Certificate of Origin Renewable Energy



Similar documents
Emerging market for Green Certificates

Country profiles: Austria

ELECTRICITY SUPPLY/ TRADE LICENSE KORLEA INVEST A.S

Requirements set for account holders and representatives of emissions trading accounts

BERMUDA TRUSTS (REGULATION OF TRUST BUSINESS) EXEMPTION ORDER 2002 BR 38 / 2002

"GSA ENERGJI" L.L.C.

System Basics for the certification of sustainable biomass and bioenergy

RECS Renewable Energy Certificate System Standard Terms & Conditions

ACT. of 15 March 2002

COMMISSION REGULATION (EU) No /.. of XXX

Guidelines for the use of electronic signature

Option Table - Directive on Statutory Audits of Annual and Consolidated Accounts

Domain Protocol for the South African Voluntary Tradable Renewable Energy Certificates Market

Copyright, Language, and Version Notice The official language of this [Certification Protocol] is English. The current version of the [Certification

INTERNATIONAL COLLECTIVE INVESTMENT SCHEMES LAW

Polish support schemes for renewable and cogeneration sources

Renewable energy sources penetration in most of BSEC countries

Real Estate Investment Funds Regulations

Country Profile: Wallonia (Belgium)

Schedule NEM Sheet 1 NET ENERGY METERING

PROCEDURE FOR ISSUANCE OF RENEWABLE ENERGY CERTIFICATE TO THE ELIGIBLE ENTITY BY CENTRAL AGENCY

Certification of the generation of electricity from renewable sources (abbreviated as: Generation EE)

DIVISION OF CORPORATIONS, BUSINESS AND PROFESSIONAL LICENSING

Oregon Department of Energy issues the following Renewable Energy Development Grants Opportunity Announcement

Electronic Documents Law

RULE ON LICENSING OF ENERGY ACTIVITIES IN KOSOVO

DELHI ELECTRICITY REGULATORY COMMISSION

Insurance Companies INSURANCE COMPANIES (REINSURANCE DIRECTIVE) REGULATIONS 2007

ONLINE SAVINGS ACCOUNT.

Regulatory Procedure

of 28 September 2007 (Status as of 1 April 2010)

THE UK GREENHOUSE GAS EMISSIONS TRADING SCHEME 2002

CERTIFIED PUBLIC ACCOUNTANT LICENSING ACT

Certification Regulations and Requirements. International Certification Management GmbH

Funds in the Cayman Islands Investment Fund Regulation

Guidelines for Monthly Statistics Data Collection

July Handbook of Prudential Requirements for Investment Intermediaries. Page 0 of 12 Page 0 of 12

GUIDELINES FOR THE ADMINISTRATION OF INSURANCE AGENTS

STATUTORY INSTRUMENTS 2012 No. _

Guidelines for Companies (Special Licence)

MICHIGAN RENEWABLE ENERGY CERTIFICATION SYSTEM OPERATING PROCEDURES

DRAFT MODEL REGULATIONS for STATE ELECTRICITY REGULATORY COMMISSION UNDER SETION 86 (1) (e) OF THE ACT. No. Dated: October, 2009 NOTIFICATION (DRAFT)

Standard conditions of electricity supply licence

National Solidarity Bond - Terms and Conditions Issue 4

Companies Regulations (COR)

LAW. ON ELECTRONIC SIGNATURE (Official Gazette of the Republic of Montenegro 55/03 and 31/05)

Ericsson Group Certificate Value Statement

THE EAST AFRICAN COMMUNITY COMMON MARKET (RIGHT OF ESTABLISHMENT) REGULATIONS

General Rules for the certification of Management Systems

The Electricity and Gas (Internal Markets) Regulations 2011

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

Federal law on certification services in the area of the electronic signature

Standard conditions of the Electricity Distribution Licence

THE TRANSFER OF PERSONAL DATA ABROAD

ELECTRONIC COMMERCE AND ELECTRONIC SIGNATURE ACT (ZEPEP-UPB1) (Official consolidated text)

5. ACCOUNT OPTIONS WHICH THE HOLDER MAY CHOOSE:

RAJASTHAN ELECTRICITY REGULATORY COMMISSION JAIPUR

QUALITY SYSTEM REQUIREMENTS FOR PHARMACEUTICAL INSPECTORATES

REQUEST FOR PROPOSALS

DISCOUNT MEDICAL PLAN ORGANIZATION MODEL ACT

Financial Services (Investment and Fiduciary Services)

Rules for SSA and SSAud members holding a SPAA Public Practice Certificate (SPAA PPC)

Banking and Payments Authority of Kosovo. Rule 5 C on the Licensing of Reinsurance Intermediaries (Insurance Intermediaries)

The Law of the Republic of Azerbaijan on Non-Bank Credit Institutions

TOWN OF JAY PROPERTY ASSESSED CLEAN ENERGY (PACE) ORDINANCE

Draft Scope 2 Accounting Guidance: What it could mean for corporate decisions to purchase environmental instruments

CREDIT REPORTING BILL EXPLANATORY NOTES

Application for accreditation of a power station

Standard terms and conditions

Rules for the certification of event sustainability management system

The Electrical Safety Regulation (pre and post 1 January 2014)

Regulation of Investment Advising, Investment Marketing and Investment Portfolio Management Law, Chapter A: Interpretation

Environmental Operational Reporting and Offset Management Standard

ACT ON PAYMENT SERVICES

CONSULTATION PAPER NO

ELECTRICITY IMPORT AND EXPORT LICENSE GRANTED TO: EVN TRADING L.L.C. Registration Number: ZRRE/Li_42/15. Prishtina, June 2015

Electronic Commerce ELECTRONIC COMMERCE ACT Act. No Commencement LN. 2001/ Assent

PRAKAS On Clearing System of Settlement Payment 3

Renewable Energy Certificate Mechanism for India. ABPS Infrastructure Advisory. Background

FAMI-QS Certification Rules for Operators. Rules for Operators

COLLECTIVE INVESTMENT LAW DIFC LAW No. 2 of 2010

REPORT On the work of the Croatian Energy Regulatory Agency For the year 2005

1. Terms and Conditions

Official Journal of RS, No. 86/2006 of REGULATION

GENERAL SUBSCRIPTION CONDITIONS

Renewable Energy Certificate systems in Europe (the path to international trade)

Transcription:

Energy Regulatory Office Certificate of Origin Renewable Energy Partnership Activity: Energy Regulatory Office & Illinois Commerce Commission National Association of Regulatory Utility Commissioners Legal and Licencing Department hysnije.rexhaj@ero ks.org November 2009 Prishtina, Republic of Kosovo 1

Renewable Energy Sources (RES) & Certificate of Origin (CoO) Defined by Law on Energy: Renewable Energy Resources means renewable non fossil energy sources (wind, solar, geothermal, hydropower, biomass, landfill gas, sewage treatment plant gas and biogases). Definition is in accordance with Directives 2003/54/EC and 2001/77/EC Defined by Law on Electricity: Certificate of Origin means a document issued by the Energy Regulatory Office evidencing the usage of renewable energy resources or waste for the generation of electricity or the co generation of heat and electricity; CoO are referred to as Guarantees of Origin in EU legislation. Defined by EU Directive: Guarantee of Origin shall specify the energy source from which the electricity was produced, specifying the dates and places of production,and in the case of hydroelectric installations, indicate the capacity; 2

Acquis Communautaire on Renewables Dir 2009/28 Directive 2009/28 (article 15) Member States shall ensure that the origin of electricity produced from renewable energy sources can be guaranteed in accordance with objective, transparent and non discriminatory criteria. GoO (Guarantee of Origin) is an Electronic Document whose sole function is to provide proof to a final consumer that a given quantity of electricity has been produced by Renewable Energy Standard size 1 MWh No support when receiving a CoO Measures for no double counting No function whatsoever with reference to National targets or Statistical Transfers Usage within 12 months from the time of production Issuance, Transfer, Cancellation Independent IB owns the mechanisms for Registration Data on the CoO Investment Support 3

Certificate of Origin (CoO) CoO shall be issued by ERO, pursuant to Article 10.1 of the Law on Electricity no. 2004/10. Certificates of Origin are issued in respect of electricity produced from RES in the territory of Kosovo, but also with respect to electricity produced: from waste; in combination with heat in a single generating unit CoOs may assume additional value if they can be used in voluntary or institutional schemes outside Kosovo 4

Production A System for CoOs The rules governing the CoO system should define the institutions involved and the processes for each of the CoO s moments. It is essential that these rules also ensure that CoOs are created/issued, transferred and redeemed/cancelled in an accurate, reliable and fraudresistant manner. Consumption The functioning of a CoO Scheme may be described with respect to the following five moments: 1. Participation and Registration; 2. Request; 3. Issuance; 4. Transfer; 5. Redemption. Issuing Certificate market Transfer Certificate system Redeemed 5

Register of Certificate of Origin (1/1) ERO shall establish and maintain the Register of CoO, (Article 18.1 of the Law on the Energy Regulator no. 2004/9). The Register shall be in electronic form and shall include two types of accounts: Tranferables Accounts; Redemption Accounts. Each CoO shall be entered into the Register. CoO recorded in a Redemption Account cannot be transferred or redeemed. The Register shall be made public (in ERO s website etc.). The Register shall be conclusive as regards to whether a CoO has been issued and exists, and as to the person who is at the time its registered holder. ERO shall publish an explanation of how any code used in the Register to state information is to be interpreted. 6

Register of Certificate of Origin (1/2) Each certificate is uniquely identifiable, containing standard information such as (indicative): Unique certificate number Name of issuing body Generation plant identity Time of issue Type of technology Installed capacity Indication of whether public support has been received. The life cycle of a certificate is as follows: Issue: A certificate is issued for, and uniquely relates to, a specific instance of the production of a standard quantity one megawatt hour of renewable electricity. Transfer: Each certificate is registered as belonging to a single party at each point during its life, this being adjusted accordingly following each transfer of its ownership. Redemption: Certificates are redeemed as soon as they are "used". 7

Issuing of CoO Certificates are created, transferred and eventually redeemed under a carefully developed and managed control structure. Issuing: One CoO shall be issued in respect of each Megawatt hour(1000 kwh) of electricity. [1] month after receiving an Application for issuing of CoO. [1] month extended. ERO has the right to request the metering records of the System Operator and other data. This certificate takes the form of an electronic record. This record states what is being certified, e.g. the issuing body, location of the production device, and technology used for the production of the renewable energy. A Certificate of Origin shall be regarded as being issued only when its registered in Register. When issuing CoO ERO assigns a unique "certificate sequence number" to each CoO issued. ERO will produce an Aplication for Certificate of Origin. 8

Transfer of CoO Ownership transfer/trade: Once a certificate has been issued, it can be transferred or traded. The certificate owner who wishes to transfer ownership must inform the Issuing Body. IB records the ownership transfer in the Central Registration Database, and confirms to the parties that the transfer has taken place. If the registered holder of a CoO requests ERO to transfer CoO to any other person, ERO shall do so by amending the Transferables Accounts (TA) in the Register. ERO do it accordingly within [7] days of receiving the request. In particular, the registered particulars of the CoO to be transferred are removed from the TA of the person making the transfer and entered into the TA of the person receiving the transfer. ERO confirms the transfer to the person submitting the request. 9

Redeem and Revoke of CoO Redemption A certificate owner can redeem it, for example to advertise its environmental performances, or to fulfil a country or region specific purpose (e.g. renewable obligation, tax exemption, etc). The registered holder of a CoO can redeem it, by submitting a written request to ERO. ERO transfers the CoO to the Redemption Account, within [7] days of receiving the request. ERO issues to the person submitting the request a declaration that the CoO has been redeemed. ERO shall revoke a Certificate of Origin where: it is satisfied that the information provided pursuant to Article 6, paragraphs 2 and 7, and Article 7, on the basis of which that CoO was issued, is incorrect in a material particular or that the CoO was issued on the basis of any fraudulent behaviour, statement or undertaking; or it is otherwise satisfied that the CoO should not have been issued, is inaccurate or was issued to the wrong person. Where ERO revokes a CoO, it shall as soon as practicable give notice of such revocation in writing to the registered holder of the CoO. 10

Appoint Agents Production Auditors (MEM& KOSTT): Verify & audit compliance with EECS Receive information about issued certificates from the IB Tell the IB if issued certificates exceed generation capacity Central Monitoring Office (CMO) (ERO): Maintains a registry of production devices & issued certificates Records ownership of certificates Records status of certificates (transferable, redeemed, imported or exported) 11

Recognition of GoO issued in Member States CoO issued in Kosova should be recognised as such by all authorities in Kosova. GoO issued in Member States of EU (equivalent to CoO) should be recognised by ERO, pursuant to article 15 of Directive 2009/28 EC. Application for the recognition of GoO should be submitted in writing by the holder of the Guarantees or Certificates to ERO, specifying, with respect of the GoO for which recognition is applied for: the number of Guarantees of Origin [or equivalent Certificates]; the Member State [ECSEE Contracting Party] or designated competent body which has issued the Guarantees of Origin. the sequence number or any other reference uniquely identifying the GoO. Except in refusing case ERO recognises the GoO and inform the applicant within [30] days of receiving the application. 12

Refusing GoO issued in Member States ERO shall refuse to recognise a GoO (or equivalent Certificates) issued in EU Member State [or another ECSEE Contracting Party] if: it has been requested to refuse such recognition by the Member State or designated competent authority which issued or supervised the issue of that GoO [or equivalent Certificate]; or it is satisfied that such refusal is necessary for the prevention of fraud or that the GoO was mistakenly issued. ERO shall notify the holder of the GoO and the European Commission of any refusal and its justification. Notwithstanding a refusal ERO shall recognise GoO issued (Article 15 of Directive 2009/28/EC), in EU Member States as equivalent to CoO, if so directed by a decision by the European Commission pursuant to article 15(10) of Directive 2009/28/EC. Where ERO has recognised a GoO it shall withdraw that recognition if: it has been requested by the non Kosovan authority which issued or supervised the issue of that GoO [or equivalent Certificate] to refuse or withdraw such recognition; or it is satisfied that such withdrawal of recognition is necessary for the prevention of fraud or that the GoO [or equivalent Certificate] was mistakenly issued. The provisions contained in this Article impose no obligation on ERO to satisfy itself that a GoO or equivalent Certificate issued in a EU Member State has been properly issued. 13

AIB Association for Issuing Bodies AIB (www.aib net.org) established in 2002 has as its purpose the development, use and promotion of a standardized system for GoO (equivalent doc.coo). Accordingly, AIB promotes systems for exchanging certificates, harmonisation of practices for voluntary and mandatory support schemes within the national and EU law. Its remit comprises the development, improvement and implementation of: data definitions; protocols for data transfer, including response times and data format; data sharing; statistical reporting; transaction logging; standards and practices for registering and auditing production devices; and standards and practices for electricity metering. All issuing bodies are member of the international Association of Issuing Bodies (AIB). ERO will applie for AIB membership. 14

Recognation of CoO issued by IB ERO shall recognise CoO issued by IB accredited with the AIB as equivalent to CoO issued by EROs Rule, except for the effects of the provisions contained in Articles 10.3 and 10.4 of the Law on Electricity no. 2004/10. Application for the recognition of CoO should be submitted in writing by the holder of the GoO Certificates to ERO, specifying, with respect of the CoO or equivalent documents for which recognition is applied for: the number of Certificates of Origin or equivalent documents; the Issuing Body which has issued the Certificates of Origin or equivalent documents; the sequence number or any other reference uniquely identifying the Certificates of Origin or equivalent documents. ERO recognises the CoO, according to the Rules and Procedures established by the AIB. ERO inform the Applicant within [30] days of receiving the application. ERO shall refuse to recognise a CoO or equivalent document issued by an AIB accredited Issuing Body if: it has been requested to refuse such recognition by the Issuing Body which issued or supervised the issue of that Certificate of Origin or equivalent document; or it is satisfied that such refusal is necessary for the prevention of fraud or that the Certificate of Origin or equivalent document was mistakenly issued. ERO shall notify the holder of the Certificate of Origin or equivalent document of any refusal and its justification. The provisions contained in this Article impose no obligation on ERO to satisfy itself that a Certificate of Origin or equivalent document issued by an AIB accredited Issuing Body has been properly issued. 15

Thank you! Energy Regulatory Office Adresa: Rr. Hamdi Mramori nr. 1, 10000 Prishtinë, Kosovë Tel: 038 247 615 lok. 101, Fax: 038 247 620, E mail: info@ero ks.org web: www.ero ks.org 16