PRESIDENTIAL INFRASTRUCTURE COORDINATING COMMISSION A SUMMARY OF THE SOUTH AFRICAN NATIONAL INFRASTRUCTURE PLAN
|
|
|
- Felicia Bennett
- 10 years ago
- Views:
Transcription
1
2 PRESIDENTIAL INFRASTRUCTURE COORDINATING COMMISSION A SUMMARY OF THE SOUTH AFRICAN NATIONAL INFRASTRUCTURE PLAN
3 TABLE OF CONTENTS MESSAGE FROM THE PRESIDENT 3 MESSAGE FROM THE DEPUTY PRESIDENT 4 MESSAGE FROM CHAIRPERSONS OF THE PICC MANAGEMENT COMMITTEE AND SECRETARIAT 5 PART 1: THE JOURNEY 6 Overview 6 Introduction 7 PICC Terms of Reference 9 PART 2: SPATIAL MAPPING 10 PART 3: THE 18 STRATEGIC INTEGRATED PROJECTS (SIPS) 17 Geographic SIPs 18 Energy SIPs 20 Spatial SIPs 21 Social Infrastructure SIPs 22 Knowledge SIPs 23 Regional SIPs 24 Water and Sanitation SIPs 25 PART 4: ENABLERS AND OPPORTUNITIES 26 Enablers 27 Funding 28 Regulatory Reform: a real example of the challenge experienced in gaining access to land for infrastructure build 29 Improving performance on infrastructure projects 30 PART 5: DRIVING JOB CREATION & INDUSTRIALISATION 31 Driving Job Creation 31 Industrial Development: Mining and Processing 33 Industrial Development: Industrial Inputs 34 Industrial Development: Component Manufacturing 35 Industrial Development: Rail Stock 36 Industrial Development: Agro-Processing 37 Industrial Development: Pharmaceuticals 38 PART 6: SIP SKILLS AND PROJECT FRAMEWORK 39 Nature of Government s Skills Gap 39 Opportunities 40 Emerging Lessons: 2010 World Cup 41 Emerging Lessons: Medupi Power Station 42 Emerging Lessons: Gautrain 43 Emerging Models: Department of Health 44 Short-Term Responses to Engineering Shortages 45 Developing a Skills Framework 46 PART 7: IMPLEMENTATION ARRANGEMENTS 47 Implementation Framework 47 PART 8: CONCLUSION 48 Empowering a nation - triggering development 48 2 PRESIDENTIAL INFRASTRUCTURE COORDINATING COMMISSION REPORT 2012
4 MESSAGE FROM THE PRESIDENT AS SOUTH AFRICA MAKES A TENTATIVE RECOVERY FROM THE GLOBAL ECONOMIC DOWNTURN, WE HAVE ASSESSED BOTH THE CHALLENGES TO, AND OPPORTUNITIES FOR, OUR COUNTRY S GROWTH. AT THE CLOSE OF THE SECOND DECADE OF OUR DEMOCRACY, IT IS CLEAR THAT WE NEED TO CHANGE GEAR. ALL SOUTH AFRICANS NEED TO WORK TOGETHER IN A CONCERTED EFFORT TO IMPROVE SERVICE DELIVERY, BOLSTER JOB CREATION AND EXPEDITE ECONOMIC TRANSFORMATION. In South Africa, joblessness is still unacceptably high even with recent growth in jobs numbers. Global economic prospects remain fragile. In response, the Government of the Republic of South Africa has taken a bold decision. We have chosen a path of counter-cyclical spending driven by catalytic infrastructure investment. We are striking a fine balance between protecting our sovereign integrity while leveraging the multiplier impact of fixed capital formation. Valuable lessons have been learned from our most recent build programmes, such as the 2010 World Cup stadiums, King Shaka International Airport, Medupi Power Station and Gautrain. We are constantly improving our turnaround times and efficiency, enabling a larger developmental impact. Infrastructure investment is a key priority of both the National Development Plan and the New Growth Path. We are transforming the economy, directing national growth and driving job creation by implementing a long-term, governmentled infrastructure investment programme. In the process, we are leveraging the investment and participation of business, labour and civil society. Government is laying the foundation for growth and decent work for all South Africans and the prosperity of our country. MR JACOB ZUMA President of the Republic of South Africa A SUMMARY OF THE NATIONAL INFRASTRUCTURE PLAN 3
5 MESSAGE FROM THE DEPUTY PRESIDENT LAST YEAR, IN RESPONSE TO THE CHALLENGE OF FACILITATING FAST-TRACKED GOVERNMENT-LED INFRASTRUCTURE INVESTMENT, CABINET ESTABLISHED THE PRESIDENTIAL INFRASTRUCTURE COORDINATING COMMISSION (PICC). The PICC is mandated by Cabinet to plan and coordinate a National Infrastructure Plan.It is driven by the highest levels of political will and dedication to harmonise infrastructure planning and implementation across all spheres of the Government of the Republic of South Africa, State agencies as well as social partners. PICC interventions are cross-cutting yet targeted, seeking to crowd-in investment and mobilise efforts. We are integrating and phasing investment plans across 18 Strategic Infrastructure Projects (SIPs) which have five core functions: to unlock opportunity, transform the economic landscape, create new jobs, strengthen the delivery of basic services and support the integration of African economies. A balanced approach is being fostered through greening of the economy, boosting energy security, promoting integrated municipal infrastructure investment, facilitating integrated urban development, accelerating skills development, investing in rural development and enabling regional integration. The National Infrastructure Plan is transforming the structure of the economy into a more employment-friendly, equitable and inclusive trajectory. One that offers every South African real opportunities and a share in our growth and wealth. Accordingly, the Government of the Republic of South Africa recognises the vital role of the social partners in creating an enabling environment for implementing national infrastructure plans, mobilising human resources and ensuring accountability. MR KGALEMA MOTLANTHE Deputy President of the Republic of South Africa 4 PRESIDENTIAL INFRASTRUCTURE COORDINATING COMMISSION REPORT 2012
6 MESSAGE FROM CHAIRPERSONS OF THE PICC MANAGEMENT COMMITTEE & SECRETARIAT FOCUSSED INVESTMENT IN ECONOMIC AND SOCIAL INFRASTRUCTURE HAS PLAYED A SIGNIFICANT AND POSITIVE ROLE IN THE GROWTH PERFORMANCE OF FAST-GROWING ECONOMIES SUCH AS THE ASIAN TIGERS AND BRICS. THROUGH THE NATIONAL INFRASTRUCTURE PLAN, GOVERNMENT AIMS IS MOBILISING SOCIAL PARTNERS TO BUILD THE FOUNDATION FOR SOUTH AFRICA S FUTURE GROWTH PROSPECTS. MR GUGILE NKWINTI Minister of Rural Development and Land Reform; Chairperson: PICC Management Committee MR EBRAHIM PATEL Minister of Economic Development; Chairperson: PICC Secretariat Providing infrastructure for the economy and communities is one of the main ways South Africa will realise inclusive and jobs-rich growth. Quality, affordable infrastructure raises economic productivity, permits economic expansion and allows marginalised households and communities to take advantage of new opportunities. It also builds social capital; and raises living standards as people have access to electricity, piped water, housing and reliable transport. Infrastructure is critical to strengthening key value chains across our economy. Implementation of the National Infrastructure Plan will strengthen domestic demand for local capital goods industries, services and products. The more locallyproduced inputs the build programme uses, the more South Africa will grow its manufacturing industry, businesses and jobs. Through the National Infrastructure Plan we are mobilising social partners to develop the capacity and skills required to meet the demands of South Africa s growing investment programme, not only for construction materials and structural steel inputs, but also for sophisticated equipment like locomotives and turbines. This includes developing the skills to implement, operate and maintain our infrastructure assets. Leveraging job creation, skills development and localisation throughout the 20-year infrastructure pipeline will be one of the ways that South Africans can collectively build an equitable society. A SUMMARY OF THE NATIONAL INFRASTRUCTURE PLAN 5
7 PART 1: THE JOURNEY OVERVIEW The South African Government adopted a National Infrastructure Plan in 2012 that intends to transform our economic landscape while simultaneously creating significant numbers of new jobs, and to strengthen the delivery of basic services. The plan also supports the integration of African economies. This document is a high-level summary of the National Infrastructure Plan. It sets out the challenges and enablers which South Africa needs to respond to in planning and developing enabling infrastructure that fosters economic growth. It provides the background to Cabinet s decision to establish a body to integrate and coordinate the long-term infrastructure build - the Presidential Infrastructure Coordinating Commission (PICC) - with its supporting management structures. It presents the PICC s spatial mapping of infrastructure gaps which analyses future population growth, projected economic growth and areas of the country which are not served with water, electricity, roads, sanitation and communication. Based on this work, eighteen Strategic Integrated Projects (SIPs) have been developed and approved to support economic development and address service delivery in the poorest provinces. Each SIP comprises a large number of specific infrastructure components and programmes. This document sketches the integrated approach embarked upon to create an enabling environment and contains key elements of the Implementation Plan. 6 PRESIDENTIAL INFRASTRUCTURE COORDINATING COMMISSION REPORT 2012
8 INTRODUCTION Challenges 18 years into our democracy, there are still major challenges of poverty, unemployment and inequality. The New Growth Path sets a goal of 5 million new jobs by 2020; identifies structural problems in the economy to be overcome and points to opportunities in specific sectors and markets or jobs drivers. The first jobs driver is infrastructure: laying the basis for higher growth, inclusivity and job creation. Yet weak capacity, poor coordination and weak integration limit the development impact of infrastructure. Response: In order to address these challenges and goals, Cabinet established the PICC, to: coordinate, integrate and accelerate implementation develop a single common National Infrastructure Plan that will be monitored and centrally driven identify who is responsible and hold them to account develop a 20-year planning framework beyond one administration to avoid a stop-start pattern to the infrastucture roll-out. A SUMMARY OF THE NATIONAL INFRASTRUCTURE PLAN 7
9 8 PRESIDENTIAL INFRASTRUCTURE COORDINATING COMMISSION REPORT 2012
10 PICC TERMS OF REFERENCE The PICC s mandate is to ensure systematic selection, planning and monitoring of large projects and its terms of reference include the objectives outlined below: Identify 5-year priorities Develop a 20-year project pipeline Achieve development objectives: skills, industrialisation, empowerment, research & development Expand maintenance: new and existing infrastructure Infrastructure is critical to: Promote balanced economic development Unlock economic opportunities Promote mineral extraction and beneficiation Address socio-economic needs Promote job creation Help integrate human settlements and economic development. Improve infrastructure links: rural areas and poorest provinces Address capacity constraints and improve coordination and integration Scale-up investment in infrastructure Address impact of prices Support African development and integration Overall Approach An infrastructure book has been compiled, which contains more than 645 infrastructure projects across the country A National infrastructure Plan with 18 identified Strategic Integrated Projects (SIPs) has been developed and adopted by Cabinet and the PICC. A SUMMARY OF THE NATIONAL INFRASTRUCTURE PLAN 9
11 PART 2: SPATIAL MAPPING A spatial mapping exercise was undertaken, to determine the key gaps and opportunities, covering: Basic needs Economic opportunities The state of existing infrastructure Required infrastructure Unlocking economic opportunities. National, provincial and local maps were developed. 10
12 MAP 1: Constrained access to services relative to population density and economic centres. Below is an illustration of the concentrated population in under-serviced areas of the country where we expect increased urbanisation as people migrate to cities to seek work opportunities. This population migration will result in even more constraints in services within economic nodes necessitating a focus on decentralising and balancing economic growth and development across the country whilst addressing basic services in previously under-serviced areas. A SUMMARY OF THE NATIONAL INFRASTRUCTURE PLAN 11
13 MAP 2: Needs analysis based on current and projected economic growth Below is an indication of the 2010 and projected (2020) Gross Value Add (GVA) across the country. The development trajectory of economic growth is anticipated to continue around existing economic hubs, especially in Johannesburg and surrounding areas. 12 PRESIDENTIAL INFRASTRUCTURE COORDINATING COMMISSION REPORT 2012
14 MAP 3: International comparison on urban sprawl and densification with implications for efficient provision of utility services This graphic illustrates the complexity of servicing Gauteng s rapidly urbanising yet sprawling spatial footprint. Despite a population size of 8.7m people, Gauteng has a spatial footprint comparable to an urban agglomeration such as Jakarta, which has a population of 16m people. Sustainable thresholds for efficient delivery of utility services are established in more compact and densified cities such as London (7m people) and Paris (8m people). Although London and Paris have comparable population sizes to Gauteng, they utilise a third of the spatial geography of Gauteng. London: 7M people Paris: 8M people Jakarta (Jabotabok) 16M people Relative density area Provincial urban sprawl Gauteng: 8.7 M people A SUMMARY OF THE NATIONAL INFRASTRUCTURE PLAN 13
15 MAP 4: Fragmentation compromises urban efficiency necessary for effective utility provision and sustained economic growth This map illustrates the challenges in the South African urban spatial geography. In Gauteng, people spend long hours and scarce resources on daily commuting from peripheral high-density residential areas into the city centres of Johannesburg and Pretoria where their work is located. Lack of spatial integration and densification of residential and economic activities constrains economic growth, undermines productivity, reduces quality of life and makes it difficult to deliver efficient utilities and basic services. Economic Centres High Population Density Constrained Transport & Services 14 PRESIDENTIAL INFRASTRUCTURE COORDINATING COMMISSION REPORT 2012
16 MAP 5: Addressing spatial imbalances through targeted infrastructure investment The map below demonstrates how the SIPs were selected to address the spatial imbalances of the past by addressing the needs of the poorer provinces and enabling socio-economic development. Many of the components within the SIPs are cross-cutting with a national footprint such as the infrastructure programmes for school building, healthcare facilities and expanding access to broadband. Needs analysis Indicated possible bulk infrastructure requirements electricity, water, transport, town planning, ports etc. A SUMMARY OF THE NATIONAL INFRASTRUCTURE PLAN 15
17 MAP 6: Overview of the 18 Strategic Infrastructure Projects (SIPs) 1. Catalytic Northern Mineral Belt Durban-Free State-Gauteng Development Region South-Eastern Node and Corridor Saldanha-Northern Cape Corridor 2. Enabling socio-economic development Greening the South African Economy, Electricity Generation, Electricity Transmission and Distribution, Water and Sanitation Municipal, Agro-logistics and Rural Infrastructure, Urban Spatial Re-organisation and Regional Integration Unlocking the economic opportunities in North West Province 3. Cross-cutting Information and Communication Technologies, National school build and Higher Education, Revitalisation of public hospitals NEW CENTRES OF ECONOMIC GROWTH IDENTIFIED ABOVE 16 PRESIDENTIAL INFRASTRUCTURE COORDINATING COMMISSION REPORT 2012
18 PART 3: THE 18 STRATEGIC INTEGRATED PROJECTS (SIPs) EIGHTEEN STRATEGIC INTEGRATED PROJECTS (SIPs) HAVE BEEN DEVELOPED WHICH INTEGRATE MORE THAN 150 OF THE INDIVIDUAL INFRASTRUCTURE PLANS INTO A COHERENT PACKAGE The SIPs cover social and economic infrastructure across all 9 provinces (with an emphasis on lagging regions). SIPs cover catalytic projects that can fasttrack development and growth. Work is being aligned with key cross-cutting areas: human settlement planning and skills development. The SIPs comprise: 5 Geographically-focussed SIPs 3 Spatial SIPs 3 Energy SIPs 3 Social Infrastructure SIPs 2 Knowledge SIPs 1 Regional Integration SIP 1 Water and Sanitation SIP A SUMMARY OF THE NATIONAL INFRASTRUCTURE PLAN 17
19 GEOGRAPHIC SIPs SIP 1: Unlocking the northern mineral belt with Waterberg as the catalyst Unlock mineral resources Rail, water pipelines, energy generation and transmission infrastructure Thousands of direct jobs across the areas unlocked Urban development in Waterberg - first major post-apartheid new urban centre will be a green development project Rail capacity to Mpumalanga and Richards Bay Shift from road to rail in Mpumalanga Logistics corridor to connect Mpumalanga and Gauteng. Primary Mineral Reserves Coal - Platinum - 18bn tons 6323 tons Chromite - Palladium - 5,5 tons 3611 tons SIP 2: Durban-Free State-Gauteng logistics and industrial corridor Port of Durban New dig-out Port Breakwater and Entrance Channel Strengthen the logistics and transport corridor between SA s main industrial hubs Improve access to Durban s export and import facilities Integrate Free State Industrial Strategy activities into the corridor New port in Durban Aerotropolis around OR Tambo International Airport. Container Terminals Liquid Bulk Terminal Automotive Terminal 18 PRESIDENTIAL INFRASTRUCTURE COORDINATING COMMISSION REPORT 2012
20 GEOGRAPHIC SIPs SIP 3: South-Eastern node & corridor development New dam at Mzimvubu with irrigation systems N2-Wild Coast Highway which improves access into KwaZulu- Natal and national supply chains Strengthen economic development in Port Elizabeth through a manganese rail capacity from Northern Cape A manganese sinter (Northern Cape) and smelter (Eastern Cape) Possible Mthombo refinery (Coega) and transshipment hub at Ngqura and port and rail upgrades to improve industrial capacity and performance of the automotive sector. SIP 4: Unlocking the economic opportunities in North West Province SIP 5: Saldanha-Northern Cape development corridor Integrated rail and port expansion Back-of-port industrial capacity (including an IDZ) Strengthening maritime support capacity for oil and gas along African West Coast Expansion of iron ore mining production and beneficiation. Acceleration of investments in road, rail, bulk water, water treatment and transmission infrastructure Enabling reliable supply and basic service delivery Facilitate development of mining, agricultural activities and tourism opportunities Open up beneficiation opportunities in North West Province. A SUMMARY OF THE NATIONAL INFRASTRUCTURE PLAN 19
21 ENERGY SIPs SIP 8: Green energy in support of the South African economy Support sustainable green energy initiatives on a national scale through a diverse range of clean energy options as envisaged in the Integrated Resource Plan (IRP2010) and support bio-fuel production facilities. SIP 9: Electricity generation to support socioeconomic development Accelerate the construction of new electricity generation capacity in accordance with the IRP2010 to meet the needs of the economy and address historical imbalances. Monitor implementation of major projects such as new power stations: Medupi, Kusile and Ingula. SIP 10: Electricity transmission and distribution for all Expand the transmission and distribution network to address historical imbalances, provide access to electricity for all and support economic development. Align the 10-year transmission plan, the services backlog, the national broadband roll-out and the freight rail line development to leverage off regulatory approvals, supply chain and project development capacity. 20 PRESIDENTIAL INFRASTRUCTURE COORDINATING COMMISSION REPORT 2012
22 SPATIAL SIPs SIP 6: Integrated municipal infrastructure project Develop national capacity to assist the 23 least resourced districts (19 million people) to address all the maintenance backlogs and upgrades required in water, electricity and sanitation bulk infrastructure. The road maintenance programme will enhance service delivery capacity thereby impacting positively on the population. SIP 7: Integrated urban space and public transport programme SIP 11: Agri-logistics and rural iinfrastructure Improve investment in agricultural and rural infrastructure that supports expansion of production and employment, small-scale farming and rural development, including facilities for storage (silos, fresh-produce facilities, packing houses); transport links to main networks (rural roads, branch train-line, ports), fencing of farms, irrigation schemes to poor areas, improved R&D on rural issues (including expansion of agricultural colleges), processing facilities (abattoirs, dairy infrastructure), aquaculture incubation schemes and rural tourism infrastructure. Coordinate planning and implementation of public transport, human settlement, economic and social infrastructure and location decisions into sustainable urban settlements connected by densified transport corridors. This will focus on the 12 largest urban centres of the country, including all the metros in South Africa. Significant work is underway on urban transport integration. A SUMMARY OF THE NATIONAL INFRASTRUCTURE PLAN 21
23 SOCIAL INFRASTRUCTURE SIPs SIP 12: Revitalisation of public hospitals and other health facilities Build and refurbish hospitals, other public health facilities and revamp 122 nursing colleges. Extensive capital expenditure to prepare the public healthcare system to meet the requirements of the National Health Insurance (NHI) system. The SIP contains major builds for 6 hospitals. SIP 13: National school build programme A national school build programme driven by uniformity in planning, procurement, contract management and provision of basic services. Replace inappropriate school structures and address basic service backlog and provision of basic services under the Accelerated School Infrastructure Delivery Initiative (ASIDI). In addition, address national backlogs in classrooms, libraries, computer labs and admin buildings. Improving the learning environment will strengthen outcomes especially in rural schools, as well as reduce overcrowding. SIP 14: Higher education infrastructure Infrastructure development for higher education, focusing on lecture rooms, student accommodation, libraries and laboratories, as well as ICT connectivity. Development of university towns with a combination of facilities from residence, retail to recreation and transport. Potential to ensure shared infrastructure such as libraries by universities, FETs and other educational institutions. Two new universities will be built - in Northern Cape and Mpumalanga. 22 PRESIDENTIAL INFRASTRUCTURE COORDINATING COMMISSION REPORT 2012
24 KNOWLEDGE SIPs SIP 15: Expanding access to communication technology Provide for broadband coverage to all households by 2020 by establishing core Points of Presence (POPs) in district municipalities, extend new Infraco fibre networks across provinces linking districts, establish POPs and fibre connectivity at local level, and further penetrate the network into deep rural areas. While the private sector will invest in ICT infrastructure for urban and corporate networks, government will co-invest for township and rural access, as well as for e-government, school and health connectivity. SIP 16: SKA & Meerkat SKA is a global mega-science project, building an advanced radio-telescope facility linked to research infrastructure and high-speed ICT capacity and provides an opportunity for Africa and South Africa to contribute towards global advanced science projects. Infraco capacity on WACs. Local Municipal Network Connectivity to provincial network Local Municipality HQ The school roll-out focus is initially on the 125 Dinaledi (science and maths-focussed) schools and 1525 district schools. Part of digital access to all South Africans includes TV migration nationally from analogue to digital broadcasting. Infraco national network Districts connected into provincial backbone Other LM buildings in same town LM s fibre optic and/or microwave backbone Schools, hospitals etc. in same town Other Other towns towns in LM in LM A SUMMARY OF THE NATIONAL INFRASTRUCTURE PLAN 23
25 REGIONAL SIPs Population: 1bn Arable land Water resources Oil, gas and mineral resources Africa Bulk Water Resources: Lesotho Highlands Electricity Transmission: Mozambique (Cesul) Hydro Power: DRC (Grand Inga), Zambia Lesotho and Mozambique (Mphanda Nkuwa) Growing economies. Transport: Regional Interconnectors SIP 17: Regional integration for African cooperation and development Participate in mutually beneficial infrastructure projects to unlock long-term socio-economic benefits by partnering with fastgrowing African economies with projected growth ranging between 3% and 10%. The projects involving transport, water and energy also provide competitively-priced, diversified, short and medium to long-term options for the South African economy where, for example, electricity transmission in Mozambique (Cesul) could assist in providing cheap, clean power in the short-term whilst Grand Inga in the DRC is long-term. All these projects complement the Free Trade Area (FTA) discussions to create a market of 600 million people in South, Central and East Africa. 24 PRESIDENTIAL INFRASTRUCTURE COORDINATING COMMISSION REPORT 2012
26 WATER AND SANITATION SIPs A Nationwide Project: Developing a Sustainable Water Supply-Chain: Source-to-Tap-to-Source All Provinces Distribution infrastructure Resource development Bulk infrastructure Connector infrastructure Internal infrastructure Distribution reservoir Dam River Water treatment works Pumping station Bulk water pipeline Wastewater treatment works To other settlements Connector pipeline Collector sewer Internal pipe network Sewerage Assimilative Capacity of Receiving Water Body Treated effluent outfall Impacts on aquatic environment and down-stream water users Outfall sewer Sewerage pump station Sewerage reservoir SIP 18: Water and sanitation infrastructure A 10-year plan to address the estimated backlog of adequate water to supply 1.4m households and 2.1m households to basic sanitation. The project will involve provision of sustainable supply of water to meet social needs and support economic growth. Projects will provide for new infrastructure, rehabilitation and upgrading of existing infrastructure, as well as improve management of water infrastructure. A SUMMARY OF THE NATIONAL INFRASTRUCTURE PLAN 25
27 PART 4: ENABLERS AND OPPORTUNITIES INTRODUCTION In order to implement the SIPs, the PICC reviewed critical enablers for the infrastructure programme. This includes assessing the supply lines for construction inputs such as wood, cement, steel and bitumen. Other impacts on the optimisation and viability of infrastructure are the direct charges such as port charges, water pricing and other forms of tariffs and levies. In the case of transport, the expansion of rail lines is now being accompanied by procurement of an increased number of trains to fully utilise the infrastructure. In the health sector the PICC supported the establishment of a pharmaceutical manufacturing plant to complement the expansion of clinic and hospital infrastructure. In addition to assessing key constraints, issues such as delayed access to land, skills constraints and the affordability of the cost of the SIPs were reviewed. 26 PRESIDENTIAL INFRASTRUCTURE COORDINATING COMMISSION REPORT 2012
28 ENABLERS Construction environment Address the supply and competition bottlenecks in steel, cement, wood, coal, bitumen, as well as equipment and machinery Address the security of supply, pricing and downstream beneficiation of iron ore and manganese Transport sector Reduce port charges by R1bn in 2012/13 Acquire modernised rolling stock (locomotive and wagons) to meet expanding demand Rural access Use the Post Office network to establish a Postbank with outreach in rural areas and tap savings Pharmaceutical manufacturing plant Support the development of a manufacturing facility to produce active pharmaceutical ingredients for antiretrovirals Access and availability of water Fast-track water licenses, expand water-system capacity, speed-up build programmes and address backlogs Authorisations Streamline, integrate and address bottlenecks in authorisations, to ensure that construction commencement and ongoing construction activities are not delayed A SUMMARY OF THE NATIONAL INFRASTRUCTURE PLAN 27
29 FUNDING Known benefits to SA by investing in infrastructure and basic services backlog Jobs Significant increase in tax base and tax revenues Infrastructure projects and economic activity attract foreign direct investment Increase in exports and trade Improved quality of life for all citizens The backlog in basic services is addressed. Considerations to be taken into account in devising appropriate funding strategies Innovative funding including accessing retirement funding for infrastructure projects Use balance sheets of State-owned Enterprises fully and build on the strengths of SOEs Bring on board the development finance institutions such as the IDC Reassess the model of PPPs that have been used in the past to ensure equitable transfer of risk to private sector Recognise that the total public sector debt is for a single sovereign entity. 28 PRESIDENTIAL INFRASTRUCTURE COORDINATING COMMISSION REPORT
30 Regulatory Reform: A real example of the challenge experienced in gaining access to land for infrastructure build Development timelines - Tx line project (Worst Case - Expropriation & appeals) Pre CRA (Planning Studies) CRA Approval EIA Process Appeals ROD - Assuming no appeals Process to approve DRA (IFC) DRA Approval (IFC worst case) Security of land Expropriation Design ERA Approval Process (worst case IFC) PFMA Pre-notification period ERA Approval (Investment decision) PFMA Approval Procurement process Line Construction Commissioning Final release approval (worst case IFC) Final Release Year Year Year Year Year Year Appeals and expropriation can result in upto-42 month delays (no productive work done) Year Year Year Year Year As much as 18 months can be required for approvals and procurement after ERA & PFMA during which no design or construction work can be performed Year Governance Structure Potential Environmental delays Duration undermined EIA, appeals and expropriation can take up to 6,5 years Time required for Eskom Governance & PFMA approvals and Procurement final approval Potential delays due to Environmental appeals and time to effect Expropriation A SUMMARY OF THE NATIONAL INFRASTRUCTURE PLAN 29
31 Improving performance on infrastructure projects Challenges Poor planning at institutional level Slow approval of projects Late start to projects Poor quality of execution High costs and monopoly pricing Poor industry reaction time Poor project controls (schedule, cost, quality, safety, health and environment) Tender abuses and corruption Unrealistic acceleration Unplanned and costly rework of designs or construction No political alignment with no champion Permitting (e.g. EIA) rework or delays Lead time delays Slow or non-payment of contractors. Improve by Actions Programme to coordinate improvement in project-related skills, with project management and engineering skills within the State Align the national, provincial and local structures Align the investment plan with funding allocation Long-term support for long-term projects, especially regional projects Predictable process for triggering of national projects, including regulatory approvals Strong policy direction for incentivisation of supplier development, localisation and private sector participation Plan and build projects that promote low life-cycle costs Standardised designs and delivery Full life-cycle costs recovered through user tariff or a committed funding strategy Strengthening project controls and monitoring in government and State-owned Enterprises Standardised and simple automated reporting to track project progress and performance Early warning to address bottlenecks New compact with private sector. 30 PRESIDENTIAL INFRASTRUCTURE COORDINATING COMMISSION REPORT 2012
32 PART 5: DRIVING JOB CREATION & INDUSTRIALISATION DRIVING JOB CREATION Jobs impact estimates done that include new jobs in: Construction Operation Maintenance Multiplier effect of infrastructure spending Components and supplies to infrastructure build programmes Unlocking investment in other sectors which depend on reliable infrastructure (e.g. mining). Key areas for Youth Inclusion Very high levels of youth unemployment require special and focussed measures to draw young people into employment in the infrastructure programme. Youth inclusion: as trainees and apprentices as employees in the SOEs and construction companies, with clear targets for each project. Available Mechanisms: Amending existing shareholder compacts to require SOEs and public entities involved in infrastructure to give effect to this goal Terms should be set out in the tender specifications and project design for the private sector. A SUMMARY OF THE NATIONAL INFRASTRUCTURE PLAN 31
33 32 PRESIDENTIAL INFRASTRUCTURE COORDINATING COMMISSION REPORT 2012
34 INDUSTRIAL DEVELOPMENT: MINING AND PROCESSING Manganese smelter and sinter plants A mine and a sinter plant in Hotazel in Northern Cape, with plans to develop a ferromanganese smelter complex at Coega in Eastern Cape. Transnet is planning to increase the current rail and port handling capacity from 5.5Mtpa to 16Mtpa as part of their current market demand strategy. Iron Ore Mining Transnet has completed the upgrade to the iron ore rail line between Sishen in Northern Cape and Saldanha in the Western Cape to 60Mtpa, with future expansion plans to 82Mtpa. Transnet is also increasing the iron ore handling facility at Saldanha. This will be complemented by measures to improve greater local steel and downstream production. A SUMMARY OF THE NATIONAL INFRASTRUCTURE PLAN 33
35 INDUSTRIAL DEVELOPMENT: INDUSTRIAL INPUTS Mining With access to water, electricity and transport logistics, the SIPs will unlock mining development in Limpopo, North West and Northern Cape provinces. Inputs: Cement Domestic production of cement can be scaled-up to meet the demand of the Infrastructure Plan. Inputs: Bitumen Local production capacity must be increased. Inputs: Steel Infrastructure programmes will require large amounts of steel and fabricated products. This opens opportunities for additional local production and investment. Inputs: Timber The net deforestation and market structure will create supply constraints and price pressure. New entrants and greater production will be encouraged. 34 PRESIDENTIAL INFRASTRUCTURE COORDINATING COMMISSION REPORT 2012
36 INDUSTRIAL DEVELOPMENT: COMPONENT MANUFACTURING Heavy Component Manufacturing The size and scope of the 20-year infrastructure plan justifies manufacturing heavy equipment locally. South Africa has a strong manufacturing capability in this industry. Small Component Manufacturing The mass roll-out of solar water heaters (SWH) and set-up boxes for digital migration justifies the support and investment for local manufacturing. A SUMMARY OF THE NATIONAL INFRASTRUCTURE PLAN 35
37 INDUSTRIAL DEVELOPMENT: RAIL STOCK Rolling stock for freight and passenger rail Transnet and Prasa locomotives and wagons are manufactured locally. Localisation of component manufacture needs to be deepened. 36 PRESIDENTIAL INFRASTRUCTURE COORDINATING COMMISSION REPORT 2012
38 INDUSTRIAL DEVELOPMENT: AGRO-PROCESSING Agro-Processing Farm Linkage With long-term food security being a top priority for most countries, South Africa has a significant opportunity to support agro-processing. Infrastructure can connect farms and markets. A SUMMARY OF THE NATIONAL INFRASTRUCTURE PLAN 37
39 INDUSTRIAL DEVELOPMENT: PHARMACEUTICALS Pharmaceuticals SA has the opportunity to support a facility which will produce the active ingredients for ARVs. SA has the largest ARV programme in the world, estimated at 1.3m which will increase to 2.5m by 2015 with a planned coverage of 80% Project Ketlaphela will produce 1bn tablets to treat 1m patients. The project is being developed by a global pharmaceutical company and State-owned corporations SA will spend R1.5bn and create 350 permanent and construction jobs. 38 PRESIDENTIAL INFRASTRUCTURE COORDINATING COMMISSION REPORT 2012
40 PART 6: SIP SKILLS AND PROJECT FRAMEWORK NATURE OF GOVERNMENT S SKILLS GAP State training facilities largely neglected after 1980s commercialisation General shortage of technical instructors, workplace assessors and mentors. Shortage of professionals - engineering, built environment etc Limited knowledge retention Skills shortage concentrated at a local government level A SUMMARY OF THE NATIONAL INFRASTRUCTURE PLAN 39
41 OPPORTUNITIES National emphasis on engineering training will be complemented by other key skills e.g. artisans, operators, planners, surveyors, project developers, financial experts, systems experts etc Progress has been made in undergraduate engineering and enrolment figures ( ). Now we will address the gap in Stage Two learning graduate mentoring workplace learning for professional designations Stagnation in numbers of new learners entering over last three years suggests economic capacity for artisan training reached. Increasing numbers require more funding and workplace opportunities We are developing an integrated skills plan for the next 20 years across all the SIPs based on the demand and supply of skills in the current and anticipated build across the country. This plan will be used to inform training colleges, universities and artisan schools across the country. It will ensure the smoother transition of construction workers from one build to the next Dedicated project training courses which are modular in design and repeat courses throughout the year to improve the capacity and standardisation in project implementation across the SIPs Develop a shared pool of scarce skills across and between public entities. 40 PRESIDENTIAL INFRASTRUCTURE COORDINATING COMMISSION REPORT 2012
42 EMERGING LESSONS: 2010 WORLD CUP Central coordination with direct presidential oversight and a Local Organising Committee with Ministerial oversight made quick decisions Well-defined specifications and project scope Coordination between national, provincial and municipal structures with public/private sector alignment and participation Identified champions, by name, in each institution, tied to performance Poor industrial relations (strikes) at subcontractor level Cost escalation to meet deadlines and acceleration caused by delays Some contracts over-priced, because of works definition deficiencies Insufficient developmental goals incorporated in project specifications. A SUMMARY OF THE NATIONAL INFRASTRUCTURE PLAN 41
43 EMERGING LESSONS: MEDUPI POWER STATION Cost escalations linked to project scope definition and specifications. Plant specifications depend on project needs and engineering conditions. There is an inherent tension between engineering solutions which are economical yet fitfor-purpose The high cost and availability of scarce specialist skills e.g. pipe and boiler welders has implications for local sourcing and project costs Pre-emptive training and sourcing of skills for build programme, prior to project initiation Timely authorizations and approvals. 42 PRESIDENTIAL INFRASTRUCTURE COORDINATING COMMISSION REPORT 2012
44 EMERGING LESSONS: GAUTRAIN Detailed planning and specification PPP model resulted in small private sector investment relative to government s investment and liability for full patronage risk Project flexibility to shift construction efforts without incurring additional costs to meet emerging government priorities e.g. Airport- Sandton link completion for 2010 World Cup Innovative contract specifications and incentive system included financial penalty regimes for lack of compliance by contractors, sub-contractors and operator Procurement in engineering and construction phases was governed by contractual obligations to transfer skills. However, additional mechanisms were needed to measure both quality and quantity of the training Monthly escalations on labour, plant, fuel and materials are standard in civil engineering projects. Yet unforeseen risks can have significant implications for cost over-runs and completion dates. A SUMMARY OF THE NATIONAL INFRASTRUCTURE PLAN 43
45 EMERGING MODELS: DEPARTMENT OF HEALTH An experienced, specialist management engineer centrally placed with authority to manage infrastructure programme across all three spheres of government Dramatic short-term decrease in provincial infrastructure under-expenditure through establishment of internal engineering management competence National department complemented policy formulation and oversight functions with capacity to guide nuts and bolts of provincial implementation Oversight and quality control of provincial implementation through building project conceptualisation, design, standardisation and project controls at a national level A specialist contracting unit was set up with the national government department to oversee project management, sequencing and pricing issues, engineering standards, fit-for-purpose assessments and standardization 44 PRESIDENTIAL INFRASTRUCTURE COORDINATING COMMISSION REPORT 2012
46 SHORT-TERM RESPONSES TO ENGINEERING SHORTAGES Increase immigration International resources per project Increased graduations due to coaching Retired back temporarily as coaches Those who have left industry back Returning diaspora Immigrants National diploma graduate BSc/BEng graduate 0 In industry from Reduce leaving the industry Loss due to premature death Reduce emigration No early retirement Reduce retirement for 5 years A SUMMARY OF THE NATIONAL INFRASTRUCTURE PLAN 45
47 DEVELOPING A SKILLS FRAMEWORK A Skills Plan will be developed for each SIP covering construction, operation and maintenance periods A dedicated Project Training Course structure with universities to augment skills in the public sector A shared pool for utilising scarce skills across and between public entities (including the South African National Defence Force s professional skills base), as well as State-owned Enterprise apprenticeships and interns Private sector skills commitments, using the National Skills Accord Attracting back South Africans with high-level engineering and project management skills, working on projects across the world Easing immigration rules in infrastructurelinked scarce-skills categories Developing partnerships with universities and other institutions in the built environment: R160m programme to increase engineering capacity at University of Johannesburg 2 new universities FET Colleges capacity with greater specialisation Minister of Higher Education and Training to initiate Infrastructure Skills Compact discussions with higher education institutions Infrastructure as a training space with skills and apprenticeship targets in the project specifications Human Resource Development Council should enhance the Skills Framework with discussions on what different constituencies can do in context of the National Skills Accord. 46 PRESIDENTIAL INFRASTRUCTURE COORDINATING COMMISSION REPORT 2012
48 PART 7: IMPLEMENTATION ARRANGEMENTS IMPLEMENTATION FRAMEWORK 1. Monitoring actual construction across the country 2. Develop an Infrastructure Skills Plan 3. Funding Framework to ensure resources for Plan 4. Social Dialogue to involve organised labour and business 5. Address bureaucracy and regulatory delays through an Infrastructure Development Act 6. Develop a Supply Side and Localisation Plan 7. Ensure Cost Containment and Anti- Corruption measures 8. Development Impact Plans per SIP, covering jobs, greening of economy, localisation, skills development, empowerment and R&D 9. Inter-governmental alignment: Deliver compacts to indicate who does what, by when 10. A single planning tool and dashboard across all Projects 11. Strengthened capacity in the PICC and in the State as a whole 12. An Interim Project Coordinator/ Implementation Agency appointed by MANCO will comprise a Project Manager responsible for developing a Business Plan and coordinating integrated infrastructure workstreams across government. A SUMMARY OF THE NATIONAL INFRASTRUCTURE PLAN 47
49 PART 8: CONCLUSION EMPOWERING A NATION - TRIGGERING DEVELOPMENT The Infrastructure Plan is a bold effort to transform the economy, laying the basis for growth and jobs The Plan is an opportunity to mobilise the nation behind a common vision, develop a common platform for delivery to the nation and build partnerships with business and labour It seeks to promote: re-industrialisation through manufacturing of inputs, components and machinery skills development aimed at critical categories greening the economy empowerment. 48 PRESIDENTIAL INFRASTRUCTURE COORDINATING COMMISSION REPORT 2012
50
CHAPTER 2. TOWARDS GREATER ALIGNMENT AND INTEGRATED PLANNING. CHAPTER 2 / AN ALIGNED & INTEGRATED PLANNING FRAMEWORK Page 2-1
CHAPTER 2. TOWARDS GREATER ALIGNMENT AND INTEGRATED PLANNING CHAPTER 2 / AN ALIGNED & INTEGRATED PLANNING FRAMEWORK Page 2-1 2.1 Introduction Recent developments in transport at national, provincial and
The National Development Plan 2030: Implications for Project Managers. 16 September 2013 Dr. Bridgette Gasa
The National Development Plan 2030: Implications for Project Managers 16 September 2013 Dr. Bridgette Gasa NATIONAL DEVELOPMENT PLAN 2030 Our future - make it work Implications of the NDP for Project Managers
Government Gazette REPUBLIC OF SOUTH AFRICA
Please note that most Acts are published in English and another South African official language. Currently we only have capacity to publish the English versions. This means that this document will only
Operational perspective on the Electricity Distribution Industry (EDI) turnaround
2008 Electricity Distribution Maintenance Summit Day 1: 9 June 2008 Operational perspective on the Electricity Distribution Industry (EDI) turnaround by Dr Willie de Beer, Chief Operations Officer, EDI
NATIONAL TREASURY STRATEGIC PLAN 2011/14
NATIONAL TREASURY STRATEGIC PLAN 2011/14 PRESENTATION TO PARLIAMENTARY FINANCE COMMITTEES Presenter: Lungisa Fuzile Director General, National Treasury 31 May 2011 TREASURY AIMS AND OBJECTIVES Chapter
INFRASTRUCTURE DEVELOPMENT BILL
REPUBLIC OF SOUTH AFRICA INFRASTRUCTURE DEVELOPMENT BILL (As introduced in the National Assembly (proposed section 7); explanatory summary of the Bill published in Government Gazette No. 36980 of 30 October
Infrastructure Development Funding and Financing
Infrastructure Development Funding and Financing 09 December 2013 2 Presentation outline 1. Role of infrastructure development 2. Public sector infrastructure investment 3. Funding options i. Recent airport
REMARKS BY THE MINISTER OF SMALL BUSINESS DEVELOPMENT, MS LINDIWE ZULU, ON THE OCCASION OF THE PROVINCIAL SMALL BUSINESS AND CO-OPERATIVE SUMMIT
REMARKS BY THE MINISTER OF SMALL BUSINESS DEVELOPMENT, MS LINDIWE ZULU, ON THE OCCASION OF THE PROVINCIAL SMALL BUSINESS AND CO-OPERATIVE SUMMIT DURBAN (6 MARCH 2015) Programme Director, MEC for Economic
State-owned Company registered in terms of the Companies Act
Introducing sefa Corporate Profile Established Corporate Type Shareholding Reporting Funding Objective Activities Geographic mandate Finance Governance Values April 2012 (merged entity) State-owned Company
AGREEMENT AS AMENDED ON 06 DECEMBER 2002
INFORMATION & COMMUNICATION TECHNOLOGIES SECTOR SUMMIT AGREEMENT AS AMENDED ON 06 DECEMBER 2002 1. INTRODUCTION 1.1 At the Presidential Jobs Summit in 1998 Nedlac constituencies Government, organised Labour,
Construction Services
Construction Services Construction Turning innovative ideas into delivered solutions At Golder Associates we strive to be the most respected global company providing consulting, design, and construction
Section 8 Funding Options and Support Services
Resources are not unlimited and it is therefore extremely important that the resources be spent on the most important projects. Prioritising projects makes implementation easier as it is possible to start
Infrastructure. In brief. Overview
7 Infrastructure In brief Budgeted spending for public-sector infrastructure totals R827 billion over the next three years. A much larger set of projects is under consideration over the longer term. Decisions
Domestic steel market overview
Domestic steel market overview Chifipa Mhango Chief Economist: ArcelorMittal South Africa Investor Session: Cape Town & Johannesburg September 2011 The Economy in a nutshell Global overview Advanced economies
Growth promotion through industrial strategies in Zambia
Growth promotion through industrial strategies in Zambia 1. Introduction and summary This brief provides a summary of the findings of a study investigating the current and potential opportunities for growth
Department of Public Works Private bag x 65, PRETORIA, 0001 Tel: 012 337 2819 - Fax: 012 323 2284 www.publicworks.gov.za
B79930/2 DPW Asset Br#12A40A 3/28/07 10:13 AM Page 1 C M Y CM MY CY CMY K THE AGENCY B79930/2 Department of Public Works Private bag x 65, PRETORIA, 0001 Tel: 012 337 2819 - Fax: 012 323 2284 www.publicworks.gov.za
SPEECH BY THE MINISTER OF SMALL BUSINESS DEVELOPMENT, MS LINDIWE ZULU, AT THE HOOKUP DINNER 2 ND ANNIVERSARY
SPEECH BY THE MINISTER OF SMALL BUSINESS DEVELOPMENT, MS LINDIWE ZULU, AT THE HOOKUP DINNER 2 ND ANNIVERSARY JOHANNESBURG (1 AUGUST 2014) Programme Director, Distinguished guests, Ladies and gentlemen
SPEECH BY MINISTER OF WATER AND ENVIRONMENTAL AFFAIRS, MS EDNA MOLEWA, AT THE DBSA KNOWLEDGE WEEK SESSION, MIDRAND
SPEECH BY MINISTER OF WATER AND ENVIRONMENTAL AFFAIRS, MS EDNA MOLEWA, AT THE DBSA KNOWLEDGE WEEK SESSION, MIDRAND 14 October 2011 Programme Director Chairperson of the DBSA Board Distinguished guests
5. Industrial and sector strategies
5. Industrial and sector strategies 5.1 Issues identified by the Accelerated and Shared Growth Initiative for South Africa (AsgiSA) Industrial policy has three core aims, namely: creation and smaller enterprises.
ANNUAL PERFORMANCE PLAN
ANNUAL PERFORMANCE PLAN 2014 2015 DEPARTMENT: PERFORMANCE MONITORING AND EVALUATION Annual Plan 2014/15 FOREWORD Minister Collins Chabane Deputy Minister Obed Bapela The Department of Monitoring and Evaluation
Report of the Auditor-General of South Africa to Parliament on a performance audit of the infrastructure delivery process at the provincial
Report of the Auditor-General of South Africa to Parliament on a performance audit of the infrastructure delivery process at the provincial departments of Education and Health August 2011 Report of the
The Framework for Strategic Plans and Annual Performance Plans is also available on www.treasury.gov.za
Published by the National Treasury Private Bag X115 Pretoria 0001 South Africa Tel: +27 12 315 5948 Fax: +27 12 315 5126 The Framework for Strategic Plans and Annual Performance Plans is also available
Chairperson of the Board; Chief Executive Officer of PRASA, Mr Montana; Board Members; Acting Director General; Management Team from PRASA;
SPEECH BY THE MINISTER OF TRANSPORT, MS DIPUO PETERS, MP, ON THE ANNUAL GENERAL MEETING OF THE PASSENGER RAIL AGENCY OF SOUTH AFRICA (PRASA) ON 29 SEPTEMBER 2014 AT HATFIELD, PRETORIA Chairperson of the
ACCOUNTING FOR ASIA S NATURAL CAPITAL
ACCOUNTING FOR S NATURAL CAPITAL DRIVING THE TRANSITION TO A RESOURCE-EFFICIENT GREEN ECONOMY Asia s rapid economic growth during recent decades has been accompanied by serious depletion of the region
2014-2019 HUMAN SETTLEMENTS PRIORITIES (MTSF)
2014-2019 HUMAN SETTLEMENTS PRIORITIES (MTSF) PRESENTATION OVERVIEW A vision and mission for human settlements Transforming human settlements and National Space Identified sub-outcomes to achieve the expected
Public Administration Leadership and Management Academy
Vote 8 Public Administration Leadership and Management Academy Budget summary 2009/10 2010/11 2011/12 Total to be Current Transfers and Payments for R million appropriated payments subsidies capital assets
BROADBAND ROLLOUT AND THE REGULATORY AND INFRASTRUCTURAL CHALLENGES
DEPARTMENT OF COMMUNICATIONS REPUBLIC OF SOUTH AFRICA WORKSHOP ON ELECTRONIC COMMERCE GENEVA, 17-18 JUNE 2013 Organised under the auspices of the WTO Council for Trade in Services BROADBAND ROLLOUT AND
PRESENTATION TO THE SELECT COMMITTEE ON ECONOMIC AND BUSINESS DEVELOPMENT DEPARTMENT OF TRANSPORT STRATEGIC PLAN, APP AND BUDGET
PRESENTATION TO THE SELECT COMMITTEE ON ECONOMIC AND BUSINESS DEVELOPMENT DEPARTMENT OF TRANSPORT STRATEGIC PLAN, APP AND BUDGET 08 JULY 2014 MR MAWETHU VILANA ACTING DIRECTOR-GENERAL 1 Mandate CONTENTS
AGRI MEGA PARK, BREDARSDORP, OVERBERG DISCTRICT, WESTERN CAPE
MINISTER S SPEAKING NOTES AGRI MEGA WEEK FOR INTERNATIONAL FOOD SECURITY AGRI MEGA PARK, BREDARSDORP, OVERBERG DISCTRICT, WESTERN CAPE 17 SEPTEMBER 2015 Program Director Honourable Mayor, Richard Mitchell
Title: Renewable Energy Policies in South Africa World Future Council Workshop in Accra, Ghana Theme: POWER KICK FOR AFRICA Renewable Energy Policies
Title: Renewable Energy Policies in South Africa World Future Council Workshop in Accra, Ghana Theme: POWER KICK FOR AFRICA Renewable Energy Policies for Sustainable African Development Date: 22 June 2010
Tamil Nadu would provide to its residents, high quality infrastructure all over the State comparable with the best in the world
Tamil Vision 2023 The vision for Tamil for 2023 is to become India s most prosperous progressive State with no poverty, where its people enjoy all the basic services of a modern society live in harmonious
Economic Development Department. Strategic Plan 2011/12 2015/16
Economic Development Department Strategic Plan 2011/12 2015/16 March 2011 1 FOREWORD BY THE MINISTER On 8 January 2011 President Jacob Zuma said that Political emancipation without economic transformation
Sustaining progress in a low-growth world 2015 MEDIUM TERM BUDGET POLICY STATEMENT
Sustaining progress in a low-growth world 2015 MEDIUM TERM BUDGET POLICY STATEMENT Sustaining progress in a low-growth world The world economy is experiencing a sustained period of low growth. All countries
CONTRACT MANAGEMENT FRAMEWORK
CONTRACT MANAGEMENT FRAMEWORK August 2010 Page 1 of 20 Table of contents 1 Introduction to the CMF... 3 1.1 Purpose and scope of the CMF... 3 1.2 Importance of contract management... 4 1.3 Managing contracts...
Latrobe City Council Submission Emissions Reduction Fund Green Paper February 2014
Latrobe City Council Submission Emissions Reduction Fund Green Paper February 2014 For further information in relation to this submission please contact Allison Jones General Manager Economic Sustainability
STRENGTHENING HEALTH SERVICES & THEIR COORDINATION THROUGH A PPP IN TETE PROVINCE
STRENGTHENING HEALTH SERVICES & THEIR COORDINATION THROUGH A PPP IN TETE PROVINCE Concept note 28/02/2013 Proposition: Rehabilitate and upgrade the Provincial hospital, as well as key aspects of district
S O U T H A F R I C A. Prepared by: Vinny Pillay Occasion: EUREKA - ITEA Co- Summit 2015 Date: 10 March 2015
S O U T H A F R I C A Prepared by: Vinny Pillay Occasion: EUREKA - ITEA Co- Summit 2015 Date: 10 March 2015 Overview South Africa s strategic context Framework for S&T cooperation with Europe ICT RDI Roadmap
National. icr Policy
National icr Policy TABLE OF CONTENTS Forward Acknowledgements 1. Principles...1 1.0 Introduction...1 1.1 Vision...2 1.2 Mission...2 1.3 Policy Context...2 2. Policy Objectives...4 2.1 ICT Infrastructure...4
Outlook of South Africa s Manganese Sector. 29 th May 2014 Hannah Edinger, Director, Frontier Advisory
Outlook of South Africa s Manganese Sector 29 th May 2014 Hannah Edinger, Director, Frontier Advisory Contents of Presentation Overview of SA Manganese Sector Challenges Facing the Sector Plans to Address
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA BACKGROUND INFORMATION DOCUMENT 1 BACKGROUND Transnet Limited s (Transnet) existing
DEPARTMENT OF FORESTRY DRAFT REVISED NATIONAL FOREST POLICY OF MALAWI
DEPARTMENT OF FORESTRY DRAFT REVISED NATIONAL FOREST POLICY OF MALAWI July, 2013 1. Foreword 2. Preface 3. Introduction 4. Policy linkages 5. Broad Policy Direction 6. Policy Priority Areas Provides the
Public works. Introduction
8 Public works Introduction Public works encompasses engineering, construction and related activities carried out by government for the benefit of citizens. This includes the acquisition, leasing, maintenance
Governments implement PPP programmes in the healthcare sector for one or more of a number of reasons:
UNECE Healthcare PPP Project Team Project Brief Introduction This is a very active time globally for the healthcare sector as demand for services continues to grow exponentially, driven by rising life
SECTOR ASSESSMENT (SUMMARY): PUBLIC RESOURCE MANAGEMENT. 1. Public Resource Management Sector Issues and Opportunities
Country Partnership Strategy: SRI, 2012 2016 SECTOR ASSESSMENT (SUMMARY): PUBLIC RESOURCE MANAGEMENT 1. Public Resource Management Sector Issues and Opportunities 1. The problems in Sri Lanka are multifaceted
JOZINI LOCAL MUNICIPALITY INTEGRATED DEVELOPMENT PLAN REVIEW 2008/2009 EXECUTIVE SUMMARY
JOZINI LOCAL MUNICIPALITY INTEGRATED DEVELOPMENT PLAN REVIEW 2008/2009 EXECUTIVE SUMMARY EXECUTIVE SUMMARY INTEGRATED DEVELOPMENT PLAN (IDP) INTRODUCTION Chapter 5 of the Municipal Systems Act No. 32 of
INVESTMENT AND BUSINESS OPPORTUNITIES IN SOUTH AFRICA
INVESTMENT AND BUSINESS OPPORTUNITIES IN SOUTH AFRICA TABLE OF CONTENTS 1 WHY INVEST IN SOUTH AFRICA...2 1.1 Strategic Location...2 1.2 Rapid Liberalization of Trade and Investment Environment...2 1.3
Business Opportunities in the Energy Sector Workshop - Mpumalanga Bundu Lodge 28 th August 2014. Name of the presenter: Sabelo Mamba Regional Manager
Business Opportunities in the Energy Sector Workshop - Mpumalanga Bundu Lodge 28 th August 2014 Name of the presenter: Sabelo Mamba Regional Manager Overview and Background Challenges that led to the establishment
Policy recommendations on urban strategic planning
Policy recommendations on urban strategic planning They are conceived as key orientations to ensure local government s access to strategic planning and concerns different actors represented by the following
Spatial planning - Apartheid (pre-1965 to early 1990s)
South Africa Spatial planning - Apartheid (pre-1965 to early 1990s) Prepared by Peter Robinson and Tanya Dayaram Spatial planning used for political and economic agendas left deep scars on the spatial
AFRICAN ECONOMIC CONFERENCE 2013
CONCEPT NOTE FOR AFRICAN ECONOMIC CONFERENCE 2013 REGIONAL INTEGRATION IN AFRICA October 28-30, 2013 JOHANNESBURG, SOUTH AFRICA African Development Bank Group United Nations Economic Commission for Africa
CHAPTER 6 OUTCOME 3 QUALITY INFRASTRUCTURE DEVELOPMENT THAT SUPPORTS LIVEABLE COMMUNITIES
Rural & agriculture Increase the value added to the City of Tshwane economy by rural regions Realise a food trade surplus, with onthird produced by small-scale farmers or households. Economic participation
IT S ONLY A DREAM UNTIL YOU DO SOMETHING ABOUT IT. www.idc.co.za www.nyda.gov.za www.sefa.org.za
IT S ONLY A DREAM UNTIL YOU DO SOMETHING ABOUT IT www.idc.co.za www.nyda.gov.za www.sefa.org.za WE VE MADE IT EASIER FOR YOU TO APPLY THROUGH OUR PARTNERSHIP. THE IDC, NYDA AND sefa HAVE ENTERED INTO A
Framework for Managing Programme Performance Information
Framework for Managing Programme Performance Information Published by the National Treasury Private Bag X115 Pretoria 0001 South Africa Tel: +27 12 315 5948 Fax: +27 12 315 5126 The Framework for Managing
Hong Kong Declaration on Sustainable Development for Cities
Hong Kong Declaration on Sustainable Development for Cities 1. We, the representatives of national and local governments, community groups, the scientific community, professional institutions, business,
Developing Power Projects in Southern Africa. Cape Town Presentation 8 th February 2016
Developing Power Projects in Southern Africa Cape Town Presentation 8 th February 2016 Company Highlights AFR now participating in the development of three large-scale power projects in Botswana Completion
PPIAF Assistance in Afghanistan
August 2012 PPIAF Assistance in Afghanistan Emerging from a decade of war, massive support from various development partners has been pouring in over the last few years to help rebuild Afghanistan. PPIAF
Industrial Development Corporation Women in Oil and Energy Department of Energy. Business Opportunities in the Energy Sector DRAFT.
Industrial Development Corporation Women in Oil and Energy Department of Energy Business Opportunities in the Energy Sector DRAFT 17 September 2015 About the IDC Established in 1940 National Development
LONG-TERM FINANCIAL PLAN POLICY. Budgets FINANCE DEPARTMENT. City of Cape Town
ANNEXURE 14 LONG-TERM FINANCIAL PLAN POLICY Budgets FINANCE DEPARTMENT City of Cape Town 1 TABLE OF CONTENTS 1. DEFINITIONS AND ABBREVIATIONS... 3 2. INTRODUCTION... 4 3. PROBLEM STATEMENT... 4 4. PURPOSE...
INDONESIA. Implementing Public TVET Programs in the Midst of the Financial Crisis - HRD Policies in Collaboration with Employment Security
INDONESIA Implementing Public TVET Programs in the Midst of the Financial Crisis - HRD Policies in Collaboration with Employment Security (Agnes Retno Dwidarsih Yosephine Pranolo) A. Employment Condition
Investment Brief for the Electricity Sector in Ghana
Investment Brief for the Electricity Sector in Ghana Overview Ghana s economy growth decelerated sharply to an estimated 4.2% in 2014, down from 7.4 % in 2013. Manufacturing and oil production from the
SECTOR ASSESSMENT (SUMMARY): ENERGY 1. 1. Sector Performance, Problems, and Opportunities
Country Partnership Strategy: Bangladesh, 2011 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Power generation gap. Bangladesh endures long
China s 12th Five-Year Plan: Healthcare sector
China s 12th Five-Year Plan: Healthcare sector May 2011 KPMG CHINA One of the guiding principles of the 12th Five-Year Plan (5YP) is inclusive growth : helping ensure that the benefits of the country s
3. VISION, TARGETS AND OVERVIEW OF THE GAUTENG EMPLOYMENT, GROWTH AND DEVELOPMENT STRATEGY...30
CONTENTS 1. INTRODUCTION...10 1.1. Aims of the GEGDS and the Structure of the Document...12 2. ECONOMIC OVERVIEW - SETTING THE SCENE FOR THE GAUTENG EMPLOYMENT, GROWTH AND DEVELOPMENT STRATEGY...16 2.1.
FROM BILLIONS TO TRILLIONS:
FROM BILLIONS TO TRILLIONS: MDB Contributions to Financing for Development In 2015, the international community is due to agree on a new set of comprehensive and universal sustainable development goals
DEVELOPMENT OF A NATIONAL EHEALTH STRATEGY FOR SOUTH AFRICA
DEVELOPMENT OF A NATIONAL EHEALTH STRATEGY FOR SOUTH AFRICA WHO-ITU MEETING, NATIONAL ehealth STRATEGY DEVELOPMENT: COUNTRY EXPERIENCE AND NEXT STEPS 24-26 JULY 1 2 1. BACKGROUND (1) The National Department
Section 2 - LED Policy and Legislative Framework
Section 2 - LED Policy and Legislative Framework 2.1 Introduction Guidelines for the implementation of Local Economic Development Strategies have been presented by the various spheres of government. Legislation
Having undertaken a general discussion on the basis of Report IV, Small and medium-sized enterprises and decent and productive employment creation,
International Labour Conference Provisional Record 104th Session, Geneva, June 2015 11-1 Fourth item on the agenda: Small and medium-sized enterprises and decent and productive employment creation Reports
The Municipal Infrastructure Grant Programme
The Municipal Infrastructure Grant Programme An Introductory Guide Prepared by Department of Provincial and Local Government March 2004 TABLE OF CONTENTS 1. Introduction... 1 1.2 About this document...
How To Improve The Infrastructure Of The City Of Germany
WSDP: MODULE 3 TOPIC 5: WATER SERVICES INFRASTRUCTURE 5. WATER SERVICES INFRASTRUCTURE 5.1. Future trends and goals (water services infrastructure) Internal and connector water and sanitation infrastructure
DEPARTMENT OF PERFORMANCE MONITORING AND EVALUATION IN THE PRESIDENCY
The Presidency Department of Performance Monitoring and Evaluation DEPARTMENT OF PERFORMANCE MONITORING AND EVALUATION IN THE PRESIDENCY Version: 060112 Date of presentation: 17 January 2012 Establishment
Adapting Northern Adelaide - Submission towards the new Climate Change Strategy for South Australia
16 October 2015 Adapting Northern Adelaide Project City of Salisbury and City of Playford Polaris Innovation Centre Mawson Lakes SA 5095 Climate Change Team, GPO Box 1047 Adelaide SA 5001 [email protected]
consulting Company Profile Immigration, Relocation and Expat Support Services
consulting Company Profile Immigration, Relocation and Expat Support Services Who are we? Expats On The Globe (EOG) is servicing beyond borders with a particular focus on Africa. Based in South Africa,
Freight and energy demand forecast
Freight and energy demand forecast 2 Table of Contents List of Tables and/or Figures List of Tables and/or Figures 21 Acronyms and Abbreviations 22 1. Introduction 23 2. Demand Planning Tools 24 3. Drivers
Meeting Urban Development Challenges
Discussion Draft Meeting Urban Development Challenges Its importance for both growth and poverty calls for a coherent national framework toward urbanization. The objective of such a framework should be
The Role of TVET Providers in Training for Employees: New Zealand paper
APEC Forum on Human Resources Development, Chiba November 2008 The Role of TVET Providers in Training for Employees: New Zealand paper Executive Summary New Zealand needs to raise labour productivity if
4 Adoption of Asset Management Policy and Strategy
4 Adoption of Asset Management Policy and Strategy Abstract The report recommends the adoption of an updated Asset Management Policy 2014 and an Asset Management Strategy 2014-2019. Both documents are
Planning for Employment in the Greater Golden Horseshoe May 2008 Background Paper, Places to Grow
July 21, 2008 Mr. Brad Graham Assistant Deputy Minister Ontario Growth Secretariat 777 Bay Street, 4th Floor, Suite 425 Toronto, ON M5G 2E5 Re: Planning for Employment in the Greater Golden Horseshoe May
Regional Agenda. World Economic Forum on Africa Meeting Overview
Regional Agenda World Economic Forum on Africa Meeting Overview Kigali, Rwanda 11-13 May 2016 Connecting Africa s Resources through Digital Transformation Africa s positive economic outlook is under pressure
PARASTATAL SECTOR REFORM AND PRIVATISATION IN TANZANIA
PARASTATAL SECTOR REFORM AND PRIVATISATION IN TANZANIA George Mbowe Introduction A dramatic change has taken place in Tanzania since the mid-1980s. It is observed that the cumulative process of the country's
1. a) How effective is the current Climate Change Act 2010 in driving climate change action by:
Public Submission Review of Climate Change Act 2010 City of Melbourne Questions 1. a) How effective is the current Climate Change Act 2010 in driving climate change action by: Government? (tick one only)
Economic 360 for Indonesia: Growth Prospects and Emerging Opportunities in the ICT Industry
Economic 360 for Indonesia: Growth Prospects and Emerging Opportunities in the ICT Industry Indonesia s ICT Industry Decoded: Hardware, Software, and Telecom to Propel Growth April 2012 Contents Executive
Digital Hume a digital strategy for a smart region. Executive Summary
a Digital Hume a digital strategy for a smart region Executive Summary ii Digital Hume: a digital strategy for a smart region Introduction As the National Broadband Network arrives in the Hume Region there
Asset Management Policy March 2014
Asset Management Policy March 2014 In February 2011, we published our current Asset Management Policy. This is the first update incorporating further developments in our thinking on capacity planning and
Assessing equity in the distribution of community pharmacies in South Africa in preparation for the National Health Insurance scheme
Assessing equity in the distribution of community pharmacies in South Africa in preparation for the National Health Insurance scheme Ward KL, Sanders D, Leng HMJ and Pollock, A OUTLINE Introduction Methods
IOE PERSPECTIVES ON THE POST 2015 DEVELOPMENT AGENDA JANUARY 2013
IOE PERSPECTIVES ON THE POST 2015 DEVELOPMENT AGENDA JANUARY 2013 INTERNATIONAL ORGANISATION OF EMPLOYERS Disclaimer Articles posted on the website are made available by the UNCTAD secretariat in the form
Immovable Asset Management in National and Provincial Government. Guideline For Custodians Custodian Asset Management Plans
Immovable Asset Management in National and Provincial Government Guideline For Custodians Custodian Asset Management Plans Version 1 20 October 2008 1 Table of Contents Glossary of Terms Relevant to Immovable
Draft Programme Document
Draft Programme Document CHANGE MANAGEMENT, PUBLIC SECTOR DEVELOPMENT AND PROGRAMME SUPPORT A Programme under the National Agriculture Development Framework APRIL 2009 1 Table of Contents I. Executive
national treasury National Treasury estimates of national expenditure Women, Children and People with Disabilities vote 8
vote 8 Women, Children and People with Disabilities National Treasury estimates of national expenditure national treasury Department: National Treasury REPUBLIC OF SOUTH AFRICA Estimates of National Expenditure
E: Business support and access to finance
E: Business support and access to finance 41 The North East Local Enterprise Partnership area benefits from a committed workforce, a good business environment and a competitive cost base. However, the