Business Continuity Management. Dan Warnock, CSP, CFPS, ALCM Risk Control Manager Senn Dunn Insurance
|
|
|
- Arlene Brown
- 10 years ago
- Views:
Transcription
1 Business Continuity Management Dan Warnock, CSP, CFPS, ALCM Risk Control Manager Senn Dunn Insurance
2 Why Business Continuity Management Now? Hurricane Season June 1st November 30th Hurricanes Potential for physical damage and significant business interruption. Each Season UNPREDICTABLE Typical Season 12 Trop Storms / 6 Hurricanes (3 Major) Trop Storms / 6 Hurricanes (2 major) Trop Storms / 2 Hurricanes (0 major) Trop Storms / 10 Hurricanes (3 major) Trop Storms / 7 Hurricanes (4 major) DEVASTATING IMPACT High Winds & Rain / Storm Surge / Inland Flooding
3 Why Business Continuity Management Now? 2015 Texas Flooding The Storms that hit the area: o More than 7 inches fell overnight o Wettest month ever recorded at inches. o So big It ended states drought Human Factor At least 28 people have been killed nationwide 24 died in Texas. At least 11 are missing
4 Overview Introduction What is Business Continuity Management (BCM) Management Support Establishing Policy and Organizational Structure Program Management 1: Understanding Your Business 2: Developing a BCM Response 3: Testing and Maintenance
5 What is Business Continuity Management (BCM) Primary Objectives: 1. Protection of people, property, and 2. Preparing an organization to resume operations as soon as possible. Definition: Ensuring the continuity or uninterrupted provision of operations and services. It is an ongoing process with different, but complementary elements: Crisis management / Business recovery, Testing & maintenance / Auditing the plan.
6 What is Business Continuity Management (BCM) Making the Case for BCM: BCM often given a low priority, or not at all. Why? Effective planning requires time and money Commitment to maintain a plan once developed Development can be enormously challenging
7 Preparing Makes Sense During an emergency, help may not be available immediately Community preparedness starts with the individual Preparing reduces anxiety
8 What is Business Continuity Management (BCM) Making the Case for BCM: 79% of companies do not have integrated Business Continuity Plans 65% of companies that do have plans, have never tested it 43% without a plan in place did not reopen 70% of businesses that closed for a month or more failed to reopen or failed altogether within 3 years
9 Could This Be You? In 1993, flooding in the state of Missouri affected 265 businesses. Of those affected, only 65 remain open one year after the floods. Damage $4.5 billion
10 What is Business Continuity Management (BCM) Making the Case for BCM: Consider other possible impacts other than natural disasters:
11 What is Business Continuity Management (BCM) Making the Case for BCM: Consider other possible impacts other than natural disasters: Hazardous spill in your neighborhood forces you to shut down your operations Critical supplier/vendor experience a strike Disgruntled employee or customer Highly visible product recall Pandemic
12 Business Continuity Management Examples Suppliers California Dock Workers Strike Supplies and imported materials not able to be received. Agriculture Suppliers What if they were your main supplier for your business? (E Coli, Salmonella outbreaks) Workplace Shooting at Beverage Distributor what if they were your main supplier and you have a wedding that following weekend?
13 Business Continuity Management Examples Natural Events Drought / Flood What if your main raw material is water or affected by water. Hurricane / Tornado / Earthquake How many locations do you have? Where are they located? Wild Fires / Ice Storms Earthquakes Business Functions Computer Records Lost, Back up did not work properly.
14 What is Business Continuity Management (BCM) What causes businesses to fail? 68% Human error 25% Technology failure 5% Natural disaster 2% Intentional causes Many companies fall into a trap of planning only for failures on a grand scale when it is the smaller interruptions that cause most problems.
15 What is Business Continuity Management (BCM) How will BCM help my organization? Help Prioritize potential hazards. Important process / bottle necks / equip. Potential Natural Disasters Help Protect against uninsured losses : Market share / Customers Business relationships Employees (injury, disability, death, quitting) Communications
16 Management Support Strong support from your organization s upper management is essential for an effective BCM Plan BCM must become part of your corporate culture. Your management must perceive BCM as an essential and integral part of your company s strategy and operations
17 Management Support Potential challenges: Insufficient resources Inadequate coordination and followthrough between departments Inadequate coordination between prevention plans and response plans.
18 Management Support Beyond approval, upper Management must: Allocate resources financial and human Appoint and support qualified individuals Provide oversight to align the Plan with other programs, policies and plans Mission statements Operating plans Strategic plans HE&S program
19 Establishing Policy and Organizational Structure The first steps in developing a Plan: Creating a written policy statement Establishing the organization of the BCM planning process Begin the documentation process to create the formal Plan
20 Establishing Policy / Organizational Structure Written Policy Statement Creating a written policy statement clearly reflects the organization s commitment to BCM. The statement should: Define the purpose and objective of the policy Define the lines of authority Be fully endorsed by top management
21 Establishing Policy / Organizational Structure Organizational Structure: Roles and Responsibilities Clearly define the roles and responsibilities Leader positions should be appointed Fully trained alternates are essential and should participate in all exercises, drills and activities
22 Establishing Policy and Organizational Structure Documentation Gather all policies, procedures, resource lists, etc. into one well-organized document. Keep current copies of the Plan in designated locations at the facility and at a secure off-site location. Provide copies to local authorities Establish a schedule for review and maintenance of each element of the Plan.
23 Making the Case for BCM Activity #1 Develop the case and need of a business continuity program for management. What is your main selling point? Owner / Partner / Management
24 1: Understanding your Business How quickly your company can get back to business after a crisis often depends on the planning done today. You must first understand your business and the critical processes to ensure continuity of a business activity.
25 1: Understanding your Business Assess your company: Internally Functions Externally Functions Determine what is absolutely critical People Materials Equipment Procedures Environment
26 1: Understanding your Business The tools for understanding your business: Business Impact Analysis (BIA) Helps understand financial and operational exposures in the event of an interruption Risk Assessment (RA) The purpose of the RA is to identify the inherent risks of performing various business functions
27 Business Impact Analysis (BIA) The BIA identifies: Processes that are critical to the survival of the business The time in which these processes must be returned to order to avoid significant impact. {Recovery Time Objective (RTO)}
28 Business Impact Analysis (BIA) The BIA process is Business Driven and designed to identify business Requirements. Not ITdriven. Step 1 - Identify appropriate Business functions and processes to analyze Step 2 - Identify appropriate participants for the analysis process Step 3 - Conduct and validate the BIA information; obtain sign-off
29 Business Impact Analysis (BIA) Step 1 - Identify Business Functions Identify business functions in a way that makes sense to you. You could start with an organizational chart and work down to the department level Only break up a department into multiple functions if the breath of activities warrant multiple BIAs
30 Business Impact Analysis (BIA) Step 2 - Identify Participants They should: Be Responsible for that function Extremely familiar with the processes Understand how their processes affect their interact with other business functions Authority to identify RTOs for the business processes IT participants should have a high-level understanding of the business applications and their interactions Consult upper management for advise across business functions
31 Business Impact Analysis (BIA) Step 3 Conduct/collect BIA data Validate BIA data Obtain Sign-off. The finalized BIA should be presented to the appropriate senior level manager for discussion and sign-off
32 Business Impact Analysis (BIA) The BIA should include Vendor Assessment Needs: Analyze your BCM throughout the business process supply chain. Business areas should conduct analysis of their vendor dependencies as they apply to critical business processes.
33 Business Impact Analysis (BIA) BIA Review Minimum annually, but more frequently in the event of: An aggressive pace of business change Significant changes in - Internal business processes, location or technology - External business environment such as market or regulatory change
34 Business Impact Analysis (BIA) A BIA should consider 4 individual scenarios: Scenario #1 Total Destruction A major disruption has occurred all business functions at your location have been disrupted for up to 30 days Personnel cannot physically access their primary location for only damage assessment Network connection to shared drives at your primary location are not longer available
35 Business Impact Analysis (BIA) Scenario #2 Technology Failure Your data center(s) supporting business functions at your location have also been disrupted and are unavailable for up to 30 days
36 Business Impact Analysis (BIA) Scenario #3 Equipment / Operational Failure Partial loss of equipment / operations, but still have use and control of your facility. Use of overtime, outside services. Employee food, travel and lodging expenses, etc. are authorized to assist in re-establishing business operations
37 Business Impact Analysis (BIA) Scenario #4 Seasonal Failure Assume that this event happens at the worst possible time of the year, quarter, month, etc.
38 Risk Assessment (RA) Risk Assessment is the definition of a critical outage based on the service you provide. A large financial company can experience major losses within minutes of an interruption An insurance company may withstand an interruption of 12 hours or more before being seriously impacted A manufacturing company could possibly be interrupted for as long as 24 hours without severe effects.
39 Risk Assessment (RA) The two primary questions to consider when assessing the risk in a business function are: 1. What is the probability that things can go wrong? (the probability of one event) 2. What is the cost if what can go wrong does go wrong? (exposure of one event)
40 Risk Assessment (RA) Risk is assessed by answering these questions for various risk factors (BIA) and assessing the exposure of failure and the impact of exposure for each risk factor. Risk is the probability times the exposure Probability x Exposure = Risk
41 Risk Assessment (RA) Considerations to critical business functions; but not limited to: Personnel Equipment Automation Software/ hardware /data Raw and finished stock Cash Vital records Facilities Transportation Customers Vendors Contractors Interdependent Companies Manufacturers Distributors
42 Risk Assessment (RA) RA Review Same as the BIA, Minimum annually, but more frequently in the event of: An aggressive pace of business change Significant change in - Internal business processes, location or technology - External business environment such as market or regulatory change
43 Understanding Your Business Activity #2: Identify the persons or job functions within your organization that you will need to contact in order to complete a Business Impact Analysis and a Risk Assessment.
44 2: Developing a BCM Response The goal of the topics covered in this section is to develop a BCM Response through two main topics: 1. Crisis Management the actions that are necessary during a crisis 2. Business Recovery the resources which are needed to enable the organization to manage an interruption whatever the cause
45 Crisis Management Phase A crisis is any activity that focuses immediate public attention on an organization or has the immediate capability of doing so. Examples include: Action by a consumer activist or terrorist group Employee accident, disaster, and/or workplace violence Legal action (e.g. discrimination, harassment, fraud, workplace violence) Natural Disasters
46 Crisis Management Phase The Crisis Plan should be initiated in any crisis situation that runs the risk of: Jeopardizing an organization s positive image Generating news media coverage Interfering with normal business operations
47 Crisis Management Phase Identify specific crisis management teams or emergency response team within your organization. Choose names that fit into their structure Ensure the roles described in this plan are covered Communicate the chosen names with the proper roles consistently
48 Crisis Management Phase Crisis Management Plan Elements: Evacuation Plan Medical Care Crisis Team Responsibility Employee Training
49 Crisis Management Phase Building Evacuations Depending on the type of emergency, staff could be required to: Evacuate a specific floor Evacuate the entire building Remain in place
50 Crisis Management Phase Medical Emergency Assigned - First responders / Area sweepers Medical equipment AEDs Special PPE required to be worn
51 Crisis Management Phase Accounting for Visitors Includes: employees acquaintances, customers, agents, vendors A method for informing and accounting for visitors should be established at your facility. At a minimum, visitors should be made aware of the evacuation procedures and the designated assembly locations. A visitor handout detailing these procedures could be distributed during the sign-in process.
52 Crisis Management Phase Crisis Management Team Responsibility The team will implement emergency response protocols. The first priority is to ensure: A safe, orderly emergency response Proper use of resources Reduce confusion Improve safety Organize and coordinate actions
53 Crisis Management Phase Crisis Management Team Roles and Responsibilities. Leader Emergency Manager Team Emergency Roles -Floor Coordinators -Sweepers -Medical Response Team Non- Emergency Roles -OSHA Compliance -Fire Prevention -Auto Fleet Program
54 Crisis Management Phase SAMPLE - Crisis Management Team LEADER EMERGENCY MANAGER Floor Coordinator 1 for each floor or 1:4 Sweepers Sweeper 1 for every 10 employees Evacuation Assistant 2 for each individual in need of assistance Stairwell/Exit Monitor 2 for each stairwell or exit Assembly Coordinator 2 for each primary assembly location
55 Crisis Management Phase Employee Training: All employees will need to be trained in their roles and responsibilities during emergencies. Each employee should have basic knowledge of: The evacuation procedure Alarm notification system Reporting procedures for emergencies Potential emergencies or hazards
56 Crisis Management Phase Individuals in Need of Assistance: Special needs may exist for some: Mobility / Visual / Hearing impairment / etc - Permanent (arthritis, emphysema) - Temporary (sprained ankle, pregnancy) condition. The controlling standard is: - The individual can move at a reasonable pace during an emergency, or - The condition exists that impedes the ability to be aware of an alarm
57 Crisis Management Phase The Human Element - Addresses the human side of a disaster. Typical Reactions: Goal - Shock / Stress - Reduced efficiency - High turnover Restores positive, proactive work Environment.
58 Crisis Management Phase The Human Element Recognizing Common Reactions Physical Fatigue / difficulty sleeping / low energy levels / illness / pain Emotional Fear / Grief / anxiety / helplessness Behavioral Changes Irrational behavior / Substance use / Withdrawn / Combative / Difficulty Concentrating / Confusion
59 Crisis Management Phase The Human Element How To Deal With Reactions Communication Share Information on Status / Future Plans Allow Employees to Express Feelings Offer Reinforcement / Encouragement to Employees
60 Crisis Management Phase The Human Element How To Deal With Reactions Communication Explain Resources Available to Employees Employee Assistance Program Community Resources Wellness Programs Crisis Counseling Scheduling Leaves of Absence Flex Time Reassignment of Duties
61 Business Recovery Phase What is Business Recovery? Part 2 of a BCM process. It follows the Crisis Management Phase. Deals with restoring processes and operations necessary to continue business interactions Focuses on two (2) major items, Infrastructure - Information Technology - Physical Plant Business Processes.
62 Business Recovery Phase Business Process Classifications All operations should be grouped into pre-determined categories with assigned sensitivity level indicators for recovery operations. For example: Category A Operations must be resumed immediately following an interruption Category B Must be recovered after Category A Category C Recovery may be deferred pending time and resource availability 68
63 Business Recovery Phase Damage Assessment Roles/Responsibilities Once local emergency services provide clearance for reentry into the facility, the team assigned to damage Assessment should do an inspection. Damage Assessment should provide information on the: - Structure - Contents - Environment.
64 Business Recovery Phase Developing Technology Recovery Team: The purpose is to establish a centralized point of technology control, support and coordination at the Emergency Operations Center (EOC), if applicable.
65 Business Recovery Phase Developing Technology Recovery Team: Plan maintenance tasks for the technology recovery team may include: Maintain: a list of all vendors and service providers a current list of service specialists and their areas of expertise. team member names and contact information a current list of all technology resources and requirements at the EOC.
66 Business Recovery Phase Business Recovery Communication Plan: A key to your operations success is your relationship with customers and business partners. In the event of a crisis, it s critical to keep these entities informed so that they understand: How you will continue the business relationship If any, impacts the situation will have on them
67 Business Recovery Phase Alternate Business Processes: Planning for an event that eliminates some central source of technology (a Data Center, outside vendor service, etc.) May not have direct impact on the physical location, staff or local services, but requires that the business processes have been prepared to implement manual work-around to replace the loss of these centralized services.
68 3: Testing and Maintenance Testing the BCM Plan: A successful BCM must have a testing program which begins simply and escalates progressively. This consists of rehearsing team members, staff and exercising procedures.
69 3: Testing and Maintenance Testing the BCM Plan: The purpose of testing is to: Evaluate overall effectiveness Identify strengths and weaknesses Develop understanding and cohesiveness with team members Determine the efficiencies of recovery procedures
70 3: Testing and Maintenance Testing the BCM Plan: Training General Training should take into consideration: Individual roles and responsibilities Information about threats, hazards, and protective actions Notification, warning, other communications Crisis management procedures Evacuation, shelter, and accountability procedures Location and use of emergency equipment - (AEDs, radios, fire extinguishers, etc.) Emergency shutdown procedures
71 3: Testing and Maintenance Testing the BCM Plan: Schedule The Plan is first completed The Plan is revised Minimum Annually Drills or exercises have not had satisfactory results There is a new employee or when employees change jobs There are new HE&S Leaders, team members or alternates Equipment and processes have been updated or altered
72 3: Testing and Maintenance Testing the BCM Plan: Drills & Exercise: Know what you want to test, who, when, why, Who will observe, record, evaluate Supplies, etc., needed for tests Relay relevant information to employees, community agencies, media Evaluate performance; correct weaknesses - Identify action items; make plans to correct them; establish target dates for completion Include employees on all shifts, including nights and weekends; don t forget telecommuters or other mobile workers
73 3: Testing and Maintenance Testing the BCM Plan: Drills should: Help evaluate the adequacy of the Plan Identify weak spots and reveal missing resources Give employees a chance to practice and improve their skills Give community responders a chance to become familiar with the Plan, the facility, and the HE&S Team members
74 3: Testing and Maintenance Testing the BCM Plan: Training Methods and Techniques: Orientation and Education Sessions Tabletop Exercises Walk-through Drills Functional Drills Evacuation Drills Full-Scale Exercises
75 3: Testing and Maintenance Testing the BCM Plan: Keep records of training activities: What training was given To whom the training was given Who did the training What exercises or tests took place Results of the exercises Changes made to the Plan as a result of the outcome of the training
76 3: Testing and Maintenance Maintenance of the BCM Plan: The Plan must remain a living document, so that it is always current and ready to be activated should the need arise.
77 3: Testing and Maintenance Maintenance of the BCM Plan: Review, audit, evaluate, revise and test your plan on a regular basis to be sure it keeps pace with changes at your facility. Conduct a formal audit of the entire Plan at least once a year.
78 3: Testing and Maintenance Maintenance of the BCM Plan: The Leading responsible party Should: Identify areas to update Determine completeness Assess chain of command Evaluate employee knowledge and awareness Assess trigger mechanisms Evaluate inventory resources
79 3: Testing and Maintenance Maintenance of the BCM Plan: Update the Plan whenever there are: New Team members or alternates New operations, processes, equipment, or materials New or renovated sites or changes in layouts Changes with outside agencies New suppliers or vendors Mergers or acquisitions
80 Summary What is Business Continuity Management (BCM) Management Support Establishing Policy and Organizational Structure Program Management Understanding Your Business Developing a BCM Response Testing and Maintenance
81 NEXT STEPS Business Continuity Action Plan Develop Purpose Priorities Contacts
82 NEXT STEPS Business Continuity Action - Handout: FEMAs 4 Step Business Continuity Guide Guide to Developing a Plan Addressing Hazard Emergency Management Considerations Business Recovery Checklist Implementation Guide Sample Business Continuity Plan Annual Review
83 Resource Links Link to Loss Control Literature from your Insurance Carrier Ready.Gov - NC Emergency Management Division OSHA Emergency Preparedness
Business Continuity Plan
Business Continuity Plan October 2007 Agenda Business continuity plan definition Evolution of the business continuity plan Business continuity plan life cycle FFIEC & Business continuity plan Questions
Prepared by Rod Davis, ABCP, MCSA November, 2011
Prepared by Rod Davis, ABCP, MCSA November, 2011 Disaster an event, which causes the loss of an essential service, or part of it, for a length of time which imperils mission achievement. (Andrew Hiles,
Business Continuity Planning and Disaster Recovery Planning
4 Business Continuity Planning and Disaster Recovery Planning Basic Concepts 1. Business Continuity Management: Business Continuity means maintaining the uninterrupted availability of all key business
Ohio Supercomputer Center
Ohio Supercomputer Center IT Business Continuity Planning No: Effective: OSC-13 06/02/2009 Issued By: Kevin Wohlever Director of Supercomputer Operations Published By: Ohio Supercomputer Center Original
NCUA LETTER TO CREDIT UNIONS
NCUA LETTER TO CREDIT UNIONS NATIONAL CREDIT UNION ADMINISTRATION 1775 Duke Street, Alexandria, VA 22314 DATE: December 2001 LETTER NO.: 01-CU-21 TO: SUBJ: ENCL: All Federally Insured Credit Unions Disaster
BUSINESS CONTINUITY PLAN OVERVIEW
BUSINESS CONTINUITY PLAN OVERVIEW INTRODUCTION The purpose of this document is to provide Loomis customers with an overview of the company s Business Continuity Plan (BCP). Because of the specific and
STEP-BY-STEP BUSINESS CONTINUITY AND EMERGENCY PLANNING MAY 27 2015
STEP-BY-STEP BUSINESS CONTINUITY AND EMERGENCY PLANNING MAY 27 2015 AGENDA: Emergency Management Business Continuity Planning Q & A MONTH DAY, YEAR TITLE OF THE PRESENTATION 2 CANADIAN RED CROSS Disaster
EMERGENCY PREPAREDNESS PLAN Business Continuity Plan
EMERGENCY PREPAREDNESS PLAN Business Continuity Plan GIS Bankers Insurance Group Powered by DISASTER PREPAREDNESS Implementation Small Business Guide to Business Continuity Planning Surviving a Catastrophic
Business Continuity and Disaster Recovery Planning
Business Continuity and Disaster Recovery Planning Jennifer Brandt, CISA A p r i l 16, 2015 HISTORY OF STINNETT & ASSOCIATES Stinnett & Associates (Stinnett) is a professional advisory firm offering services
This presentation will introduce you to the concepts and terminology related to disaster recovery planning for businesses.
1. An Introduction This presentation will introduce you to the concepts and terminology related to disaster recovery planning for businesses. This presentation was prepared by the South Central Economic
Business Continuity Planning 101. +1 610 768-4120 (800) 634-2016 www.strohlsystems.com [email protected]
Business Continuity Planning 101 Presentation Overview What is business continuity planning Plan Development Plan Testing Plan Maintenance Future advancements in BCP Question & Answer What is a Disaster?
www.pwc.com Business Resiliency Business Continuity Management - January 14, 2014
www.pwc.com Business Resiliency Business Continuity Management - January 14, 2014 Agenda Key Definitions Risks Business Continuity Management Program BCM Capability Assessment Process BCM Value Proposition
Learning about an Emergency Management Plan GET READY NOW!
GET READY NOW! This supplemental document was designed to be used in conjunction with the Guide to an Emergency Management Plan (October 2014). It is meant to further support the emergency planning process
Business Continuity Planning for Risk Reduction
Business Continuity Planning for Risk Reduction Ion PLUMB [email protected] Andreea ZAMFIR [email protected] Delia TUDOR [email protected] Faculty of Management Academy of Economic Studies
Continuity of Operations Planning. A step by step guide for business
What is a COOP? Continuity of Operations Planning A step by step guide for business A Continuity Of Operations Plan (COOP) is a MANAGEMENT APPROVED set of agreed-to preparations and sufficient procedures
Why Should Companies Take a Closer Look at Business Continuity Planning?
whitepaper Why Should Companies Take a Closer Look at Business Continuity Planning? How Datalink s business continuity and disaster recovery solutions can help organizations lessen the impact of disasters
Temple university. Auditing a business continuity management BCM. November, 2015
Temple university Auditing a business continuity management BCM November, 2015 Auditing BCM Agenda 1. Introduction 2. Definitions 3. Standards 4. BCM key elements IT Governance class - IT audit program
BUSINESS CONTINUITY PLANNING GUIDELINES
BUSINESS CONTINUITY PLANNING GUIDELINES Washington University in St. Louis The purpose of this guide is to serve as a tool to all departments, divisions, and labs across the University in building a Business
85-01-55 Overview of Business Continuity Planning Sally Meglathery Payoff
85-01-55 Overview of Business Continuity Planning Sally Meglathery Payoff Because a business continuity plan affects all functional units within the organization, each functional unit must participate
PAPER-6 PART-1 OF 5 CA A.RAFEQ, FCA
1 Chapter-4: Business Continuity Planning and Disaster Recovery Planning PAPER-6 PART-1 OF 5 CA A.RAFEQ, FCA Learning Objectives 2 To understand the concept of Business Continuity Management To understand
Child Care Emergency Preparedness Training. Participant Manual
Child Care Emergency Preparedness Training Participant Manual Contents Introduction.... 5 Description.... 6 Goal.... 6 Objectives.... 6 Audience... 7 Prerequisite.... 7 Accompanying Materials...........................................................
RLI PROFESSIONAL SERVICES GROUP PROFESSIONAL LEARNING EVENT PSGLE 125. When Disaster Strikes Are You Prepared?
RLI PROFESSIONAL SERVICES GROUP PROFESSIONAL LEARNING EVENT PSGLE 125 When Disaster Strikes Are You Prepared? Copyright Materials This presentation is protected by US and International Copyright laws.
Emergency Preparedness: Learning Objectives. Minimizing and Controlling Future Disasters. SHRM Disaster Preparedness Survey 3.
Emergency Preparedness: 1 Minimizing and Controlling Future Disasters October 7-8, 2013 Presenter: Marna Hayden, SPHR Hayden Resources Inc. www.haydenhr.com Learning Objectives How to develop emergency
Building Economic Resilience to Disasters: Developing a Business Continuity Plan
Building Economic Resilience to Disasters: Developing a Business Continuity Plan Buffalo Niagara Region February 26, 2014 Gail Moraton, CBCP Business Resiliency Manager Business Resiliency one important
HURRICANE DISASTER PREPARATION CHECKLIST AND BUSINESS CONTINUITY PLAN
HURRICANE DISASTER PREPARATION CHECKLIST AND BUSINESS CONTINUITY PLAN G. Thomas Harper, Esq., Editor Florida Employment Law Letter HARPER GERLACH, PL 4110 Southpoint Boulevard Suite 228 Jacksonville, Florida
Business Continuity and Emergency Preparedness Planning. Vandita Zachariah, MA, MBA, CIA HHSC Internal Audit Division May 21, 2010
Business Continuity and Emergency Preparedness Planning Vandita Zachariah, MA, MBA, CIA HHSC Internal Audit Division May 21, 2010 Overview Define key terms and list essential elements of business continuity
Disaster Preparedness & Response
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 A B C E INTRODUCTION AND PURPOSE REVIEW ELEMENTS ABBREVIATIONS NCUA REFERENCES EXTERNAL REFERENCES Planning - Ensuring
EMERGENCY ACTION PLAN Emergency Plan For:
California Institute of Technology EMERGENCY ACTION PLAN Emergency Plan For: DEPARTMENT/DIVISION BUILDING (S) FLOOR/ROOM Work Site Emergency Coordinator Name Email Evacuation Assembly Areas Building Assembly
How To Handle An Emergency
Company Name Address Telephone Contact Name Title Last Revision Date Policy and Organizational Statements Identify the goals and objectives for the emergency response plan. Define what your emergency response
Fundamentals of Business Continuity Planning Have a Plan!
Fundamentals of Business Continuity Planning Have a Plan! Michael Kadar, MBCP, CISSP 2008 MK Continuity & Availability LLC [email protected] InfraGard Meeting Walsh College, Novi March 25, 2008
2014 NABRICO Conference
Business Continuity Planning 2014 NABRICO Conference September 19, 2014 6 CityPlace Drive, Suite 900 St. Louis, Missouri 63141 314.983.1200 1520 S. Fifth Street, Suite 309 St. Charles, Missouri 63303 636.255.3000
Disaster Ready. By: Katie Tucker, Sales Representative, Rolyn Companies, Inc
By: Katie Tucker, Sales Representative, Rolyn Companies, Inc Are you and your facility disaster ready? As reported by the Red Cross, as many as 40 percent of small businesses do not reopen after a major
Business Continuity Planning for Schools, Departments & Support Units
Business Continuity Planning for Schools, Departments & Support Units 1 What is Business Continuity Planning? Examples Planning for an adverse, major or catastrophic event that would cause a disruption
Building and Maintaining a Business Continuity Program
Building and Maintaining a Business Continuity Program Successful strategies for financial institutions for effective preparation and recovery Table of Contents Introduction...3 This white paper was written
The handouts and presentations attached are copyright and trademark protected and provided for individual use only.
The handouts and presentations attached are copyright and trademark protected and provided for individual use only. READINESS RESOURCES American Bar Association -- www.abanet.org Disaster Recovery: www.abanet.org/lpm/lpt/articles/slc02051.html
CRISIS MANAGEMENT PLAN
CRISIS MANAGEMENT PLAN Table of Contents Introduction... 3 Purpose... 3 Objectives... 3 Types & Levels of a Crisis... 4 Plan Activation... 6 Crisis Management Team (CMT) Structure... 6 CMT Responsibilities...
Enterprise Resiliency & Response Program Customer Overview May 2014
Customer Overview May 2014 Table of Contents Section I Enterprise Resiliency & Response Overview... 1 Background... 1 Mission Statement... 1 Policy... 1 Objective... 2 Program Strategy... 2 The Layered
With the large number of. How to Avoid Disaster: RIM s Crucial Role in Business Continuity Planning. Virginia A. Jones, CRM, FAI RIM FUNDAMENTALS
How to Avoid Disaster: RIM s Crucial Role in Business Continuity Planning The world has experienced a great deal of natural and man-made upheaval and destruction in the past few years, including tornadoes,
Keys to Narrowing Business Continuity Planning Gaps: Training, Testing & Audits
Keys to Narrowing Business Continuity Planning Gaps: Training, Testing & Audits Betty A. Kildow, CBCP, FBCI, Emergency Management Consultant Kildow Consulting 765/483-9365; [email protected] 95 th
Business Continuity Template
Emergency Management Business Continuity Template The Regional Municipality of Wood Buffalo would like to give credit to the Calgary Emergency Management Agency (CEMA) and the Calgary Chamber of Commerce
Emergency Management Audit For Businesses
Emergency Management Audit For Businesses Sponsor Acknowledgement: This manual is sponsored by NZ Safety Limited and produced for the Ministry of Civil Defence Public Education Advisory Committee by Auckland
Page Administrative Summary...3 Introduction Comprehensive Approach Conclusion
TABLE OF CONTENTS Page Administrative Summary...3 Introduction Comprehensive Approach Conclusion PART 1: PLANNING General Considerations and Planning Guidelines... 4 Policy Group Oversight Committee Extended
Emergency Preparedness Tips and Actions for the Workplace
Emergency Preparedness Tips and Actions for the Workplace Is Your Business Disaster Ready? Disaster and emergencies can happen anytime and anywhere in Minnesota. 52 Presidential Disaster Declarations between
UNITED CHURCH OF CHRIST LOCAL CHURCH DISASTER PREPAREDNESS AND RESPONSE PLANNING GUIDELINES
UNITED CHURCH OF CHRIST LOCAL CHURCH DISASTER PREPAREDNESS AND RESPONSE PLANNING GUIDELINES The United Church of Christ local churches may use this plan as a guide when preparing their own disaster plans
Business Continuity and Crisis Management
Business Continuity and Crisis Management Crisis Management, Business Continuity and The Incident Command System Understanding Differences and Putting it all together? by Max Ckonjevic FBCI, CBCP 1 Objectives
Creating a Business Continuity Plan
Family Office Information Creating a Business Continuity Plan Hurricanes, fires, terrorist attacks, earthquakes and tsunamis aren t the only kinds of events that can cripple a family office. More common
Template for BUSINESS CONTINGENCY PLAN
Template for BUSINESS CONTINGENCY PLAN EFFECTIVE DATE: [effective_date] DISCLAIMER The materials presented herein are for general reference only. Federal, state or local laws or individual circumstances
Why COOP? 6 Goals of COOP. 6 Goals of COOP. General Guidelines for COOP Capability. COOP Program Model 7 Phases. Phase 1: Initiate COOP program
Overview What is continuity of operations (COOP) planning? Business continuity planning the all hazard approach 466 Brian Butler Columbus Public Health, Office of Emergency Preparedness 6 goals of COOP
Disaster Recovery Plan Checklist
Disaster Recovery Plan Checklist Your guide for setting up or updating a Disaster Recovery Plan for your business. ArcSource Disaster Recovery Plan Checklist 1. Compile Your Internal Contacts Information
Unit Guide to Business Continuity/Resumption Planning
Unit Guide to Business Continuity/Resumption Planning (February 2009) Revised June 2011 Executive Summary... 3 Purpose and Scope for a Unit Business Continuity Plan(BCP)... 3 Resumption Planning... 4 Assumptions
Data Center Assistance Group, Inc. DCAG Contact: Tom Bronack Phone: (718) 591-5553 Email: [email protected] Fax: (718) 380-7322
Business Continuity and Disaster Recovery Job Descriptions Table of Contents Business Continuity Services Organization Chart... 2 Director Business Continuity Services Group... 3 Manager of Business Recovery
Guideline on Business Continuity Management
Circular No. 033/B/2009-DSB/AMCM (Date: 14/8/2009) Guideline on Business Continuity Management The Monetary Authority of Macao (AMCM), under the powers conferred by Article 9 of the Charter approved by
CONTINUITY OF OPERATIONS PLAN TEMPLATE
CONTINUITY OF OPERATIONS PLAN TEMPLATE For Long-Term Care Facilities CALIFORNIA ASSOCIATION OF HEALTH FACILITIES DISASTER PREPAREDNESS PROGRAM TABLE OF CONTENTS TABLE OF CONTENTS...2 SECTION 1: INTRODUCTION...3
DISASTER RECOVERY 101 3 Steps You Need to Take (Before It s Too Late)
DISASTER RECOVERY 101 3 Steps You Need to Take (Before It s Too Late) Introduction... 4 Disaster Recovery vs. Business Continuity... 4 Why You Need to Read this ebook... 5 Chapter 1: The Risks (aka, The
Clovis Municipal School District Information Technology (IT) Disaster Recovery Plan
Clovis Municipal School District Information Technology (IT) Disaster Recovery Plan Revision History REVISION DATE NAME DESCRIPTION Draft 1.0 Eric Wimbish IT Backup Disaster Table of Contents Information
Disaster Recovery and Business Continuity Plan
Disaster Recovery and Business Continuity Plan Table of Contents 1. Introduction... 3 2. Objectives... 3 3. Risks... 3 4. Steps of Disaster Recovery Plan formulation... 3 5. Audit Procedure.... 5 Appendix
Business Continuity Planning Guide
Business Continuity Planning Guide For Small Businesses Prepared by the City of Vaughan Emergency Planning Department 1 Business Continuity Planning Business Continuity Planning (BCP) is a planning process
BUSINESS CONTINUITY PLAN
BUSINESS CONTINUITY PLAN Business Name: Phone # Cell # Emergency Contact Information: Dial 9-1-1 in an Emergency Non-Emergency: Police: Fire: Insurance Provider: Emergency Planning Team: I. CRITICAL OPERATIONS
Desktop Scenario Self Assessment Exercise Page 1
Page 1 Neil Jarvis Head of IT Security & IT Risk DHL Page 2 From reputation to data loss - how important is business continuity? Neil Jarvis Head of IT Security (EMEA) DHL Logistics IT Security Taking
Fire Department Guide. Creating and Maintaining Business Continuity Plans (BCP)
Fire Department Guide Creating and Maintaining Business Continuity Plans (BCP) Business Continuity Planning Components Index: Introduction Getting Started Section 1 1. Assign departmental business continuity
Chapter 1: An Overview of Emergency Preparedness and Business Continuity
Chapter 1: An Overview of Emergency Preparedness and Business Continuity After completing this chapter, students will be able to: Describe organization and facility stakeholder needs during and after emergencies.
Business Continuity Training and Testing: Narrowing the Gaps
Business Continuity Training and Testing: Narrowing the Gaps Betty A. Kildow, CBCP, FBCI, Emergency Management Consultant Kildow Consulting 765/483-9365; [email protected] 93 nd Annual International
BUSINESS CONTINUITY PLAN
How to Develop a BUSINESS CONTINUITY PLAN To print to A4, print at 75%. TABLE OF CONTENTS SUMMARY SUMMARY WHAT IS A BUSINESS CONTINUITY PLAN? CHAPTER PREPARING TO WRITE YOUR BUSINESS CONTINUITY PLAN CHAPTER
Audit, Finance and Legislative Committee Mayor Craig Lowe, Chair Mayor-Commissioner Pro Tem Thomas Hawkins, Member
City of Gainesville Inter-Office Communication April 3, 2012 TO: FROM: SUBJECT: Audit, Finance and Legislative Committee Mayor Craig Lowe, Chair Mayor-Commissioner Pro Tem Thomas Hawkins, Member Brent
Assisted Living Facilities & Adult Care Comprehensive Emergency Management Plans
Assisted Living Facilities & Adult Care Comprehensive Emergency Management Plans STATUTORY REFERENCE GUIDANCE CRITERIA The Henrico County Division of Fire s Office of Emergency Management provides this
EMERGENCY PREPAREDNESS CHECKLIST RECOMMENDED TOOL FOR EFFECTIVE HEALTH CARE FACILITY PLANNING Not Started In Progress Completed
Develop Emergency Plan: Gather all available relevant information when developing the emergency plan. This information includes, but is not limited to: - Copies of any state and local emergency planning
Workforce Solutions Business Continuity Plan May 2014
Workforce Solutions Business Continuity Plan May 2014 Contents 1. Purpose... 3 2. Declaration of Emergency... 4 3. Critical Operations... 4 3.1 Communication... 4 3.1.1 Internal Communication During Emergencies...
Table of Contents... 1
... 1 Chapter 1 Introduction... 4 1.1 Executive Summary... 4 1.2 Goals and Objectives... 5 1.3 Senior Management and Board of Directors Responsibilities... 5 1.4 Business Continuity Planning Processes...
DISASTER RESPONSE: MANAGING THE ENVIRONMENTAL RISKS. By Frank Westfall and Robert Winterburn
DISASTER RESPONSE: MANAGING THE ENVIRONMENTAL RISKS By Frank Westfall and Robert Winterburn DISASTER RESPONSE: MANAGING THE ENVIRONMENTAL RISKS Frank Westfall and Robert Winterburn April 2015 Whether it
Disaster Recovery Plan
Disaster Recovery Plan Date: February 2, 2009 Revision: 9.0 EXTERNAL BUSINESS CONTINUITY PLAN PAGE 1 of 13 Federal regulation states, and internal corporate policies require, that Penson Financial Services,
Emergency Plan Starter Kit
ARDA-HOA Outreach Emergency Plan Starter Kit Advanced planning is the key to any type of natural disaster. A. Is your property at risk for any type of natural disaster hurricane, tornado, wild fire, floods,
Disaster Recovery Plan (DRP) / Business Continuity Plan (BCP)
Preface Computer systems are the core tool of today s business and are vital to every business from the smallest to giant organizations. Money transactions, customer service are just simple examples. Despite
Emergency Management Guide for Business and Industry
Emergency Management Guide for Business and Industry A Step-by-Step Approach to Emergency Planning, Response and Recovery for Companies of All Sizes FEMA 141/October 1993 EMERGENCY MANAGEMENT GUIDE FOR
Disaster Recovery Plan
Disaster Recovery Plan Date: Revision: 8.0 EXTERNAL BCP PLAN PAGE 1 OF 12 Federal regulation states, and internal corporate policies require, that Penson Financial Services, Inc. (Penson) develop Business
Business Continuity and Disaster Planning
WHITE PAPER Business Continuity and Disaster Planning A guide to preparing for the unexpected Robert Drewniak Director, Strategic & Advisory Services Disasters are not always the result of high winds and
Assessment of natural hazards, man made hazards, technical and societal related risks and associated impact.
Aon Business Continuity Planning The Aon Business Continuity Planning practice provides consulting services that allow Aon clients to measure and manage their strategic and tactical risks through Crisis
FORMULATING YOUR BUSINESS CONTINUITY PLAN
WHITE PAPER Page 0 Planning for the Worst Case Scenario: FORMULATING YOUR BUSINESS CONTINUITY PLAN 9 Wing Drive Cedar Knolls, NJ 07927 www.nac.net Page 1 Table of Contents Overview... 2 What is Disaster
Emergency Preparedness Guidelines
DM-PH&SD-P7-TG6 رقم النموذج : I. Introduction This Guideline on supports the national platform for disaster risk reduction. It specifies requirements to enable both the public and private sector to develop
Center for Clinical Standards and Quality/Survey & Certification Group
DEPARTMENT OF HEALTH & HUMAN SERVICES Centers for Medicare & Medicaid Services 7500 Security Boulevard, Mail Stop C2-21-16 Baltimore, Maryland 21244-1850 Center for Clinical Standards and Quality/ Group
MANAGEMENT AUDIT REPORT DISASTER RECOVERY PLAN DEPARTMENT OF FINANCE AND ADMINISTRATIVE SERVICES INFORMATION TECHNOLOGY SERVICES DIVISION
MANAGEMENT AUDIT REPORT OF DISASTER RECOVERY PLAN DEPARTMENT OF FINANCE AND ADMINISTRATIVE SERVICES INFORMATION TECHNOLOGY SERVICES DIVISION REPORT NO. 13-101 City of Albuquerque Office of Internal Audit
Disaster Recovery Planning Process
Disaster Recovery Planning Process By Geoffrey H. Wold Part I of III This is the first of a three-part series that describes the planning process related to disaster recovery. Based on the various considerations
BRYN MAWR COLLEGE EMERGENCY RESPONSE PLAN Revised 3/17/08 (abridged)
BRYN MAWR COLLEGE EMERGENCY RESPONSE PLAN Revised 3/17/08 (abridged) This document is a synopsis of the planning and preparation the College has undertaken to handle emergencies in a professional, efficient,
BUSINESS IMPACT ANALYSIS.5
Table of Contents I. GENERAL.3 Introduction.3 Scope.3 Components.3 II. BUSINESS IMPACT ANALYSIS.5 Academic Affairs...5 Finance and Administration.6 Planning and Accountability..8 Student Affairs.8 Institutional
NIMS ICS 100.HCb. Instructions
NIMS ICS 100.HCb Instructions This packet contains the NIMS 100 Study Guide and the Test Questions for the NIMS 100 final exam. Please review the Study Guide. Next, take the paper test - record your answers
Business Continuity Management AIRM Presentation
16 January, 2008 Business Continuity Management AIRM Presentation David Hamilton, Senior Consultant http://www.marsh.ie Presentation Overview Terms used for BCP Where BCM fits in a business plan Business
SAFETY GUIDANCE MATERIAL
SAFETY GUIDANCE MATERIAL SAFETY MANAGEMENT MONDAY MARCH 23,GUIDANCE 2015 This safety resource was written for the scrap industry by the scrap industry and was developed to assist you in making your scrap
Post-Class Quiz: Business Continuity & Disaster Recovery Planning Domain
1. What is the most common planned performance duration for a continuity of operations plan (COOP)? A. 30 days B. 60 days C. 90 days D. It depends on the severity of a disaster. 2. What is the business
Emergency Management of Long-term Care Facilities
Emergency Management of Long-term Care Facilities What is the Ombudsman Role? Patty Ducayet, Texas State Long-term Care Ombudsman Emergency Preparedness in Long-term Care Facilities Facility planning involves