DECISION OF THE PULIC AUTHORITIES BOARD OF THE ECSEL JOINT UNDERTAKING
|
|
|
- Charleen Hunt
- 9 years ago
- Views:
Transcription
1 DECISION OF THE PULIC AUTHORITIES BOARD OF THE ECSEL JOINT UNDERTAKING Approving the selection of project proposals retained for funding following ECSEL Call and the allocation of funding THE PUBLIC AUTHORITIES BOARD OF THE ECSEL JOINT UNDERTAKING, Having regard to the Statutes annexed to Council Regulation (EU) No 561/2014 of 6 May 2014 on the establishment of the ECSEL Joint Undertaking, and in particular Articles 9 5(b) and 12(e); Having regard to the Decision of the Public Authorities Board on the evaluation and selection procedures related to Calls for proposals 1, Having regard to the Governing Board decision approving the work plan for 2015 and describing the scope and budget of ECSEL Calls , WHEREAS: (1) Pursuant to the work plan, the Joint Undertaking has published on 17 March 2015 the ECSEL Call H2020-ECSEL RIA-TWO STAGE with a deadline of 8 September 2015; (2) 51 Full Project Proposals for research and innovation actions were submitted in response to this Call, out of which 51 satisfied the eligibility criteria for proposals and 0 were not compliant; (3) The 51 proposals were evaluated by independent experts in accordance with the ECSEL evaluation and selection procedures related to Calls for proposals, under the coordination of the ECSEL JU. 1 2 ECSEL PAB ECSEL GB , amended by decision ECSEL GB
2 (4) Following the evaluation of the 51 full project proposals, the following results are reported in the Evaluation Report of the ECSEL Call : - Evaluation Summary Reports were produced for each proposal, - 11 proposals did not reach the evaluation thresholds and were included in the "below threshold" list, - The remaining 40 proposals reached the evaluation thresholds and were included in the "above threshold" list (ranked list with scores). (5) The PAB should decide on the final ranking of proposals. (6) The PAB should approve the list of selected proposals with the indications of maximum eligible costs and allocated maximum public funding. (7) The PAB should reject the proposals in the "below threshold" list as well as those that it deems not financially viable due to limitations in the available public funding. (8) The PAB may establish a reserve list of proposals. (9) The Executive Director should implement the decision of the PAB by entering into contact with the consortia of selected proposals and signing the relevant grant agreements. HAS ADOPTED THIS DECISION: Article 1 The ranking of the proposals in the "above threshold" list in Annex 1 is approved. Article 2 8 proposals should be selected for possible financing within the maximum eligible costs and the maximum public funding allocated as annexed to this Decision (Annex 2). 3 The Executive Director should take the necessary decisions to implement the decision of the PAB and should sign, where relevant, the grant agreement with selected consortia indicated in Annex 2. He should inform the PAB of the dates and conditions of the signature of the JU grant agreements. Article 3 1 proposal should be put on the reserve list (Annex 3). 3 The EU contribution is based on the budget foreseen for JTIs in the general Union budget. The total EU estimated contribution for CALL ECSEL RIA and CALL ECSEL IA is 145 M, of which 95 M represents revenues from the 2015 general Union budget and 50 M represents estimated revenues from 2016 estimated general Union budget. The total amount of 50 M (of which 17 M for CALL ECSEL RIA) deriving from the 2016 estimated general Union budget is subject to its adoption by the budgetary authority and may be updated accordingly. Taking this into consideration, concerning EU contribution projects ranked 1-4 will be financed by the 2015's Union budget (up to 33 M ) and those ranked 5-8 will be financed by the 2016's Union budget (see Annex 1). 2
3 Article 4 11 proposals in the "below threshold" list should be rejected as its score is below threshold in one or more evaluation criteria or below the minimum total score required (Annex 4). Article 5 30 proposals should not be selected for funding because the Public Authorities Board considers them as not financially viable due to limitations in the available public funding (Annex 4). 1 proposal should not be selected for funding because the Public Authorities Board considers it having a too strong overlap with projects that are already funded (Annex 4). Article 6 The Executive Director shall inform the corresponding National Funding Authorities of the signature of the JU Grant agreement, in order to proceed with the establishment of the National Grant Agreements. Article 7 This Decision shall enter into force on the date of its adoption. Done at Brussels, on 18 November 2015, For the Public Authorities Board (signed) Ben Ruck Chairperson of the Public Authorities Board Annexes: - Annex 1: ranking of proposals - Annex 2: list of selected proposals retained for funding - Annex 3: reserve list - Annex 4: list of non-retained proposals 3
4 ANNEX 1 - RANKING OF PROPOSALS The PAB ranking takes into account the points resulting from the total scores of the evaluation by experts and the level of synergy of the proposed work with EU and national R&D&I policies. Ranking Project Acronym 1 SafeCOP 2 3DAM 3 AMASS 4 4 REFERENCE 5 PRIME 6 DEPHI4LED 7 DENSE 8 5 ASTONISH 4 Projects ranked 1-4 will be financed by the 2015's Union budget 5 Projects ranked 5-8 will be financed by the 2016's Union budget after the adoption of the 2016 budget and the 2016 Work plan. 4
5 Call: ECSEL ANNEX 2 - LIST OF SELECTED PROPOSALS RETAINED FOR FUNDING Proposal Legal Name of Coordinator EPS H2020 costs EU funding acronym SafeCOP ALTEN SVERIGE AKTIEBOLAG SE 11,580, ,777, DAM FEI ELECTRON OPTICS BV NL 22,396, ,582, AMASS FUNDACION TECNALIA RESEARCH & INNOVATION ES 20,481, ,211, REFERENCE S.O.I.TEC SILICON ON INSULATOR TECHNOLOGIES SA FR 33,144, ,068, PRIME INTERUNIVERSITAIR MICRO-ELECTRONICACENTRUM VZW BE 38,847, ,199, DELPHI4LED PHILIPS LIGHTING B.V. NL 9,594, ,834, DENSE DAIMLER AG DE 14,439, ,221, ASTONISH PHILIPS MEDICAL SYSTEMS NEDERLAND BV NL 18,334, ,895, TOTAL 168,819, ,791, Proposal acronym SafeCOP 3DAM AMASS REFERENCE Legal Name of Participants ALTEN SVERIGE AKTIEBOLAG; DANMARKS TEKNISKE UNIVERSITET; TEKNOLOGISK INSTITUT; MOBILE INDUSTRIAL ROBOTS ApS; ODENSE UNIVERSITETSHOSPITAL; TECHNICON APS; ILMATIETEEN LAITOS; MOBISOFT OY; ALTE Visetec Oy; UNIVERSITA DEGLI STUDI DELL'AQUILA; CONSIGLIO NAZIONALE DELLE RICERCHE; Intelligence Behind Things Solutions S.r.l.; Impara S.r.l.; POLITECNICO DI MILANO; Thales Italia spa; AITEK SOCIETA' PER AZIONI; RO TECHNOLOGY SRL; INTECS SPA; DNV GL AS; MARITIME ROBOTICS AS; STIFTELSEN SINTEF; INSTITUTO SUPERIOR DE ENGENHARIA DO PORTO; GMVIS SKYSOFT SA; TEKEVER II AUTONOMOUS SYSTEMS LDA; MAELARDALENS HOEGSKOLA; Qamcom Research and Technology AB; KUNGLIGA TEKNISKA HOEGSKOLAN; Safety Integrity AB; SICS Swedish ICT Västerås AB FEI ELECTRON OPTICS BV; APPLIED MATERIALS ISRAEL LTD; INTERUNIVERSITAIR MICRO- ELECTRONICACENTRUM IMEC VZW; NEDERLANDSE ORGANISATIE VOOR TOEGEPAST NATUURWETENSCHAPPELIJK ONDERZOEK TNO; NOVA MEASURING INSTRUMENTS LTD; JORDAN VALLEY SEMICONDUCTORS LTD; COMMISSARIAT A L ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVES; Attolight Sàrl; SEMILAB FELVEZETO FIZIKAI LABORATORIUM RESZVENYTARSASAG; CAMECA; ADAMA INNOVATIONS LTD; FEI SAS; STMICROELECTRONICS CROLLES 2 SAS; TECHNISCHE UNIVERSITEIT EINDHOVEN; CAPRES A/S; DANMARKS TEKNISKE UNIVERSITET; APPLIED MATERIALS FRANCE FUNDACION TECNALIA RESEARCH & INNOVATION; HONEYWELL INTERNATIONAL SRO; SIEMENS AKTIENGESELLSCHAFT OESTERREICH; KPIT MEDINI TECHNOLOGIES AG; MAELARDALENS HOEGSKOLA; ECLIPSE FOUNDATION EUROPE GMBH; INFINEON TECHNOLOGIES AG; AIT Austrian Institute of Technology GmbH; FONDAZIONE BRUNO KESSLER; INTECS SPA; Berner&Mattner Systemtechnik GmbH; GMV AEROSPACE AND DEFENCE SA UNIPERSONAL; RINA SERVICES SPA; THALES ALENIA SPACE ESPANA, SA; UNIVERSIDAD CARLOS III DE MADRID; RAPITA SYSTEMS LIMITED; CENTRO DE INNOVACION Y SOLUCIONES EMPRESARIALES Y TECNOLOGICAS SL; Safety Integrity AB; Masarykova univerzita; AVL LIST GMBH; Kompetenzzentrum - Das Virtuelle Fahrzeug, Forschungsgesellschaft mbh; IMPRONOVA AB; COMMISSARIAT A L ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVES; CLEARSY SAS; ALTEN SVERIGE AKTIEBOLAG; LANGE RESEARCH AIRCRAFT GMBH; Thales Italia spa; SP SVERIGES TEKNISKA FORSKNINGSINSTITUT AB; Comentor AB; ALLIANCE POUR LES TECHNOLOGIES DE L'INFORMATIQUE S.O.I.TEC SILICON ON INSULATOR TECHNOLOGIES SA; AIRBUS DEFENCE AND SPACE GMBH; Ferfics Limited; GLOBALFOUNDRIES Dresden Module One LLC & Co. KG; NANIUM S.A.; sentronics metrology GmbH; SILTRONIC AG; STMICROELECTRONICS S.A.; TELIT AUTOMOTIVE SOLUTIONS SARL; AED Engineering GmbH; COMMISSARIAT A L ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVES; FRAUNHOFER GESELLSCHAFT ZUR FORDERUNG DER ANGEWANDTEN FORSCHUNG EV; INTERUNIVERSITAIR MICRO-ELECTRONICACENTRUM IMEC VZW; TECHNISCHE UNIVERSITAET DRESDEN; UNIVERSITE LYON 1 CLAUDE BERNARD; UNIVERSITAET DER BUNDESWEHR MUENCHEN. 5
6 Proposal acronym PRIME DELPHI4LED DENSE ASTONISH Legal Name of Participants INTERUNIVERSITAIR MICRO-ELECTRONICACENTRUM IMEC VZW; GLOBALFOUNDRIES Dresden Module One LLC & Co. KG; FRAUNHOFER GESELLSCHAFT ZUR FORDERUNG DER ANGEWANDTEN FORSCHUNG EV; STMICROELECTRONICS S.A.; COMMISSARIAT A L ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVES; STICHTING IMEC NEDERLAND; TECHNISCHE UNIVERSITAET DRESDEN; ZENTRUM MIKROELEKTRONIK DRESDEN AG; CEZAMAT PW Sp. z o.o.; SURECORE LTD; TECHNOLUTION BV; INTRINSIC ID B.V.; S.O.I.TEC SILICON ON INSULATOR TECHNOLOGIES SA; Dream Chip Technologies GmbH; Singulus Technologies AG; Bubbles and Beyond GmbH; VL BV*VIRAGE LOGIC; STMICROELECTRONICS ROUSSET SAS PHILIPS LIGHTING B.V.; TECHNISCHE UNIVERSITEIT EINDHOVEN; BUDAPESTI MUSZAKI ES GAZDASAGTUDOMANYI EGYETEM; MENTOR GRAPHICS MAGYARORSZAG SZAMITASTECHNIKAI TANACSADO ES KERESKEDELMI KORLATOLT FELELOSSEGU TARSASAG; Mentor Graphics (Ireland) Limited UK Branch; Teknologian tutkimuskeskus VTT Oy; Lighting Design Collective Oy; Flexbright Oy; MAGILLEM DESIGN SERVICES SAS; INGELUX; Pi Lighting SARL; PISEO; PHILIPS FRANCE; ECCE'LECTRO; Havells Sylvania Lighting Belgium NV DAIMLER AG; AUTOLIV DEVELOPMENT AB; AUTOLIV ELECTRONICS AB; Autoliv Electronic SAS; CENTRE D ETUDES ET D EXPERTISE SUR LES RISQUES L ENVIRONNEMENT LA MOBILITE ET L AMENAGEMENT; EUROPEAN CENTER FOR INFORMATION AND COMMUNICATION TECHNOLOGIES GMBH; Hitachi Europe GmbH; IBEO AUTOMOTIVE SYSTEMS GMBH; Innoluce; MODULIGHT OY; OPLATEK GROUP OY; RENAULT SAS; TTY-SAATIO; UNIVERSITAET ULM; VAISALA OYJ; Teknologian tutkimuskeskus VTT Oy; Xenics nv PHILIPS MEDICAL SYSTEMS NEDERLAND BV; PHILIPS ELECTRONICS NEDERLAND B.V.; TECHNISCHE UNIVERSITEIT EINDHOVEN; Stichting Kempenhaeghe; QUEST PHOTONIC DEVICES BV; ANTERYON BV; STICHTING HET NEDERLANDS KANKER INSTITUUT-ANTONI VAN LEEUWENHOEK ZIEKENHUIS; ACADEMISCH ZIEKENHUIS LEIDEN; STMICROELECTRONICS SRL; CONSIGLIO NAZIONALE DELLE RICERCHE; UNIVERSITA DEGLI STUDI DI PALERMO; UNIVERSITA DEGLI STUDI GABRIELE D'ANNUNZIO DI CHIETI- PESCARA; Teknologian tutkimuskeskus VTT Oy; Icare Finland Oy; OKMETIC OYJ; VYSOKE UCENI TECHNICKE V BRNE; INSTITUT MIKROELEKTRONICKYCH APLIKACI S.R.O.; INTERUNIVERSITAIR MICRO- ELECTRONICACENTRUM IMEC VZW; g.tec medical engineering Spain SL; AGENCIA ESTATAL CONSEJO SUPERIOR DE INVESTIGACIONES CIENTIFICAS; IBERMATICA SA; FUNDACION TECNALIA RESEARCH & INNOVATION; NORAY BIOINFORMATICS SL; UNIVERSIDAD DEL PAIS VASCO/ EUSKAL HERRIKO UNIBERTSITATEA 6
7 ANNEX 3 - LIST OF PROPOSALS RETAINED FOR THE RESERVE LIST The following proposal is on the reserve list: Hyb-Man 6 ANNEX 4 - LIST OF NON-RETAINED PROPOSALS The following proposals are below threshold: Project Acronym Below threshold for criterion ARIES Asips-For-CPS ChiPackBo CyberSafeWork ECSIS LearningHealth P2NS RESCUE SafeIC SWESYS We-Spear Impact Excellence and Impact Excellence All All All Excellence and Impact Implementation All Impact and Implementation Excellence and Implementation 6 If funded this project will be financed by the 2016 Union budget after the adoption of the 2016 budget and the 2016 Work plan. 7
8 The following proposals are not viable due to exhaustion of public funding. Project Acronym AAA4CPS AQUAS ASSESSORS COSMIC CPSforIoT CROWD-IT DEBTclock E-Harvest EMCROSS EvoBoard FOODCHAIN GALAXY HASTINGS I-MECH INDICATE InSiC INTELLUM MASH7 MegaMaRt MEMPHIS MoISSon RepDyn RUNMESAFE 8
9 SHIVA SIGMA SMART RF SmartERA US4U VisionNet WeWair AAA4CPS AQUAS ASSESSORS COSMIC CPSforIoT CROWD-IT DEBTclock E-Harvest EMCROSS The following proposal should not be selected for funding because the Public Authorities Board considers it having a too strong overlap with projects that are already funded (Annex 4). SMILI 9
DECISION OF THE PULIC AUTHORITIES BOARD OF THE ECSEL JOINT UNDERTAKING
DECISION OF THE PULIC AUTHORITIES BOARD OF THE ECSEL JOINT UNDERTAKING Approving the selection of project proposals retained for funding following ECSEL Call 2015-2 and the allocation of funding THE PUBLIC
C h a r t 1 - KPNQwest Group
C h a r t 1 - Group NV BIJLAGE / ANNEX 1 IP Services BV Services Finance BV financing moratorium: 30-05 bankruptcy: 25-09 09-2002 Assets Central Europe BV moratorium: 18-06 moratorium has ended Netherlands
ECSEL Call 2015 Work Plan and submission tools. Yves Gigase
ECSEL Call 2015 Work Plan and submission tools Yves Gigase 1 Where to find? Check out the ECSEL website and the participant portal for H2020 Documents: Work Plan: schedule, budget, topics, evaluation procedure
The Netherlands ICT R&D
The Netherlands ICT R&D In 2009, business expenditure on R&D (BERD) in the ICT sectors amounted to 672M, down from 674M the year before, resulting in a slightly increased R&D intensity of 2.7% of sectoral
EU R&I POLICY & DATA-DRIVEN DECISION MAKING. Knowing your innovation ecosystem actors: data on European RTOs
EU R&I POLICY & DATA-DRIVEN DECISION MAKING Knowing your innovation ecosystem actors: data on European RTOs 13 March 2015 Contents 1. Introduction... 2 2. The distinctive mission of RTOs... 3 3. Lack of
The Netherlands: ICT R&D and participation to FP7
The Netherlands: ICT R&D and participation to FP7 Research & Development expenditure in ICT In 2011, public support for ICT R&D (ICT GBAORD) in the Netherlands was 6.6% of total public funding for R&D,
How To Build An International Security System
IMSK Integrated Mobile Security Kit EU Security Research - Achievements & Lessons Learned 1 Brussels November 30th, 2010 Daniel Forsberg, SAAB AB Project details Project Start: 1st of March 2009 Project
Final Report EU Financial Contribution Distribution
EUROPEAN COMMISSION RESEARCH AND INNOVATION DG Final Report EU Financial Contribution Distribution Project No: 218812 Project Acronym: MyOcean Project Full Name: Development and pre-operational validation
Action Plan D4 Anne-Sophie PARENT - Action on innovation for Age friendly environments
Action Plan D4 Anne-Sophie PARENT - Action on innovation for Age friendly environments Support to active and healthy ageing through innovation for age-friendly buildings, cities and environments What is
Spain: ICT R&D and participation to FP7
Spain: ICT R&D and participation to FP7 Research & Development expenditure in ICT In 2011, public support for ICT R&D (ICT GBAORD) in Spain was 686.7M, roughly 9% of total public funding for R&D, which
DK 5229 2012DSV DE SAMMENSLUTTEDE VOGNMAEND AF 13-7 1976 A/S CH 7990 2012PANALPINA WELTTRANSPORT (HOLDING) AG
Név Ország kód TEÁOR Utolsó kód beszámoló Tulajdonos Forgalom EUR Létszám 1 SCHENKER AKTIENGESELLSCHAFT DE 5229 2012BUNDESMINISTERIUM 15389000 n.a. 2 KUEHNE & NAGEL INTERNATIONAL AG CH 5222 2012 KÜHNE,
L innovazione tecnologica dell industria italiana verso la visione europea del prossimo futuro
L innovazione tecnologica dell industria italiana verso la visione europea del prossimo futuro Mercoledì 2 Aprile 2014 Pilot line integration for next generation MEMS products Dino Faralli, STMicroelectronics,
ZOZ 213 VAS 452002-2012-06
Surface C Pochte d Reinigung Oppervlak Salvita D ZOZ 213 B C VAS 452002-2012-06 1 2 A max 10 mm A A 2 VELUX 3 VELUX ENGLISH: Installation instructions for solar powered roller shutter DEUTSCH: Montageanleitung
NedStack Projects Pending and concluded
NedStack Projects Pending and concluded For correspondence: NedStack fuel cell technology BV, P.O. box 5167, 6802 ED Arnhem, The Netherlands For visiting: Industriepark Kleefsewaard, Westervoortsedijk
CALZONI. Research Activities in Maritime Robotics for Mobility and Manipulation: Industrial and Academic Perspectives
CALZONI Research Activities in Maritime Robotics for Mobility and Manipulation: Industrial and Academic Perspectives Raffaele Grandi, PhD Research Engineer @ Calzoni [email protected] EMRA 14
Portugal: ICT R&D and participation to FP7
Portugal: ICT R&D and participation to FP7 Research & Development expenditure in ICT In 2011, public support for ICT R&D (ICT GBAORD) in Portugal was 11% of total public funding for R&D, which itself amounted
arch. Filippo Terzaghi Esperienze di altri progetti europei: Progetto Streamer - AOU Careggi Project STREAMER 2013-2017
Project STREAMER 2013-2017 Semantics-driven Design through Geo and Building Information Modelling for Energy-efficient Buildings Integrated in Mixed-use Healthcare Districts CP-IP FP7.EeB.NMP.2013-5: Optimised
The SAUTER Group. 2013 edition
The SAUTER Group 2013 edition 340.0 320.0 300.0 280.0 260.0 240.0 Turnover (in EUR million) 261.3 263.0 285.0 295.2 304.9 340.0 320.0 300.0 280.0 260.0 240.0 Orders received (in EUR million) 265.2 270.9
Pivot Park Screening Centre participates in novel 196 million pan-european drug discovery platform
PRESS RELEASE Pivot Park Screening Centre participates in novel 196 million pan-european drug discovery platform Pivot Park Screening Centre in Oss will play an important role in a new pan-european drug
Credit Rating Agencies 2014 market share calculations for the purposes of Article 8d of the CRA Regulation
Credit Rating Agencies 2014 market share calculations for the purposes of Article 8d of the CRA Regulation 22 December 2014 ESMA/2014/1583. Date: 22 December 20144 ESMA/2014/1583 Table of Contents Acronyms
Horizon 2020. Possibilities of cooperation and first results. Speaker: Zygmunt Krasiński, Director
Polish-Ukrainian-German Rectors' Meeting Warsaw, 15 December 2014 Horizon 2020 Possibilities of cooperation and first results Speaker: Zygmunt Krasiński, Director This presentation is based on materials
PORTUGAL: Total EC Funding: 86M (1.4% of total) Total number of participations: 247 (1.7% of total) Number of project co-ordinations: 17
Portugal ICT R&D In 2009, business expenditure on R&D (BERD) in the ICT sectors amounted to 399M, up from 386M the year before. The share of ICT in total BERD is quite high, at around 31%; In 2011, public
State or Jurisdiction of Incorporation. Companies Listed by Country. Subsidiaries of Hertz Global Holdings, Inc. A. U.S. and Countries Outside Europe
A. U.S. and Countries Outside Europe Subsidiaries of Hertz Global Holdings, Inc. Companies Listed by Country United States Hertz Investors, Inc. The Hertz Corporation Brae Holding Corp. Executive Ventures,
Security solutions. For multinational and global customers
Security solutions For multinational and global customers 2 We would like to get to know you better What type of company or organization do you belong to? What is the mission of your organization? What
METSÄ GROUP INVOICING ADDRESSES. Metsäliitto Cooperative 6.11.2015. E-invoice operator for all companies is Basware BAWCFI22 003705925424
METSÄ GROUP 6.11.2015 INVOICING ADDRESSES E-invoice operator for all companies is Basware BAWCFI22 003705925424 VAT Id FI01163004 Group Management Group management PO BOX 3700 E-invoice address 0037011630043700
EU SUSTAINABLE ENERGY WEEK 24-28 JUNE 2013
EU SUSTAINABLE ENERGY WEEK 24-28 JUNE 2013 Prof. Anna Osello 25.06.2013 Energy Summary The SEEMPubS project Objectives The demonstrator Methodology Results End user s awareness The DIMMER project Objectives
FACTORIES OF THE FUTURE: BEYOND THE LIMITS OF INDUSTRIAL ROBOTICS
FACTORIES OF THE FUTURE: BEYOND THE LIMITS OF INDUSTRIAL ROBOTICS The use of robots to realize high precision machining opens new scenarios in the field of advanced automation The European scientific and
EBiSC the first European bank for induced pluripotent stem cells
Press Release EBiSC the first European bank for induced pluripotent stem cells Pharmaceutical companies who are members of the European Federation of Pharmaceutical Industries and Associations (EFPIA)
AXA Confidentiel 17/10/2014 Page 1
ARGENTINA AXA Assistance Argentina S.A. AXA Bank Europe Head Office AXA Belgium AXA Private Management GIE AXA Technology Services Belgium Inter Partner Assistance Servis Touring Assurances Touring Verzekeringen
MINUTES OF THE ADMINISTRATIVE COMMITTEE: EVALUATION OF THE REQUIRED INTEGRATIONS
REALIZATION OF A RESEARCH AND DEVELOPMENT PROJECT (PRE-COMMERCIAL PROCUREMENT) ON CLOUD FOR EUROPE MINUTES OF THE ADMINISTRATIVE COMMITTEE: EVALUATION OF THE REQUIRED INTEGRATIONS UNDER SECTION 13 OF THE
Leaseurope releases its Ranking of Top European Leasing Companies for 2009
PRESS RELEASE FOR IMMEDIATE RELEASE Leaseurope releases its Ranking of Top an Leasing Companies for 2009 Brussels, 20 August 2010 Leaseurope is pleased to announce the release of its ninth consecutive
MTA1 CAN, M1 10Prog CAN, AT1CAN, AT1 CoarseFine CAN, M1, AT1, AT1 CoarseFine, RA 12, RA 23, RA T1, FS 002 CAN, FS 002
GB MTA1 CAN, M1 10Prog CAN, AT1CAN, AT1 CoarseFine CAN, M1, AT1, AT1 CoarseFine, RA 12, RA 23, RA T1, FS 002 CAN, FS 002 Instruction manual 0459 576 101 GB 090129 Valid for serial no. 506 -xxx -xxxx, 719
Vandemoortele Group Requirements for Supplier Invoicing
Vandemoortele Group Requirements for Supplier Invoicing The Vandemoortele Group (VDM) Requirements for Supplier Invoicing will ensure the fully automated processing of your invoice. To ensure the efficient
Digital performance of Italy
Digital performance of Italy Broadband markets At the end of 2013, fixed broadband covered 99% of homes in Italy (97% in the EU). In rural areas, fixed broadband covered 88% of homes. At the same time,
AXA 18/12/2014 Page 1
ARGENTINA AXA Assistance Argentina S.A. AXA Bank Europe Head Office AXA Belgium AXA Private Management GIE AXA Technology Services Belgium Inter Partner Assistance Servis Touring Assurances Touring Verzekeringen
Economic footprint of 9 European RTOs
Economic footprint of 9 European RTOs Final report December 2015 Prepared for: EARTO European Association of Research and Technology Organisations Rue Joseph II, 36-38 B-1000 Brussels Authors of the report:
OVERVIEW OF RESEARCH PROJECTS IN THE ICT DOMAIN 2012. ICT statistical report for annual monitoring (StReAM)
OVERVIEW OF RESEARCH PROJECTS IN THE ICT DOMAIN 2012 ICT statistical report for annual monitoring (StReAM) 12 June 2013 ACRONYMS AAL: ACC: ARTEMIS: ASS: BPN: CA: CIP: CP: CSA: EEA: EPO: FP: FET: GBAORD:
Company Presentation
Company Presentation EICAS Automazione: who we are An overview EICAS was established in 1984 by a group of professors of the Politecnico di Torino and industrial researchers led by Prof. Francesco Donati
Grant Agreement N 215483. Updated Project Web Portal. Eric Schmieders (UniDue) Deliverable #PO-SoE-1.2.9. Version: 1.0.
Grant Agreement N 215483 Title: Authors: Editor: Reviewers: Identifier: Type: Updated Project Web Portal UniDue Eric Schmieders (UniDue) Neil Maiden (CITY) Deliverable #PO-SoE-1.2.9 Deliverable Version:
HONDA MOTOR EUROPE LOGISTICS NV Change of Legal Structure VAT INFORMATION
HONDA MOTOR EUROPE LOGISTICS NV Change of Legal Structure VAT INFORMATION 1 Table of content Honda Europe NV As Is 3 Honda Motor Europe Logistics NV To Be 4 Honda Logistics Centers As Is 5 Honda Motor
SST 2. Soft starting tool 2. Instruction manual
SST 2 Soft starting tool 2 Instruction manual 0740 800 174 090909 Introduction.................................................................... 3 Connections to / from SST 2.....................................................
The Knowledge Innovation Community on Raw Materials (EIT Raw Materials)
The Knowledge Innovation Community on Raw Materials (EIT Raw Materials) Dario della Sala ENEA & interim manager CLC-SOUTH Burgos June 25, 2015 Picture source http://www.falconautoonline.com/incoming-material/
Invoicing addresses 15.3.2016
Invoicing addresses 15.3.2016 Invoice needs to contain both invoicing address and delivery address. Fiskars purchase order (PO) number and/or Fiskars contact person name has to be stated on the invoice.
Objective 1.2 Cloud Computing, Internet of Services and Advanced Software Engineering
Cloud Computing, Internet of Services and Advanced Software Engineering Arian Zwegers European Commission Information Society and Media Directorate General Software & Service Architectures and Infrastructures
VAT Guidelines for Tooling. Volvo Group VAT guidelines for Vendor Tooling
VAT Guidelines for Tooling VAT guidelines for Vendor Tooling VAT Guidelines for Tooling Scope: The VAT Guidelines for Tooling s applicable for all Tooling suppliers when billing Companies. Objective: is
Certificate No. 91659-2011-AQ-FIN-FINAS. This is to certify that SSAB EUROPE OY. Suolakivenkatu 1, FI-00810 Helsinki; Finland
\ DNV BUSINESS ASSURANCE MANAGEMENT SYSTEM CERTIFICATE Certificate No. 91659-2011-AQ-FIN-FINAS This is to certify that Suolakivenkatu 1, FI-00810 Helsinki; Finland has been found to conform to the Management
CO2 BASED MOTOR VEHICLE TAXES IN THE EU IN 2015
CO2 BASED MOTOR VEHICLE TAXES IN THE EU IN 2015 COUNTRY AT (AUSTRIA) BE (BELGIUM) BG (BULGARIA) CO2/FUEL CONSUMPTION TAXES A fuel consumption tax (Normverbrauchsabgabe or NoVA) is levied upon the first
years Tebis Top process efficiency Cutting-edge technology Tebis Consulting New value creation in design and manufacturing
1984 2014 years Tebis Top process efficiency Cutting-edge technology Tebis Consulting New value creation in design and manufacturing We help you increase efficiency, reduce pricing pressures and eliminate
USA. Mexico. South America. Australia. Austria. Bahrain. Belgium. Bulgaria. Canada
Contacts for Education Regional Pricing and Quotes: Americas: David Montanaro [email protected] EMEA: Alex Masters [email protected] APJ: Rahul Agarwal - [email protected] List of Partners/Resellers/Distributors:
RESEARCH EXECUTIVE AGENCY. SP3-People
RESEARCH EXECUTIVE AGENCY SP3-People Support for training and career development of researchers (Marie Curie) Networks for Initial Training (ITN) STRONGnet Strong Interaction Supercomputing Training Network
AVC Patent Portfolio License Briefing*
AVC Patent Portfolio License Briefing* V05/02/16 *This presentation is for information purposes only. Actual license agreements will provide the only definitive and reliable statement of license terms.
Connect with Plantronics Introducing the Plantronics Partner Programme
Connect with Plantronics Introducing the Plantronics Partner Programme www.plantronics.com Plantronics Ltd Wootton Bassett, UK 0800 410014 +44 (0)1793 842200 Plantronics Ireland Citywest Business Campus
Contents. Introduction... 3 How to Send E-Invoices to Wärtsilä... 4 Option 1... 4 Option 2... 5 Wärtsilä Invoice Requirements... 6 Appendix A...
Contents Introduction... 3 How to Send E-Invoices to Wärtsilä... 4 Option 1... 4 Option 2... 5 Wärtsilä Invoice Requirements... 6 Appendix A... 7 Page 2 Introduction An e-invoice is a form of invoice document
Le azioni Marie Curie individuali: ultimi bandi del 7PQ
Le azioni Marie Curie individuali: ultimi bandi del 7PQ Il futuro delle MSCA in H2020 Rome, 19 April 2013 Alessandra Luchetti Head of Unit, DG Education & Culture European Commission Agenda Marie Curie
Proton Therapy System A NEW WAY TO DO WHAT YOU DO BEST FIGHT CANCER
Proton Therapy System A NEW WAY TO DO WHAT YOU DO BEST FIGHT CANCER Particle Therapy is one of my top initiatives as CEO of. We are leveraging all of our existing and future technologies from image guidance,
LEARN MORE. M25 & M55 Bluetooth Headset
LEARN MORE M25 & M55 Bluetooth Headset TAKE A GOOD LOOK A CALL BUTTON C VOLUME BUTTON Take/End a call M25: Take a call or end it (1 tap) E D Volume presets (1 tap per level change) INDICATOR LIGHT (LED)
Announcement BOA Competition. Voice Over IP Capability for NATO Wide Secure Voice Services RFQ-CO-14137-VOSIP
NCIA/ACQ/ASG/2015/1629 30 October 2015 Announcement BOA Competition Voice Over IP Capability for NATO Wide Secure Voice Services RFQ-CO-14137-VOSIP RFQ Release Date: 30 October 2015 Bid Closing Date: 20
SP/1/EN/5. Product Summary. KLIMA 1 Catalogue KLIMA 2 Catalogue FILTER Catalogue. The art of handling air
SP/1/EN/5 Product Summary KLIMA 1 Catalogue KLIMA 2 Catalogue FILTER Catalogue The art of handling air Components and Systems for Ventilation and Air Conditioning As an internationally leading manufacturer
fib Facultat d Informàtica de Barcelona Universitat Politècnica de Catalunya http://www.fib.upc.edu/ José-Manuel Diéguez Decision-making Support Area
fib Facultat d Informàtica de Barcelona Universitat Politècnica de Catalunya http://www.fib.upc.edu/ José-Manuel Diéguez Decision-making Support Area upc The Universitat Politècnica de Catalunya (UPC-BARCELONATECH)
Tieto invoicing addresses:
Operator code for all Tieto companies is the same: 003701011385. Our e-invoicing operator is Tieto Oyj. Mandatory reference information in invoices addressed to any company of Tieto is Purchaser Name,
European Policies Affecting the Supply Chain for IoT. Andreas Wild Executive Director
European Policies Affecting the Supply Chain for IoT Andreas Wild Executive Director Content Introduction Internet of Things: an Opportunity A European Policy: ECSEL JU ECSEL 2014 Actions IoT: Driving
Your Partner in High Strength Steel
Your Partner in High Strength Steel THE CHALLENGE THE CHALLENGE DEVELOPING A LIGHTER CAR IS EASY. DEVELOPING A SAFER AND STIFFER CAR IS EASY. BUT WHAT ABOUT DOING BOTH? IT S A CHALLENGE Today s automotive
OTHER USERS - YOU SHOULD CAREFULLY READ THE FOLLOWING TERMS. YOUR INSTALLATION OF THE PROGRAM INDICATES YOUR ACCEPTANCE OF THESE LICENSE TERMS.
EXTENDED ACCESS USERS - IF YOU ARE USING THE EXTENDED ACCESS FEATURE OF THIS PROGRAM AND ITS ASSOCIATED SERVICE IN A GIVEN COUNTRY ON MORE THAN AN OCCASIONAL BASIS, YOUR SYSTEMS ADMINISTRATOR MUST PROVIDE
Analysis on European landscape & Match making tool for Photonics Industry & Research
Analysis on European landscape & Match making tool for Photonics Industry & Research Contents Topic of this presentation Photonics21 Projects supporting Photonics21 Analysis on European landscape Matchmaking
Groupon Goods Global GmbH VENDOR INVOICE GUIDE. This Guide Applies to:
VENDOR INVOICE GUIDE This Guide Applies to: Guide Introduction This guide contains important information to help you produce and provide Groupon Goods Global GmbH with invoices that are compliant with
Certificate. Hilti Aktiengesellschaft. 9494 Schaan Liechtenstein. According to appendix
Certificate SQS herewith certifies that the company named below has a management system which meets the requirements of the standards specified below. Certified area According to appendix Field of activity
CULTURAL AND CREATIVE SECTORS GUARANTEE FACILITY
CULTURAL AND CREATIVE SECTORS GUARANTEE FACILITY OPEN CALL FOR EXPRESSION OF INTEREST TO SELECT FINANCIAL INTERMEDIARIES UNDER THE CULTURAL AND CREATIVE SECTORS GUARANTEE FACILITY (Published on 18th July
ISO 15408. The international IT security standard. Marcel Weinand. 049-228/9582-152 [email protected]. Marcel Weinand
The international IT security standard ISO 15408 1 049-228/9582-152 [email protected] History of IT-Security Criteria Canada CTCPEC 3 USA 93 2 US TCSEC 83, 85 Germany France UK Netherlands Federal
ENCS/NEC RESEARCH MEETING
ENCS/NEC RESEARCH MEETING Benessa Defend ベネッサ ディフェンド [email protected] April 21, 2014 NEC, Kawasaki 1 PARTNERING FOR CYBER RESILIENCE We create and bring together knowledge and resources to secure
The Pan-European In-depth Accident Investigation Network
Session 6 Improving our Understanding of Crashes Friday 23 rd November 2012 Julian Hill, Loughborough University Project co-financed by the European Commission, Directorate-General for Mobility and Transport
Caddyt A32, A33, A34. Instruction manual
Caddyt A32, A33, A34 Instruction manual 0460 449 174 GB 080513 Valid from program version 1.03 1 INTRODUCTION... 3 1.1 Control panel A32... 3 1.2 Control panel A33... 4 1.3 Control panel A34... 5 2 MMA
How To Buy Eclipse Premium
Eclipse Premium HOMOGENEOUS FLOORCOVERING VINYL > Harmonised colour range > Classic non-directional design > PUR reinforced Easy low-cost maintenance > Favourable initial cost > No additional surface treatment
A Statistical Overview of the Erasmus Programme in 2012-13
On the way to Erasmus+ A Statistical Overview of the Erasmus Programme in 2012-13 Education and Training TABLE OF CONTENTS 3 Table of contents Acronyms used in this report...14 Disclaimer...14 Preface...15
