Optimization of Production and Inventory Systems in Manufacturing for Higher Productivity

Similar documents
A Genetic Algorithm Approach for Solving a Flexible Job Shop Scheduling Problem

A Production Planning Problem

Universidad del Turabo MANA 705 DL Workshop Eight W8_8_3 Aggregate Planning, Material Requirement Planning, and Capacity Planning

Inventory Decision-Making

An Integrated Production Inventory System for. Perishable Items with Fixed and Linear Backorders

Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras

Example Summary of how to calculate Six Sigma Savings:

Supply Chain Management Optimization Problem

Keywords: Forward Logistics, Reverse Logistics, Supply Chain Management, Mathematical Programming, Beverage Industry.

CREATING WEEKLY TIMETABLES TO MAXIMIZE EMPLOYEE PREFERENCES

Reverse Logistics Network in Uncertain Environment

Chapter 13: Binary and Mixed-Integer Programming

Supply Chain Planning Considering the Production of Defective Products

Abstract. 1. Introduction. Caparica, Portugal b CEG, IST-UTL, Av. Rovisco Pais, Lisboa, Portugal

Management Accounting and Decision-Making

Module 2: Preparing for Capital Venture Financing Financial Forecasting Methods TABLE OF CONTENTS

Inventory Management - A Teaching Note

Linear Programming Supplement E

How To Plan A Pressure Container Factory

Formulation of simple workforce skill constraints in assembly line balancing models

International Journal of Advances in Science and Technology (IJAST)

Inventory Management: A Tool of Optimizing Resources in a Manufacturing Industry A Case Study of Coca-Cola Bottling Company, Ilorin Plant

Production Planning and Control Practices Influencing Consumer Satisfaction in Nigerian Manufacturing Industry

Motivated by a problem faced by a large manufacturer of a consumer product, we

Production Planning & Control. Chapter 2. Aggregate Planning & Master Production Scheduling. Chapter2 1

SECTION 10-2 Mathematical Induction

12 Marginal Costing Definitions

Simulation-based Optimization Approach to Clinical Trial Supply Chain Management

GENERALIZED INTEGER PROGRAMMING

Homework until Test #2

Chapter 7. Production, Capacity and Material Planning

Scheduling Jobs and Preventive Maintenance Activities on Parallel Machines

Economic Production Quantity (EPQ) Model with Time- Dependent Demand and Reduction Delivery Policy

VALUE STREAM MAPPING FOR SOFTWARE DEVELOPMENT PROCESS. Ganesh S Thummala. A Research Paper. Submitted in Partial Fulfillment of the

A Brief Study of the Nurse Scheduling Problem (NSP)

Chapter 21: The Discounted Utility Model

Issues in Information Systems Volume 14, Issue 2, pp , 2013

Linear Programming Notes VII Sensitivity Analysis

A MODEL TO SOLVE EN ROUTE AIR TRAFFIC FLOW MANAGEMENT PROBLEM:

Linear Programming based Effective Maintenance and Manpower Planning Strategy: A Case Study

Proceedings of the World Congress on Engineering and Computer Science 2009 Vol II WCECS 2009, October 20-22, 2009, San Francisco, USA

Short-term Financial Planning and Management.

Integrating Benders decomposition within Constraint Programming

Case study of a batch-production/inventory system E.M.M. Winands 1, A.G. de Kok 2 and C. Timpe 3

INVENTORY Systems & Models

Resource grouping selection to minimize the maximum over capacity planning

Section IV.1: Recursive Algorithms and Recursion Trees

Using Business Intelligence to Mitigate Graduation Delay Issues

2.3 Solving Equations Containing Fractions and Decimals

Optimization of Fuzzy Inventory Models under Fuzzy Demand and Fuzzy Lead Time

BREAK-EVEN ANALYSIS. In your business planning, have you asked questions like these?

Performance Management at DU Online system overview

IMPROVING PRODUCTIVITY USING STANDARD MATHEMATICAL PROGRAMMING SOFTWARE

Part 1 : 07/28/10 08:41:15

Student Project Allocation Using Integer Programming

Business Finance: Will I Make a Profit?

Further Study on Strong Lagrangian Duality Property for Invex Programs via Penalty Functions 1

Blending petroleum products at NZ Refining Company

10. Proximal point method

House Published on

A Reference Point Method to Triple-Objective Assignment of Supporting Services in a Healthcare Institution. Bartosz Sawik

1 Introduction. Linear Programming. Questions. A general optimization problem is of the form: choose x to. max f(x) subject to x S. where.

A LOT-SIZING PROBLEM WITH TIME VARIATION IMPACT IN CLOSED-LOOP SUPPLY CHAINS

A MILP Scheduling Model for Multi-stage Batch Plants

Comprehensive Business Budgeting

How To Plan Production

Cost Models for Vehicle Routing Problems Stanford Boulevard, Suite 260 R. H. Smith School of Business

constraint. Let us penalize ourselves for making the constraint too big. We end up with a

II- Review of the Literature

Offline sorting buffers on Line

APPLICATIONS AND MODELING WITH QUADRATIC EQUATIONS

Budgetary Planning. Managerial Accounting Fifth Edition Weygandt Kimmel Kieso. Page 9-2

Unit 1. Today I am going to discuss about Transportation problem. First question that comes in our mind is what is a transportation problem?

SUPPLIER SELECTION IN A CLOSED-LOOP SUPPLY CHAIN NETWORK

INTEGRATED OPTIMIZATION OF SAFETY STOCK

A simple analysis of the TV game WHO WANTS TO BE A MILLIONAIRE? R

Web based Multi Product Inventory Optimization using Genetic Algorithm

SINGLE-STAGE MULTI-PRODUCT PRODUCTION AND INVENTORY SYSTEMS: AN ITERATIVE ALGORITHM BASED ON DYNAMIC SCHEDULING AND FIXED PITCH PRODUCTION

A Branch and Bound Algorithm for Solving the Binary Bi-level Linear Programming Problem

Integer Programming Model for Inventory Optimization for a Multi Echelon System

Minimizing costs for transport buyers using integer programming and column generation. Eser Esirgen

Product Documentation SAP Business ByDesign Supply Chain Planning and Control

The Goldberg Rao Algorithm for the Maximum Flow Problem

Research Article Two-Period Inventory Control with Manufacturing and Remanufacturing under Return Compensation Policy

THE SCHEDULING OF MAINTENANCE SERVICE

Consumer Price Index Commonwealth of the Northern Marianas

An integrated Single Vendor-Single Buyer Production Inventory System Incorporating Warehouse Sizing Decisions 창고 크기의사결정을 포함한 단일 공급자구매자 생산재고 통합관리 시스템

IEOR 4404 Homework #2 Intro OR: Deterministic Models February 14, 2011 Prof. Jay Sethuraman Page 1 of 5. Homework #2

Transcription:

P and Optimization of Production and Inventory Systems in Manufacturing for Higher Productivity Osueke, G. OP 1 Okolie, S. T. AP 1.Mechanical Engineering Dept., Federal University of Technology, Owerri. Nigeria. 2. National Productivity Centre, Abuja. Nigeria. 2 ABSTRACT. The coordination of production and inventory systems in manufacturing is of critical importance. This research work integrates the production and inventory systems of Nigeria bottling company Owerri plant. Data were collected through structured questionnaire from the production, inventory and sales department of the company. Two models were developed from the data collected which integrate the production and inventory systems of the company for a six month production planning horizon. The models were solved using a computer software called TORA. Both models depict the optimum production and inventory schedules within the specified planning horizon. Model one makes a productivity improvement of 15.7%, while model two makes an improvement of 15.0% when compared with the existing model. The results from the models were analyzed and compared using sensitivity analysis vis-à-vis dual price and reduced cost analysis. The percentage level of productivity improvement and reduction on the optimum solution was determined through dual price and reduced cost on both models respectively. Model one makes an improvement of 0.0028% and a reduction of 0.0031%,while model two makes an improvement of 0.0021% and a reduction of 0.0037% when a unit input is added. Key words: Production, Optimization, Inventory systems, Manufacturing, Productivity. Introduction Selection of the right manufacturing strategy is a critical decision for production managers in the increasingly competitive manufacturing arena. To be more competitive in today s business environment, companies are striving to improve their manufacturing processes. Increasing labor productivity, eliminating waste from operations and responding more efficiently are major targets to achieve. These are aimed at meeting customers expectation through reduction in production costs and necessary parameters. According to Adeyemi e tal (2010), Optimum production scheduling of multi-product plant has been an intricate issue. This motivated the researcher after discovering an escalated increase in holding cost due to excess production, as a result of seasonal demand for soft drink every last quarter month of the year. There was no guideline as how much to produce. Secondly, inventory and production are being managed independently with little or no integration among them. 71

CRiR ARjR ARiR URiR CRPR DRiR Objectives To develop models that will integrate and co-ordinate production and inventory systems of the company. To determine the optimum inventory and production schedules with a minimum total cost of production using the developed models for higher productivity. Methodology The instruments that were used in this project are, development and administration of structured questionnaires which aided in data collection. Literature reviews/ libraries for data collection; data analysis, soft ware applications, modeling. Direct interaction and interview with some key personnel in the store, purchasing, accounting, production and inventory department were used. Data were made available by some of the key personnel mentioned in the departments above by providing the past records in their departments. Company s journals were also made available which aided In providing data. Model Parameters The parameters, variables and constraints are defined as follows: j =No of raw materials, t =No of periods, i = No of products. HRcjR HRciR =Unit holding/carrying cost of the raw material in the plant. =unit holding/carrying cost of the product (finished goods) =Production cost per unit product =Maximum storage capacity of the raw materials at the Plant =Maximum storage capacity of the finished goods (products) at the plant. =Unit production time ( cycle time) of product i at the Plant. T =Maximum available production time at the plant =Periodic/forecasted demand for each of the products(i) =Purchasing cost of raw materials Decision Variables. Q RitR =Quantity of product I produced in period t. 72

.R INVRitR =Inventory level of product I kept in period t IRRjtR =Inventory level of raw materials j in period tr Assumptions A. Demand for each product in each period is estimated and known. B. Initial inventory at the beginning of the period is zero. C. Enough personnel and good standard of operation Model Formulation Total Cost Of Production(Tcp) =Total Production Cost (Tpc)+Total Inventory Cost (TIC) TC P = TPC + TIC---------------------A TPC = Cit Qit------------------------B TIC = Sum of average inventories of finished goods and raw materials Finished goods inventory=ave Sum of initial and final inventory, but initial inventory is assumed to be zero (Brown, 2002). Final Inventory = HRcitR INVRitR. This means that Ave Sum Of Inventory = 0.5 (0+HRcitR INVRitR)-------------C For Raw Materials, Inventory cost of raw material = Ave SUM of starting and ending inventory. Cost of starting = unit purchasing cost x inventory level. = Cp IRRitR Cost of ending inventory =unit holding/carrying cost inventory level. =HRcjtR IRRitR AVE SUM = Combining eqn 0.5 (Cp IRRitR + HRcjtR IRRitR )-------------------------------D (C) and (D) I have 0.5(Cp IRRitR +HRcjtR IRRitR +HRcjtR INVRitR Total Inventory Cost = 0.5[ (HRcitR + Cp) IRRitR +(HRcitR) INVRit------------RF TCP = CRitR QRitR + 0.5[ (HRcjtR + Cp) IRRitR + (HRCitR ) INVRitR-------------G Model One,(The Linear Programming Model) Minimize TCP = CRitR QRitR + 0.5[ (HRcjtR + Cp) IRRitR + (HRCitR ) INVit i ε (1,2,3), t ε (1-----6), j ε (1,2,3) subject to 73

A. Periodic capacity restriction on production URitR QRitR TRiR i ε (1,2,3), t ε (1 6) B. Production demand inventory balance (INVRitR + QRitR) Ai i ε (1,2,3), and t ε (1----6)R R C. Production demand inventory balance. Using inventory continuity equations (Chandra, 2004), ie initial inventory + quantity produced final inventory DEMAND. That is, (INVit + Qit INVit) Di I ε (1,2,3), t ε (1- - -6) D, Material inventory facility balance, I RRjtR ARjtR J ε (1,2,3) t ε (1---6) Model Two, (Integer Programming Model) Minimize TCP = CRitR QRitR + [ (HRcjtR + Cp) IRRitR + (INVit) i ε (1,2,3), t ε (1-----6), j ε (1,2,3) Recall That Q RitR =Quantity of product i produced in period t Therefore YRitR =[1 if product i is produced at period t] =[ 0 otherwise] Y is a binary decision variable which can be 1 or 0 subject to A, QRitR MyRitR i ε (1,2,3), t ε (1-----6) YRitR ε ( 0, 1) B, M = Max DRitR 74

DR C, QRit R 0 R URitR QRitR MRitR i ε (1,2,3), and t ε (1----6) E, (INVRitR + QRitR) A i ε (1,2,3), and t ε (1---6) F, (INVRitR + QRitR INVRitR) DRiR i ε (1,2,3), and t ε (1---6) G, IRRitR ARjR i ε (1,2,3), and t ε (1---6) Model description model two The first constraint A, implies that decision yritr depends on the amount of QRit,R it means that when there is production in period t, yit is certainly equal to one and to satisfy the relation between yit and Qit, a very large positive number M is needed. The second constraint B, suggests one of the feasible values for M. this value must be set sufficiently large to ensure that it is greater than Qit. This amount can be set as the maximum summation of demand for each product over a planning horizon. The third constraint C, is used to define the non negativity of the decision variable Qit ( Du & Evans, 2008). The fourth constraint D is the period capacity restriction on production. This entails the maximum production time irrespective the number of shift the company may run in a period. This must satisfy the quantity of product I produced at that period multiply by the unit production time. The fifth constraint E,is the production facility inventory balance, this tries to satisfy the storage capacity of the plant with respect to the production volume in a period. The sixth constraint F, is the production demand inventory balance.this equation entails that demand in the current month can be met from goods produced at that month ( Kozan, 2001). The seventh constraint G is the material inventory facility balance. This tries to satisfy the inventory level of raw materials with the storage capacity. Data Presentation. For ease of identification and simplification, the variables used in the model are redefined as follows. 75

Table 1. Quantity Of Product i, produced in period t. Where Q1 is the Quantity of product One produce in Period one,q2 is The quantity of product two produced in period two.q4 is the quantity of one produced in period two. Qit i T Q1 1 1 Q2 2 1 Q3 3 1 Q4 4 2 Products Or Finished Goods Inventory. 76

The company has the followings three products, coca cola (coke, fanta,sprite etc), CSD, and bottle water, with the estimated periodic holding/lnventory carrying cost shown on the table below. Table 4.3 Sensitivity Analysis: This shows how the input parameters of the models can change within certain limits without causing the optimum solution to change.. Reduced Cost. This is the amount (penalty) to be paid for producing /introducing a unit quantity of a product that is not recommended by optimal solution. Dual Price(Shadow Price). This is the amount or gain by which the objective could be improved or changed, given a unit increase / decrease in the RHS of the constraints. Conclusion/Recommendation At this point, it is very clear that the dual price made an improvement while the reduced cost made a reduction in the optimal value. This implies that both parameters help in determining the performance level of production and consequently variables for productivity increase.. Going by these, the NBC Owerri Plant, should look critically on the constraints that have the greater values of dual price and try as much as possible to focus on them by increasing the input resources in such area for higher productivity. Also the company should try as much as possible to avoid keeping inventory of the finished goods (INVs),especially those ones that have greater values of reduced cost for them to avoid incurring cost. If they should abide by these, they will attain a greater optimal level production and inventory The use of computer software In solving mathematical programming problems have in a remarkable way proven to be highly effective in making improvement in manufacturing industries. Consequently, the integration and coordination of production and inventory systems through good model formulation in manufacturing industries have paved way for optimum production of goods and services. This was proved in the models formulated in this research work. Minimize TCP = CRitR QRitR + [ (HRcjtR + Cp) IRRitR + (INVit) i ε (1,2,3), t ε (1-----6), j ε (1,2,3). The models integrated the production and inventory systems of NBC owerri plant. This implies that manufacturing companies that have the same system of operation like NBC owerri will find this work very useful as guide to achieving higher productivity. References. Adeyemi, S. I. and Salam, A. O. (2010); Inventory management: A tool for optimizing resources in a manufacturing industry. J Soc Sci, 23(2). Pp135-142. 77

P Edition, Brown G. G, Robert, F. D. Ray L and Richard H. (2002); Optimizing plant-line schedules and an application at hidden valley manufacturing company. Interface 2002 informs. Vol32, No. 3. Chandra P and Fisher M. L. (2004); Coordination of production and distribution planning. European journal of operational research. 72(3), pp 503-517. Du F, and Evans G. W. (2008); A bi-objective reverse logistics network analysis for post sales service. Computer & Operations research 35(8), 2617-2634. Kozan C. (2001); A hierarchical planning approach for mixed model assembly process, sequel to aggregate production planning. Application at hidden valley manufacturing company. Interface 12(4) 20-31. Osueke, G. O.(2007); Waste Reduction And Productivity Relationship: What Are The Indicators? The Heartland Engineer, 2P nd Vol. 1. ISSN: 2006-1757. 78