0.00 0 Etra Depth Helical Pier or New Construction Helical Pier, charge will be in 5 ft sections Each $175.00 $0.00 50 Steel Beam Sizes determined by engineer LF $75.00 $3,750.00 0 Steel Channel/Angle Sizes determined by engineer LF $80.00 $0.00 0 Clip eisting concrete piers Each $160.00 $0.00 0 Helical tie back up to 30 linear feet. Additional charges will apply for etra length Each $1,750.00 $0.00 0 Wall anchors Each $695.00 $0.00 0 Install new or replacement structural floor as engineer's design Sqft $12.00 $0.00 0 Blocking for floor joists Each $8.50 $0.00 0 Chip and grout beam pocket Each $125.00 $0.00 10 Steel support post with concrete pad Each $75.00 $750.00 0 Epoy injection - Not a water proofing repair LF $50.00 $0.00 0 Remove and Replace Concrete-No decorative flatework Sqft $9.50 $0.00 0 Concrete Flatwork - Basement Slabs only Sqft $6.50 $0.00 50 Concrete Footing as outline by the engineer Sqft $45.00 $2,250.00 0 Concrete Wall as outlined by engineer Sqft $19.00 $0.00 0 Concrete Grade Transfer Beam as outlined by engineer Each $5,000.00 $0.00 0 Concrete counterfort as outlined by engineer, steel or concrete pier is etra Each $2,400.00 $0.00 1 On Site Concrete Pump Truck Each $500.00 $500.00 13 Carbon Fiber Straps Each $400.00 $5,200.00 0 Carbon Fiber Staples Each $50.00 $0.00 5 Labor Costs / Transport Costs $75.00 $375.00 0 Structural Fill Material Cyd $50.00 $0.00 0 Clean Fill Dirt Cyd $40.00 $0.00 0 Delivery Charge per 11 Cyd Each $55.00 $0.00 0 Ecavation only, no backfill Cyd $75.00 $0.00 0 Ecavation by Hand with backfill Cyd $150.00 $0.00 0 Ecavation by Machine with backfill Cyd $675.00 $0.00 0 Ecavation by Hand-Interior with backfill Cyd $175.00 $0.00 0 Trench Shoring-Wood frame only LF $25.00 $0.00 0 Interior Drain LF $35.00 $0.00 0 Interior Drain with concrete remove and replace LF $65.00 $0.00 0 Channel Drain - Includes cutting concrete LF $70.00 $0.00 0 Move AC unit - Third Party Contractor Each $1,000.00 $0.00 0 Eterior Water Proofing - Does not include ecavation of foundation Sqft $1.95 $0.00 0 Sump pit - sump pump - sump alarm Each $990.00 $0.00 0 Sump pump replacement Each $375.00 $0.00 0 Sump etraction for eterior only LF $5.00 $0.00 0 20 mil vapor barrier Sqft $2.25 $0.00 0 Drywall and stud removal only - client will need to contract a professional for finish work LF $8.00 $0.00 0 Remove and Replace Oriented Strand Board (OSB) Each $75.00 $0.00 0 Suspend/Re-install Furnace - third party vendor may be contracted Each $500.00 $0.00 0 Suspend/Re-install Hot water heater - third party vendor may be contracted Each $500.00 $0.00 0 Suspend/Re-install Wooden stairs only Each $840.00 $0.00 0 Property grading Cyd $27.00 $0.00 0 Load Testing for Piers - Based on requirements of an engineer Each $15,000.00 $0.00 1 Debris removal Each $350.00 $350.00 6 44 posts 8ft lengths Each $45.00 $270.00 0 Soils Report - as required by engineer or city building department Each $1,300.00 $0.00 0 Egress Window - includes engineer, foundation cut, window well and ecavation Each $3,500.00 $0.00 1 Third Party Licensed Structural Engineer Each $975.00 $975.00 Office Processing Fee 14420 $562.38 Building Permit $504.70 Total $15,487.08 Deposit $5,420.48 Balance Due $10,066.60

TERMS AND CONDITIONS 1) SERVICES NOT COVERED: Pinnacle Structural Services will not perform any other work or trade than that which is specified herein, including but not limited to carpentry, plaster/wall work, electrical work, tile work, landscaping, masonry, flooring, paving, etc., even if that work is incidental or necessary to the contracted work, or necessary to restore the premises after the repair is made. Interior cosmetic cracks/separations may occur during the repair process including, but not limited to, the installation of resistance piers, helical piers, wall anchors and or any other items that may affect the position of the foundation. Pinnacle Structural Services will not be responsible for the repairs of any resulting cracks/separations that may occur. Pinnacle Structural Services does not install electrical outlets for sump pumps. Client is responsible for installation of necessary outlet(s) and ensuring unit is plugged in. Verbal agreements are not considered binding for this contract. 2) CUSTOMER'S RESPONSIBILITIES AND SITE CONDITIONS: If available, Customer is responsible to supply water, gas, sewer and electrical utilities unless otherwise agreed to in writing. Customer shall allow and provide Pinnacle Structural Services and its equipment access to the property. Customer is responsible to secure, remove and protect all persons and/or property, and its contents, including but not limited to adults, children, animals, cabinets and their contents, fitures, flooring, walls, tiling, carpets, drapes, furniture, and vegetation, during and upon completion of work, and shall hold harmless and indemnify Pinnacle Structural Services against all claims arising out of Customer's failure to do so. Pinnacle Structural Services is not responsible for any carpets, drapes, furniture, driveways, lawns, shrubs, etc. Customer should epect dust throughout the work process on the interior and eterior of the building. Customer is responsible to establish positive drainage around the eterior foundation walls of the building and install proper downspouts 8ft away from foundation walls after the work has been completed. If ecavation was required for a project settlement of soil may occur. If settlement occurs it will be the responsibility of the client to add additional fill dirt to the settled areas. Customer will point out and warrant the property lines to Pinnacle Structural Services. Pinnacle Structural Services cannot guarantee future damage to the structure will be prevented due to unknown factors such as; hidden structural deficiencies, changes to the water content below the structure and weakening of the structure over time. Pinnacle Structural Services is not responsible for frozen sump pump discharge lines, or any resulting damage from freezing. 3) DELAYS: Pinnacle Structural Services agrees to start and diligently pursue work through to completion, but shall not be responsible for delays for any of the following reasons: failure of the issuance of all necessary building permits within a reasonable length of time, acts of God, stormy or inclement weather, etra work ordered by Customer, or civil commotion, inability to secure material through regular recognized channels, or allocation of materials, failure of Customer to make payments when due, or delays caused by inspection or changes ordered by the inspectors of authorized governmental bodies, or engineers, for acts of independent Contractors, or holidays, or other causes beyond Pinnacle Structural Services reasonable control. If delays are caused by the client, a charge of $500 per day will be added to the total amount due. 4) PAYMENTS AND RIGHT TO STOP WORK: Past due payments shall bear interest at the rate of 2% per month (24% per annum), until paid in full. Pinnacle Structural Services shall have the right to stop work if any payment shall not be made, when due, to Pinnacle Structural Services under this Agreement; Pinnacle Structural Services may keep the job idle until all payments due are received. If any check tendered by Customer does not clear, in no case more than $500, nor less than $100, plus the face value of the check shall be charged to Customer. These remedies are in addition to any other right of remedy that Pinnacle Structural Services may have. Pinnacle will consider this to be a material breach of this Agreement if a Customer fails to make any payment when due. The unpaid amount will be submitted for collection action. Once the agreement is eecuted, $500 of deposit is nonrefundable. Once work has commenced, down payment is non-refundable. 5) CLEAN-UP: Pinnacle Structural Services will remove from the Customer's property debris and surplus material created by its operation and leaves it in a neat and broom clean condition. So long as dumpster was contracted. 6) LIMITATIONS: This repair plan is based on conditions of the structural elements that were readily observed at the time of the inspection. No invasive testing or inspections were performed. No action of any character arising from or related to this contract, or the performance thereof, shall be commenced by Customer more than one year after completion or cessation of work under this contract.. Epoy injection does not guarantee cracks to be waterproof. If epoy injecting is being completed, Pinnacle Structural Services recommends water proofing from eterior of foundation wall to prevent water intrusion through cracks. If lift is being attempted, customer understands that it is only an attempt and not a guarantee. Customer should wait 90 days upon completion of any foundation repair to begin any cosmetic or finish work.

7) ATTORNEY FEES: In the event that there is any litigation or an arbitration arising out of this Agreement, then the prevailing party shall be entitled to its reasonable attorney s fees and costs. 8) VALIDILITY: In case one or more of the provisions of this Agreement of any application thereof shall be invalid, unenforceable or illegal, the validity, enforceability and legality of the remaining provisions and any other application shall not in any way be impaired thereby. 9) CHANGES IN CONTRACTED WORK / CONCEALED CONDITIONS: If additional drilling is required to reach engineer required depths, customer will be notified immediately and additional charges will apply for predrill. Should the Customer or any publ ic body or engineer direct any modification or addition to the work covered by this contract, the contract price shall be adjust ed accordingly. The change in the contract price caused by such additional work shall be as agreed to in writing. Pinnacle Stru ctural Services actual cost of labor, equipment, subcontractors and materials, plus overhead and profit shall be the change in cont ract price. A change order may also increase the time within which the contracted work is to be completed. Pinnacle Structural Services shall promptly notify the Customer of: (a) latent physical conditions at the site and differing materially from thos e indicated in this contract, or (b) unknown physical conditions differing materially from those ordinarily encountered and gen erally recognized as inherent in work of the character provided for in this contract. Any epense incurred due to such conditions sh all be paid for by Customer as added work. No etra or change order work shall be required to be performed without prior written authorization of the person contracting for the repair or construction. However, in the event that the building department or other governing body requires a change or modification Pinnacle Structural Services may make that change prior to receiving written authorization and thereafter negotiate the effect of that change with the Customer. STRUCTURAL WORK For structural work, we require that both a third party licensed Structural Engineer review the repair plan and that a permit be obtained through the proper municipality/city for each project. An independent engineering firm will help assure the client is provided the best possible repair and workmanship possible. Pinnacle Structural Services utilizes the unparalleled AB Chance and Atlas Steel Piering and Anchoring products on our structural projects and repairs. LIMITED WARRANTY Pinnacle Structural Services warrants that all work performed by Pinnacle Structural Services and its subcontractors shall be done in a good and workmanlike manner in accordance with accepted trade practices Pinnacle Structural Services offers a 2 year warranty on interior drains and a lifetime warranty on the contracted structural work performed, however, does not warranty resulting damage due to unknown factors such as; hidden structural deficiencies, changes to the water content below the structure and weakening of the structure over time. Pinnacle Structural Services supplier of structural materials also provid es a 30 year warranty on its products.. Said warranty on workmanship shall etend for 1 year from the date of substantial completi on of Pinnacle Structural Services work for workmanship.pinnacle Structural Services will not compensate the client for any inconveniences caused by warranty work. THANK YOU FOR THE OPPORTUNITY TO BE OF SERVICE TO YOU AND YOUR INTEREST IN PINNACLE STRUCTURAL SERVICES. PLEASE HAVE THE AUTHORIZED PERSON SIGN BELOW IF YOU ACCEPT THIS REPAIR PLAN. I authorize Pinnacle Structural Services to charge my credit card. These charges will include and limited to, the deposit, p rogress payment(s) and or final payment. Final payment will be charges upon completion. The final payment is due upon completion of project. When final payment is received a closeout package will be sent within two weeks and will include the warranty, final engineer letter and building permit. All Projects that etend over 5 business days of the project start date will be subject to weekly progress payments. Projects will not begin until the deposit funds clear. Homeowner/Authorized Agent Date Pinnacle Structural Services Date