Requirements to Obtain a Building Permit for a NEW HOME. 1. Completed application form. (Boxes A, B, C, D & E if applicable F and I)

Building Permit Application

Building Permit Application

A HOMEOWNERS GUIDE TO BUILDING PERMITS

BUILDING APPLICATION CHECK LIST

Small Business Permit Service

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012

A HOMEOWNERS GUIDE TO BUILDING IN GREY HIGHLANDS

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act.

RULING OF THE MINISTER OF MUNICIPAL AFFAIRS AND HOUSING

A Homeowner s Guide to Building Permits

A Guide to Building Permits for Home Owners / Renovators. Address: 1 Carden Street Guelph, Ontario N1H 3A1

Residential Building Permits

A Guide for the Homeowner/Builder

BUILDING SAFETY UNIT

Demo Permit Guide For Homeowners

A Building Permit Guide For Homeowners

Residential Building Permit Process

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

City of Peterborough

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

Residential Building Permit Guide

Building FAQ s. Answers to Frequently Asked Questions about Building & the Building Permit Process

BUILDING PERMIT SPECIFICATIONS

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

INCORPORATION BY REFERENCE OF INTERNATIONAL. (1) The Department of Labor and Industry adopts and incorporates by

Botetourt County, Virginia. Frequently Asked Questions

H:\forms\handouts\bldg049 1 of 11 Revised Mar 2/15/dh

IECC Compliance Guide for Homes in Virginia

Single Family Residential Basement Finish

Zoning Department DECK PERMITS. Checklist

2014 British Columbia Building Code Changes

APPLICANT / CONTACT:_

Bureau Veritas Contact Information

Building Permit, Fire Inspection and Operating Permit Fee Schedule

Sample Drawing Package for One and Two Family Dwelling Applications

Depending on the nature of your project, below is a checklist of what this office requires. Make sure you include your .

Does Wall Township require an inspection by the building department on resale of a home?

Applications for building permits will not be reviewed until all of the required information has been submitted.

REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT

ELIGIBLE REPAIR PROJECT PARAMETERS

BUILDING/PLUMBING PERMIT APPLICATION REQUIREMENTS

ENERGY STAR Certified Homes, Version 3 Cost & Savings Estimates

Notice to Property Owners

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Preparation for 2015 Residential Code Changes Discussion with Local Builders and Designers

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

Residential Use. Contents. Building Permits. Drawing Requirements: Sample Drawings. Drawing Requirements. Applications.

PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY ELECTRICAL PLUMBING HEATING DEMOLITION SIGN MOBILE HOME

Homeowner s Guide to Residential Building Permits

NEW HOME CONSTRUCTION

Home Energy Evaluation Report for Fritz Kreiss and Catherine McQueen

PLAN SUBMITTAL INFORMATION

Basement Development Construction requirements for the development of basements in residential dwellings.

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

Residential Plan Routing Information

Time/Date Stamp when received:

PARK COUNTY BUILDING PERMIT GUIDE PO Box 517 Fairplay, CO Fax: Inspections:

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW

17 East Main Street Cuba,NewYork Code Enforcement

BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION CURRENT OWNER

NATIONAL FLOOD INSURANCE PROGRAM (NFIP) SUBSTANTIAL DAMAGE/ SUBSTANTIAL IMPROVEMENT (50% RULE)

Fill out all sections or mark with N/A (not applicable)

SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES

Chapter 2: Foundations

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

CHARLOTTE COUNTY Community Development Department

WINDOW AND DOOR REPLACEMENT REQUIREMENTS

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

THE CORPORATION OF THE TOWNSHIP OF SEVERN BY-LAW NO

A Homeowners Guide To Code Enforcement

Estimated Cost of Repair

Development Services City of Lawrence, KS

C I T Y O F P E A R S A L L

Building Permits: When are they required?

Schedule B to By-law

TOWN OF SPENCER Office of Development & Inspectional Services

Building Condition Assessment Report

( Staple Upper Right Corner ) MINNEAPOLIS TRUTH-IN-SALE OF HOUSING DISCLOSURE REPORT

BUILDING PERMIT RESIDENTIAL BASEMENT FINISH

Requirement checklist to obtain a building permit for a: NEW SINGLE FAMILY DWELLING RESIDENTIAL ADDITION

Development Services Guidelines

CONSTRUCTION PERMIT APPLICATION AND INSTRUCTIONS (Permit Application follows instructions)

City of St. Charles Basement Finish or Remodel

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas Phone: (830) Fax: (830)

New Homes EPS Modeling Frequently Asked Questions. Developed by Energy Trust of Oregon

PREPARED DATE: SIGNATURE AND SEAL INSPECTION REPORT PREPARED BY: PRINT NAME: REGISTRATION NUMBER: MAILING ADDRESS:

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE APPLICATION REVIEW

Guide to Preparing a Quality Management Plan for Registered Code Agencies (under the Building Code Act, 1992 and Building Code )

BUILDING MOVE PROCESS INSIDE CITY LIMITS

CITY OF WEST PALM BEACH HISTORIC PRESERVATION AD VALOREM TAX EXEMPTION APPLICATION

HOMEOWNER S PERMIT GUIDE

Substantial Improvement/Damage (FEMA 50% Rule) Frequently Asked Questions and Information

Energy Upgrade California TM Incentive Reservation Form

Transcription:

Township Of Blandford-Blenheim Permit Guide When do I require a building permit? Building Permits are required before any construction can begin. The following is a typical list of project that DO REQUIRE a building permit: Building any detached structure larger than 10m 2 (107.6ft 2 ) Building any addition to a structure Uncovered decks higher than 24 from grade Covered decks (any height) Carports or garages Structural alterations Bunker silo Manure storage facility Storage bins and supporting structure Interior alterations involving removal or addition of walls or floors Moving or lifting a structure from its foundation Altering or adding any plumbing Demolishing a structure (except for farm buildings) Free standing or attached signs Installing a woodstove or fireplace The following projects typically DO NOT REQUIRE a building permit: Detached structures 10m 2 (107.6ft 2 ) or less in area Uncovered decks 24 or less from grade Replacement of windows, doors, roofing or siding Repairs to chimneys, porches, decks or roofs Waterproofing repairs to basements Replacement of plumbing fixtures Replacement of furnace Painting and decorating Landscaping NOTE: IF IN DOUBT PLEASE CONTACT TOWNSHIP OFFICE How do I get a building permit? In order to get a building permit, you must complete the provided application along with any other forms that have been provided to you. You need to also provide the Township, in duplicate, a complete set of construction drawings including a site plan. Other approvals may be required from agencies such as Grand River Conservation Authority, Upper Thames River Conservation Authority, Oxford County Board of Health, etc. Page 1 of 3

Explanation of required drawings Site plan A site plan is a drawing showing the complete property and identifying all structures in relation to the property boundaries and each other. A property survey is a common template for developing a site plan. The site plan should include: Title and scale North Arrow Street locations and names Lot lines and dimensions to all buildings Existing and proposed buildings including their areas Proposed changes to existing grade if any Rights-of-ways and easements Access and parking Hydro Service to property, if applicable Floor plans A floor plan is a drawing of the building showing each floor including basement and crawlspaces from above. Floor plans should include: Title and scale Use of rooms and spaces (labels) Dimensions The extent of new proposed construction, including construction in existing structures Sizes of all door and window openings Cross-section locations and directions Material specifications and notes Locations of all smoke and carbon monoxide detectors All required fire separations All floor joist, roof rafter, lintels and beams sizes, dimensions and direction of span Elevations Elevations show the exterior of the building from all sides. Each elevation is to be labeled by the direction it is facing, and shall include: Title and scale Extent of new and proposed construction Exterior wall finishes, cladding and flashing Dimensioned finished floor levels Grade level Overall height of structure and roof slopes Page 2 of 3

Cross-section A cross-section represents a view of a building along an imaginary line cut through the building in correspondence with the section line drawn on the floor plan. A cross-section illustrates all elements within the walls being cut through and should include: Title and scale Details of footings, foundation walls, exterior wall construction including air barrier, floor and roof framing details Size and type of materials and finishes Dimensioned finished floor levels Grade level Attic and crawlspace ventilation Additional drawings and notes Additional information may be required upon submission for a building permit. For new structures or additions, HVAC drawings and calculations will be necessary for buildings required to be heated. Buildings with engineered floor joist or roof trusses will need to submit engineered designs with an engineer seal on them. MDS 1 and/or 2 may be required, dimensions to be confirmed by OLS, if required by Chief Building Official. For drawing formats the Township accepts architectural and structural drawings to be drawn in either imperial or metric measurement. All drawings must conform to the Ontario Building Code, the Township of Blandford-Blenheim by-laws and any other applicable law. Inspection Requests The building permit applicant or property owner must call the Township of Blandford-Blenheim for inspections at the different stages of construction. Required inspections will be marked on your permit form and they typically include: Footings Foundation Framing Insulation and vapour barrier Air barrier HVAC Plumbing Final/occupancy To book a building inspection you must notify the Township a minimum of 24 hours in advance. Township of Blandford-Blenheim contact: 519-463-5347 Page 3 of 3

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act. For use by Principal Authority Application number: Permit number (if different): Date received: Roll number: 3245- Application submitted to: The Township of Blanford-Blenheim (Name of municipality, upper-tier municipality, board of health or conservation authority) A. Project information Building number, street name Unit number Lot/con. Municipality Postal code Plan number/other description Project value est. $ Area of work (m 2 ) B. Purpose of application New construction Proposed use of building Addition to an existing building Alteration/repair Demolition Conditional Permit Current use of building Description of proposed work C. Applicant Applicant is: Owner or Authorized agent of owner Last name First name Corporation or partnership Street address Unit number Lot/con. Municipality Postal code Province E-mail Telephone number Fax Cell number D. Owner (if different from applicant) Last name First name Corporation or partnership Street address Unit number Lot/con. Municipality Postal code Province E-mail Telephone number Fax Cell number Application for a Permit to Construct or Demolish Effective January 1, 2011 (SEE OVER)

E. Builder (optional) Last name First name Corporation or partnership (if applicable) Street address Unit number Lot/con. Municipality Postal code Province E-mail Telephone number Fax Cell number F. Tarion Warranty Corporation (Ontario New Home Warranty Program) i. Is proposed construction for a new home as defined in the Ontario New Home Warranties Plan Act? If no, go to section G. Yes No ii. Is registration required under the Ontario New Home Warranties Plan Act? Yes No iii. If yes to (ii) provide registration number(s): G. Required Schedules i) Attach Schedule 1 for each individual who reviews and takes responsibility for design activities. ii) Attach Schedule 2 where application is to construct on-site, install or repair a sewage system. H. Completeness and compliance with applicable law i) This application meets all the requirements of clauses 1.3.1.3 (5) (a) to (d) of Division C of the Building Code (the application is made in the correct form and by the owner or authorized agent, all applicable fields have been completed on the application and required schedules, and all required schedules are submitted). Payment has been made of all fees that are required, under the applicable by-law, resolution or regulation made under clause 7(1)(c) of the Building Code Act, I992, to be paid when the application Yes Yes No No is made. ii) This application is accompanied by the plans and specifications prescribed by the applicable by-law, resolution or regulation made under clause 7(1)(b) of the Building Code Act, 1992. Yes No iii) This application is accompanied by the information and documents prescribed by the applicable bylaw, resolution or regulation made under clause 7(1)(b) of the Building Code Act, 1992 which enable Yes No the chief building official to determine whether the proposed building, construction or demolition will contravene any applicable law. iv) The proposed building, construction or demolition will not contravene any applicable law. Yes No I. Declaration of applicant I declare that: (print name) 1. The information contained in this application, attached schedules, attached plans and specifications, and other attached documentation is true to the best of my knowledge. 2. If the owner is a corporation or partnership, I have the authority to bind the corporation or partnership. Date Signature of applicant Personal information contained in this form and schedules is collected under the authority of subsection 8(1.1) of the Building Code Act, 1992, and will be used in the administration and enforcement of the Building Code Act, 1992. Questions about the collection of personal information may be addressed to: a) the Chief Building Official of the municipality or upper-tier municipality to which this application is being made, or, b) the inspector having the powers and duties of a chief building official in relation to sewage systems or plumbing for an upper-tier municipality, board of health or conservation authority to whom this application is made, or, c) Director, Building and Development Branch, Ministry of Municipal Affairs and Housing 777 Bay St., 2nd Floor. Toronto, M5G 2E5 (416) 585-6666. Application for a Permit to Construct or Demolish Effective January 1, 2011

Energy Efficiency Design Summary (Part 9 Residential) This form is used to summarize the energy efficiency design of the project. Information on completing this form is on the reverse Application No: For use by Principal Authority Model/Certification Number A. Project Information Building number, street name Unit number Lot/Con Municipality the Township of Blanford-Blenheim B. Compliance Option Postal code Reg. Plan number / other description SB-12 Prescriptive [SB-12-2.1.1.] Table: Package: A B C D E F G H I J K L M (circle one) SB-12 Performance* [SB-12-2.1.2.] Energy Star * [SB-12-2.1.3.] * Attach energy performance calculations using an approved software * Attach Builder Option Package form EnerGuide 80 * * House must be evaluated by NRCan advisor and meet a rating of 80 C. Project Design Conditions Climatic Zone (SB-1): Heating Equipment Efficiency Space Heating Fuel Source Zone 1 (< 5000 degree days) 90% AFUE Gas Propane Solid Fuel Zone 2 ( 5000 degree days) 78% < 90% AFUE Oil Electric Earth Energy Windows+Skylights &Glass Doors Other Building Conditions Gross Wall Area = m 2 % Windows+ ICF Basement Walkout Basement Log/Post&Beam Gross Window+ Area = m 2 ICF Above Grade Slab-on-ground D. Building Specifications [provide values and ratings of the energy efficiency components proposed, or attach Energy Star BOP form] Building Component RSI / R values Building Component Efficiency Ratings Thermal Insulation Windows & Doors 1 Ceiling with Attic Space Windows/Sliding Glass Doors Ceiling without Attic Space Exposed Floor Skylights Mechanicals Walls Above Grade Space Heating Equip. 2 Basement Walls HRV Efficiency (SRE% at 0 o C) Slab (all >600mm below grade) Slab (edge only 600mm below grade) Slab (all 600mm below grade, or heated) DHW Heater (EF) NOTES 1. Provide U-Value in W/m 2.K, or ER rating 2. Provide AFUE or indicate if condensing type combined system used E. Performance Design Verification [complete applicable sections if SB-12 Performance, Energy Star or EnerGuide80 options used] SB-12 Performance: The annual energy consumption using Subsection 2.1.1. SB-12 Package is Gj (1 Gj =1000Mj) The annual energy consumption of this house as designed is Gj The software used to simulate the annual energy use of the building is: The building is being designed using an air leakage of air changes per hour @50Pa. Energy Star: Submit the BOP form with Energy Advisor s certification on completion. Energy Star and EnerGuide80: Evaluator/Advisor/Rater Name: Evaluator/Advisor/Rater Licence #: F. Designers [names of designers who are responsible for the building code design and whose plans accompany the permit application] Architectural Mechanical Form authorized by OHBA, OBOA, LMCBO. April 23, 2012

Guide to the Energy Efficiency Design Summary Form The Energy Efficiency Design Summary form summarizes the compliance path used by a house designer to comply with energy efficiency requirements of the Ontario Building Code. This form must accompany the building permit application. The information on this form MUST reflect the drawings and specifications being submitted, or the building permit may be refused. Refer to Supplementary Standard SB-12 for details about building code compliance requirements. Further information about energy efficiency requirements for new buildings is available from the provincial building code website at www.mah.gov.on.ca, or the municipal building department. Beginning January 1, 2012, a house designer must use one of four energy efficiency compliance options in the building code: 1. Comply with the SB-12 Prescriptive design tables, 2. Use the SB-12 Performance compliance method, and model the design against the prescriptive standards, 3. Design to Energy Star standards, or 4. Evaluate the design according to EnerGuide technical procedures and achieve a rating of 80 or more. COMPLETING THE FORM B. Compliance Options Indicate the compliance option being used. SB-12 Prescriptive requires that the building conforms to a package of thermal insulation, window and mechanical system efficiency requirements set out in Subsection 2.1.1. of SB-12. Energy efficiency design modeling and testing of the building is not required under this option. SB-12 Performance refers to the alternative method of compliance set out in Subsection 2.1.2. of SB-12. Using this approach the designer must use recognized energy simulation software (such as HOT2000 V9.34c1.2 or newer), and submit documents which show that the annual energy use of the building is equal to a prescriptive package. Energy Star houses must be designed to Energy Star requirements and be labelled on completion by Enerquality or other agency. The Energy Star BOP form must be submitted with the permit documents. EnerGuide80 houses are validated by NRCan authorized energy advisors and must achieve a rating of 80 or more when evaluated in accordance with EnerGuide administrative and technical procedures. C. Project Design Conditions Climatic Zone: The number of degree days for Ontario cities is contained in Supplementary Standard SB-1 Windows, Skylights and Glass Doors: If the ratio of the total gross area of windows, sidelights, skylights and glass doors to the total gross area of walls is more than 17%, higher efficiency glazing is required. If the ratio is more than 22% the SB-12 Prescriptive option may not be used. The total area is the sum of all the structural rough openings. Some exceptions apply. Refer to 2.1.1.1. of SB-12 for further details. Fuel Source and Heating Equipment Efficiency: The fuel source and efficiency of the proposed heating equipment must be specified in order to determine which SB-12 Prescriptive compliance package table applies. Other Building Conditions: These construction conditions affect SB-12 Prescriptive compliance requirements. D. Building Specifications Thermal Insulation: Indicate the RSI or R-value being proposed where they apply to the house design. Under the SB-12 Prescriptive option, RSI 3.52 wall insulation is permitted in certain conditions where other design elements meet higher standards. Refer to SB-12 for further details. E. Performance Design Summary This section is not required to be completed if the SB-12 Prescriptive option is being used. BUILDING CODE REQUIREMENTS FOR AIRTIGHTNESS IN NEW HOUSES All houses must comply with increased air barrier requirements in the building code. Notice of air barrier completion must be provided and an inspection conducted prior to it being covered. The building code requires that a blower door test be conducted to verify the air tightness of the house during construction if the SB-12 Performance option is used and an air tightness of less than 2.5 ACH @ 50 Pa in the case of detached houses, or 3.0 ACH @ 50 Pa in the case of attached houses is necessary to meet the required energy efficiency standard. A blower door test must also be conducted if the EnerGuide 80 option is used. ENERGY EFFICIENCY LABELING FOR NEW HOUSES Energy Star and EnerGuide issue labels for new homes constructed under their energy efficiency programs. The building code does not regulate new home labelling.

Schedule 1: Designer Information Use one form for each individual who reviews and takes responsibility for design activities with respect to the project. A. Project Information Building number, street name Unit no. Lot/con. Municipality Postal code Plan number/ other description B. Individual who reviews and takes responsibility for design activities Name Firm Street address Unit no. Lot/con. Municipality Postal code Province E-mail Telephone number Fax number Cell number C. Design activities undertaken by individual identified in Section B. [Building Code Table 3.5.2.1. of Division C] House HVAC House Building Structural Small Buildings Building Services Plumbing House Large Buildings Detection, Lighting and Power Plumbing All Buildings Complex Buildings Fire Protection On-site Sewage Systems Description of designer s work D. Declaration of Designer I declare that (choose one as appropriate): (print name) I review and take responsibility for the design work on behalf of a firm registered under subsection 3.2.4.of Division C, of the Building Code. I am qualified, and the firm is registered, in the appropriate classes/categories. Individual BCIN: Firm BCIN: I review and take responsibility for the design and am qualified in the appropriate category as an other designer under subsection 3.2.5.of Division C, of the Building Code. Individual BCIN: Basis for exemption from registration: The design work is exempt from the registration and qualification requirements of the Building Code. Basis for exemption from registration and qualification:_ I certify that: 1. The information contained in this schedule is true to the best of my knowledge. 2. I have submitted this application with the knowledge and consent of the firm. NOTE: Date Signature of Designer 1. For the purposes of this form, individual means the person referred to in Clause 3.2.4.7(1) (c).of Division C, Article 3.2.5.1. of Division C, and all other persons who are exempt from qualification under Subsections 3.2.4. and 3.2.5. of Division C. 2. Schedule 1 is not required to be completed by a holder of a license, temporary license, or a certificate of practice, issued by the Ontario Association of Architects. Schedule 1 is also not required to be completed by a holder of a license to practice, a limited license to practice, or a certificate of authorization, issued by the Association of Professional Engineers of Ontario. Application for a Permit to Construct or Demolish Effective January 1, 2014

LOCATI BUIL DER DESI GNER HEA TING HO HEATING USE SYSTEM 1. Location 2. Builder Name: Address: Township: Civic Address: RESIDENTIAL MECHANICAL VENTILATION DESIGN SUMMARY for design and performance of residential ventilation systems to OBC 2012 Div. B 9.32 City: Postal Code: Ph: Fax: 3. Designer Name: Address: Postal Code: Ph: Firm BCIN: Designer BCIN: HRAI#: 4. Heating Systems Forced Air Electric City: Fax: Non Forced Air Gas Oil Other 8. TVC System HRV Central Exhaust Multiple Fans Master Bedroom Other Bedrooms Fan 1 Location 9. Principal Exhaust Fan Capacity (PEF) @ 31.8CFM(15L/S) @ 15.9CFM(7.5L/S) Total 10. Principal Exhaust Fan Manufacturer Model HVI rated Design Airflow High If Using HRV/ERV: Total Ventilation Capacity Less Principle Ventilation Capacity Low Sones % Sensible Efficiency @ 0 C watts % Sensible Efficiency @ 25 C watts 5. Combustion Appliances 9.32.3.1.(1) Required Supplemental Ventilation Capacity a) Direct Vent b) Induced Draft c) Natural Draft d) Solid Fuel Appliances e) No combustion appliances 6. Type of House 9.32.3.1.(2) Type 1 a) or b) type appliances only Type 2 a) or b) type appliances with a d) type appliance Type 3 any type c) appliance = part 6 design Type 4 electric space heat Fan 2 Location Manufacturer/Model Design airflow Fan 3 Location Manufacturer/Model Design airflow CFM 11. Supplemental Exhaust Fan Capacity (SEF) 12. Additional Equipment Sones Sones TVC TVC TVC SYSTEM PRINCIPAL EXH. FAN CAPACITY PRINCIPAL EXHAUST FAN SUPPLIMENTAL EXHAUST CAPACITY ADDITIONA L EXHAUST SYSTEM DESIG TOTAL VENTILATI ON 7. System Design Option Exhaust only forced air system/coupled HRV with extended exhaust or simplified coupled HRV full ducting/not coupled to forced air Part 6 design 8. TVC Capacity OBC 9.32.3.3 Bsmt & Master bedroom Other Bedrooms Bathrooms & Kitchen Other Habitable Rooms @ 21.2 CFM (10 L/S) @ 10.6 CFM (5 L/S) @ 10.6 CFM (5 L/S) @ 10.6 CFM (5 L/S) Total Ventilation Capacity (TVC) Fan 4 Location Manufacturer/Model Design airflow Sones TVC 13 Designer Consent I, have reviewed and take responsibility for the design work described In this document and I am qualified in the appropriate categories. Date: / / Signature: DESIGNER CONSENT Conversion Note: 1 L/S = 2.118 CFM Ontario Residential Ventilation Design Summary R 06/11

Acknowledgement by Applicant of Incomplete Application Pursuant to Division C, Part 1.3.1.3 (5) of the Building Code For use by Principal Authority Application number: Date received: Building number, street name: Unit number: Lot / Con: A prescreening of the application described above reveals it is incomplete in that all applicable laws have not been met, and/or insufficient documents and drawings have been provided, at the time of application. The incomplete items include but are not necessarily limited to the items described below. INCOMPLETE ITEMS AT THE TIME OF APPLICATION Applicable law approvals have not all been obtained, as described below All of the required documents which must be filed with this application have not been provided, including the items described below or in the attached document submission checklist According to the building code and the Township s building by-law (1729-2012), since this application is incomplete it may be either: a) refused since it is not complete, or b) accepted and processing commenced, provided the applicant acknowledges in writing that the application is incomplete and waives the time period prescribed in the building code within which the permit must be issued or refused. APPLICANT S WAIVER The undersigned acknowledges that: a) the application described above does not meet the requirements of Division C, Part 1.3.1.3(5) of the b) Building Code and hereby waives any rights to the permit being issued or refused within the time periods prescribed in the building code; and c) the items described above must be completed before this application can be fully processed or a permit issued. I have authority to act on behalf of the corporation or partnership with respect to this application(if applicable) Date: Signature of Applicant: Form effective July 1, 2013 Township of Blandford-Blenheim Acknowledgment of Incomplete Application

Township of Blandford-Blenheim AUTHORIZATION FORM Building Department Please complete if the person applying for the building permit is not the property owner, or if there are multiple owners of a property and one owner is applying for a permit. If your contractor or agent is filling out your permit application, this form must be completed. Municipal Address: Legal Description: Permit Application No.: This document shall serve to notify the Township of Blandford-Blenheim that I am/we are the legal owner(s) of the property described above and do authorize the person indicated below ( Authorized Agent ) to act on my/our behalf on all matters pertaining to the Building Permit Application and authorize the Authorized Agent to sign all related documents on my/our behalf. Name of Property Owner(s): Mailing Address: Email: Telephone: Signature of Property Owner(s): Signature of Property Owner(s): Name of Authorized Agent: Company Name: Mailing Address: Email: Telephone: Signature of Authorized Agent: All registered owners of the property shall sign this Authorization Form. Use additional sheets if necessary. A new Authorization Form must be submitted to the Township if ownership of the property changes prior to issuance of the building permit or before final approval is granted. Personal information contained in this form is collected under the authority of Subsection 8(1.1) of the Building Code Act, 1992, and will be used in the administration and enforcement of the Act, and the OBC. Questions about the collection of personal information may be addressed to the Chief Building Official of the Township of Blandford-Blenheim. Form effective July 1, 2013. Township of Blandford-Blenheim Authorization Form

BUILDING PERMIT FEE SCHEDULE PERMIT TYPE PERMIT FEE OTHER APPLICABLE FEES, CHARGES AND BY-LAWS THAT MAY APPLY Sewer Connection $50.00 Water Connection $50.00 Plumbing Inspection Only (Basic) $50.00 Plumbing Inspection Only per fixture $10.00 Septic Permit Sign Installation $150.00 Site Plan Agreement Change of Use $100.00 Development Charges, Site Plan Agreement, Septic Permit Temporary Structure $100.00 Site Plan Agreement All Designated Structures $350.00 Site Plan Agreement Tents Exempt Demolition Permit - buildings on farm land exempt $50.00 Site Plan Agreement New Residential Unit basic) $125.00 New Residential Unit (square foot charge) $1.25 Development Charges, Septic Permit Residential Addition (basic) $125.00 Residential Addition (square foot charge) $1.25 Septic Permit Residential Renovation $150.00 Septic Permit Accessory Structure to Residential including: Garage, Carport, Shed, Deck, porch (basic) $125.00 Accessory Structure to Residential including: Garage, Carport, Shed, Deck, porch (sq.ft. charge) $0.20 Uncovered Deck less than 2'-0" Above Grade Exempt Swimming Pool $150.00 Swimming Pool By-Law Wood Burning stove, appliance fireplace & insert $150.00 New Livestock barn (basic) $125.00 New Livestock barn (square foot charge) $0.20 Agricultural Addition (basic) $125.00 Agricultural Addition (square foot charge) $0.20 Farm Implement/Storage Shed (basic) $125.00 Farm Implement/Storage Shed (sq.ft. charge) $0.20 Liquid/Solid Manure Storage Structure (basic) $125.00 Liquid/Solid Manure Storage Structure (sq.ft. charge) $0.10

PERMIT TYPE PERMIT FEE OTHER APPLICABLE FEES, CHARGE AND BY-LAWS THAT MAY APPLY Agricultural renovation $150.00 Horizontal Bunk Silo (basic) $125.00 Horizontal Bunk Silo (square foot charge) $0.10 Vertical Silos/ Grain Bins, Etc. $150.00 New Commercial/Industrial/Institutional (basic) $125.00 New Commercial/Industrial/Institutional (sq.ft. charge) $1.25 Site Plan Agreement, Development Charges, Septic Permit Addition to Commercial/Industrial/Institutional (basic) $125.00 Addition to Commercial/Industrial/Institutional (sq.ft.) $1.25 Site Plan Agreement, Development Charges, Septic Permit Renovation to Commercial/Industrial/Institutional $350.00 Site Plan Agreement, Septic Permit Greenhouse (basic) $125.00 Greenhouse (square foot charge) Review of drawings after permit issuance due to $0.10 changes made on site $250.00 DEPOSITS Engineer Letter $500.00 Lot Grading $1,500.00 Hard Surfacing $1,000.00 NOTES: 1. Township Zoning By-Law applies to all permit types 2. This schedule is to be read in conjunction with all applicable by-laws as listed on the Township's website: www.blandfordblenheim.ca 3. "Other Applicable fees, charges, and by-laws" column is only a guide, and some permits may require addional fees and/or be regulated by additional laws 4. All fees and charges are calculated and due on completion of permit application review