1 Financial Planning Templates 2014/15 to 2018/19 - Guidance for CCGs Contents 1. Introduction Cover Financial Plan Summary Revenue Resource Limit Planning Assumptions Financial Plan Detail QIPP Risk Investment Better Care Fund (BCF) Contract Value Triangulation Cash flow and Statement of Financial Position Capital Appendix A: Suggested Approach Appendix B: Financial Planning Business Rules
2 1. Introduction Planning templates have been constructed to provide sufficient granularity for NHS England to assess CCG plans for the five year period from 2014/15 to 2018/19. Due to the need to develop comprehensive plans for a full five year period, templates have been adjusted from the 2013/14 planning round. Each financial year has its own expenditure plan. Rather than having to enter values for all five years, the later years are open to a degree of pre-population by adjusting assumptions on key factors such as levels of activity growth. The financial information included in the templates should reflect the assumptions set out in the wider plans for CCGs. All financial values should be entered in 000. Cells in light yellow should be completed by CCGs where appropriate; those in blue are calculated, and those in light green will be pre-populated. The sections below give more detailed guidance on each sheet within the workbook. Appendix A also gives a suggested approach to completing the template. Please submit completed plans to the Financial Performance (NHS England) mailbox at NHSCB.financialperformance@nhs.net in line with the submission date on the instruction. Please also direct any queries on template completion to this mailbox. 2. Cover Input is required on this tab. Firstly select your CCG from the drop down list. This will then populate further information on this sheet as well as your allocation for 2014/15 and 2015/16 on the Revenue Resource Limit tab. Thereafter, please complete all of the boxes shaded red in order to demonstrate sufficient ownership and sign off of the financial plan. Once you have finished completing the template please ensure that the box for quality checks is showing as cleared before submitting the plan. Further detail on the checks can be found in the quality checks tab further on in the template. 2
3 3. Financial Plan Summary The majority of numbers on the Financial Plan Summary tab will be pre-populated from the other input sheets within the template, it is therefore suggested that this sheet is completed once data has been entered into all of the other sheets. The only numbers that do need to be input on this sheet relate to 2013/14. Column J requires commentary on the CCG s financial position to be entered. It is recommended that financial performance is linked to wider strategic and operational plans over the five year period. 4. Revenue Resource Limit This tab will be pre-populated with the CCG s allocation for 2014/15 and 2015/16 in order to prevent the difficulties that were faced in 2013/14 reconciling resource limits. Therefore if the CCG thinks the allocation is incorrect they need to raise this with their Area Team immediately. CCGs should enter their assumptions for the years 2016/ /19. Values are shown for the non elective, headroom and 70% non elective collection. These funds should be taken from the notified allocation and employed non recurrently with the plans for their investment detailed on the Investment and Financial Plan Summary tabs. 5. Planning Assumptions In order to populate future years, an Assumptions tab has been added in in order to better link assumptions and costs. Percentage growth assumptions should be added where relevant for each financial year for recurrent costs. The growth percentages ought to be year on year growth, for example the percentage increase in cost against a service compared to the previous year. Costs in the financial plan will be prepopulated with recurrent costs based on the % assumptions added in this tab. Assumptions should be added for demographic and non-demographic activity growth, gross provider efficiency and inflation. Demographic growth must be derived from a published source (e.g. ONS). Non-demographic growth includes pressures arising from technological developments, increased prevalence etc. 3
4 This assumptions sheet allows a CCG to link financial planning with other operational and activity plans, and use this information to drive future year financial plans. 6. Financial Plan Detail This is designed to capture all of the CCG s resource and spend. The table separates recurrent and non-recurrent items in order to calculate the CCG s underlying position. Rows 2 and 3 detail the resource limit. The figures feed from the revenue resource limit sheet and therefore do not need to be populated. This is for information while completing the template and supporting the calculation of surplus or deficit while the plan is being completed. The remaining rows detail the expenditure as follows; Column B - 13/14 Forecast Outturn this column should be populated with the latest FOT position. Columns C - E - Adjustments to expenditure baseline - These columns are designed to account for any adjustments in order for the CCG to get back to a recurrent opening budget position. The adjustments that reflect the underlying position should reflect what the organisation has submitted on the non-isfe underlying position return. o Any non recurrent expenditure incurred in 2013/14 should be entered in Column C. o Column D would include the full year effect of any QIPPs achieved in 2013/14, or of any investments o Column E is for any other full year effects not covered in Column D adjustments. Column F This column is calculated and outlines the recurrent underlying expenditure position for the CCG, and is used to calculate the underlying surplus. Columns G - I - Demonstrates the provider efficiency requirement delivered (min 4%) and the inflation funded to show net price deflation / inflation. These numbers will be calculated from the assumptions sheet. The % change is not expected to be applicable to exclusions/cost per case, but CCGs can enter values if appropriate. Column J - Demographic Growth uplift reflecting population change (Must be derived from a published source e.g. ONS). These numbers will be calculated form the assumptions sheet. 4
5 Column K - Non-demographic growth pressures arising from other population changes, technological developments, increased prevalence etc. These numbers will be calculated from the assumptions sheet. Column L - Cost pressures. These are free cells to enter costs as financial values directly onto the expenditure template (i.e. they are not driven by the assumptions sheet). This would include any recurrent cost pressures not adequately captured by the headings in columns G to K. Columns M & N These cells capture the information entered onto the QIPP sheet. All QIPP schemes will need to have an expenditure type selected from the drop down box on the QIPP sheet for the information to flow through to the Financial Plan and reconcile. Column O - Investment which is not QIPP related, but relating to other service quality/developments. As above, this is pre-populated once the CCG has completed the investments worksheet within the template. All costs entered on the investments worksheet need to be allocated to a cost category on the drop down menu for the workbook to reconcile. Column Q - CCGs need to enter any non-recurrent pass through costs here that the CCG has received and has been assumed in the allocation. Column R - Non-recurrent pressures, investments (incl. CQUIN where relevant). Non-recurrent items all at 2014/15 prices. Column S Non Recurrent Investments. As with the recurrent investments this will be captured from the Investments tab Columns T & U Non Recurrent QIPPs. As with the recurrent QIPPs, these will be captured from the QIPPs sheet. Include Learning Disability costs under Mental Health (hospital-based) or Community Services. The CCG s total Programme Resources should be matched across the expenditure categories, the difference being its surplus or deficit (shown in the Financial Plan Summary). Where reserve budgets are expected to be used to fund other programme expenditure, e.g. the use of reablement funding for community services investment, this should be shown netting off in the investments column (i.e. reducing reserves line and increasing service expenditure). Running costs have been split between CCG pay costs, CSU re-charge, NHS Property Services Recharge and other non-pay. The Financial Plan Summary will match the total expenditure to the running costs allocation to check to see whether the CCG is within target allocation. Columns Y - AJ - Monthly expenditure profile. Please enter the correct monthly profile into these columns. The March figure will calculate automatically to ensure that the monthly totals match the annual plan in column V. 5
6 The template for 2015/16 replicates the 2014/15 sheet requiring the same level of detail. For the following three years the information requirement is reduced. 7. QIPP There is a separate QIPP sheet for each year with the first two years requiring further detail. The QIPP table splits QIPP into two headings: Transactional & Contract efficiencies relate to savings made from providers from purchasing activity more efficiently, i.e. re-procurement of diagnostics, contract conditions such as new to follow up ratios. Transformational & Pathway changes relate to savings from decommissioning, more effective service provision, new models of care. Under each heading the QIPP is broken down into separate work streams. The QIPP plan will need to be split between recurrent and non-recurrent schemes. Column A requires the local name of each scheme over 0.5m. All schemes that are under 0.5m should be grouped together under the balance of schemes under 0.5m section. In order that the QIPP tab feeds the financial plan detail tab column B requires the area of spend to be selected. Therefore, more than one line would be needed for each local scheme. For example, a transformational QIPP scheme for a cardiology pathway redesign might require the following: In Columns C and D please enter the expected full recurrent annual value of savings and investment. In the above example the scheme is expected to generate recurrent savings of 4.5m (Col C) with recurrent annual investment of 1.5m (Col D). Column E calculates the net annual recurrent saving, in this case 3m. In Columns F & G please enter how much of that saving/investment will occur in 2014/15. In the above example the investment of 1.5m was needed up front, but the savings came in half way through the year generating a 2.25m saving and an overall net saving of 0.75m. 6
7 Columns I and J calculate the full year effect of the scheme; that is, the difference between the total recurrent annual saving and the 2014/15 saving. This will be used to calculate the recurrent underlying surplus. In Columns L and M please enter the value of any non recurrent savings in that year. The QIPP sheets for all five years are identical with the exception that for years 2014/15 and 2015/16 the QIPP savings profile is required (columns Q to AB). For later years the schemes are not expected to be as detailed, but strategic intentions are expected to be outlined and there are consequently fewer areas of spend to choose from. Please note On each worksheet only enter new schemes anticipated to be effected that year. Do not include the full year effect of schemes begun in prior periods as this will be calculated automatically. Unidentified QIPPs needs to be entered on rows with the spend category chosen from the drop down box to ensure the figures feed through to the overall financial plan. Levels of unidentified QIPP will be reviewed during the assurance process. If there are risks to the achievement of the QIPP programme please enter these onto the Risk sheet. QIPP schemes may require investment by other parties, for example by an Area Team within Primary Care. If your CCG s QIPP requires external investment please complete the section at the end of the QIPP form external investment supporting QIPP. 8. Risk The format for risk assessment follows a similar format to that used for non-isfe reporting throughout For the first two years, CCGs are required to enter their full risk value and percentage probability of risk being realised which automatically populates a potential risk value amount. Please note that risks entered here ought to be anything in addition to what has been incorporated in the planned position. As a general rule of thumb, if there is a very high chance that a risk will materialise (over 90%) it would be expected to be shown in the expenditure tabs as part of the planned surplus or deficit position. Only include additional risks in this tab which put the achievement of your planned position at risk. CCGs are also asked to provide meaningful commentaries against each risk figure entered, providing specific detail as to what is driving the risk and avoiding general terminology as much as possible. 7
8 CCGs are then asked to enter any mitigations that can be used to offset this risk. This is split between Uncommitted Funds and Actions to Implement. Uncommitted funds ought to include any funds available that have not been committed in the plans. Again CCGs should enter the full mitigation value and the probability of success of the mitigation working as a percentage and the expected mitigation value will automatically populate. A commentary box is provided to show detail of what these mitigating actions are. For the final three years of the five year plan, CCGs are only required to enter the potential risk value and expected mitigation value as net figures already, and provide a commentary to add detail where possible. The key figure produced by these assessments is the net risk/headroom position which is used to drive a risk adjusted planned surplus/ (deficit) position in the Commetary sheet. 9. Investment The table requires a high-level analysis of where CCGs propose to apply their investments. Each development should be named in Column A with the category of spend selected from Column B in order that the detail feeds through to the financial detail tab Recurrent Column C Investment the CCG will incur in the financial year. Please enter the part year effect for the year that is being completed. Column M Enter the total value of the investment needed. Column O This will calculate the full year effect of the investment (the difference between Columns M and C) and feed through to the underlying surplus calculations. Non Recurrent Column E - Bought forward Surplus - how and where the brought forward surplus is being spent Column F - Non-Recurrent Headroom - application of the funds will be subject to Business Case approval by ATs and no funds should be committed at plan stage unless the AT has specifically approved the scheme. Column G - 70% Threshold Column H - Readmissions Credit 8
9 There may be circumstances where expenditure that should have been committed non-recurrently has been committed recurrently. Where this has happened this should be recorded as an over-commitment under the recurrent section of the investment tab. In the example below; the CCG has planned to invest both the non-recurrent headroom ( 4m) and the 70% threshold ( 1m) in non recurrent schemes. However, only 1m of the 2.5m bought forward surplus is planned to be spent nonrecurrently. Effectively, 1.5m has been invested recurrently and therefore appears in column C. 2014/15 Recurrent resource (underying and in-yr surplus) B/F surplus NR Headroom Non-Recurrent 70% Threshold Readmission Credit Available to Invest ,500 NR Total Total Recurrent Description Area of Spend (select from drop down) Admission Prevention Schemes (b/fwd Surplus) Other Programme Services ,500 Sub-total recurrent 1, ,500 Non-Recurrent Description Area of Spend (select from drop down) Admission Prevention Schemes Other Programme Services ,000 Acute Re-investment Acute contracts -NHS (includes Ambulance services) ,000 Contingency Contingency ,000 Sub-total Non-Recurrent - 1,000 4,000 1,000-6,000 6,000 Total planned Investment 1,500 1,000 4,000 1,000-6,000 7,500 Remaining Funds (1,500) 1, , Better Care Fund (BCF) CCGs are required to detail investment in the Better Care Fund for 2014/15 and 2015/16. The top two rows in the worksheet outline the funding available and will be calculated from elsewhere in the template; the Notified BCF Allocation will be prepopulated in the Revenue Resource Allocation worksheet; and Transfers from other Pooled Budgets will be calculated from within this worksheet where additional funds have been identified for investment into the BCF. In the Expenditure section CCGs are required to firstly state where the Notified Allocation will be spent and secondly identify any additional funding that is being invested into the BCF. Within both expenditure sections CCGs are asked to detail how the funding will be spent: which organisation will hold the pooled fund and which Health and Wellbeing Board will oversee the allocation of funds. 9
10 Any benefits expected from this fund should be shown on the QIPP sheets. 11. Contract Value Triangulation This information is being collated to provide more detailed analysis for planning purposes and to provide an overall position of contract values reported between Commissioners, NHS Trusts and Foundation Trusts. It is expected that organisations will align their plans with those of the wider local health economy. In order to test the alignment of key assumptions Monitor, NHS England, and NTDA will reconcile provider and commissioner plans both for the two and five year submission review phases. The outputs of the reconciliation will be shared between the regional teams of Monitor, NHS England and NTDA. Every step will be taken not to prejudice the position of any trust or commissioner and no information will be shared at individual organisation level without first contacting the appropriate party. There are separate sheets for each year detailing the significant contracts (over 5m) for acute, mental health and community. The sheet breaks the contracts down in to value and activity over the relevant headings. For all contracts under 5m, the total value should be included within the other contract line. All contract spend across the headings should reconcile back to the value on the financial plans elsewhere on the templates. Therefore, for 2013/14 please enter the forecast performance for each provider rather than values contained within service level agreements. And for subsequent years please enter the anticipated value of activity with providers inclusive of any QIPP schemes. Please also outline the QIPP per provider as a memorandum, as well as the value of CQUIN per provider. The contracts data tab requires information to be split by point of delivery. If you are in doubt as to what category activity falls into please refer to the NHS Data Model and Dictionary ( ). Entries on this sheet will be compared with provider submissions via Monitor or the TDA. 10
11 12. Cash flow and Statement of Financial Position The cash draw-down profile for the CCG and a projected Statement of Financial Position will be required for the first two years of the model. 13. Capital The table captures direct CCG capital plans and those that it is expecting to be made within its area by other organisations such as NHS Property Services and the NCB (predominantly Primary Care related). For 2014/15 the information provided should be in line with the Capital Planning Returns submitted to your Area Teams and approved by your Region. 11
12 Appendix A: Suggested Approach This section offers a suggested approach to completing the planning templates. As the worksheets are linked, it is recommended that the workbook is completed in the suggested order below to ensure information is meaningful during completion. CCGs should adhere to the guidance for the relevant worksheets as above. 1. Select the appropriate CCG in the Cover sheet. 2. Next go to the Revenue Resource Limit tab. Enter values for 2013/14. The following two years will be pre-populated. Entries for 2016/ /19 can be entered at this stage or returned to once plans for 2014/ /16 have been completed. 3. In the Financial Plan Detail 1415 worksheet populate the FOT position against the cost categories provided in column B, further stripping out nonrecurrent costs in column C and adding full year effects in columns D and E in order to reach the recurrent underlying starting position. It is important that expenditure is entered correctly to generate a surplus in column B that corresponds with the latest forecast outturn position for 2013/ Complete the Contract 1314 worksheet. The sum of the contracts on this sheet must match back to the financial plan detail As such, please record the level of cost with each provider rather than the signed SLA value. 5. In the Assumptions sheet enter appropriate values for inflation, efficiency and growth. On the Financial Plan Detail sheet this will calculate the cost implication of those assumptions; 6. In the Financial Plan Detail 1415 worksheet enter any other recurrent non-activity related cost pressures as required on the template that are not driven by assumptions (columns J & K); 7. Complete the 2014/15 sections on QIPP (including the monthly profile), investments and NR fund proposals worksheets, in line with the guidance for these worksheets above. This will automatically update these areas of the expenditure plan; 8. Ensure all extra non-recurrent costs are entered on the expenditure plan for application of pass through and any other cost pressures (in columns P & Q) 12
13 9. On the same tab, complete the monthly profile of spend for 2014/15, ensuring that in total this balances back to the overall 2014/15 plan; 10. Complete the Contract 1415 worksheet. As with 1314 these values must tie back to the financial plan detail sheet. 11. Complete the Capital worksheet for 1415 for any planned additions; 12. Complete the SoFP and Cash sheets for 2014/15. A monthly profile is needed and it will be expected to match information provided in the other planning sheets. 13. Once all expenditure plans are complete, the Risk worksheet needs to be completed to assess any additional risk on top of the planned surplus or deficit positions; 14. Complete plans for the Better Care Fund. 15. The 2014/15 Financial Plan should now be complete. Move onto Financial Plan Detail 1516 worksheet and populate the template in same way. For 2015/16 the same level of detail is required as for 2013/14, but this reduces for the third, fourth and fifth years of the plan. 16. Run through the Quality Checks worksheet to ensure that all information entered in monthly profiles and against contracts, QIPP, investments and non-recurrent headroom, ties back to the expenditure plans. Ensure that any validation errors are fixed before proceeding; 17. Review the Financial Plan Summary worksheet to ensure the five year plans accurately reflect the CCG view of planned financial performance. 18. Complete the Financial Plan Summary worksheet to add context and narrative to the financial performance as required; and 19. Complete the Cover sheet in order to demonstrate ownership and sign off. 13
14 Appendix B: Financial Planning Business Rules The Financial Plan Summary sheet is formula driven, pulling in information from the detailed sheets in order to RAG rate financial performance in line with business rules for CCGs. This section defines how the criteria have been calculated. 1% Surplus Target. CCGs are required to make a cumulative 1% surplus. The calculation driving this on the planning templates is as below: Surplus (includes non-recurrent allocation and non-recurrent expenditure) Total allocation (recurrent and non-recurrent including b/f surplus) RAG criteria: Green = 1% or greater; Amber = Between 0% and 1%; Red = Less than 0% Risk Adjusted 1% Surplus Target. Net (risk)/headroom is brought into the surplus calculation to show a risk adjusted surplus or deficit position before recalculating the surplus target percentage: Surplus+ Net (Risk)/Headroom Total allocation (recurrent and non-recurrent including b/f surplus) RAG criteria: Green = 1% or greater; Amber = Between 0% and 1%; Red = Less than 0% Underlying Surplus. Commissioners should also be planning to be in 2.5% underlying (recurrent) surplus at the end of 2014/15 and 2% underlying surplus from 2015/16 to 2018/19, calculated as follows: Surplus Non Recurrent Expenditure Non Recurrent Allocation Recurrent Notified Allocation RAG criteria (2014/15): Green = 2.5% or greater; Amber = Between 0% and 2.5%; Red = Less than 0% RAG criteria (2015/16 onwards): Green = 2% or greater; Amber = Between 0% and 2%; Red = Less than 0% 0.5% Contingency. CCGs should be setting aside at least 0.5% contingency for each year in their financial plans. This is calculated as below: Contingency Total allocation (recurrent and non-recurrent including b/f surplus) RAG criteria: Green = 0.5% or greater; Red = Less than 0.5% Non-recurrent headroom. The requirement % for non-recurrent headroom is calculated as a % of recurrent notified allocation. For 2014/15 the target is 14
15 2.5% of recurrent notified allocation and 1% from 2015/16 to 2018/19. The plans show the difference between what has been committed and the full % that is available to be used as part of the recurrent notified allocation: Agreed plans in place for non-recurrent fund Recurrent notified allocation QIPP. There are no specific targets for QIPP plans at this stage built into the planning templates. These figures will be used to draw up comparative data during consolidation of the submitted financial plans. The formula works as follows: Net QIPP (including recurrent and non-recurrent) Recurrent notified allocation 15
How To Write A Financial Plan For A Cg
Activity and Financial Planning Templates 2015/16 Guidance for CCGs NHS England INFORMATION READER BOX Directorate Medical Commissioning Operations Patients and Information Nursing Trans. & Corp. Ops.
More informationFinancial Planning Templates 2014/15 to 2018/19 - Guidance for Direct Commissioning
Financial Planning Templates 2014/15 to 2018/19 - Guidance for Direct Commissioning Contents 1. Introduction... 2 2. Cover... 2 3. Area Team Summary... 3 4. Financial Plan Summary... 3 5. Allocations...
More informationGoverning Body. Date of Meeting: 29 May 2014 Paper No: 14/39. Title of Presentation: Update to the CCG Financial Plan 2014-15 to 2018-19
Oxfordshire Clinical Commissioning Group Oxfordshire Clinical Commissioning Group Governing Body Date of Meeting: 29 May 2014 Paper No: 14/39 Title of Presentation: Update to the CCG Financial Plan 2014-15
More informationSubmitted to: NHS West Norfolk CCG Governing Body, 29 January 2015
Agenda Item: 11.2 Subject: Draft Financial Plan 2015/16 Presented by: John Ingham, Chief Financial Officer Submitted to: NHS West Norfolk CCG Governing Body, 29 January 2015 Purpose of Paper: For information
More informationHARINGEY CLINICAL COMMISSIONING GROUP MAY 2013 GOVERNING BODY 2013/14 FINANCIAL PLAN
HARINGEY CLINICAL COMMISSIONING GROUP MAY 2013 GOVERNING BODY 2013/14 FINANCIAL PLAN 1. Introduction The purpose of this paper is to provide an update to the Governing Body of the CCGs 2013/14 financial
More informationFinancial Strategy 5 year strategy 2015/16 2019/20
Item 4.3 Paper 15 Financial Strategy 5 year strategy 2015/16 2019/20 NHS Guildford and Waverley Clinical Commissioning Group Medium Term Financial Strategy / Finance and Performance Committee May 2015
More informationBudget Paper 2015/16
Budget Paper 2015/16 1. Introduction The CCG constitution requires that the Chief Finance Officer will, on behalf of the accountable officer, prepare and submit budgets for approval by the governing body.
More informationFinancial Plan 2013/14-2014/15
Financial Plan 2013/14-2014/15 Final May 2013 1.0 Synopsis and Recommendations This Plan provides detail of NHS North Staffordshire Clinical Commissioning Group financial planning intentions for 2013/14.
More informationLesley MacLeod, Interim Chief Finance Officer. Commercially Sensitive For the Public or Private Agenda To be publically available via the CCG Website
Subject: Financial Planning 2015-16 Meeting: NHS Milton Keynes CCG Board Date of Meeting: 27 th January 2015 Report of: Lesley MacLeod, Interim Chief Finance Officer Is this document: Commercially Sensitive
More information2014-2016 Operating Plan, financial plan and five year draft strategy
Agenda item 9 Attachment 04 Title of paper: Meeting: 2014-2016 Operating Plan, financial plan and five year draft strategy Governing Body Date: 21 st March 2014 Author: email: Exec Lead: Karen Parsons,
More informationAgenda Item. NHS Cumbria CCG Governing Body. 3 June 2015 8. Financial Plan (Budget) 2015/16. Purpose of report:
POLICY REFERENCE NO: CORPORATE IDENTITY GUIDELINES NHS Cumbria CCG Governing Body Agenda Item 3 June 2015 8 Financial Plan (Budget) 2015/16 Purpose of report: The purpose of the report is to provide the
More informationNHS Trust Development Authority. 2015/16 Trust Financial Management System (TFMS) Plan Guidance
NHS Trust Development Authority 2015/16 Trust Financial Management System (TFMS) Plan Guidance NHS Trust Development Authority 2015/16 Trust Financial Management System (TFMS) Plan Guidance Table of Contents
More informationDelivering the Forward View: NHS planning guidance for 2016/17 2020/21
Delivering the Forward View: NHS planning guidance for 2016/17 2020/21 Annex 1 to the Technical Guidance Activity Plan, Contract Tracker and SRG Operational Resilience Template Guidance January 2016 1
More informationDelivering the Forward View: NHS planning guidance 2016/17 2020/21
Delivering the Forward View: NHS planning guidance 2016/17 2020/21 Planning Guidance 2016/17 Published December 2015 Spending Review National Priorities 2 separate but connected plans CCG Operational plan
More informationNORTHUMBERLAND, TYNE AND WEAR NHS FOUNDATION TRUST BOARD OF DIRECTORS MEETING
NORTHUMBERLAND, TYNE AND WEAR NHS FOUNDATION TRUST Meeting Date: 25 March 2015 BOARD OF DIRECTORS MEETING Title and Author of Paper: 2015/16 Budget & Financial Plans 15/16 & 16/17 James Duncan, Deputy
More informationFinancial Plan 2015-16. Update for Governing Body Meeting 19 th May 2015
Financial Plan 2015-16 Update for Governing Body Meeting 19 th May 2015 Contents Overview Changes to February 2014 Plan Tariff and implications What s new for 2015/16 Summary bridge from 14/15 to 15/16
More informationREPORT TO MERTON CLINICAL COMMISSIONING GROUP GOVERNING BODY
REPORT TO MERTON CLINICAL COMMISSIONING GROUP GOVERNING BODY Date of Meeting: 26 th March 20 Agenda No: 6.2 Attachment: 07 Title of Document: Draft Financial Strategy and Plan 20-16 Purpose of Report:
More information2016/17 Financial Planning. Governing Body 1 st March 2016
2016/17 Financial Planning Governing Body 1 st March 2016 2016/17 Financial Planning Outline Financial Planning Guidelines Business Rules National Context Comparators Local Summary Local Analysis Next
More informationTrust Development Authority. Securing Sustainability. Planning guidance for NHS Trust Boards 2014/15 to 2018/19. Technical guidance
Trust Development Authority Securing Sustainability Planning guidance for NHS Trust Boards 2014/15 to 2018/19 Technical guidance December 2013 Contents 1 Introduction 3 2 Submission requirements 3 3 Planning
More informationFinancial performance
Financial performance In our first NHS Financial Temperature Check briefing 2 we noted the number of organisations that were overspending or reporting a deficit has increased since the 2012/13 financial
More informationTRUST BOARD PUBLIC SEPTEMBER 2014 Agenda Item Number: 163/14 Enclosure Number: (4) 2015/16 Business Planning Board Discussion Paper
TRUST BOARD PUBLIC SEPTEMBER 2014 Agenda Item Number: 163/14 Enclosure Number: (4) Subject: Prepared by: Sponsored & Presented by: Purpose of paper Key points for Trust Board members Options and decisions
More informationHarrow CCG - 3 Year Strategic and Financial Recovery Plan (2014/15 2016/17) Final Version: 7 November 2013
Harrow CCG - 3 Year Strategic and Financial Recovery Plan (2014/15 2016/17) Final Version: 7 November 2013 1 Executive Summary (page 1 of 4) Context This 3 Year Strategic and Financial Recovery Plan (2014/15
More informationFinancial Plan 2015/16
Trust Board Public Meeting 28 May 2015 Page Executive Summary 2 Income & Expenditure 3 CIP 6 Balance Sheet 7 Capital Programme 8 Risks and Opportunity 9 Recommendations 10 Introduction Income and Expenditure
More informationThe CCG Assurance Framework: 2014/15 Operational Guidance. Delivery Dashboard Technical Appendix DRAFT
The CCG Assurance Framework: 2014/15 Operational Guidance Delivery Dashboard Technical Appendix DRAFT 1 NHS England INFORMATION READER BOX Directorate Medical Operations Patients and Information Nursing
More informationBackground... 1. What is it?... 2. Why is it important?... 2. What is essential for your plan?... 3. What is recommended for your plan?...
Contents Background... 1 What is it?... 2 Why is it important?... 2 What is essential for your plan?... 3 What is recommended for your plan?... 3 Sensitivity Analysis... 13 Financial Risk... 15 How do
More informationHillingdon CCG INITIAL BUDGETS AND FINANCIAL PLAN 2015/16. Governing Body 27/03/2015. Jonathan Wise Chief Finance Officer BHH CCGs
Hillingdon CCG INITIAL BUDGETS AND FINANCIAL PLAN 2015/16 Governing Body 27/03/2015 Jonathan Wise Chief Finance Officer BHH CCGs Contents Executive summary and recommendations Context and background National
More informationFinancial Recovery Plan
Airedale Wharfedale and Craven Clinical Commissioning Group Financial Recovery Plan 2015/16 onwards Neil Smurthwaite 11/17/2015 0 Contents - 1. Executive Summary 2 Page 2. Financial Background and Context
More informationNHS Bexley CCG 2016/17 Financial Planning. January 2016. Excellent healthcare locally delivered
NHS Bexley CCG 2016/17 Financial Planning January 2016 Excellent healthcare locally delivered Summary of achievements 2 High level of transparency on financial position Detailed understanding of finance
More informationFINANCIAL PLAN 2014/15 2018/19
Appendix 11a Financial Plan 2014/15 2018/19 NHS LOTHIAN Board Meeting 2 April 2014 Director of Finance FINANCIAL PLAN 2014/15 2018/19 1 Purpose of the Report 1.1 The purpose of this report is to seek approval
More informationThe Financial Plan 2013/14 was re balanced in July to reflect agreed contract values, expected QIPP savings and known over performance.
Number: 5 NHS VALE OF YORK CLINICAL COMMISSIONING GROUP GOVERNING BODY MEETING Meeting Date: 3 October 2013 Report Sponsor: Kevin Howells Interim Chief Finance Officer Report Author: Andrew Wilson Interim
More informationTrust Board Finance Report as at 31 st January 2014
Trust Board Finance Report as at 31 st January 2014 L O Neill Director of Finance February 2014 Produced by Director of Finance Trust Board Financial Position 31 st January 2014 1 Table of Reports Report
More informationThe Sustainability and Transformation Fund and financial control totals for 2016/17: your questions answered March 2016
The Sustainability and Transformation Fund and financial control totals for 2016/17: your questions answered March 2016 NHS Improvement (March 2016) Publication code: Guidance 01/16 Q1. Will commissioners
More informationFinancial Risk Share and Transitional Investment Fund North Central London Clinical Commissioning Groups 2013/14-2017/18
Financial Risk Share and Transitional Investment Fund North Central London Clinical Commissioning Groups 2013/14-2017/18 1. Background The North Central London Clinical Commissioning Groups (Barnet, Camden,
More information5-Year Financial Plan Update September 2013. Croydon CCG. Longer, healthier lives for all the people in Croydon
5-Year Financial Plan Update September 2013 Croydon CCG Financial Strategy Background (1) This 5-Year Plan builds on the full financial strategy document incorporated in the 3-Year Financial Improvement
More informationDudley & Walsall Mental Health Partnership NHS Trust
Dudley & Walsall Mental Health Partnership NHS Trust Date of Board meeting: 25 th March 2009 Subject: Financial Plans 2009/10 Trust Board lead: Presented by: Aim of the report: Ian Baines, Director of
More informationX Part 2 (Closed) Title of Paper 2015/16 Operational Plan Deliverables Quarter 1 Assurance report
CCG Board Meeting Paper Summary Sheet DETAILS Part 1 (Open) X Part 2 (Closed) Agenda Item Title of Paper 2015/16 Operational Plan Deliverables Quarter 1 Assurance report 5.3 Meeting CCG Board Date 3 September
More informationProject Implementation Plan (PIP) User Guide
eea financial mechanism Project Implementation Plan (PIP) User Guide 23 November 2007 norwegian financial mechanism Page 2 of 20 1 Introduction The Project Implementation Plan (PIP) is a representation
More informationEveryone counts Ambitions for GCCG for 7 key outcome measures
Everyone counts s for GCCG for 7 key outcome measures Outcome ambition Outcome framework measure Baseline 2014/15 Potential years of life lost to 1. Securing additional years of conditions amenable to
More informationANNEX F. London Focus Group Tender - Commissioning Support Services ITT Clarification Questions: FINAL Summary7
ANNEX F London Focus Group Tender - Commissioning Support Services ITT Clarification Questions: FINAL Summary7 Srl. Question Response 1 According to the memorandum of information, the draft ITT was supposed
More informationFinancial Planning Handbook
Financial Planning Handbook Effective for all colleges financial plans This handbook is of interest to principals and chief executives of colleges, finance directors at FE colleges and sixth form colleges,
More informationDraft Board Memorandum on Projected Working Capital and Financial Reporting Procedures. Page 1 of 27
Draft Board Memorandum on Projected Working Capital and Financial Reporting Procedures Page 1 of 27 Contents 1. Introduction and background 2. Executive summary 3. Basis of preparation 4. Key assumptions
More informationEngagement for commissioning success. {Smart Guides} to ENGAGEMENT. For better commissioning
Engagement for commissioning success {Smart Guides} to ENGAGEMENT For better commissioning Engagement for commissioning success Part of the Smart Guides to Engagement series, this guide looks at the benefits
More informationThe English NHS payment system: reforms to support efficiency and integrated care
The English NHS payment system: reforms to support efficiency and integrated care Anita Charlesworth Chief Economist 7 th April 2014 The NHS Payment System following the 2012 Health and Social Care Act
More informationGoverning Body Meeting in Public
Agenda Item No: Item 12 Date of Meeting: 26 th March 2015 Governing Body Meeting in Public Paper Title: Forward View Into Action Plan for 2015/16 Decision Discussion Information Follow up from last meeting
More informationNHS procurement - Report for the Board of Foods
Meeting of Lanarkshire Lanarkshire NHS Board NHS Board: Kirklands 28 January 2015 Fallside Road Bothwell G71 8BB Telephone: 01698 855500 www.nhslanarkshire.org.uk SUBJECT: FINANCE REPORT FOR THE PERIOD
More informationFinancial Planning Handbook
Financial Planning Handbook Effective for all colleges financial plans This handbook is of interest to principals and chief executives of colleges, finance directors at FE colleges and sixth form colleges,
More informationDelivering in a challenging environment
Trust Development Authority Delivering in a challenging environment Refreshed plans for 2015/16 Planning Guidance for NHS Trust Boards December 2014 Delivering in a challenging environment: refreshed plans
More informationDraft financial impact assessment of draft new standards for paediatric cardiac and adult congenital heart disease services
ANNEX C Draft financial impact assessment of draft new standards for paediatric cardiac and adult congenital heart disease services Executive Summary 1. The aim of the new Congenital Heart Disease review
More informationSupporting all NHS Trusts to achieve NHS Foundation Trust status by April 2014
TFA document Supporting all NHS Trusts to achieve NHS Foundation Trust status by April 2014 Tripartite Formal Agreement between: Walsall Healthcare NHS Trust NHS West Midlands Department of Health Introduction
More informationSUS R13 PbR Technical Guidance
SUS R13 PbR Technical Guidance Published 2nd April 2013 We are the trusted source of authoritative data and information relating to health and care. www.hscic.gov.uk enquiries@hscic.gov.uk Contents Introduction
More informationNHS LANARKSHIRE FINANCIAL PLAN 2009/10 2013/14
NHS LANARKSHIRE FINANCIAL PLAN 2009/10 2013/14 1. Purpose of Report 1.1. This paper seeks Board approval for the NHS Lanarkshire Financial Plan for the five year period 2009/10 to 2013/14. 2. Overview
More information2. Excel is used so that the projected outturn figure can be calculated and entered on the spreadsheet.
BUDGET MONITORING & BALANCES REPORT Background 1. The source data for the monitoring report is extracted from the School s financial records held in the ledger system used by the School. This can then
More informationPublication of 2014-15 NHS Trust Accounting Returns data
Publication of 2014-15 NHS Trust Accounting Returns data Overview NHS Trusts submit accounting and management information data to the Department of Health at the end of the financial year. The NHS Trust
More informationConsultancy spending controls: Initial Guidance to NHS Trusts
Consultancy spending controls: Initial Guidance to NHS Trusts 1. Summary 1.1 The NHS Trust Development Authority (NHS TDA), Monitor and NHS England (NHSE) are jointly implementing a controls process over
More informationFinancial Planning. Preparing Financial Budgets to support your Development Plan
Introduction Financial Planning Preparing Financial Budgets to support your Development Plan Welcome to Oxfordshire Early Years Development & Childcare Partnership s electronic financial planning tool.
More informationThe NHS payment system: reforms to support integrated care
The NHS payment system: reforms to support integrated care Anita Charlesworth Chief Economist 14 February 2014 The NHS Payment System following the 2012 Health and Social Care Act NHS England and 211 clinical
More informationLaunch of the National Clinical Utilisation Review Framework
Launch of the National Clinical Utilisation Review Framework Guide for Clinical Commissioning Groups Publications Gateway Number: 03917 Launch of the National Clinical Utilisation Review Framework Guide
More informationPC13 Information Requirements Chapter 5 Financial Model and Financial Tables Issued 13 December 2011 - Version 01
PC13 Information Requirements Chapter 5 Financial Model and Financial Tables Issued 13 December 2011 - Version 01 Contents Chapter 5 - Financial Model and Financial Tables... 3 5.1. Table 5.1 Charge caps
More informationNorth West Surrey CCG - Head of Ambulance Contracts. Job Description
North West Surrey CCG - Head of Ambulance Contracts Job Description Job Title: Band: Responsible to: Responsible for: Accountable to: Head of Ambulance Contracts Band 8c Associate Director of Contracts
More informationAppendix 5 Oadby and Wigston Borough Council: HRA self-financing business plan model
Appendix 5 Oadby and Wigston Borough Council: HRA self-financing business plan model As we enter the final quarter of 2013/14, the HRA business plan model has been updated to reflect activity in 2013/14
More informationChapter 6 Financial Plans
Chapter 6 Financial Plans Chapter 6 Financial Plans 109 6. Financial Plans Introduction 6.1 The purpose of this chapter is to: Review the historical financial performance of the Trust for 2011/12 to. Outline
More informationHow to Use the Cash Flow Template
How to Use the Cash Flow Template When you fill in your cash flow you are trying to predict the timing of cash in and out of your bank account to show the affect and timing for each transaction when it
More informationLab 11: Budgeting with Excel
Lab 11: Budgeting with Excel This lab exercise will have you track credit card bills over a period of three months. You will determine those months in which a budget was met for various categories. You
More informationSouth West London and St George s Mental Health NHS Trust s Foundation Trust Application
Agenda item 8 Paper H South West London and St George s Mental Health NHS Trust s Foundation Trust Application Author: Alwen Williams, Director of Delivery and Development (London) Purpose 1. The purpose
More informationThe Royal Marsden. 2016/17 financial planning. Trust Board. March 2016
2016/17 financial planning Trust Board March 2016 Overview Planning context Financial plan 3 Overview The Board reviewed the draft financial plan for 2016/17 at its February meeting with the draft plan
More informationConsultancy spending approval process: Initial guidance to NHS foundation trusts
Annex One Consultancy spending approval process: Initial guidance to NHS foundation trusts Summary 1. Monitor, the NHS Trust Development Authority (TDA) and NHS England are jointly implementing an approval
More informationNHS Chartutes - A Guide to the governing Body
Constitutional Changes Proposed by Legal Advisers At Clause 4.1.2, changed the term Board to Governing Body to align with the term used in the legislation. Page 14. Amended Clause 4.8.1 to clarify the
More informationDelivering the Forward View: NHS planning guidance 2016/17 2020/21
Delivering the Forward View: NHS planning guidance 2016/17 2020/21 December 2015 Delivering the Forward View: NHS planning guidance 2016/17 2020/21 Version number: 2 First published: 22 December 2015 Prepared
More informationSECTION : 4 BUDGET MANAGEMENT
SECTION : 4 4.1 INTRODUCTION Budget Management is the process of planning and measuring an organisation s effectiveness in achieving its aims and objectives. By using methods of Budgetary Control, comparisons
More informationReport by Director of Health and Social Care Commissioning and Interim Director of Joint Commissioning
Agenda Item No. 5 Policy and Resources Select Committee 21 February 2013 Progress Report on the Joint Commissioning Unit Report by Director of Health and Social Care Commissioning and Interim Director
More informationSales Revenue Plan/Budget Excel Template User Guide
Sales Revenue Plan/Budget Excel Template User Guide Three year sales plan/budget The Sales Revenue Plan/Budget Excel template allows you to develop a monthly sales revenue plan for up to three years. It
More informationBOARD OF DIRECTORS PAPER COVER SHEET. Meeting Date: 27 January 2010
BOARD OF DIRECTORS PAPER COVER SHEET Meeting Date: 27 January 1 Agenda Item: 5 Paper No: C Title: CLAIMS REVIEW SUMMARY REPORT Purpose: To update the Board of Directors on current clinical and non-clinical
More informationCoventry and Warwickshire Repatriation Programme
NHS Arden Commissioning Support Unit Coventry and Warwickshire Repatriation Programme Large-scale service redesign and innovation to benefit patients Arden Commissioning Support Unit worked with Coventry
More informationCASH FLOW STATEMENT & BALANCE SHEET GUIDE
CASH FLOW STATEMENT & BALANCE SHEET GUIDE The Agriculture Development Council requires the submission of a cash flow statement and balance sheet that provide annual financial projections for the business
More informationFinancial planning handbook
Financial planning handbook This financial planning handbook sets out the framework for completing financial plans for sixth form colleges and other further education colleges for 2016 to 2018. Of interest
More informationCHESHIRE FIRE AUTHORITY SUBJECT : 2014-15 DRAFT BUDGET, COUNCIL TAX AND MEDIUM TERM FINANCIAL PLAN
CHESHIRE FIRE AUTHORITY Item 2 ITEM: 2 MEETING OF : FIRE AUTHORITY DATE : 12 FEBRUARY 2014 REPORT OF : CHIEF FIRE OFFICER AUTHOR : HEAD OF FINANCE SUBJECT : 2014-15 DRAFT BUDGET, COUNCIL TAX AND MEDIUM
More informationGE1 Clinical Utilisation Review
GE1 Clinical Utilisation Review Scheme Name QIPP Reference Eligible Providers GE1 Clinical Utilisation Review QIPP 16-17 S40-Commercial The CUR CQUIN is aimed at large NHS acute providers of specialised
More informationNicola Greenfield, Deputy Director of Finance. Approve Adopt Receive for information. Finance Revenue & Capital X Equality & Diversity
Board of Directors Agenda Item Date: 26 th September 2013 Title of Report Monitor s revised Risk Assessment Framework for 2013/14 Purpose of the report and the key issues for consideration / decision Presented
More informationEmergency Preparedness, Resilience and Response (EPRR)
GB 15/135 Emergency Preparedness, Resilience and Response (EPRR) Introduction The NHS needs to plan for and respond to a wide range of emergencies and business continuity incidents that could affect the
More informationDRAFT Social Services Budget Programme Financial Plan Summary 2014 2020 APPENDIX 4 Appendix 4 2016/17 ( ) 2017/18 ( )
DRAFT Social Services Budget Programme Financial Plan Summary 2014 2020 APPENDIX 4 Date: Dec 14 1. Divisional Savings Identified Project Description Project Sponsor 2014/15 2015/16 2016/17 2017/18 2018/19
More informationTrust Board Meeting in Public: Wednesday 13 January 2016 TB2016.16
Trust Board Meeting in Public: Wednesday 13 January 2016 Title NHS Planning Guidance 2016/17 2020/21 Status History For information This report provides a summary of the annual national planning guidance.
More informationOperational Plan Document for 2014-16. Royal Devon & Exeter NHS Foundation Trust
Operational Plan Document for 2014-16 Royal Devon & Exeter NHS Foundation Trust Operational Plan Guidance Annual Plan Review 2014-15 The cover sheet and following pages constitute operational plan submission
More informationStrategic Plan Document for 2013-14. Homerton University Hospital NHS Foundation Trust
Strategic Plan Document for 2013-14 Homerton University Hospital NHS Foundation Trust 1 Strategic Plan for y/e 31 March 2014 (and 2015, 2016) This document completed by (and Monitor queries to be directed
More informationReport on: Strategic and operational planning 2016/17 to 2020/21
To: The Board For meeting on: 25 February 2016 Agenda item: 7 Report by: Bob Alexander Report on: Strategic and operational planning 2016/17 to 2020/21 Purpose 1. The purpose of this paper is to invite
More informationStatus of Report: Public Agenda Item: 10. The Chief Fire and Rescue Officer and the Treasurer
Status of Report: Public Agenda Item: 10 Meeting: Policy Committee Date: 14 th January 2015 Subject: Report by: Author: For: Local Government Finance Settlement The Chief Fire and Rescue Officer and the
More informationAgenda Item: 4.1.2. REPORT TO THE TRUST BOARD MEETING IN PUBLIC August 2013. Integrated Performance Report. Title
REPORT TO THE TRUST BOARD MEETING IN PUBLIC August 2013 Title Lead Director Author(s) Purpose Previously considered by Executive Summary Integrated Performance Report Agenda Item: 4.1.2 Paul Scott - Director
More informationNHS Five Year Forward View Recap briefing for the Health Select Committee on technical modelling and scenarios
NHS Five Year Forward View Recap briefing for the Health Select Committee on technical modelling and scenarios May 2016 Document title: NHS Five Year Forward View: Recap briefing for the Health Select
More informationITEM NO: 5. Date: 21 September 2015. Reporting Officer:
ITEM NO: 5 Report To: OVERVIEW (AUDIT) PANEL Date: 21 September 2015 Reporting Officer: Cllr J M Fitzpatrick - First Deputy (Performance and Finance) Ben Jay - Assistant Executive Director, (Finance) Subject:
More informationNorth West London CCGs:
North West London CCGs: The future of collaborative working update 1. Purpose of this paper 1.1 This paper contains recommendations for the future of Commissioning Support Services which require a final
More informationPreparing a budget template and presenting financial graphs using Excel
Preparing a budget template and presenting financial graphs using Excel KLA: STAGE: UNIT: Topic: HSIE Stage 5 Commerce Personal Finance Budgeting, loans and insurance Outcomes: 5.1 Applies consumer, financial,
More informationThe Audit Findings for NHS Bristol Clinical Commissioning Group
The Audit Findings for NHS Bristol Clinical Commissioning Group Year ended 31 March 2015 21 May 2015 Barrie Morris Engagement Lead T 0117 305 7708 E Barrie.Morris@uk.gt.com Hannah Jones Audit Manager T
More informationElectricity Market Reform:
Electricity Market Reform: Consultation on Low Carbon Contracts Company s and Electricity Settlements Company s operational costs 2015/16 Government Response January 2015 Crown copyright 2015 URN 15D/001
More informationHow To Write A Local Authority Budget
Circular Fin 08/2014 1 July 2014 Guidance associated with Local Property Tax (Local Adjustment Factor) Regulations 2014 I am directed by the Minister for Environment, Community and Local Government to
More informationConsultation on amendments to the Compliance Framework. Dated 31 January 2008
Consultation on amendments to the Compliance Framework Dated 31 January 2008 1. Introduction 1.1. Developing the regulatory framework Monitor continues to develop a regulatory framework within which boards
More informationItem: TfL Prudential Indicators 2016/17 to 2018/19
Board Date: 17 March 2016 Item: TfL Prudential Indicators 2016/17 to 2018/19 This paper will be considered in public 1 Summary 1.1 This paper sets out the proposed TfL borrowing limits and other Prudential
More informationUser Guide for OPIC Financial Projections Model Builder Tool
User Guide for OPIC Financial Projections Model Builder Tool 4/2/2013 Prepared by: Deborah Howard Document Control Document Information Information Document Owner Deborah Howard Issue Date 4/2/2013 Document
More informationNHS Sheffield CCG Performance Management Framework
NHS Sheffield CCG Performance Management Framework Governing Body meeting 3 December 2015 Author(s) Rachel Gillott, Deputy Director of Delivery and Performance Sponsor Tim Furness, Director of Delivery
More informationCreating a sustainable culture NHS financial resilience review 2015
Creating a sustainable culture NHS financial resilience review 15 Summary findings from our financial health checks of English NHS trusts, foundation trusts and CCGs March 15 Efficiency Demand Funding
More informationUser Guide for Contract Pricing Statement
User Guide for Contract Pricing Statement 1 Introduction 1. Introduction 1.1 This document is issued by the Single Source Regulations Office (SSRO) and sets out guidance to assist contractors with statutory
More informationFEDERAL EMPLOYEES HEALTH BENEFITS PROGRAM (FEHBP) ANNUAL REPORTING INSTRUCTIONS FOR EXPERIENCE-RATED CARRIERS
United States Office of Personnel Management The Federal Government s Human Resources Agency FEDERAL EMPLOYEES HEALTH BENEFITS PROGRAM (FEHBP) ANNUAL REPORTING INSTRUCTIONS FOR EXPERIENCE-RATED CARRIERS
More information