1 Developing Asset Management Contents: 2.1 Implementation Process 2.2 Towards an Asset Management Culture 2.3 Current State Analysis 2.4 Desired State Analysis 2.5 Gap Analysis 2.6 Implementation Plan 2.7 Relationships within Surrey s Transport Asset Management Plan 2.8 Managing the Introduction of Asset Management in the Service 20
2 2 Developing Asset Management 2.1 Implementation Process This chapter addresses some of the important issues, which this authority will need to consider as part of the development of a formalised asset management approach for highways. The following simple process model can be applied to our service in order to identify desired business improvements. Fig 2.1 Process for Implementing Asset Management Current State Analysis Desired State Analysis Gap Analysis Implementation Plan This approach has been used to identify key decision-making processes throughout the Transportation Service. Its primary objective is to improve the quality of our decision-making for the allocation of highway funds. At the same time, it has enabled us to identify and document our existing arrangements, to set these down as process maps, and to seek a more standardised approach, more structured decision-making, and less reliance on institutional knowledge. This work is set out in more detail below, and in Chapter 15 Decision Making. 2.2 Towards an Asset Management Culture It will now be necessary to apply the macro process, shown in Fig 2.1, in a systematic and more general way within our Service. Asset management is a process that will enable managers within our Service to make decisions in a more informed way. However, this more structured approach is likely to require a change of established practices. As part of our implementation of asset management it will be necessary for us to address issues, which include: The organisation, cultural changes and engagement and development of staff Comprehensive review of existing processes/procedures and establishment of new desired procedures Arrangements for the collection, storage, and analysis of asset related data and systems These three areas are now considered in relation to the progressive analysis set out in Fig 2.1 above. 21
3 2.3 Current State Analysis As part of the development of asset management within our Service it will be necessary to consider each of these key areas, (staff, procedures and data), and identify and document our existing practices. Staff Decision makers are our key decision makers (for example, those responsible for applying for funding and for the distribution of resources) the appropriate people for this task. Organisational structure it will be important to examine whether or not the present (and planned) organisational structure allows for the effective use of asset management. Does this structure, for example inhibit the proper flow of asset information to these key decision-makers Staffing skills do key asset personnel have the necessary skills to implement and develop asset management. It will be necessary to be able to analyse asset data to identify trends and exceptions, and to assess alternative options. Institutional knowledge it is important to share and record knowledge, which is not widely available within the service. This would include full details about our assets and where information on them is stored. Processes/Procedures It will be necessary to consider the way in which condition and performance data, economics and political influences are being used to supplement or influence engineering judgement. The areas we will need to address will include the following: Annual budgets how are these set, and what allowance is made for asset condition and performance data in establishing the need for resources and the distribution of these. Alternative options how are these evaluated using whole life costing to compare alternative solutions and treatments. Levels of Service do our budgets reflect these detailed levels of service (or service standards), and to what extent does our monitored performance against these service standards affect resource allocations. Whole life options are we identifying the best whole life options using economic evaluation techniques (eg calculation of net present value of alternative options). Political influences how are these catered for as part of our current decision-making. Our future asset management planning will need to reflect the political environment and the way this may influence priorities. Improvement projects are these identified using a structured process. Project benefits is the effectiveness of projects recorded after completion and are benefits noted in terms of their influence on relevant levels of service. Project comparisons how do we rationalise the competing demands of our various projects (for example, a street lighting improvement rather than a footway scheme). Project programmes how do we prioritise projects, develop forward programmes of work and over what period. 22
4 2 Data and Systems Data is fundamental to the development of asset management within our Service. A comprehensive review of all asset data, currently held by this Service, is being undertaken and full details of this appear in Chapter 4. This includes inventory, condition, as well as performance data. As part of this exercise it has been necessary to identify what data is used to make key policy and managerial decisions, and to support funding decisions. Also, in what way this various data is used. It will be important to catalogue our existing software systems (eg CONFIRM, WiNGS, BridgeStation, WDM PMS and eventually UKPMS). In addition to this, it will be necessary to set down how each of these assists our Service in managing the asset, and in decision-making. As we develop our asset management approach, we are now identifying the important regular decisions, which affect the performance of our assets. It is also important to examine and improve existing processes and create new processes, which will help us to improve these decisions. Enhancing these existing, or providing new, software systems, may improve these decisions. A significant improvement in this decision-making can also be derived from introducing software systems that allow full data integration and wider access by our staff. 2.4 Desired State Analysis A start has been made in identifying the desired practice, which is appropriate for this Service. It is intended to develop asset management within the generic framework set out in Chapter 1. The key consideration for us is to determine how we should manage our business in the future. This may well be a very long-term view and will require a number of issues to be addressed before achieving this desired state. It will be necessary for us to consider, in relation to the proper management and development of our asset, who will be best placed to make the key decisions, and the basis for allocating our resources. In addition to this, the data required to make decisions, the key processes we need to use, and information systems required to support our operations. 2.5 Gap Analysis A gap analysis compares the current and desired situations and identifies the activities required to bring current practice to the desired state. As part of this process it will be necessary to consider a number of aspects: The extent of the gaps between the current and desired states, (eg, staff structure, knowledge, processes, inventory and condition data etc) The cost of meeting these various changes Identification of the expected benefit to customers of each of these changes Prioritising those items, which are most crucial to improving our service deliver. Consider the extent to which our resources can be used to achieve these desired changes This gap analysis will allow us to develop an implementation plan for this Service. As part of the implementation plan, a comprehensive improvement schedule has been developed and has been included in Chapter 18. The scale and extent of the various improvement actions will mean that these are addressed over a three-year programme, commencing April The life of this Asset Management Plan is three years, but will be subject to annual review based on progress on these improvements. 23
5 2.6 Implementation Plan The national framework makes a number of recommendations in the way that highway authorities should approach the development of highway asset management. The Transportation Service has begun to address some of these. The main recommendations are: Corporate commitment: ensure that this is highly visible and that there is senior management endorsement. Surrey response implementation workshop arising from Best Value improvement action, Steering Group established (see later), advisory letter to all staff from Transportation Head of Service. TMT involvement throughout development of the Plan. Communication: provide ongoing communication of the commitment to change and the progress in delivering these changes. Set targets for the implementation of asset management and demonstrate progress by publishing and reporting on an implementation plan. Surrey response involving a range of key staff and producing an asset management plan and associated improvement action plan. Steering Group maintaining contact with TMT, District technical officers, Finance, IT, LTP and Risk Managers. Asset Management Champion: the need to appoint an asset manager to drive forward the full adoption and general acceptance of the asset management concept within an authority. Surrey response Highway Asset Development Manager appointed to introduce and establish asset management within the Transportation Service. Revised staffing structure establishes an asset manager at group manager level together with the aforementioned post. Profile of this work raised within the Service generally. Training: the need to provide ongoing training and briefing to those involved in new processes. Surrey response launch of this Asset Management Plan is scheduled for October Briefing sessions for individual groups will follow as required. Pilot projects: introduce aspects of asset management where necessary through pilot projects for a particular activity or geographic area. Surrey response to be planned, as required, and likely to form part of the improvement action plan. Timeframe: successful implementation of asset management means that this process becomes accepted practice and requires time and concerted effort to change the way people manage our business, more specifically changing processes, collection, analysis and interpretation of performance data and the use of improved software systems to make the whole process easier. Surrey response needs to be one of the principal messages to TMT and staff from the Asset Management Steering Group. The above recommendations are concerned with the way in which the Service, and specifically our staff, address the challenges associated with the implementation of asset management. In addition, there are key improvements for this Service, which will include a thorough review of asset data collection. Linked with this, it will be necessary to implement effective data management and investment in integrating software systems, as defined by our users. It is likely to involve changes in the way we prioritise and manage our work, as well as some reorganisation of individual responsibilities and working practices. The full range of improvement actions, both generic and asset specific, and individually described, can be found in Chapter
6 2 Case Study Review of Highway Funding Arrangements A specific application of the implementation process described in the previous section. The simple process set out in Fig 2.1 above has been applied to the allocation of highway funds within our Service using interviews and workshops to identify: Current State The range of key decision makers The key decisions for the management of the asset The documentation of information used to assist decision making The recording of existing processes The output from this work has led to the development of a series of process maps in relation to our key asset management functions (e.g. structures, traffic systems, lighting etc). It has also identified the data requirements for each process step. This will lead to a more consistent and systematic approach to the allocation of funds and the programming and prioritisation of our highway works. It has also been possible to identify a generic process map, (following), as part of this work. Genric Process Map Start Local Input Condition Survey External Inputs Gap Documented Process Collation into a list of Tasks Prioritisation Performance Monitoring Cost Options Rolling Programme Budget Bid Unfunded Funded Annual Programme Construct 25
7 Desired State All our key decisions from an asset management point of view Which officers are the most appropriate ones to make these decisions How these decisions are to be made by these officers, in particular covering the process to be used, information required as an input and information required as an output How decisions are to be communicated to other stakeholders Gap Analysis It is now necessary to compare our current practice with this desired state in order to identify: Gaps in our processes Future data requirements and use Inefficiencies in the storage and use of asset data From this work to develop an improvement plan which is based on the cost, benefits and practicality of closing the gaps. By way of example, the cost and practicality of providing particular asset data may be prohibitive when compared against its likely benefit. 26
8 2 2.7 Relationships within Surrey s Transport Asset Management Plan The diagram below sets out the linkages and relationships between the key aspects of our Transport Asset Management Plan. Many inter-dependencies exist, but in particular it can be seen that the Improvement Action Plan has the most significant impact. Relationships within Surrey s STAMP Surrey Performance Wheel STAMP Performance Indicators only map to parts of the Performance Wheel STAMP Performance Indicators STAMP Performance Indicators completely map to Levels of Service Levels of Service Improvement Action Plan Improvement Actions may affect Delivery Programme Delivery Programmes Risk items may affect some Performance Indicators STAMP Risk Analysis Process Assessment Corporate Risk Analysis Process assessment covers all aspects of Asset Management processes Some Risk items have been migrated from the Corporate Risk Analysis to the STAMP Risk Analysis 27
9 2.8 Managing the Introduction of Asset Management in the Service The national framework has recommended that officers who are tasked with delivering the service should produce the Transport Asset Management Plan. This is intended to engender a sense of ownership and to ensure delivery of the various proposals. It also recognises that this team of officers may not have the necessary skills or sufficient time to produce the plan themselves, and that assistance from internal and external resources would be required. The Transportation Management Team appointed a champion to introduce and establish asset management within our Service. Since then a Steering Group has been formed to provide full support in the preparation of the plan and identification of future improvements, which will lead to the successful integration of asset management into our business processes. The Steering Group includes a number of officers with key responsibilities for aspects of our highway asset. Our local service delivery and asset monitoring are also represented. External consultants support the Steering Group. During the early part of its work the Steering Group has maintained close contact with other relevant members of staff, (IT specialists, finance officers and highway information). In addition, the Surrey Chief Technical Officers Association (SCTOA) is represented on the Steering Group. The Steering Group is supported by a Working Group, which has done much of the detailed work associated with elements of the asset management plan. Early work has included existing process review and production of process maps and the compilation and rationalisation of our asset data requirements. This work will also lead to the production of a user specification for a data integrating asset management software system. The work of both the Steering Group and its Working Group will continue following the production of this plan. Its work will concentrate on addressing the identified improvements over the three-year period starting from April 2004, which will go some way towards fully integrating the concept of asset management within our Service. 28
Performance Monitoring
7 Chapter 17 Performance Monitoring Performance Monitoring Contents: 17.1 Introduction 17.2 A Wider Perspective 17.3 Requirements for a Good Performance Indicator 17.4 Types of Performance Monitoring 17.5
More informationDepartment of the Environment and Local Government. Project Management. Public Private Partnership Guidance Note 7. 14 April 2000
Project Management Project Management Public Private Partnership Guidance Note 7 14 April 2000 Guidance Note 7 14 April 2000 Project Management Contents Section Page I INTRODUCTION...1 SCOPE AND PURPOSE
More informationLogan City Council. Strategic Planning and Performance Management Framework
Logan City Council Strategic Planning and Performance Management Framework 1 Table of contents 1. Overview 3 a) Purpose 3 b) Key Features 3 2. Context 4 a) National Framework for Sustainability 4 b) Elements
More informationTEC Capital Asset Management Standard January 2011
TEC Capital Asset Management Standard January 2011 TEC Capital Asset Management Standard Tertiary Education Commission January 2011 0 Table of contents Introduction 2 Capital Asset Management 3 Defining
More informationPerformance audit report. Ministry of Education: Management of the school property portfolio
Performance audit report Ministry of Education: Management of the school property portfolio Office of the Auditor-General Private Box 3928, Wellington Telephone: (04) 917 1500 Facsimile: (04) 917 1549
More informationChange Management Office Benefits and Structure
Change Management Office Benefits and Structure Author Melanie Franklin Director Agile Change Management Limited Contents Introduction 3 The Purpose of a Change Management Office 3 The Authority of a Change
More informationUCDHR. HR Strategy Implementation & Quality Improvement Plan: 2012-2015
UCDHR HR Strategy Implementation & Quality Improvement Plan: 2012-2015 HR Strategy Implementation Plan and Quality Improvement Plan Introduction This Action Plan is a combination of the HR Strategy Implementation
More informationTechnical Journal. Paper 142
Technical Journal 09 Paper 142 142 Kevin Balaam Programme Manager Highways & Transportation Atkins The Area 6 MAC approach to planning and programme management Introduction Steve Dickinson Schemes Manager
More information11. Managing our Transport Assets
11. Managing our Transport Assets 11.1 The Need for an Asset Management Plan 11.1.1 A key challenge is to make transport assets work for the city in a way which fully contributes to the delivery of corporate
More informationBusiness continuity management policy
Business continuity management policy health.wa.gov.au Effective: XXX Title: Business continuity management policy 1. Purpose All public sector bodies are required to establish, maintain and review business
More informationMANAGING DIGITAL CONTINUITY
MANAGING DIGITAL CONTINUITY Project Name Digital Continuity Project DRAFT FOR CONSULTATION Date: November 2009 Page 1 of 56 Contents Introduction... 4 What is this Guidance about?... 4 Who is this guidance
More informationExternal Audit BV Performance Report: Delivering Change Management and Financial Sustainability
CLACKMANNANSHIRE COUNCIL THIS PAPER RELATES TO ITEM 05 ON THE AGENDA Report to: Resources and Audit Committee Date of Meeting: 24 September 2015 Subject: External Audit BV Performance Report: Delivering
More informationPerformance Detailed Report. May 2008. Review of Performance Management. Norwich City Council. Audit 2007/08
Performance Detailed Report May 2008 Review of Performance Management Audit 2007/08 External audit is an essential element in the process of accountability for public money and makes an important contribution
More informationIDMS PMSA Infrastructure Project Management Congress, Durban, 16/17 September 2013. Greg Evans: Strategic Executive Engineering Unit
IDMS PMSA Infrastructure Project Management Congress, Durban, 16/17 September 2013 Greg Evans: Strategic Executive Engineering Unit IDMS Infrastructure Delivery Management System IDMS SECTION ONE Introduction
More informationEfficiency Scrutiny Committee 16 th September 2014 IT - Scrutiny of the Service Review process and viability of options for change
Efficiency Scrutiny Committee 16 th September 2014 IT - Scrutiny of the Service Review process and viability of options for change For Decision Member Champion(s): Cllr A Alford, Corporate - Director:
More informationContinuous. Improvement. Review Kit. for planning and responsible authorities February 2006. A Victorian Government Initiative
Continuous Improvement Review Kit for planning and responsible authorities February 2006 A Victorian Government Initiative Published by the Victorian Government Department of Sustainability and Environment
More informationBUILDING A HIGH PERFORMING SYSTEM. A business improvement plan for the Department for Education and Child Development
BUILDING A HIGH PERFORMING SYSTEM A business improvement plan for the Department for Education and Child Development BUILDING A HIGH PERFORMING SYSTEM 1 Contents Executive summary 3 Increasing local decision-making
More informationAUDIT & PERFORMANCE REVIEW COMMITTEE ON 26 TH SEPTEMBER 2007
PAGE: 1 REPORT TO: SUBJECT: BY: AUDIT & PERFORMANCE REVIEW COMMITTEE ON 26 TH SEPTEMBER 2007 ASSET MANAGEMENT CHIEF FINANCIAL OFFICER 1. REASON FOR REPORT 1.1 To provide the Audit and Performance Review
More informationReport to Parliament No. 4 for 2011 Information systems governance and security. Financial and Assurance audit. Enhancing public sector accountability
Financial and Assurance audit Report to Parliament No. 4 for 2011 Information systems governance and security ISSN 1834-1128 Enhancing public sector accountability RTP No. 4 cover.indd 1 15/06/2011 3:19:31
More informationD-G4-L4-126 Police contact management and demand reduction review Deloitte LLP Service for G-Cloud IV
D-G4-L4-126 Police contact management and demand reduction review Deloitte LLP Service for G-Cloud IV September 2013 Contents 1 Service Overview 1 2 Detailed Service Description 2 3 Commercials 6 4 Our
More informationTHE BRITISH LIBRARY. Unlocking The Value. The British Library s Collection Metadata Strategy 2015-2018. Page 1 of 8
THE BRITISH LIBRARY Unlocking The Value The British Library s Collection Metadata Strategy 2015-2018 Page 1 of 8 Summary Our vision is that by 2020 the Library s collection metadata assets will be comprehensive,
More informationProgramme Manager Relationship Management System
Programme Manager Relationship Management System Russam Ref 4573 Job Profile This document is a generic description for the role. Any specific requirements in the published advert should also be taken
More informationINTEGRATED PLANNING AND REPORTING
Government of Western Australia Department of Local Government INTEGRATED PLANNING AND REPORTING Framework and Guidelines Integrated Planning and Reporting Framework and Guidelines p1. Contents Foreword
More informationGREATER LINCOLN AREA MAJOR INFRASTRUCTURE PROJECTS
GREATER LINCOLN AREA MAJOR INFRASTRUCTURE PROJECTS COMMUNICATIONS PLAN 1 2 LINCOLN MAJOR SCHEMES COMMUNICATION PLAN Scope This document sets out the aims, roles and responsibilities of Lincolnshire County
More informationHow To Manage The Council
Mole Valley District Council Corporate Communications Strategy 2002-2005 CONTENTS Content Section 1: Introduction Section 2: Stakeholders Section 3: Objectives Section 4: Targets Section 5: Principles
More informationCONCORDAT IMPLEMENTATION
CONCORDAT IMPLEMENTATION UNIVERSITY OF ABERDEEN HR EXCELLENCE IN RESEARCH AWARD TWO YEAR INTERNAL REVIEW PROGRESS REPORT. The University of Aberdeen received the HR Excellence Award for Excellence in December
More informationE Distribution: GENERAL RESOURCE, FINANCIAL AND BUDGETARY MATTERS. Agenda item 6 FINAL UPDATE ON THE WINGS II PROJECT.
Executive Board First Regular Session Rome, 8 11 February 2010 RESOURCE, FINANCIAL AND BUDGETARY MATTERS Agenda item 6 For information* FINAL UPDATE ON THE WINGS II PROJECT E Distribution: GENERAL WFP/EB.1/2010/6
More informationBusiness Continuity Business Impact Analysis arrangements
Aberdeen City Council Internal Audit Report 2012/2013 for Aberdeen City Council May 2013 Business Continuity Business Impact Analysis arrangements Final Report Contents Section Page 1. Executive Summary
More informationHow To Improve Safety In The Nhs
PS035 Original research completed in 2010 Briefing Paper Introduction: Principal Investigator: Professor John Clarkson Should the NHS adopt a new system for predicting possible risks to patient safety?
More informationDeveloping Data Analysis and Visualisation Tools within the SAQD. Dr Colin Gillespie Scottish Environment Protection Agency
Developing Data Analysis and Visualisation Tools within the SAQD Dr Colin Gillespie Scottish Environment Protection Agency Air quality hits the news Greater public interest in AQ, the data collected and
More informationCity and County of Swansea. Human Resources & Workforce Strategy 2013-2017. Ambition is Critical 1
City and County of Swansea Human Resources & Workforce Strategy 2013-2017 Ambition is Critical 1 Delivering quality services for a safer, greener, smarter, fairer, healthier, richer Swansea Executive Summary
More informationPUBLIC HEALTH LIMITED OPEN CALL SCHEME (LOCS) PHA202 RESEARCH BRIEFING
Introduction PUBLIC HEALTH LIMITED OPEN CALL SCHEME (LOCS) PHA202 RESEARCH BRIEFING Following publication of its new national health research strategy Best Research for Best Health (DH 2006a), the Department
More informationEVALUATION REPORT TITLE: Independent evaluation of the Demand-Driven Impact Evaluations for Decisions (3DE) Pilot
EVALUATION REPORT TITLE: Independent evaluation of the Demand-Driven Impact Evaluations for Decisions (3DE) Pilot RESPONSE TO EVALUATION REPORT (overarching narrative) Overall we are pleased with the findings
More informationAwarding body monitoring report for: English Speaking Board (International) Ltd (ESB) May 2009. Ofqual/09/4637
Awarding body monitoring report for: English Speaking Board (International) Ltd (ESB) May 2009 Ofqual/09/4637 2009 Office of the Qualifications and Examinations Regulator 2 Contents Introduction...4 Regulating
More informationUNSOLICITED PROPOSALS
UNSOLICITED PROPOSALS GUIDE FOR SUBMISSION AND ASSESSMENT January 2012 CONTENTS 1 PREMIER S STATEMENT 3 2 INTRODUCTION 3 3 GUIDING PRINCIPLES 5 3.1 OPTIMISE OUTCOMES 5 3.2 ASSESSMENT CRITERIA 5 3.3 PROBITY
More informationCommunity Client Health Profile (CCHP) Program
DEPARTMENT of HEALTH and HUMAN SERVICES CCHP PROGRAM, INFORMATION SERVICES Community Client Health Profile (CCHP) Program Governance Structure Version: 1.0 3 July 2006 Contents 1. Governance structure...
More informationResource Management. Determining and managing the people resources on projects can be complex as:
Baseline Resource Management RESOURCE MANAGEMENT Purpose To provide a procedure and associated guidelines to facilitate the management of project people resources. Overview This Phase is used to establish
More informationVISION FOR LEARNING AND DEVELOPMENT
VISION FOR LEARNING AND DEVELOPMENT As a Council we will strive for excellence in our approach to developing our employees. We will: Value our employees and their impact on Cardiff Council s ability to
More informationHIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY
HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY 16 November 2015 Highway Infrastructure Asset Management Strategy Contents Introduction 1.0 The Need for Asset Management 1.1. Background 1.2. Aims and
More informationImproving Accountability: Developing an Integrated Performance System
OCCASIONAL PAPER No. 11 Improving Accountability: Developing an Integrated Performance System This paper was prepared as part of the State Services Commission's "Improving Accountability" project, and
More informationDRAFT Version 1.0 Proposal to Implement the Information Technology Infrastructure Library Framework for IT Service Management
Proposal to Implement the Information Technology Infrastructure Library Framework for IT Service Management Prepared for the ITM By Hamish Duff in consultation with the ITIL Implementation Working Party
More informationManager Service Transition
Revised Manager Service Transition Your position description Your: Location Group Business unit / team Wellington Organisation Capability & Services IT Solutions / Service Transition Pay Group MGR Band
More information5 STEP 5 DEVELOPING THE STRATEGY 2
CONTENTS 5 STEP 5 DEVELOPING THE STRATEGY 2 5.1 USER GUIDE TO THIS STEP 2 5.2 KEY MESSAGES OF THIS STEP 4 5.3 NATURE OF THE STRATEGY 5 5.4 BUILDING CONSENSUS AND OWNERSHIP 5 5.5 DEFINING THE STRATEGY 6
More informationClimate Local Hampshire County Council Our progress on November 2013
Climate Local Hampshire County Council Our progress on November 2013 Since signing up to Climate Local on in July 2013 we have made the following progress towards achieving the commitments and actions
More informationCompetency Based Recruitment and Selection
Competency Based Recruitment and Selection A Handbook for Managers 2010 March 2010 v2 1 March 2010 v2 2 Table of Contents Introduction...4 1. What are competencies?...4 2. Why use competencies for recruitment
More informationCENTRAL MANCHESTER UNIVERSITY HOSPITALS NHS FOUNDATION TRUST
CENTRAL MANCHESTER UNIVERSITY HOSPITALS NHS FOUNDATION TRUST Report of: Paper prepared by: Adrian Roberts, Executive Director of Finance Simon Walsh, Head of Procurement and E-Commerce Date of paper: August
More informationTHE UNIVERSITY OF LEEDS. Vice Chancellor s Executive Group Funding for Research Data Management: Interim
THE UNIVERSITY OF LEEDS VCEG/12/274 Vice Chancellor s Executive Group Funding for Research Data Management: Interim SOME CONTENT HAS BEEN REMOVED FROM THIS PAPER TO MAKE IT SUITABLE FOR PUBLIC DISSEMINATION
More informationRisk Management Strategy & Implementation Plan 2014 2016
St George s Healthcare NHS Trust: the next decade Risk Management Strategy & Implementation Plan 2014 2016 DRAFT VERSION 6.0 UPDATED 19.11.14 Executive summary We know, from external assurances received
More informationGuide for the Development of Results-based Management and Accountability Frameworks
Guide for the Development of Results-based Management and Accountability Frameworks August, 2001 Treasury Board Secretariat TABLE OF CONTENTS Section 1. Introduction to the Results-based Management and
More informationPol 24/15 Appendix 2. National Policing Fraud Protect Strategy
National Policing Fraud Protect Strategy Draft prepared by the National Police Coordinator for Economic Crime V2.1 February 2015 1 PROTECTING THE COMMUNITY FROM FRAUD Introduction: This is the draft National
More informationTHE INFORMATION AUDIT AS A FIRST STEP TOWARDS EFFECTIVE KNOWLEDGE MANAGEMENT: AN OPPORTUNITY FOR THE SPECIAL LIBRARIAN * By Susan Henczel
INSPEL 34(2000)3/4, pp. 210-226 THE INFORMATION AUDIT AS A FIRST STEP TOWARDS EFFECTIVE KNOWLEDGE MANAGEMENT: AN OPPORTUNITY FOR THE SPECIAL LIBRARIAN * By Susan Henczel Introduction Knowledge is universally
More informationThe overall aim for this project is To improve the way that the University currently manages its research publications data
Project Plan Overview of Project 1. Background The I-WIRE project will develop a workflow and toolset, integrated into a portal environment, for the submission, indexing, and re-purposing of research outputs
More informationLIBER Case Study: University of Oxford Research Data Management Infrastructure
LIBER Case Study: University of Oxford Research Data Management Infrastructure AuthorS: Dr James A. J. Wilson, University of Oxford, james.wilson@it.ox.ac.uk Keywords: generic, institutional, software
More informationConfident in our Future, Risk Management Policy Statement and Strategy
Confident in our Future, Risk Management Policy Statement and Strategy Risk Management Policy Statement Introduction Risk management aims to maximise opportunities and minimise exposure to ensure the residents
More informationReview of the Management of Sickness Absence Conwy County Borough Council
Audit 2004/2005 Date: December 2005 Authors: Ros Adams and George Jones Ref: 1072A2005 Review of the Management of Sickness Absence Conwy County Borough Council Contents Summary Report Introduction 3 Background
More informationMapping the Technical Dependencies of Information Assets
Mapping the Technical Dependencies of Information Assets This guidance relates to: Stage 1: Plan for action Stage 2: Define your digital continuity requirements Stage 3: Assess and manage risks to digital
More informationHuman Resource Strategy for Researchers action plan
Human Resource Strategy for Researchers action plan Starting point In 2009 the University of Applied Sciences Northwestern Switzerland (FHNW) became a signatory 1 to the European Charter for Researchers
More informationPlymouth University. European Commission HR Excellence in Research: Action Plan 25 th September 2015
Plymouth University European Commission HR Excellence in Research: Action Plan 25 th September 2015 Plymouth University achieved the European Commission HR Excellence in Research Award on 5 th September
More informationWhat is Total Place? Presented By: Simon Robinson & Duncan Mackison Date: 1 st March 2010
What is Total Place? Presented By: Simon Robinson & Duncan Mackison Date: 1 st March 2010 What is Total Place? A whole area approach to public service can lead to better services at less cost Identify
More informationSeventeenth Meeting of the IMF Committee on Balance of Payments Statistics Pretoria, October 26 29, 2004
BOPCOM-04/12 Seventeenth Meeting of the IMF Committee on Balance of Payments Statistics Pretoria, October 26 29, 2004 ABS Business Statistics Reengineering and the Impact on Australia s Balance of Payments
More informationMeta-Evaluation of interventions undertaken by the Luxembourg Cooperation in the subsector of professional training in hospitality and tourism.
Meta-Evaluation of interventions undertaken by the Luxembourg Cooperation in the subsector of professional training in hospitality and tourism. In 2013, the Directorate for Development Cooperation and
More informationJoint Surrey Carers Commissioning Strategy for 2012/3 to 2014/5 Key Priorities for Surrey Multi Agency Delivery Plan - May 2012
Joint Surrey Carers Commissioning Strategy for 2012/3 to 2014/5 Key Priorities for Surrey Multi Agency Delivery Plan - May 2012 Note this Delivery Plan will be updated & republished 3 times a year throughout
More informationProgress on the System Sustainability Programme. Submitted to: NHS West Norfolk CCG Governing Body, 31 July 2014
Agenda Item: 9.1 Subject: Presented by: Progress on the System Sustainability Programme Dr Sue Crossman, Chief Officer Submitted to: NHS West Norfolk CCG Governing Body, 31 July 2014 Purpose of Paper:
More informationBSBCUE607 Manage customer engagement centre staffing
BSBCUE607 Manage customer engagement centre staffing Release: 1 BSBCUE607 Manage customer engagement centre staffing Modification History Release Release 1 Comments This version first released with BSB
More informationASEAN Central Banks Working Committee on Payment and Settlement Systems (WC-PSS) Strategic Report to the ASEAN Central Bank Governors Meeting
ASEAN Central Banks Working Committee on Payment and Settlement Systems (WC-PSS) Strategic Report to the ASEAN Central Bank Governors Meeting Introduction April 2011 1. The WC-PSS was endorsed at the ASEAN
More informationISA Work Programme SECTION I
ISA Work Programme SECTION I TABLE OF CONTENTS INTRODUCTION...4 1. THE CONTEXT...4 1.1. The need for the ISA programme...4 1.2. The political context...4 2. THE ISA PROGRAMME...5 3. THE EUROPEAN INTEROPERABILITY
More informationKnowledge Management Strategy 2011-2014. Version 0.8
Knowledge Management Strategy 2011-2014 Version 0.8 25 October 2011 1 1. Introduction 1.1 What is knowledge management? Knowledge management is creating, capturing, sharing and using the skills and experience
More informationGSBPM. Generic Statistical Business Process Model. (Version 5.0, December 2013)
Generic Statistical Business Process Model GSBPM (Version 5.0, December 2013) About this document This document provides a description of the GSBPM and how it relates to other key standards for statistical
More informationDecision Making Under Uncertainty
Decision Making Under Uncertainty Think clearly, act decisively and feel confident Unilever s story Sven Roden Think Clearly Act Decisively Feel Confident In any large dynamic organisation, complexity
More informationGuideline. Records Management Strategy. Public Record Office Victoria PROS 10/10 Strategic Management. Version Number: 1.0. Issue Date: 19/07/2010
Public Record Office Victoria PROS 10/10 Strategic Management Guideline 5 Records Management Strategy Version Number: 1.0 Issue Date: 19/07/2010 Expiry Date: 19/07/2015 State of Victoria 2010 Version 1.0
More informationBest Value toolkit: Performance management
Best Value toolkit: Performance management Prepared by Audit Scotland July 2010 Contents Introduction The Audit of Best Value The Best Value toolkits Using the toolkits Auditors evaluations Best Value
More informationThe merger of Community Impact Bucks
CASE STUDY The merger of Community Impact Bucks December 2010 NAVCA (National Association for Voluntary and Community Action), The Tower, 2 Furnival Square, Sheffield S1 4QL Tel 0114 278 6636 Fax 0114
More informationABERDEEN CITY COUNCIL. Name of Committee : Resources Management Committee
ABERDEEN CITY COUNCIL Name of Committee : Resources Management Committee Date of Meeting : 29 March 2007 Title of Report : CRM System Procurement Lead Officer : Jacek Nowak, Head of Customer Relations
More informationLONDON SCHOOL OF COMMERCE. Programme Specifications for the. Cardiff Metropolitan University. MSc in International Hospitality Management
LONDON SCHOOL OF COMMERCE Programme Specifications for the Cardiff Metropolitan University MSc in International Hospitality Management 1 Contents Programme Aims and Objectives 3 Programme Learning Outcomes
More informationLearning & Development Framework for the Civil Service
Learning & Development Framework for the Civil Service 2011-2014 Table of Contents 1. Introduction & Background... 1 2. Key Objectives and Actions arising... 3 3. Framework Objectives... 4 3.1 Prioritise
More informationThe Emergency Market Mapping and Analysis (EMMA) Review A Summary
The Emergency Market Mapping and Analysis (EMMA) Review A Summary February 2012 Review carried out by Jude Powell, Summary compiled by Carol Brady. In recent years, international humanitarian agencies
More informationNational publication of inpatient nursing staffing
Report to: HPFT Board Date: 26 June 2014 Report by: Mary Mumvuri (Head of Nursing and Patient Safety) Subject: Nature of Report National publication of inpatient nursing staffing Open 1. Background This
More informationEvaluation Case Study. Leadership development in special schools
Australian Government Department of Education and Training More Support for Students with Disabilities 2012-2014 Evaluation Case Study Leadership development in special schools Output 7: Supporting school
More informationTown of Bradford West Gwillimbury. Asset Management Strategy and Plan Project. Asset Management and IT Strategy Executive Summary
Town of Bradford West Gwillimbury Asset Management Strategy and Plan Project Asset Management and IT Strategy Executive Summary March 2012 Table of Contents Introduction 1 Project Objectives 1 The Town
More informationCity of Johannesburg. ANNEXURE 2 Group Performance Management Framework
City of Johannesburg ANNEXURE 2 Group Performance Management Framework August 2009 Table of Contents 1 INTRODUCTION... 4 2 LEGISLATIVE FRAMEWORK... 6 3 GROUP PERFORMANCE MANAGEMENT FRAMEWORK OBJECTIVES...
More informationThe Quality Initiative in Scottish Schools
The Quality Initiative in Scottish Schools Working together to achieve excellence For dissemination and use by teaching and education authority staff The Quality Initiative in Scottish Schools Working
More informationA FRAMEWORK FOR ASSESSING ASSET MANAGEMENT PERFORMANCE IN AUSTRALIA. Neville Binning, MBA, AEng, GCertHRDev, MIEAust, CPEng, MCIT
A FRAMEWORK FOR ASSESSING ASSET MANAGEMENT PERFORMANCE IN AUSTRALIA Florentina Mihai, BEng, GDipMgt, MIEAust Neville Binning, MBA, AEng, GCertHRDev, MIEAust, CPEng, MCIT Laurie Dowling, BSc, BEng, FIEAust,
More informationEnvironment Sustainability & Highways
Job Title: ICT Contract Manager Job Grade: Band 5 Directorate: Environment Sustainability & Highways Job Reference Number: P01265 The Role The ideal candidate for this role would be a perceptive, technically
More informationRobbie Ewen Fellowship Report By Fiona MacAskill University of Aberdeen
Robbie Ewen Fellowship Report By Fiona MacAskill University of Aberdeen 1. Introduction The University of Aberdeen is about to embark in the implementation of an Enterprise Resource Planning (ERP) which
More informationInternal Audit Annual Report 2011/12
1 Introduction 1.1 In accordance with the Code of Practice for Internal Audit in Local Government in the United Kingdom, the Internal Audit Annual Report 2011/12 for Cheshire East contains the following:
More informationHighway Asset Management Strategy
1. Introduction 1.1. Cheshire East Council (CEC) recognises the importance of its highway infrastructure and how an effectively maintained and managed network contributes to the achievement of its corporate
More informationCustomer requirements. Asset management planning Inspection and assessment Route asset planning Annual work plans Contracting strategy
Section 8 Output monitoring Inputs Customer requirements Safety standards Outputs and funding SRA and Government Policy Network stewardship strategy Asset and operational policies Maintenance & renewal
More informationDerbyshire Constabulary
h Derbyshire Constabulary Job Description Closing Date Wednesday 28 October 205 at midday HR Service Centre Contact Rachael Stone Tel int 733 00 Extl 0300 330 330 Role Title Technical Support Manager Grade
More information13. Performance Management
13. Performance Management Summary Delivering schemes on time and on budget Management of Capital Programme Management of Risk Gateway Reviews Resource requirements Project Management and skills development
More informationCONDUCTING AN EQUAL PAY REVIEW: the role of union reps
CONDUCTING AN EQUAL PAY REVIEW: the role of union reps ABOUT THIS BRIEFING This briefing is designed to give trade union reps an understanding of the role that they should play in conducting an equal pay
More information7. ASSESSING EXISTING INFORMATION SYSTEMS AND INFORMATION NEEDS: INFORMATION GAP ANALYSIS
7. ASSESSING EXISTING INFORMATION 6. COMMUNITY SYSTEMS AND LEVEL INFORMATION MONITORING NEEDS: OF THE INFORMATION RIGHT TO ADEQUATE GAP ANALYSIS FOOD 7. ASSESSING EXISTING INFORMATION SYSTEMS AND INFORMATION
More informationHow To Manage A University Computer System
PC asset management policy Name of policy, procedure or regulation Purpose of policy, procedure or regulation PC asset management policy To provide a policy framework in relation to PC asset management
More informationCRAFT NORTHERN IRELAND STRATEGIC PLAN 2014 2017
CRAFT NORTHERN IRELAND STRATEGIC PLAN 2014 2017 Innovative Craft 2014-17 March 2014 STRATEGY 1 Context o 1.1 Craft Northern Ireland history o 1.2 Evaluation o 1.3 Other considerations in developing a new
More informationCROATIAN BUREAU OF STATISTICS REPUBLIC OF CROATIA MAIN (STATISTICAL) BUSINESS PROCESSES INSTRUCTIONS FOR FILLING OUT THE TEMPLATE
CROATIAN BUREAU OF STATISTICS REPUBLIC OF CROATIA MAIN (STATISTICAL) BUSINESS PROCESSES INSTRUCTIONS FOR FILLING OUT THE TEMPLATE CONTENTS INTRODUCTION... 3 1. SPECIFY NEEDS... 4 1.1 Determine needs for
More informationMonitoring and Evaluation
Communication Handbook - Factsheet 4 Version 1 April 2012 Monitoring and Evaluation The need for monitoring your communication How to plan and resource your evaluation The main evaluation tools Why to
More informationOttawa Charter. Toolkit and Implementation Planning Guide
Ottawa Charter Toolkit and Implementation Planning Guide Information required to support the Health Promotion Plan Introduction Priority Groups. Health Goal The aim of NCSP/BSA. Regional Community Profile
More informationUpdate on NHSCB Key features of (proposed) NHSCB operating model for primary care
Aim to cover Update on NHSCB Key features of (proposed) NHSCB operating model for primary care NHSCB dental commissioning strategy all dental services Concept and context of local professional networks
More informationTITLE C171 ASSET MANAGEMENT POLICY DEPARTMENT. Engineering Services POLICY DIRECTIVE
TITLE C171 ASSET MANAGEMENT POLICY DEPARTMENT Engineering Services POLICY DIRECTIVE This Asset Management policy will ensure that Asset Management is clearly recognised by Council and community in accordance
More informationA COMPARISON OF PRINCE2 AGAINST PMBOK
Introduction This comparison takes each part of the PMBOK and gives an opinion on what match there is with elements of the PRINCE2 method. It can be used in any discussion of the respective merits of the
More informationReview of Transport Asset Management Plans For the Department for Transport
Review of Transport Asset Management Plans For the Department for Transport January 2008 Executive Summary Local Transport Plan guidance encourages local authorities to develop Transport Asset Management