Territory and Municipal Services Reference Document 10



Similar documents
Terms and Conditions of Offer and Contract (Works & Services) Conditions of Offer

Code of Practice. for Inspecting and Certifying Buildings and Works. Building Control Regulations 2014

ARTWORK COMMISSION AGREEMENT

COMPLIANCE FRAMEWORK AND REPORTING GUIDELINES

ANNEXURE TO Australian Standard Minor Works Contract Conditions (Superintendent Administered) AS Part A

NORTHERN TERRITORY ELECTRICITY RING-FENCING CODE

Home Warranty Insurance Claim Form

WRITTEN STATEMENT OF SERVICE /TERMS AND CONDITIONS OF SERVICE

HOME WARRANTY INSURANCE ELIGIBILITY APPLICATION

Mandatory Addendum to the Owner/Architect Contract For Projects Funded in Whole or in Part with State Capital Outlay Funds

4 Adoption of Asset Management Policy and Strategy

GUIDANCE NOTE Building Control (Amendment) Regulations 2014 Procurement Implications for Contracting Authorities

Guide to the Letters of Assurance in the B.C. Building Code 2006 December, 2010 Edition 5a

Home Warranty Insurance eligibility application

Corporate Standard. Contractor Management

BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT. Notice No

Thames Water Utilities Limited. Settlement deed

REQUEST FOR PROPOSALS FOR LANDSCAPE ARCHITECTURAL SERVICES TOWN OF AVON, CONNECTICUT

GENERAL CONDITIONS OF CONTRACT MINOR WORKS AND SERVICES

Smart Meters Programme Schedule 2.5. (Security Management Plan) (CSP South version)

[Project Name] NZTA Contract No. [Contract Number] Schedule of Prices

CONSTRUCTION PROJECT MANAGER TERMS OF REFERENCE CENTRAL BANK OF LESOTHO PROPOSED EXTENSION BUILDING AND DISASTER RECOVERY SITE CONSTRUCTION PROJECTS

AGREEMENT FOR THE PROVISION OF CONSULTANCY ENGINEERING SERVICES

qbcc Insurance Policy Conditions Edition 8 1 queensland building and construction commission

AGREEMENT FOR SERVICES BETWEEN THE CITY OF YREKA AND [CONTRACTOR] WHEREAS, Contractor has the necessary experience in providing the services; and

TfNSW Standard Requirements TSR T Technical Management

Regional Council of Goyder

Module 12 Managed Services TABLE OF CONTENTS. Use Guidelines

Procedure. Work Health and Safety Contractor Management. Document number: PRO Rev no. Description Process Owner Approved for issue

PERSONAL ALERT SYSTEMS REBATE SCHEME PROVIDER PANER DEED

AUSTRALIAN PRUDENTIAL REGULATION AUTHORITY SUPERANNUATION CIRCULAR NO III.A.6 WINDING-UP A SUPERANNUATION FUND

1. LOAN TERMS 2. BORROWER INFORMATION

CSENSE LTD. Block Management Agreement

City of Tempe. Service Line Protection Program (SLiPP)

Draft Maritime Labour Certificate and Declaration of Compliance Regulations, 2015

APES 310 Dealing with Client Monies

STATE OF OHIO DEPARTMENT OF COMMERCE DIVISION OF FINANCIAL INSTITUTIONS "An Equal Opportunity Employer and Service Provider"

Any other capitalised terms have the meanings set out in Schedule 1.

Sports Bookmaker Licence

Government of the Kingdom of Lesotho. Ministry of Public Works and Transport. Principal Building Agreement

Module 5 Software Support Services TABLE OF CONTENTS. Version 3.1

JOHN HART GENERATING STATION REPLACEMENT PROJECT. Schedule 9. Quality Management

Residential Turf Removal Program Application Package

B & D Australia Pty Ltd ABN: APPLICATION FOR A COMMERCIAL CREDIT ACCOUNT AND GENERAL TERMS AND CONDITIONS OF SALE 7 DAY TRADING ACCOUNT

Policy of Insurance under the HBCF (Home Building Compensation Fund)

Form 20 Application for additional/change of qualified person for a contractor licence

SITE PLAN APPROVAL PROCESS INTRODUCTION

Business Account(s) Opening Form for businesses introduced by an accountant

MISCELLANEOUS PROFESSIONAL LIABILITY / GENERAL LIABILITY APPLICATION

VET (WA) Ministerial Corporation Purchase of Training Services Process Terms and Conditions

ASIC Registered Agents - Lodging Online

Land development manual Section 73 Compliance Certificate application process

Mitchell Shire Council

Guideline for preparing an Environmental and Social Management Plan

CITY OF VINCENT. Audit Completion Report to the Audit Committee For the Year Ended 30 June 2015

Buildings Departmen t Lands Department Planning Department

User Guidelines for QFES e-lodgement

Schedule of Prices. Project Name Contract No. Contract Number

Professional Trainers, Licensing Assessment and Consultancy Services Professional Indemnity and Public Liability Insurance Proposal Form

SOUTHEAST MISSISSIPPI COMMUNITY INVESTMENT CORPORATION LOAN APPLICATION

Asset and Development Coordinator

Board of Surveying and Spatial Information

Standardized Forms for Performance Guarantees 5:36-4 STANDARDIZED FORMS FOR PERFORMANCE GUARANTEES

Right-of-Way Use Permit Application Instructions

The Land Victoria Lodging Book A guide to dealings Section 4 Subdivision Act 1988

ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan)

PUBLIC SECTOR STANDARD CONDITIONS OF CONTRACT FOR CONSTRUCTION WORKS

This is Document Schedule 5 Part 1 referred to in this Contract SCOTTISH MINISTERS REQUIREMENTS SCHEDULE 5 PART 1 QUALITY MANAGEMENT SYSTEM

Memorandum Potentially Affected AIA Contract Documents AIA Document A AIA Document B Important Information

Contractors and Suppliers Code of Conduct. June 2013

LEAD PROVIDER FRAMEWORK CALL OFF TERMS AND CONDITIONS

IP AUSTRALIA B2B ONLINE TRANSACTION SYSTEM AGREEMENT

Building in the ACT. A consumer guide to the building process OCTOBER 2014

Chapter 4 Section 2 - Emergency Excavation Permit Administration Procedure

APPLICATION FOR ARCHITECTS & ENGINEERS AND DESIGN/BUILD PROFESSIONAL LIABILITY INSURANCE

New Hampshire Insurance Company (A Stock Insurance Company, hereinafter called the Company)

STATE OF MINNESOTA GRANT CONTRACT

FACTORING AGREEMENT ARGYLL COMMUNITY HOUSING ASSOCIATION LIMITED

REQUEST FOR EXPRESSIONS OF INTEREST

Tender forms and letters 1. Final accounts 7 Cost items 7 Presenting the final account 9. Retention and defects liability period 11.

Kesa Risk Universe Compliance Risks

Asset Protection Agreement Templates - Customer Explanatory Notes. Explanatory Notes on Asset Protection Agreement

Private Health Insurance Intermediaries. Document 2: Self-Audit Questionnaire. Version 2

FACTORING AGREEMENT ARGYLL COMMUNITY HOUSING ASSOCIATION LIMITED

SCHEDULES OF CHAPTER 40B MAXIMUM ALLOWABLE PROFIT FROM SALES AND TOTAL CHAPTER 40B COSTS EXAMINATION PROGRAM

Sample form not to be used as original

Transcription:

Territory and Municipal Services Reference Document 10 REQUIREMENTS FOR SOFT LANDSCAPE CONSOLIDATION AND HANDOVER Issue 2 Revision 2 APPROVED FOR ISSUE Approved by: Fay Steward Executive Director Land Management and Planning Date: August 2010 Date of issue: 19 March 2010 Page 1 of 5

TERRITORY AND MUNICIPAL SERVICES REQUIREMENTS FOR SOFT LANDSCAPE CONSOLIDATION AND HANDOVER AA 1. PURPOSE This document establishes the Territory and Municipal Services (TAMS) mandatory requirements (Requirements) to be included in any Submission Requesting Landscape Consolidation (Submission) and Certification of Soft Landscape Handover. 2. SCOPE These Requirements apply to any formal Submission for all Works. 3. OBJECTIVES These Requirements are issued to: define the information required by TAMS for any Submission to be accepted, reviewed, assessed and ultimately endorsed, and encourage high quality submissions with complete supporting documentation that comply with these Requirements. 4. DEFINITIONS, TERMS AND ABBREVIATIONS Developer In the private sector, the organisation nominated in the Deed of Agreement as the Developer including its employees, contractors, successors and agents. In the public sector, the Land Development Agency (LDA) or any other ACT Government agency responsible for development of public infrastructure works in the ACT including its employees, contractors, successors and agents. Coordinator The Developer, the Head Consultant or the agent nominated by the Developer as being responsible for the coordination of all disciplines of design and documentation prepared and certified by the Consultant/s and for the superintendence of the construction of the Works. The Coordinator shall be responsible for the lodgement of the Submission with TAMS and shall be the sole point of contact between Asset Acceptance, through the Project Lead, and the Developer throughout the life of the development. Asset Acceptance is not required to meet or communicate directly with any other entity or individual other than the nominated Coordinator on issues relating to the Submission. Head Consultant The organisation responsible on behalf of the Developer for the overall design and/or site superintendence of the whole of the Works and certification that the design and/or construction of the Works comply with these Requirements and Standards. Date of issue: 19 March 2010 Page 2 of 5

Consultant The organisation responsible for the design and/or site superintendence of part or whole of the Works and certification that the design and/or construction of that part of the Works for which it is responsible complies with these Requirements and the Standards. Asset Acceptance (AA) Asset Acceptance is the section of TAMS responsible for coordinating the Asset and nominated capital works design and construction acceptance process on behalf of TAMS. Asset Acceptance Project Lead The Manager who will act as a single point of contact for the life of a project. Standards All Australian Standards, applicable ACT Government requirements, codes and guidelines and all statutory and regulatory requirements governing the design of the Works. Works The public infrastructure works for which TAMS will become the ultimate owner and operator on behalf of the ACT Government. Work Lot A subdivision of the Works defined as such for verification purposes by the nature of the work and its location (or equivalent). Soft Landscape Tree, shrub and grass planting, topsoil, mulch, staking and ancillary edging, protection and other minor items. Consolidation Period The designated period for plant/grass establishment to demonstrate adequate growth and vigour. 5. GENERAL REQUIREMENTS FOR COMMENCEMENT OF CONSOLIDATION 5.1 General Soft landscape work can only be placed into Consolidation in a complete Work Lot unless alternative arrangements have formally been agreed with the Senior Manager AA. The Coordinator shall lodge a Submission prior to the Consolidation commencement period. The request for Soft Landscape Consolidation and Handover shall be submitted under a cover sheet AA-SCS-10 Soft Landscape Consolidation and Handover Submission Cover Sheet (refer Attachment A). The Consolidation Period will commence on the date a complete Submission, certified by the Coordinator, is received and endorsed by AA. All defects shall be remedied within two weeks of the commencement date. Certification by the Consultant, endorsed by the Coordinator, that the defects have been satisfactorily completed, shall be provided to AA within seven working days of completion of the Works. AA reserves the right to inspect the Works at any time during the Consolidation Period and may direct a recommencement of, or extension to, the Consolidation Period in the event that any major defects are identified. Date of issue: 19 March 2010 Page 3 of 5

5.2 Documentation The Submission shall include: 1. Certification by the Consultant, endorsed by the Coordinator, that it has inspected the Works for which Consolidation is requested and that the Works is constructed according to the approved design and complies with the Standard Specification for Urban Infrastructure Works. 2. A copy of the Certificate of Design Acceptance. 3. A Site Inspection Report prepared by the Project Superintendent and endorsed by the Coordinator stating: Project Title Extent of Work Contractor Inspection Date Inspection Type Attendees The Report shall be formatted to identify: The element inspected; compliance, and any action taken /proposed including the date of completion of the remedial works. 4. A proposed Maintenance Programme for the Consolidation Period and any Extended Maintenance Period. 5. A List of Defects that are not safety issues, excluding any omissions, identified at the time of certification by the Consultant. 6. Works as Executed Quality Records in accordance with TAMS Document No. AA-REF-08 Works as Executed Quality Records. 7. A list of all Amendments to the design approved by TAMS. 6. GENERAL REQUIREMENTS FOR END OF CONSOLIDATION When the Coordinator deems that the Works are ready for handover, the Coordinator shall request in writing the issue of a Certificate of Soft Landscape Handover from AA no earlier than two weeks prior to the expiration of the Consolidation Period. The request shall include the following information: 1. Certification by the Consultant that it has comprehensively inspected the Works placed in Consolidation and that it is sufficiently established and free of defects. The certification shall be endorsed by the Coordinator and state the date of inspection, include a maintenance log, and confirm that all Works are in accordance with the Standard Specification for Urban Infrastructure Works. 2. A List of Defects previously identified, subsequently discovered and/or arising during the Consolidation Period, and the dates that they were rectified. 3. Updated Works as Executed Quality Records where necessary. Date of issue: 19 March 2010 Page 4 of 5

Upon receipt of all the abovementioned documents, AA will organise a joint inspection to include the Coordinator and Consultant and representative/s of the section of TAMS responsible for the ongoing maintenance of the Works. If the outcome of the joint inspection is acceptable to all parties present, then the AA will issue the Certificate of Soft Landscape Handover. Should the joint inspection not meet the requirements of all parties, the Coordinator will be required to rectify all outstanding items and continue maintaining the Works until a further joint inspection has been undertaken, the Works deemed acceptable by all parties, and the Certificate of Soft Landscape Handover issued. 7. EXTENDED MAINTENANCE PERIODS Where an Extended Maintenance Period is required or agreed, an Interim Certificate of Soft Landscape Handover will be issued. The Coordinator shall continue to maintain the Works in accordance with the Maintenance Program; however, ownership and liability will otherwise pass to TAMS. At the end of the Extended Maintenance Period and where the Works are suitable, an application shall be made for a full Certificate of Soft Landscape Handover as per Section 6. 8. REFERENCES Works as Executed Quality Records, Document No. AA-REF-08, Territory and Municipal Services. Design Standards for Urban Infrastructure, Urban Services. Available online at http://www.tams.act.gov.au/work/standards_and_procedures/tams_reference_documents Standard Specification for Urban Infrastructure, Urban Services Territory and Municipal Services Drafting Standard, Document No. REF 11, Territory and Municipal Services. Available online at http://www.tams.act.gov.au/ data/assets/pdf_file/0003/34698/ref- 11_TAMS_Drafting_Standard.pdf Development Control Code For Best Practice Waste Management In The ACT, Urban Services September 1999 Available online at http://www.tams.act.gov.au/ data/assets/pdf_file/0003/12495/wastemanagementplan.pdf ATTACHMENTS Attachment A: Document No. AA-SCS-10 Soft Landscape Consolidation and Handover Submission Cover Sheet Date of issue: 19 March 2010 Page 5 of 5

ATTACHMENT A : Soft Landscape Consolidation and Handover Submission Cover Sheet To Senior Manager, Asset Acceptance, Territory and Municipal Services Macarthur House, 12 Wattle Street, Lyneham ACT 2602 Project Title: Project Description: Submission Status: Original Submission Resubmission Design Consultant: Address: Contact Name: Applicant's Reference: Telephone: email: SUBMISSION CONTENTS Consolidation Handover Covering Letter: Certificate of Compliance: Site Inspection Report: Maintenance Program: List of Defects: Works as Executed Quality Records: List of Amendments approved by TAMS Number of sets of documents: Date of Submission: SUBMISSION IMPACT Original Submission Resubmission Ref. Clause Element Circle as applicable Circle as applicable 6 Landscape and Street Furniture Yes No Yes No 6 Landscape Structures Yes No Yes No 6 Sportsgrounds Yes No Yes No 6 Other Yes No Yes No 1. These Documents are submitted for review, comments and approval. 2. All Documents are in accordance with the design brief and have been prepared in accordance with the Requirements detailed in Reference Document AA-REF-10 Requirements for Soft Landscape Consolidation and Handover. Certified by: Print name: Signature: Date: Document No: AA-SCS-10 Issue 1 : Revision 0 Date of issue: 1 March 2010 Page 1 of 1