1 Los Angeles Pilot Project Using Japanese Earthquake Resistant Joint Ductile Iron Pipe Los Angeles Department of Water & Power Craig A. Davis and Joe Castruita Presented to California-Nevada Section American Water Works Association October 1, 2013
2 Contents Introduction to the LADWP Overview Historic perspective on earthquake risk in LA (1994 Earthquake) Earthquake Resistant Ductile Iron Pipe (ERDIP) Overview Examples of ERDIP performance in 2011 earthquake and other hazards Summary of the LADWP Pilot Project Purpose Implementation plan Site selection criteria Steps taken to implement pilot project Focus on 1 st project site at Contour Dr. Planning, Design, Procurement, Construction Acceptance criteria and initial results Technical and cultural exchange Outreach Media interest Conclusions Questions and Answers
3 LADWP OVERVIEW Largest Municipal Utility in USA Founded 1902 Serves 4.1-million people 712,000 water service connections 1214-square kilometer service area Receives water from: 4 aqueducts Local wells LADWP owns and operates the water and power systems
4 Area shown in Figure 2 (damaged influent and effluent lines) (power loss) Water System Performance in 1994 GTL Desoto Reservoir STL RoTL TT Damaged Tanks BGT = Beverly Glen Tank CCT = Coldwater Canyon Tank GHT = Granada High Tank TT = Topanga Tank ZT = Zelzah Tank GHT ZT RTL BGT Northridge Earthquake CCT 2 locations) 3 locations) (power loss, damage to south half) (power loss) (roof collapse) Area shown in Slide 5 Van Norman Complex Additional Damage -High Speed Channel - Bypass Channel - Power Plant Tailrace - LA25 (MWD connection) - LA35T (MWD connection) - VNPS I Discharge Line - VNPS II Discharge Line Water System Damages 14 repairs to the raw water supply conduits 60+ repairs to treated water transmission pipes 1013 repairs to distribution pipe > 200 service connection repairs 7 damaged tanks Temporary suspension of half the treatment plant service Power lost throughout City $41 million total repair costs Los Angeles water supply and transmission subsystems showing major facilities and 1994 damages
5 Los Angeles Water Service (%)_ Northridge Earthquake Area shown in Figure L.A. DELIVERY SERVICES (damaged influent and effluent lines) (power loss) GTL GHT Desoto Reservoir STL RoTL RTL 2 locations) 3 locations) (power loss, damage to south half) (power loss) (roof collapse) TT ZT BGT CCT Damaged Tanks BGT = Beverly Glen Tank CCT = Coldwater Canyon Tank GHT = Granada High Tank TT = Topanga Tank ZT = Zelzah Tank Van Norman Complex Additional Damage -High Speed Channel - Bypass Channel - Power Plant Tailrace - LA25 (MWD connection) - LA35T (MWD connection) - VNPS I Discharge Line - VNPS II Discharge Line 100 Delivery Normal Service Level Quantity Fire Protection 80 Quality 159,434 service connection outages 22% of all services ~670,000 residents All delivery service restored in 7 days Pipe repairs completed several weeks later t Time (days) Functionality 7 DAYS
6 Network Resilience by Incorporating Seismic Resistant Distribution Pipes Identify pipe materials and joint types that provide adequate seismic resistance Identify critical/important distribution pipes Replace critical pipes based on seismic risk and in collaboration with the Asset Management and Pipe Replacement Programs Recognize earthquake damages and water service outages will occur entire network cannot be cost-effectively replaced in near term Develop plan to ensure water service restorations achieve community resilience within an acceptable timeframe Focus on most critical water restorations first Develop long-term network improvement program (e.g. 25 to 50 years)
7 Earthquake Resistant Ductile Iron Pipe Comparison of Joint Structure General Joint Earthquake-Resistant Joint (Flexible Joint) (Chain structure Joint) Rubber Gasket Rubber Gasket Lock Ring T-type Spigot Projection NS-type Expand Deflect No Expansion if lock joint used Expand / Contract Deflect Lock
8 ERDIP Characteristics Property Performance ISO Amount of expansion/contraction ±1% of L Class S-1 Slip-out resistance 3D kn Class A Joint deflection angle 6-8 *1 Note) L : Nominal pipe length (millimeters) D : Nominal diameter of pipe (millimeters) *1) Joint deflection angles depend on pipe diameters. No Damage or Leaks after 40-years of use Experienced many large Japanese earthquakes Subjected to several meters of permanent ground deformation
9 Diameter range of the earthquake resistant joints Joint Diameter Range (mm/inch) Slip-on Type Mechanical Type GENEX NS S 75~250mm (3 ~10 ) 75~450mm (3 ~18 ) 500~1000mm (20 ~30 /3.3 ) 500~2600mm (20 ~102 /8.5 )
10 The 2011 Great East Japan Earthquake Overview of Damages on Water Pipelines A B C D E Water works bureau Sendai City Miyagi Pref. Ishinomaki Chiba Pref. Mito City Water supply population Maximum seismic intensity Pipeline length (km) Number of damages Damage rate (/km) 1,017,407 6U 3, ,852,000 (water supply) 6U ,025 6U 1, ,928,062 6L 8, ,133 6L 1, A E D B Epicenter Seismic intensity in J.M.A. scale C 4 5L 5U 6L 6U 7
11 CIP CIP ERDIP ERDIP DIP DIP SP (Weld) SP(Weld) SP (Screw SP(Screw joint) joint) PVC PVC Others Others Damage rate 被 害 率 ( 件 /km) Pipe material comparison [No./ km] DIP is more reliable material than others. ERDIP suffered no damage the same as previous big earthquake.
12 Damaged points and liquefied areas along Tokyo Bay Many damages of pipelines occurred in the liquefied areas Drained land Loam plateau Urayasu city Sandbank Reclaimed land Damage rate =1.64 point/km Damaged points of pipeline Liquefied areas Red :Liquefied Blue:Not liquefied Source: (Left drawing) map: Geospatial Information Authority of Japan. Landform classification: National Research Institute for Earth Science and Disaster Prevention (Right drawing) Ministry of Land, Infrastructure, Transport and Tourism, Regional Development Bureau
13 ERDIP suffered no damages in liquefied area ERDIP suffered no damages in the liquefied areas where many damages occurred at water pipelines DN700ERDIP Subway Tozai Line JR Keiyo Line 1km Urayasu city
14 DN150, 200 NS-type (Landslide of Road by Tsunami) DN200 NS-type DIP Damaged DN75 PVC 継 手 部 の 離 脱 DN150 NS-type DIP
15 DN350 NS-type DIP at Water Bridge DN350 NS-type DIP Tsunami
16 SII, NS-type DIP Withstand Large Ground Subsidence Ground Subsidence Subsidence (1.3m) Liquefaction DN300 SII-type DN150 NS-type
17 SII, NS-type DIP withstand Landslide by typhoon Landslide at Road DN400 SII-type DN150 NS-type
18 Training LADWP Earthquake Resistant Joint Ductile Iron Pipe Pilot Project Construction
19 Pilot Project using Earthquake Resistant Joint Ductile Iron Pipe (ERDIP) The ERDIP is 1 of several pipes that meets the proposed criteria for investigating use in LA for seismic resistance Other pilot projects are being undertaken with HDPE and PVC Kubota and LADWP have collaborated to implement a pilot project to install ERDIP in Los Angeles Currently ERDIP only available and used in Japan LADWP is the 1 st to use in USA Additional advantages (other than seismic) Landslide risks Erosion Thermal stresses Overall, the ERDIP may provide significant infrastructure reliability above the seismic risk
20 Pilot Project Purpose Purpose of pilot project is to: Allow the LADWP to become acquainted with the ERDIP Obtain direct observations and experience of the design and installation procedures Compare the design and installation of ERDIP with pipes normally installed by LADWP Make our own assessment on suitability for using the ERDIP to improve network reliability Determine if ERDIP is helpful for improving the LA Water Infrastructure
21 Pilot Project Outline We are here For Reseda Blvd. (1) Presentation 1) Kubota sends pipes from Japan. 2) Kubota gives a presentation and demonstration on ERDIP (NS and GENEX models) pipe in Los Angeles. (2) Develop the pilot project plan (3) Preparation for installation In process for 3 more sites 1) LADWP settles the details of the pilot project (pipe diameter, length, schedule, etc). 2) LADWP s management approves the project plan. 1) Kubota supports the pipeline design phase with training and reviews. 2) Kubota makes installation manual, and helps to addresses items needed to meet local requirements. 3) Agreement of purchase conditions between LADWP and Kubota. (4) Production and Export (from Kubota) 1) Kubota produces pipe. 2) Export and transport (logistic, stock yard, etc). 3) Procure the fittings for joints between JWWA 1 pipe and AWWA 1 pipe standards. (5) Construction 1) Kubota dispatches the pipe installation instructors from Japan. 2) Kubota provides training for field crews appointed by LADWP. 3) LADWP undertakes construction using their own field crews. We are here For Contour Dr. (6) Feedback 1) LADWP compiles the evaluation (design, construction, cost, etc). 2) Kubota improves NS and GENEX for US market, (if necessary). (7) Promotion Present Results 1) LADWP announces the achievement of pilot project. 1 Japan Water Works Association 2 American Water Works Association
22 Pilot Project Site Selection For 1 st two sites: Identify areas damaged by ground failure during the 1994 Northridge Earthquake Balboa Blvd Reseda Blvd Region Studio City/Sherman Oaks Region Review pipe layout Compare with planned pipe replacements Select pipes to be replaced as part of pilot project Implement pilot project in a manner consistent with a longterm seismic improvement program. Currently have two pilot sites Reseda Blvd. (Relatively level ground in San Fernando Valley) Contour Drive (Sloped and curvy roads in Studio City) Select additional pilot project sites using resilience criteria West LA Central LA Harbor
23 Pilot Project Locations Considered Balboa Blvd region Roscoe Blvd region Sherman Oaks/Studio City region
24 LONGRIDGE LADWP originally planed to replace ~1750 of 6 line; 157 psi (1.1 Mpa) Proposed pilot to include ERJDIP Training performed 1/15 to 1/18/13 Initiated Construction on 1/28/ installed ERDIP installation completed on April 30, 2013 (53 work days) Main Replacement Contour Drive SHERWOOD STERN MATILIJA DAVANA # BENEDICT CANYON GLENRIDGE BENEDICT CANYON # DEER # WESLIN WOODMAN OAK CANYON BOBSTONE KOSTER DEBSTONE CONTOUR ALLOTT SUNNYSLOPE GREENBUSH # # CHELTENHAM INWOOD DIXIE CANYON GALEWOOD Contour Dr. Main Replacement -- Ventura Blvd. Hillside Area VENTURA CANYON # # # CONTOUR RAND # # NEWCOMB NAGLE # CHELTENHAM VALLEYHEART VALLEY VISTA # STONERIDGE # # Size 6" DI Length 1800 feet Pressure 157 psi ALOMAR Streets # Leaks $ Breaks Pilot Area Main projects Dist Pipes N Feet
25 Steps Taken to Implement Pilot Project Learned about ERDIP over past decade Met with Kubota Corp. (Mr. Toshima) in October 2011 Identified opportunity for pilot project Concept encouraged by LADWP managers
26 Kubota ERDIP Presentation and Demonstration LADWP-Kubota meetings held in LA on January 23-25, 2012 Presentation and demonstration held in Los Angeles on January 24, 2012 Invited guests from waterworks community Over 110 attended from 17 organizations Support from WRF Demonstration allowed LADWP handson learning experience with GENEX Positive feedback LADWP crews demonstrating GENEX Pipe assembly LADWP-Kubota team Mr. Hara, Kubota Engineer Mr. Toshima, Kubota Manager
27 Pipe Design, Contour Drive Design Training by Kubota Engineers Design performed by LADWP Engineers Design checked by Kubota Engineers
28 Pipe Design, Contour Drive
29 Steps Taken to Implement Pilot Project Worked with Kubota on: Pipe layout plans and design changes AWWA to JWWA adaptors Installation procedures Specifications Backfill requirements (sand vs cement slurry) Worked closely by Follow up meetings held in LA on: August 7, 2012 October 17, 2012 Socket : Mechanical joint (for AWWA spigot) Socket: Mechanical joint (for JWWA spigot)
30 Procurement and Delivery Procurement Informal contract (>$150,000) Sole source Ordered extra materials for: Training Field alterations Delivery in December, 2012
31 Technology Exchange LADWP traveled to Japan Nov Engineer Distribution Manager Field/Training Supervisor Meet with: Kobe Waterworks Bureau Sendai Waterworks Bureau Kyoto University Direct exchange of information at equal levels See earthquake damages and pipe performances Observe ERDIP installation by Japanese Visit Kubota manufacturing plant for ERDIP
32 Cultural Exchange Sendai Beef Nanzen Temple, Kyoto Sendai Sushi
33 Cultural Exchange Kobe Beef Kobe elementary school, emergency evacuation center
34 Training and Installation in LA
35 LADWP Installation Video
36 Acceptance Criteria Contour Drive Near-term criteria Item Criteria Status as of July 1, Acceptance of Concept Achieved 2 Application to network resilience Able to meet concept outline 3 Ability to learn about the technology application Achieved, January Ability to perform engineering design for ERDIP Achieved by LADWP staff 5 Ability to purchase pipe Achieved Fall Ability to train and certify installation crews for ERDIP Achieved January Ability to adopt local installation procedures to the ERDIP technology (e.g., slurry trench fill) Achieved, Summer Field crew ability to install correctly Achieved, Feb./March Positive acceptance from LADWP Distribution Division (Management and supervisor levels) Achieved, management, supervision, and const. crews interviewed May 9, Installation rate (feet per day) Acceptable, similar compared to other similar projects. 11 Project cost in comparison with other pipe projects (standard DIP, steel, nonmetallic, etc.) 12 Workability (the degree of ease the material can be cut, shaped or smoothed by hand or machines and capable of being put into effective operation) Acceptable, within an acceptable range at pilot stage. Acceptable and overall positive input from field crews. Long-term Criteria: 1. Investigation corrosion resistance of GenEx coating 2. Actual seismic performance * * Seismic performance is not a criterion for accepting use of this pipe on a full scale production level. We must accept the documented positive performance in Japan of no breaks or leaks for nearly 40 years.
37 PILOT PROJECT RESULTS CONTOUR DRIVE Costs Construction: 8% to 13% increase, mostly from material cost. Engineering: cost about doubled, increased total project cost by ~7%. Project: 15% to 20% total project cost increase. Workability Construction crews found the material to be very workable, in some cases easier than the Tyton joint pipe normally placed by the LADWP The tools are very good, easy to use, and helped make installation go smoothly. Smooth Process: Removed straining and as a result eliminated injuries that otherwise can occur when forcing the pipe spigot into the bell, & Prevented rolling the gaskets out of the bell.
38 LADWP Outreach Purpose: provide others an opportunity to learn from the LADWP pilot project while it was being undertaken educate other water agencies, associations, universities, and consulting firms about the ERDIP in case it may be useful for them Demonstration project, January 2012 Over 100 participants from LADWP, other agencies, consultants, and Universities Site Visits, February and March site tours Attendees included 60 people from 17 organizations (not including LADWP or Kubota)
39 Site Visit Outline 10:00AM 1.5-hour presentation covering: Background and purpose for using the ERJ-DIP, and Plan and purpose of the LADWP Pilot Project Questions and Answers 11:30 PM Lunch in cafeteria (on your own) 12:15 PM Take LADWP vans to the site 1:00 PM View placing and jointing the pipe. Communication with LADWP installation supervisor. 2 to 2:30 Depart site and return to JFB. End of meeting.
40 Media Attention Los Angeles ERDIP Pilot project has captured attention of international media 9 News Paper articles 7 in Japan 2 in USA (LA Daily News & Wall Street Journal) 7 Television broadcasts 3 in Japan 1 in San Francisco (KTVU) 3 International (NHK World)
41 Media Attention
42 Pilot Project Status Other sites Reseda Blvd. ERDIP Design in progress Phase I in progress Installing 1 st line of standard DIP Material Procurement method Formal (present to Board of W&P Commissioners) Construction planned to initiate around July 2014 Western, Central, Harbor In the process of selecting sites for design Reseda Blvd. Design Drawings
43 Summary Kubota ERDIP is one of several potential pipes that can help improve the LADWP distribution network seismic performance Pilot project provides: Direct experiences to determine applicability of new technologies into the network Opportunity to apply seismic improvement concepts into the distribution network Incremental seismic improvements Distribution network seismic improvements are important for LADWP infrastructure reliability Pilot Project results are positive so far
44 Questions?
Case Study: Los Angeles Water Services Restoration Following the 1994 Northridge Earthquake
Case Study: Los Angeles Water Services Restoration Following the 1994 Northridge Earthquake C.A. Davis, Los Angeles Department of Water and Power, Los Angeles, CA, USA T.D. O Rourke Cornell University,
Understanding the Seismic Vulnerability of Water Systems
Understanding the Seismic Vulnerability of Water Systems Lessons Learned and What You Can Do Donald Ballantyne October 2, 2013 Regional Water Providers Consortium Board Overview Oregon Resilience Plan
Recent Earthquakes: Implications for U.S. Water Utilities [Project #4408]
Recent Earthquakes: Implications for U.S. Water Utilities [Project #4408] ORDER NUMBER: 4408 DATE AVAILABLE: July 2012 PRINCIPAL INVESTIGATORS: John Eidinger and Craig A. Davis PROJECT PURPOSE: The purpose
Performance of Pipes During Earthquakes
Performance of Pipes During Earthquakes March 28-31, 2011, Long Beach, CA Camille George Rubeiz, PE Director of Engineering, Plastics Pipe Institute [email protected] Japan March 2011 EQ: Failures
The Current Situation and Circumstances Regarding the Great Earthquake Damage
The Current Situation and Circumstances Regarding the Great Earthquake Damage Ishinomaki District Water Supply Authority Junichi Takaki, Deputy Technology Director 116 Shinkaminuma Hebita Ishinomaki-city
Seismic Practices to Improve Water System Resilience
Seismic Practices to Improve Water System Resilience C.A. Davis 1 1 Geotechnical Engineering Manager, Department of Water and Power, Los Angeles, California. Email: [email protected] ABSTRACT : The
SEISMIC DAMAGE ESTIMATION PROCEDURE FOR WATER SUPPLY PIPELINES
SEISMIC DAMAGE ESTIMATION PROCEDURE FOR WATER SUPPLY PIPELINES Ryoji ISOYAMA 1, Eisuke ISHIDA 2, Kiyoji YUNE 3 And Toru SHIROZU 4 SUMMARY This paper presents a practical procedure for estimating damage
Cornell University LADWP SHORT COURSE & WORKSHOP
CASE STUDY: LIFELINE RESILIENCE- LOS ANGELES DEPARTMENT OF WATER & POWER Tom O Rourke Cornell University 1200 km2 Los Angeles N 200 km 40 km Los Angeles Department of Water and Power (LADWP) Serves 4.0
High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines
High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines Jeff Schell General Manager United Pipeline Middle East, Inc. Introduction HDPE Liners A cost effective and environmentally beneficial
Tokyo Waterworks supports the capital of Tokyo
Tokyo Waterworks supports the capital of Tokyo Tokyo, the Japanese capital, is the largest city in Japan with a population of about 13.16 million, which is about 10% of the country s entire population
EMERGENCY-RESPONSE CAPACITY OF LIFELINES AFTER WIDE-AREA EARTHQUAKE DISASTERS
Proceedings of the International Symposium on Engineering Lessons Learned from the 211 Great East Japan Earthquake, March 1-4, 212, Tokyo, Japan EMERGENCY-RESPONSE CAPACITY OF LIFELINES AFTER WIDE-AREA
LIFELINE PIPELINE RESTORATION AND SEISMIC MITIGATION
LIFELINE PIPELINE RESTORATION AND SEISMIC MITIGATION Le Val LUND 1 And P E M ASCE 2 SUMMARY A number of methods are discussed which can be used for lifeline pipeline rehabilitation and improving the seismic
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant
SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE
6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction
TECHNICAL SPECIFICATION
THOMAS - G-FLEX GFLEX TECH SPEC CONNECTING INNOVATION JOHANNESBURG TEL: +27 11 794 7594 CAPE TOWN TEL: +27 21 556 5258 POLOKWANE TEL: 015 298 9142 DESIGNER, MANUFACTURER AND DISTRIBUTOR OF PIPE CONNECTION,
Sewers Float and other aspects of Sewer Performance in Earthquakes
Sewers Float and other aspects of Sewer Performance in Earthquakes Presented by Donald Ballantyne, PE Niigata Japan, 1964 Overview Introduction Earthquake Hazards Historic Damage Seattle 1965 Loma Prieta
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown
SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.
SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price
2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS
2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS Water system improvements proposed for inclusion into Western s service area shall be designed in accordance with all appropriate AWWA standards, include
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials
TG 105 ALLOWABLE PIPE SIZE, CLASS AND MATERIALS FOR WATER MAINS TECHNICAL GUIDELINE. Manager Asset Management SOUTH AUSTRALIAN WATER CORPORATION
TG 105 SOUTH AUSTRALIAN WATER CORPORATION TECHNICAL GUIDELINE ALLOWABLE PIPE SIZE, CLASS AND MATERIALS FOR WATER MAINS Issued by: Manager Asset Management Issue Date: SA WATER 2007 This document is copyright
Carlon Bore-Gard and Boreable Multi-Gard Raceway
Carlon Bore-Gard and Boreable Multi-Gard Raceway Bore-Gard Schedule 40 Bore-Gard Schedule 80 Boreable Multi-Gard Type 40 www.carlonsales.com 231 Bore-Gard Trenchless Raceway Carlon Bore-Gard Trenchless
Mechanical Joint Restraints
-15 PVC Pipe Restrainer The PVC mechanical joint restrainer eliminates the need for thrust blocking, tie rodding, or harnessing mechanical joint fittings when they are used with PVC pipe. The key to the
Appendix A: Acceptable pipe and fitting materials
Watercare Services Limited Water and Code of Practice Content from the NZS 4404:2010 Land development and subdivision infrastructure has been reproduced for use in the Infrastructure Design s Manual for
Comparison of Water Utility Earthquake Mitigation Practices
Comparison of Water Utility Earthquake Mitigation Practices Donald Ballantyne, VP Lifeline Services, ABS Consulting, Seattle, Washington Abstract The U.S. and Japan lead the world in earthquake mitigation
Chesapeake Section AWWA Symposium
PRESTRESSED CONCRETE CYLINDER PIPE (PCCP) Chesapeake Section AWWA Symposium HANSON PRESSURE PIPE Steve Smith January 16,2014 Interpace Projects with Problems INTERPACE 45 MILLION FEET 11,500 PROJECTS Slide
Wastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
Important Points: Timing: Timing Evaluation Methodology Example Immediate First announcement of building damage
3.3. Evaluation of Building Foundation Damage Basic Terminology: Damage: Destruction, deformation, inclination and settlement of a building foundation caused by an earthquake. Damage grade: Degree of danger
60.12. Depend-O-Lok FxE Expansion Coupling. System No. Submitted By Spec Sect Para Location Date Approved Date. DEPEND-O-LOK FxE EXPANSION COUPLING
60.1 D-O-L FxE expansion couplings are a bolted, split-sleeve design that provides for expansion and contraction at the coupled joint. These couplings are furnished with restraint rings that, when affixed
RESTORING THE LOS ANGELES WATER SUPPLY SYSTEM FOLLOWING AN EARTHQUAKE
RESTORING THE LOS ANGELES WATER SUPPLY SYSTEM FOLLOWING AN EARTHQUAKE T.H.P. Tabucchi 1, R.A. Davidson 2, and S. Brink 3 1 Catastrophe Risk Analyst, Risk Management Solutions, Inc., Newark, CA, USA 2 Associate
SECTION 3 SANITARY SEWER DESIGN
SECTION 3 SANITARY SEWER DESIGN 3.1 GENERAL DESIGN CRITERIA 3.1.1 Requirement for Sanitary Sewer 3.1.2 Design Approval 3.1.3 IEPA Permit Required 3.1.4 Differentiation Between Public and Private Sanitary
Cathodic Protection Use On Tank Bottoms & Underground Piping In Power Generation Plants
Cathodic Protection Use On Tank Bottoms & Underground Piping In Power Generation Plants PG&E Office San Francisco January 18, 2007 Craig K. Meier Corrosion Control Incorporated Corrosion process for tanks
STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS
STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for cleaning and lining existing cast iron and ductile iron water mains
Victaulic Depend-O-Lok Couplings. STI / SPFA Pipe Section Meeting January 14, 2011
Victaulic Depend-O-Lok Couplings STI / SPFA Pipe Section Meeting January 14, 2011 What is the Depend-O-Lok (D-O-L) family of products? Bolted split-sleeve type coupling per AWWA C227. Core products ExE
SECTION 02612 NONREINFORCED CONCRETE SEWER PIPE
SECTION 02612 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Furnishing and installing nonreinforced concrete sewer pipe. Provide concrete sewer pipe less than 12 inches in diameter, and in other sizes
Terms of Reference. Aqaba Water and Wastewater Utility Asset Valuation
Technical Support for Procurement and Project Management and Private Sector Participation to the Ministry of Water and Irrigation, Water Authority of Jordan and the Jordan Valley Authority Support for
SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS
SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS PART 1: GENERAL 1.01 COORDINATION OF WORK Connection to existing pipelines may require shutdown of AW facilities. Closely coordinate construction work
Installation of Large Diameter Buried Pipes
Installation of Large Diameter Buried Pipes Sullivan (Sully) Curran P. E., Executive Director I. Introduction and Scope There is an ongoing need to provide designers, specifiers, engineers, consultants
Local Government Responses to the Great East Japan Earthquake
Local Government Responses to the Great East Japan Earthquake Takehiko Imai, Counselor of the Information Policy Department, Sendai City Most of the speeches today started with the speaker relating how
WATER QUALITY AND STANDARDS Vol. I -Management of Water Supplies After A Disaster - Yasumoto Magara, Hiroshi Yano
MANAGEMENT OF WATER SUPPLIES AFTER A DISASTER Yasumoto Magara Professor of Engineering, Hokkaido University, Sapporo, Japan Hiroshi Director, Kobe Municipal Water Works Bureau, Kobe, Japan Keywords: Earthquake
WATER MAIN CONSTRUCTION TECHNIQUES DEPARTMENT OF PUBLIC WORKS WATER & WASTEWATER DIVISION
WATER MAIN CONSTRUCTION TECHNIQUES Overview Water Main - Materials Specifications Installation Future? Water Main Materials Material Types There are various material types used for water mains, these include:
Meeting the Challenge of Pipeline Emergency Repair
Meeting the Challenge of Pipeline Emergency Repair Michael R. McReynolds, PE, SE 1 Tao Peng, PE, SE 2 ABSTRACTS The Metropolitan Water District of Southern California (MWD) is the nation s largest provider
SECTION 15410 GROUND WATER STORAGE TANKS
SECTION 15410 GROUND WATER STORAGE TANKS PART 1 GENERAL.01 SCOPE A. Section Includes Requirements for designing, fabricating, and erecting a welded steel ground storage tank..02 SYSTEM DESCRIPTION A. Design
SECTION 15105 DUCTILE IRON PIPE AND FITTINGS
SECTION 15105 DUCTILE IRON PIPE AND FITTINGS PART 1 GENERAL.01 COORDINATION OF WORK Connection to existing pipelines may require shutdown of Owner facilities. Closely coordinate construction work and connections
HYDRAULIC ANALYSIS OF PIPE LINED WITH MADISON S 100% SOLIDS STRUCTURAL POLYURETHANE COATINGS
HYDRAULIC ANALYSIS OF PIPE LINED WITH MADISON S 100% SOLIDS STRUCTURAL POLYURETHANE COATINGS Shiwei William Guan, Ph.D. Vice President, R&D and International Business Madison Chemical Industries Inc. 490
SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL
SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL PART 1 - GENERAL 1.1 WORK INCLUDED IN THIS SECTION A. The WORK of this Section includes the repair, demolition, and disposal of asbestos
Emerging Technologies in Wastewater Collection Systems
Keville Enterprises Emerging Technologies in Wastewater Collection Systems Douglas McCutchen, CCM Brian Karmasin, P.E., BCEE CMAA Annual Conference Oct 2008 San Francisco, California Today s s Presentation
WATER & SEWER CORROSIVE RESISTANT PRODUCTS
WATER & SEWER CORROSIVE RESISTANT PRODUCTS The Standard of Excellence in the Industry CASING SPACERS COUPLINGS & FLANGE COUPLING ADAPTERS REPAIR CLAMPS DUCTILE IRON SADDLES STAINLESS STEEL SADDLES TAPPING
DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES
SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing
RESUME Lee A. Knuppel, P.E.
RESUME Lee A. Knuppel, P.E. OFFICE: EDUCATION: LEE A. KNUPPEL AND ASSOCIATES, Inc. 7770 Cooper Road, Suite 7 Montgomery, Ohio 45242 (513) 793-4222 Graduate: UCLA, Los Angeles, CA M.S. in Civil Engineering,
BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION
BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION GENERAL Rehabilitation of culverts with pipe liners is one of several methods available for extending the life of an existing culvert. It is often cost
Beacon Hill Sewer District Standard Specifications
Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Provisions
SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE
SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel
Niigata as a temporary water works relay base: support for teams in a major seismic disaster
Niigata as a temporary water works relay base: support for teams in a major seismic disaster Etsuro Kawase 1 Abstract Water works support in Niigata for the Great East Japan Earthquake in 2011 allowed
Sewer Water Pipeline Replacement with CERTA LOK RESTRAINED JOINT PVC PIPE
1.0 GENERAL 1.1 DESCRIPTION This section addresses the procedures to be employed for pipe bursting existing water/sewer pipelines, as identified on the drawings, and replacing with new Restrained Joint
Module 3 : Sewer Material. Lecture 3 : Sewer Material
1 P age Module 3 : Sewer Material Lecture 3 : Sewer Material 2 P age 3.1 Important Factors Considered for Selecting Material for Sewer Following factors should be considered before selecting material for
LEE S SUMMIT USES PIPE BURSTING TO BROADEN ITS ASSET MANAGEMENT TOOLBOX AND REHABILITATE POTABLE WATER DISTRIBUTION SYSTEM
North American Society for Trenchless Technology (NASTT) No-Dig Show 2010 Chicago, Illinois May 2-7, 2010 Paper D-4-02 LEE S SUMMIT USES PIPE BURSTING TO BROADEN ITS ASSET MANAGEMENT TOOLBOX AND REHABILITATE
Fittings and valves. Ductile cast iron valves. for water and gas supply
Fittings and valves Ductile cast iron valves for water and gas supply 1 Valves made of ductile cast iron Reliable, saf The basis cast iron Düker places emphasis on protection: Quality and a long life cycle,
Emergency Planning and Response Damage Prediction Modeling to Mitigate Interdependency Impacts on Water Service Restoration
Title: Authors: Emergency Planning and Response Damage Prediction Modeling to Mitigate Interdependency Impacts on Water Service Restoration Serge V. Terentieff (contact person / presenter) Engineering
GIS Characterization of the Los Angeles Water Supply, Earthquake Effects, and Pipeline Damage
GIS Characterization of the Los Angeles Water Supply, Earthquake Effects, and Pipeline Damage by Thomas D. O Rourke, Selcuk Toprak and Sang-Soo Jeon, Cornell University Research Objectives The objectives
SECTION 5: SANITARY SEWER SYSTEM DESIGN
SECTION 5: SANITARY SEWER SYSTEM DESIGN 5.01 GENERAL Sanitary sewer improvements shall be designed to serve the ultimate level of City development as defined in the General Plan and the Wastewater Facilities
Design Criteria & Service Goals
4.1 Design Life of Improvements The design life of a water system component is sometimes referred to as its useful life or service life. The selection of a design life is a matter of judgment based on
Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses
Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses They also give the community a built-in re-entry system for future monitoring and repair. BY BRETT HANES According to
SECTION 02630 STORM DRAINAGE SYSTEM
SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE
Module 3: Sewer Material Lecture 3: Sewer Material
Module 3: Sewer Material Lecture 3: Sewer Material [NPTEL, IIT Kharagpur, Prof. M.M.Ghangrekar, Department of Civil Engineering Page 1 3.0 SEWER MATERIAL 3.1 Important Factors Considered for Selecting
SECTION 02401 - SANITARY SEWER PIPE
PART 1 - GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for furnishing and installing sanitary sewer pipe, in accordance with
DIVISION 4300 STORM DRAINAGE
DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES
SECTION 603 SANITARY SEWER FORCE MAINS
SECTION 603 SANITARY SEWER FORCE MAINS 1. GENERAL Pipelines for sanitary sewer force main systems shall conform to the following specifications and shall be installed at the locations indicated on the
THE CALIFORNIA STATE UNIVERSITY ANNUAL REPORT OF EXEMPTIONS FROM THE BIDDING PROCESS DUE TO UNEXPECTED CAUSES. 2/11/2011 Page 1
Bakersfield Channel Islands Chico Dominguez Hills Belfor USA Group 13767 9/20/2010 $ 136,000.00 East Bay Davis Moreno Construction Inc. 58933A 6/22/2010 6,725.00 Fresno Electric Motor Shop and Supply 58930
FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation
644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines
Native InDesign 2890 SaniTite Brochure 1/8" 100 300 CMYK April 17, 07
Sanitary Sewer Pipe Tough pipe for a tough environment SaniTite Sanitary Sewer Pipe delivers the features that engineers, contractors and municipalities demand durability, performance, handling, toughness
The surface roughness of the polyurethane lining is 10 times lower than cement-lined pipes.
QUALITY INSIDE When it comes to long life piping for drinking water, sewage, industrial water or gas, there is one name that continues to lead the way - ECOPUR by vonroll. Delivering precision-engineered
REPAIR AND RETROFIT OF BRIDGES DAMAGED BY THE 2010 CHILE MAULE EARTHQUAKE
Proceedings of the International Symposium on Engineering Lessons Learned from the 2011 Great East Japan Earthquake, March 1-4, 2012, Tokyo, Japan REPAIR AND RETROFIT OF BRIDGES DAMAGED BY THE 2010 CHILE
LEAK DETECTION IN UNDERGROUND PIPELINES OF MUNICIPAL WATER DISTRIBUTION
4th DAAAM International Conference on Advanced Technologies for Developing Countries September 21-24, 2005 Slavonski Brod, Croatia LEAK DETECTION IN UNDERGROUND PIPELINES OF MUNICIPAL WATER DISTRIBUTION
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
(1) Minami Nagamachi and Naka Nagamachi viaducts between Shiraishi Zao and Sendai Stations on the Tohoku Shinkansen line
Report by the First Joint Survey Team of the JSCE Concrete and Structural Engineering Committees on the damage caused by the Great East Japan Earthquake April 5, 2011 (First Report) 1. Survey team members
SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING
SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent
ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application.
ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. Article II provides rules governing the allowable connection to the City POTW and the construction and inspection of
Condition Assessment of a 48 PCCP Water Main Within an Abandon Subway Tunnel
OAWWA 73 rd Annual Conference Condition Assessment of a 48 PCCP Water Main Within an Abandon Subway Tunnel By Jason DeLaet, P.E. Supervising Engineer Greater Cincinnati Water Works & Michael J. Livermore
Landslides & Mudflows
1 2 - What is a Landslide? - Geologic hazard Common to almost all 50 states Annual global Billions in losses Thousands of deaths and injuries 3 1 - What is a Landslide? - Gravity is driving force Some
LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD
www.norcalpug.com LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD Bob Fisher and Lance Stracner Ameron Protective Lining J.R. Pipeline Co Inc. Abstract: The
A Discussion of Steel Pipe versus Ductile Iron Pipe
A Discussion of Steel Pipe versus Ductile Iron Pipe The comparison of spiral-welded steel pipe to ductile iron pipe below highlights how steel is not only equal to ductile iron as a material for use in
Universal Installation and Maintenance Instructions Double Wall Spill Containment Bucket (5 and 15 gal)
Universal Installation and Maintenance Instructions Double Wall Spill Containment Bucket (5 and 15 gal) IMPORTANT: It is imperative that the user read these warnings and use of the assembly instructions
Ductile Iron Pipe Couplings
J-9 Pipe 1 2 Straight and Transition Ductile offer an easy and economical way of joining whether the is of the same nominal and/or type or different at each coupling. couplings will handle most of your
32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.
SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and
MODELING POST-EARTHQUAKE RESTORATION OF THE LOS ANGELES WATER SUPPLY SYSTEM. A Thesis. Presented to the Faculty of the Graduate School
MODELING POST-EARTHQUAKE RESTORATION OF THE LOS ANGELES WATER SUPPLY SYSTEM A Thesis Presented to the Faculty of the Graduate School of Cornell University In Partial Fulfillment of the Requirements for
Oil and Gas Pipeline Design, Maintenance and Repair
Oil and Gas Pipeline Design, Maintenance and Repair Dr. Abdel-Alim Hashem Professor of Petroleum Engineering Mining, Petroleum & Metallurgical Eng. Dept. Faculty of Engineering Cairo University [email protected]
1.3.2 Method of construction and restoration of existing water service connections. This shall include:
1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting