1 CABINET ACCOMMODATION FOR THE ICT SERVER ROOM (Report by the ICT Services Manager and the Projects and Assets Manager) 1. PURPOSE 1.1 To recommend that the ICT server room on the 2 nd floor of Pathfinder House should be extended. 2 BACKGROUND 2.1 DEPENDENCY ON SERVER ROOM EQUIPMENT The Council relies heavily on the availability of information and access to IT systems in order to deliver services. This is especially true at Pathfinder House & Castle Hill House but is increasingly the case at Leisure Centres too where, for example, computerised booking of facilities is used by reception staff. A failure of the database server at Pathfinder House will adversely affect all these locations and services On the occasions where Pathfinder House has been without power it is evident that staff are not able to carry out many basic service functions without access to their desktop PCs, and the information held on the central servers housed in the 2 nd floor server room In spite of this dependency very few instances of complete system close-down have occurred. This is largely due to the prompt and effective action of ICT Services staff in maintaining the service. 2.2 SERVER ROOM ISSUES A detailed analysis of the issues can be found in the paper presented to the Technical Infrastructure Project Board (part of the Customer First Programme) in December This report only identifies the major issues. Physical Environment The high levels of system availability can only be maintained if the environmental conditions which sustain the servers are kept within prescribed limits. These include: Temperature & humidity Robust power supply Space around equipment racks for staff to carry out maintenance
2 2.2.3 The construction and limitations of Pathfinder House impose additional constraints on the 2 nd floor server room location, including: Ceiling loading & cavity restrictions limiting the positioning and scale of air conditioning & cable densities. Floor weight restrictions which mean adjacent equipment racks have to be further apart on the 2 nd floor than they would need to be on the ground floor. Location of air conditioning units on external wall the external wall is already congested. Floor to ceiling height which restricts the air flows necessary for efficient cooling of equipment and limits rack size thus taking up more floor space. Air conditioning specialists have advised that a brick wall, enclosing the main server room, needs to be removed to achieve satisfactory air flow; this would require powering down all systems (because of the disruption and dust) During the Summer of 2003 external temperatures caused air conditioning failures and a complete close-down of servers was only narrowly avoided. Whilst staff are able to function (albeit with reduced efficiency) in environmental extremes the servers will close down automatically. With an increased number of servers since last Summer there is a risk that a partial or complete closedown of servers will occur in the Summer of 2004 (or earlier if there is an exceptionally warm spell of weather). Expansion Needs In 1997, the Council's ICT infrastructure consisted of 4 servers, 150 connected PC s and printers and two remote sites. There was a total of about 20Gb of data space. Currently, there are 54 servers, over 1000 items of network-connected equipment, and 11 other connected sites. There is a total of about 2000Gb of data space The situation is not static as the infrastructure is still expanding; the demands of the Customer First Programme have increased this rate of expansion. To date, this expansion has been achieved by expanding the original server room into an adjacent ICT Services area. As a result, the space allocated for the servers is virtually full to capacity and any further expansion will not be possible without further displacing staff from the ICT Services area Putting a definitive figure on the final number of servers that need to be housed is not feasible (different suppliers have different configurations) so some further space for expansion needs to be allowed for The key point to note is that expansion on the 2 nd floor tends to be achieved by horizontal expansion (i.e. floor area occupied) whereas without these physical limitations it could be achieved by vertical expansion (subject to ceiling height) There are many other design criteria which are present in modern day, robust computer room which are absent from the 2 nd floor server rooms (see report to the Technical Infrastructure Project Board).
3 3 EVALUATION OF OPTIONS 3.1 A number of options have been considered. It is clear that some would incur significantly more expense than others. Depending where the room is located, between 1 & 3 workstations desks are required for ICT Services staff who need ready access to the air conditioned equipment area. 3.2 There are four main options: 1) Relocate the server room to the ground floor of Pathfinder House i. As a bought-in module room within the Council Chamber ii. As a bespoke built room within the Chamber 2) Further extend the existing server room on the 2 nd floor 3) Relocate the server room to a purpose-built area adjacent to Pathfinder House 4) Relocate the server room to Godmanchester Depot 3.3 Evaluation The Council Chamber options are a similar cost to option 2, but bring with them the significant disadvantage of loss of the space for meetings, Council and Development Control Panel in particular, which require a large amount of space Extending the existing 2 nd floor server room is the most cost effective solution. However, it requires at least 2 days of down time so would need to be scheduled to minimise disruption to service. The loss of space for officers can be managed within the 2 nd floor by moving people around The two relocation options options 3 and 4 are prohibitively expensive due to the need to provide a weatherproof shell (option 3) or an expensive communications link (option 4). 3.4 Cost Costs are estimated at 74k, as set out in the Annex. The recent request to Cabinet for the release of MTP funds amounted to 20k for building works, with repairs to the air conditioning and the cost of humidity control totalling 9k being funded from existing revenue. 3.5 Timescale The works are planned to coincide with the new power supply for Pathfinder House, which requires the location of the server room to be identified, and should be completed by 1 st June CONCLUSION The computer room needs to be expanded and to have more effective air conditioning if the existing service is to be maintained through the Summer months and the Customer First Programme is to continue unhindered Option 2 is the most cost-effective solution, but requires an additional 45k of funding above the 20k requested in the MTP bid.
4 5 RECOMMENDATION Cabinet is asked to endorse Option 2 and approve additional capital funding of 45k. Background papers: Expansion of ICT Infrastructure (Report to Technical Infrastructure Project Board 23- Dec-2003) Contact Officers: David Ward ICT Services Manager, IMD Paul Woodruff Project Manager, Technical Infrastructure (Customer First Programme)
5 ANNEX Cost of Extending 2 nd floor IT server Room K Building demolition of walls, new office, new ceiling 10 Flooring new flooring (anti-static) 5 Painting walls 2 Electrical from new switch provided by Electrical 10 upgrade project Air conditioning removal of existing & installation of new 25 IT Cabling 5 Sub-total 57 Consultant fees (12% of project cost) 7 Contingency including overtime for HDC staff for 10 weekend working TOTAL 74
Standard Comms Rooms Specification
Standard Comms Rooms Specification Room Configuration Electrical General Distribution Boards Small Power Lighting Containment Fire Detection General To be defined in the project brief but should meet requirements
How To Manage A Business Continuity Strategy
Business continuity strategy 2009 2012 Table of contents 1 Why this strategy is needed 3 2 Aim of the strategy 4 3 Our approach to business continuity 4 PROCESS 4 STRUCTURE 5 DOCUMENTATION 6 DISRUPTION
Containment Solutions
Containment Solutions Improve cooling efficiency Separate hot and cold air streams Configured to meet density requirements Suitable for commercial and SCEC endorsed cabinets Available for retrofit to SRA
JAWAHARLAL NEHRU UNIVERSITY
School of Biotechnology JAWAHARLAL NEHRU UNIVERSITY New Delhi 110 067 Tender No. JNU/SBT/DBT-BUILDER/Data Centre/2015-16 Sealed Quotation for the establishment of a Data Centre for High-End Computational
RACKMOUNT SOLUTIONS. 1/7/2013 AcoustiQuiet /UCoustic User Guide. The AcoustiQuiet /UCoustic User Guide provides useful
RACKMOUNT SOLUTIONS 1/7/2013 AcoustiQuiet /UCoustic User Guide The AcoustiQuiet /UCoustic User Guide provides useful hints, tips and advice to help maximize the thermal and acoustic properties of the cabinets.
PA MATTHEWS AUDIO NSW STATE HIGH SCHOOL PA SYSTEMS WHITE PAPER
Required Functions: PA MATTHEWS AUDIO NSW STATE HIGH SCHOOL PA SYSTEMS WHITE PAPER - Separate sounds for Evacuate, Lock Down, Lock out. Sounds able to be changed i.e. MP3 files - Period Bell as a changeable
BUSINESS CONTINUITY PLAN
Business Logo or Name here BUSINESS CONTINUITY PLAN FOR RESIDENTIAL CARE HOMES PRODUCED BY DURHAM CIVIL CONTINGENCIES UNIT BUSINESS CONTINUITY PLAN LIST OF CONTENTS 1. DISCLAIMER...4 2. AIM...4 3. BUSINESS
ISS Data Centre Server Hosting. Service Description
ISS Data Centre Server Hosting Service Description March 9, 2011 Information Solutions and Services Page 1 TABLE OF CONTENTS INTRODUCTION...3 ISS SERVER HOSTING SERVICE OVERVIEW...3 WHAT IS THE ISS DATA
BUSINESS CONTINUITY PLAN
Business Logo Here BUSINESS CONTINUITY PLAN FOR SMALL TO MEDIUM SIZED BUSINESSES DATE :??? VERSION:?? PRODUCED BY DURHAM CIVIL CONTINGENCIES UNIT BUSINESS CONTINUITY PLAN LIST OF CONTENTS 1. DISCLAIMER...4
Energy Efficient Data Centre at Imperial College. M. Okan Kibaroglu IT Production Services Manager Imperial College London.
Energy Efficient Data Centre at Imperial College M. Okan Kibaroglu IT Production Services Manager Imperial College London 3 March 2009 Contents Recognising the Wider Issue Role of IT / Actions at Imperial
Information Services Strategy 2011-2013
Information Services Strategy Issue 1 1 Introduction The States of Jersey public sector is facing significant pressure for efficiencies and savings. This has created the context to take a fresh look at
BLABY DISTRICT COUNCIL
BLABY DISTRICT COUNCIL Meeting: Cabinet Executive Date: 30 June 2008 Subject: Report of: Status: Telephone Replacement System Head of ICT Services Public 1. Purpose of Report 1.1 To seek authority to allocate
Upgrading the PRS datacentres: space requirement. S. S. Mathur, GM-IT, CRIS
Upgrading the PRS datacentres: space requirement S. S. Mathur, GM-IT, CRIS PRS / UTS scenario: then and now Year 2000 PRS: 600 locations UTS: 0 locations Year 2008 PRS 1600 locations E-ticketing Passengers
IMPROVING DATA CENTER EFFICIENCY AND CAPACITY WITH AISLE CONTAINMENT
DATA CENTER RESOURCES WHITE PAPER IMPROVING DATA CENTER EFFICIENCY AND CAPACITY WITH AISLE CONTAINMENT BY: STEVE HAMBRUCH EXECUTIVE SUMMARY Data centers have experienced explosive growth in the last decade.
The following are general terms that we have found being used by tenants, landlords, IT Staff and consultants when discussing facility space.
The following are general terms that we have found being used by tenants, landlords, IT Staff and consultants when discussing facility space. Terminology: Telco: Dmarc: NOC: SAN: GENSET: Switch: Blade
Cooling a hot issue? MINKELS COLD CORRIDOR TM SOLUTION
Cooling a hot issue? MINKELS COLD CORRIDOR TM SOLUTION The heat load in data centers is increasing rapidly, the adaptation of a cooling strategy is often necessary. Many data centers and server rooms use
ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE
For discussion (date to be confirmed) PWSC(2015-16)6 ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE HEAD 703 BUILDINGS Government Office Intra-governmental services 120KA Building a government
T: 0344 875 4555 [email protected]
T: 0344 875 4555 [email protected] DATACENTRE UK INTRODUCTION Datacentre UK are specialist providers of energy efficient data centre and physical infrastructure solutions across the UK, Europe
Data centres that deliver [email protected]
Data centres that deliver [email protected] DATA CENTRE INFRASTRUCTURE MANAGEMENT (DCIM) DCIM solutions are designed to collect and manage information about a data centre s assets, resource use
University of St Andrews. Energy Efficient Data Centre Cooling
Energy Efficient Data Centre Cooling St. Andrews and Elsewhere Richard Lumb Consultant Engineer Future-Tech Energy Efficient Data Centre Cooling There is no one single best cooling solution for all Data
Fire Alarm system Installation Guide
Fire Alarm system Installation Guide Fire Alarm System Categories Systems designed for Protection of Property only, fall into two classifications P1 or P2. but a manual system is also needed, then this
Document Details. 247Time Backup & Disaster Recovery Plan. Author: Document Tracking. Page 1 of 12
Document Details Title: Author: 247Time Backup & Disaster Recovery Plan Document Tracking Page 1 of 12 TABLE OF CONTENTS 1 INTRODUCTION... 3 1.1 OVERVIEW... 3 1.2 DEFINED REQUIREMENT... 3 2 DISASTER OVERVIEW...
Birkenhead Sixth Form College IT Disaster Recovery Plan
Author: Role: Mal Blackburne College Learning Manager Page 1 of 14 Introduction...3 Objectives/Constraints...3 Assumptions...4 Incidents Requiring Action...4 Physical Safeguards...5 Types of Computer Service
Traditional Data Centers
Data Centers 2 Lectrus is a leading electrical systems integrator and custom metal enclosure manufacturer. We build fully integrated modules for power distribution, power generation, cooling and IT equipment
Assuming you currently have a SWGfL solution, is the selected location for the new solution the same as the location of the existing solution?
SWGfL Trust Site Survey Guide Page 1 of 5 1 Site Survey Guide 2 Blank Site Survey Guide 2.1 Background This Guide provides explanations and details to assist in responding to the Site Survey. 2.2 Location
Prepared by: OIC OF SOUTH FLORIDA. May 2013
OIC OF SOUTH FLORIDA REQUEST FOR PROPOSAL INFORMATION TECHNOLOGY SUPPORT SERVICES Proposals will be received by OIC of South Florida for Information Technology Support Services. Interested vendors should
Modularized and Multi-Functional Power Distribution for Cabinets 3.01
Modularized and Multi-Functional Power Distribution for Cabinets 3.01 1 1 Intelligent Data Center Solutions for Networks of the Future Hexatronic offers reliable, high quality data center solutions designed
TECHNICAL SUPPORT. and HARDWARE/SOFTWARE/NETWORK MAINTENANCE. for TICKETING DATABASE
IT Services Service Level Agreement TECHNICAL SUPPORT and HARDWARE/SOFTWARE/NETWORK MAINTENANCE for TICKETING DATABASE IT Services Service Level Agreement:Ticketing Database This service level agreement
Optimum Climate Control For Datacenter - Case Study. T. Prabu March 17 th 2009
Optimum Climate Control For Datacenter - Case Study T. Prabu March 17 th 2009 Agenda 2 About EDEC (Emerson) Facility Data Center Details Design Considerations & Challenges Layout Design CFD Analysis Of
IT White Paper MANAGING EXTREME HEAT: COOLING STRATEGIES FOR HIGH-DENSITY SYSTEMS
IT White Paper MANAGING EXTREME HEAT: COOLING STRATEGIES FOR HIGH-DENSITY SYSTEMS SUMMARY As computer manufacturers pack more and more processing power into smaller packages, the challenge of data center
Data Center Cooling & Air Flow Management. Arnold Murphy, CDCEP, CDCAP March 3, 2015
Data Center Cooling & Air Flow Management Arnold Murphy, CDCEP, CDCAP March 3, 2015 Strategic Clean Technology Inc Focus on improving cooling and air flow management to achieve energy cost savings and
Australian Government Data Centre Strategy 2010-2025
Australian Government Data Centre Strategy 2010-2025 Better Practice Guide: Data Centre Structure August 2013 Contents Contents 2 1. Introduction 3 Purpose 3 Scope 3 Policy Framework 4 Related documents
Optimizing Network Performance through PASSIVE AIR FLOW MANAGEMENT IN THE DATA CENTER
Optimizing Network Performance through PASSIVE AIR FLOW MANAGEMENT IN THE DATA CENTER Lylette Macdonald, RCDD Legrand Ortronics BICSI Baltimore 2011 Agenda: Discuss passive thermal management at the Rack
Adlib Hosting - Service Level Agreement
Adlib Hosting - Service Level Agreement June 2014 This service level agreement (SLA) applies to the Adlib Hosting services provided by Axiell ALM Netherlands BV, and includes the activities and facilities
Mechanic Handheld Wireless Access Point Setup Guide
Pre-Installation Manual Mechanic Handheld Wireless Access Point Setup Guide February 2014 / 10-095400-085 Mechanic Handheld Wireless Access Point Setup Guide Pre-Installation Manual February 2014 by the
An Uninterruptible Power Supply Topology to Manage the Arrival of Big Data Kenny Green
An Uninterruptible Power Supply Topology to Manage the Arrival of Big Data Kenny Green Biography Kenny Green is Technical Support Manager for Uninterruptible Power Supplies Ltd. He is a graduate of Imperial
Executive 29 October 2015
Executive 29 October 2015 Report of the Assistant Director - Finance, Property & Procurement Portfolio of the Executive Member for Finance and Performance The Future of York s Guildhall & Riverside Summary
HIGHLY EFFICIENT COOLING FOR YOUR DATA CENTRE
HIGHLY EFFICIENT COOLING FOR YOUR DATA CENTRE Best practices for airflow management and cooling optimisation AIRFLOW MANAGEMENT COLD AND HOT AISLE CONTAINMENT DC ASSESSMENT SERVICES Achieving true 24/7/365
www.plannedaction.com
www.plannedaction.com Planned Action Limited Fit-Out and Refurbishment Specialists Planned Action Limited is an established Essex-based business with close to 30 years experience of design & build projects
APC APPLICATION NOTE #112
#112 Best Practices for Deploying the InfraStruXure InRow SC By David Roden Abstract The InfraStruXure InRow SC (ACSC100 and ACSC101) is a self-contained air conditioner for server rooms and wiring closets.
BUSINESS CONTINUITY PLAN
BUSINESS CONTINUITY PLAN Signed Governor Print Name Date: Review: 1 To provide guidance to school staff, governors and external parties on how to react to disruption major or minor. 1. Rationale 1.1 To
TECHNICAL SUPPORT. and HARDWARE/SOFTWARE/NETWORK MAINTENANCE
IT Services Service Level Agreement TECHNICAL SUPPORT and HARDWARE/SOFTWARE/NETWORK MAINTENANCE for ROOM RESERVATION SYSTEM IT Services Service Level Agreement: Room Reservation System This service level
Data Centers. Mapping Cisco Nexus, Catalyst, and MDS Logical Architectures into PANDUIT Physical Layer Infrastructure Solutions
Data Centers Mapping Cisco Nexus, Catalyst, and MDS Logical Architectures into PANDUIT Physical Layer Infrastructure Solutions 1 Introduction The growing speed and footprint of data centers is challenging
Reducing Room-Level Bypass Airflow Creates Opportunities to Improve Cooling Capacity and Operating Costs
WHITE PAPER Reducing Room-Level Bypass Airflow Creates Opportunities to Improve Cooling Capacity and Operating Costs By Lars Strong, P.E., Upsite Technologies, Inc. 505.798.000 upsite.com Reducing Room-Level
Improve competiveness of IDC and enterprise data centers with DCIM
Improve competiveness of IDC and enterprise data centers with DCIM This paper studies the implementation of modern DCIM systems for data centers to improve operational competitiveness with ATEN's DCIM
Datacentre Studley. Dedicated managed environment for mission critical services. Six Degrees Group www.6dg.co.uk
Dedicated managed environment for mission critical services www.6dg.co.uk Our datacentres are the core of our business. At we own and manage 30,000 square feet of highly available, geographically diverse
Karen Winter Service Manager Schools and Traded Services 01823 355267 [email protected]
Somerset Services to Education Providers 2014-2015 SOUTHWEST ONE TECHNOLOGY SERVICES Service Provider: Southwest One Service Category: Academy Schools - Chargeable Contact: Karen Winter Service Manager
TECHNICAL SUPPORT. and HARDWARE/SOFTWARE/NETWORK MAINTENANCE. for PLACEMENT TESTING LAB
IT Services Service Level Agreement TECHNICAL SUPPORT and HARDWARE/SOFTWARE/NETWORK MAINTENANCE for PLACEMENT TESTING LAB IT Services Service Level Agreement:Placement Testing Lab This service level agreement
RVH/BCH Data Centres Proposals for Surge Protection and Ventilation
REPORT Proposals for Surge Protection and Ventilation BELFAST HEALTH AND SOCIAL CARE TRUST ROYAL GROUP OF HOSPITALS GROSVENOR ROAD BELFAST BT12 6BA Rev. 01 6th September 2013 Table of Contents 1.0 Ventilation
Citizen Machinery UK Ltd
JOB TITLE IT Support Engineer REPORTING TO European Business Systems Manager JOB PURPOSE Citizen Machinery UK Ltd is the Western Europe sales and support hub for the market leading ranges of Cincom sliding
Colocation, Hot Seat Services, Disaster Recovery Services, Secure and Controlled Environment
Colocation, Hot Seat Services, Disaster Recovery Services, Secure and Controlled Environment 3 Company Overview Confisio DataCenter was formed to help organisations tackle the ever increasing challenges
Data Centres and Associated Management Services CUA169209
Data Centres and Associated Management Services CUA169209 Contract Launch Presentation December 2010 Agenda The new direction for Data Centre Procurement - Overview of CUA169209 Mark Norton A/Senior Procurement
Other Scomis Quotations 1 st April 2015 until 31 st March 2016
Other Scomis Quotations 1 st April 2015 until 31 st March 2016 1. SIMS Remote Upgrade Service This installation service involves the implementation by Scomis of each SIMS upgrade onto the Customer's ICT
STCC Hardware & Equipment Policy
STCC Hardware & Equipment Policy The Help Desk will be the primary point of contact for all related support requests. The preferred method of contact is via email at [email protected] or, if email is unavailable,
South Tahoe Public Utility District Job Description
South Tahoe Public Utility District Job Description JOB TITLE: Information Technology Systems Specialist I/II UPDATED: 1/25/12 REVIEWED: 1/1/12 DEPT: Information Systems APPROVED STPUD: NH APPROVED LOCAL
Information and Communication Technology Network Cabling Infrastructure Standard
Approved on Dec-2005 by Eugene Formato Manager, Communications Services Last Amended Aug-2009 by Jarren Beveridge Network Engineer, Communications Services Scheduled for Review Jan-2010 Information and
REQUEST FOR PROPOSAL INFORMATION TECHNOLOGY SUPPORT SERVICES
CITY OF RICHLAND HILLS, TEXAS REQUEST FOR PROPOSAL INFORMATION TECHNOLOGY SUPPORT SERVICES Proposals will be received by the City of Richland Hills for Information Technology Support Services. Interested
ADC s Data Center Optical Distribution Frame: The Data Center s Main Cross-Connect WHITE PAPER
ADC s Data Center Optical Distribution Frame: The Data Center s Main Cross-Connect WHITE PAPER ADC s Data Center Optical Distribution Frame: The Data Center s Main Cross-Connect Introduction The primary
Senior Network Administrator Page 2
Long Beach Community College District CLASS SPECIFICATION Senior Network Administrator Date Adopted: May 22, 2006 FLSA Status: EEOC Job Category: Union Representation: Non-Exempt Professionals Represented
Exam : EX0-100. Title : ITIL Foundation Certificate in IT Service Management. Ver : 08.01.06
Exam : EX0-100 Title : ITIL Foundation Certificate in IT Service Management Ver : 08.01.06 QUESTION 1 The successful diagnosis of a problem results in a Known Error. On the basis of this Known Error a
ALWAYS ON GLOBALSWITCH.COM
ALWAYS ON GLOBALSWITCH.COM Data Centre Design Considerations Kelvin Fong Managing Director, Hong Kong ALWAYS ON GLOBALSWITCH.COM Agenda 1. Introduction to Global Switch 2. Customer Requirements 3. Development
LEVEL 3 DATA CENTER ASSESSMENT
Nationwide Services Corporate Headquarters 410 Forest Street Marlborough, MA 01752 USA Tel: 800-342-5332 Fax: 508-303-0579 www.eecnet.com LEVEL 3 DATA CENTER ASSESSMENT Submitted by: Electronic Environments
Our Customer Relationship Agreement CO-LOCATION SERVICE DESCRIPTION
Our Customer Relationship Agreement CO-LOCATION SERVICE DESCRIPTION Internode Pty Ltd ABN 82 052 008 581 Phone: 13 66 33 1/502 Hay Street, Subiaco WA 6008 15 October 2013 Rules of interpretation and capitalised
CenSus ICT Strategy (2012 2015)
CenSus ICT Strategy (2012 2015) Date: September 2012 Version: 5.0 Version Control Amendment History including Author: Version Date Author / Amendment History 1.0 Draft 30 th August 2012 Graham Crossingham
How To Upgrade The Council'S Network Infrastructure
Report Asset Management 21 October 2004 I1 ICT INFRASTRUCTURE UPGRADE PROGRAMME 1. Purpose of Report To propose a programme of investment necessary to update our ICT infrastructure, making it fit for purpose
ResNet services Roles and responsibilities
ResNet services Roles and responsibilities Suppliers: Information and Communication Technology Services (ICTS), Student Housing and Residence Life (SH&RL) Customer: Residents in UCT accommodation managed
Choosing Close-Coupled IT Cooling Solutions
W H I T E P A P E R Choosing Close-Coupled IT Cooling Solutions Smart Strategies for Small to Mid-Size Data Centers Executive Summary As high-density IT equipment becomes the new normal, the amount of
MFX RELOCATIONS. Data Centre & Computer Room Relocations
MFX RELOCATIONS MFX Relocations is our specialist relocation division and can undertake any type of commercial move but also undertakes specialist moves which includes:- Specialist IT relocations (Data
PART 10 COMPUTER SYSTEMS
PART 10 COMPUTER SYSTEMS 10-1 PART 10 COMPUTER SYSTEMS The following is a general outline of steps to follow when contemplating the purchase of data processing hardware and/or software. The State Board
BUSINESS CONTINUITY PLAN
Business Logo or Name here BUSINESS CONTINUITY PLAN FOR PERSONAL CARE PROVIDERS TEMPLATE PREPARED BY DEVON COUNTY COUNCIL EMERGENCY PLANNING SERVICE BUSINESS CONTINUITY PLAN LIST OF CONTENTS 1. DISCLAIMER...
Issues Affecting the Design and Choice of Cabling Infrastructures within Data Centres
Issues Affecting the Design and Choice of Cabling Infrastructures within Data Centres White Paper Nexans Cabling Solutions September 2006 Executive Summary Planning for the unknown is always a difficult
Energy efficient home design
Energy efficient home design GUIDELINES How an energy efficient home can help you live in comfort and save money An energy efficient home is designed to provide shade and allow cooling breezes to enter
MOVING OFFICE CHECKLIST
MOVING OFFICE CHECKLIST Any office move requires a great deal of planning and careful thought beforehand - and strong commitment all round, both before and during the move. This Checklists assumes that
Best Practices for Wire-free Environmental Monitoring in the Data Center
White Paper 11800 Ridge Parkway Broomfiled, CO 80021 1-800-638-2638 http://www.42u.com [email protected] Best Practices for Wire-free Environmental Monitoring in the Data Center Introduction Monitoring for