American Express Data Center Migration Presentation to the TPF Users Group Washington, DC
|
|
|
- Everett Paul
- 10 years ago
- Views:
Transcription
1 American Express Data Center Migration Presentation to the TPF Users Group Washington, DC March 11 th, 2014
2 Agenda Context Point of Departure New Data Center Set-Up New Data Center Validation Migrations Results
3 Point of Departure - CAS/TPF Environment Three Processors (2) IPC1, (1) MDC > IPC1 Production and Dev/Test are split > Dev/Test provides a production back-up platform > MDC for Disaster Recovery Production and Dev/Test share Six DASD Sub Systems (3) IPC1, (3) MDC > Production and Dev/Test are striped across all Sub Systems > West and ADC share some volumes with TPF Four Tape ATLs (2) IPC1, (2) MDC > Production and Dev/Test share all tape > West and ADC share Tape ranges with TPF 100% IP network as of March 2012 Shared Console environment across LPARs > Sharing limited by LPARs being fixed to separate processors > Windows servers running ware and SuperVision
4 Point of Departure: 2012 IGS TPF Install and Testing Plan --- March > Provide WWCAS a Detail Timeline and Migration Plan EMC/IGS detail install plan --- March > EMC to reflect back IGS/AMX Requirements for IPC1 and MDC hardware, Enginuity microcode, all scripts, EMC Product Suite for TPF, and detail copy design > EMC to reflect back IGS/AMX Requirements for IPC2 hardware, Enginuity microcode, EMC Product Suite for TPF and copy all scripts, and detail copy design Replication Network Detail Planning --- March Update WWCAS on Replication planning provided & Timeline --- April IGS/EMC IPC1/MDC Migration Methodology Test plan --- April Channel Extension install and zoning IPC1, MDC, IPC2 --- May EMC configuration and Product Suite for TPF changes for Test Plan --- May Verify and Cascaded SRDF in the IPC1/MDC environment --- June
5 Point of Departure: CAS/TPF DASD Environment IPC1 PHX I9, I10 MDC MSP M16 AR2 CLN R1 AX AY AZ AT R2 Local Box TimeFinder Copy Local or Remote Box or SRDF/DM Copy Red or Black, SRDF or TimeFinder, local or remote, suspended copy TPF Records striped across 3 AX using SRDF/DM Immediate Tape file copies WK/AZ ATE
6 EMC Migration Method Validation: June 30, 2012 IPC1 PHX MDC MSP AR21 SHR P R21 AY Temp AX AZ SHR P R2 Temp AX R2 AT CLN R1 Temp ATE I9, I10 M16 * Set-up DR Environment to validate IPC2 requirements * This can be made permanent for the Migration Method WK/AZ
7 Set-up IPC2 Environment: 2012 EMC configuration input to IGS Hardware Management --- July > IPC1/MDC/IPC2 Microcode upgrade and patches Copy Network install IPC1, MDC, IPC2 --- July Channel Extension install and zoning IPC1, MDC, IPC2 --- July EMC DASD and BIN File upgrades IPC1, MDC --- August EMC delivery of all scripts --- September IBM install W9 processor & Tape --- October IGS install SuperVision Servers --- October EMC DASD and BIN File install IPC2 --- October > IPC1/IPC2 IOPS 300k -- Projected > IPC2 Double bandwidth of IPC1 (RFs in AX) > IPC1/MDC/EMC Product Suite for upgrade to version 7.1.0
8 Introduction of IPC2 Hardware: October 31, 2012 IPC1 PHX MDC MSP AR21 CLN R1 AY R2 AX AZ AT ATE I9, I10 M16 24 WK/AZ 48 WK1 W9 IPC2
9 TPF Systems Validation: 2012 Fully Functional W9 Environment --- October - November > First /TPF copy Cascaded SRDF/DM from MDC AR21 to IPC2 R2 TimeFinder Clone from IPC2 R2 to IPC2 AX Clone (R1) SRDF/DM from IPC2 AX R1 to IPC2 R2 SRDF/DM from MDC / R1 to IPC2 / R2 TimeFinder / IPC2 R2s to IPC2 / Clones > First /TPF IPL Hardware Verification, Processor, DASD, Tape TPF Testing/Validation --- November - December > TPF DB Utilities Test Cases Tape copy delay timings and copy start > Application Utilities Test Cases > Repeatable TPF Migration Copy Function Developed and Documented Validate Swapair as depicted in Detail Plan
10 IPC2 Validation: December 31, 2012 IPC1 PHX I9, I10 MDC MSP AY AZ AT M16 AX AR21 WK/AZ ATE R2 WK IPC2 W9
11 WWCAS IPC2 Validation: January July, 2013 TPF Stand-alone Network Start --- January > Validate Network connectivity > Begin TPF Migration Copies per WWCAS requests Additional Processor Install/Validation --- February Network Connectivity Validation --- February -- May > West, East, International, CAS Transactions testing in IPC2 > Individual GAN, STRATUS, traffic generators > Outage Timing Runs, IPC2 DR like verification exercise Production Network Migration Testing --- June & July (after MG6 & MG7) > Final Tape Copy Validation, remote shared tape > Final West Validation, remote shared DASD > Final TPF Migration Validation > Final Swapair Validation with AX to s
12 DC2015 Risk Platforms Migration Calendar DC2015 Migration Calendar January February March April May June July August September MG 4.2 MG 4.3 MG 4.4 MG 5A MG 5B MG 6A MG 6B MG 6C MG 7A MG 7B MG 8A MG 8B MG 8C Midrange Midrange Midrange Midrange Midrange Mainframe (DIPJ) Mainframe (PPRD/EPRD) Midrange Midrange Mainframe (West/LPRD) Midrange Midrange Mainframe (EAST/zData) Midrange Midrange Mainframe (CAS/TPF) Apr 26 Institutional and OPEN 4.2 Mar 22 Risk Rules Engine (WinARES) UW (CRUSE, icruse) ROP, AboutRisk 4.3 Jun 7 Credit Bureau Reporting (CBR), Credit and Collections (WCC), Global Account Monitor (GAM), Global Acquisition (GNA), Card Number Generation (CANS), Risk Assessment (GRMS) 4.4 5A 5B Apr 12 Credit Review Online (irisk ), Enterprise MIS, AMC, Enterprise Model Mgr, Risk Change Mgmt & BNR portals, CDIT 6A 6A 6A 6B 6B Jun 16 IDN Analytics, Big Data 6B 6B Jul 19 IDN Warehouse, IDN 6C Jul 12 Credit Bureau Reporting (CBR), Credit and Portal, 7A 7A Collections (WCC), Global Account Monitor (GAM), Global Acquisitions (GNA), ibureau 7A 7A Aug 16 Sphere 7B Aug 9 Credit Bureau Reporting (CBR), Credit and Collections (WCC), Global 8A 8A (Global Decision Engine, Global Risk Fulfillment 8B Account Monitor (GAM), Global Acquisitions (GNA) Card Number Generation (CANS), Risk Assessment (GRMS) Primary Migration Event 8A 8A 8C 8C Application Freeze- Primary Migration Date (2 wks prior,3 days post) Aug 30 Authorizations (CAS) Contingency Migration Event Region IPCW IPCE EPRD PPRD Migration Date EST 7/13/2013 8/11/2013 6/8/2013 & 6/9/2013 6/8/2013 & 6/9/2013 Application Freeze- Contingency Migration Date Outage Time 22:00 14:00 EST 00:01 16:00 EST 14:00 06:00 EST 14:00 06:00 EST Outage Duration 16 hours 16 Hours 16 Hours 16 Hours Local Time 00:01 16:00 MST 00:01 16:00 EST 19:00 11:00 GMT 04:00 20:00 UTC 12
13 Mainframe Migration Downtime (MST-PHX Times) Move Group 6A May Move Group 6B June 8-9 Move Group 7A July Soft Launch (DIPJ) International (EPRD, PPRD) zlinux LPRD UROC EAST zlinux Move Group 8C Aug 31 Saturday May 11 START Saturday June 8 START Saturday July 13 WEST zlinux Move Group 8A Aug START CAS/TPF START Sunday July 14 START TIME 18:00 START TIME 12:00 START TIME 23:00 START TIME 00:01 (midnight) START TIME 00:01 Saturday August 10 (midnight) END Sunday - May 12 END Sunday June 9 END Sunday July 14 START TIME Saturday August 10 21:00 END TIME* 2:00 END TIME* 12:00 END END TIME* Sunday July 14 16:00 END END TIME* Saturday August 10 13:00 START START END TIME* 4:00 END TIME* Sunday August 11 13:00 END START START TIME END END TIME (MSTPHX) Saturday August 31 2:00 Saturday August 31 6:00 (*) Includes contingency window of approximately 4 hours
14 CAS/TPF Migrations: June August, 2013 CAS/TPF Migration Dry Run Testing -- June -- July West Migration to IPC2 -- July 12, 2013 > Remote Shared DASD Automation CAS/TPF Migration to IPC2 -- August 31, 2013 > Run EMC Product Suite for in IPC1 until commit to IPC2 > Back-up the EMC Control Tables > Sync in IPC2 via from IPC1 and IPL in IPC2 > Activate SRDF/DM copy from MDC to IPC2 > Ensure all copies are very close to in-sync Cycle TPFA in IPC1 to 1052 state Start a new cycle and stop copies > When all copies are 100% in-sync Perform Pend/Drop on TPFA Suspend SWAPair Split Suspend Delpair Clip IPC2 Volsers
15 Summary of Credit Authorizations (CAS) Mainframe Migration Move Group 8C Aug 31 Authorizations Pre-Migration START Saturday August 31 Migration Infrastructure Hardware and data replication enhancements have been implemented DATA Integrity Process in place to ensure all updates are applied to the new hardware Integration Developed integrated migration plan working with all vendor partners Outage Time Scheduled 60 minutes starting on 02:00MST Change Restrictions All changes will be reviewed weekly with development teams for freeze impacts Repeatable Developed a repeatable testing process to validate data, software, and hardware in the new datacenter Stand-In Distributed platforms provide authorizations during planned outage Impacts Servicing, ATM, PIN@POS functions will be unavailable during the migration change window START TIME END 2:00 Saturday August 31 Outage Duration 60 mins Post Migration Validate Connectivity All teams will be engaged to validate network and intersystem connectivity Validate Data All teams will be engaged to validate data integrity Validate Apps All teams will be engaged to validate capabilities Fallback Processes and scripts ready to execute in case of fallback decision Uplift Upgraded disk arrays used for authorizations to avoid additional cost and outages 15
16 Move Group 8C Move Day Timeline TPF/CAS on August 31 1:50AM CHECK POINT Confirm all is ready for shut down 00:01AM CHECK POINT All Pre-Work Confirmed 2:00AM Shut down TPF 2:40AM CHECK POINT Confirm ready to start TPF 3:00AM Start TPF in IPC-2 3:15AM CHECK POINT Confirm TPF is up and available 4:30AM BSD VP Sign-off Migration Complete 5:00AM Migration GO/NO GO Checkpoint decision complete TPF/CAS Migration 1:00AM Open Migration Bridges 1:30AM Quiesce batch and Drain copy data to IPC-2 2:05AM Drain and Stop 2:25AM Split IPC-2 data from the copy process 2:15AM Complete data synchronization 3:00AM Systems, BSD, and Business verification of migrated data and network connectivity 6:00AM Migration Complete 6:00AM 10:00AM CHECK POINT Monitor/TPF health Additional Check Points: 9/1 3:00am, 8:00pm 9/2 8:00am, 8:00pm Saturday, August 31
17 August 2013 TPF Performance IPC1 Mills per Msg: 4.16 MIPS per Msg: 2.16 ECB s in Use: VFA Efficiency: 76.7% DASD Service Time: 0.973ms TPF Auth Time: seconds
18 TPF Migration: August 31, 2013 IPC1 PHX I9, I10 AY AX AT MDC MSP M16 AR21 AZ WK/AZ ATE R2 WK W9, W10 IPC2
19 CAS/TPF Migration Success: August 31, 2013 To minimize downtime and customer impact, the CAS and IBM teams completed a total of four dry runs in preparation for the migration. Automation and scripting were used extensively and the duration of the actual CAS outage was minimized to only 27 minutes (2:02am-2:29am MST). As planned, GAN stood-in for CAS during that time period and Payment Awareness provided stand-in logic to ensure payments were not interrupted. All technical, application and business validation activities were completed at 3:51am MST with no significant problems identified. The CAS/TPF Mainframe environment consisted of: 46 applications 1 LPAR 6,300 MIPS 120 Terabytes of storage
20 CAS/TPF Migration Commit: August 31, 2013 CAS/TPF Migration -- August 31 Stop running EMC Product Suite for in IPC1 > Run EMC Product Suite for in IPC2 > Set-up CAS/TPF DR copies Create IPC2 to MDC Groups from IPC2 s (no clear) Create MDC SRDF Groups from s to s Create MDC TimeFinder Clone Sessions Create IPC2 TimeFinder Clone Sessions Create IPC1 SRDF Sessions > Commit Decision for CAS/TPF to remain in IPC2 > Clean-up & build new CAS/TPF DR copies Clean-up any SRDF/TimeFinder session not needed Delpair SRDF TPFA Terminate IPC1 TimeFinder Clone Sessions Remove IPC1 TimeFinder and SRDF Groups > Initiate CAS/TPF DR copies from IPC2 to MDC
21 TPF Migration Commit: August 31, 2013 IPC1 PHX I9, I10 MDC MSP AZ AX M16 AT AR21 WK/AZ R2 AY ATE WK R1 W9,W10 IPC2
22 CAS/TPF Migration Success: August 31, 2013 CAS/TPF Migration completed and BAU --- August 31, 2013 >Normal operation in IPC2 / Normal DR support in MDC TPF Production back-up copies created in IPC2 TPF DR copies in MDC created from IPC2 TPF Test Systems copies in IPC1 created from IPC2 /data copies in IPC2 from IPC1 to support Production TPF issues only
23 TPF Migration Success: August 31, 2013 IPC1 PHX I9, I10 AT AZ AX AY M16 MDC MSP WK/AZ ATE R1 WK W9,W10 IPC2
24 September 2013 TPF Performance IPC2 Mills per Msg: 3.04 (-26.9%) MIPS per Msg: 2.32 (6.8%) ECB s in Use: (-46.5%) VFA Efficiency: 76.5% (- 0.2%) DASD Service Time: 0.467ms (-51%) TPF Auth Time: seconds (-62.6%)
25 March 2014 TPF Performance CAS Authorizations TPF Time Series1
26 Questions
Storage Based Replications
Storage Based Replications Miroslav Vraneš EMC Technology Group [email protected] 1 Protecting Information Is a Business Decision Recovery point objective (RPO): How recent is the point in time for
Local and Remote Replication Solutions from IBM, EMC, and HDS Session 16057 SHARE Pittsburgh August 6, 2014
Local and Remote Replication Solutions from IBM, EMC, and HDS Session 16057 SHARE Pittsburgh August 6, 2014 Brett Quinn Tony Negro EMC Corporation Insert Custom Session QR if Desired. EMC Local Replication
Storage Considerations for Database Archiving. Julie Lockner, Vice President Solix Technologies, Inc.
Storage Considerations for Database Archiving Julie Lockner, Vice President Solix Technologies, Inc. SNIA Legal Notice The material contained in this tutorial is copyrighted by the SNIA. Member companies
www.rackwareinc.com RackWare Solutions Disaster Recovery
RackWare Solutions Disaster Recovery RackWare Solutions Disaster Recovery Overview Business Continuance via Disaster Recovery is an essential element of IT and takes on many forms. The high end consists
DISASTER RECOVERY BUSINESS CONTINUITY DISASTER AVOIDANCE STRATEGIES
DISASTER RECOVERY BUSINESS CONTINUITY DISASTER AVOIDANCE STRATEGIES Dejan Živanović EMC Technology Solutions Group SEE Presales Manager [email protected] 1 The Business Maturity Model V Enabled Web
THE VIRTUAL DATA CENTER OF THE FUTURE
THE VIRTUAL DATA CENTER OF THE FUTURE An Introduction to VMAX and VPLEX NAME TITLE EMC Petabyte Club Customers with > 1 PB EMC storage 1,000 10 2002 2003 2004 2005 2006 2007 2008 2009 2010 EMC Petabyte
Best practices for data migration.
IBM Global Technology Services June 2007 Best practices for data migration. Methodologies for planning, designing, migrating and validating data migration Page 2 Contents 2 Executive summary 4 Introduction
EMC: The Virtual Data Center
EMC: The Virtual Data Center Dejan Živanovi EMC Technology Solution Group Sr. Technology Consultant High-End platforms & Business Continuity 1 Business Challenges Data growing at 70% annually 80% are files
Storage Virtualization for Mainframe DASD, Virtual Tape & Open Systems Disk
Storage Virtualization for Mainframe DASD, Virtual Tape & Open Systems Disk Scott James Luminex Software, Inc. John McDevitt HDS Jeffrey Deaver Financial Services Company Example Wednesday, August 14 Session
FDR/UPSTREAM and INNOVATION s other z/os Solutions for Managing BIG DATA. Protection for Linux on System z.
FDR/UPSTREAM and INNOVATION s other z/os Solutions for Managing BIG DATA. Protection for Linux on System z. Patrick Fitzsimmons [email protected] INNOVATION Data Processing August 6, 2014 Insert
Migration Scenario: Migrating Backend Processing Pipeline to the AWS Cloud
Migration Scenario: Migrating Backend Processing Pipeline to the AWS Cloud Use case Figure 1: Company C Architecture (Before Migration) Company C is an automobile insurance claim processing company with
Simplify and Improve Database Administration by Leveraging Your Storage System. Ron Haupert Rocket Software
Simplify and Improve Administration by Leveraging Your Storage System Ron Haupert Rocket Software Session Agenda and Storage Integration Overview System-Level Backup Methodologies and Storage Integration
EMC MIGRATION OF AN ORACLE DATA WAREHOUSE
EMC MIGRATION OF AN ORACLE DATA WAREHOUSE EMC Symmetrix VMAX, Virtual Improve storage space utilization Simplify storage management with Virtual Provisioning Designed for enterprise customers EMC Solutions
Migration and Building of Data Centers in IBM SoftLayer with the RackWare Management Module
Migration and Building of Data Centers in IBM SoftLayer with the RackWare Management Module June, 2015 WHITE PAPER Contents Advantages of IBM SoftLayer and RackWare Together... 4 Relationship between
Disk Library for mainframe - DLm6000 Product Overview
Disk Library for mainframe - DLm6000 Product Overview Abstract This white paper introduces the EMC DLm6000 - the EMC flagship mainframe VTL solution and a member of the EMC Disk Library for mainframe family.
Case Studies Using EMC Legato NetWorker for OpenVMS Backups
OpenVMS Technical Journal V6 Case Studies Using EMC Legato NetWorker for OpenVMS Backups Case Studies Using EMC Legato NetWorker for OpenVMS Backups... 2 Overview... 2 Introduction... 2 Case Study 1: Backup
Virtual Linux Server Disaster Recovery Planning
Virtual Linux Server Disaster Recovery Planning Rick Barlow Nationwide Insurance August 2013 Session 13726 Agenda Definitions Our Environment Business Recovery Philosophy at Nationwide Planning Execution
RL Solutions Hosting Service Level Agreement
RL Solutions Hosting Service Level Agreement April 2012 Table of Contents I. Context and Scope... 1 II. Defined Terms... 1 III. RL Solutions Responsibilities... 2 IV. Client Responsibilities... 4 V. The
BUSINESS CONTINUITY AND DISASTER RECOVERY FOR ORACLE 11g
BUSINESS CONTINUITY AND DISASTER RECOVERY FOR ORACLE 11g ENABLED BY EMC VMAX 10K AND EMC RECOVERPOINT Technical Presentation EMC Solutions Group 1 Agenda Business case Symmetrix VMAX 10K overview RecoverPoint
Project Manager 1 Post == Experience 10-12 years in Project Management in reputed company, Salary Rs.1,20,000/-
Project Manager 1 Post == Experience 10-12 years in Project Management in reputed company, Salary Rs.1,20,000/- Senior Soft ware Developer 2 Posts Junior Soft ware Developer 4 Posts Database Administrator
Remote Copy Technology of ETERNUS6000 and ETERNUS3000 Disk Arrays
Remote Copy Technology of ETERNUS6000 and ETERNUS3000 Disk Arrays V Tsutomu Akasaka (Manuscript received July 5, 2005) This paper gives an overview of a storage-system remote copy function and the implementation
EMC Business Continuity and Disaster Recovery Solutions
EMC Business Continuity and Disaster Recovery Solutions Comprehensive Data Protection Rick Walsworth Director, Product Marketing EMC Cross Platform Replication 1 Agenda Data Protection Challenges EMC Continuity
EMC BACKUP MEETS BIG DATA
EMC BACKUP MEETS BIG DATA Strategies To Protect Greenplum, Isilon And Teradata Systems 1 Agenda Big Data: Overview, Backup and Recovery EMC Big Data Backup Strategy EMC Backup and Recovery Solutions for
Migration and Disaster Recovery Underground in the NEC / Iron Mountain National Data Center with the RackWare Management Module
Migration and Disaster Recovery Underground in the NEC / Iron Mountain National Data Center with the RackWare Management Module WHITE PAPER May 2015 Contents Advantages of NEC / Iron Mountain National
Open Source Mainframe Backup with Hercules
Open Source Mainframe Backup with Hercules An Overview of the Hercules Disaster Recovery Solution 1 Issue: Mainframe Computer Backup Why? Business Need stay in business 60% of all organizations that have
Dell High Availability Solutions Guide for Microsoft Hyper-V
Dell High Availability Solutions Guide for Microsoft Hyper-V www.dell.com support.dell.com Notes and Cautions NOTE: A NOTE indicates important information that helps you make better use of your computer.
IT Sr. Systems Administrator
IT Sr. Systems Administrator Location: [North America] [United States] [Monrovia] Category: Information Technology Job Type: Open-ended, Full-time PURPOSE OF POSITION: Systems Administrators and Engineers
Enhancements of ETERNUS DX / SF
shaping tomorrow with you ETERNUS - Business-centric Storage Enhancements of ETERNUS DX / SF Global Product Marketing Storage ETERNUS Business-centric Storage Agenda: 1 Overview of the top 3 innovations
Migration and Building of Data Centers in IBM SoftLayer with the RackWare Management Module
Migration and Building of Data Centers in IBM SoftLayer with the RackWare Management Module June, 2015 WHITE PAPER Contents Advantages of IBM SoftLayer and RackWare Together... 4 Relationship between
EMC VMAX 40K: Mainframe Performance Accelerator
White Paper EMC VMAX 40K: Mainframe Performance Accelerator Abstract This document describes the Mainframe Performance Accelerator feature of the VMAX 40K for FICON environments. October 2014 Copyright
SAP Disaster Recovery Solution with VMware Site Recovery Manager and EMC CLARiiON
SAP Disaster Recovery Solution with VMware Site Recovery Manager and EMC CLARiiON Applied Technology Abstract This white paper demonstrates how VMware s Site Recovery Manager enables the design of a powerful
Improving disaster recovery with Virtual Tape Libraries in Mainframe Environments By Deni Connor Principal Analyst, Storage Strategies NOW
Improving disaster recovery with Virtual Tape Libraries in Mainframe Environments By Deni Connor Principal Analyst, Storage Strategies NOW Recovering from disasters is an arduous process for mainframe
System Migrations Without Business Downtime. An Executive Overview
System Migrations Without Business Downtime An Executive Overview Businesses grow. Technologies evolve. System migrations may be inevitable, but business downtime isn t. All businesses strive for growth.
Capacity planning for IBM Power Systems using LPAR2RRD. www.lpar2rrd.com www.stor2rrd.com
Capacity planning for IBM Power Systems using LPAR2RRD Agenda LPAR2RRD and STOR2RRD basic introduction Capacity Planning practical view CPU Capacity Planning LPAR2RRD Premium features Future STOR2RRD quick
Office of Information Technology Hosted Services Service Level Agreement FY2009
Application Name: Application Agreement Start Date: 07/01/08 Customer Name: Customer Agreement Renewal Date: 06/30/09 SLA Number: HSxxxFY09A Service Description: This document describes the technical support
Maximizing Data Center Uptime with Business Continuity Planning Next to ensuring the safety of your employees, the most important business continuity
Maximizing Data Center Uptime with Business Continuity Planning Next to ensuring the safety of your employees, the most important business continuity task is resuming business critical operations. Having
IBM AIX MANAGED SERVICES:
IBM AIX MANAGED SERVICES: REMOTE MONITORING REMOTE ADMINISTRATION MANAGED HOSTING Reduce Your IBM AIX (pseries) Operating Costs & Get Higher Uptime. Let Connectria Help Run Your IBM AIX (pseries) Environment.
HP EVA to 3PAR Online Import for EVA-to-3PAR StoreServ Migration
Technology Insight Paper HP EVA to 3PAR Online Import for EVA-to-3PAR StoreServ Migration By Leah Schoeb December 3, 2012 Enabling you to make the best technology decisions HP EVA to 3PAR Online Import
Module 7: System Component Failure Contingencies
Module 7: System Component Failure Contingencies Introduction The purpose of this module is to describe procedures and standards for recovery plans to be implemented in the event of system component failures.
How To Help Your Hotel With A Guest Room Service
ORACLE HOSPITALITY CLOUD CONSULTING SERVICE DESCRIPTIONS September 10, 2015 TABLE OF CONTENTS Service Offerings CONSULTING SERVICE OFFERINGS ORACLE HOSPITALITY FOOD AND BEVERAGE POINT OF SALE IMPLEMENTATION
Response to Bidder Questions and Amendment 2 to Request for Proposal 11 01 Disaster Recovery Services
STATE OF NEW YORK DEPARTMENT OF TAXATION AND FINANCE Office of Budget & Management Analysis Bureau of Fiscal Services Building 9, Room 234 W.A. Harriman Campus Albany, NY 12227 Eric Mostert, Chief Financial
Outline SSS6422 - Microsoft Windows Server 2008 Hyper-V Virtualization
Outline SSS6422 - Microsoft Windows Server 2008 Hyper-V Virtualization Duration: Three consecutive Saturdays About this Course This instructor led course teaches students how to implement and manage Windows
IT SERVICES MANAGEMENT Service Level Agreements
IT SERVICES MANAGEMENT Service Level Agreements Sample Agreements, Reports, and Checklists White Paper PREPARED BY: RICK LEOPOLDI May 25, 2002 Copyright 2002. All rights reserved. Duplication of this document
APPENDIX 7 TO SCHEDULE 3.3 TO THE COMPREHENSIVE INFRASTRUCTURE AGREEMENT MAINFRAME & SERVER SERVICES SOW EXHIBIT P TO AMENDMENT NO.
EHIBIT P TO AMENDMENT NO. 60 APPENDI 7 TO SCHEDULE 3.3 TO THE COMPREHENSIVE INFRASTRUCTURE AGREEMENT APPENDI 7 TO SCHEDULE 3.3 TO THE COMPREHENSIVE INFRASTRUCTURE AGREEMENT EHIBIT P TO AMENDMENT NO. 60
Appendix C Pricing Index DIR Contract Number DIR-TSO-2724
Appendix C Pricing Index DIR Contract Number DIR-TSO-2724 Infrastructure as a Service (IaaS) and Platform as a Service (PaaS) Amazon Web Services (AWS) is a comprehensive cloud services platform that offers
Backing up a Large Oracle Database with EMC NetWorker and EMC Business Continuity Solutions
Backing up a Large Oracle Database with EMC NetWorker and EMC Business Continuity Solutions EMC Proven Professional Knowledge Sharing June, 2007 Maciej Mianowski Regional Software Specialist EMC Corporation
User Experience: BCPii, FlashCopy and Business Continuity
User Experience: BCPii, FlashCopy and Business Continuity Mike Shorkend Isracard Group 4:30 PM on Monday, March 10, 2014 Session Number 14953 http://www.linkedin.com/pub/mike-shorkend/0/660/3a7 [email protected]
What is the Cloud, and why should it matter?
391 12 What is the Cloud, and why should it matter? 23 Everyone seems to be asking about it. No one seems to know exactly what it is, what they need, and where to find it. 4 A Philosophy of Design and
REDCENTRIC INFRASTRUCTURE AS A SERVICE SERVICE DEFINITION
REDCENTRIC INFRASTRUCTURE AS A SERVICE SERVICE DEFINITION SD021 V2.2 Issue Date 01 July 2014 1) OVERVIEW Redcentric s Infrastructure as a Service (IaaS) enables the to consume server, storage and network
EMC Business Continuity for Microsoft SQL Server 2008
EMC Business Continuity for Microsoft SQL Server 2008 Enabled by EMC Symmetrix V-Max with SRDF/CE, EMC Replication Manager, and Enterprise Flash Drives Reference Architecture Copyright 2009 EMC Corporation.
IBM Virtualization Engine TS7700 GRID Solutions for Business Continuity
Simplifying storage processes and ensuring business continuity and high availability IBM Virtualization Engine TS7700 GRID Solutions for Business Continuity The risks are even greater for companies that
VMware vcenter Site Recovery Manager 5 Technical
VMware vcenter Site Recovery Manager 5 Technical Raj Jethnani, VCP 4/5, VCAP4-DCA / DCD Systems Engineer VMware, Inc. [email protected] @rajtech 2009 VMware Inc. All rights reserved Agenda Simplifying
EMC Symmetrix VMAX Series with Enginuity for IBM i Environments
EMC Symmetrix VMAX Series with Enginuity for IBM i Environments Applied Technology Abstract This white paper described the features and benefits of the EMC Symmetrix VMAX Series with Enginuity for customer
Flora Muglia Azure Solution Sales Professional [email protected]. We are partners in learning. November 2015
Flora Muglia Azure Solution Sales Professional [email protected] Join the US EDU Azure Discussion (Yammer): http://aka.ms/useduazure We are partners in learning. November 2015 Agenda Why Azure? New
HA / DR Jargon Buster High Availability / Disaster Recovery
HA / DR Jargon Buster High Availability / Disaster Recovery Welcome to Maxava s Jargon Buster. Your quick reference guide to Maxava HA and industry technical terms related to High Availability and Disaster
PROFESSIONAL SERVICES
v.2016.02 PROFESSIONAL SERVICES Training Services Computrition offers a wide array of training services to streamline the implementation process. Of all the factors critical to the success of an automation
Flagship Managed Solutions (FMS)
Flagship Managed Solutions (FMS) a Cloud service iseries application hosting provides an alternative to the traditional iseries ownership costs, management and administration. Elimination of high up-front
Surround SCM Backup and Disaster Recovery Solutions
and Disaster Recovery Solutions by Keith Vanden Eynden Investing in a source code management application, like, protects your code from accidental overwrites, deleted versions, and other common errors.
EMC NETWORKER SNAPSHOT MANAGEMENT
White Paper Abstract This white paper describes the benefits of NetWorker Snapshot Management for EMC Arrays. It also explains the value of using EMC NetWorker for snapshots and backup. June 2013 Copyright
Module: Business Continuity
Upon completion of this module, you should be able to: Describe business continuity and cloud service availability Describe fault tolerance mechanisms for cloud infrastructure Discuss data protection solutions
EMC Business Continuity for VMware View Enabled by EMC SRDF/S and VMware vcenter Site Recovery Manager
EMC Business Continuity for VMware View Enabled by EMC SRDF/S and VMware vcenter Site Recovery Manager A Detailed Review Abstract This white paper demonstrates that business continuity can be enhanced
The Promise of Virtualization for Availability, High Availability, and Disaster Recovery - Myth or Reality?
B.Jostmeyer Tivoli System Automation [email protected] The Promise of Virtualization for Availability, High Availability, and Disaster Recovery - Myth or Reality? IBM Systems Management, Virtualisierung
HRG Assessment: Stratus everrun Enterprise
HRG Assessment: Stratus everrun Enterprise Today IT executive decision makers and their technology recommenders are faced with escalating demands for more effective technology based solutions while at
Increasing Recoverability of Critical Data with EMC Data Protection Advisor and Replication Analysis
Increasing Recoverability of Critical Data with EMC Data Protection Advisor and Replication Analysis A Detailed Review Abstract EMC Data Protection Advisor (DPA) provides a comprehensive set of features
Alternative Backup Methods For HP-UX Environments Today and Tomorrow
Alternative Backup Methods For HP-UX Environments Today and Tomorrow Rob O Brien Product Marketing Manager VERITAS Software [email protected] September, 2002 Agenda VERITAS Software Overview Storage
EPIC EHR: BUILDING HIGH AVAILABILITY INFRASTRUCTURES
EPIC EHR: BUILDING HIGH AVAILABILITY INFRASTRUCTURES BEST PRACTICES FOR PROTECTING EPIC EHR ENVIRONMENTS EMC HEALTHCARE GROUP ABSTRACT Epic Electronic Health Records (EHR) is at the core of delivering
Long term retention and archiving the challenges and the solution
Long term retention and archiving the challenges and the solution NAME: Yoel Ben-Ari TITLE: VP Business Development, GH Israel 1 Archive Before Backup EMC recommended practice 2 1 Backup/recovery process
Application Management Services (AMS)
Contents 1. AMS : An Overview 2. AMS : Models 3. Delivery Organization 4. Processes & Tools 5. Transition Methodology 6. Pricing Application Management Services (AMS) Enterprise Application Services Capability
For windows erver, Which edition of Windows server 2008 is required ( i. e. Web / Standard / Enterprise )?? Kindly suggest.
Clarifications/Responses for Notice Inviting Tender From Companies/Agencies for Hiring Four Dedicated Servers (3 - Linux & 1 - Windows) Sr. No. Page No. Clause in Tender Clarification/Suggestion Sought
Transformyx Service Level Agreement
Transformyx Service Level Agreement Transformyx provides business IT on demand. Launched with the aim of disrupting the way that organizations currently purchase, use and manage IT, Transformyx provides
Documentation for data centre migrations
Documentation for data centre migrations Data centre migrations are part of the normal life cycle of a typical enterprise. As organisations expand, many reach a point where maintaining multiple, distributed
Introduction to Database as a Service
Introduction to Database as a Service Exadata Platform Revised 8/1/13 Database as a Service (DBaaS) Starts With The Business Needs Establish an IT delivery model that reduces costs, meets demand, and fulfills
Seagate Cloud Systems & Solutions
Seagate Cloud Systems & Solutions Market Challenge 3 Traditional Storage Is Not Viable Traditional Enterprise (EMC, NetApp, HP) DIY Public Cloud 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 4 Seagate
Server and Storage Virtualization: A Complete Solution A SANRAD White Paper
Server and Storage Virtualization: A Complete Solution A SANRAD White Paper copyright SANRAD 2008 SANRAD Inc. www.sanrad.com Server and Storage Virtualization: A Complete Solution A SANRAD Whitepaper Server
Veritas Storage Foundation High Availability for Windows by Symantec
Veritas Storage Foundation High Availability for Windows by Symantec Simple-to-use solution for high availability and disaster recovery of businesscritical Windows applications Data Sheet: High Availability
SQL Server on Azure An e2e Overview. Nosheen Syed Principal Group Program Manager Microsoft
SQL Server on Azure An e2e Overview Nosheen Syed Principal Group Program Manager Microsoft Dedicated Higher cost Shared Lower cost SQL Server Cloud Continuum Hybrid SQL Server in Azure VM Virtualized Machines
iseries Recovery Options Pro s & Cons
iseries Recovery Options Pro s & Cons Presented by: David Tedford Lakeview Technology, Inc. [email protected] 978-671-9211 office 617-901-7909 - cell Presenter background 1987, BS in CIS, Quinnipiac
Replicating Mainframe Tape Data for DR Best Practices Session #10929
Replicating Mainframe Tape Data for DR Best Practices Session #10929 Lee Reiersgord Systems Engineer Luminex Software, Inc. Scott James VP Global Alliances & Marketing Luminex Software, Inc Steve Schwietz
Veritas Cluster Server from Symantec
Delivers high availability and disaster recovery for your critical applications Data Sheet: High Availability Overview protects your most important applications from planned and unplanned downtime. Cluster
DASD Backup Automation
white paper DASD Backup Automation bluezone.rocketsoftware.com DASD Backup Automation A White Paper by Rocket Software 2013 Rocket Software, Inc. All rights reserved. Rocket and Rocket Software logos are
SHARE Lunch & Learn #15372
SHARE Lunch & Learn #15372 Data Deduplication Makes It Practical to Replicate Your Tape Data for Disaster Recovery Scott James VP Global Alliances Luminex Software, Inc. Randy Fleenor Worldwide Data Protection
StorageX 7.5 Case Study
StorageX 7.5 Case Study This document will cover how StorageX 7.5 helps to transform a legacy Microsoft DFS environment into a modern, domain-based DFS environment The Challenge Microsoft has officially
Data Sheet: Disaster Recovery Veritas Volume Replicator by Symantec Data replication for disaster recovery
Data replication for disaster recovery Overview Veritas Volume Replicator provides organizations with a world-class foundation for continuous data replication, enabling rapid and reliable recovery of critical
EMC DISK LIBRARY FOR MAINFRAME
EMC DISK LIBRARY FOR MAINFRAME A complete suite of solutions to meet any mainframe tape requirement Carlo Dioos [email protected] BRS EMEA TC 1 EMC Mainframe Solutions in the News 2 1 Typical Mainframe
Speeding Recovery Through the Cloud Presentation to Mid TN ISC2 Matthew Stevens, Senior Solutions Engineer Windstream Hosted Solutions
Speeding Recovery Through the Cloud Presentation to Mid TN ISC2 Matthew Stevens, Senior Solutions Engineer Windstream Hosted Solutions November 7, 2014 1 Agenda My Background Current Trends in the Datacenter
EMC NETWORKER AND DATADOMAIN
EMC NETWORKER AND DATADOMAIN Capabilities, options and news Madis Pärn Senior Technology Consultant EMC [email protected] 1 IT Pressures 2009 0.8 Zettabytes 2020 35.2 Zettabytes DATA DELUGE BUDGET DILEMMA
EonStor DS remote replication feature guide
EonStor DS remote replication feature guide White paper Version: 1.0 Updated: Abstract: Remote replication on select EonStor DS storage systems offers strong defense against major disruption to IT continuity,
CA ARCserve Replication and High Availability Deployment Options for Hyper-V
Solution Brief: CA ARCserve R16.5 Complexity ate my budget CA ARCserve Replication and High Availability Deployment Options for Hyper-V Adding value to your Hyper-V environment Overview Server virtualization