1 Asset Management Guideline Office of the National Rail Safety Regulator

2 Version Authorised by Date Review Date 1.0 Rob Andrews Chief Executive Officer November 2014 November 2015 Asset Management Guideline Page 2

3 Table of contents Foreword Asset management regulatory requirements Definitions (see also s.4 of the RSNL) What does the Law say about safety of assets? Duty of officers to exercise due diligence Asset management is part of the safety management system What does the ONRSR expect? The key focus for the ONRSR Balancing safety and commercial needs Asset management across the life-cycle Developing a policy and processes The exploratory and concept phases Design and delivery Asset utilisation phase Managing changes to safety critical assets (Schedule 1.12) On-going staff training (Schedule 1.15 and 1.24) Asset retirement phase (Schedule 1.16) Auditing (Schedule 1.10) Asset Management Ready Reckoner A systematic approach to safe asset management Appropriate documentation of asset management processes Effective monitoring of asset performance Management of any changes to safety critical assets Appendix: The Road to Improvement A1 Context A2 Leadership A3 Planning A4 Support A5 Operation A6 Performance evaluation A7 Improvement A8 The asset management dialogue Asset Management Guideline Page 3

4 Foreword The Office of the National Rail Safety Regulator (the ONRSR) has prepared this guideline to promote the ongoing safety of rail infrastructure and rolling stock assets. It: provides guidance to duty holders about their duties and related obligations under the Rail Safety National Law (RSNL) as they apply to asset management; explains the expectations of the ONRSR when assessing a duty holder s compliance with these obligations; and provides a scalable approach to implementing systems for the safe management of assets throughout their lifecycle. It is up to individual rail transport operators to determine the extent to which they apply the provisions of this guideline. Scope and limitations The scope of this guideline is focused on the lifecycle asset management requirements of Schedule 1 of the RSNL National Regulations 2012 (the regulations ). The guideline therefore does not go into detail on processes needed to create other elements that may be required by Schedule 1, such as: a safety management system (clauses 4, 8, 9, 10, 16, 24, 28, and 29); document control and information management (clause 7); training requirements or plans (clause 15); a human factor integration plan (HFIP) (clauses 17, 27, 28, and 29); a security management plan or equivalent (clause 25); or an emergency management plan or equivalent (clause 26). Nor does it detail the supporting evidence required to document compliance with any of these elements of an SMS. NB. References to Schedule 1 in this document relate to Schedule 1 of the regulations. Further information To avoid repeating guidance from other ONRSR documents, this guideline should be read in conjunction with the following publications: ONRSR Regulatory Approach Compliance & Enforcement Policy Safety Improvement Policy Meaning of duty to ensure safety so far as is reasonably practicable guideline Preparation of a Rail Safety Management System guideline Effective control and management of railway operations guideline Asset Management Guideline Page 4

5 Chapter outline Chapter 1 Chapter 2 Chapter 3 Appendix explains the legislative basis for the asset management advice provided in this guideline. explains the expectations of the ONRSR in relation to the safe management of assets. provides a ready-reckonerr of the ONRSR s requirements. provides guidance on structuring an integrated, scalable s asset management system that might be usedd by operators (using context, leadership, planning, resources, operations, performance evaluation, and a improvement). This guideline is not intended to provide a detailed manual on how to manage assets. The reader may want to refer to other tools and standards such as ISO series or PAS 555 to further their knowledge on this topic. For analysis techniques that may assist in managing asset risk, refer to the iesm, international Engineering Safety Management Handbook or ISO I 31010:2009 Risk management t Risk assessment techniques. Asset Management Guideline Page 5

6 1 Asset management regulatory requirementss The introduction of the Rail Safety National Law (RSNL) saw the formalisationn and streamlining of pre-existing asset management requiremenr ts operating in each Australian state and territory. These are intended to ensure the ongoing safety and longevity of rail infrastructure and rolling stock and, by extension, to protect all users of Australian rail systems. The legislation specifies certain duties and obligations for officers, operators, and other relevant r parties concerning the ongoing managemen nt and safety of rail infrastructure and rolling stock assets, which are outlined in the diagram below and described further in this chapter. Figure 1 Key requirements of the Rail Safetyy National Law Asset Management Guideline Page 6

7 1.1. Definitions (see also s.4 of the RSNL) Asset management system The approach used by an organisation to ensure that physical assets remain safe, fit-for-purpose, and commercially viable from design and construction, throughout its life-cycle, to decommissioning. Duty holder A person who has a duty under the RSNL Part 3 Division 3. Management system Rail infrastructure Rail transport operator (RTO) Railway operations Rolling stock SFAIRP A set of interrelated or interacting elements of an organisation to establish policies and objectives, and the processes to achieve those objectives (ISO 9000). The facilities that are necessary to enable a railway to operate, including: railway tracks and associated track structures; service roads, signalling systems, communications systems, rolling stock control systems, train control systems, and data management systems; notices and signs; electrical power supply and electric traction systems; associated buildings, workshops, depots, and yards; and plant, machinery, and equipment. A rail infrastructure manager (RIM) has effective control and management of the rail infrastructure, whether or not they own it or have a statutory or contractual right to use it. A rail infrastructure manager or rolling stock operator, or a person or organisation which is both. These include: the construction of a railway, railway tracks, and associated railway track structures; the construction of rolling stock; the management, commissioning, maintenance, repair, modification, installation, operation, or decommissioning of rail infrastructure; and the commissioning, use, modification, maintenance, repair, or decommissioning of rolling stock. A vehicle that operates on, or uses, a railway. It includes a locomotive, carriage, rail car, rail motor, light rail vehicle, train, tram, light inspection vehicle, selfpropelled infrastructure maintenance vehicle, trolley, wagon, or monorail vehicle. It does not include a vehicle designed to operate both on and off a railway when it is not operating on a railway. A rolling stock operator (RSO) has effective control and management of the operation or movement of rolling stock on rail infrastructure for a railway, but does not include a person who drives the rolling stock, or controls the network or network signals. so far as is reasonably practical. In relation to a duty to ensure safety it means that it was reasonably able to be done, taking into account and weighing up all relevant matters (see s.47 of the RSNL and the ONRSR s Meaning of duty to ensure safety so far as is reasonably practicable guideline). Asset Management Guideline Page 7

8 1.2. What does the Law say about safety of assets? The RSNL prescribes overarching safety duties for those whose activities might affect rail safety Principles of shared responsibility, accountability The RSNL makes it clear that rail safety is the shared responsibility of everyone who has a role at any point of an asset s lifecycle. Each party has a duty to work with others to ensure that everything reasonably practicable is done to ensure the safety of assets throughout their lifecycle (s.50). However, the degree to which a person is accountable for rail safety is dependent on the nature of the risk their activities might pose to rail safety. Thus, the management of risks associated with railway operations is predominantly the responsibility of the person best able to control them Rail Transport Operators and others undertaking railway operations Rail transport operators (RTO) are required to ensure, so far as is reasonably practicable (SFAIRP), the safety of their railway operations (s.52(1)). This means that rail infrastructure managers (RIM), rolling stock operators (RSO), and any organisation or contractor undertaking railway operations must ensure, SFAIRP, that: rail infrastructure and/or rolling stock assets are designed, constructed, and maintained to appropriate standards that ensure safety; and activities undertaken across the life-cycle of rail infrastructure and rolling stock assets are performed in a way that ensures the ongoing safety of railway operations. In addition: accredited RTOs must comply with the requirements of Schedule 1 of the RSNL National Regulations in relation to the development and implementation of a safety management system (SMS); contractors and suppliers to a RTO must comply with the accredited operator s SMS to the extent that it applies to their activities and relevant equipment. It is the RTO s responsibility to ensure that contractors remain compliant; and the RIM of a private siding should adopt a systematic approach to ensure the safety of their operations. However, due to the limited scope and nature of operations or private sidings, the RSNL allows an exemption from accreditation and prescribes fewer requirements for safety management. As a result they are not required to develop an SMS or an asset management strategy Designers, Manufacturers, Suppliers Designers, manufacturers, and suppliers must ensure that rail infrastructure or rolling stock assets are safe for their intended purpose. They must also provide adequate information as to their safe use (s.53) to help RTOs maintain safety, including: details about the use for which the asset was designed, commissioned, manufactured, supplied, installed, or erected; the results of any testing or examination of the asset; and any conditions necessary to ensure, SFAIRP, that the asset is safe if used as intended. Asset Management Guideline Page 8

9 A person who decommissions rail infrastructure or rolling stock must ensure, SFAIRP, that the decommissioning is carried out safely and that appropriate testing and examination has been carried out to comply with the duty (s.53(3)) Duty of officers to exercise due diligence 1 If an organisation has a duty or obligation under the RSNL, an officer of that organisation must exercise due diligence to ensure that it complies (s.55) Asset management is part of the safety management system Consideration of the performance, safety, and integrity of infrastructure or rolling stock is essential if the safety of railway operations is to be maintained. Accordingly, s.99 of the RSNL requires RTOs to have a documented SMS to cover their railway operations, including tasks or activities that are contracted out, in a form approved by the Regulator. Schedule 1 of the regulations gives effect to s.99 and to regulations 16 and 17, by outlining the required contents of an SMS, including 1.21, which stipulates that there must be: An asset management policy and processes that address all phases of the asset life cycle of the rail infrastructure or rolling stock operations. Therefore, the SMS must identify, and comprehensively and systematically assess, any safety risk to railway operations and assets, including a level of detail that is: appropriate for the scope, nature, and safety risks of their operations, and sufficient to meet the organisation s general safety duty. As part of this process, the roles, responsibilities, and accountabilities of all personnel (including contractors) charged with maintaining safety and performing each of the activities prescribed by the plan should be clearly documented. This includes the competent person who has primary responsibility and accountability for asset management. 1 The form and detail of requirements for officers of a duty holder organisation are different in Victoria (see the Rail Safety National Law Application Act 2013 (Victoria) section 49). In determining whether an officer of a body corporate failed to exercise due diligence, a Victorian court may have regard to: a) what the officer knew, or ought reasonably to have known, about the commission of an offence by the body corporate; b) whether or not the officer was in a position to influence the body corporate in relation to the commission of the offence; and c) what steps the officer took, or could reasonably have taken, to prevent the commission of the offence by the body corporate. Asset Management Guideline Page 9

10 2 What does the ONRSR expect? 2.1. The key focus for the ONRSR In carrying out its function to enforce the regulations, the ONRSR will specifically examine an organisation s AM and safety management systems, policies, and procedures to ensure they include: a systematic approach to safe asset management; appropriate documentation of asset management processes; effective monitoring of asset performance (including trending against life expectancy to determine timing for renewals); and management of any changes to safety critical assets. As AM is part of the SMS, the ONRSR will review such strategies against the whole of Schedule 1 of the regulations, not just clause Balancing safety and commercial needs The ONRSR recognises that RTOs operate within a demanding environment that carries its own commercial realities. This may result in the need to maximise and even stretch the output of assets to meet competing business objectives and to get the most value from, and safety of, infrastructure and rolling stock. This allows the RTO to strike the right balance between asset maintenance, renewal, and operational activity in order to maintain asset integrity, enhance performance, and minimise downtime The importance of scalability Any activities carried out by an RTO in relation to its SMS or AM system need to be scalable to suit the specific nature of that organisation. The Regulator understands that strategies will, by necessity, be appropriate to the risks and needs of each individual RTO and does not expect to see all possible tools and methodologies listed in this guide being used in every AM system. For example, a major metropolitan railway operator might reasonably be expected to have a robust and complete AM system, while a heritage operator might only require a very basic approach to asset management Asset management across the life-cycle To create an AM policy and processes, an organisation should consider the life-cycle and operational use of their assets and their performance requirements at each stage. This is an iterative process that allows the operator to identify issues that might need to be addressed. Various asset or systems life-cycle models have been published which may provide guidance for this purpose, such as the diagram below, which is in accordance with ISO/IEC Asset Management Guideline Page 10

11 Figure 2: Asset life-cycle phases of ISO/IEC For the purpose of this guideline,, the ONRSR has taken a life-cycle approachh to explaining its expectations that is similar to, but not the same as, the one shownn above. However, the RTO should choose the approach that is most appropriate for managing their organisation s assets and identifying the needs and risks arising from their operations Developing a policy and processes A systematic approach to managing risk allows an operator to identify, eliminate, or reduce risk across the lifecycle of the asset. A clearly documented AM system allows an organisation to provide assurance about the safety of their rail infrastructure and rolling stock. Clause 21 of Schedule 1, states that effective asset management includes both an asset management policy and processes, some off which are also requirements of the SMS. One way of describing these processes might be through the development off a strategic asset management plan. These are described below. Asset Management Guideline Page 11

12 2.4.1 Asset management policy (Schedule 1.21) The Asset Management Policy should: clearly set out the organisation s broad asset management objectives and measures for success; demonstrate senior management commitment to the principles and process; outline a risk-based approach to asset management, which: o shows how asset-related risks are identified and addressed throughout the organisation; and o ensures alignment of the RTO s safety management and asset management strategies; provide a framework for developing and implementing the AM strategy, consistent with any organisational constraints; assign responsibilities for the AM system and its outcomes, and for the establishment and improvement of the strategic asset management plan (SAMP), to individual positions; and communicate to the organisation and other stakeholders the importance of disciplined asset management practices to ensuring the safety of railway operations; This should be part of, or consistent with, the rest of the safety management system Strategic asset management plan Operators must be able to demonstrate that they have a coordinated approach to asset management. A Strategic Asset Management Plan (SAMP) 2 is one possible way of outlining the processes that give effect to the policy and demonstrating such an approach. It clearly identifies and documents a long term view of asset management and the processes and controls required to meet safety, statutory and organisation obligations. It outlines a coordinated approach to support the safety objectives, and: describes the operating context; identifies safety critical systems and their key performance objectives; describes how risks are managed in the operation, maintenance, modification, extension, or renewal of assets; aligns the objectives and processes of the asset management and safety management systems; establishes the standards and processes used in maintaining asset integrity; and outlines the responsibilities and accountabilities of duty holders in relation to the SAMP. If an organisation is developing a SAMP, it should: adopt a life-cycle risk assessment approach to identify safety critical assets and develop the plan; identify key internal and external stakeholders and their specific needs and concerns; 2 For more information, see clause of ISO 55000: Asset Management Overview, principles, and terminology. Asset Management Guideline Page 12

13 detail the operator s asset systems, asset portfolio, and criteria for identifying whatt is included; employ existing organisational management systems, wheree appropriate, in risk management activities; identify performance and safety requirements and the controls or processes needed to deliver them; understand trending of asset performance and assess risks towards thee end of the asset s design life; and conduct a regular management revieww of the SAMP and its activities a to ensure it is meeting its objectives, address any gaps, and identify appropriate improvements. All operators must have an up-to-date assett management policy and a processes, as part of their SMS, which is appropriate to their size and risk profile. If no SAMP is being developed, then t the issues listed above should still be addressed by the RTO s SMS The ONRSR s expectations Keeping the scalability of the operator in mind (see ), the ONRSR will lookk for: an asset management policy that outlines: objectives; a framework for implementing the asset management system; the organisation s risk assessment approach to assets; ; and the broad responsibilities of relevant stakeholders; and a description of asset management processes, including: the operating context; evidence of the consideration of each asset ss life-cycle; how safety critical systems are identified, maintained, modified, extended, and renewed; how the safety and asset management systems are aligned and/ /or integrated; and the specific roles, responsibilities, and accountabilities of duty holders. This might be achieved through the use of an SAMP The exploratory and concept phases The RTO should establish processes to: determine requirements forr any new and/or modified assets and consult on them with relevant stakeholders (Schedule 1.12) ); manage the risks associated with implementing such changes, in line with the SMSS (Schedule 1.16) ); and manage the risks associated with asset procurement and contract management (Schedule 1.18) ). While tourism and heritage operators should have processes that are scalable to their t operations, as a minimum they should ensure that: safety requirements and risks are identified and managed in line with the SMS; if an original equipment manufacturer (OEM) is still in operation, safety critical items are sourced from them. In most cases, however, items will be like-for-like replacements, tested by competent people; and safety information and specifications should be drawn from historical h data sourcess and reviewed, or obtained from the OEM iff it is still operating. This information should be used as a starting point for developing a plan, recognisingg that current use will differ markedly from the original design intent. Asset Management Guideline Page 13

14 2.5.1 The ONRSR s expectations Keeping the scalability of the operator in mind (see 2.2.1), the ONRSR will look for: documentary evidence of processes andd consultationn to determine asset requirements, and of risk management strategies in relation to thee procuring and implementing the neww or modifiedd assets Design and delivery Configuration management (Schedule 1.7) Having established an AM policy and the associated asset management strategy, the RTO should document all relevant processes and information relating to the design and delivery of the proposed asset in their SMS. This can be coordinated through the use of configuration management processes (or a configuration management system (CMS)). These outline the technical and organisation nal activities that establish and maintain control of the asset throughout its life-cycle. While tourism and heritage operators should have processes that are scalable to their t operations, as a minimum they should ensure that: if an original equipment manufacturer (OEM) is still in operation, safety critical items should be sourced from them. In most cases, however, items will bee like-for-like replacements, tested by competent people; and safety information and specifications should be drawn from historical h data sourcess and reviewed, or obtained from the OEM iff it is still operating. This information should be used as a starting point for developing a plan, recognisingg that current use will differ markedly from the original design intent Asset design risk management (Schedule 1.16) The RTO should establish and document a process to manage thee risks associated with the design and delivery of the asset solution. This should include hazard safety analysis to identify areas most at a risk of failure, reviewed against the operator s risk register. The risk management process is part of the organisation s SMS, for which ann operator must develop systems and procedures for complying with risk management obligations under s.46 of the RSNL. For larger RTOs, this should be achieved byy identifying safety critical systemss and establishing key performance objectives through the t use of appropriate risk identification techniques, such as: reliability, availability, maintainability & safety (RAMS) analysis of the design of assets 3 ; and failure modes, effects and criticality analysis (FMECA) and/or reliability centred maintenance (RCM) to manage risks during the design phase and to support establishing a maintenance plan. 3 If design is done by a 3rd party, the accredited operator still has responsibility to communicate key safetyy performance criteria c to the designers to ensure that the asset is fit for purpose. Asset Management Guideline Page 14

15 While tourism and heritage operators should have processes that are scalable to their operations, as a minimum they should ensure that: hazard analyses are conducted and signed off by a competent person; safety information and specifications are obtained from suppliers and reviewed, or existing maintenance practices on similar assets adapted; and they have considered whether to use tools such as FMECA, or to review historical failure information, in order to manage safety risks during design and to establish maintenance plans or manage any deviation from common practice Asset system engineering management (Schedule 1.19) It is important for an RTO to demonstrate how they capture and maintain system and safety requirements for their assets, and how these will be verified, validated, and tracked. These requirements should be managed against the specific standards and processes used for the design, maintenance, and operation of rail infrastructure and rolling stock, as identified by the operator. 4 These will be important for asset management purposes and will be of interest to the ONRSR. The RTO should ensure that: safety critical systems are designed to functional specifications; there is a validation and commissioning test plan to confirm that the asset is fit for purpose and safe to operate and maintain; and operation and maintenance documentation has been prepared, which outlines processes for updating, reviewing, and maintaining assets. RTOs should demonstrate that they use appropriate systems engineering processes and safety assurance processes (e.g. EN50126/8/9 for complex systems) in their design and procurement approach. This might be achieved through the creation of a systems engineering management plan (SEMP), which would specify the procedure to identify and record stakeholders, system requirements, and safety needs. While tourism and heritage operators should have processes that are scalable to their operations, as a minimum they should ensure that: if an original equipment manufacturer (OEM) is still in operation, safety critical items should be sourced from them. In most cases, however, items will be like-for-like replacements, tested by competent people; and safety information and specifications should be drawn from historical data sources and reviewed, or obtained from the OEM if it is still operating. This information should be used as a starting point for developing a plan, recognising that current use will differ markedly from the original design intent. 4 If design and supply is from a 3 rd party, it is still the accredited operator s responsibility to demonstrate safety assurance or compliance and show that the asset is fit for purpose. Asset Management Guideline Page 15

16 2.6.4 The ONRSR s expectations Keeping the scalability of the operator in mind (see ), the ONRSR will lookk for: processes for designing and delivering assets; processes for managing riskss in the design and delivery phase; evidence of the tools used for assuring safety and reliability details of the standards or other safety information relied upon forr the design and maintenance of the asset and any tests used to confirm compliance; and the existence of a manual, orr similar, thatt includes the processes for operatingg and maintaining assets and for managing risks in the operation and maintenance phase. p 2.7. Asset implementation phase (Schedule 1.16 and 1.19) In order to ensure the successfull and safe implementation of the asset, a the RTO should establish processes to manage the risks associated with its construction, testing, and commissioning, in line with the processes of the SMS. It should also implement a process to manage: the testing, verification, and validation of system and safety requiremenr nts of the asset, which might be achieved by way of a Testingg and Commissioning ManagemeM nt Plan or equivalent; and the operational readiness of the asset, which could be achieved with ann operational readiness checklist. While tourism and heritage operators should have processes that are scalable to their t operations, as a minimum they should ensure that: testing and verification are carried out t against a managemen nt plan that has been informed by historical data or OEM safety specifications and developed to t meet current usage patterns The ONRSR s expectations Keeping the scalability of the operator in mind (see 2.2.1), the ONRSR will look for: evidence of safety risk management, testing, and validation processes covering construction and commissioning of the asset and its operational readiness Asset utilisation phase Asset operation and maintenanc ce documentation (Schedule 1.19) The RTO should develop an asset operationn and maintenance documentationn that outlines the processes it uses to update, review, and maintain their assets. It should describe the scope of the operations and, where applicable, the risk k management strategies they have in place to cover all relevant activities. Asset Management Guideline Page 16

17 This document should: ensure that the asset is operated and maintained in accordance with the asset design; identify and incorporate all safety related conditions, which specify how the use of the asset might be restricted, and the conditions that are in place for its use; and specify the ongoing checks to be carried out. While tourism and heritage operators should have processes that are scalable to their operations, as a minimum they should ensure that: manuals are provided where available, or documentation developed, that: o ensures assets are operated and maintained in accordance with design; o identifies safety related conditions; and o specifies ongoing checks; and equipment is only operated and maintained by competent personnel Asset configuration (Schedule 1.7) The process for configuring the design and delivery of the proposed asset (described in 2.6.1) should be extended to cover the whole of its life-cycle. This should be done by: establishing and maintaining records of all assets through the creation of an asset register. This should contain information such as the unique identification of the assets, their location, any maintenance carried out,, etc.; managing documents and information about the assets in accordance with the organisation s SMS; and determining the criticality of assets, based on the results of a safety risk assessment. Safety critical assets should be identified within the asset register. The operator should show how asset information is developed, maintained, and integrated within their risk register. The requirement for a risk register should be appropriate for the size and scope of the organisation. For example, a major operator would almost certainly have a software system to maintain asset records, while tourism and heritage operators could maintain their asset and risk register in a spreadsheet. While tourism and heritage operators should have processes that are scalable to their operations, as a minimum they should ensure that: asset records are maintained in a system that is appropriate to the size and nature of the operation Asset operation and maintenance (Schedule 1.19 and 1.20) An RTO should monitor ongoing compliance with their nominated standards and processes in order to ensure that their railway operations continue to be safe and perform efficiently. To this end, the organisation should establish processes to ensure that: assets are operated and maintained in accordance with the relevant manuals; Asset Management Guideline Page 17

18 the condition of the assets are monitored; equipment needed to test or inspect assets is appropriately controlled, calibrated, and maintained; any risks associated with operating and maintaining the assets are being managed in accordance with: o the RTO s SMS and AM strategy risk management processes; and o all workplace health and safety (WHS) laws; and spare parts are available for maintenance, especially for the safety critical assets. This might be achieved by determining spare part needs for the assets based on the asset criticality, as identified through the use of reliability centred maintenance (RCM). Asset maintenance 5 planning by an RTO should: address competency, capacity, and resource requirements; provide for information management and record keeping needs; deliver detailed plans that have been established through a risk-based process; and ensure calibration of the tools and equipment that will be used for maintenance. For larger RTOs, this should specifically include: a Technical Maintenance Plan (TMP) which is controlled by the office of a chief engineer or another technical authority; and work instructions developed from and audited against the TMP. Planning should be documented and controlled in a computer maintenance management system, or by using a simpler equivalent if the RTO is a tourism or heritage operator. The RTO should have processes in place to ensure that: maintenance is delivered to schedule; work instructions is available for all safety critical activities; all tasks are signed-off for compliance; documentation about maintenance carried out is controlled; and competency based training is available on all safety critical systems. While tourism and heritage operators should have processes that are scalable to their operations, as a minimum they should ensure that: operations and maintenance documents are kept up to date; all safety critical assets are documented; controlled work instructions are carried out to schedule and performed by competent people; and safety critical tasks are checked and signed-off by competent people, and all documents controlled. 5 If maintenance is contracted to a 3 rd party, it is the accredited operator s responsibility to specify and monitor that the performance of the asset complies with the operator s established standards. Asset Management Guideline Page 18

19 2.8.4 Monitoring asset performance (Schedule 1.20 and 1.22) Once processes are in place to manage the risk associated with safety critical assets, the operator should monitor asset performance against these risks and its own expectations. RTOs should demonstrate that they: understand the performance of their safety critical assets by identifying what needs to be monitored, measured, and reported; establish and record the method and frequency of monitoring, measurement, analysis, and evaluation of the performance of safety critical assets; monitor trending performance against the predicted strategic life of an asset; report on performance issues based on the level of safety risk and escalate high-risk performance issues so that that they are adequately addressed; establish channels to communicate any results (this can use the communications strategies already in place for the SMS); improve the conformance of safety critical assets with nominated standards by: o reviewing operational and maintenance controls, and assessing the risk of assets not meeting the predetermined standards; o identifying the root cause(s) of safety performance issues; and o identifying actions that might be needed for recovery to safe operating conditions; improve the SMS continuously by identifying potential risks and taking corrective action; and document where opportunities have been taken to reduce or eliminate risk and how this was achieved. While tourism and heritage operators should have processes that are scalable to their operations, as a minimum they should ensure that: evidence that performance against safety objectives is being monitored Failure management and corrective action (Schedule 1.11) An RTO should have processes for identifying any faults or failures that might occur with their assets and ensuring the appropriate corrective actions are carried out. These should be in line with the provisions and maintenance programs outlined in the organisation s SMS and should: ensure appropriate recording of failures and the resultant corrective actions; address safety critical failures; ensure the appropriate reporting of notifiable occurrences, as per the requirements of existing the ONRSR guidelines; and coordinate unscheduled repairs for safety related assets. The RTO should: document the failure management process; use appropriate analysis techniques for safety critical features, such as Root Cause Analysis (RCA); Asset Management Guideline Page 19

20 implement failure recording, which may include fault codes, failure mode, effect, criticality and corrective action; develop procedures to manage common repair activities; and introduce a feedback process for the engineering or technical teams to review and improve systems and minimise the risk of future failures. This could be achieved through the use of fault reporting, analysis, and corrective actions (FRACAS), which: records faults that were detected and recorded during testing and commissioning, as well as any that occurred during operation or maintenance; and manages the subsequent corrective actions taken to address them. As a minimum, tourism and heritage operators, should document all faults and corrective actions and require a technically competent person to check any unscheduled repairs. While tourism and heritage operators should have processes that are scalable to their operations, as a minimum they should ensure that: all faults and corrective actions are documented; any unscheduled repairs are checked by a technically competent person; and failures of assets are reviewed regularly Asset security and emergency management (Schedule 1.25 and 1.26) An RTO should have processes in place to manage any security or emergency issues that might arise during the operation or maintenance of the asset. These security and emergency management processes should comply with arrangements in place in the organisation s SMS Asset interface management (Schedule 1.19 and 1.22) The RTO should establish processes to manage any interface risks that might occur during the operation and maintenance of its assets. These should cover interfaces between assets and between operators. While tourism and heritage operators should have processes that are scalable to their operations, as a minimum they should ensure that: interface risks are identified and controls managed. Asset Management Guideline Page 20

21 2.8.8 The ONRSR s expectations Keeping the scalability of the operator in mind (see 2.2.1), the ONRSR will look for: evidence of ongoing compliance with thee RTO s nominated standards and processes, and management of identified risks; asset maintenance plans and procedures; evidence of identifying and eliminating safety risks; evidence of reporting and managing anyy performance issues andd corrective actions; evidence of the use of trending performance against the predicted strategic life of an asset for tracking performance and planning for renewals; processes for identifying faults and failures and undertaking corrective action; and evidence of the consideration of asset management in SMS provisions for: security and emergency management, notifiable occurrences, and interface management t Managing changes to safety critical assetss (Schedule 1.12) In situations where an operator might seek to change the configuration baseline of safety critical assets, they should implement a change management process to ensure the effective management of safety risks. RTOs should establish configuration baselines for all safety critical assets, including associated software, whether they are embedded in existing systems or stand-alone programs. If an operator is changing the configuration baseline of safety critical assets, they should, where possible: manage the risks arising from changess to these assets; track serial and model numbers; validate functional requirements against specifications and controls; c control the release of configuration items; and ensure that the status of any assets under configuration management iss up to date. Changes to established baselines, operatingg conditions, or the maintenance schedule off safety critical assets must not in any way diminish the safety of the operating railway. Management of any changes in place to operational or maintenance processes for safety critical assets should comply with Schedule 1.12 off regulations. While tourism and heritage operators should have processes that are scalable to their t operations, as a minimum they should ensure that: changes to safety critical assets are managed in compliancee with Schedule The ONRSR s expectations Keeping the scalability of the operator in mind (see 2.2.1), the ONRSR will look for: evidence of the configurationn management of assetss through their life-cycle; and evidence of change management processes to deal with baselinee reconfigurations. Asset Management Guideline Page 21

22 2.10. On-going staff training (Schedulee 1.15 and 1.24) The RTO should establish a program of on-going training and induction for relevant staff. In particular, this should cover relevant information on how to: assess and manage risks in relation too the asset; operate the asset safely; use any inbuilt safeguards the asset might have; maintain the asset, and to what standards; manage any changes or modificationss to the asset; and identify and report on any faults f and failures of the asset or system. s This training should be in line with the RTO s other training responsibilities under their SMS and should ensure employees and contractors are competent to perform the taskss required of them. While tourism and heritage operators should have processes that are scalable to their t operations, as a minimum they should ensure that: employees and contractors are appropriately trained and meet accepted competency standards The ONRSR s expectations Keeping the scalability of the operator in mind (see ), the ONRSR will lookk for: details of the training processes to ensuree that relevant employees and contractors are appropriately competent to operate and maintain assets Asset retirement phase (Schedule 1.16) Where assets are likely to be renewed, decommissioned, or disposed of, the RTO should establish and document processes to manage any risks associated with such activities. These processes are only relevant to organisations that are carrying out suchh activities or are likely to do so (e.g. a tourism or heritage operator r that will not be replacing its rolling stock need not have such processes in place) Renewal For the renewal of an asset that is approaching its end of life, an RTO R shouldd ensure that the replacement asset meets established safetyy performance criteria. As part of this process, all hazard safety analyses should be reviewed and signed off by a competentt officer. An RTO should understand the condition of their assetss and, if they are deteriorating, respond accordingly by replacing or maintaining them. A validation and commissioning test t plan should be established to confirm that the new asset is fit- appropriate safety information, such as historical data, to ensure that it remains safe to use. Monitoring of trending against expected performance should be carried out ass describedd in for-purpose and safe to operate and maintain. If a tourism or heritagee operator is i extendingg the life of an existing asset, theyy should seek Asset Management Guideline Page 222

23 Disposal When disposing of any rail infrastructure or rolling stock, RTOs should appropriately manage the risks of taking the asset out of service. These asset disposal strategies should be articulated in the operator s SMS. While tourism and heritage operators should have processes that are scalable to their t operations, as a minimum they should ensure that: any renewal and disposal strategies are articulated in the operator s asset management procedures The ONRSR s expectations Keeping the scalability of the operator in mind (see 2.2.1), the ONRSR will look for: evidence of processes to manage risks associated with the renewal, decommissioning, or disposal of assets, as appropriate to the scale and nature of the organisation; and safety criteria or information relevant to the ongoing operation and management of the asset, as appropriate to the scale and nature of the organisation Auditing (Schedule 1.10) RTOs should establish processes for auditing their SMS (and, by extension, e their AM system) to ensure ongoing compliance. The process, frequency, required competencies, and independence needed for such an audit should be clearly stated in the SMS. While tourism and heritage operators should have processes that are scalable to their t operations, as a minimum they should ensure that: evidence is available of the processess in place for auditing compliance c against the provisions of the SMS The ONRSR s expectations Keeping the scalability of the operator in mind (see 2.2.1), the ONRSR will lookk for: evidence of the processes in place for auditing compliance against the provisions of the SMS and AM system. Asset Management Guideline Page 23

24 3 Asset Management Ready Reckoner Following is a ready reckoner of the key issues that the ONRSR will be seeking in an RTO s asset management system, as outlined in section 2.1, above, keeping in mind the scalability of the organisation (2.2.1) A systematic approach to safe asset management Asset management policy An Asset Management Policy, including: objectives of the policy; a framework for implementing the asset management system; the organisation s risk assessment approach to assets; and the broad responsibilities of relevant stakeholders. A description of asset management processes, including: the operating context; evidence of the consideration of each asset s life-cycle; how safety critical systems are identified, maintained, modified, extended, and renewed; how the safety and asset management systems are aligned and/or integrated; and the specific roles, responsibilities, and accountabilities of duty holders. This might be achieved through the use of an SAMP. Schedule 1.21 Schedule 1.5 Schedule 1.21 Schedule 1.5 Exploratory and concept phase Evidence of processes and consultation to determine asset requirements. Schedule 1.12 Evidence of risk management strategies in relation to the procuring and implementing the new or modified assets. Schedule 1.16 Schedule 1.18 Schedule 1.19 On-going staff training Details of the training processes in place to ensure that relevant employees and contractors are appropriately competent to operate and maintain assets. Schedule Appropriate documentation of asset management processes Asset design and delivery Documentation of all relevant processes for designing and delivering assets. Schedule 1.7 Processes for managing risks in the design and delivery phase. Schedule 1.16 Evidence of the tools used for ensuring safety and reliability. Schedule 1.16 Details of the standards or other safety information relied upon for the design and maintenance of the asset and any tests used to confirm compliance. The existence of a manual, or similar, that includes the processes for operating and maintaining assets and for managing risks in the operation and maintenance phase. Schedule 1.19 Schedule 1.19 Asset Management Guideline Page 24

25 3.3. Effective monitoring of asset performance Asset implementation Evidence of safety risk management, testing, and validation processes covering construction and commissioning of the asset and its operational readiness. Schedule 1.16 Schedule 1.19 Asset utilisation Evidence of ongoing compliance with the RTO s nominated standards and processes, and management of identified risks. Schedule 1.20 Asset maintenance plans and procedures. Schedule 1.19 Schedule 1.20 Evidence of the activities of the operator in relation to identifying and eliminating risks. Schedule 1.20 Evidence of the processes used to report on and manage any performance issues and corrective actions. Evidence of the use of trending performance against the predicted strategic life of an asset for tracking performance and planning for renewals. Schedule 1.11 Schedule 1.18 Schedule 1.19 Processes for identifying faults and failures and undertaking corrective action. Schedule 1.11 Evidence of the consideration of asset management in SMS provisions for: security and emergency management, notifiable occurrences, and interface management. Schedule 1.11 Schedule 1.19 Schedule 1.25 Schedule 1.26 Schedule 1.23 Schedule 1.22 Asset retirement Evidence of processes to manage risks associated with the renewal, decommissioning, or disposal of assets, as appropriate to the scale and nature of the organisation. Safety criteria or information relevant to the ongoing operation and management of the asset, as appropriate to the scale and nature of the organisation. Schedule 1.16 Schedule 1.16 Auditing Evidence of the processes in place for auditing compliance against the provisions of the SMS and AM system. Schedule Management of any changes to safety critical assets Managing changes to safety critical assets Evidence of the configuration management of assets through their life-cycle. Schedule 1.7 Evidence of any change management processes in place to deal with baseline reconfigurations. Schedule 1.12 Please note that this is not an exhaustive list and that the scalability of each of these measures to what may be appropriate for different organisations will be a consideration. Asset Management Guideline Page 25

Preparation of a Rail Safety Management System Guideline

Preparation of a Rail Safety Management System Guideline Preparation of a Rail Safety Management System Guideline Page 1 of 99 Version History Version No. Approved by Date approved Review date 1 By 20 January 2014 Guideline for Preparation of a Safety Management

More information

Asset Management Policy March 2014

Asset Management Policy March 2014 Asset Management Policy March 2014 In February 2011, we published our current Asset Management Policy. This is the first update incorporating further developments in our thinking on capacity planning and

More information

to Asset Management Policy and Guidance Draft Version 1.4 9 July 2015

to Asset Management Policy and Guidance Draft Version 1.4 9 July 2015 D to Asset Management Policy and Guidance Draft Version 1.4 9 July 2015 This page has been left blank intentionally Page 2 of 24 Page 3 of 24 This page has been left blank intentionally Page 4 of 24 Strategic

More information

The Asset Management Landscape

The Asset Management Landscape The Asset Management Landscape ISBN 978-0-9871799-1-3 Issued November 2011 www.gfmam.org The Asset Management Landscape www.gfmam.org ISBN 978-0-9871799-1-3 Published November 2011 This version replaces

More information

TfNSW Standard Requirements TSR T Technical Management

TfNSW Standard Requirements TSR T Technical Management Template Applicable to: Transport Projects Quality Management System Status: Division: Approved Transport Projects Version: 5.0 Desksite No.: 3455797_1 Date of issue: 1 July 2014 Effective date: 1 July

More information

AEO Guide to Engineering Management

AEO Guide to Engineering Management Management standard AEO Guide to Engineering Management Issued Date: 4 June 2013 Important Warning This document is one of a set of standards developed solely and specifically for use on the rail network

More information

The Asset Management Landscape

The Asset Management Landscape The Asset Management Landscape Second Edition ISBN 978-0-9871799-2-0 Published March 2014 www.gfmam.org The Global Forum on Maintenance and Asset Management The Global Forum on Maintenance and Asset Management

More information

Page 1 of 24. To present the Asset Management Policy 2014 for Council adoption.

Page 1 of 24. To present the Asset Management Policy 2014 for Council adoption. Page 1 of 24 COMMUNITY AND SERVICES SPECIAL COMMITTEE REPORT 9 DECEMBER 2104 AGENDA ITEM 6.1 ASSET MANAGEMENT POLICY 2014 REVIEW Director: Manager: Ian Butterworth Director Infrastructure and Engineering

More information

IRIS International Railway Industry Standard

IRIS International Railway Industry Standard English Addendum, 19th June 2008 IRIS International Railway Industry Standard Hier kann ein kleiner Text stehen Hier kann ein kleiner Text stehen Hier kann ein kleiner Text stehen Chapter 1 3 IRIS Certification

More information

Title: Rio Tinto management system

Title: Rio Tinto management system Standard Rio Tinto management system December 2014 Group Title: Rio Tinto management system Document No: HSEC-B-01 Standard Function: Health, Safety, Environment and Communities (HSEC) No. of pages: 23

More information

Health and Safety Management Standards

Health and Safety Management Standards Health and Safety Management Standards Health and Safety Curtin University APR 2012 PAGE LEFT INTENTIONALLY BLANK Page 2 of 15 CONTENTS 1. Introduction... 4 1.1 Hierarchy of Health and Safety Documents...

More information

Engineering Inspection Plans For Entity in Charge of Maintenance Certificates. May 2012

Engineering Inspection Plans For Entity in Charge of Maintenance Certificates. May 2012 Engineering Inspection Plans For Entity in Charge of Maintenance Certificates May 2012 Contents 1. Introduction 4 Engineering Inspection Plans 4 The Assessment Process 5 Proportionality 5 Assessment Timescale

More information

Risk-Based Regulation - Presentation to Central BOF Steve Bickley, Director Safety and Risk 9 December 2015

Risk-Based Regulation - Presentation to Central BOF Steve Bickley, Director Safety and Risk 9 December 2015 Risk-Based Regulation - Presentation to Central BOF Steve Bickley, Director Safety and Risk 9 December 2015 Contents > Introduction > What is risk-based regulation? > A framework for risk-based regulation

More information

Auditing Health and Safety Management Systems. 4th Edition

Auditing Health and Safety Management Systems. 4th Edition Auditing Health and Safety Management Systems 4th Edition SafetyMAP: AUDITING HEALTH AND SAFETY MANAGEMENT SYSTEMS 4th Edition Published by the Victorian WorkCover Authority Victorian WorkCover Authority

More information

Procurement of Goods, Services and Works Policy

Procurement of Goods, Services and Works Policy Procurement of Goods, Services and Works Policy Policy CP083 Prepared Reviewed Approved Date Council Minute No. Procurement Unit SMT Council April 2016 2016/0074 Trim File: 18/02/01 To be reviewed: March

More information

AS/NZS 4801:2001. Safety Management Systems (SMS) Self-Assessment Checklist. Revision 1 (January 2014)

AS/NZS 4801:2001. Safety Management Systems (SMS) Self-Assessment Checklist. Revision 1 (January 2014) AS/NZS 4801:2001 Safety Management Systems (SMS) Self-Assessment Checklist This document restates the requirements of AS/NZS 4801:2001 for Safety Management Systems (SMS) and has been developed to assist

More information

SAFETY and HEALTH MANAGEMENT STANDARDS

SAFETY and HEALTH MANAGEMENT STANDARDS SAFETY and HEALTH STANDARDS The Verve Energy Occupational Safety and Health Management Standards have been designed to: Meet the Recognised Industry Practices & Standards and AS/NZS 4801 Table of Contents

More information

The New Zealand Human Services Quality Framework - ISO9002:2008 to 2012

The New Zealand Human Services Quality Framework - ISO9002:2008 to 2012 HUMAN SERVICES QUALITY FRAMEWORK STANDARDS - POLICIES DOCUMENT Q:/1 DATE REVEIWED: REFERENCE: GOVERNANCE AND August 2014 MANAGEMENT POLICY AUTHORISATION: STANDARD REFERENCE: NEXT REVIEW DATE: Management

More information

3000_115 Competency Standard: Certified Practitioner in Asset Management (CPAM)

3000_115 Competency Standard: Certified Practitioner in Asset Management (CPAM) 3000_115 Competency Standard: Certified Practitioner in Asset Management (CPAM) Asset Management Council GENERAL Holders of this certificate will have an understanding of the contribution that they make

More information

Asset Management Systems Scheme (AMS Scheme)

Asset Management Systems Scheme (AMS Scheme) Joint Accreditation System of Australia and New Zealand Scheme (AMS Scheme) Requirements for bodies providing audit and certification of 13 April 2015 Authority to Issue Dr James Galloway Chief Executive

More information

15 Guiding Principles

15 Guiding Principles Health, Safety, Environment and Corporate Social Responsibility 15 Guiding Principles 2013 Message from President and CEO 0 New Gold has a complementary portfolio of assets in different countries and cultures

More information

Customer Installation Safety Plan. March 2015

Customer Installation Safety Plan. March 2015 Customer Installation Safety Plan March 2015 Document History Issue No. Date Approved By Summary of Changes 1 June 2014 Chief Engineer Updated and revised in line with requirement for biennial review under

More information

Network Certification Body

Network Certification Body Network Certification Body Scheme rules for assessment of railway projects to requirements of the Railways Interoperability Regulations as a Notified and Designated Body 1 NCB_MS_56 Contents 1 Normative

More information

The anglo american Safety way. Safety Management System Standards

The anglo american Safety way. Safety Management System Standards The anglo american Safety way Safety Management System Standards 2 The Anglo American Safety Way CONTENTS Introduction 04 Anglo American Safety Framework 05 Safety in anglo american 06 Monitoring and review

More information

HEALTH SAFETY & ENVIRONMENT MANAGEMENT SYSTEM

HEALTH SAFETY & ENVIRONMENT MANAGEMENT SYSTEM HEALTH SAFETY & ENVIRONMENT MANAGEMENT SYSTEM September 2011 OUR HEALTH, SAFETY AND ENVIRONMENT POLICY OUR PRINCIPLE OF DUE CARE We care about the wellbeing of our people and our impact on the environment.

More information

NABL NATIONAL ACCREDITATION

NABL NATIONAL ACCREDITATION NABL 160 NABL NATIONAL ACCREDITATION BOARD FOR TESTING AND CALIBRATION LABORATORIES GUIDE for PREPARING A QUALITY MANUAL ISSUE NO. : 05 AMENDMENT NO : 00 ISSUE DATE: 27.06.2012 AMENDMENT DATE: -- Amendment

More information

Understanding Principles and Concepts of Quality, Safety and Environmental Management System Graham Caddies

Understanding Principles and Concepts of Quality, Safety and Environmental Management System Graham Caddies Understanding Principles and Concepts of Quality, Safety and Environmental Management System Graham Caddies Owner / Principal Advance Profitplan Understanding Principles & Concepts Page 1 of 10 Revision

More information

Standard 1. Governance for Safety and Quality in Health Service Organisations. Safety and Quality Improvement Guide

Standard 1. Governance for Safety and Quality in Health Service Organisations. Safety and Quality Improvement Guide Standard 1 Governance for Safety and Quality in Health Service Organisations Safety and Quality Improvement Guide 1 1 1October 1 2012 ISBN: Print: 978-1-921983-27-6 Electronic: 978-1-921983-28-3 Suggested

More information

Superseded by T MU AM 04001 PL v2.0

Superseded by T MU AM 04001 PL v2.0 Plan T MU AM 04001 PL TfNSW Configuration Management Plan Important Warning This document is one of a set of standards developed solely and specifically for use on the rail network owned or managed by

More information

ELECTROTECHNIQUE IEC INTERNATIONALE 61508-3 INTERNATIONAL ELECTROTECHNICAL

ELECTROTECHNIQUE IEC INTERNATIONALE 61508-3 INTERNATIONAL ELECTROTECHNICAL 61508-3 ª IEC: 1997 1 Version 12.0 05/12/97 COMMISSION CEI ELECTROTECHNIQUE IEC INTERNATIONALE 61508-3 INTERNATIONAL ELECTROTECHNICAL COMMISSION Functional safety of electrical/electronic/ programmable

More information

Discipline: Technical Services Category: Procedure. Risk Management RM-01 2013. Applicability. ARTC Network Wide. Interstate Network.

Discipline: Technical Services Category: Procedure. Risk Management RM-01 2013. Applicability. ARTC Network Wide. Interstate Network. Discipline: Technical Services Category: Procedure Risk Management RM-01 2013 Applicability ARTC Network Wide Interstate Network Hunter Valley Document Status Version Prepared by Reviewed by Endorsed Approved

More information

Directory. Maintenance Engineering

Directory. Maintenance Engineering 2 / 17 INDEX 1.0 INTRODUCTION... 3 2.0 MAINTENANCE POLICY... 4 2.1 MAINTENANCE MISSION... 5 2.2 CRITICAL SUCCESS FACTORS AND KEY RESULT AREAS... 6 2.3 OBJECTIVES... 7 3.0 MAINTENANCE ENGINEERING SERVICES...

More information

CCF Systems Gap Analysis Checklist. Civil Contractors Federation. Civil Construction Management Code

CCF Systems Gap Analysis Checklist. Civil Contractors Federation. Civil Construction Management Code CCF Systems Gap Analysis Checklist Civil Contractors Federation Civil Construction Management Code Please Note: This Gap Analysis Checklist is designed to enable Contractors to undertake an initial self

More information

WORK HEALTH AND SAFETY

WORK HEALTH AND SAFETY WORK HEALTH AND SAFETY SCOPE POLICY Work Health and Safety System Work Health and Safety Objectives Roles and Responsibilities Executive Responsibilities Manager Responsibilities Worker Responsibilities

More information

TGA key performance indicators and reporting measures

TGA key performance indicators and reporting measures TGA key indicators and reporting measures Regulator Performance Framework Version 1.0, May 2015 About the Therapeutic Goods Administration (TGA) The Therapeutic Goods Administration (TGA) is part of the

More information

information Records Management Checklist business people security preservation accountability Foreword Introduction Purpose of the checklist

information Records Management Checklist business people security preservation accountability Foreword Introduction Purpose of the checklist Records Management Checklist Foreword We fi rst developed the Records Management Checklist in 2008 to complement our performance audit Records Management in the Victorian Public Sector. At that time the

More information

Common Safety Method for risk evaluation and assessment

Common Safety Method for risk evaluation and assessment Common Safety Method for risk evaluation and assessment Guidance on the application of Commission Regulation (EU) 402/2013 March 2015 Contents 1. Introduction 4 Background 4 Purpose of this guidance 5

More information

JOB DESCRIPTION. Team Leader Fleet Engineering. Environment & Sustainable Communities / Highways. Transport Operations / Vehicle Fleet & Depot

JOB DESCRIPTION. Team Leader Fleet Engineering. Environment & Sustainable Communities / Highways. Transport Operations / Vehicle Fleet & Depot JOB DESCRIPTION JOB TITLE: DIRECTORATE: SECTION: GRADE: Team Leader Fleet Engineering Environment & Sustainable Communities / Highways Transport Operations / Vehicle Fleet & Depot BBCU11 DATE PREPARED:

More information

IAM Certificate in Asset Management Ver1.2 January 2013

IAM Certificate in Asset Management Ver1.2 January 2013 IAM Certificate in Asset Management Ver1.2 January 2013 Introduction 1.1 The IAM Certificate is aimed primarily at new entrants and those with some experience in asset management roles and seeking to achieve

More information

WATE R O&M S E RV I CE S An asset management perspective

WATE R O&M S E RV I CE S An asset management perspective WATE R O&M S E RV I CE S An asset management perspective Smart asset management solutions create long term value With more than 150 years of water industry experience and responsibility for operations

More information

SUPPORTING THE RAIL INDUSTRY UNIQUE SOLUTIONS FOR UNIQUE SITUATIONS WWW.SGS.COM/RAIL

SUPPORTING THE RAIL INDUSTRY UNIQUE SOLUTIONS FOR UNIQUE SITUATIONS WWW.SGS.COM/RAIL SUPPORTING THE RAIL INDUSTRY UNIQUE SOLUTIONS FOR UNIQUE SITUATIONS WWW.SGS.COM/RAIL OUR UNIQUE SOLUTION TO YOUR UNIQUE SITUATION SGS is recognised as the global benchmark for quality and integrity. We

More information

Quality Management System

Quality Management System LH Sleightholme Ltd, Westfield Works, Helperthorpe, Malton, North Yorkshire YO17 8TQ Quality Management System MANUAL ISO 9001:2008 This Quality Management System Manual has been issued on the authority

More information

Sustaining Local Assets. Local government asset management policy statement

Sustaining Local Assets. Local government asset management policy statement Sustaining Local Assets Local government asset management policy statement December 2003 ISBN 0 646 42106 9 Authorised by the Victorian Government Address: Local Government Victoria Department for Victorian

More information

Association for Project Management Business Management System

Association for Project Management Business Management System Association for Project Management Business Management System December 2012 2 Association for Project Management About APM Formed in 1972, the Association for Project Management (APM) is committed to developing

More information

Rolling Stock PPP Double Deck Trains. Exhibit 2. Contract Management Requirements

Rolling Stock PPP Double Deck Trains. Exhibit 2. Contract Management Requirements Rolling Stock PPP Double Deck Trains Exhibit 2 Contract Management Requirements PPP.005.227.0623 Change Log Issue Date Author Change v9 CONTRACT v10 14/01/2009 ARJS Addition of text from: Deed of Variation

More information

Engineering Procurement Construction Quality Plan

Engineering Procurement Construction Quality Plan Engineering Procurement Construction Quality Plan Index 1 Introduction... 4 1.1 Project Background... 4 1.2 Document Purpose... 4 1.3 Change Control... 4 1.4 Contract... 4 1.5 Quality system... 4 1.6 Distribution...

More information

RTO Delegations Guidelines

RTO Delegations Guidelines RTO Delegations Guidelines ISBN 0 7594 0389 9 Victorian Qualifications Authority 2004 Published by the Victorian Qualifications Authority This publication is copyright. Apart from any use permitted under

More information

Safety Management System (SMS) Guidelines

Safety Management System (SMS) Guidelines Safety Management System (SMS) Guidelines Pursuant to section 9D (2) (c) of the Passenger Transport Act 1990 For Bus and Coach Operators in NSW Roads and Maritime Services Level 5, 27-31 Argyle Street

More information

Procedure: OHS CONTRACTOR MANAGEMENT

Procedure: OHS CONTRACTOR MANAGEMENT Procedure: OHS CONTRACTOR MANAGEMENT. Purpose This procedure outlines the occupational health and safety (OHS) requirements for the management of contractors engaged to perform tasks or services for Greater

More information

How To Manage Health, Safety, Security And Environment

How To Manage Health, Safety, Security And Environment Health, Safety, Security and Environmental Management System Management Standards and take c&re of yourself, others and the environment Health, Safety, Security and Environment Policy E.ON Climate & Renewables

More information

SMS0045 Construction Health and Safety Policy and Procedures

SMS0045 Construction Health and Safety Policy and Procedures SMS0045 Construction Health and Safety Policy and Procedures March 2015 Version 8 Please note that for projects utilising a CDM Co-ordinator under the transitional arrangements of CDM 2015 (between 6 April

More information

Business Continuity Management

Business Continuity Management Business Continuity Management Standard Operating Procedure Notice: This document has been made available through the Police Service of Scotland Freedom of Information Publication Scheme. It should not

More information

For the Design, Installation, Commissioning & Maintenance of Fixed Gaseous Fire Suppression Systems

For the Design, Installation, Commissioning & Maintenance of Fixed Gaseous Fire Suppression Systems BAFE Scheme: SP203-3 Version 1: July 2008 Amendment No: 1 Fire Protection Industry Scheme, Reference SP203 Part 3 For the Design, Installation, Commissioning & Maintenance of Fixed Gaseous Fire Suppression

More information

SQ 901 Version D. Railway Application Quality Specification REQUIREMENTS FOR THE QUALITY MANAGEMENT SYSTEM AND QUALITY PLAN

SQ 901 Version D. Railway Application Quality Specification REQUIREMENTS FOR THE QUALITY MANAGEMENT SYSTEM AND QUALITY PLAN SQ 901 Version D Railway Application Quality Specification OBTAINING QUALITY OF PRODUCTS PURCHASED BY SNCF REQUIREMENTS FOR THE QUALITY MANAGEMENT SYSTEM AND QUALITY PLAN Issue date March 2004 This English

More information

OH&S Management Systems Audit Checklist (NAT, E3)

OH&S Management Systems Audit Checklist (NAT, E3) 3.1.2 3.1.1 Introduction OH&S Management Systems Audit Checklist (NAT, E3) This audit checklist is based on Element 3 (Implementation) of the National Self-Insurers OHS Audit Tool. For a full copy of the

More information

Rail Asset Management. Rail

Rail Asset Management. Rail Rail Asset Management Rail Rail Asset Management Calibre Global understands the key drivers facing rail owners and operators are both financial and operational performance. The end objective for any company

More information

WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES

WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES WHS UNIT WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES Contents 1 Purpose... 1 2 Scope... 1 3 Definitions... 1 4 Responsibilities... 1 4.1 WHS Unit... 1 4.2 Auditor(s)... 1 4.3 Managers of Faculties

More information

Information Governance Strategy & Policy

Information Governance Strategy & Policy Information Governance Strategy & Policy March 2014 CONTENT Page 1 Introduction 1 2 Strategic Aims 1 3 Policy 2 4 Responsibilities 3 5 Information Governance Reporting Structure 4 6 Managing Information

More information

STRATEGIC ASSET MANAGER POSITION & PERSON DESCRIPTION February 2015

STRATEGIC ASSET MANAGER POSITION & PERSON DESCRIPTION February 2015 GENERAL Position & Person Descriptions form an important part of an integrated planning process to ensure that individual performance, and the required outputs and outcomes, align with the strategic and

More information

COMPLIANCE FRAMEWORK AND REPORTING GUIDELINES

COMPLIANCE FRAMEWORK AND REPORTING GUIDELINES COMPLIANCE FRAMEWORK AND REPORTING GUIDELINES DRAFT FOR CONSULTATION June 2015 38 Cavenagh Street DARWIN NT 0800 Postal Address GPO Box 915 DARWIN NT 0801 Email: utilities.commission@nt.gov.au Website:

More information

LIFT MANAGEMENT. Version 01 / November 2015 Page 1 of 9 Approved by Health & Safety Committee

LIFT MANAGEMENT. Version 01 / November 2015 Page 1 of 9 Approved by Health & Safety Committee LIFT MANAGEMENT Version 01 / November 2015 Page 1 of 9 Approved by Health & Safety Committee This is a controlled document. It should not be altered in any way without the express permission of the author

More information

Quality Management Subcontractor QM Guide-Section Two

Quality Management Subcontractor QM Guide-Section Two SECTION TWO QUALITY MANAGEMENT SYSTEMS Version No 1. PREFACE This document has been developed to assist subcontractors to meet Monaco Hickeys (MHPL) Quality Management (QM) requirements whilst working

More information

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable)

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable) OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable) 4.1 General Requirements 4.2 OHS policy Has the organisation an established and maintained

More information

District Council of Cleve

District Council of Cleve 1. Overview The purpose of this procedure is to provide minimum standards for how the District Council of Cleve will maintain its WHS management system documentation so that documents are drafted, maintained,

More information

WHS CONTRACTOR MANAGEMENT PROCEDURE

WHS CONTRACTOR MANAGEMENT PROCEDURE 1. Overview The Port Augusta City Council as part of its commitment under its WHS Contractor Management policy, recognises its obligation to: Ensure, so far as is reasonably practicable, the health and

More information

WHS Contractor Management Procedure

WHS Contractor Management Procedure Wudinna District Council 1. Overview Wudinna District Council as part of its commitment under its Policy recognises its obligation to: Ensure, so far as is reasonably practicable, the health and safety

More information

State Records Guideline No 25. Managing Information Risk

State Records Guideline No 25. Managing Information Risk State Records Guideline No 25 Managing Information Risk Table of Contents 1 Introduction... 4 1.1 Purpose... 4 1.2 Authority... 4 2 Risk Management and Information... 5 2.1 Overview... 5 2.2 Risk management...

More information

WA Food Regulation: Temporary and Mobile Food Businesses

WA Food Regulation: Temporary and Mobile Food Businesses WA Food Regulation: Temporary and Mobile Food Businesses This document contains information on the application of the Food Act 2008 (the Act) in relation to temporary and mobile food businesses. It is

More information

Operations. Group Standard. Business Operations process forms the core of all our business activities

Operations. Group Standard. Business Operations process forms the core of all our business activities Standard Operations Business Operations process forms the core of all our business activities SMS-GS-O1 Operations December 2014 v1.1 Serco Public Document Details Document Details erence SMS GS-O1: Operations

More information

WHS DOCUMENT MANAGEMENT PROCEDURE

WHS DOCUMENT MANAGEMENT PROCEDURE 1. OVERVIEW The purpose of this procedure is to provide minimum standards for how The Flinders Ranges Council will maintain its WHS management system documentation so that documents are drafted, maintained,

More information

CORPORATE QUALITY MANUAL

CORPORATE QUALITY MANUAL Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance

More information

AQTF Audit Handbook. This publication remains current and applicable to the VET sector.

AQTF Audit Handbook. This publication remains current and applicable to the VET sector. AQTF Audit Handbook The following publication was endorsed by the former Standing Council for Tertiary Education Skills and Employment (SCOTESE). On 13 December 2013, COAG agreed that its council system

More information

RISK MANAGEMENT FRAMEWORK

RISK MANAGEMENT FRAMEWORK RISK MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Manager Organisational Development

More information

Engineering Procedure

Engineering Procedure Engineering Procedure Design EPD 0020 INVENTORY MANAGEMENT ENGINEERING RESPONSIBILITIES Owner: Approved by: Manager, Engineering Standards and Configurations Jagath Peiris Manager Engineering Standards

More information

Environmental Policy. JRI Orthopaedics Limited

Environmental Policy. JRI Orthopaedics Limited JRI Orthopaedics Limited October 2014 Contents Clause 1. Policy Statement 1 2. Who is covered by the policy? 2 3. Organisation and Responsibilities 2 4. Training and Communication 3 5. Suppliers and Customers

More information

Managing Contractor Health and Safety Risks Guidelines for Local Government

Managing Contractor Health and Safety Risks Guidelines for Local Government Managing Contractor Health and Safety Risks Guidelines for Local Government Acknowledgements This manual has been prepared by Noel Arnold & Associates Pty Ltd, occupational health and safety consultants

More information

LIFECYCLE INTEGRITY PARTNER

LIFECYCLE INTEGRITY PARTNER sset PTIMISATION Optimising performance, maximising returns Stork Asset Management Consultancy. ASSET LIFECYCLE INTEGRITY PARTNER YOUR ASSET Our brains Asset driven companies face many challenges. In addition

More information

Sector Development Ageing, Disability and Home Care Department of Family and Community Services (02) 8270 2218

Sector Development Ageing, Disability and Home Care Department of Family and Community Services (02) 8270 2218 Copyright in the material is owned by the State of New South Wales. Apart from any use as permitted under the Copyright Act 1968 and/or as explicitly permitted below, all other rights are reserved. You

More information

Guidelines for the Application of Asset Management in Railway Infrastructure Organisations

Guidelines for the Application of Asset Management in Railway Infrastructure Organisations Guidelines for the Application of Asset Management in Railway Infrastructure Organisations INTERNATIONAL UNION OF RAILWAYS (UIC) 16 rue Jean Rey - F-75015 PARIS Tel: +33 (0)1 44 49 20 20 Fax: +33 (0)1

More information

BLOOM AND WAKE (ELECTRICAL CONTRACTORS) LIMITED QUALITY ASSURANCE MANUAL

BLOOM AND WAKE (ELECTRICAL CONTRACTORS) LIMITED QUALITY ASSURANCE MANUAL 130 Wisbech Road Outwell Wisbech Cambridgeshire PE14 8PF Tel: (01945) 772578 Fax: (01945) 773135 Copyright 2003. This Manual and the information contained herein are the property Bloom & Wake (Electrical

More information

Quick Guide: Meeting ISO 55001 Requirements for Asset Management

Quick Guide: Meeting ISO 55001 Requirements for Asset Management Supplement to the IIMM 2011 Quick Guide: Meeting ISO 55001 Requirements for Asset Management Using the International Infrastructure Management Manual (IIMM) ISO 55001: What is required IIMM: How to get

More information

How To Manage Risk In Ancient Health Trust

How To Manage Risk In Ancient Health Trust SharePoint Location Non-clinical Policies and Guidelines SharePoint Index Directory 3.0 Corporate Sub Area 3.1 Risk and Health & Safety Documents Key words (for search purposes) Risk, Risk Management,

More information

University of New England Compliance Management Framework and Procedures

University of New England Compliance Management Framework and Procedures University of New England Compliance Management Framework and Procedures Document data: Document type: Administering entity: Framework and Procedures Audit and Risk Directorate Records management system

More information

How To Monitor Safety Management System Performance

How To Monitor Safety Management System Performance Guidance Note Performance standards and indicators Advice for operators of major hazard facilities on developing meaningful and useful performance standards and indicators for the Safety Management System

More information

Procedure. Work Health and Safety Contractor Management. Document number: PRO-00808. Rev no. Description Process Owner Approved for issue

Procedure. Work Health and Safety Contractor Management. Document number: PRO-00808. Rev no. Description Process Owner Approved for issue Procedure Work Health and Safety Contractor Management Document number: PRO-00808 This document is the property of Seqwater. It must not be copied or reproduced in any way whatsoever without the authority

More information

Health and safety in construction procurement

Health and safety in construction procurement A handbook for the public sector Health and safety in construction procurement Edition No. 1 October 2010 Contents Introduction 2 Phase 1: Planning 5 Phase 2: Design 7 Phase 3: Tender 9 Phase 4: Contract

More information

Environmental Management System Tool

Environmental Management System Tool Environmental Management System Tool How to use this Tool The Department of the Environment, Water, Heritage and the Arts (DEWHA) has developed the EMS Tool to assist office based organisation who are

More information

Information security controls. Briefing for clients on Experian information security controls

Information security controls. Briefing for clients on Experian information security controls Information security controls Briefing for clients on Experian information security controls Introduction Security sits at the core of Experian s operations. The vast majority of modern organisations face

More information

COMPANY NAME. Environmental Management System Manual

COMPANY NAME. Environmental Management System Manual Revision No. : 1 Date : DD MM YYYY Prepared by : Approved by : (EMR) (Top Management) Revision History Revision Date Description Sections Affected Revised By Approved By Table of Content 0.0 Terms and

More information

Records Management Checklist. preservation. accountability. information. security. peoplep. A tool to improve records management

Records Management Checklist. preservation. accountability. information. security. peoplep. A tool to improve records management Records Management Checklist preservation accountability information security busine ess peoplep A tool to improve records management preservation people security business Foreword accountability information

More information

Standards for Registered Training Organisations (RTOs) 2015

Standards for Registered Training Organisations (RTOs) 2015 Standards for Registered Training Organisations (RTOs) 2015 I, Ian Elgin Macfarlane, Minister for Industry, make this legislative instrument under subsection 185(1) and subsection 186(1) of the National

More information

Crime Statistics Data Security Standards. Office of the Commissioner for Privacy and Data Protection

Crime Statistics Data Security Standards. Office of the Commissioner for Privacy and Data Protection Crime Statistics Data Security Standards Office of the Commissioner for Privacy and Data Protection 2015 Document details Security Classification Dissemination Limiting Marker Dissemination Instructions

More information

Recognition of Prior Learning and Credit Transfer Policy & Procedure RTO No 22234

Recognition of Prior Learning and Credit Transfer Policy & Procedure RTO No 22234 Recognition of Prior Learning and Credit Transfer Policy & Procedure RTO No 22234 Policy 1.1 Ashton College employs a fair and equitable policy for Recognition of Prior Learning and Credit Transfer. 1.2

More information

CCD MARINE LTD QUALITY MANUAL PROCEDURE Q0.000. Date: Title. Revision: QUALITY MANUAL PROCEDURE Q0.000. 29 September 2014

CCD MARINE LTD QUALITY MANUAL PROCEDURE Q0.000. Date: Title. Revision: QUALITY MANUAL PROCEDURE Q0.000. 29 September 2014 Title: Quality Manual Uncontrolled if Hardcopy CCD MARINE LTD th Date: 29 September 2014 Doc Ref: Q0.000 Issued By: Sarah Leighton Rev No: 2 Title Revision: Date: QUALITY MANUAL PROCEDURE Q0.000 2 29 September

More information

Business Continuity Policy and Business Continuity Management System

Business Continuity Policy and Business Continuity Management System Business Continuity Policy and Business Continuity Management System Summary: This policy sets out the structure for ensuring that the PCT has effective Business Continuity Plans in place in order to maintain

More information

Health, Safety and Environment Management System

Health, Safety and Environment Management System Health, Safety and Environment Management System For Bridgeport Energy Ltd Level 7, 111 Pacific Highway North Sydney 2011 June, 2010 DOCUMENT CONTROL Title: Document Number: Health, Safety and Environmental

More information

COMPLIANT CONTRACTOR GUIDELINES

COMPLIANT CONTRACTOR GUIDELINES COMPLIANT CONTRACTOR GUIDELINES DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Guidelines Approved Director Corporate Services

More information

JSP 886 THE DEFENCE LOGISTIC SUPPORT CHAIN MANUAL VOLUME 7 INTEGRATED LOGISTICS SUPPORT PART 8.11 QUALITY MANAGEMENT

JSP 886 THE DEFENCE LOGISTIC SUPPORT CHAIN MANUAL VOLUME 7 INTEGRATED LOGISTICS SUPPORT PART 8.11 QUALITY MANAGEMENT JSP 886 THE DEFENCE LOGISTIC SUPPORT CHAIN MANUAL VOLUME 7 INTEGRATED LOGISTICS SUPPORT PART 8.11 QUALITY MANAGEMENT THE MASTER VERSION OF JSP 886 IS PUBLISHED ON THE DEFENCE INTRANET. FOR TECHNICAL REASONS,

More information

SYDNEY TRAMWAY MUSEUM CHANGE MANAGEMENT PROCEDURE

SYDNEY TRAMWAY MUSEUM CHANGE MANAGEMENT PROCEDURE CHANGE MANAGEMENT PROCEDURE JUNE 2011February 2015 1. Document Details: Name: SYDNEY TRAMWAY MUSEUM Document Control Record Number STM6012 Version Number: 2.43 Change Management Procedure Document Status:

More information

Quality Management System Manual

Quality Management System Manual Effective Date: 03/08/2011 Page: 1 of 17 Quality Management System Manual Thomas C. West Eric Weagle Stephen Oliver President ISO Management General Manager Representative Effective Date: 03/08/2011 Page:

More information