Is Calculating ROI Meaningful for Agile Projects? December 2014



Similar documents
Program & Portfolio! Management using! Kanban! Copyright 2013 Davisbase Consulting. Limited Display License Provided to ASPE

AGILE FROM 6 FEET PATHWAYS TO PROJECT AND TEAM AGILITY PMI BALTIMORE HANOVER FEBRUARY 16, 2012

Manage projects effectively

Traditional requirements

LEAN AGILE POCKET GUIDE

Fact or Fiction: ERP Projects Can Be Delivered Using Agile

Integrating PRINCE2 and Scrum for successful new product development

When is Agile the Best Project Management Method? Lana Tylka

Successfully Doing TOGAF in a Scrum Project

The Agile Manifesto is based on 12 principles:

From Agile by Design. Full book available for purchase here.

CompSci Fall 2014 Professors: Robert Duvall, Ajay Patel, Salman Azhar (rcd@cs, ajay.patel, azhar@cs)

Scaling Agile with the Lessons of Lean Product Development Flow Copyright 2012 Net Objectives, Inc. All Rights Reserved

Scrum vs. Kanban vs. Scrumban

Agile Training Portfolio

Agile vs. Waterfall. Why not both. Arnold Okkenburg PMP

Agile Projects 7. Agile Project Management 21

Scrum Is Not Just for Software

PPM and Agile: Realizing the Best of Both Worlds

Portfolio Management 101:

Agile Metrics. It s Not All That Complicated

Would you like to have a process that unlocks ability to learn and produce faster?

Lean Software Development and Kanban

AGILE METHODOLOGY IN SOFTWARE DEVELOPMENT

Process Methodology. Wegmans Deli Kiosk. for. Version 1.0. Prepared by DELI-cious Developers. Rochester Institute of Technology

Waterfall to Agile. DFI Case Study By Nick Van, PMP

Project Management and Scrum A Side by Side Comparison by Anne Loeser, October 2006

Governments information technology

Rolling Wave Planning: Manage Projects Without Going Under

What is meant by the term, Lean Software Development? November 2014

Teaching an Elephant to Dance. Patterns and Practices for Scaling Agility

Introduction to Agile Scrum

The Agile PMO. Contents. Kevin Thompson, Ph.D., PMP, CSP Agile Practice Lead cprime, Inc E. Third Avenue, Suite 205 Foster City, CA 94404

Improving Project Governance Using Agile and Metrics. Kevin Aguanno PMP, IPMA-B, MAPM, Cert.APM

THE BUSINESS VALUE OF AGILE DEVELOPMENT

Planning of Project Work (IS PM 6. Lecture, 2011 Spring)

Agile Practitioner: PMI-ACP and ScrumMaster Aligned

Executive Guide to SAFe 24 July An Executive s Guide to the Scaled Agile Framework.

Table of contents. Performance testing in Agile environments. Deliver quality software in less time. Business white paper

Introduction to Agile and Scrum

IndigoBlue Governance Framework

Water-Scrum-Fall Agile Reality for Large Organisations. By Manav Mehan Principal Agile consultant

Agile Project Management By Mark C. Layton

Agile Scrum Workshop

Glossary SAFe 4.0 for Lean Software and Systems Engineering

The style is: a statement or question followed by four options. In each case only one option is correct.

Doing is the best way of Thinking New insights on work. Agile Project Methodology at ITG

Chapter 10. Becoming an Agile Enterprise

Agile for Project and Programme Managers

Improving Business Outcomes with Agile Discovery and Development by John Parker, CEO

FIVE CHALLENGES TO AGILE PLANNING:

Agile Software Development

Mastering the Iteration: An Agile White Paper

Agile Project Management and Agile Practices Training; with a Scrum Project that you will do.

PREPARING YOUR ORGANIZATION FOR BUSINESS INTELLIGENCE SUCCESS

FIVE CHALLENGES TO AGILE PLANNING AND SOLUTIONS FOR GREATER SUCCESS ACROSS YOUR ORGANIZATION

EMC PERSPECTIVE. Adopting an Agile Approach to OSS/BSS Development

Agile Software Development

How Silk Central brings flexibility to agile development

Bridging the Gap: Traditional to Agile Project Management. I. S. Parente 1. Susan Parente, PMP, PMI ACP, CISSP, PMI RMP, ITIL, MSEM;

How To Develop An Application

An Agile Project Management Model

Answered: PMs Most Common Agile Questions

Chapter 6. Iteration 0: Preparing for the First Iteration

Measuring ROI of Agile Transformation

Overview of Scrum. Scrum Flow for one Sprint SCRUMstudy.com. All Rights Reserved. Daily Standup. Release Planning Schedule. Create.

CE Entrepreneurship. Investment decision making

Agile Scrum and PMBOK Compatible or Contrary?

Collaborative Project Management in a DevOps Culture

Lean QA: The Agile Way. Chris Lawson, Quality Manager

AGILE & SCRUM. Revised 9/29/2015

Agile Project Forecasting Techniques. "Who Says You Can't Plan Agile Projects?" Matt Davis, PMP, MCITP October 21, 2013

Atern The latest version of the DSDM approach which makes DSDM appropriate to all types of project.

Scrum. SE Presentation. Anurag Dodeja Spring 2010

Development. Lecture 3

Issues in Internet Design and Development

Agile Project. Management FOR DUMME&* by Mark C. Layton WILEY. John Wiley & Sons, Inc.

Agile Development. Redefining Management in Project Management. Neil Stolovitsky

Agile Requirements Engineering + LESSONS LEARNED

Roles: Scrum Master & Project Manager

Agile Development in Today s Industry. Duke CS408 Session 2014

Introducing ConceptDraw PROJECT

Build Your Project Using Scrum Methodology #3 of a Series, by Pavan Kumar Gorakavi, M.S., M.B.A, G.M.C.P, C.A.P.M.

Reporting Scrum Project Progress to Executive Management through Metrics. Introduction. Transparency into Projects

Ten Steps to Comprehensive Project Portfolio Management Part 3 Projects, Programs, Portfolios and Strategic Direction By R.

Making Sense of. Agile Project Management. Traditional. Project Management. 1/19/ Breakthrough Solutions, Inc. 1

Rational Team Concert. Scrum Project Management Tutorial

WE ARE FOCUSED ON HELPING OUR CLIENTS WORK SMARTER AND MORE EFFICIENTLY SO THAT TOGETHER, WE CAN EMPOWER PEOPLE TO DELIVER GREAT RESULTS.

So what exactly is this #NoEstimates movement?

PLM - Agile. Design Code Test. Sprints 1, 2, 3, 4.. Define requirements, perform system design, develop and test the system. Updated Project Plan

Collaborative and Agile Project Management

Driving an agile peg in a CMMI hole

Scrum Guidelines. v W W W. S C R U M D E S K. C O M

Agile Notetaker & Scrum Reference. Designed by Axosoft, the creators of OnTime the #1 selling scrum software.

T14 "TIMELINES, ARTIFACTS AND OWNERS IN AGILE PROJECTS" Hubert Smits Rally Software Development BIO PRESENTATION 6/21/2007 1:30:00 PM

Introduction... 2 Introducing the DSDM Agile Project Framework (AgilePF)...2 Introducing DSDM...2 Introducing Scrum...3

SCRUM BODY OF KNOWLEDGE (SBOK Guide)

Building Software in an Agile Manner

Why Agile Works: Economics, Psychology, and #PrDC16

Agile and the Seven Deadly Sins of Project Management

Transcription:

Is Calculating ROI Meaningful for Agile Projects? Scope of this Report December 2014 This report is not about ROI of agile methods versus other SDLC s. Instead, we consider if the traditional approach to producing business cases for projects or programs by predicting financial outflows (project costs) and financial inflows (new income of savings) is still appropriate or even meaningful for agile software development based on scrum and/or enterprise wide extensions of scrum such as SAFe or DSDM. Definition of Return on Investment (ROI) Description Purpose Utilization Data Required Calculation Timing Baseline Industry Data Ratio of the benefit a project yields to the cost of the project. Evaluate between features, releases or projects based on ROI and on overall performance after implementation. As a planning tool to evaluate whether to include features in a release or projects in a portfolio. Cost, estimated benefits (expressed as a stream) Simple: ROI = (Net Present Value of Benefits)/ (Net Present Value of Costs) Planning Company Hurdle Rate Not Applicable The Traditional Approach to ROI The traditional approach to justifying software development investment has been to draw up a time line of predictions of project costs and project income or savings in the form of displaced current costs. The go no go decision is then based upon company targets for one or more of simple ROI, Cash-on-cash 2014 David Consulting Group Page 1 of 6

return, payback period, cost of money or some other similar measure. ROI has always been useful for comparing alternative projects or investments when funds are limited, as they almost always are! Appropriate Granularity for ROI Traditionally, we have worked with software development projects which are sometimes aggregated up into programs. Of course, there is no universally agreed definition for these terms and different organizations have had different financial cut-off points above which investments in projects/programs require business cases and for which those business cases must return a minimum ROI to proceed. Once a commitment has been made to fund a project /program based on a business case, there is an expectation (however naïve) from stakeholders that all of the elements of the software needed to deliver the estimated financial returns will be completed with a manageable increase in estimated costs. Any other outcome threatens the viability of the original funding business case. Perhaps it is for this reason that few organizations track the actual cash flows from projects very carefully. Or perhaps it is simply that the asynchronous nature of the cash flows - out during the project but only in when the software is employed by the business is beyond the attention span of both IT and the business. This is a gap that Finance could fill. In contrast, for Agile software development where most organizations start with Scrum, the future workload is represented by a backlog of epics that break down into user stories which form the incremental deliverables. Stories, by design, are much smaller units of work than projects (see Figure 1): Figure 1: Contrasting models of value delivery (Source: Scaled Agile Inc.) In Tara Hamilton-Walker s blog post in 2009 on Self-funding Projects, she notes, In reality, it is unlikely that you would/should take the time out to calculate the ROI for each story. Indeed, the 2014 David Consulting Group Page 2 of 6

incremental delivery of value raises some important questions that go to the heart of the title of this report: Is it possible to associate future income/savings with a single story? We agree with Hamilton- Walker while it may be possible it is almost certainly not practical. Is it worth investing in the cost of building a business case for an individual story? Again, no. Can we conclude that it is not meaningful to calculate ROI for Agile Projects? Not yet but we do have to get away from the concept of Agile Projects and consider further the appropriate level of granularity for ROI for Agile Software development at the epic or functions (which might be groups of epics) level which are business recognizable. One approach to calculating ROI for Agile In her blog post, Hamilton-Walker goes on to assert that one of the biggest benefits of developing software in an iterative or agile way, is that you can start realising the benefit of your work before the project is officially finished. The objective is to front-load the project with the most profitable or highest value deliverables and release them as soon as possible so that they can start making money for you. If you re using a Lean approach, you ll release them as soon as they re finished, if you re using a Scrum approach, you ll cluster a few into one (or more) releases at the end of each iteration. This concept of delivering value early and continuously is one of the foundations of Agile (See Figure 2) and the breaking down of enterprise level demand (and cost) into lower level backlogs then ensuring that the resulting value (income or savings) is a critical benefit of the Scaled Agile Framework (SAFe). Figure 2 Value Flow from Agile (Source: Scaled Agile, Inc.) Figure 2 also illustrates another benefit of Agile from a ROI perspective by identifying the diminishing market value of a feature over time. This effect is separate from and additional to the use of Net Present Value (NPV) in ROI calculations. 2014 David Consulting Group Page 3 of 6

In his blog post, Steps for Calculating ROI on Agile Projects, Richard Banks identifies a key challenge with calculating ROI for Agile at the higher levels of granularity, the final scope of the deliverable at any given future time point is not fixed. As he states, In an agile project requirements are often discovered, adapted and/or changed completely as the project progresses and very little up-front design work is performed as a result, unlike traditional methods that work on the belief that requirements can be defined up front and then fixed for the duration of the project. Banks proposes using the Product Backlog as the appropriate aggregation of stories for ROI. He suggests an initial ROI calculation can be done broadly as follows (with our proposed modifications included): 1. Gather the initial high level requirements for the project (presumably the project is describe as a theme or one or more epics) and place them in the product backlog 2. Get the team to estimate sizes for the requirements individually at a high level using story points, or whatever unit of measure they are comfortable with, but keep it high level and estimate quickly. 3. Examine the overall size of the product backlog. If the size seems too large at the start, then it probably is. Before proceeding either look to cull items from the backlog, or cancel the project. 4. Work out your starting velocity (i.e. how many points your team completes in a sprint). If possible, get approval to develop one item (or a few) as a proof of concept exercise - this often helps determine what the initial velocity of the project is likely to be. 5. Extrapolate from your initial velocity how many sprints will be required, and thus what the cost will be. 6. Find out from the business the following income or savings metrics: a. One or more units of measure in which the income or saving will be denominated e.g. new subscribers added for a website b. The number of units of value associated with delivering all, or subsets of, the Product Backlog e.g. this story/group of stories/epic will deliver 100 new subscribers c. The actual monetary value of delivering a unit of value at particular dates on the project timeline and beyond e.g. Each 10 new subscribers are worth $10 on March 1, $15 on April 1, $20 on May 1, $15 on June 1 and so on. d. The cost of delay, if any, of delivering all, or subsets of, the Product Backlog e.g. this story/group of stories/epic will deliver cause us to pay a fine of $2000 if we do not deliver by August 1 or this story/group of stories/epic will deliver cause us to pay a fine of $2000 if we do not deliver by August 1 be worth nothing if delivered after the Christmas sales season. 7. Use the estimated time, income, savings and cost figures to determine your ROI. Of course, the product backlog, income and saving metrics and velocity can and will change and that must trigger recalculation of the ROI. When? It is appropriate to calculate the sensitivity of the business case to changes in the underlying metrics and set up allowable ranges of fluctuation for individual metrics, beyond which the ROI must be recalculated. It is certainly not Agile to continue to pursue a theme, epic or even story for which there is no longer a business case. It has to be said that while 2014 David Consulting Group Page 4 of 6

Product backlog grooming and sprint reviews should guard against this happening by providing fast feedback from stakeholders, it is often the case that these activities focus on functional and user experience issues more than economic reviews. More Thoughts on Granularity for ROI Now that we have an approach for calculating ROI for Agile, it is worth considering the appropriate level of granularity further because our calculation approach involves cooperation, or at least coordination, between the development group and the business sponsoring the development. Various organizations implementing scrum have found it difficult to get commitments from the business for the day-to-day involvement necessary for the Product Owner role. This may be due to lack of resources or lack of understanding or some other reason embedded in the traditional corporate culture (and budget). Building and tracking business cases in the past was a business function or a PMO function. The PMO may no longer exist in an Agile organization so moving to ROI from business cases with Agile implementations will require some education and will need to recognize that the effort required will only be justified at quite high levels of aggregation the assumptions required to operate at this high level of aggregation will seem quite contrary to Agile principles at first. SAFe addresses this challenge by defining Product and Portfolio levels of aggregation above the Team level characteristic of Scrum. Business cases are made and long-running (longer than a typical project or release) trains of scrum teams are funded at the Portfolio Level. One of our clients takes a different approach by using a hierarchy of story types in which high-level Demand Stories correlate closely with business cases at the business-development interface. These Demand Stories are then broken down successively into Customer Experience Stories, Component Stories, Engineering Stories and so on. Their experience with this approach has led to them building a rule into their story management system that only complete Demand Stories can be progressed through their Kanban stages. That is, all of the subsidiary stories must be complete before any one of them can be progressed because too often subsidiary stories were worked on in isolation but the expected business value could only be realized when all the subsidiary stories in a Demand Story were delivered. The phrase orphan CE stories barely hints at some of this issues that can occur if some such rule is not in place. But, again, many people think that such a constraint is in conflict with the principles of agile. Conclusions We believe that it is meaningful to calculate ROI for Agile Projects but only at an enterprise or portfolio level. Further, we have demonstrated that it is not a trivial exercise. Finally, we believe that the risk of funding long-running projects which turn out to have limited business value is much smaller with Agile than with Waterfall or other SDLCs. 2014 David Consulting Group Page 5 of 6

. Sources Self-Funding Projects A Benefit of Agile Software Development, Tara Hamilton-Whitaker, July 22, 2009, https://agile101.wordpress.com/tag/roi/ Foundations of the Scaled Agile Framework Presentation, Leffingwell et al. 2014 Scaled Agile, Inc. (with permission). Steps for Calculating ROI on Agile Projects, Richard Banks, http://www.richardbanks.org/2007/07/steps-for-calculating-roi-on-agile.html The Business Value of Agile Software Methods: Maximizing ROI With Just-in-time Processes and Documentation, 2009, by David F. Rico, Hasan H. Sayani, Saya Sone. 2014 David Consulting Group Page 6 of 6