1 Agile Development in the Federal IT Environment Presented to CMMI Conference: North America
2 AGENDA Agile and Waterfall Agile Manifesto Federal Government Adoption of Agile Principles Federal Acquisition Management Challenges Software Estimation Approaches Framework for Developing Cost Estimates for Agile Projects Case Study 2
3 AGILE AND WATERFALL Agile Software development paradigm involving time-boxed development, small multifunctional teams, evolving requirements, test-driven development, and early delivery of functional software Agile umbrella represents adaptive software development methodologies (Rational Unified Process, Scrum, Extreme Programming) popularized in the late 90s Agile was a response to heavyweight waterfall methodologies, which some consider rigid, unresponsive and with high management overhead. Waterfall Sequential, serial process where milestones must be reached to move to next phase Inherited from the hardware manufacture strategies and construction strategies that were in practice during the 1970s. Easier to baseline and manage, and enforces requirements solicitation at inception Testing issues not identified up front, functional software is not delivered until end of project 3
4 WHAT IS AGILE 5
5 AGILE MANIFESTO Developed by the Agile Alliance in 2001 ( 4
6 FEDERAL GOVERNMENT S ADOPTION OF AGILE 2010 Federal IT Reform Plan 1 identified that technology has outpaced budget formulation in regards to modular development contracting Office and Management and Budget (OMB) and Congress were asked to create working capital (revolving) funds Office of Federal Procurement Policy (OFPP) was tasked to develop contracting guidance and templates to increase modular contracting flexibility All of this was a shot in the arm to the Agile community! OFPP has not yet issued this guidance, or the required templates and samples supporting modular development. An OFPP official explained delays due to challenges in ensuring consistent definitions of modular development across the government and industry (GAO As of 2012, GAO reported this objective has only been partially met. OFFP did deliver contracting guidance in Kundra, Vivek. 25 Point Implementation Plan to Reform Federal Information Technology Management. U.S. Chief Information Officer. Dec 9,
7 ACQUISITION MANAGEMENT CHALLENGES Two years later, GAO identified agile implementation challenges that include Procurement practices do not support agile projects, as some federal contracts have waterfall criteria Teams had difficulty collaborating and transitioning to self-directed work Difficulty in adopting of Agile tools Inconsistent software development guidance (strategic guidance aligned to waterfall practices) EVM and status tracking does not conform to agile principles 7
8 FRAMEWORK FOR ESTIMATING AGILE PROJECTS Iterative development did not begin with the Agile Manifesto, and traditional estimation techniques can still be leveraged Agile projects are not inherently more or less productive Process 1. Size project according to conventional methods (requirements-based sizing, analogy) and express in SLOC or function points 2. Confirm and model typical Agile tenants (Experienced, cohesive team, focus on internal communication, complex integration reduced documentation) 3. At each sprint, calibrate productivity (at team level, not Story Point level) 4. Include delivered scope as risk if not mandated contractually 5. Leverage Agile tools wherever possible, which can serve as database of project You can t estimate the impact of a paradigm; you can only estimate the impact of the practices that may occur as a result of that paradigm -Arlene Minkiewicz, PRICE Systems Chief Scientist 9
9 SOFTWARE COST ESTIMATION CHALLENGES Software cost estimation has traditionally been based on software size (SLOC or function points) for requirements identified at inception, software complexity and other factors Productivity is typically analyzed in SLOC/Person month Scope is generally fixed, while team size and schedule are variable Agile projects are baselined from iterations (sprints) and story points per sprint (velocity) Each sprint s stories are determined at the beginning of Sprint planning Story points are a measure of expected effort based upon size and complexity Story points differ by team and are inherently subjective In Agile, schedule and team size are fixed while scope is variable Government oversight agencies lack familiarity and acceptance of Agile metrics 8
10 CASE STUDY COMMERCE The Problem An ongoing Agile project at Commerce identified the following A hybrid of Agile and Waterfall was implemented causing confusion and management problems Agile Program Management tools were not used Developers did not follow software design (cowboy coding) Limited support of Senior Management Poor metrics collection Software testing identified many requirements that could not be tested due to dependencies to other open requirements Software did not meet requirements 10
11 AGILE PROJECT MANAGEMENT TOOLS Agile PM Tools are useful to track monthly performance Automates velocity and assists with schedule planning
12 CASE STUDY COMMERCE The Solution /Compumatics team implemented market survey and tested Agile tools implemented project management tool, Agile training, and metric collection process Management, developers, and our team collaborated to rebaseline the development schedule Organic development team was assisted with determining story points for open requirements (stories) Remaining estimate was updated through traditional software estimation methods (function point analysis, calibration, parametrics) 11
13 Q&A 12
14 LOCATED IN THE CITY OF FALLS CHURCH, VA Picture of George Mason Square 13
GAO SOFTWARE DEVELOPMENT. Effective Practices and Federal Challenges in Applying Agile Methods
GAO United States Government Accountability Office Report to the Subcommittee on Federal Financial Management, Government Information, Federal Services, and International Security, Committee on Homeland
Software Development Methodologies
Software Development Methodologies Jonathan Hoyle Eastman Kodak Thursday, June 2, 2005 Overview Predictive Methodologies Waterfall Other Predictive Methodologies Agile Methodologies Extreme Programming
Software Development Life Cycle at SSPL. An Summary of Methodologies We Offer
Software Development Life Cycle at SSPL An Summary of Methodologies We Offer 10/29/2009 Table of Contents The SSPL Advantage... 2 Commonly Used SDLC Models at SSPL... 2 Waterfall Model... 2 Agile Model...
In today s acquisition environment,
4 The Challenges of Being Agile in DoD William Broadus In today s acquisition environment, it no longer is unusual for your program to award a product or service development contract in which the vendor
How To Understand The Software Process
Ingegneria del Software Corso di Laurea in Informatica per il Management Software process model Davide Rossi Dipartimento di Informatica Università di Bologna The task of the software development team
A Viable Systems Engineering Approach. Presented by: Dick Carlson ([email protected])
A Viable Systems Engineering Approach Presented by: Dick Carlson ([email protected]) Philip Matuzic ([email protected]) i i Introduction This presentation ti addresses systems engineering
2015 Defense Health Information Technology Symposium Implementation of Agile SCRUM Software Development Methodology
Mr. Christopher Harrington, PM Clinical Support, Solution Delivery Division Mr. James Huber, Healthcare Data Analyst, DHA Decision Support 2015 Defense Health Information Technology Symposium Implementation
OPM System Development Life Cycle Policy and Standards. Table of Contents
Table of Contents 1. INTRODUCTION... 4 1.1 Purpose... 4 1.1.1 OPM SDLC Policy... 4 1.1.2 Key Concepts and Principles... 4 1.2 Scope and Applicability... 5 1.3 Compliance, Enforcement and Exceptions...
Course Title: Managing the Agile Product Development Life Cycle
Course Title: Managing the Agile Product Development Life Cycle Course ID: BA25 Credits: 28 PDUs Course Duration: 4 days (with optional Executive session) Course Level: Intermediate/Advanced Course Description:
Course Title: Planning and Managing Agile Projects
Course Title: Planning and Managing Agile Projects Course ID: BA15 Credits: 21 PDUs Course Duration: 3 days (Live in person class only) Course Level: Basic/Intermediate Course Description: This 3-day course
Thinking About Agile in DoD
Thinking About Agile in DoD Stephen Welby Deputy Assistant Secretary of Defense for Systems Engineering AFEI Agile for Government Summit November 21, 2013 11/21/2013 Page-1 US Department of Defense (DoD)
PPM V2.0 Frequently Asked Questions (FAQs) U.S. Department of Housing and Urban Development
PPM V2.0 Frequently Asked Questions (FAQs) U.S. Department of Housing and Urban Development December 2015 1. Getting Started with PPM Life Cycle 2. PPM Life Cycle Process 3. PPM V2.0 and Project Types
!"#$%&'(%)*$+ :%;$)*%<&%6 4.7&68'9"/6")& 0)1.%$2.3*%./'4"55*)6 ,&+-%$+./ !"#$%&##'()*+&## Figure 1: Five OSP Dimensions
!""#!$%&'(#)$*+,(-*(.&%/# &0*$1!"#$%&'(%)*$+ :%;$)*%
PLM - Agile. Design Code Test. Sprints 1, 2, 3, 4.. Define requirements, perform system design, develop and test the system. Updated Project Plan
PLM - Agile Agile Development Evolved in the 1990s as a response to heavyweight methodologies. In 2001 representatives of various new methodologies met to discuss the need for lighter alternatives. The
CompSci 408 - Fall 2014 Professors: Robert Duvall, Ajay Patel, Salman Azhar (rcd@cs, ajay.patel, azhar@cs)
Agile Software Development in Today s Industry CompSci 408 - Fall 2014 Professors: Robert Duvall, Ajay Patel, Salman Azhar (rcd@cs, ajay.patel, azhar@cs) Overview Introduction Software Development Methodologies
Controlling Change on Agile Software Development Projects
Universal Journal of Management 4(1): 42-49, 2016 DOI: 10.13189/ujm.2016.040106 http://www.hrpub.org Controlling Change on Agile Software Development Projects Andrew L Ecuyer 1, Syed Adeel Ahmed 2,* 1
When User Experience Met Agile: A Case Study
When User Experience Met Agile: A Case Study Michael Budwig User Experience Manager PayPal 2211 North 1 st Street, San Jose, California 95131 USA [email protected] Soojin Jeong Manager, User Interface
Waterfall vs. Agile Project Management
Lisa Sieverts, PMP, PMI-ACP Phil Ailes, PMI-ACP Agenda What is a Project Overview Traditional Project Management Agile Project Management The Differences Product Life Cycle The Teams Requirements WBS/Product
Agile Software Development in the Large
Agile Software Development in the Large Jutta Eckstein 1 Large Large in... Scope Time People Money Risks We concentrate on Large Teams Large is relative 1, 2, 10, 100, 2000 People 2 Principles behind Agile
Deputy Chief Financial Officer Peggy Sherry. And. Chief Information Security Officer Robert West. U.S. Department of Homeland Security.
Deputy Chief Financial Officer Peggy Sherry And Chief Information Security Officer Robert West U.S. Department of Homeland Security Testimony Before the Subcommittee on Government Organization, Efficiency
White Paper IT Methodology Overview & Context
White Paper IT Methodology Overview & Context IT Methodologies - Delivery Models From the inception of Information Technology (IT), organizations and people have been on a constant quest to optimize the
Agile Training and Certification Options. David Hicks
Agile Training and Certification Options David Hicks Agile Business Conference London 2011 David Hicks RADTAC Founder & Director Specialist in Lean and Agile since 1998 Agile Alliance Founder Member in
Roles: Scrum Master & Project Manager
Roles: Scrum Master & Project Manager Scrum Master: Facilitate collaborative meetings Track team performance Remove impediments (Risk, Issue) Validate team alignment to Agile framework and scope Drive
IS EARNED VALUE + AGILE A MATCH MADE IN HEAVEN?
1 IS EARNED VALUE + AGILE A MATCH MADE IN HEAVEN? Presented at The Nexus of Agile Software Development and Earned Value Management, OSD-PARCA, February 19 20, 2015 Institute for Defense Analysis, Alexandria,
Process Methodology. Wegmans Deli Kiosk. for. Version 1.0. Prepared by DELI-cious Developers. Rochester Institute of Technology
Process Methodology for Wegmans Deli Kiosk Version 1.0 Prepared by DELI-cious Developers Rochester Institute of Technology September 15, 2013 1 Table of Contents 1. Process... 3 1.1 Choice... 3 1.2 Description...
How to Use EVM to Maintain Quality in an Agile Environment. A National Asset for National Missions 1
How to Use EVM to Maintain Quality in an Agile Environment 1 Agenda Key Terms and Calculations Earned Value Management System Supporting Systems Practical Example Earned Value Management in an Agile Environment
System development lifecycle waterfall model
Slide 6.1 System development lifecycle waterfall model Figure 6.1 The waterfall model of system development lifecycle Slide 6.2 The b model Figure 6.2 The b model Source: N D Birrell and M A Ould, A Practical
What is a life cycle model?
What is a life cycle model? Framework under which a software product is going to be developed. Defines the phases that the product under development will go through. Identifies activities involved in each
Why the Traditional Contract for Software Development is Flawed
Why the Traditional Contract for Software Development is Flawed Susan Atkinson [email protected] Introduction Agile has entered the mainstream. In a recent survey, more than 50% of the respondents
DHS IT Successes. Rationalizing Our IT Infrastructure
TESTIMONY OF Richard A. Spires Chief Information Officer U.S. Department of Homeland Security Before the House Committee on Oversight and Government Reform February 27, 2013 Chairman Issa, Ranking Member
Requirement Management with the Rational Unified Process RUP practices to support Business Analyst s activities and links with BABoK
IBM Software Group Requirement Management with the Rational Unified Process RUP practices to support Business Analyst s activities and links with BABoK Jean-Louis Maréchaux Software IT Specialist IBM Rational
Agile Project Management Controls
0 Agile Project Management Controls Issues with EVM and a Viable Alternative: Agile Project Management (PM) Tool ICEAA Conference, June 2015 San Diego, CA Blaze Smallwood, Booz Allen Hamilton Omar Mahmoud,
Scheduling Process Maturity Level Self Assessment Questionnaire
Scheduling Process Maturity Level Self Assessment Questionnaire Process improvement usually begins with an analysis of the current state. The purpose of this document is to provide a means to undertake
UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MANUAL TRANSMITTAL SHEET
Form 1221-2 (June 1969) UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT Release: 1-1718 Date: MANUAL TRANSMITTAL SHEET Subject 1265 Information Technology Investment Management (ITIM)
Transitioning from Waterfall: The Benefits of Becoming Agile. ASPE Web Seminar Friday, February 27 th, 2015
Transitioning from Waterfall: The Benefits of Becoming Agile ASPE Web Seminar Friday, February 27 th, 2015 Objectives Give a high-level look at the challenges in software development Give a basic look
Enhancing The ALM Experience
Enhancing The ALM Experience Tools to Accelerate Delivery of Secure, Reliable Modern Applications Brent Dorenkamp Solutions Architect Agenda Application Modernization and the Instant-On Enterprise Building
A Capability Maturity Model (CMM)
Software Development Life Cycle (SDLC) and Development Methods There are some enterprises in which a careful disorderliness is the true method. Herman Melville Capability Maturity Model (CMM) A Capability
M ANAGEMENT I NTEGRATION G OAL. Achieve organizational and management excellence
M ANAGEMENT I NTEGRATION G OAL Achieve organizational and management excellence 71 MANAGEMENT INTEGRATION STRATEGIC GOAL Management Integration Goal Achieve organizational and management excellence The
Process Increments: An Agile Approach to Software Process Improvement
: An Agile Approach to Software Process Improvement Amr Noaman Senior Quality Consultant Software Engineering Competence Center Agenda Experience Report Overview Observations and Findings 2 Agenda Experience
Implementing End-to-End agile Portfolio Management. Thomas Haas [email protected]
Implementing End-to-End agile Portfolio Management Thomas Haas [email protected] My Reference INVENTIQUE.NET End-to-End Portfolio Management 2014-02-26 2 Implementing End-to-End Portfolio Management
Metrics and scope management in agile projects
Metrics and scope management in agile projects Marcel Pereboom, Mediaan April 2009 Just Software Motivation The Sydney opera house Development? Misunderstanding the requirements Not managing change properly
2015 IBM Continuous Engineering Open Labs Target to better LEARNING
2015 IBM Continuous Engineering Open Labs Target to better LEARNING (NO COST - not a substitute for full training courses) Choose from one or more of these Self-Paced, Hands-On Labs: DMT 3722 - Learn to
SCEA 2010 EST06. Estimating Issues Associated with Agile. Bob Hunt. Galorath Incorporated
SCEA 2010 EST06 Estimating Issues Associated with Agile Development Bob Hunt Vice President, Services Galorath Incorporated What Is Agile Software Dev? In the late 1990 s several methodologies began to
Agile Projects 7. Agile Project Management 21
Contents Contents 1 2 3 Agile Projects 7 Introduction 8 About the Book 9 The Problems 10 The Agile Manifesto 12 Agile Approach 14 The Benefits 16 Project Components 18 Summary 20 Agile Project Management
Quality Assurance Software Development Processes
Quality Assurance Software Development Processes Part II - Lecture 3 1 The University of Auckland New Zealand 254 12/09/ /2012 The FBI Virtual Case File 254 12/09/ /2012 Database application developed
Agile Software Development Methodologies and Its Quality Assurance
Agile Software Development Methodologies and Its Quality Assurance Aslin Jenila.P.S Assistant Professor, Hindustan University, Chennai Abstract: Agility, with regard to software development, can be expressed
IT SYSTEM LIFE-CYCLE AND PROJECT MANAGEMENT
United States Department of Agriculture Agricultural Marketing Service Directive 3130.8 IT SYSTEM LIFE-CYCLE AND PROJECT MANAGEMENT I. PURPOSE... 1 II. POLICY... 1 III. DEFINITIONS... 1 IV. DOCUMENTATION
Demand & Requirements Management Software Development QA & Test Management IT Operations & DevOps Change Management Agile, SAFe, Waterfall Support
Demand & Requirements Management Software Development QA & Test Management IT Operations & DevOps Change Management Agile, SAFe, Waterfall Support Overview codebeamer is a single-repository Application
Development. Lecture 3
Software Process in Modern Software Development Lecture 3 Software Engineering i Practice Software engineering practice is a broad array of principles, concepts, methods, and tools that must be considered
STATE OF MICHIGAN SUITE
STATE OF MICHIGAN SUITE Agile Process Guide Another Companion to the Systems Engineering Methodology (SEM) of the State Unified Information Technology Environment (SUITE) Michigan Department of Technology,
Software Engineering
1 Software Engineering Lecture 2: Software Life Cycles Stefan Hallerstede Århus School of Engineering 25 August 2011 2 Contents Naive Software Development Code & Fix Towards A Software Process Software
Holding Managed Services Vendors Accountable in an Agile Environment
White Paper Holding Managed Services Vendors Accountable in an Agile Environment By Robert Gassaway and Gerry Robinson Abstract Managed services clients can hold vendors accountable to software output
Preparation Guide. EXIN Agile Scrum Foundation
Preparation Guide EXIN Agile Scrum Foundation Edition March 2014 Copyright 2014 EXIN All rights reserved. No part of this publication may be published, reproduced, copied or stored in a data processing
Managing a Project Using an Agile Approach and the PMBOK Guide
Managing a Project Using an Agile Approach and the PMBOK Guide Kathy Schwalbe, Ph.D. [email protected] Augsburg College Minneapolis, Minnesota September 25, 2012 Abstract This paper includes excerpts
MM Agile: SCRUM + Automotive SPICE. Electronics Infotainment & Telematics
MM Agile: SCRUM + Automotive SPICE Electronics Infotainment & Telematics 20 Novembre, 2010 INDEX Introduction Why MM Agile Approach? How did we align classical and agile approach? How do we implement SCRUM?
Agile SW Development @ Siemens
CON ECT INFORMUNITY, 24.3.2014 Agile SW Development @ Siemens Corporate Development Center Unrestricted Siemens Aktiengesellschaft Österreich 2013 All rights reserved. Eva Kišo ová - that s me Faculty
The Agile Project Manager
The Agile Project Manager PMI Madrid, 29/1/2014 1 Jose Barato Consulting, Training and Tools in Project Management PMPeople (Managing Director) PMI Madrid Chapter (Director) PM-IB (founder, Vice-President)
Software Development Process and Activities. CS 490MT/5555, Fall 2015, Yongjie Zheng
Software Development Process and Activities CS 490MT/5555, Fall 2015, Yongjie Zheng Software Process } A set of activities that leads to the production of a software product } What product we should work
Project Management in Software: Origin of Agile
PAGE 1 ios App Development Project Management in Software: Origin of Agile PAGE 2 Learning Outcomes By the end of the unit, you should be able to: 1. Differentiate between Waterfall and Agile process 2.
Asset management guidelines
Asset management guidelines 1 IT asset management (ITAM) overview Objective Provide a single, integrated view of agency assets in order to allow agencies to identify the asset location and assess the potential
Leveraging Agile and CMMI for better Business Benefits Presented at HYDSPIN Mid-year Conference 2014 28-Jun-2014
Leveraging Agile and CMMI for better Business Benefits Presented at HYDSPIN Mid-year Conference 2014 28-Jun-2014 Outline 2 Context Key Business Imperatives Agile Adoption and CMMI Roadmap CMMI+Agile Best
PPM and Agile: Realizing the Best of Both Worlds
PPM and Agile: Realizing the Best of Both Worlds This white paper discusses the challenges of integrating agile methods into a PPM framework and how to deliver executive visibility into agile projects
Improving Project Governance Using Agile and Metrics. Kevin Aguanno PMP, IPMA-B, MAPM, Cert.APM
Improving Project Governance Using Agile and Metrics Kevin Aguanno PMP, IPMA-B, MAPM, Cert.APM Your Presenter: Kevin Aguanno 20+ years of PM experience 20+ published books, audiobooks, DVDs, and CD-ROMs
IT Baseline Management Policy. Table of Contents
Table of Contents 1. INTRODUCTION... 1 1.1 Purpose... 2 1.2 Scope and Applicability... 2 1.3 Compliance, Enforcement, and Exceptions... 3 1.4 Authority... 3 2. ROLES, RESPONSIBILITIES, AND GOVERNANCE...
How To Plan An Agile Project
GAO Scheduling Best Practices Applied to an Agile Setting by Juana Collymore and Brian Bothwell April 15, 2015 Outline Why is scheduling important? GAO Schedule Assessment Guide Overview Status of the
METRICS DRIVEN CONTINUAL SERVICE IMPROVEMENT USING AGILE CONCEPTS
METRICS DRIVEN CONTINUAL SERVICE IMPROVEMENT USING AGILE CONCEPTS John Osteen B Cognizant Business Consulting Process Quality Consulting Cognizant Technology Solutions, Chennai, India [email protected]
Introduction to Software Engineering: Overview and Methodologies
Introduction to Software Engineering: Overview and Methodologies John T. Bell Department of Computer Science University of Illinois, Chicago Based on materials from Bruegge & DuToit, Object Oriented Software
Case Study. An example of a new government contract award to a private sector company required to demonstrate ANSI-748 Compliance
Case Study An example of a new government contract award to a private sector company required to demonstrate ANSI-748 Compliance Executive Summary Managing a government contract with ANSI-748 Earned Value
Using the Agile Methodology to Mitigate the Risks of Highly Adaptive Projects
Transdyne Corporation CMMI Implementations in Small & Medium Organizations Using the Agile Methodology to Mitigate the Risks of Highly Adaptive Projects Dana Roberson Quality Software Engineer NNSA Service
Scrum QA Assessment. John Scarborough VP System Engineering STeP-IN Summit January 2006
Scrum QA Assessment John Scarborough VP System Engineering STeP-IN Summit January 2006 1 The origins of Agile Agile methodologies were created to provide an alternative means for software product development
Agile Software Development
Agile Software Development Use case for Agile Software Development Methodology in an Oil and Gas Exploration environment. White Paper Introduction No matter what business you are in, there are critical
Agile SW Development @ Siemens
CON ECT INFORMUNITY, 19.9.2013 Neue Software-Trends Agilität Prozesse & RE Agile SW Development @ Siemens Corporate Development Center Dr. Kurt Hofmann > 25 years Siemens ACT SW developer at PSE Team leader
Agile Practitioner: PMI-ACP and ScrumMaster Aligned
Agile Practitioner: PMI-ACP and ScrumMaster Aligned The PMI Agile Certified Practitioner (PMI-ACP) ScrumMaster credential validates your ability to understand agile principles, agile concepts, and establishes
Requirements-Based Testing: Encourage Collaboration Through Traceability
White Paper Requirements-Based Testing: Encourage Collaboration Through Traceability Executive Summary It is a well-documented fact that incomplete, poorly written or poorly communicated requirements are
Agile and lean methods for managing application development process
Agile and lean methods for managing application development process Hannu Markkanen 24.01.2013 1 Application development lifecycle model To support the planning and management of activities required in
Software Life Cycle. Main issues: Discussion of different life cycle models Maintenance or evolution
Software Life Cycle Main issues: Discussion of different life cycle models Maintenance or evolution Not this life cycle SE, Software Lifecycle, Hans van Vliet, 2008 2 Introduction software development
SENTINEL AUDIT V: STATUS OF
SENTINEL AUDIT V: STATUS OF THE FEDERAL BUREAU OF INVESTIGATION S CASE MANAGEMENT SYSTEM U.S. Department of Justice Office of the Inspector General Audit Division Audit Report 10-03 November 2009 Redacted
Enhance State IT Contract Expertise
Enhance State IT Contract Expertise Chris Estes State Chief Information Officer Office of Information Technology Services March 2015 1 P a g e Table of Contents 1. Legislative Request... 3 2. Introduction...
Simplifying development through activity-based change management
IBM Rational ClearCase and IBM Rational ClearQuest October 2004 Simplifying development through activity-based change management Allan Tate Product Manager IBM Software Group Karen Wade SCM Product Marketing
Cost effective methods of test environment management. Prabhu Meruga Director - Solution Engineering 16 th July SCQAA Irvine, CA
Cost effective methods of test environment management Prabhu Meruga Director - Solution Engineering 16 th July SCQAA Irvine, CA 2013 Agenda Basic complexity Dynamic needs for test environments Traditional
Topics covered. Agile methods Plan-driven and agile development Extreme programming Agile project management Scaling agile methods
Topics covered Chapter 3 Agile Software Development Agile methods Plan-driven and agile Extreme programming Agile project management Scaling agile methods 1 2 Need for rapid software Rapid software Changing
Introduction to Software Engineering: Project Management ( Highlights )
Introduction to Software Engineering: Project Management ( Highlights ) John T. Bell Department of Computer Science University of Illinois, Chicago Based on materials from chapters 14, 15, and 16 of Object
Agile Project. Management FOR DUMME&* by Mark C. Layton WILEY. John Wiley & Sons, Inc.
Agile Project Management FOR DUMME&* by Mark C. Layton WILEY John Wiley & Sons, Inc. Table of Contents»#» « Introduction / About This Book 1 Foolish Assumptions 1 Conventions Used in This Book 2 How This
Department of Veterans Affairs VA Directive 6004 CONFIGURATION, CHANGE, AND RELEASE MANAGEMENT PROGRAMS
Department of Veterans Affairs VA Directive 6004 Washington, DC 20420 Transmittal Sheet September 28, 2009 CONFIGURATION, CHANGE, AND RELEASE MANAGEMENT PROGRAMS 1. REASON FOR ISSUE: This Directive establishes
Waterfall vs. Agile Methodology
2012 Waterfall vs. Agile Methodology Mike McCormick MPCS, Inc. Revised Edition 8/9/2012 Contents Waterfall vs. Agile Model Comparison...3 Conceptual Difference...3 Efficiency...4 Suitability...4 Waterfall
Agile vs. Waterfall. Why not both. Arnold Okkenburg PMP
Agile vs. Waterfall Why not both Arnold Okkenburg PMP Project Management Agile Project Management Traditional Project Management Key Questions for Project Managers 1. Impact on Existing Project Methodologies:
I. Purpose - 1 MD # 0005
Department of Homeland SecUl ity Management Directives System MD Number: 0005 Issue Date: 10/28/2004 FINANCIAL MANAGEMENT LINE OF BUSINESS INTEGRATION AND MANAGEMENT I. Purpose This Management Directive