1 MINUTES OF PRE-BID MEETING FOR CONSULTANCY SERVICES FOR CONSTRUCTION SUPERVISION OF RETROFITTING WORKS FOR SELECTED PUBLIC BUILDINGS IN ISTANBUL (AF-CB-1.1) Venue :Office of Istanbul Project Coordination Unit (IPCU) Date :Monday, 24 th December 2012 Time :13.00 Participants : Representing IPCU Emin ATAK Yalçın KAYA İskender USLU Yunus UÇAR Representing the Consultants Name of Representative Deputy Director Deputy Director Senior Civil Engineer Civil Engineer Company Name Elif EROĞLU Hülya EKSERT Gönül ÖZKAN Füsun ÖZER Cem AKER Adil BACAK Onur KARACA : Prota Engineering, Project and Consultancy Services Inc. : Prota Engineering, Project and Consultancy Services Inc. : Üçer Consultant Engineering Inc. / Tuna Engineering and Architecture Services Inc. JV : Üçer Consultant Engineering Inc. / Tuna Engineering and Architecture Services Inc. JV : Dolsar Engineering Limited / A.R.S Progetti S.P.A JV : Dolsar Engineering Limited / A.R.S Progetti S.P.A JV : Tricorp Engineering Consulting Corp. Ali ATAÇ : STIPE Consulting Engineering Srl (Italy) / TimA Engineering Consultancy Ltd. Co. (Turkey) JV
2 INTRODUCTION The consultants were welcomed to the pre-bid meeting. Both the representatives of IPCU and the consultants introduce themselves and then the IPCU representatives outlined the proposed agenda for the meeting. The questions and answers given during the meeting are as follows; 1- On section 2 Instructions to consultants Data Sheet (page 28), Point 5.2(a), point (iii) Key professional staff, points system: - In the Criteria, sub-criteria, and point system for the evaluation of Full Technical Proposals, the Environmental Engineer (one of the key experts listed in page 22) is not included among the professional staff that are assigned a rating score for the evaluation. Is this correct? Yes, the Environmental Engineer is not included among the professional staffs that are assigned a rating score for the evaluation. 2- On Section 5, par 2 and 3.1 Supervision of Construction Works and Engineering Services (pages 51,52): p.51, par 2 Consultants shall review the final designs for the retrofitting purposes and the necessary construction documents for construction (retrofitting) contract packages to take the whole responsibility for application of construction drawings p.52, par 3.1 The Consultant Structural Engineers are obliged to check/review the retrofitting designs and Construction drawings of all buildings to ensure they are adequate for execution of the work. - Our understanding is that the design check/review does not include the assessment of the appropriateness/adequacy of the design choices and the designed solutions nor any check of calculations. Please confirm. The adequacy/ appropriateness of structural (retrofitting) designs, design choices and calculations are under the responsibility of the design consultants. Important points mentioned during the meeting related to Request for Proposal Document of AF-CB1.1 are as follows; * Please find the revised Summary Table in Appendix.1 Table.1 List of Selected Public buildings To Be Retrofitted of TOR from Annex-1 of this document. * It is important to fill the forms given in RFP document in an accurate manner. If any staff is proposed for part-time input, it should be clearly expressed how much staff-month rate is allocated for each and every month. For instance, staff/month schedules should be filled in an accurate manner, part time and full time personnel should be clearly indicated in the schedule.
3 * Breakdown of Remuneration will be filled logically. It should be in consistent with the total bid price. Consultant has to verify the total price with breakdown of reimbursable and remuneration expenses considering their amount and staff-months rates. * The cost for the reimbursable expenses should not be included in the cost of the remuneration and it should be given as a separate cost item. The cost of the reimbursable item should be within reasonable range. * Transportation, communication, drafting etc. should be indicated as reimbursable expenses as explained in RFP document. Therefore, reimbursable expenses should be realistic. * If an academic personal is proposed, it should comply with the Item 3.4 in Section 2 Instructions to Consultants Data Sheet of RFP document. * In addition to the required minimum 20 key staff months in the DLP; The Consultant will provide minimum number of technical staff acceptable to the Client during the DLP period. The term Technician is used as Technician/Junior Engineer. * The number of copies of Contractor s Tender document is generally between 20 and 25. * It is estimated that minimum 20 key staff month is required for Construction Supervision of Defects Liability Period (DLP). * In Section 3. Technical Proposal Standard For; the definition Approx. value of the services provided by your firm under the contract means the budget of the consultancy services not the construction contract. Please be careful about the words written in the Forms. Please fill all details written in the forms such as closed area, name of other partners; ratio of the partners, etc. * The CV forms should be signed both by personnel and the authorized representative of the consultant. * The selection of Contractor will be performed by the Client. * The sub clauses 1 and 2 in the Table Local Taxes Applicable To of the clause 3.7 of Section 2 Instructions to Consultants are revised as follows; 1. Signing of Contract at the Signing of Contract the Consultant should pay a stamp duty for contract decision amounting 0,569%, (5.69 per mil) and 0.948% (9.48 per mil) for Signing of Contract. 2. For the each payment due to Consultant a stump duty of 0.948% (9.48 per mil) shall be deducted from the amount of due payment. * The Environmental Engineer is requested as part-time for Construction Supervision of All Buildings Group but he/she should work at least one week in each month.
4 * The attendance of the site supervision personnel to the project is important. All related personnel should be at work on time. Finally, all the participants were thanked for their kind attention and interest and for this fruitful meeting. It was expressed that all the questions and opinions of the participants will be replied by IPCU staff and sent to all participants.
5 ANNEX-1 SUMMARY TABLE Type of Building Number of Institutions Total Area (m 2 ) Schools Hospitals Polyclinics &Healtcare Facilities Administrative Buildings Dormitories & Social Servıce Buıldıngs Total
AUSTIN INDEPENDENT SCHOOL DISTRICT INTERNAL AUDIT DEPARTMENT CONSTRUCTION AUDIT PROGRAM
GENERAL: Some of the Districts largest capital expenditures are from new construction, facility upgrades, and renovations. A single project can run into the millions of dollars, involving engineering,
North American Development Bank. Model Bidding Document: Consultant Services
North American Development Bank Model Bidding Document: Consultant Services MODEL DOCUMENTS Sample letter of invitation Outline for typical Terms of Reference Supplementary information for consultants
Consultant Services Complex Time-Based Assignments Large Lump-Sum Assignments
REQUEST FOR PROPOSALS Consultant Services Complex Time-Based Assignments Large Lump-Sum Assignments Public Procurement Board Accra, Ghana September 2003 i CONTENTS INTRODUCTION AND INSTRUCTIONS...1 SECTION
Appendix 18 NEC3 Options
Appendix 18 NEC3 Options December 2007 Page 449 Appendix 18 NEC3 Options NEC3 Main Options There are six main options as set out below. The Contractor carries the greatest risk under options A and B, and
REQUEST FOR PROPOSALS
Table of Contents March 2012 REQUEST FOR PROPOSALS DISASTER RECOVERY/BUSINESS CONTINUITY SERVICES Soliciting detailed proposals for the development of plans to meet a variety of contingencies REQUEST FOR
Procurement Policy Office
Procurement Policy Office (Established under section 4 of the Public Procurement Act 2006) Ref: SC/EG37/07-12 Evaluation Guide (Consultancy Services) Procurement Policy Office Ministry of Finance and Economic
Procurement of Services
AFRICAN UNION UNION AFRICAINE UNIÃO AFRICANA African Union Standard Bidding Documents Procurement of Services Provision of Fumigation and Pest control Services Procurement Number: AUC/AFMD/OT/1350 Date
Request for Proposal. MPAO Data Center Virtualization
Request for Proposal MPAO Data Center Virtualization Maldives Pension Administration Office (MPAO) is accepting bids for supply, installation, configuration and Support for MPAO Data Center Virtualization.
KENYA NETWORK INFORMATION CENTRE TENDER TO PROVIDE: CONSULTANCY SERVICES TO PROVIDE ARBITRATION SERVICES RFP NO: KENIC/RFP/16/09/2014
KENYA NETWORK INFORMATION CENTRE TENDER TO PROVIDE: CONSULTANCY SERVICES TO PROVIDE ARBITRATION SERVICES RFP NO: KENIC/RFP/16/09/2014 DATED: 16 th SEPTEMBER 2014 KENYA NETWORK INFORMATION CENTRE P.O BOX
[Indicate name of Procuring Entity]
THE REPUBLIC OF RWANDA [Indicate name of Procuring Entity] STANDARD REQUEST FOR PROPOSALS SELECTION OF CONSULTANTS FOR SMALL SERVICES Title of the Tender: Tender Reference Number: Procurement Method: Date
AUDIT COMMITTEE TERMS OF REFERENCE
AUDIT COMMITTEE TERMS OF REFERENCE 1. Purpose The Audit Committee will assist the Board of Directors (the "Board") in fulfilling its oversight responsibilities. The Audit Committee will review the financial
Manual of Policies and Procedure of Employment of Consultants
Manual of Policies and Procedure of Employment of Consultants CONTENTS Chapter Description Page No I Introduction 1-4 II Expression of Interest 5-6 III Selection of Consultants 7-18 IV Other Methods
GUIDE FOR EVALUATION PROCEDURES FOR EMPLOYMENT OF CONSULTANTS UNDER JAPANESE ODA LOANS
GUIDE FOR EVALUATION PROCEDURES FOR EMPLOYMENT OF CONSULTANTS UNDER JAPANESE ODA LOANS Japan International Cooperation Agency (JICA) December 2006 (Amended December 2009) version 1.0 CONTENTS INTRODUCTION...
GOVERNMENT OF GUYANA STANDARD REQUEST FOR PROPOSAL SELECTION OF CONSULTANTS/FIRM
GOVERNMENT OF GUYANA STANDARD REQUEST FOR PROPOSAL SELECTION OF CONSULTANTS/FIRM 1 Standard Bidding Document Version Control v0-1 STANDARD REQUEST FOR PROPOSALS SELECTION OF CONSULTANTS/FIRM Introduction
Contracting for Services
Contracting for Services A National State Auditors Association Best Practices Document Published by the National State Auditors Association Copyright 2003 by the National State Auditors Association. All
Aurangabad Industrial Township Limited
Aurangabad Industrial Township Limited FEASIBILITY STUDY, DESIGN AND PROJECT/ CONSTRUCTION MANAGEMENT CONSULTANCY OF 100 MLD WATER RECYCLE PLANT AT NAKSHATRAWADI AND ASSOCIATED INFRASTRUCTURE TO SUPPLY
RESPONSES TO CLARIFICATIONS REQUEST FOR PROPOSAL FOR FOR IMPLEMENTATION OF A HUB STATION AND BROADBAND VSAT WAN CONNECTIVITY ADB/ICB/CGSP/2013/0157
RESPONSES TO CLARIFICATIONS REQUEST FOR PROPOSAL FOR FOR IMPLEMENTATION OF A HUB STATION AND BROADBAND VSAT WAN CONNECTIVITY ADB/ICB/CGSP/2013/0157 ADB/ICB/CGSP/2013/0157 No. Question or Clarification
REQUEST FOR PROPOSAL DOCUMENT FOR CONSULTANCY SERVICES FOR ENTERPRISE RISK MANAGEMENT TENDER NO.: PC/RFP/03/2015-2016 SELECTION OF CONSULTANTS
P.O. Box - 34542-00100 Tel :+254 20 2212346/7/8 Fax :+254 20 2212237 Extelcoms House,11th Floor Haile Selassie Avenue Nairobi, Kenya REQUEST FOR PROPOSAL DOCUMENT FOR CONSULTANCY SERVICES FOR ENTERPRISE
STATE OF NEW HAMPSHIRE 2013-EG-03 REQUEST FOR PROPOSALS PLAN MANAGEMENT CONSULTANTS
STATE OF NEW HAMPSHIRE 2013-EG-03 REQUEST FOR PROPOSALS PLAN MANAGEMENT CONSULTANTS INTRODUCTION The New Hampshire Insurance Department (NHID) is requesting proposals for contractors to provide plan management
PROJECT DEVELOPMENT & MANAGEMENT CONSULTANT (PDMC) for ATAL MISSION for REJUVENATION and URBAN TRANSFORMATION (AMRUT) ASSAM REQUEST FOR PROPOSAL
Recruitment of Consulting Firm for PROJECT DEVELOPMENT & MANAGEMENT CONSULTANT (PDMC) for ATAL MISSION for REJUVENATION and URBAN TRANSFORMATION (AMRUT) ASSAM REQUEST FOR PROPOSAL RFP Notice issued on:
Procurement of Consulting Services
S T A N D A R D R E Q U E S T F O R P R O P O S A L Procurement of Consulting Services Royal Government of Bhutan Ministry of Home and Cultural Affairs Department of Immigration October 2015 1 Preface
TURKEY VISIT REPORT April 2015
TURKEY VISIT REPORT April 2015 Agenda Yildiz Visit Welcome & Greeting Presentation - Mevlana Exchange Program MOU - Signing & Handing Over Beşiktaş Campus Tour Yildiz Teknopark Tour Davutpaşa Campus Tour
Request for Proposal
Request for Proposal Management of ADEC Warehousing Activities RFP No. ADEC/2015/1115 Scope of Work Introduction: The Procurement and Contract Management division (P&C) in Abu Dhabi Education Council (ADEC)
ALBANIAN ROAD AUTHORITY TERMS OF REFERENCE FOR CONSULTANT PROJECT MANAGER RESULTS BASED ROAD MAINTENANCE AND SAFETY PROJECT
ALBANIAN ROAD AUTHORITY TERMS OF REFERENCE FOR CONSULTANT PROJECT MANAGER RESULTS BASED ROAD MAINTENANCE AND SAFETY PROJECT 1. BACKGROUND The Republic of Albania has received a World Bank Loan to rehabilitate
EMPLOYEES OLD-AGE BENEFITS INSTITUTION
EMPLOYEES OLD-AGE BENEFITS INSTITUTION HEAD OFFICE, G.P.O. BUILDING I.I. CHUNDRIGAR ROAD, KARCHI REQUEST FOR PROPOSAL FOR HUMAN RESOURCE CONSULTANCY SERVICES A. INVITATION TO BID The Employees Old-Age
Guide to Professional Practice
Architectural Technology Building Design Services Applied Science Technologists and Technicians of BC (ASTTBC) DRAFT #7 May 22, 2008 Approved in principle by ASTTBC Council. Comments requested by October
Cost and Software Data Reporting Training
Cost and Software Data Reporting Training Contracting for CSDRs October 16, 2012 Contracting Begins 60 days prior to RFP release CSDR IPT Contractor Data Reporting Structure Resource Distribution Table
Expression of Interest (EoI) Design, Development and Maintenance of New Mobile Application for National Institute of Solar Energy, Gurgaon
Expression of Interest (EoI) Design, Development and Maintenance of New Mobile Application for National Institute of Solar Energy, Gurgaon Please send/submit separate Annexure-1 (Technical Bid) and Annexure-2
NEC Users Group Workshop Defined Cost
NEC Users Group Workshop Defined Cost [email protected]; July 2014 Turner & Townsend plc July 14 making the difference Introduction Practicalities in assessing of Defined Cost & Disallowed Cost Assumption
Appendix 23. Sample of Invitation Letter for Submission of Fee Proposal for Acting as a Project Consultant for Maintenance and Improvement Works
Sample of Invitation Letter for Submission of Fee Proposal for Acting as a Project Consultant for Maintenance and Improvement Works This is a blank page Sample of Invitation Letter for Submission of Fee
How To Write An Integrated Construction Project
GUIDANCE FOR ENGINEERING CONSULTANCY FIRMS INTEGRATED CONTRACTS PREFACE Our industry is facing new integrated business models with increasing frequency. The processes driving these models are very different
Expression of Interest (EoI) Design, Development and Maintenance of New Website for National Institute of Solar Energy, Gurgaon
Expression of Interest (EoI) Design, Development and Maintenance of New Website for National Institute of Solar Energy, Gurgaon Please send/submit separate Annexure-1 (Technical Bid) and Annexure-2 (Financial
NEC3: The Engineering and Construction Contract An overview
NEC3: The Engineering and Construction Contract An overview Michael Dunn FRICS FCIArb LLB LLM T: 02079 976 520 and 01274 693 622 E: [email protected] www.rpp.co.uk Delivering Professional Solutions to the
MINISTRY OF TRANSPORT AND COMMUNICATIONS OF KYRGYZ REPUBLIC. CAREC Transport Corridor 1 (Bishkek-Torugart Road) Project 3
MINISTRY OF TRANSPORT AND COMMUNICATIONS OF KYRGYZ REPUBLIC CAREC Transport Corridor 1 (Bishkek-Torugart Road) Project 3 financed by the Asian Development Bank under Loan 2755-KGZ (SF) TERMS OF REFERENCE
Government of the Kingdom of Lesotho. Ministry of Public Works and Transport. Principal Building Agreement
Government of the Kingdom of Lesotho Ministry of Public Works and Transport Project Employer Contractor Contract Date Contract No Principal Building Agreement MINISTRY OF PUBLIC WORKS & TRANSPORT BUILDING
E.SUN FHC Financial Review of 1Q 2015
E.SUN FHC Financial Review of 1Q 2015 May 2015 Disclaimer This Presentation is provided by E.SUN Financial Holding Co., Ltd. ( E.SUN FHC ). E.SUN makes no guarantee or warranties as to the accuracy or
REQUEST FOR PROPOSAL (RFP) DOCUMENT
REQUEST FOR PROPOSAL (RFP) DOCUMENT Procurement of Consulting Services: Study on Sediment Management in Run-of-River Hydropower Projects of Nepal Lump-sum Assignments Quality- and Cost-Based Selection
Internal Audit. Capital Projects. May 2015. Final Report
Internal Audit TABLE OF CONTENTS Executive Summary...3 1 Introduction...3 2 Objectives...3 3 Scope...4 4 Summary of...4 5 Overall and Opinion...4 Audit Tests and...5 6.1 Management & Delivery of Projects...5
Limited and sealed bids are hereby invited on behalf of State Bank of India, Estate Department, GITC, CBD Belapur for appointment of Architect.
Tender no: 01/2016/ NOTICE INVITING TENDER Limited and sealed bids are hereby invited on behalf of State Bank of India, Estate Department, GITC, CBD Belapur for appointment of Architect. Name of work Eligibility
Conditions of Contract
Amberley Main Street Upgrade Contract No. 10/21 10/21 - Amberley Main Street Upgrades CC Page 1 of 24 C Contents Conditions of Contract Table of Contents Page GENERAL CONDITIONS OF CONTRACT 3 FIRST SCHEDULE
Managing programme change on an NEC3 form of contract
Managing programme change on an NEC3 form of contract Presentation: Summary of Key NEC3 Programme Principles Timing of compensation events relative to the last Accepted Programme Assessing effects of a
BUDGET HEADING 04 03 01 05 CALL FOR PROPOSALS VP/2015/002
EUROPEAN COMMISSION Employment, Social Affairs and Inclusion DG Employment and Social Legislation, Social Dialogue Social dialogue, Industrial Relations BUDGET HEADING 04 03 01 05 Information and training
ASSEMBLY OF FIRST NATIONS
ASSEMBLY OF FIRST NATIONS REQUEST FOR PROPOSAL CONTRACTOR FOR MEETING REGISTRATION This is a Request for Proposal only. The AFN is not obligated to accept any proposal or to proceed further. The AFN may
Request for Proposals (RFP)
GOVERNMENT OF TAMILNADU Commissionerate of Municipal Administration 6 th Floor, Ezhilagam Annexe Building, Chepauk, Chennai - 600005 Tel: +91 44-044-28549924 Name of Project: Procurement of Hosted Exchange
Contract Administration
Chapter 5 Contract Administration Section 3 Change Orders 5-301 General 5-302 Change Order Policy 5-303 Purpose of Change Orders 5-304 Initiation of Change Orders 5-305 Preliminary Considerations 5-306
REGULATION ON FINANCIAL HOLDING COMPANIES (Published in Official Gazette dated November 1, 2006 Nr. 26333)
By the Banking Regulation and Supervision Agency: REGULATION ON FINANCIAL HOLDING COMPANIES (Published in Official Gazette dated November 1, 2006 Nr. 26333) PART ONE Objective and Scope, Basis and Definitions
ISLAMIC DEVELOPMENT BANK. Guidelines for the Use of Consultants Under ISLAMIC DEVELOPMENT BANK FINANCING
ISLAMIC DEVELOPMENT BANK Guidelines for the Use of Consultants Under ISLAMIC DEVELOPMENT BANK FINANCING June, 2005 Table of Contents 1. General Principles... 1 1.1 Purpose of the Guidelines... 1 1.3 Relationship
NEC3 Engineering & Construction Contract An Overview
NEC3 Engineering & Construction Contract An Overview Delivering Professional Solutions to the Property Industry Michael Dunn FRICS FCIArb LLB LLM Director of Contract Services T: 01274 693 622 E: [email protected]
BUDGET HEADING 04.03.01.08 CALL FOR PROPOSALS. Improving expertise in the field of industrial relations VP/2015/004
EUROPEAN COMMISSION Employment, Social Affairs and Inclusion DG Employment and Social Legislation, Social Dialogue Social dialogue, Industrial Relations BUDGET HEADING 04.03.01.08 Industrial relations
Q&A ADDENDUM FOR INFORMATION SECURITY VULNERABILITY ASSESSMENT PUBLISHED 10/20/2015
Q&A ADDENDUM FOR INFORMATION SECURITY VULNERABILITY ASSESSMENT PUBLISHED 10/20/2015 UPDATE HISTORY: 10/21/2015 10/30/2015 11/5/2015 Questions submitted by Proposers All proposers should reference the following
Australian Industry Participation (AIP) Plan for Midal Cables Aluminium Rod and Conductor Facility Tomago NSW
Midal Cables International Pty Ltd Australian Industry Participation (AIP) Plan for Midal Cables Aluminium Rod and Conductor Facility Tomago NSW This Document Mailed From, VICTORIA COBURN Associate Director
Frequent Asked Questions related to tender EU-OSHA/CPU/2013/T3
Web and ICT services The Agency will be closed from 24/12/2013 until 01/01/2014 (both inclusive) Please note there was a typo on the date of opening session (see 1.8 of the technical specifications) The
Guidance for employers within the NHS on the process for making severance payments
Guidance for employers within the NHS on the process for making severance payments December 2013 Guidance for employers within the NHS on the process for making severance payments This guidance, revised
Welcome to Exchequer Solutions Ltd
solutions CIS (SELF-EMPLOYED) Welcome to Exchequer Solutions Ltd Established in 2003, Exchequer Solutions is a commercial contractor offering construction services. We are vastly experienced in working
REQUEST FOR PROPOSALS, SELECTION OF CONSULTANTS
REPUBLIC OF RWANDA MINISTRY OF ENVIRONMENT AND LANDS REQUEST FOR PROPOSALS, SELECTION OF CONSULTANTS Title of Tender: TO UPDATE & RESOURCES MINISTRY OF CONSULTANCY SERVICES UPGRADE THE WATER DATABASEFOR
HK Electric Smart Power Fund. Application Guideline
HK Electric Smart Power Fund Application Guideline Corporate Development Division 4/F Hongkong Electric Centre, 44 Kennedy Road, Hong Kong Hotline : 2887 3455 Fax : 2810 0506 Email : [email protected]
PRIME CONSULTANT SERVICES
GUIDELINES FOR Professional Engineers providing PRIME CONSULTANT SERVICES 1.0 INTRODUCTION 1.1 PURPOSE OF GUIDELINES The "Guidelines for Professional Engineers providing Prime Consultant Services" have
AUDIT REPORT 2013/024
INTERNAL AUDIT DIVISION AUDIT REPORT 2013/024 Audit of air travel activities and related practices at UNON Overall results relating to efficient and effective management of travel services were assessed
USING OCIPs AND CCIPS TO BRING ORDER TO PROJECT INSURANCE
USING OCIPs AND CCIPS TO BRING ORDER TO PROJECT INSURANCE CMAA Southern California Chapter October 30, 2014 8:00 a.m. The Grand Conference Center 4101 E. Willow Street Long Beach, CA Panel Greg Kildare
Schedule 11. The Transfer of Undertakings (Protection of Employment) Regulations 2006
Schedule 11 The Transfer of Undertakings (Protection of Employment) Regulations 2006 1 Definitions 1.1 In this Schedule 11 the following definitions apply: Contractor Personnel means any employee, worker,
Guidelines Selection and Employment of Consultants by World Bank Borrowers
Guidelines Selection and Employment of Consultants by World Bank Borrowers January 1997 Revised September 1997, January 1999, and May 2002 Guidelines Selection and Employment of Consultants by World Bank
QBE Professional Indemnity Proposal Form Single Project Professional Indemnity
Notice to the Proposed Insured QBE Professional Indemnity Proposal Form Your duty of disclosure If a proposer does not fully and faithfully give the facts as he knows them or ought to know them, he may
Name of the Issuer: UniCredit S.p.A. Website: www.unicreditgroup.eu
APPENDIX TO REPORT ON CORPORATE GOVERNANCE AND OWNERSHIP STRUCTURES REGARDING THE APPLICATION OF CORPORATE GOVERNANCE RULES SPECIFIED IN THE CODE OF BEST PRACTICE FOR WARSAW STOCK EXCHANGE LISTED COMPANIES
Length of Contract: 2 months (with an option to extend for a further 5 months).
1. Introduction The Joint Workplace Solution (JWS) team will shortly complete the migration of some 2000 users from SharePoint 2007 to 20 and alongside this a programme of developing a series of line-of-business
INSTRUCTIONS TO CONTRACTORS
INSTRUCTIONS TO CONTRACTORS APPLICATION FOR REGISTRATION AND CATEGORISATION OF ETRICAL CONTRACTORS FOR THE YEAR 2009/10 GENERAL NOTE: INFORMATION SUPPLIED IN THIS APPLICATION MUST, WHERE NECESSARY, BE
Estonian Health Insurance Fund Act
Issuer: Riigikogu Type: act In force from: 23.03.2014 In force until: 31.12.2016 Translation published: 02.04.2014 Amended by the following acts Passed 14.06.2000 RT I 2000, 57, 374 Entry into force 01.01.2001,
HANDBOOK FOR THE PART III PROFESSIONAL EXAMINATION
MAJLIS PEPERIKSAAN SENIBINA LEMBAGA ARKITEK MALAYSIA (LAM) HANDBOOK FOR THE PART III PROFESSIONAL EXAMINATION LEMBAGA ARKITEK MALAYSIA 17th Floor, Block F JKR Headquarters Jalan Sultan Salahuddin 50582
The South African Council for the Project and Construction Management Professions (SACPCMP)
The South African Council for the Project and Construction Management Professions (SACPCMP) Registration Rules for Professional Construction Mentors in terms of Section 18(1) (c) of the Act, 2000 (Act
EUROPEAN COMMISSION Employment, Social Affairs and Inclusion DG. Employment and Social Legislation, Social Dialogue Labour Law
EUROPEAN COMMISSION Employment, Social Affairs and Inclusion DG Employment and Social Legislation, Social Dialogue Labour Law BUDGET HEADING 04.03.01.06 INFORMATION, CONSULTATION AND PARTICIPATION OF REPRESENTATIVES
September 2005 Report No. 06-009
An Audit Report on The Health and Human Services Commission s Consolidation of Administrative Support Functions Report No. 06-009 John Keel, CPA State Auditor An Audit Report on The Health and Human Services
BUDGET HEADING 04.03.01.08 CALL FOR PROPOSALS. Support for social dialogue VP/2015/001
EUROPEAN COMMISSION Employment, Social Affairs and Inclusion DG Employment and Social Legislation, Social Dialogue Social dialogue, Industrial Relations BUDGET HEADING 04.03.01.08 Industrial relations
EXPRESSION OF INTEREST PROVISION OF TRAINING SERVICES
The Kenya Power & Lighting Co. Ltd. EXPRESSION OF INTEREST PROVISION OF TRAINING SERVICES TENDER NO. KPLC1/5BA/42U/01/11 LIST OF CONTENTS PART I INTRODUCTION PART II SUMMARY OF THE IN-HOUSE COURSES TO
Standard Request for Proposals. Selection of Consultants
STANDARD PROCUREMENT DOCUMENTS Standard Request for Proposals Selection of Consultants The Islamic Development Bank March 2012 This document is subject to copyright. This document may be used and reproduced
Mandatory Addendum to the Owner/Architect Contract For Projects Funded in Whole or in Part with State Capital Outlay Funds
Page 1 of 5 Mandatory Addendum to the Owner/Architect Contract For Projects Funded in Whole or in Part with State Capital Outlay Funds The Owner may use any form of agreement mutually agreed upon by the
No. NEIGR/ENGG/ 7/2015/NC Dated 23 rd March, 2015
No. NEIGR/ENGG/ 7/2015/NC Dated 23 rd March, 2015 To, THE EXECUTIVE ENGINEER NORTH EASTERN INDIRA GANDHI REGIONAL INSTITUTE OF HEALTH AND MEDICAL SCIENCES, SHILLONG SUB: TENDER FOR THE WORK: - Annual Rate
REQUEST FOR PROPOSALS (PROCUREMENT OF SERVICES) For Simple Assignments SERVICES FOR. The Design and Development of the Zimbabwe Diaspora Website
FPU.SR- 19.5 REQUEST FOR PROPOSALS (PROCUREMENT OF SERVICES) For Simple Assignments SERVICES FOR The Design and Development of the Zimbabwe Diaspora Website Prepared by Number 4 Duthie Road, Alexandra
BUDGET HEADING 04 03 01 05 CALL FOR PROPOSALS VP/2014/002
EUROPEAN COMMISSION Employment, Social Affairs and Inclusion DG Employment and Social Legislation, Social Dialogue Social dialogue, Industrial Relations BUDGET HEADING 04 03 01 05 Information and training
CONTRACT FOR PAYROLL SERVICES. It is agreed by clicking on Acknowledge on the PayMe Australia Pty Ltd Contractors Join Online Form:
CONTRACT FOR PAYROLL SERVICES Introduction This Agreement records the terms and conditions by which the Company has been engaged by the Contractor to perform payroll services for the Contractor. It is
DELHI METRO RAIL CORPORATION LTD. (A Joint Venture of Govt. of India & Govt. of NCT, Delhi)
DELHI METRO RAIL CORPORATION LTD. (A Joint Venture of Govt. of India & Govt. of NCT, Delhi) Supply, Installation, Testing and Commissioning of VRV/VRF type HVAC System for the office of CPM-5 at Dhaula
State of Rhode Island Department of Administration / Division of Purchases ADDENDUM # 4 RFP # 7479367
State of Rhode Island Department of Administration / Division of Purchases One Capitol Hill, Providence, Rhode Island 02908-5855 Tel: (401) 574-8100 Fax: (401) 574-8387 Solicitation Information July 23,
REQUEST FOR QUALIFICATIONS PROPERTY APPRAISAL SERVICES. Prepared by. City of Richmond Finance Department. February 18, 2016 RESPONSES DUE:
REQUEST FOR QUALIFICATIONS PROPERTY APPRAISAL SERVICES Prepared by City of Richmond Finance Department February 18, 2016 RESPONSES DUE: 2:30 P.M., Monday, March 7, 2016 REQUEST FOR STATEMENTS OF QUALIFICATIONS
OUTSOURCING DUE DILIGENCE FORM
OUTSOURCING DUE DILIGENCE FORM SERVICE TO BE OUTSOURCED 1. Type of service to be outsourced: Accounting/Finance: Compliance Consulting: Legal Services: Administrative Functions: Information Technology:
Request for Proposal Brand USA Human Resources Information System December 2015
Request for Proposal Brand USA Human Resources Information System December 2015 INTRODUCTION Brand USA is a public-private not for profit organization created by the Travel Promotion Act of 2009. The mission
REPUBLIC OF KENYA COUNTY GOVERNMENT OF NYERI REQUEST FOR PROPOSAL CONSULTANCY SERVICES
REPUBLIC OF KENYA COUNTY GOVERNMENT OF NYERI REQUEST FOR PROPOSAL CONSULTANCY SERVICES REQUEST FOR PROPOSALS FOR CONSULTANCY SERVICES FOR THE DEVELOPMENT OF A COUNTY INTEGRATED PERFORMANCE MANAGEMENT SYSTEM
Selection of Consultants By the World Bank
STANDARD REQUEST FOR PROPOSALS Selection of Consultants By the World Bank The World Bank Washington, D.C. March 2007 CONTENTS Preface... iv Section 1. Letter of Invitation... 7 Section 2. Instructions
Presented by Albert D. Goldwasser, CPA Government Contractor Consultant
Presented by Albert D. Goldwasser, CPA Government Contractor Consultant Agenda DCAA s Objectives Accounting 101 Indirect Cost Allocations SF 1408 Passing the DCAA Audit References What does the DCAA want?
TENDER SPECIFICATIONS
EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR EDUCATION AND CULTURE Youth and sport; Erasmus+ Traineeships Office INTERINSTITUTIONAL CALL FOR TENDERS OPEN PROCEDURE N EAC/05/2014 COLLECTIVE HEALTH INSURANCE