Information Strategy Planning in Construction: Framework and Processes
|
|
|
- Austen Manning
- 10 years ago
- Views:
Transcription
1 Information Strategy Planning in Construction: Framework and Processes Boong Yeol Ryoo 1, Soo Yong Kim 2 and Young Dai Lee 3 1Assistant Professor, 3137 TAMU Department of Construction Science, Texas A&M University, College Station, TX , U.S.A, [email protected] 2Professor, Department of Civil Engineering, Pukyong National University, San 100, Yongdangdong, Namgu Busan, , Korea, [email protected] 3Professor, Department of Civil Engineering, Pukyong National University, San 100, Yongdangdong, Namgu Busan, , Korea, [email protected] Abstract The intended objective of ISP is to develop a comprehensive plan for integrated systems development. Thus, Information Strategy Planning (ISP) is the first step in order for general contractors in the construction industry to introduce Information technology (IT) to their business and project management. Due to a lack of understanding of the role of ISP in systems development, it has been often ignored or not been considered by them. In order to design and develop an integrated system flawlessly, a well-defined software development methodology must be adopted. However, most existing methodologies are proprietary intellectual property of System Integrators (SI) whose fees are too expensive to most contractors. Their methodologies are generic and it requires a thorough understanding of their methodology and business processes in construction in order to implement in an integrated systems development in construction. This paper presents a comprehensive framework of ISP for construction contractors. Methods and tools for each step will be presented and desirable deliverables will be followed. Thus, without professional system integrators, they are able to explore information technologies that might support their business needs. It also can help them to evaluate existing systems, examine their IT and business environments, define a system architecture and functional architecture, and assess the impact on their organization. Keywords: Information Strategy Planning (ISP), System Integration (SI), software Development Methodologies, Software Development Life Cycle (SDLC) 1. Introduction In the construction industry, information systems have been designed and developed by computer scientists who do not have adequate understanding of the characteristics of construction business and construction projects. The construction companies also do not have sufficient knowledge of how information systems should be designed and developed in accordance with their needs. The management of system development projects must be thoroughly planned in order to put all systems and their components together [1]. Software Development Life Cycle (SDLC) models have been used in Information Technology (IT) industry. SDLC is a conceptual model for system integrators to manage software development projects. It covers from planning to operation and maintenance of a system s life cycle. However, software engineering techniques have been known to the IT industry whereas a little known to the construction industry [2]. System integrators often employ a software development methodology which has been used as a tool for producing and documenting project deliverables. Based on information engineering knowledge, comprehensive software development methodologies have been devised by system integrators. The methodologies include deliverables by phase, a project management model, a quality control model, and reasonable analysis methods and appropriate tools. Deliverables along with efficient methods and specific tools are defined and categorized throughout the software development project life cycle. Accessing such methodologies is limited since those are proprietary intellectual property of the system integrator. Information Strategy Planning (ISP) is the basis and the first step of system integration. Without a proper ISP, system integration would not succeed [3]. Due to its characteristics, it is very hard to execute 584
2 26th International Symposium on Automation and Robotics in Construction (ISARC 2009) complete ISP comprehensively for construction contractors because it involves the analysis of business environment and information technology environment in the industry. This paper presents a framework and architecture of Information Strategy Planning for general contractors. The framework is based on case studies and generic software development methodologies. It includes major tasks by phase and deliverables. Thus general contractors will be able to evaluate their deliverables. 2. Software Development Life Cycle A framework of essential tasks to design and develop an integrated system is called System Development Life Cycle (SDLC). Traditionally phased life-cycle model and waterfall model have been put into practice. The models divide a software development project into six key phases such as Planning, Analysis, Design, Development, Testing, and Operation and Maintenance. More practical models including prototyping model, spiral model, iterative and incremental development model, and component-based development have been introduced to the information technology industry. Potential problems still exist because the models focus on design and programming and testing. Capturing industry specific business processes and knowledge has not been specified. 2.1 SDLC Methodologies Three distinct approaches have been considered as shown in Table 1. The concept of software development methodologies has been moved forward from Process-Oriented, to Data-Oriented, and to Object-Oriented Design. In early stage of software engineering, the process modelling method was used in structured analysis and design. Yourdon/DeMarco [4] and Gane/Sarson proposed a process-driven approach to bring both data and control flow of a system together. DFD is Data Flow Diagram. James Martin [5][6] proposed a data-driven approach. Booch [7] and Yourdon/Coad [8][9] proposed objectedoriented approach. Table 1 Characteristic of System Development Approaches Approach Developers Description Structured analysis Information Engineering Object-Oriented Analysis/Design Yourdon/DeMarco Gane/Sarson James Martin Grady Booch Yourdon/Coad Unit system-oriented and Process-oriented Convert business requirements into specifications Good for computerization of existing business process Data-oriented Plan project management throughout the project life cycle Good for enterprise system integration Object-oriented Convert functional requirements into implementation classes Good to define dependency for complex systems 2.2 CASE Tools Even though such software development methodologies have been introduced in the information technology industry many years ago, implementing such a methodology in real projects is very complicated because of a lack of understanding of the methodologies and CASE Tools. It is also hard to measure the 585
3 performance and productivity of a software development project. In many cases, success of a software development project has been relying on the knowledge, experience, and skills of team members. As shown in Table 2, well-known system development methodologies have been introduced by business consultation firms. These are available from the firms or their business partners. Often these methodologies are not easily accessible due to expensive fees. Method/1 focuses on three issues: what is the business environment that the client faces, in which desired direction the client would go, and what activities must be completed in order to achieve the issues [10]. Method/1 tries to help to identify functions, analyze data, and design the architecture of intended systems. Navigator proposes system design and development tasks in more than 250 subject areas throughout project life cycle. It describes how three distinct components of system development, i.e., data, process, and information technology, can be formulated. Application Development Workbench (ADW) is a Computer- Aided Software Engineering (CASE) tool by Sterling Software and system developers are able to share resources in design and development. In 4Front, business strategy, people, organization, processes, information technology come together. Thus understanding business strategy is important before developing a system. Information Engineering Methodology (IEM) has been adopted by Texas Instruments (TI) and it uses Information Engineering Facility (IEF) which is the first computerized methodology. Table 2 Commercial System Development Methodologies Methodologies CASE Tool Developer Phases Method/1 Foundation Accenture Oldest methodology and used by more than 300 organizations Navigator ADW Ernest & Young More than 250 subject areas 4Front Excelerator Deloitte Planning, design and development IEM (Information Engineering Methodology) IEF (Information Engineering Facility) Texas Instruments (James Martin) Covers ISP phase to implementation phase SSADM (LSDM) System Engineer LBMS Used in the analysis and design stages of systems development SILC (Systems Integration Life Cycle) SHL Transform SHL Includes deliverables from design and development phases 3. Information Strategy Planning Information Strategy Planning (ISP) is the process of exploring essential tasks for systems development by studying client s business plans and goals [11]. To identify major tasks and required deliverables from ISP for construction contractors, two surveys were conducted to investigate the business and information technology strategies and future plan for system development. Ninety-nine small and medium-size contractors participated in the first survey and twenty-three contractors were participated the second survey. 3.1 ISP Survey Two surveys were sent out to small and medium size contractors and their annual volume of work is under $1.5 Billion. As shown in Figure 1, the volume of the majority of the respondents was less than $
4 26th International Symposium on Automation and Robotics in Construction (ISARC 2009) million which are considered as small-size forms. 31% of them were greater than $250 million but less than $750 million where as 21% of them were more than $1.5 billion. According the survey, most contractors were not aware of such methodologies. Because of additional expenses in hiring well-known consultation firms as shown in Table 2, the contractors have been attempted to build up an information strategy planning without external assistance. This enforced them to purchase off the shelf systems for various management as shown in Table 3. This shows system integration between related systems is needed but it has not been seriously considered. One of the common misunderstanding, 57% of the respondents, was a project management system, an estimating application or a contract management application has been considered as an Enterprise Resource Planning (ERP) system. Only 14% of the respondents have been used a commercial ERP system. For example, ERP is a key system in corporate level management. Important decisions to buy an ERP system have been made by top management (45%) and Project Management System (PMS) by the same top management (46%). Finance, accounting, human resources, and asset management had more priority than other management modules. Majority of contractors (53%) want to purchase commercial ERP systems where as only 19% of the contractors want to have custom-build management information systems. Approximately 80% of the respondents set aside a budget of less than $500,000 for an ERP system implementation even though they understand that ERP is compatible with the way of the business practice in the construction industry. >$1.5B 21% $750M~$1. 5B 8% <$250M 47% $250M~$75 0M 24% Figure 1 Size of Respondents Table 3 Plan for System Integration Future Plan 587 No. of Respondants Percent (%) Develop MIS 19 18% Buy off-the-shelf ERP 53 51% Integrate multiple modules 11 11% Buy functional systems 16 16% Other 4 4% The average satisfaction rate on corporate level systems was 2.65 on 5 point scale when their integration rate was 3.28 on 5 point scale. This showed that the level of integration among the systems was poor because they did not have proper assistance from information technology professionals. The survey also showed most of contractors did not aware of the importance of information strategy planning and did not hire a standard methodology. Notably, they were not able to financially execute such tasks because their budget was limited or none. 3.2 Case Studies The objective of this study was to identify essential tasks. Through the study a set of tasks or ISP was presented as shown in Table 3. Six construction firms were studied. Three of them were construction management firms and the other three are program management firms. One of the chief roles of program management firms is to execute heavy construction projects and development projects. Broader business environment both in national and global should be studied in their ISP. Construction management firms required the study of narrow business environment including the market analysis. Thus combining broader
5 and barrow business environment can be beneficial for contractors to predict the image of future systems and required information technology. 3.3 Framework of ISP In initiation phase, five phases can be considered in order to complete an information strategy planning project: Project Planning, Business Environment Analysis of Current and Future Market, Information Systems and Information Technology of Current and Future Market, Recommendations for Future System Integration, and Project Management. The project plan includes the scope of work, project team, project schedule, and the project execution plan. In order for successful project completion, key items for the project plan were considered such as project goals, project strategy and its structure, methods, staff and skills. System integrators perspective, the management of deliverables is critical. All tasks performed during the project must be documented. Business processes are broken down into three levels: main, group, and unit. Business actions at corporate level processes fall into main processes. These main processes are further broken into group processes for team level actions. Unit processes are to define specific procedures for individual members of the group. In the beginning of ISP phase, the required corporate level information will be asked to complete an information strategy planning for general contractors. The defined vision and goals were among the items. Long-term and short-term plan related to the goals were collected. Especially corporate level strategy, business level strategy and organization level strategy on key business areas were defined. Corporate level strategy is to cope with where the industry is going. Business level strategy is more specific strategy and may vary depending on the types of business areas. Organization strategy is for home office management, human resources management, customer relationship management, and supply chain management. Thus, corporate level strategy should be supported by business level strategy and its functional strategy. Some certain techniques can be used for specific tasks such as Strengths, Weaknesses, Opportunities, and Threats (SWOT) analysis to evaluate the contractor s vision and goals, and plans. For public firms, it is important to validate if its vision and goals are incorporated with the national and industry trends. Through this step, some Critical Success Factor (CSF) can be identified. 4. Conclusions and Suggestions Construction firms need a practical template so that where they can use it for system integration projects. This research presents a template that small and medium size contractors can use prior to their system integration projects. It will help the contractors to understand its current operational performance and clarify its future strategy in a systematic way. Understand the business strategy is critical. Business environment analysis such as the identification of factors for business, IT and organization is also essential. Basic statistics tools were used to study the past trend and forecast the future trend of external business environment. Some specific methods such as SWOT, CSF, and matrix analysis were used to measure internal business environment such as business, organization and information technology. Gap analysis was seriously considered in order for successful implementation. By benchmarking and case studies, potential mistakes can be eliminated. It helped contractors to realize the gap between desired systems and actual systems they have. Feasibility study, both technical and functional, was performed in order to prepare an IT implementation plan. Selecting a proper SDLC methodology and CASE tool is crucial even for ISP. Thus contractors can carry out ISP in a systematic way. Acknowledgement The authors wish to express their appreciation to all those who participate in the surveys for this research. 588
6 26th International Symposium on Automation and Robotics in Construction (ISARC 2009) References [1] Lederer, Albert L. and Sethi, V. (1996). Key Prescriptions for Strategic Information Systems Planning, Journal of Management Information Systems, pp 35-62, Volume 13, Issue 1 (June 1996). [2] Artuk, U, Ryoo, B.Y., and Baier, R. (2007). An Overview of Enterprise Resource Planning (ERP) Systems in Small and Medium sized Organizations: Case of Florida Contractors. Fourth International Conference on Construction in the 21 st Century (CITC-IV), July 11-13, Gold Coast, Australia, [3] Haapio, T. (2007). A Framework for Improving Effort Management in Software Projects, Soft Process Improvement and Practice, pp , Volume 12, [4] Zhao, S. Sun, Y, Liu, W. And Yin, M. (2007). Research on a Framework of Information System Strategy Planning under Supply Chain Environment, International Conference on Wireless Communications, Networking and Mobile Computing, WiCom 2007, pp , [5] Yourdon, E. (1986) Whatever happened to structured Nalsys, Datamation, V32, n 11 p133(4), June 1, 1986, [6] Martin, J., Odell, J. (1992) Oriented Analysis and Design, [7] Martin, J., Odell, J. (1993) Principles of Object-Oriented Analysis and Design, [8] Booch, G. (1994) Object-Oriented Analysis and Design with Applications, [9] Coad, P., and Yourdon, E. (1991) Oriented Analysis (2nd edition), 1991a. [10] Coad, P., and Yourdon, E. (1991) Object-Oriented Design, 1991b. [11] Andersen Consulting (1987), Foundation-Method/I: Information Planning, Version 8.0. Chicago: Andersen Consulting,
7 Table 4 Tasks for Information Strategy Planning by Phases Phase Tasks Deliverables Project planning Set scope of work Organize project team and assign responsibility Call for pre-project meeting Project plan - Scope of work (objectives), Schedule, and project team and responsibility Project execution plan Review of current strategy and policies Identify line-items Perform benefit/cost analysis, return on investment Make out corporate vision, objectives, goals, and long-term/short-term plans Investigate industry and major markets Review existing business plan Identify critical success factors Project execution plan - deliverables Business environment review Business strategy review Critical success factors System development plan Review current business processes Review current information technology Future business processes Future information technology Assess organization: functions & business processes Study industry Perform interviews Perform past trend analysis Perform SWOT Analysis Review profit models Examine information management team Review applications/systems (hardware, software, and network) Evaluate information technology infrastructure Suggest suitable information technology Study competitors, clients, and partners Identify future markets Study information technology trends Perform benchmarking Prioritize suggestions Redesign current business processes Describe information management structure Propose framework for system integration Propose information technology structure Suggest information management team Owner s requirements Existing business process model Future business process model Report on applications Report on information technology infrastructure Analysis report on information management team Benchmarking report Information technology trends report Priority report Scope of work report Information strategy plan System integration plan System management plan Project Closeout Review and submit deliverables Documentation 590
DESIGNING A STRATEGIC INFORMATION SYSTEMS PLANNING METHODOLOGY FOR MALAYSIAN INSTITUTES OF HIGHER LEARNING (ISP-IPTA)
DESIGNING A STRATEGIC INFORMATION SYSTEMS PLANNING METHODOLOGY FOR MALAYSIAN INSTITUTES OF HIGHER LEARNING (ISP-IPTA) Irny Suzila Ishak, Universiti Industri Selangor, [email protected] Rose Alinda Alias,
What is a life cycle model?
What is a life cycle model? Framework under which a software product is going to be developed. Defines the phases that the product under development will go through. Identifies activities involved in each
Strategic Information Systems Planning : A Brief Review
IJCSNS International Journal of Computer Science and Network Security, VOL.11 No.5, May 2011 179 Strategic Information Systems Planning : A Brief Review Fahad N. Al-Aboud King Saud University, Riyadh Kingdom
Chapter 1 Exercises. 1. Why would a systems analyst have to act as a translator? What groups might be involved?
Hejazi 1 Mohammad Essam Hejazi MGMT 310-01 Chapter 1 & 2 01/22/2014 Chapter 1 Exercises 1. Why would a systems analyst have to act as a translator? What groups might be involved? A systems analyst should
Software Engineering. What is a system?
What is a system? Software Engineering Software Processes A purposeful collection of inter-related components working together to achieve some common objective. A system may include software, mechanical,
A Review of an MVC Framework based Software Development
, pp. 213-220 http://dx.doi.org/10.14257/ijseia.2014.8.10.19 A Review of an MVC Framework based Software Development Ronnie D. Caytiles and Sunguk Lee * Department of Multimedia Engineering, Hannam University
(Refer Slide Time: 01:52)
Software Engineering Prof. N. L. Sarda Computer Science & Engineering Indian Institute of Technology, Bombay Lecture - 2 Introduction to Software Engineering Challenges, Process Models etc (Part 2) This
A. Waterfall Model - Requirement Analysis. System & Software Design. Implementation & Unit Testing. Integration & System Testing.
Processing Models Of SDLC Mrs. Nalkar Sanjivani Baban Asst. Professor, IT/CS Dept, JVM s Mehta College,Sector 19, Airoli, Navi Mumbai-400708 [email protected] Abstract This paper presents an
A Capability Maturity Model (CMM)
Software Development Life Cycle (SDLC) and Development Methods There are some enterprises in which a careful disorderliness is the true method. Herman Melville Capability Maturity Model (CMM) A Capability
An Integrated Methodology for Implementing ERP Systems
APDSI 2000 Full Paper (July, 2000) An Integrated Methodology for Implementing ERP Systems Su-Yeon Kim 1), Eui-Ho Suh 2), Hyun-Seok Hwang 3) 1) Department of Industrial Engineering, POSTECH, Korea ([email protected])
n Assignment 4 n Due Thursday 2/19 n Business paper draft n Due Tuesday 2/24 n Database Assignment 2 posted n Due Thursday 2/26
Class Announcements TIM 50 - Business Information Systems Lecture 14 Instructor: John Musacchio UC Santa Cruz n Assignment 4 n Due Thursday 2/19 n Business paper draft n Due Tuesday 2/24 n Database Assignment
ISSUES OF STRUCTURED VS. OBJECT-ORIENTED METHODOLOGY OF SYSTEMS ANALYSIS AND DESIGN
ISSUES OF STRUCTURED VS. OBJECT-ORIENTED METHODOLOGY OF SYSTEMS ANALYSIS AND DESIGN Mohammad A. Rob, University of Houston-Clear Lake, [email protected] ABSTRACT In recent years, there has been a surge of
CHAPTER_3 SOFTWARE ENGINEERING (PROCESS MODELS)
CHAPTER_3 SOFTWARE ENGINEERING (PROCESS MODELS) Prescriptive Process Model Defines a distinct set of activities, actions, tasks, milestones, and work products that are required to engineer high quality
How To Develop Software
Software Engineering Prof. N.L. Sarda Computer Science & Engineering Indian Institute of Technology, Bombay Lecture-4 Overview of Phases (Part - II) We studied the problem definition phase, with which
Software Development Life Cycle (SDLC)
Software Development Life Cycle (SDLC) Supriyo Bhattacharjee MOF Capability Maturity Model (CMM) A bench-mark for measuring the maturity of an organization s software process CMM defines 5 levels of process
System development lifecycle waterfall model
Slide 6.1 System development lifecycle waterfall model Figure 6.1 The waterfall model of system development lifecycle Slide 6.2 The b model Figure 6.2 The b model Source: N D Birrell and M A Ould, A Practical
A Comparison of SOA Methodologies Analysis & Design Phases
202 A Comparison of SOA Methodologies Analysis & Design Phases Sandra SVANIDZAITĖ Institute of Mathematics and Informatics, Vilnius University Abstract. Service oriented computing is a new software engineering
DATABASE DEVELOPMENT LIFE CYCLE
DATABASE DEVELOPMENT LIFE CYCLE Pranshu Gupta 1 Ramon A. Mata-Toledo 2 Morgan D. Monger 3 Abstract A software development life cycle model (SDLC) consists of a set of processes (planning, requirements,
Component Based Development in Software Engineering
Component Based Development in Software Engineering Amandeep Bakshi, Rupinder Singh Abstract--In today s world, Component Based development is an active research area for more than a decade in software
The most suitable system methodology for the proposed system is drawn out.
3.0 Methodology 3.1 Introduction In this chapter, five software development life cycle models are compared and discussed briefly. The most suitable system methodology for the proposed system is drawn out.
CS 487. Week 8. Reference: 1. Software engineering, roger s. pressman. Reading: 1. Ian Sommerville, Chapter 3. Objective:
CS 487 Week 8 Reading: 1. Ian Sommerville, Chapter 3. Objective: 1. To check the understandibility of the students in life cycle and process model for development of a software product. 2. To check if
Elite: A New Component-Based Software Development Model
Elite: A New Component-Based Software Development Model Lata Nautiyal Umesh Kumar Tiwari Sushil Chandra Dimri Shivani Bahuguna Assistant Professor- Assistant Professor- Professor- Assistant Professor-
Information Technology Policy
Information Technology Policy Systems Development Life Cycle Policy ITP Number ITP-APP012 Category Recommended Policy Contact [email protected] Effective Date May 1, 2013 Supersedes Scheduled Review
5/19/2014. 1 Professor Lili Saghafi
5/19/2014 1 Professor Lili Saghafi MANAGING INFORMATION TECHNOLOGY Lecture 9 METHODOLOGIES FOR CUSTOM SOFTWARE DEVELOPMENT By : Prof. Lili Saghafi 1-2 METHODOLOGIES FOR CUSTOM SOFTWARE DEVELOPMENT Large
Software Engineering. Software Processes. Based on Software Engineering, 7 th Edition by Ian Sommerville
Software Engineering Software Processes Based on Software Engineering, 7 th Edition by Ian Sommerville Objectives To introduce software process models To describe three generic process models and when
Introduction to Systems Analysis and Design
Introduction to Systems Analysis and Design What is a System? A system is a set of interrelated components that function together to achieve a common goal. The components of a system are called subsystems.
A SYSTEM DEVELOPMENT METHODOLOGY FOR ERP SYSTEM IN SMEs OF MALAYSIAN MANUFACTURING SECTORS
A SYSTEM DEVELOPMENT METHODOLOGY FOR ERP SYSTEM IN SMEs OF MALAYSIAN MANUFACTURING SECTORS 1 YOUSEF KHALEEL, 2 RIZA SULAIMAN 1 Student, Department of Industrial Computing, UKM, Selangor, Malaysia 2 Assoc.
Unit Title: Personnel Information Systems Unit Reference Number: F/601/7510 Guided Learning Hours: 160 Level: Level 5 Number of Credits: 18
Unit Title: Personnel Information Systems Unit Reference Number: F/601/7510 Guided Learning Hours: 160 Level: Level 5 Number of Credits: 18 Unit objective and aim(s): This unit aims to give learners a
Peter Mileff PhD SOFTWARE ENGINEERING. The Basics of Software Engineering. University of Miskolc Department of Information Technology
Peter Mileff PhD SOFTWARE ENGINEERING The Basics of Software Engineering University of Miskolc Department of Information Technology Introduction Péter Mileff - Department of Information Engineering Room
A COMPARISON BETWEEN DIFFERENT TYPES OF SOFTWARE DEVELOPMENT LIFE CYCLE MODELS IN SOFTWARE ENGINEERING
A COMPARISON BETWEEN DIFFERENT TYPES OF SOFTWARE DEVELOPMENT LIFE CYCLE MODELS IN SOFTWARE ENGINEERING Mr. Ashish Kumar Gupta Assistant Professor, Dept. of C.S.E., I.T.S. Engineering College, Greater Noida,
Systems Analysis and Design
Systems Analysis and Design Slides adapted from Jeffrey A. Hoffer, University of Dayton Joey F. George, Florida State University Joseph S. Valacich, Washington State University Modern Systems Analysis
A system is a set of integrated components interacting with each other to serve a common purpose.
SYSTEM DEVELOPMENT AND THE WATERFALL MODEL What is a System? (Ch. 18) A system is a set of integrated components interacting with each other to serve a common purpose. A computer-based system is a system
Software development life cycle. Software Engineering - II ITNP92 - Object Oriented Software Design. Requirements. Requirements. Dr Andrea Bracciali
Software development life cycle Software life cycle: Software Engineering - II ITNP92 - Object Oriented Software Design Dr Andrea Bracciali Module Co-ordinator 4B86 [email protected] Spring 2014 (elicitation)
PERFORMANCE MANAGEMENT METHOD FOR CONSTRUCTION COMPANIES
24th International Symposium on on Automation & Robotics in in Construction (ISARC 2007) Construction Automation Group, I.I.T. Madras PERFORMANCE MANAGEMENT METHOD FOR CONSTRUCTION COMPANIES Namho Kim
CDC UNIFIED PROCESS JOB AID
CDC UNIFIED PROCESS JOB AID Independent Verification & Validation Activities Document Purpose This Job Aid is a brief document listing the items to be noted, checked, remembered, and delivered when completing
Software Development Methodologies in Industry. By: Ahmad Deeb
Software Development Methodologies in Industry By: Ahmad Deeb Methodologies Software Development Methodologies in Industry Presentation outline SDM definition Project and analysis approach Research methods
PROJECT MANAGEMENT METHODOLOGY OF OBJECT- ORIENTED SOFTWARE DEVELOPMENT
PROJECT MANAGEMENT METHODOLOGY OF OBJECT- ORIENTED SOFTWARE DEVELOPMENT Ing. David BEDNÁŘ, Doctoral Degree Programme (2) Dept. of Information Systems, FIT, BUT E-mail: [email protected] Supervised by:
Program Lifecycle Methodology Version 1.7
Version 1.7 March 30, 2011 REVISION HISTORY VERSION NO. DATE DESCRIPTION AUTHOR 1.0 Initial Draft Hkelley 1.2 10/22/08 Updated with feedback Hkelley 1.3 1/7/2009 Copy edited Kevans 1.4 4/22/2010 Updated
Application of software product quality international standards through software development life cycle
Central Page 284 of 296 Application of software product quality international standards through software development life cycle Mladen Hosni, Valentina Kirinić Faculty of Organization and Informatics University
Information Technology Project Management, Sixth Edition. Note: See the text itself for full citations. Visit cie-wc.edu for more courses.
Management, Sixth Edition Note: See the text itself for full citations. Visit cie-wc.edu for more courses. Describe the systems view of project management and how it applies to information technology projects
A Survey of Software Development Process Models in Software Engineering
, pp. 55-70 http://dx.doi.org/10.14257/ijseia.2015.9.11.05 A Survey of Software Development Process Models in Software Engineering Iqbal H. Sarker 1, Faisal Faruque 1, Ujjal Hossen 2 and Atikur Rahman
Chapter 1 The Systems Development Environment
Your Objects of SA&D Study Chapter 1 The Systems Development Environment 2011 by Prentice Hall: J.A.Hoffer et.al., Modern Systems Analysis & Design, 6 th Edition 1/55 2/55 Course Content Fundamental of
Educational Software Development Life Cycle Stages. Salah Alkhafaji, B. Sriram. Sur University College, Sur, Sultanate of Oman
Chinese Business Review, ISSN 1537-1506 January 2012, Vol. 11, No. 1, 128-137 D DAVID PUBLISHING Educational Software Development Life Cycle Stages Salah Alkhafaji, B. Sriram Sur University College, Sur,
SOFTWARE DEVELOPMENT SD
CONTENTS 1.SOFTWARE-DEFINITION 2.TYPES OF SOFTWARE 3.SOFTWARE DEVELOPMENT 4.SOFTWARE LIFECYCLE 5.WATERFALL MODEL 6.ITERATION MODEL 7.V SHAPED MODEL 8.SPIRAL MODEL SOFTWARE DEVELOPMENT SD MODULE 1 1.SOFTWARE:
SOFTWARE ENGINEERING INTERVIEW QUESTIONS
SOFTWARE ENGINEERING INTERVIEW QUESTIONS http://www.tutorialspoint.com/software_engineering/software_engineering_interview_questions.htm Copyright tutorialspoint.com Dear readers, these Software Engineering
INTERNATIONAL JOURNAL OF ADVANCES IN COMPUTING AND INFORMATION TECHNOLOGY An International online open access peer reviewed journal
INTERNATIONAL JOURNAL OF ADVANCES IN COMPUTING AND INFORMATION TECHNOLOGY An International online open access peer reviewed journal Research Article ISSN 2277 9140 ABSTRACT Analysis and tabular comparison
Applying Agile Methods in Rapidly Changing Environments
Applying Agile Methods in Changing Environments 7/23/2002 1 Applying Agile Methods in Rapidly Changing Environments Peter Kutschera IBM Unternehmensberatung GmbH Am Fichtenberg 1, D-71803 Herrenberg Steffen
Software Engineering. Objectives. Designing, building and maintaining large software systems
Software Engineering Objectives Designing, building and maintaining large software systems To define software engineering and explain its importance To discuss the concepts of software products and software
Information Management System
Information Management System Pertemuan II Magister Teknik Elektro Universitas Udayana 1/ 40 Organizations, Managers, & Information To understand how information flows in an organization, we need to understand
Journal of. Risk Analysis of the Waterfall Model for Educational Software Development. Abstract
Journal of of Industrial Technology Ubon Ratchathani Rajabhat University Risk Analysis of the Waterfall Model for Educational Software Development Prawit Simmatun 1, Songsak Songsanit 2, Kanok Samavardhana
Security Considerations for the Spiral Development Model
Security Considerations for the Spiral Development Model Loye Lynn Ray University of Maryland University College 3501 University Blvd East Adelphi, MD 20783 [email protected] 717-718-5727 Abstract
How To Test A Robot Platform And Its Components
An Automated Test Method for Robot Platform and Its Components Jae-Hee Lim 1, Suk-Hoon Song 1, Jung-Rye Son 1, Tae-Yong Kuc 2, Hong-Seong Park 3, Hong-Seok Kim 4 1,2 School of Information and Communication,
The Software Development Life Cycle (SDLC)
Document ID: Version: 2.0 1 / 22 2 TABLE OF CONTENTS INTRODUCTION... 4 THE SDLC WATERFALL... 4 ALLOWED VARIATIONS... 5 OTHER SDLC MODELS... 6 REFERENCES... 7 GENERIC STAGE... 8 KICKOFF PROCESS... 8 INFORMAL
Summary: Natalia Futekova * Vladimir Monov **
in Small and Medium-Sized Enterprises Natalia Futekova * Vladimir Monov ** Summary: The paper is concerned with problems arising in the implementation process of ERP systems including the risks of severe
Unit I. Introduction
Unit I Introduction Product Life Cycles Products also have life cycles The Systems Development Life Cycle (SDLC) is a framework for describing the phases involved in developing and maintaining information
Chapter 1 System Development Environment
Chapter 1 System Development Environment Definition Information systems analysis and design: The organizational process to develop computer-based information systems. History In the early years of computing,
Evolving a Ultra-Flow Software Development Life Cycle Model
RESEARCH ARTICLE International Journal of Computer Techniques - Volume 2 Issue 4, July - Aug Year Evolving a Ultra-Flow Software Development Life Cycle Model Divya G.R.*, Kavitha S.** *(Computer Science,
THE BCS PROFESSIONAL EXAMINATIONS Certificate in IT. October 2006. Examiners Report. Information Systems
THE BCS PROFESSIONAL EXAMINATIONS Certificate in IT October 2006 Examiners Report Information Systems General Comments The pass rate for Section A was disappointing, being lower than previously. One reason
AC 2009-803: ENTERPRISE RESOURCE PLANNING: A STUDY OF USER SATISFACTION WITH REFERENCE TO THE CONSTRUCTION INDUSTRY
AC 2009-803: ENTERPRISE RESOURCE PLANNING: A STUDY OF USER SATISFACTION WITH REFERENCE TO THE CONSTRUCTION INDUSTRY I. Choudhury, Texas A&M University American Society for Engineering Education, 2009 Page
REVIEW ON THE EFFECTIVENESS OF AGILE UNIFIED PROCESS IN SOFTWARE DEVELOPMENT WITH VAGUE SYSTEM REQUIREMENTS
REVIEW ON THE EFFECTIVENESS OF AGILE UNIFIED PROCESS IN SOFTWARE DEVELOPMENT WITH VAGUE SYSTEM REQUIREMENTS Lisana Universitas Surabaya (UBAYA), Raya Kalirungkut, Surabaya, Indonesia E-Mail: [email protected]
MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question.
Exam Name MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question. 1) Which of the following requires a systems development method that uses a data orientation
The Role of Knowledge Management in Building E-Business Strategy
The Role of Knowledge Management in Building E-Business Strategy Mohammad A. ALhawamdeh, P.O.BOX (1002), Postal Code 26110, Jarash, Jordan, +962-2-6340222 [email protected] Abstract - e-business
Contents. viii. 4 Service Design processes 57. List of figures. List of tables. OGC s foreword. Chief Architect s foreword. Preface.
iii Contents List of figures List of tables OGC s foreword Chief Architect s foreword Preface Acknowledgements v vii viii 1 Introduction 1 1.1 Overview 4 1.2 Context 4 1.3 Purpose 8 1.4 Usage 8 2 Management
General Problem Solving Model. Software Development Methodology. Chapter 2A
General Problem Solving Model Software Development Methodology These focus on understanding what the problem is about Chapter 2A Concerned with understanding more about the nature of the problem and possible
Advisory Services Application Services. The right choice.* Implementation starts with selection. *connectedthinking
Advisory Services Application Services The right choice.* Implementation starts with selection *connectedthinking Headline 2 The right choice.* Table of contents The heart of the matter 4 Making the right
Brief Contents. Part Three: Decisions and Strategies. Part One: Information Technology Infrastructure. Part Four: Organizing Businesses and Systems
Brief Contents 1 Introduction Part One: Information Technology Infrastructure 2 Information Technology Foundations 3 Networks and Telecommunications 4 Database Management Part Two: Business Integration
Basic Trends of Modern Software Development
DITF LDI Lietišķo datorsistēmu programmatūras profesora grupa e-business Solutions Basic Trends of Modern Software Development 2 3 Software Engineering FAQ What is software engineering? An engineering
Enterprise Content Management (ECM)
Business Assessment: A Quick-Reference Summary Intro to MIKE2 methodology and phase 1 The methodology that will be used throughout the specialist track is based on the MIKE2 methodology. MIKE stands for
System Development Life Cycle. Many business company uses software systems or specific programs to help
System Development Life Cycle Many business company uses software systems or specific programs to help organize their organizations. System development life cycle is one of the common information systems
Seven Steps to Developing an Effective IT Strategic Plan
Seven Steps to Developing an Effective IT Strategic Plan David Herr, Chief Technology and Security Officer, The Asbury Group Integrated Technologies What is your organization s vision for technology? Senior
IT2404 Systems Analysis and Design (Compulsory)
Systems Analysis and Design (Compulsory) BIT 1 st YEAR SEMESTER 2 INTRODUCTION This is one of the 4 courses designed for Semester 1 of Bachelor of Information Technology Degree program. CREDITS: 04 LEARNING
Requirements Analysis (RA): An Analytical Approach for Selecting a Software Process Models ABSTRACT
Evolving Ideas Computing, Communication and Networking Publish by Global Vision Publishing House Edited by Jeetendra Pande Nihar Ranjan Pande Deep Chandra Joshi Requirements Analysis (RA): An Analytical
Software Process Improvement Framework Based on CMMI Continuous Model Using QFD
www.ijcsi.org 281 Software Process Improvement Framework Based on CMMI Continuous Model Using QFD Yonghui CAO 1, 2 1, School of Economics & Management, Henan Institute of Science and Technology, Xin Xiang,
A New Methodology For Developing The MIS Master Plan Mohammad Dadashzadeh, Ph.D., Oakland University, USA
A New Methodology For Developing The MIS Master Plan Mohammad Dadashzadeh, Ph.D., Oakland University, USA ABSTRACT Organizations, small and large, for profit and non-profit, service oriented as well as
A DESIGN SCIENCE APPROACH TO DEVELOP A NEW COMPREHENSIVE SOA GOVERNANCE FRAMEWORK
A DESIGN SCIENCE APPROACH TO DEVELOP A NEW COMPREHENSIVE SOA GOVERNANCE FRAMEWORK Fazilat Hojaji 1 and Mohammad Reza Ayatollahzadeh Shirazi 2 1 Amirkabir University of Technology, Computer Engineering
ADMINISTRATIVE SUPPORT AND CLERICAL OCCUPATIONS SIN 736 1
Following are the Contractor Site and Government Site Labor Categories for SIN 736-1, SIN 736-1, and SIN 736-5. Please do not hesitate to contact us at [email protected] if you have any questions ADMINISTRATIVE
Total Quality Management (TQM) Quality, Success and Failure. Total Quality Management (TQM) vs. Process Reengineering (BPR)
Total Quality Management (TQM) Quality, Success and Failure Total Quality Management (TQM) is a concept that makes quality control a responsibility to be shared by all people in an organization. M7011
Redesigned Framework and Approach for IT Project Management
Vol. 5 No. 3, July, 2011 Redesigned Framework and Approach for IT Project Management Champa Hewagamage 1, K. P. Hewagamage 2 1 Department of Information Technology, Faculty of Management Studies and Commerce,
PROCESS-DRIVEN SOFTWARE DEVELOPMENT METHODOLOGY FOR ENTERPRISE INFORMATION SYSTEM
PROCESS-DRIVEN SOFTWARE DEVELOPMENT METHODOLOGY FOR ENTERPRISE INFORMATION SYSTEM Kwan Hee Han 1 and Yongsun Choi 2 1 Department of Industrial & Systems Engineering, Engineering Research Institute, Gyeongsang
Keywords document, agile documentation, documentation, Techno functional expert, Team Collaboration, document selection;
Volume 4, Issue 4, April 2014 ISSN: 2277 128X International Journal of Advanced Research in Computer Science and Software Engineering Research Paper Available online at: www.ijarcsse.com A Document Driven
Software development process
OpenStax-CNX module: m14619 1 Software development process Trung Hung VO This work is produced by OpenStax-CNX and licensed under the Creative Commons Attribution License 2.0 Abstract A software development
SUSTAINABLE BUSINESS PROCESS MANAGEMENT MODEL FOR CONSTRUCTION COMPANIES
SUSTAINABLE BUSINESS PROCESS MANAGEMENT MODEL FOR CONSTRUCTION COMPANIES Young Woong, Song 1 and Yoon Ki, Choi 2 * 1 MEST-NRF Research Professor, Ph.D., Research Institute of Frontier Technology, Soong
VisPMIS: A VISUAL PROJECT MANAGEMENT INFORMATION SYSTEM
Eleventh East Asia-Pacific Conference on Structural Engineering & Construction (EASEC-11) Building a Sustainable Environment November 19-21, 2008, Taipei, TAIWAN VisPMIS: A VISUAL PROJECT MANAGEMENT INFORMATION
TRADITIONAL VS MODERN SOFTWARE ENGINEERING MODELS: A REVIEW
Year 2014, Vol. 1, issue 1, pp. 49-56 Available online at: http://journal.iecuniversity.com TRADITIONAL VS MODERN SOFTWARE ENGINEERING MODELS: A REVIEW Singh RANDEEP a*, Rathee AMIT b a* Department of
Custom Software Development Approach
Custom Software Development Approach Our approach to custom software development combines benefits from several standard development process models. We tend to have a well-defined, predictable and highly
The software process. Generic software process models. Waterfall model. Software Development Methods. Bayu Adhi Tama, ST., MTI. [email protected].
The software process Software Development Methods Bayu Adhi Tama, ST., MTI. [email protected] A structured set of activities required to develop a software system Specification; Design; Validation; Evolution.
Principles of Execution. Tips and Techniques for Effective Project Portfolio Management
Principles of Execution Tips and Techniques for Effective Project Management Roadmap Develop A Shared Vision for Management Understanding the Difference between Project Management Reviews and Management
Towards Collaborative Requirements Engineering Tool for ERP product customization
Towards Collaborative Requirements Engineering Tool for ERP product customization Boban Celebic, Ruth Breu, Michael Felderer, Florian Häser Institute of Computer Science, University of Innsbruck 6020 Innsbruck,
Sample marketing plan template
Sample marketing plan template Table of Contents 1) Executive summary Page # 2) Situation analysis Page # 3) Marketing strategy Page # 4) Financials Page # 5) Implementation and Contingency Page # http://www.entrepreneurmag.co.za/
IV. Software Lifecycles
IV. Software Lifecycles Software processes and lifecycles Relative costs of lifecycle phases Examples of lifecycles and processes Process maturity scale Information system development lifecycle Lifecycle
SOFTWARE PROCESS MODELS
SOFTWARE PROCESS MODELS Slide 1 Software Process Models Process model (Life-cycle model) - steps through which the product progresses Requirements phase Specification phase Design phase Implementation
System/Data Requirements Definition Analysis and Design
EXECUTIVE SUMMARY This document provides an overview of the Systems Development Life-Cycle (SDLC) process of the U.S. House of Representatives. The SDLC process consists of seven tailored phases that help
On Design of SDM Model of an ERP Implementation for MCD
On Design of SDM Model of an ERP Implementation for MCD Dr. Sanjay Kumar Gupta 1, Vilender Kumar 2 1 School of Studies in Computer Science & Applications, Jiwaji University, Gwalior-474002 2 Associate
Chapter 3 Technology adapted
Chapter 3 Technology adapted 3.1 Introduction In developing a web enabled solution for laboratory data and document management, there are several options available for system analysis and designing, documentation
Management. Project. Software. Ashfaque Ahmed. A Process-Driven Approach. CRC Press. Taylor Si Francis Group Boca Raton London New York
Software Project Management A Process-Driven Approach Ashfaque Ahmed CRC Press Taylor Si Francis Group Boca Raton London New York CRC Press is an imprint of the Taylor St Francis Croup, an Informa business
D6 INFORMATION SYSTEMS DEVELOPMENT. SOLUTIONS & MARKING SCHEME. June 2013
D6 INFORMATION SYSTEMS DEVELOPMENT. SOLUTIONS & MARKING SCHEME. June 2013 The purpose of these questions is to establish that the students understand the basic ideas that underpin the course. The answers
