BUILDING A LOW COST, LONG LIFE OPERATION
|
|
|
- Juniper Hancock
- 10 years ago
- Views:
Transcription
1 BUILDING A LOW COST, LONG LIFE OPERATION Technical Presentations Asanko Gold Mine Site Visit Phase 1 Update 14 May 2015
2 MINING 2
3 3
4 PHASE 1: MINING UNDERWAY Open pit contractor mining opera5on Low opera5ng strip ra5o (waste:ore) - 4.7:1 Nkran is the main pit, >80% of the resource Selected mining contractor (PW Ghana) originally mined Nkran pit in late 1990 s Mining contractor for Nkran pre- strip and Year 1 of opera5ons maintains future flexibility Strong emphasis on grade control to improve head grade and minimise dilu5on 4
5 PHASE 1: BUILDING A LOW-RISK OPERATION Mine Plan designed around consistent annual opera5ng volumes and opera5ng strip ra5o Ensures consistent ore availability with ore stockpiles between 1.0 and 1.8Mt (4-6 months)* Life of Mine Tonnages and Strip Ra3o Asuadi Tonnes Million Tonnes Mined Opera3ng Strip Ra3o Abore Tonnes DynamiteHill Tonnes Adubiaso tonnes 5 2 Nkran Tonnes * Ore stockpiles volumes of 1.0M tonnes from Q Opera5ng Strip Ra5o 5
6 NKRAN PUSHBACK SEQUENCE TOPOGRAPHY CUT 1 PIT Feb 15 Dec 15 CUT 2 PIT (Start July) Village CUT 4 PIT Aug 16 Dec 24 CUT 3 PIT Nov 15 Dec 20 Final depth 380m CUT 5 PIT Jan 21 Jul 27 6
7 Nkran Pushback 1 February 2015 December
8 Nkran Pushback 2 July 2015 January
9 Nkran Pushback 3 November 2015 January
10 Nkran Pushback 4 August 2016 December
11 Nkran Pushback 5 and WRD January 2021 July
12 TOTAL MINED TONNES MATERIAL TYPE YEAR 1 & 2 (MONTHS) Total Mined Tonnes Material Type - Year 1 & 2 in Months 3,000,000 2,500,000 2,000,000 1,500,000 1,000, ,000 0 Feb- 15 Mar- 15 Apr- 15 May- 15 Jun- 15 Jul- 15 Aug- 15 Sep- 15 Oct- 15 Nov- 15 Dec- 15 Jan- 16 Feb- 16 Mar- 16 Apr- 16 May- 16 Jun- 16 Jul- 16 Aug- 16 Sep- 16 Oct- 16 Nov- 16 Dec- 16 Total Oxide Tonnes Total Transi5onal Tonnes Total Fresh Tonnes Actual / Forecast Progressive tonnes mned to end April 3.45Mt vs. plan 4.20Mt 12
13 ORE MINING SCHEDULE MATERIAL TYPE YEAR 1 & 2 Ore tonnes mined to date 4,500 tonnes at 2.1g/t from inferred blocks 450, , , ,000 Tonnes 250, , , ,000 50,000 0 Oxide Ore Tonnes Transi5onal Ore Tonnes Fresh Ore Tonnes 13
14 CONSISTENT GRADE AND OUNCES 14 14
15 NKRAN PIT GRADE CONTROL Strong emphasis on grade control to minimize dilu5on and maximize ounces Grade control methodology in place As of April 30, ,500 ore 2.1 g/t Au placed on ROM stockpile 15
16 NKRAN PIT GRADE CONTROL DESIGN Resolute GC Asanko Block Model Advanced GC Drilling m depth 25m centres SMU is 5m x 5m x3m Ore is mined in 3m flitches Waste mined in 6m Benches Stockpile Grade control Marginal : g/t Au Low grade : g/t Au Medium Grade : g/t Au High Grade : > 2.5 g/t Au Waste : < 0.5 g/t Au GC Drilling RC 18m depth, samples every 1.5m To be op3mized 5-10m centres 16
17 NKRAN PIT: PUSHBACK GRADE CONTROL Nkran Pit 17
18 PLANT & INFRASTRUCTURE CONSTRUCTION 18
19 STRONG HEALTH & SAFETY PERFORMANCE Zero lost 5me accidents during 350 days of construc5on & 1,166,400 man- hours completed 1 Million LTI- free hours achieved on the project on 15 April 2015 with only 2 first aid cases All SHE construc5on systems and procedures have been fully implemented on site Daily SHE training with a zero harm approach Current Company Wide SHE Stats Last LTI Date July 16, 2012 LTI Free Man- hours 3,266,983 LTI Free Days Worked
20 CONSTRUCTION UPDATE Construc3on approach Full review of previous work done & redesign of plant plaoorm with Phase 2 in mind Op5mized laydown areas around plant to speed up construc5on Innova5ve construc5on methodology on CIL tanks (flanged and bolted) Plant site construc3on well advanced: EPCM contractor (DRA) plus seven subcontractors on site = 1,349people Plant site terracing Wilson Baily Holmes Tailings Dam Engineers and Planners Pit Dewatering KPS and De- Montage Civil Works Consar Contractor Camp housing complex Red Sea Independent materials tes5ng laboratory Knight Piesold Steelwork, Mechanical & Platework Redis Construc5on Electrical & Instrumenta5on EnI Ghana Piping Redis Construc5on 20
21 PHASE 1: ON SCHEDULE On track for first gold in Q Main construc5on commenced in August 2014 earthworks scheduled around the rainy season All key contractors, 1,349 people, on site Project is 48% complete, tracking according to schedule and budget Median Actual Forecast Asanko Gold Mine - Overall S- Curve 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Feb- 14 Mar- 14 Apr- 14 May- 14 Jun- 14 Jul- 14 Aug- 14 Sep- 14 Oct- 14 Nov- 14 Dec- 14 Jan- 15 Feb- 15 Mar- 15 Apr- 15 May- 15 Jun- 15 Jul- 15 Aug- 15 Sep- 15 Oct- 15 Nov- 15 Dec- 15 Jan- 16 Feb
22 PHASE 1: CONSTRUCTION PROGRESS Pit Dewatering Primary Crusher Pre- Stripping Stockpile Tunnel 22
23 PHASE 1: CONSTRUCTION PROGRESS Mill Founda5ons CIL Tanks Pre- Leach Thickener CIL Tank Platework 23
24 SECURING STABLE & RELIABLE POWER Overview Ghana s power sector is expanding rapidly with offshore gas and independent power producers (IPPs) Power supplied via one na5onal grid (Gridco) Main power genera5on body is the state owned Volta River Authority (VRA) Recent growth in demand is outstripping supply, resul5ng in compe55on for power and load shedding 24
25 ASANKO S SOLUTION Strategic Approach Secure long- term stable and reliable power Self genera5on too capital intensive Asanko building connec5ng power line from grid to ensure control over delivery date - targe5ng Q Have been monitoring the network reliability for past 14 months over 99% reliable Power Purchase Agreement with Independent Power Producer (IPP) Advanced nego5a5ons with Genser Energy (Interna5onal IPP) DPP cost: 18c/kwh including 2c/kwh wheeling charge IPP rates similar to DPP rates with probable reduc5ons in future Envisage Genser will construct a 19MW plant next to the AGM processing facility 100% redundancy Target to have power available in Q
26 GENSER ENERGY - LEADING ENERGY SOLUTION PROVIDER IN GHANA Genser Energy Ghana is an IPP based in the USA with opera5ons in Africa. It provides electricity and steam solu5ons for mines, large- scale industrial companies, and u5li5es. Among the technologies used by Genser are the following IGCC - Integrated Gasifica5on Combined Cycle; CCGT - Combined Cycle Gas Turbine; CHP - Combined Heat and Power; and ICE - Internal Combus5on Engines. Genser has successfully built and operated the following power plants: 30MW ICE Plant for Golden Star Resources; and 5.0MW/ 20 tons CHP Facility for Unilever Ghana, Tema. Genser is in the commissioning phase of a 30MW IGCC Plant (GP Chirano Plant) for Chirano Gold Mines Limited (CGML). In the short term Genser shall install and operate the following power plants: 20MW ICE for Asanko Gold ; 120MW IGCC for GoldFields Ghana, Tarkwa. In the long term Genser will: Expand the GP Chirano Plant from 30MW to 90MW; Construct and operate a 120MW IGCC for Gold Fields Ghana, Tarkwa. Expand into other African countries, including Burkina Faso, Mail, and Botwsana. Exis3ng Genser Projects GP Chirano Plant GP Bogoso Pant GP Unilever Plant Source: Genser Energy Africa Inc 26
27 PHASE 1 - KEY CONSTRUCTION SCHEDULE ITEMS KEY MILESTONES Date Status Commence Bulk Earthworks Q ü Op5mized Mine Plan for Phase 1 (Defini5ve Project Plan) Q ü Start Plant Site Civils Q ü Mining Pre- Strip Begins at Nkran Q ü Plant Site Earthworks Q % complete Concrete Civils Q % complete Structural Steel and Mechanical Construc5on Q Commenced ahead of schedule Mills Arrive on Site Q ü Arrived in March SAG and Ball Mill Civils Q % complete Piping, Electrical and Instrumenta5on Ore Mining Opera5ons Commissioning First Gold Pour Phase 1 Steady State Produc3on of 190,000oz/pa Q Q Q Q Q
28 OUR SOCIAL LICENCE TO OPERATE 28
29 CSR IS FUNDAMENTAL TO OUR SUCCESS Our approach to CSR is based on the following principles: Complying with our corporate governance principles, na5onal and interna5onal laws & industry codes Maintaining a high level of health and safety performance Ac5vely iden5fying opportuni5es to make a posi5ve and meaningful contribu5on to the communi5es we operate in beyond the life of our mines Contribu5ng to the economic and social development of our host countries we ac5vely support the Africa Mining Vision Mi5ga5ng our impact on the environment Developing our employees Adhering to our values and demonstra5ng them in our behavior Our CSR stakeholder engagement commenced back in 2006 and is ac5vely implemented and monitored by a site- based team of Ghanaian staff We are monitoring and measuring our CSR ac5vi5es and their effec5veness, our first CSR report was published in March 2015 We have established strategic partnership with GIZ to leverage exper5se and funds in the areas of financial literacy, skills development, and healthcare so we can maximize our efforts 29
30 KEY CSR PROGRAMS Jobs: Localiza5on policy in place to ensure locals benefit from job opportuni5es at the mine Building local capability: 2 Skills- development and training centers at Esaase & Obotan with GIZ Training focused on carpentry, electrical installa5on, plumbing, masonry, catering, bamboo furniture produc5on and dress making Community Healthcare (with GIZ): Implemen5ng educa5on programs about HIV/AIDS, STDs & malaria 3,000 locals screened for basic healthcare in 2014 Community Engagement: Social Responsibility Forums set up to shape and manage community expecta5ons in a collabora5ve manner: Rela5onship Agreement Development Fund Agreement Local Employment Agreement Sustainable Livelihood Agreement 30
31 PHASE 1 RELOCATION ACTION PLAN Ghana has a prescribed process for reseulement A por5on of Nkran village, consis5ng of 88 building structures, have been iden5fied for reloca5on Nkran Village Par3al Reloca3on Ac3on Plan (RAP) 500m blast radius Reloca5on costs included in Capital Cost Es5mate The RAP report has been completed and submiued to EPA for review Site for reloca5on has been selected and approved by Ghanaian Lands Commission Site prepara5on completed in December 2014 Reloca5on is due for comple5on end Q Impacted Area Reseulement Township 31
32 UPGRADING LIVING STANDARDS Construc5on commenced February local contractors, all mobilized to site 56% of labour sourced from local villages Infrastructure: Roads Landscaping Stormwater Water supply and storage Electrical Supply Houses will be replaced on a Room- for- Room basis Addi5onal communal facili5es: Community informa5on centre Football field Sold waste transfer sta5on 32
33 BUSINESS READINESS 33
34 OUR APPROACH TO BUILDING A HIGH PERFORMANCE ORGANISATION (HPO) Build the organiza5onal capability and physical mine & plant in parallel Design the organiza5on and populate the management structure early on Develop a high performance culture and business readiness Use trusted, tested principles to guide design and behavior: ü Organiza5on Congruence ü Stra5fied Systems ü Core Process Design Congruence Model of Organisation Change S tr Culture Voluntary behaviour Inputs a t e g y Task Processes People Skills Outputs Structure Systems Measurement and Feedback 34
35 BUILDING THE ORGANISATION AROUND THE REQUIREMENTS OF THE CORE PROCESS Design the organiza5on around the Core Process and posi5on Services to meet the requirements of the core Use core and service work cycles to design structures and roles Base these on the reality of opera5onal and business environment Technical Process Map 35
36 BUSINESS READINESS PLAN (BRP) A BRP helps build required organiza5on capability ahead of opera5ons progress against the plan is tracked Key BRP components include: Recruitment ü Majority of AGM management team recruited, predominantly Ghanaian ü Local hiring policy in place, important for Social License ü Total current workforce in Ghana 1,571 people ü only 82 are non- Ghanaian ü of 1,489 Ghanaians on site, 639 are local and 850 non- local ü Asanko employees 222 people Opera.ng System & Procedures Design ü All required opera5ng systems & procedures iden5fied ü BRP details when and who will implement before commissioning The Asanko Gold Way ü A guide that contains our High Performance Principles and Prac5ces 43% AGM employees from Local Communi5es 37% AGM Contractors from Local Communi5es 96% AGM total workforce are Ghanaian Training and Development Plan ü Detailed Training and Development Plan drives technical, management, supervisory, policy and cultural training 36
37 NEAR MINE EXPLORATION 37
38 ASANKO GOLD MINE REGIONAL SETTING Orebodies located in the Asankrangwa Gold Belt lying along the axis of the Kumasi Basin Deposits are structurally controlled by mineralized NE faults and predominantly hosted in metasedimentary rocks with minor grani5c intrusions 38
39 AGM GEOLOGY, MINERAL RESOURCES & RESERVES Nkran historic gold produc5on g/t Au rec 591,000oz Deposit Measured & Indicated Grade (g/t) Tonnes (million) Ounces (million) Nkran Abore Adubiaso Dynamite Hill Asuadai Phase 1 Total Esaase Phase 1 & 2 Total Proven & Probable Deposit Tonnes Grade Ounces (million) (g/t) (million) Nkran Abore Adubiaso Dynamite Hill Asuadai Phase 1 Total Esaase Phase 1 & 2 Total
40 THREE IDENTIFIED ORE DEPOSIT STYLES HW Deformed Sedimentary Host Controlling Structures FW Undeformed Sedimentary Host Esaase and Adubiaso Style Quartz veins within deformed sediment host Gold mineralisa5on associated with briule deforma5on of the sedimentary host Rela5vely simple structural controls on mineralisa5on Granite Host Controling Structures Dynamite Hill, Abore and Asuadai Style Shallow dipping quartz veins within grani5c host Gold mineralisa5on associated with briule deforma5on of the grani5c host Rela5vely simple structural controls on mineralisa5on Controling Structures Resolute Pit Final Pit Nkran Style Quartz veins within both sedimentary and grani5c hosts Gold mineralisa5on associated mul5ple phases of deforma5on Complex structural controls on mineralisa5on 40
41 2014 BELT SCALE PROSPECTIVITY ANALYSIS Study completed in December 2014 of Kumasi Basin Both belt scale and locally focused Confirmed that only 7% of region has been effec5vely explored Iden5fied many prospec5ve near mine and regional targets Provided a plaoorm for systema5c explora5on ac5vi5es in 2015 Iden5fied data gaps in our geophysics coverage Prospec5vity model is dynamic and con5nues to be refined as new data is collected 41
42 2015 AIRBORNE GEOPHYSICAL SURVEY Geophysical data gaps were iden5fied once the PMI and Asanko data sets were merged 2015 survey will be combined VTEM, Magne5cs, and Radiometrics, approximately 3200 line km. Ver5cal Time Electromagne5c (VTEM) surveys are excellent tools for iden5fying primary and secondary structures which control gold mineraliza5on in the Asankrangwa gold belt Iden5fica5on of these structures, and especially flexures and cross structure intersec5ons, allow explora5on to focus on the areas of the tenement with highest prospec5vity Survey will lead to addi5onal high priority targets for near mine and regional explora5on ac5vi5es Survey has been approved and will commence in May
43 FOCUS ON NEAR MINE OXIDE EXPLORATION Phase 1 ore sources is dominated by Nkran fresh ore The satellite Dynamite Hill provides oxides for approximately the first 2 years of opera5ons Study iden5fied several targets near Phase 1 infrastructure These targets form basis for upcoming explora5on programs in H and beyond Targets will con5nue to be refined and generated as more field data is collected and the airborne geophysical survey completed and interpreted (September 2015) Near mine targets are currently being systema5cally explored with the aim of defining new drilling targets High likelihood of ongoing reserves replacement 43
LOW COST, NEAR-TERM GOLD PRODUCTION
TSX NYSE: AKG LOW COST, NEAR-TERM GOLD PRODUCTION Investor Presentation BMO Metals & Mining Conference - February 2015 FORWARD LOOKING INFORMATION This document has been prepared by Asanko Gold Inc. (the
RED 5 Limited The next gold producer
The next gold producer May 2011 Company highlights Target production Sept 2011 quarter at Siana Gold project Construction 0% complete, all plant equipment in country Forecast cash costs sub $400 per ounce,
INVESTOR PRESENTATION JULY 2013
INVESTOR PRESENTATION JULY 2013 DISCLAIMER This presentation contains only a brief overview of Millennium Minerals Limited. The contents of this presentation, including matters relating to the geology
Endeavour Management Presentation
Endeavour Management Presentation June 2014 GOLD PRODUCER WEST AFRICA CASH FLOW Disclaimer & Forward Looking Statements This presentation contains forward-looking statements including but not limited to,
ALCYONE REPORTS JORC SILVER RESOURCES
ASX ANNOUNCEMENT & MEDIA RELEASE 29 March 2010 ALCYONE REPORTS JORC SILVER RESOURCES +15Moz RESOURCE INVENTORY UNDERPINS PROGRAM TARGETING RESUMPTION OF SILVER PRODUCTION AT TEXAS PROJECT LATER THIS YEAR
DAMANG MINE: SWINGING BACK TO PROFITABILITY ALFRED BAKU EVP & Head of West Africa NG Mining Summit, Cape Town, June 2015
DAMANG MINE: SWINGING BACK TO PROFITABILITY ALFRED BAKU EVP & Head of West Africa NG Mining Summit, Cape Town, June 2015 CONTENT GLOBAL OPERATIONS WHERE WE VE COME FROM REVERSING THE TREND TRANSFORMATION
AT&T Global Network Client for Windows Product Support Matrix January 29, 2015
AT&T Global Network Client for Windows Product Support Matrix January 29, 2015 Product Support Matrix Following is the Product Support Matrix for the AT&T Global Network Client. See the AT&T Global Network
For personal use only
Korab Resources Limited Gold Operations Update November 2012 Andrej K. Karpinski Executive Chairman Korab Projects BOBRIKOVO MELROSE 1 Korab Gold Projects Other Korab Projects Robust Undervalued Gold Portfolio
Mining Indaba Presentation. Capetown, South Africa 8 th 10 th February 2016
Mining Indaba Presentation Capetown, South Africa 8 th 10 th February 2016 www.birimiangold.com 1 Disclaimer This presentation has been prepared by Birimian Gold Limited (BGS) for general information purposes
Update on Heap Leach potential of the Murchison gold project
3 July 2012 Australian-based Kentor Gold Limited (ASX: KGL) is entering the ranks of operating gold mining companies in 2012. The Company is progressing a pipeline of advanced projects in Australia and
We are pleased to offer the following program to Woodstock Area Educators:
DATE: Spring 2016 TO: RE: Woodstock Area Educators Upcoming Cohort Programs Presently, many teachers are enrolled in cohort graduate programs through partnerships between local regional offices of education,
NEWS RELEASE ROXGOLD ANNOUNCES SECOND PROJECT FINANCE DRAWDOWN FOR THE YARAMOKO GOLD PROJECT & PROVIDES DEVELOPMENT UPDATE
NEWS RELEASE ROXGOLD ANNOUNCES SECOND PROJECT FINANCE DRAWDOWN FOR THE YARAMOKO GOLD PROJECT & PROVIDES DEVELOPMENT UPDATE Toronto, Ontario December 10, 2015 Roxgold Inc. (the "Company" or "Roxgold ")
Mar Qtr 2015. Ore Mined t 79,000 68,000 119,200 143,000 Mine Grade g/t 8.43 6.08 4.77 4.30 Contained Gold oz 21,511 13,252 18,262 19,759
SARACEN MINERAL HOLDINGS LIMITED ACN: 009 215 347 QUARTERLY REPORT: SEPTEMBER Corporate Details: 21 October ASX code: SAR Corporate Structure: Ordinary shares on issue - 792.8m Unvested employee performance
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
Session 4: Programmes: the Core of the 10YFP
Session 4: Programmes: the Core of the 10YFP * Criteria * Initial and non-exhaustive list * 5 steps model to develop programmes * Request for additional programmas * Criteria and process for new programmes
September 2015 Quarterly Activities Report
ASX RELEASE 31 OCT 2015 September 2015 Quarterly Activities Report Expansion of Premier JV Gold Mine to 40,000ozpa production rate on track and future production growth plans advanced Highlights Production
Program Model: Muskingum University offers a unique graduate program integra6ng BUSINESS and TECHNOLOGY to develop the 21 st century professional.
Program Model: Muskingum University offers a unique graduate program integra6ng BUSINESS and TECHNOLOGY to develop the 21 st century professional. 163 Stormont Street New Concord, OH 43762 614-286-7895
9/21/15. Research Educa4on Solu4ons A NEW LANGUAGE FOR LEADERSHIP TRANSFORMING PERFORMANCE MANAGEMENT: AN ELI LILLY CASE STUDY
A NEW LANGUAGE FOR LEADERSHIP TRANSFORMING PERFORMANCE MANAGEMENT: AN ELI LILLY CASE STUDY Research Educa4on Solu4ons Dr. David Rock, Director, NeuroLeadership Ins4tute Mark Ferrara, VP of Talent Management,
Golden Band Resources Inc.
Golden Band Resources Inc. Rodney Orr, VP Corporate Development Saskatchewan Mining Supply Chain Forum, April 4, 2012 TSX.V: GBN OTCQX: GBRIF Notices Rodney Orr, P.Geo., Golden Band s VP of Corporate Development,
Wonawinta Silver Project to be acquired; Mount Boppy development cost and risk cut back
Southern Cross Goldfields Ltd ASX Announcement 5 September 2014 Wonawinta Silver Project to be acquired; Mount Boppy development cost and risk cut back Wonawinta Silver Project (60 M oz) to be acquired
AFRICAN GOLD GROUP, INC. DEFINITIVE FEASIBILITY STUDY FOR KOBADA GOLD PROJECT GENERATES ROBUST ECONOMIC OUTCOME
African Gold Group, Inc. TSX-V: AGG Yonge & Richmond Centre 151 Yonge Street, 11th Floor. Toronto Canada M5C 2W7 Tel: +1 647 775 8538 website : www.africangoldgroup.com AFRICAN GOLD GROUP, INC. DEFINITIVE
Paladin Energy. Development & Expansion of the Langer Heinrich Operation in Namibia. June 2009
Paladin Energy Development & Expansion of the Langer Heinrich Operation in Namibia June 2009 1 Disclaimer This presentation includes certain statements that may be deemed forward-looking statements. All
So#ware quality assurance - introduc4on. Dr Ana Magazinius
So#ware quality assurance - introduc4on Dr Ana Magazinius 1 What is quality? 2 What is a good quality car? 2 and 2 2 minutes 3 characteris4cs 3 What is quality? 4 What is quality? How good or bad something
MAXIMIZING THE SUCCESS OF YOUR E-PROCUREMENT TECHNOLOGY INVESTMENT. How to Drive Adop.on, Efficiency, and ROI for the Long Term
MAXIMIZING THE SUCCESS OF YOUR E-PROCUREMENT TECHNOLOGY INVESTMENT How to Drive Adop.on, Efficiency, and ROI for the Long Term What We Will Cover Today Presenta(on Agenda! Who We Are! Our History! Par7al
Exchange of experience from a SuccessFactors LMS Implementa9on
Exchange of experience from a SuccessFactors LMS Implementa9on Seen from a user perspective Hanne Vasshus Ask Competency Management Cau9onary Statement The following presenta9on includes forward- looking
Analysis One Code Desc. Transaction Amount. Fiscal Period
Analysis One Code Desc Transaction Amount Fiscal Period 57.63 Oct-12 12.13 Oct-12-38.90 Oct-12-773.00 Oct-12-800.00 Oct-12-187.00 Oct-12-82.00 Oct-12-82.00 Oct-12-110.00 Oct-12-1115.25 Oct-12-71.00 Oct-12-41.00
Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8
Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138 Exhibit 8 Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 2 of 138 Domain Name: CELLULARVERISON.COM Updated Date: 12-dec-2007
Performance Management. Ch. 8 The Strategy Implementa9on Mechanism. Chiara Demar9ni UNIVERSITY OF PAVIA. mariachiara.demar9ni@unipv.
UNIVERSITY OF PAVIA! Performance Management Ch. 8 The Strategy Implementa9on Mechanism Chiara Demar9ni [email protected] Master in Interna+onal Business and Economics! Defini9on Strategy implementa9on
Armadale Capital Plc Armadale or the Company Robust Project Demonstrated by Mpokoto Feasibility Study HIGHLIGHTS
Armadale Capital Plc / Index: AIM / Epic: ACP / Sector: Investment Company 8 February 2016 Armadale Capital Plc ( Armadale or the Company ) Robust Project Demonstrated by Mpokoto Feasibility Study Armadale,
Mission. To provide higher technological educa5on with quality, preparing. competent professionals, with sound founda5ons in science, technology
Mission To provide higher technological educa5on with quality, preparing competent professionals, with sound founda5ons in science, technology and innova5on, commi
Legacy Archiving How many lights do you leave on? September 14 th, 2015
Legacy Archiving How many lights do you leave on? September 14 th, 2015 1 Introductions Wendy Laposata, Himforma(cs Tom Chase, Cone Health 2 About Cone Health More than 100 loca=ons 6 hospitals, 3 ambulatory
Xtract Resources Plc (AIM:XTR) Chepica Gold Mine: Quarterly Results Presentation
Xtract Resources Plc (AIM:XTR) Chepica Gold Mine: Quarterly Results Presentation London 3 February 2016 Aerial view of Chepica Gold Mine Taken with Phantom 3 Professional Drone 2 We are xtracting significant
El cinturón de oro del río Narcea: el futuro de la minería de oro en España. Dr. Vern N. Rampton Presidente y CEO de Kinbauri Gold Corp.
El cinturón de oro del río Narcea: el futuro de la minería de oro en España Dr. Vern N. Rampton Presidente y CEO de Kinbauri Gold Corp. CORPORATE PRESENTATION JUNE 16, 2009 TARGETED TO BECOME ONE OF WESTERN
Bendigo Mining Limited Investor Briefing February 2010
Bendigo Mining Limited Investor Briefing Investor Briefing February 2010 Agenda Corporate info Timeline Dec qtr 09 results Operations review Finance Summary Forward-looking statements This presentation
QUARTERLY ACTIVITY REPORT FOR THE PERIOD ENDED 31 st December 2015
STRATEGIC MINERALS CORPORATION N.L. 29th January 2016 ASX Release ASX Code: SMC QUARTERLY ACTIVITY REPORT FOR THE PERIOD ENDED 31 st December 2015 WOOLGAR GOLD PROJECT QUEENSLAND (100% SMC) Highlights
CANADA S INTERMEDIATE GOLD PRODUCER
CANADA S INTERMEDIATE GOLD PRODUCER Third Quarter 2015 Results Conference 1 Call & Webcast October 29, 2015 Forward Looking Information This presentation contains certain forward-looking information and
HIGH GRADE GOLD DRILL RESULTS MT EGERTON PROJECT
July 7 th, 2015 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 HIGH GRADE GOLD DRILL RESULTS MT EGERTON PROJECT RC Drilling has returned shallow high grades at the Gaffney
Mako Project, Eastern Senegal Completion of Scoping Study
Toro Gold Ltd Trafalgar Court Admiral Park, Guernsey. GY1 3EL. News Release: 18 th April 2013, Guernsey Mako Project, Eastern Senegal Completion of Scoping Study Toro Gold Ltd ( Toro Gold or the Company
For personal use only
ASX Release 27 September 2012 OPTION TO ACQUIRE 560,000oz PEAK HILL GOLD PROJECT RESOURCE AND INVESTMENT NL (ASX: RNI) (RNI or the Company) has reached agreement with Montezuma Mining Company Limited for
Positioned for Production: Exploring for Growth
ASX Code: AYN Positioned for Production: Exploring for Growth Andrew King, Managing Director May 2010 Pg 1 Disclaimer and Key Information Disclaimer This presentation has been prepared by the Directors
Enhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017
From -JAN- To -JUN- -JAN- VIRP Page Period Period Period -JAN- 8 -JAN- 8 9 -JAN- 8 8 -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -FEB- : days
How To Know If Goldcorp Is A Successful Company
Second Quarter Conference Call July 30 th, 2009 Management Participants Chuck Jeannes President and Chief Executive Officer Lindsay Hall Chief Financial Officer Steve Reid Chief Operating Officer Jeff
Queensland Mining Corporation L I M I T E D. Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District
ASX Release 12 October 2012 Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District Total mineral resource at Duck Creek Project area of 960,000t @ 1.47% Cu (0.2%
How To Mine And Treat Ore From Castle Hill Stage 1
` Dated: 5 th August 2014 NORTON TAKES UP OPTION TO MINE AND TREAT ORE FROM CASTLE HILL STAGE 1 ASX: PXG, PXGOA HIGHLIGHTS Development of Castle Hill Stage 1 with Norton Gold Fields potentially adds a
Graduate Systems Engineering Programs: Report on Outcomes and Objec:ves
Graduate Systems Engineering Programs: Report on Outcomes and Objec:ves Alice Squires, [email protected] Tim Ferris, David Olwell, Nicole Hutchison, Rick Adcock, John BrackeL, Mary VanLeer, Tom
Barkerville Gold Mines Investor presentation q1 2016. The last great Canadian gold mining camp controlled by a junior mining company.
Barkerville Gold Mines Investor presentation q1 2016 The last great Canadian gold mining camp controlled by a junior mining company. 1 Forward Looking statement This presentation and the material contained
TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY
10 August 2015 ASX: AOH, FSE: A2O TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY Estimated oxide and sulphide resources within the optimum pit is 17.3
Quarterly Report Highlights. Ulysses Gold Project, Western Australia. Viking Gold Project, Western Australia
ASX Announcement Quarterly Activities Report For the Quarter Ended 31 December 2015 29 January 2016 Genesis Minerals Limited ASX Code: GMD Issued Capital 446 million shares 27.2 million options Current
EXPLORATION 1.0 2.0 3.0. 4.0 5.0 6.0 TONY HOUSTON Head of Exploration 7.0 8.0 9.0
EXPLORATION 1.0 2.0 3.0 4.0 5.0 6.0 TONY HOUSTON Head of Exploration 7.0 8.0 9.0 OZ MINERALS NOVEMBER 2009 PAGE 54 STRATEGY SUPERIOR TOTAL SHAREHOLDER RETURNS ZERO HARM FOCUS ON COPPER MAXIMISE POTENTIAL
Driving Operational and Financial Improvements using Balanced Scorecards and Key Performance Indicators
www.pwc.com/ca Driving Operational and Financial Improvements using Balanced Scorecards and Key Mining Minds Introductions Paul Ingram Managing Director, PwC Mining Centre of Excellence, Toronto Business
CHALICE GOLD MINES AND SUB SAHARA RESOURCES ANNOUNCE PROPOSED MERGER TO CONSOLIDATE AND FUND ERITREAN GOLD PROJECT
3 APRIL 2009 CHALICE GOLD MINES AND SUB SAHARA RESOURCES ANNOUNCE PROPOSED MERGER TO CONSOLIDATE AND FUND ERITREAN GOLD PROJECT Key Points Chalice Gold Mines and Sub Sahara Resources agree to merge by
Q4 & FY2015 OPERATING HIGHLIGHTS. January 29, 2016
Q4 & FY2015 OPERATING HIGHLIGHTS January 29, 2016 1 FORWARD-LOOKING STATEMENTS This presentation contains certain statements that constitute forward-looking information within the meaning of applicable
Las Bambas Project. Joe Albright, Project Director 4 October 2012
Las Bambas Project j Joe Albright, Project Director 4 October 2012 Agenda Project Overview Highlights Challenges Initiatives Schedule Pictures Summary Assembly of the first two dozers that support the
Protec'ng Informa'on Assets - Week 8 - Business Continuity and Disaster Recovery Planning. MIS 5206 Protec/ng Informa/on Assets Greg Senko
Protec'ng Informa'on Assets - Week 8 - Business Continuity and Disaster Recovery Planning MIS5206 Week 8 In the News Readings In Class Case Study BCP/DRP Test Taking Tip Quiz In the News Discuss items
NEW GOLD DISCOVERY IN GHANA WEST AFRICA
NEW GOLD DISCOVERY IN GHANA WEST AFRICA FEBRUARY 2016 JORC DISCLOSURE JORC 2012 This Presentation contains information extracted from the following reports which are available for viewing on the Company
Resources Rising Stars
ASX Code: AYN Resources Rising Stars Andrew King, Managing Director September 2010 Pg 1 Disclaimer and Key Information Disclaimer This presentation has been prepared by the Directors of Alcyone Resources
CNSX: TV www.trevali.com
CNSX: TV www.trevali.com March 2010 DISCLAIMER Certain statements contained in this document, including, without limitation, those concerning the economic outlook for the mining industry, expectations
Keras Resources plc ( Keras or the Company ) Moving Towards First Production in Q2 2016 at Grants Patch Gold Tribute Project, Australia
Keras Resources plc / Index: AIM / Epic: KRS / Sector: Mining 14 January 2016 Keras Resources plc ( Keras or the Company ) Moving Towards First Production in Q2 2016 at Grants Patch Gold Tribute Project,
The Shi'ing Role of School Psychologists within a Mul7-7ered System of Support Framework. FASP Annual Conference October 29, 2015
The Shi'ing Role of School Psychologists within a Mul7-7ered System of Support Framework FASP Annual Conference October 29, 2015 Dr. Jayna Jenkins, Florida PS/RtI Project EARLY WARNING SYSTEMS AND THE
Ferrex plc ( Ferrex or the Company ) Acquisition of Gold Mining Company in Australia and Strategic Review
Ferrex plc / Index: AIM / Epic: FRX / Sector: Mining 17 November 2015 Ferrex plc ( Ferrex or the Company ) Acquisition of Gold Mining Company in Australia and Strategic Review Ferrex plc, the AIM quoted
De Grey Mining Ltd. Wingina Deeps Drilling Commenced (Turner River Project) Highlights. Turner River Unlocking Shareholder Value
De Grey Mining Ltd ASX RELEASE 5 July 2016 ASX Code DEG ABN 65 094 206 292 Wingina Deeps Drilling Commenced (Turner River Project) Highlights Diamond drilling programme of approximately 1,500m has COMPANY
Implementing Carbon Reduction Without Impacting Working Capital. Presented by Dylan Crompton
Implementing Carbon Reduction Without Impacting Working Capital Presented by Dylan Crompton Evolution of a Carbon Strategy Proactive organisations are on a journey to reduce carbon emissions. Marginal
ENISA: Cybersecurity policy in Energy Dr. Andreas Mitrakas, LL.M., M.Sc., Head of Unit Quality & data mgt
ENISA: Cybersecurity policy in Energy Dr. Andreas Mitrakas, LL.M., M.Sc., Head of Unit Quality & data mgt Cyber European Union Security Agency for Network Energia, and Informa8on Rome, Security 24/09/15
Detour Gold Provides New Life of Mine Plan for Detour Lake
January 25, 2016 NEWS RELEASE Detour Gold Provides New Life of Mine Plan for Detour Lake Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) is pleased to announce a new life of mine plan
African Barrick Gold. BMO Global Metals & Mining Conference February 2013
African Barrick Gold BMO Global Metals & Mining Conference February 2013 Disclaimer Important Notice This presentation has been provided to you for information purposes only. It does not constitute an
Retail Pharmacy Clinical Services: Influence of ACOs & Healthcare Financing Models
Retail Pharmacy Clinical Services: Influence of ACOs & Healthcare Financing Models Tim Kosty, R.Ph., MBA President Pharmacy Healthcare Solu
Exploration and Development Activity
For the period ending 30 June 2008 Exploration and Development Activity Over the last year, exploration and development work at the Company s Nullagine Gold Project in Western Australia s eastern Pilbara
Fixed Scope Offering (FSO) for Oracle SRM
Fixed Scope Offering (FSO) for Oracle SRM Agenda iapps Introduc.on Execu.ve Summary Business Objec.ves Solu.on Proposal Scope - Business Process Scope Applica.on Implementa.on Methodology Time Frames Team,
C o r p o r a t e P r e s e n t a t i o n A u g u s t 2 0 1 5
C o r p o r a t e P r e s e n t a t i o n A u g u s t 2 0 1 5 Forward Looking Statements This presentation includes certain estimates, projections and forward looking statements within the meaning of Section
AIM: KEFI 6 March 2014. KEFI Minerals Plc. ( KEFI or the Company ) SAUDI ARABIAN EXPLORATION AND DEVELOPMENT UPDATE
KEFI Minerals Plc Doğu Akdeniz Mineralleri San. Tic. Ltd. Şti. Cemal Gürsel Cad. Yalı Apt. No:304 K:4 D:9 Karşıyaka İZMİR Tel: +90 232 381 9431 Fax: +90 232 381 9071 Email: [email protected] AIM:
CMEMS user requirements and user uptake strategy
CMEMS Service Evolution & User Uptake Workshop CMEMS user requirements and user uptake strategy Dominique Obaton Mercator Océan CMEMS Service Evolution & User Uptake Workshop The Copernicus Marine service
Windimurra Acquisition Finalised. Investor Presentation October 2010
Building a World Class Resources Group Windimurra Acquisition Finalised Investor Presentation October 2010 Disclaimer The material in this presentation ( material ) is not and does not constitute an offer,
Effec%ve AX 2012 Upgrade Project Planning and Microso< Sure Step. Arbela Technologies
Effec%ve AX 2012 Upgrade Project Planning and Microso< Sure Step Arbela Technologies Why Upgrade? What to do? How to do it? Tools and templates Agenda Sure Step 2012 Ax2012 Upgrade specific steps Checklist
Mines Growth Projects
Boliden s Capital Markets Days 7-8 June 2006 Odda, Norway Mines Growth Projects President BA Mines Jan Moström Mines Smelters Zinc Copper Boliden s Capital Markets Days 7-8 June 2006 Odda, Norway 2 Ore
For personal use only
ABN 38 123 629 863 30 June 2015 Annual Report CORPORATE DIRECTORY Directors Peter John Bird (Chairman) David Alan Hamlyn (Managing Director) David Sidney Potter (Technical Director) Chen Chik (Nicholas)
Press Release 30 th October 2015
Press Release 30 th October 2015 SEPTEMBER 2015 QUARTERLY ACTIVITIES REPORT Resources Limited (ASX: WAF) is pleased to report activities on its 100%-owned and 100%- earning gold and copper-gold projects
FALCO COMPLETES HORNE 5 CONFIRMATION DRILLING PROGRAM AND ANNOUNCES FINAL RESULTS
For Immediate Release TSX.V - FPC FALCO COMPLETES HORNE 5 CONFIRMATION DRILLING PROGRAM AND ANNOUNCES FINAL RESULTS (November 23, 2015) Montreal, Québec Falco Resources (FPC: TSX-V) ( Falco ) is pleased
The Point Rousse Project - An Economic Analysis
ANACONDA MINING SELLS 3,956 OUNCES AND GENERATES $1.5M OF EBITDA AT THE POINT ROUSSE PROJECT FOR Q1 FISCAL 2016 TORONTO October 15, 2015 Anaconda Mining Inc. ( Anaconda or the Company ) (TSX: ANX) is pleased
Avion will host a conference call at 10:30 AM (EST) on Monday, April 2, 2011 to discuss the results. To participate in the call please dial:
March 31, 2012 A v i o n G o l d A n n o u n c e s F o u r t h Q u a r t e r 2 0 1 1 E a r n i n g s o f $ 8. 1 M i l l i o n W i t h E a r n i n g s P e r S h a r e O f $ 0. 0 2 R e c o r d 2 0 1 1 E
Student Contact Center: From Development to Delivery. A Vision for Anytime, Anywhere Student Services
Student Contact Center: From Development to Delivery A Vision for Anytime, Anywhere Student Services The Vision Single Source of Information Walk In Needs Met Here! Phone Email Agents empowered Departments