1 Process Governance: Definitions and Framework, Part 1 Rafael Paim & Raquel Flexa This Article if the first of a two-part series discussing governance frameworks. In Part `, four existing frameworks are examined and a new proposal is described. The proposed framework was gernerated based on experience in working with organizations in the public and private sectors. Part 2 will present further details regarding the proposed framework. Introduction Certainly, what is most challenging for organizations about process management is how to encourage performance improvement and then to ensure that these improvements are workable and maintained over the short, medium and long term. Even more difficult, however, is the task of assuring that such actions are fully aligned with business objectives. Given that need, it can be seen how important it is for a Process Governance Model to exist within the organization. Governance, when well defined, well managed and fully aligned with organizational strategy, acts to orient and facilitate Process Management, in that it defines goals, roles, responsibilities and instruments. As a result, efforts to improve process management are directed to a common goal, avoiding the usual duplication of effort and converging to achieve the goals. Process Governance: Some Conceptual Definitions To begin the discussion, it is important to know how Process Governance is understood by authors who have studied the subject. Paim (2007, 2010) and Paim et. al. (2009) state that process governance comprises the definition of overall guidelines of the process management model, the process control model and the activities of the various organizational units, and involves mainly the distribution of Process Management-related responsibilities within the organization. Briefly, it involves fostering the definition of overall guidelines to orient what should be done in Process Management and how it should be done. Jeston & Nelis (2008) summarize Governance as an instrument to guarantee that processes, process designs and strategy perform well, and to ensure alignment among all three. Spanyi & Dwyer (2008) define it as the structure, metrics, roles and responsibilities necessary to measure and improve performance and to manage an organization s processes, and regard it as fundamental to optimal, workable process improvement in the organization. Korhonen (2007) sees Governance as necessary to ensure coordination among process initiatives by different functional units and to eliminate misalignment between organizational strategy and process endeavors. Lastly, Richardson (2006) characterizes Governance as used to define the set of rules that dictate or govern how an organization must conduct a specific business function. Thus, process governance consists of the set of guidelines and resources that an organization uses to facilitate collaboration and communication when it undertakes enterprise process initiatives. To summarize, despite certain distinctions, all the definitions agree on some common points: Governance acts to guide Process Management, in which it is aided by an overarching goal and by roles and instruments aligned with that goal. It becomes an important tool supporting business management. Background to the Proposed Process Governance Framework From the conceptual analyses offered by the above authors, from benchmarking visits to firms in various sectors, from the results of international research into Process Management and Governance in Organizations and from participation in international congresses and visits, 1
2 Enjourney Consulting and Education has developed its own definition of the term. In this proposal, Process Governance consists in the definition, spread and control of Process Management, as regards its: goals; principles, orientations and decision-making limits; form of organization/structure; roles and responsibilities; form of evaluation and control, which are designed to protect the interests of shareholders and stakeholders, partners or the corporation in a systemic and integrated way, and assure that the organization does not fail to solve problems and take opportunities to improve and innovate in how its work is done. Process Governance may include the activities of formulating, introducing, controlling and reviewing policies, guidelines, rules, procedures, instruments and technologies that guide process management practices within the organization. It also includes the forms of organization, integration, collaboration and communication among the various different process management initiatives within the firm. The objects of Process Governance are the organization s value chain, the process management methodology and the rules, roles and responsibilities that structure and organize how process management functions. To sumarize, Process Governance can be said to enable and steer the execution of Process Management, involving the whole organization and clarifying what should be done, who should do it and how. Process Governance vs. Process Management: Clarifying the Concepts It is very common for managers and other members of organizations to confuse the terms process governance and process management, sometimes in the belief that they refer to the same object. Ultimately, this causes difficulties for efforts to introduce a by-process approach in organizations. Firstly it has to be understood what process management means. This concept should be understood as a coordinated set of permanent tasks required to design processes and assure they function properly, and to foster process-related learning. These tasks can be represented as the design, monitoring, control and correction of processes, and the promotion of process-related learning in organizations. The role of Process Governance, meanwhile, is to guide Process Management, i.e., to fill the gap between strategy and execution, to help align the two and consequently to increase productivity and generate value. 2
3 Figure 1 - Relation between Process Governance, Process Management and Strategy in the Organization. Source: Enjourney, 2010 Building a Governance Model: Impacting Factors In order to build a sound Model of Governance it is necessary not only to understand the definition of Governance, but also to understand what major impacting factors must be reflected in the model. Only then will it be possible to generate a result that not only contains those factors, but uses them most efficiently. These factors are: The Sector where the firm operates and information on its portfolio of products and/or services: these factors steer and guide construction of the Governance Model; Business Strategy: impacts how the model will be constructed; Value Chain / Macro-process: this factor is the foundation for process management because it brings together the major cross-processes in the firm; Process or By-Process Management Status: this factor is explanatory as regards realities in the organization and the degree of maturity of its processes; Institutional Policies and Guidelines: these factors may be restrictive or driving, but they always steer organizational actions; Organizational Design and Power Structures: these factors are constraints on certain functions of the Governance Model, given the characteristics (functional, matrix, geographic etc.) of the organizational structure; Existing process-oriented instruments: are a facilitating and enabling factor for construction of a Process Governance Model; Process Maturity in the Organization: impacts how processes are structured, standardized, documented, managed and improved. Some Process Governance Frameworks in the Literature A Framework is a conceptual structure that enables different business objects to be framed and treated homogeneously. It can be defined as a set of concepts used to solve a problem in a specific domain. In our case, it provides a view of how Process Governance should be structured in the organization by bringing out explicitly some of its key elements, their forms and the levels at which they act. At present, various model Frameworks have been developed by a number of authors writing on this subject. Four of these are examined in this Article and will be discussed below to support construction of the model proposed by Enjourney. The first Framework to be examined is proposed by Braganza & Lambert (2000). In this model, Governance acts mainly in improving processes tied to the organization s day-to-day activities, seeking to balance and minimize conflicts between the two. Roles and their respective tasks and responsibilities are stated explicitly in the Governance Model in order to assist in fostering improvements. In addition, the model defines and legitamizes various other important elements, such as reward models that fluctuate between improvements and day-to-day activities. 3
4 Figure 2 - Process Governance Framework. Source: Braganza & Lambert, The second Framework is taken from Peeters (2008). In this model, Governance also acts in dayto-day activities, but it acts at the operations level, and this action is not directly connected with endeavors to achieve improvements. Definition of roles and responsibilities is related to each operational level, but not very clearly. Other important elements and the interrelations among them are mentioned, but not explored in much depth. 4
5 Figure 3 Process Governance Framework. Source: Adapted from Peeters, The following model is drawn from Korhonen (2007). Here Process Governance focuses on improvement by process re-design, but without acting on day-to-day activities. Governance tasks and roles, and their interrelations, are well defined and the author stresses the importance of there being a Process Office. 5
6 Figure 4 - Process Governance Framework. Source: Korhonen, Lastly, the Framework proposed by Barros (2009) proposes a model in which it is possible for Governance to act both in day-to-day activities and in process improvement, balancing the conflict that exists between them. Roles are defined, although the related tasks and responsibilities are not set out clearly enough for implementation purposes. Process Governance Framework: Enjourney Consulting and Education From analysis of the frameworks demonstrated above and its experience on the subject in projects in business and government in a wide range of industries sectors, Enjourney has developed a Framework using the elements it considers most important in defining an effective Process Governance Model which can meet organizational needs. Knowing that the object on which the governance model focuses are organizational processes, the key elements to be incorporated are: Decision-Making Models; Management Models; Introduction and Implementation; Sponsorship; Organizational Design; Budget; Roles and Tasks; Rewards; Design Cycle; 6
7 Organization Goals; Monitoring and Control; Performance Evaluation. From a combination of all these elements, Enjourney developed the model Framework shown in Figure 5 below: Figure 5 - Process Governance Framework. Source: Enjourney, The framework is made up of 7 (seven) elements and rests on general construction principles. The model is oriented by strategies and goals, which then disaggregate into the other elements. Execution centers on roles, division of tasks and the structure and criteria escalation for decisionmaking. All the elements of this model are supported by predefined standards and instruments and use control, evaluation and reward mechanisms. The elements present in the framework are detailed below: Strategies/Goals: express the organization s expectations, represent what it intends to accomplish with its actions in processes. It is extremely important for these goals to be clearly defined and effectively circulated, because they orient the actions of collaborators and the firm as a whole. Roles OF and IN Governance: the Roles OF Governance are representations held of such Governance in view of the stated goal. Roles IN Governance are the units or positions (or roles proper) created to give explicit, practical form to the model of action structured with a view to managing processes. 7
8 Division of Process Management Tasks: represents the pre-defined attributes, responsibilities and roles. The tasks and responsibilities of process management enable it to exist in the organization in structured form. Sponsorship, Structure and Criteria Escalation for Governance Decision-making: determines the set of relationships among the roles and may take into consideration determinants pertaining to hierarchy, interaction and collaboration. This structure comprises the definition of decision-making entitlements in Governance, as well as the prioritization of process designs and sponsorship structure. Standards and Instruments: represent the set of factors intended to give uniformity to process initiatives. This element embraces tools, methods, methodology, process architecture, metrics, documentation and so on. Control and Evaluation: represent the set of control and evaluation metrics necessary to ascertain the consistency and effectiveness of the process governance operating in the organization on the basis of the model designed previously. Recognition and Rewards: represents systems of rewards relating to performance of the roles involved in governance. In turn, a progress mechanism is defined that encourages and induces improvement and development in how such roles are performed. These vary with the stated goal and the set of roles (OF and IN governance) in place. Final Remarks The results produced by process management initiatives and the maturing of Process Management techniques over recent years have attracted the interest of organizations. The need to direct and organize process management itself has grown accordingly. Efforts to achieve change and improvement have to be conducted in keeping with clear definitions of the various related elements; otherwise, introduction of initiatives and actions to restructure processes may not produce the expected results, and success will not be guaranteed. It is thus vital that the organization is supported by a well-defined Process Governance Model aligned with the business strategy. This will permit coordination and communication among process initiatives through roles, responsibilities, structures and metrics by which processes in organizations can be measured and improved. In order to further understand the elements in the framework, please see (Paim & Flexa, 2011b) Authors Prof. Rafael Paim is a senior professional in Process Management. Over the last 15 years he has worked on over 120 consulting and research projects related to processes management and governance, information technology, services, and organizational design. Prof. Paim has trained over 2500 professionals, in more than 100 in-company courses and public process management courses in Brazil. In 2002, Prof. Paim lead a spin-off from COPPE/UFRJ and created a process management consulting and training firm, called Enjourney Consulting and Education. He is Founder Partner at Enjourney. In 2009, Prof. Paim published the book "Process Management: think, execute and learn". Since 2007 he has been an editorial board member of the Business Process Management Journal and has published more than 30 papers and articles on the topic. Since 2010, he has leaded an International Benchmarking Mission. Eight organizations were visited in 2010 and Nine will be visited in 2011, in London, Porto, Lisbon and Florida. Production Engineering Professor at Cefet-RJ, Brazil. Prof. Rafael Paim was visiting scholar at Carnegie Mellon University; is Business Process Management Journal Editorial Board Member; is author of the book: Process Management: think, execute and learn; and his main focus - in education, research and consulting - is process management. Nowadays, Rafael Paim is Professor of the Department of Production Engineering of the Federal Center for Technological Education Celso Suckow da Fonseca Cefet-RJ and collaborative professor of Poli / COPPE/ UFRJ. Prof. Paim is the GEOS Leader, focusing on research and professional 8
9 teaching. GEOS is a Group of Operations and Systems Management and Engineering at Cefet-RJ, Brazil. Rafael Paim is Production/Industrial Engineer, Master in Science, Doctor in Science, at Poli/COPPE/UFRJ. Prof. Raquel Flexa is a senior professional in Process Management. Over the last 12 years she has worked on over 50 consulting andresearch projects related to processes management and governance, industrial engineering, public management, health services, and organizational design. Prof. Flexa has trained over 1000 professionals, in more than 30 in-company courses and public process management courses in Brazil. In 2002, Prof. Flexa leaded a spin-off from COPPE/UFRJ and created a process management consulting and training firm, called Enjourney Consulting and Education. She is Founder Partner at Enjourney. Raquel was also supply chain manager at Biomanguinhos (the biggest vaccine producer in Latin America), at Fiocruz for two years. Production Engineering Professor at Cefet-RJ, Brazil. Prof. Raquel and her main focus - in education, research and consulting - is public management and health services. Nowadays, Raquel Flexa is Professor at the Department of Production Engineering infederal Center for Technological Education Celso Suckow da Fonseca (Cefet-RJ) and collaborative professor and PhD candidate at Poli / COPPE/ UFRJ. Prof. Flexa is a GEOS Member, focusing on research and professional teaching. GEOS is a Group of Operations and Systems Management and Engineering at Cefet-RJ, Brazil. Raquel Flexa is Production/Industrial Engineer, Master in Science at Poli/COPPE/UFRJ. BPTrends Linkedin Discussion Group We recently created a BPTrends Discussion Group on Linkedin to allow our members, readers and friends to freely exchange ideas on a wide variety of BPM related topics. We encourage you to initiate a new discussion on this publication or on other BPM related topics of interest to you, or to contribute to existing discussions. Go to Linkedin and join the BPTrends Discussion Group. 9
Project Management Office Charter
Old Dominion University Office of Computing and Communication Services Project Management Office Charter Version: 1.0 Last Update: February 18, 2010 Created By: Anthony Fox, PMP OCCS Project Management
Strategic Program Management
Governance Assessment Organizational Change Management Strategic Program Management Continuous Improvement Framework Processes Strategy Strategic Program Management Bob Prieto Published by Construction
Business Architecture: a Key to Leading the Development of Business Capabilities
Business Architecture: a Key to Leading the Development of Business Capabilities Brent Sabean Abstract: Relatively few enterprises consider themselves to be agile, i.e., able to adapt what they do and
Enterprise Architecture and Portfolio Management: The Need for IT Governance
Enterprise Architecture and Portfolio Management: The Need for IT Governance By Kavita Kalatur In a federal environment characterized by shrinking budgets and increasing regulation, CIOs are under constant
Appendix B Data Quality Dimensions
Appendix B Data Quality Dimensions Purpose Dimensions of data quality are fundamental to understanding how to improve data. This appendix summarizes, in chronological order of publication, three foundational
Leading Practices in Business Transformation
Leading Practices in Business Transformation Stick To The Game Plan Business Transformation Conference October 2013 While the typical risks and challenges seem intuitive, why do business transformation
IEEE IoT IoT Scenario & Use Cases: Social Sensors
IEEE IoT IoT Scenario & Use Cases: Social Sensors Service Description More and more, people have the possibility to monitor important parameters in their home or in their surrounding environment. As an
How Work Gets Done The Culture Audit
How Work Gets Done The Culture Audit Anyone who has been working for a while has probably been through at least one of these experiences. Which is part of your work history? Merger or acquisition Change
Board of Member States ERN implementation strategies
Board of Member States ERN implementation strategies January 2016 As a result of discussions at the Board of Member States (BoMS) meeting in Lisbon on 7 October 2015, the BoMS set up a Strategy Working
KEY CONCEPTS AND IDEAS
LEAD SELF The domain of the LEADS in a Caring Environment leadership capability framework, consists of four capabilities: a leader (1) Is Self-Aware, (2) Manages Self, (3) Develops Self, and (4) Demonstrates
Team Dynamics in Process Simplification. Introduction to Process Improvement Slide 1
Team Dynamics in Process Simplification Understanding the Basics of Team Development Slide 1 Teams are all around us Slide 2 Each team should: Define their principles in alignment with organizational vision
The Leadership Pipeline Ram Charan, Stephen Drotter, and James Noel
The Big Idea The Leadership Pipeline Ram Charan, Stephen Drotter, and James Noel There is a growing need to develop leaders within many corporations. The demand for leaders greatly outpaces the supply.
ILO. Information Technology Governance Committee (ITGC) Charter
ILO Information Technology Governance Committee (ITGC) Charter TABLE OF CONTENTS Charter... 1 Purpose... 1 Authority... 1 Membership... 1 Responsibilities... 2 Responsibilities of the ITG Committee...
CDC UNIFIED PROCESS PRACTICES GUIDE
Purpose The purpose of this document is to provide guidance on the practice of Modeling and to describe the practice overview, requirements, best practices, activities, and key terms related to these requirements.
ARB's overarching goals The Board has identified two objectives from the Act which underpin all of our work:
Architects Registration Board Communications Strategy Introduction Effective communication is key to the work of the Architects Registration Board (ARB), enabling the organisation to build and maintain
The Job of the Project Manager. Robert Youker World Bank (retired) 5825 Rockmere Drive Bethesda, Md. USA 20816 [email protected].
The Job of the Project Manager Robert Youker World Bank (retired) 5825 Rockmere Drive Bethesda, Md. USA 20816 [email protected] For any organization and for any project manager it is vitally important
High level principles for risk management
16 February 2010 High level principles for risk management Background and introduction 1. In their declaration of 15 November 2008, the G-20 leaders stated that regulators should develop enhanced guidance
project portfolio management
The business rationale of project portfolio management Several project management studies in the last five years have suggested that, the efficient and effective use of project management is critical to
Sound Transit Internal Audit Report - No. 2014-3
Sound Transit Internal Audit Report - No. 2014-3 IT Project Management Report Date: Dec. 26, 2014 Table of Contents Page Background 2 Audit Approach and Methodology 2 Summary of Results 4 Findings & Management
A Framework for a BPM Center of Excellence
Leandro Jesus, Andre Macieira, Daniel Karrer, Michael Rosemann Abstract A BPM Center of Excellence (CoE) is a governance mechanism that is widely adopted by organizations aiming for a consistent and centralized
A new approach in the assessment of the internal control systems applied in the public sector 1
I János Ivanyos József Roóz A new approach in the assessment of the internal control systems applied in the public sector 1 In our article, we will describe the new approach that supports the assessment
THIRD REGIONAL TRAINING WORKSHOP ON TAXATION. Brasilia, Brazil, December 3 5, 2002. Topic 4
THIRD REGIONAL TRAINING WORKSHOP ON TAXATION Brasilia, Brazil, December 3 5, 2002 Topic 4 INFORMATION TECHNOLOGY IN SUPPORT OF THE TAX ADMINISTRATION FUNCTIONS AND TAXPAYER ASSISTANCE Nelson Gutierrez
Leadership on BPM ideas, methods and results in Brazil
Leadership on BPM ideas, methods and results in Brazil A Framework for a BPM Center of Excellence e Leonardo ProcessDays ProcessDays July26th 2010 Leandro Jesus Managing Partner, ELO Group About the speaker
P3M3 Portfolio Management Self-Assessment
Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire P3M3 Portfolio Management Self-Assessment P3M3 is a registered trade mark of AXELOS Limited Contents Introduction
White Paper. Executive Guide to Business Process Management (BPM) and Integration with ERP
Executive Guide to Business Process Management (BPM) Content 1. Introduction... 3 2. Changing Business and IT... 4 3. Introducing Business Process Management (BPM)... 4 4. What BPM does... 5 5. BPM Project
4.1 Identify what is working well and what needs adjustment. 4.1.1 Outline broad strategies that will help to effect these adjustments.
(Overview) Step 1 Prepare 1.1 Identify specific issues or choices that the planning process should address. 1.2 Develop an organizational profile. 1.3 Identify any information that must be collected to
Background. Audit Quality and Public Interest vs. Cost
Basis for Conclusions: ISA 600 (Revised and Redrafted), Special Considerations Audits of Group Financial Statements (Including the Work of Component Auditors) Prepared by the Staff of the International
The PNC Financial Services Group, Inc. Business Continuity Program
The PNC Financial Services Group, Inc. Business Continuity Program 1 Content Overview A. Introduction Page 3 B. Governance Model Page 4 C. Program Components Page 4 Business Impact Analysis (BIA) Page
An organizational ethics management program The context of an organization s whistle-blowing program
An organizational ethics management program The context of an organization s whistle-blowing program Willem A Landman CEO, Ethics Institute of South Africa (EthicSA) Extraordinary Professor of Philosophy,
ITSM. Maturity Assessment
ITSM 2012 Maturity Assessment Table of Contents Introduction... 2 What is ITSM?... 2 What is ITIL... 2 Is ITS doing ITSM today?... 3 Where is ITS in relation to ITIL best practices?... 3 Readiness and
IT Sourcing. White Paper IT Advisory
IT Sourcing Sourcing of IT capabilities can result in significant benefits. Besides getting access to market competence and development, BearingPoint s experience is that the actual cost savings typically
A shift in responsibility. More parties involved Integration with other systems. 2
EFFECTIVE SERVICE RELATIONSHIP MANAGEMENT ALSO INCLUES THE FOLLOWING ACTIVITIES: Today, organizations frequently elect to have certain services be provided by service vendors, also referred to as service
STANDARD. Risk Assessment. Supply Chain Risk Management: A Compilation of Best Practices
A S I S I N T E R N A T I O N A L Supply Chain Risk Management: Risk Assessment A Compilation of Best Practices ANSI/ASIS/RIMS SCRM.1-2014 RA.1-2015 STANDARD The worldwide leader in security standards
LEADERSHIP DEVELOPMENT FRAMEWORK
LEADERSHIP DEVELOPMENT FRAMEWORK February 13, 2008 LEADERSHJP PERSPECTIVE I consider succession planning to be the most important duty I have as the Director of the NOAA Corps. As I look toward the future,
ESRC Research Data Policy
ESRC Research Data Policy Introduction... 2 Definitions... 2 ESRC Research Data Policy Principles... 3 Principle 1... 3 Principle 2... 3 Principle 3... 3 Principle 4... 3 Principle 5... 3 Principle 6...
Learning Outcomes Implementation Guidance - Revised Staff Questions & Answers Document
Committee: International Accounting Education Standards Board Meeting Location: IFAC Headquarters, New York, USA Meeting Date: November 4 6, 2015 SUBJECT: Learning Outcomes Implementation Guidance - Revised
Building an effective stay back team to gain maximum value from an outsourcing agreement
WHITE PAPER Building an effective stay back team to gain maximum value from an outsourcing agreement How to define its role, determine its size and assess the skills required 1 cgi.com 2015 CGI GROUP INC.
Business Analyst Position Description
Analyst Position Description September 4, 2015 Analysis Position Description September 4, 2015 Page i Table of Contents General Characteristics... 1 Career Path... 2 Explanation of Proficiency Level Definitions...
Self-Assessment Tool for Service-Learning Sustainability
Self-Assessment Tool for Service-Learning Sustainability distributed by Community-Campus Partnerships for Health to assist our higher education-based members in their service-learning efforts This self-assessment
Organizational Restructuring
Organizational Restructuring The Challenge Facilitating better alignment between technology and business units Focusing organizational strengths on delivering business value despite frequent distractions
Office of the Chief Information Officer
Office of the Chief Information Officer Business Plan: 2012 2015 Department / Ministère: Executive Council Date: November 15, 2012 1 P a g e This Page Left Intentionally Blank 2 P a g e Contents The Business
Project Management Best Practice Benchmarks
A PM SOLUTIONS RESEARCH COMPENDIUM Project Management COST SCOPE Quality SCHEDULE 2 Project Management Senior executives want to know one thing about project management: What s the value? Today more than
Five Core Principles of Successful Business Architecture
Five Core Principles of Successful Business Architecture Authors: Greg Suddreth and Whynde Melaragno Strategic Technology Architects (STA Group, LLC) Sponsored by MEGA Presents a White Paper on: Five Core
Business Process Management. Prof. Corrado Cerruti General Management Course
Business Process Management General Management Course Summary Business Process Management definition Business Process Management Life Cycle ARIS approach to BPM Business Process Identification; Designing
Solutions Master Data Governance Model and Mechanism
www.pwc.com Solutions Master Data Governance Model and Mechanism Executive summary Organizations worldwide are rapidly adopting various Master Data Management (MDM) solutions to address and overcome business
Enterprise Risk Management: From Theory to Practice
INSURANCE Enterprise Risk Management: From Theory to Practice KPMG LLP Executive Summary Enterprise Risk Management (ERM) is a structured and disciplined business tool aligning strategy, processes, people,
6 Essential Characteristics of a PLC (adapted from Learning by Doing)
6 Essential Characteristics of a PLC (adapted from Learning by Doing) 1. Shared mission, vision, values, goals Educators in a PLC benefit from clarity regarding their shared purpose, a common understanding
Human Resources Management Philosophy JAGODA MRZYGŁOCKA-CHOJNACKA PHD 1
Human Resources Management Philosophy JAGODA MRZYGŁOCKA-CHOJNACKA PHD 1 Human Resources Management Philosophy The HR Management Philosophy is not mainly about Human Resources Function. It is more about
TDWI strives to provide course books that are content-rich and that serve as useful reference documents after a class has ended.
Previews of TDWI course books offer an opportunity to see the quality of our material and help you to select the courses that best fit your needs. The previews cannot be printed. TDWI strives to provide
Agile Master Data Management TM : Data Governance in Action. A whitepaper by First San Francisco Partners
Agile Master Data Management TM : Data Governance in Action A whitepaper by First San Francisco Partners First San Francisco Partners Whitepaper Executive Summary What do data management, master data management,
E-commerce in Developing Countries. Judy Young School of Information Systems University of Tasmania [email protected]
E-commerce in Developing Countries Judy Young School of Information Systems University of Tasmania [email protected] Gail Ridley School of Information Systems University of Tasmania [email protected]
Overview of: A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition
Overview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition Overview of: A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition 1 Topics for Discussion
A CobiT Case Study. Drawing on CobiT for the implementation of an Enterprise Risk Management Framework. December 2008
A CobiT Case Study Drawing on CobiT for the implementation of an Enterprise Risk Management Framework December 2008 Presenter: Clive E. Waugh, CISSP C/EH 1 Risk Management Framework Objectives CobiT provided
Forest Carbon Partnership Facility (FCPF)
Forest Carbon Partnership Facility (FCPF) Readiness Mechanism Review and Assessment of Readiness Preparation Proposals DRAFT September 4, 2009 This Program Document updates Program Document FMT 2009-1-Rev.2
Integrating Continuity of Operations (COOP) into the Enterprise Architecture
Volume 1, Issue 2 August 2007 Continuity of Operations Leadership Series for Government Integrating Continuity of Operations (COOP) into the Enterprise Architecture Pillar COOP Leadership Series for Government
SEMS/NIMS MANAGEMENT SYSTEM REVISED SEPTEMBER 2007
SEMS/NIMS MANAGEMENT SYSTEM REVISED SEPTEMBER 2007 SEMS/NIMS - SYSTEM (ICS) is the model tool for command, control, and coordination of a response and provides a means to coordinate the efforts of individual
15) GUIDELINES ON THE APPLICATION OF ISO 9001:2000 FOR THE FOOD AND DRINK INDUSTRY
15) GUIDELINES ON THE APPLICATION OF ISO 9001:2000 FOR THE FOOD AND DRINK INDUSTRY INTRODUCTION During the course of these seminars you have come across with the good management standards applicable within
Advanced Risk Analysis for High-Performing Organizations
Pittsburgh, PA 15213-3890 Advanced Risk Analysis for High-Performing Organizations Christopher Alberts Audrey Dorofee Sponsored by the U.S. Department of Defense 2006 by Carnegie Mellon University page
A&CS Assurance Review. Accounting Policy Division Rule Making Participation in Standard Setting. Report
A&CS Assurance Review Accounting Policy Division Rule Making Participation in Standard Setting Report April 2010 Table of Contents Background... 1 Engagement Objectives, Scope and Approach... 1 Overall
BPM: Chess vs. Checkers
BPM: Chess vs. Checkers Jonathon Struthers Introducing the Games Business relies upon IT systems to perform many of its tasks. While many times systems don t really do what the business wants them to do,
Project Management Competencies in the Project Oriented Organization
Project Management Competencies in the Project Oriented Organization In the project-based organization, project management (pm) competences are not only required by individuals, but also by project teams
Reaching CMM Levels 2 and 3 with the Rational Unified Process
Reaching CMM Levels 2 and 3 with the Rational Unified Process Rational Software White Paper TP174 Table of Contents INTRODUCTION... 1 LEVEL-2, REPEATABLE... 3 Requirements Management... 3 Software Project
Last updated: July 2009
Effective Organizational Processes Last updated: July 2009 Table of contents Designing effective organizations: overview When are processes the problem/answer? Basic principles and how to approach the
HKIHRM HR PROFESSIONAL STANDARDS MODEL
HKIHRM HR PROFESSIONAL STANDARDS MODEL Creating Values For You and For Organisations Setting Standards Recognising s ABOUT HKIHRM The Hong Kong Institute of Human Resource Management (HKIHRM) is the leading
EFFECTIVE STRATEGIC PLANNING IN MODERN INFORMATION AGE ORGANIZATIONS
EFFECTIVE STRATEGIC PLANNING IN MODERN INFORMATION AGE ORGANIZATIONS Cezar Vasilescu and Aura Codreanu Abstract: The field of strategic management has offered a variety of frameworks and concepts during
HRQM AND COLLIDING GYROSCOPES AN ALTERNATIVE WAY OF LOOKING AT VALUE CREATION IN ORGANIZATIONS
HRQM AND COLLIDING GYROSCOPES AN ALTERNATIVE WAY OF LOOKING AT VALUE CREATION IN ORGANIZATIONS Study stream Human resource and Quality management JOOP VINKE Arnhem Business School Arnhem, HAN University
State of Minnesota IT Governance Framework
State of Minnesota IT Governance Framework June 2012 Table of Contents Table of Contents... 2 Introduction... 4 IT Governance Overview... 4 Process for Developing the New Framework... 4 Management of the
the discipline has real value to offer managers
Marketing in a Nutshell: Key Concepts for Non- Specialists Mike Meldrum and Malcolm McDonald Butterworth-Heinemann 2007 ISBN: 0750681330, 294 pages Theme of the Book Mike Meldrum and Malcolm McDonald set
Mapping COBIT 5 with IT Governance, Risk and Compliance at Ecopetrol S.A. By Alberto León Lozano, CISA, CGEIT, CIA, CRMA
Volume 3, July 2014 Come join the discussion! Alberto León Lozano will respond to questions in the discussion area of the COBIT 5 Use It Effectively topic beginning 21 July 2014. Mapping COBIT 5 with IT
Process Management: Creating Supply Chain Value
Process Management: Creating Supply Chain Value Carol L. Marks, C.P.M., Director of Purchasing and Business Management Systems Industrial Distribution Group, Southern Division 704/398-5666; [email protected]
structures stack up Tom McMullen
Making sure your organization structures stack up October 21, 2009 Tom McMullen Building effective organizations Trends in organization design Optimizing Focusing resources and reducing headcounts Removing
PEOPLE INVOLVEMENT AND THEIR COMPETENCE IN QUALITY MANAGEMENT SYSTEMS * Jarmila ŠALGOVIČOVÁ, Matej BÍLÝ
PEOPLE INVOLVEMENT AND THEIR COMPETENCE IN QUALITY MANAGEMENT SYSTEMS * Jarmila ŠALGOVIČOVÁ, Matej BÍLÝ Authors: Workplace: Assoc. Prof. Jarmila Šalgovičová, PhD., Prof. Matej Bílý, DrSC.* Institute of
How to Develop a Board Member s Job Description
How to Develop a Board Member s Job Description Many board members serve for months before they really understand their roles and responsibilities. This confusion can waste valuable time and energy for
RELATIONAL DIAGRAM OF MAIN CAPABILITIES. Strategic Position position (A) Strategic Choices choices (B) Strategic Action action (C)
Business Analysis (P3) September 2015 to August 2016 Syllabus AIM FR (F7) BA (P3) AB (F1) APM (P5) PM (F5) To apply relevant knowledge, skills, and exercise professional judgement in assessing strategic
CORPORATE INFORMATION AND TECHNOLOGY STRATEGY
Version 1.1 CORPORATE INFORMATION AND TECHNOLOGY STRATEGY The City of Edmonton s Information and Technology Plan, 2013-2016 Bringing the Ways to Life through Information and Technology June 2013 2 Copyright
Program Management Professional (PgMP) Examination Content Outline
Program Management Professional (PgMP) Examination Content Outline Project Management Institute Program Management Professional (PgMP ) Examination Content Outline April 2011 Published by: Project Management
CHANGING HRM PRACTICES WITH SPECIAL REFERENCE TO RETENTION POLICIES AT TCS
CHANGING HRM PRACTICES WITH SPECIAL REFERENCE TO RETENTION POLICIES AT TCS Ms. Ruchita Petkar Asst. Professor ATSS CBSCA, Chinchwad, Pune Dr. Suhas Sahasrabudhe Principal CSIT, Shahu Nagar, Pune Abstract:
Strategic solutions to drive results in matrix organizations
Strategic solutions to drive results in matrix organizations Copyright 2004-2006, e-strategia Consulting Group, Inc. Alpharetta, GA, USA or subsidiaries. All International Copyright Convention and Treaty
GUIDE ON DEVELOPING SERVICE STANDARDS
GUIDE ON DEVELOPING SERVICE STANDARDS Contents 1. Background... 3 2. Why the Guide/ Toolkit?... 4 3. Service Delivery Planning Value Chain Components... 4 4. Definition and types of Service Standards...
Implementing Portfolio Management: Integrating Process, People and Tools
AAPG Annual Meeting March 10-13, 2002 Houston, Texas Implementing Portfolio Management: Integrating Process, People and Howell, John III, Portfolio Decisions, Inc., Houston, TX: Warren, Lillian H., Portfolio
ACMP Certification Committee. Methods for Demonstrating Competency
ACMP Certification Committee Methods for Demonstrating Competency 6 February 2014 CCMP Assessment of Competency ACMP s Certification Committee recommended a two-part assessment through which CCMP applicants
DEVELOPING THE PROJECT PORTFOLIO MANAGEMENT PROCESS AND MATURITY STEP BY STEP
1 (7) DEVELOPING THE PROJECT PORTFOLIO MANAGEMENT PROCESS AND MATURITY STEP BY STEP IPMA World Congress 2009-06-11 Seminar 1: Strategy Creation and Project Portfolios Tuesday, June 16, 2009, 10:30-11.00
MoP Glossary of Terms - English
English Term aggregated risk English Definition The overall level of risk to the portfolio when all the risks are viewed as a totality rather than individually. This could include the outputs of particular
Partner selection: A source of alliance success. Danielle Twardy
Partner selection: A source of alliance success Danielle Twardy Table of Contents Introduction 1. The study 2. The role of a partner selection process in alliance capability building 3. Which steps are
Strategic Project Management Alex S. Brown, PMP Strategic Planning Office Manager, MSIG USA. Introduction. Strategic Planning at MSIG USA
Strategic Project Management Alex S. Brown, PMP Strategic Planning Office Manager, MSIG USA A nightmare for project managers: Introduction To spend time, money, and effort, execute a project To end on-time
Solutions. Master Data Governance Model and the Mechanism
Solutions Master Data Governance Model and the Mechanism Executive summary Organizations worldwide are rapidly adopting various Master Data Management (MDM) solutions to address and overcome business issues
Agile project portfolio manageme nt
Agile project portfolio manageme nt Agile project & portfolio summit at Harrisburg University May 9, 2016 Agile project portfolio management Agenda Portfolio management challenges Traditional portfolio
The Vienna PhD School of Informatics Design, Implementation and Experiences
The Vienna PhD School of Informatics Design, Implementation and Experiences María del Carmen Calatrava Moreno, Hannes Werthner Vienna University of Technology Vienna, Austria [email protected]
Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire. P3M3 Project Management Self-Assessment
Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire P3M3 Project Management Self-Assessment Contents Introduction 3 User Guidance 4 P3M3 Self-Assessment Questionnaire
Achieving Excellence in Capital Asset Management through Project Portfolio Management
Achieving Excellence in Capital Asset Management through Project Portfolio Management Dr. Nicole L. Oxley, CEO, Oxley Enterprises, Inc. Angela Rahman, Senior Consultant, Oxley Enterprises, Inc. Introduction
ISO Revisions Whitepaper
ISO Revisions ISO Revisions Whitepaper What is the difference between a procedures and a process approach? Approaching change Process vs procedures: What does this mean? The concept of process management