First Power Production Results from the Wave Star Roshage Wave Energy Converter
|
|
|
- Andra Sanders
- 9 years ago
- Views:
Transcription
1 First Power Production Results from the Wave Star Roshage Wave Energy Converter Laurent Marquis, Head of Development, Wave Star A/S Morten Kramer, R&D engineer, Wave Star A/S Peter Frigaard, Head of Civil Engineering Department, Aalborg University 3 rd International Conference on Ocean Energy, 6 October, Bilbao
2 The Wave Star machines Test machine at Aalborg University Deployment: Scale: 1/40 Float diameter: 0.25 m Test machine at Nissum Bredning Deployment: Scale: 1/10 Float diameter: 1.0 m Test section at Roshage Deployment: 2009-> Scale: 1/2 Float diameter: 5.0 m 2
3 Wave Star make use of a unique concept 2 rows with10 floats, 20 floats total The floats are mounted on a machine which is founded on the seabed All the moving gparts are located above the waterline Hydraulic fluid is pumped from each float to a hydraulic motor, which drives a generator The Wave Star machine can lift the floats out of the water into safety position 3
4 Wave Star scale 1:40 Aalborg University, Denmark 4
5 Normal operation Storm protection mode Wave Star scale 1:10 Nissum Bredning, Denmark 5 More than 4 years in operation and 15 storms without damage
6 The location for the test section (photo taken before deployment) Roshage Pier, location for the Wave Star scale 1:2 test section Hanstholm, Denmark 6 Energy Supply Chain June 2009
7 7 The machine was built in Gdansk and towed to Denmark in August 2009
8 8 The jacking system was tested in dry dock in Frederikshavn, Denmark
9 The machine was installed on 18 September 2009 Video: Installation 9
10 The 19 th of September 2009 the installation was finalized and the machine was placed in storm protection Video: Storm protection 10
11 A bridge was built during the autumn 2009, and the first guests visited the plant during COP15. The machine has been supplying electricity to the grid since February Video: Operation 11
12 The Roshage test unit is a section of the complete machine Parameter Roshage test unit Commercial Wave Star C5-600 kw Number of floats 2 20 Float diameter Ø5 m Ø5 m Arm length 10 m 10 m Weight 1000 Tons 1600 Tons Nominal electrical power 110 kw 600 kw 12
13 Power measurements from the Roshage test unit Measured September 2010 (Control generation 3) Measured June 2010 (Control generation 2) Measured May 2010 (Control generation 1) Simulation, Control generation Power (kw) Power (kw) Significant wave height (m) Wave power (kw/m) 13 Notes: Power is 10 minute average values of harvested power from one float (hydraulic power leaving one cylinder) The same data are shown in the figures, only the x-axis is different A typical wave period for the Roshage location is used for the simulated curve
14 Power measurements from the Roshage test unit Measured September 2010 (Control generation 3) Measured June 2010 (Control generation 2) Measured May 2010 (Control generation 1) Simulation, Control generation 3 ForskVE Limit Curve Power (kw) Power (kw) Significant wave height (m) Wave power (kw/m) 14 Notes: Power is 10 minute average values of harvested power from one float (hydraulic power leaving one cylinder) The same data are shown in the figures, only the x-axis is different A typical wave period for the Roshage location is used for the simulated curve
15 Approved by EnergiNet is a non-profit enterprise owned by the Danish Climate and Energy Ministry If the measured production is above the limit, subsidies are recieved from EnergiNet Measured production Limit for subsidies Example of measured data from the Roshage test unit (10 min average values): PLC_Datetime AllDataValid Hs Tmean P_TwoFloats ForskVE_limit AboveLimit [%] [m] [s] [kw] [kw] [True/False] 21/09/10 09: True 21/09/10 09: True 21/09/10 09: True 21/09/10 09: True 21/09/10 10: True 21/09/10 10: True 21/09/10 10: True 21/09/10 10: True 21/09/10 10: True 21/09/10 10: True 21/09/10 11: True 21/09/10 11: True 21/09/10 11: True 21/09/10 11: True 21/09/10 11: True 21/09/10 11: True / / 15 Power numbers in kw are measured harvested power (hydraulic power leaving the two cylinders). Wave climate is calculated using wave measurements at the location.
16 Power measurements from the Roshage test unit Measured September 2010 (Control generation 3) Measured June 2010 (Control generation 2) Measured May 2010 (Control generation 1) Simulation, Control generation 3 Capture width (m) Capture wid dth ratio (%) Wave power (kw/m) Wave power (kw/m) 16 Notes: Power is 10 minute average values of harvested power from one float (hydraulic power leaving one cylinder) The same data are shown in the figures, only the y-axis is different A typical wave period for the Roshage location is used for the simulated curve
17 Power matrix for a single Wave Star C5 600 kw machine with 20 floats Values inside the table are average electrical power to grid in kw. Wave height Wave period T 0,2 (s) H m0 (m) Storm protection 17
18 Perspectives: Wave Star C5 performance at different sites in Europe Site Nominal Power Storm protection Annual production Belmullet, IR 1200 kw Hs > 5 m 4.29 GWh Site Nominal Power Storm protection Annual production EMEC,UK 1200 kw Hs > 5 m 2.88 GWh Site Nominal Power Storm protection Annual production Wave Hub, UK 1200 kw Hs > 5 m 2.64 GWh Site Nominal Power Storm protection Annual production Site Nominal Power Storm protection Annual production Horns Rev 2,DK 600 kw Hs > 3 m 1.41 GWh SEM-REV, F 1200 kw Hs > 5 m 2.37 GWh Site Nominal Power Storm protection Annual production Pilot Zone, P 1200 kw Hs > 5 m 2.87 GWh Site Nominal Power Storm protection Annual production BIMEP, ES 1200 kw Hs > 5 m 2.21 GWh 18
19 C5 Wave Star and C10 Wave Star C5 70 m long 20 floats of Ø 5 m ~ m of water depth m Hs C m long 20 floats of Ø10 m ~ m of water depth 6 5.0m Hs Double size = 11 times more power 19
20 Road Map for Cost of Energy for Wave Star WEC Based on average wave energy potential at European sites (WEC lifetime: 20 years, Interest of investment: 9%) Development factors Energy production: 1.0 Total investment: 1.0 Maintenance: 1.0 /kwh Development factors Energy production: 1.1 Total investment: Maintenance: Development factors Energy production: 1.5 Total investment: 0.1 Maintenance: Year 20
21 Activities in Wave Star at present The Roshage test section will actively be used as test platform for Power Take-Off optimization, test of other component/parts, and for getting maintenance data. Improvement of the structural design of the C5-machine, and optimization and reduction of systems for future machines Focus on reducing production and development cost for the next projects: Expertise from similar industries Focus on increasing the Power Take-Off efficiency: In collaboration with innovative companies and universities Agreement with utility company Find subsidiaries 21
22 Wave Star cracks the nuts! To stay in the sea Take energy out of waves Cost decreasing More efficient PTO The storm protection strategy effectively protects the Wave Star machines. The Roshage WEC has survived several storms with no severe damages and no service afterwards. The Roshage WEC is connected to the grid, and it has produced energy since January The measurements fits the expected power curve. The energy costs for the first full WEC will not be competitive to other conventional sources of energy. The calculated costs has already been decreased by 30 %, but further cost reduction is needed. The first test results have shown challenges in ensuring a high efficiency of the complete power transmission to the electrical grid. Projects on improvements are on-going with universities. 22
23 Please visit our website and get updated! 23
First Power Production figures from the Wave Star Roshage Wave Energy Converter
First Power Production figures from the Wave Star Roshage Wave Energy Converter L. Marquis 1, M. Kramer 1 and P. Frigaard 1 Wave Star A/S, Gammel Vartov Vej 0, 900 Hellerup, Denmark E-mail: [email protected]
Performance Evaluation of the Wavestar Prototype
Performance Evaluation of the Wavestar Prototype Morten M. Kramer #1, Laurent Marquis #2, Peter Frigaard *3 # Wave Star A/S Park Allé 350A, 2605 Brøndby, Denmark 1 [email protected] 2 [email protected]
Wavestar prototype at Roshage Performance data for ForskVE project no 2009 1 10305 phase 1 & 2, January 2013
Wave Star A/S Park Allé 350A 2605 Brøndby Denmark Tel: +45 4040 4696 www.wavestarenergy.com Table of contents 1 Summary... 3 2 History of events and performance... 6 3 Production data in phase 1... 10
The extensive R&D behind the Weptos WEC
The extensive R&D behind the Weptos WEC A. Pecher & J. P. Kofoed Aalborg University, Aalborg, Denmark T. Larsen Weptos A/S, Fredericia, Denmark ABSTRACT: The Weptos wave energy converter (WEC) has been
Ocean Energy Activities in Spain
Ocean Energy Activities in Spain Pablo Ruiz-Minguela Head of Wave Energy [email protected] Contents Ocean Energy Policy Research and Development Technology Demonstration Other activities Conclusions
Modelling and Control of the Wavestar Prototype
Modelling and Control of the Wavestar Prototype Rico H. Hansen Energy Technology, Aalborg University & Wave Star A/S Pontoppidanstraede 11, 9 Aalborg, Denmark E-mail: [email protected] Morten M. Kramer
Primer: Power from Ocean Waves and Tides
Primer: Power from Ocean Waves and Tides The United States has significant ocean wave and tidal energy resources. The technology to convert those resources to electricity, though in its infancy, is here
A Brief Introduction and Discussion of R&D
: A Brief Introduction and Discussion of R&D, Denmark We have developed the world s only offshore-proven, grid-connected wind and wave power plant. FPP s P37 Test Platform Disconnectable Video 3 Smoothed
2 Axis Solar Tracker / 12 Kw
2 Axis Solar Tracker / 12 Kw 4 Rows 14 metres 4 rows x 14 metres Quantity / Panel Type: 68 units Photovoltaic panel 1.600 x 790 mm Panel power / Total power: 165 W 11,2 Kw Total Surface: 94 m² Diameter
Developing Ocean Energy in Ireland. Belmullet Wave Energy Test Site
Developing Ocean Energy in Ireland Belmullet Wave Energy Test Site Where does our energy come from? Most of the energy we use in Ireland comes from fossil fuels such as oil, coal, peat and gas. We burn
Monobuckets and the competitiveness versus monopiles and jacket structures.
Monobuckets and the competitiveness versus monopiles and jacket structures. Lars Bo Ibsen, Aalborg University, Professor. Foundation concepts for offshore Wind Turbines The Universal Foundation Carbon
A Wide Span Tractor concept developed for efficient and environmental friendly farming
A Wide Span Tractor concept developed for efficient and environmental friendly farming It is wide and stable during field operations. When on roads it is long and narrow PhD student Hans Henrik Pedersen,
MODEL BASED DESIGN OF EFFICIENT POWER TAKE-OFF SYSTEMS FOR WAVE ENERGY CONVERTERS
The Twelfth Scandinavian International Conference on Fluid Power, May 18-2, 211, Tampere, Finland MODEL BASED DESIGN OF EFFICIENT POWER TAKE-OFF SYSTEMS FOR WAVE ENERGY CONVERTERS Rico H. Hansen, Torben
ROADMAP ON MARINE RENEWABLE ENERGY
FAME PROJECT - INTERNATIONAL WORKSHOP TERESA SIMAS 1 20 TH NOVEMBER, 2012 OBJECTIVES Overview of marine renewable energy development and prospects CONTENTS Green House Gas emissions targets Renewable energy
GRAVITY BASE FOUNDATIONS
GRAVITY BASE FOUNDATIONS 2 Crown with reference to Marine All Activity Map Concrete gravity base foundations able to be floated and towed out to deeper water windfarms and installed without specialist
Perspectives for ESS in Germany and Europe legal situation and applications StoREgio energy storage system association
Perspectives for ESS in Germany and Europe legal situation and applications StoREgio energy storage system association Dr. Peter Eckerle Managing Director [email protected] Topics Who is StoREgio?
Building Research Capacity for Marine Renewable Energy in Ireland. Prof. Tony Lewis Emeritus Beaufort Professor University College Cork, Ireland
Building Research Capacity for Marine Renewable Energy in Ireland Prof. Tony Lewis Emeritus Beaufort Professor University College Cork, Ireland National Drivers Research Infrastructures Integrating research
Ministry of Power & Energy
Ministry of Power & Energy Institutional Frame work Power sector overview Renewable energy policy Major issues and barriers Institutional Framework Sustainable Energy Authority The Sri Lanka Sustainable
Solar Thermal Power Plants SOLAIR TECHNOLOGY
Solar Thermal Power Plants SOLAIR TECHNOLOGY Clean Electricity from Solar Energy and Atmospheric Air Dr. Manuel Romero CIEMAT Plataforma Solar de Almería 1 SOLAIR EUROPEAN CONSORTIUM HelioTech Denmark
Ship propulsion by renewable energies available at sea: Innovations for utilisation of wind and waves
Ship propulsion by renewable energies available at sea: Innovations for utilisation of wind and waves Dr. rer. nat. Jörg Sommer Januar 2013 Preliminary remark 1 The next-but-one generation of vehicles
ACCELERATING GREEN ENERGY TOWARDS 2020. The Danish Energy Agreement of March 2012
ACCELERATING GREEN ENERGY TOWARDS The Danish Energy Agreement of March 2012 The most ambitious energy plan of the world In March 2012 a historic new Energy Agreement was reached in Denmark. The Agreement
Wind Service Offshore. We can t conquer the elements But we can outthink them
Wind Service Offshore We can t conquer the elements But we can outthink them We make maintenance a routine, not an adventure Turning unpredictability into output Massive waves. Racing tides. Early nightfall.
The WindFloat Project
The WindFloat Project Deep Offshore Wind an opportunity for Europe Conference Atlantic Forum Brest, 30 th of October, 2012 1 Are wecreatingsustainablevaluefromouroceans? Howcan wedo it? Energy as a sustainable
Extremely compact in size to allow direct flange-mounting on vehicle engine or gearbox PTOs.
TXV - Presentation pumps with Load Sensing control variable displacement piston pumps ADVANTAGES pumps are variable displacement with pressure-flow control called Load Sensing. They self-regulate to give
OWNER S/OPERATOR S - PARTS MANUAL CEMENT MIXER MODEL MX-80
OWNER S/OPERATOR S - PARTS MANUAL CEMENT MIXER MODEL MX-80 Read the Operator s Manual entirely. When you see this symbol, be aware that the subsequent instructions and warnings are serious - follow without
The CLIPPER Solutions
The CLIPPER Solutions 111 112 C51 6,5 Hp Ø 350mm 76kg Compact, robust and highly manoeuvrable machines designed for both wet and dry cutting of concrete and asphalt. Machine delivered without diamond blade.
Dutch wind energy strength
Dutch wind energy strength Chris Westra (senior consultant ECN) (general manager We@Sea) www.we-at-sea.org www.ecn.nl www.haveneilandopzee.nl 2010 The start in 1972 here we are now: 2010 Drivers for offshore
1x90 TONS TENSIONERS TECHNICAL PROPOSAL. 1 X 90 Tons 30 m/min Tensioners TECHNICAL PROPOSAL JOB 08/059. 0 19/02/2008 Basic proposal PP GM SB
Pagina N.: 1 of 19 1 X 90 Tons 30 m/min Tensioners JOB 08/059 0 19/02/2008 Basic proposal PP GM SB Rev N Date Issue Description Prepared by Checked by Approved by Pagina N.: 2 of 19 TABLE OF CONTENTS:
WIND ENERGY - THE FACTS PART III THE ECONOMICS OF WIND POWER
WIND ENERGY - THE FACTS PART III THE ECONOMICS OF WIND POWER Acknowledgements Part III was compiled by Poul Erik Morthorst of Risǿ DTU National Laboratory, Technical University of Denmark; Hans Auer of
Dansk Offshore Netværk, Lindø Industripark, 21. April 2015 The Road to Below 10 ct /kwh
Dansk Offshore Netværk, Lindø Industripark, 21. April 2015 The Road to Below 10 ct /kwh, Head of Cost of Energy Siemens AG, Wind Power and Renewables Answers for energy. Introduction Siemens Wind Power
Simplified Design as Secret to higher Performance: Siemens Direct Drive Technology
Simplified Design as Secret to higher Performance: Siemens Direct Drive Technology Formatvorlage Gunnar Liehr, Head des Untertitelmasters of Sales Wind Power durch Region Klicken Central bearbeiten siemens.at/future-of-energy
Wave & Tidal Energy. Wave and Tidal Energy. What is Wave energy? What is Tidal Energy?
Wave and Tidal Energy Wave & Tidal Energy Amanda Wright SCI 321u / Gossen A new solution? As non-renewable energy sources, such as coal, are being tapped out, new and innovative ways of creating energy
Renewable Energy Framework in Spain. Marine Technologies
Las Palmas de Gran Canaria, 14 th November 2011 Renewable Energy Framework in Spain. Marine Technologies Juan Ramón Ayuso Ortiz Wind Energy Department Table of contents 1 2 3 4 5 6 IDAE: Mission and activities
The installation and servicing
European Forum for Renewable Energy Sources The installation and servicing of offshore wind farms Kaj Lindvig, CSO, A2SEA A/S 16 th September 2010 A2SEA Started 1 st July 2000 100% dedicated offshore wind
PMDD WIND TURBINE 1.5MW
1.5MW PMDD WIND TURBINE Generator Stator Rotor Blade Wind Measurement Equipment Casted Hub Auxiliary Crane Pitch System Base Frame Generator PM Rotor GOLDWIND 1.5MW PERMANENT MAGNET DIRECT-DRIVE (PMDD)
Ocean Energy: Cost of Energy and Cost Reduction Opportunities. May 2013
Ocean Energy: Cost of Energy and Cost Reduction Opportunities M May 2013 Table of Contents 1 Introduction... 3 2 Factors considered in cost calculation... 4 2.1 Lifetime levelised cost of energy calculation...
CO-LOCATED WAVE AND OFFSHORE WIND FARMS: A PRELIMINARY CASE STUDY OF AN HYBRID ARRAY
CO-LOCATED WAVE AND OFFSHORE WIND FARMS: A PRELIMINARY CASE STUDY OF AN HYBRID ARRAY C. Perez-Collazo 1 ; S. Astariz 2 ; J. Abanades 1 ; D. Greaves 1 and G. Iglesias 1 In recent years, with the consolidation
How To Build A 100Mw Wind Farm In Ques
ALTO VALLE WIND FARM - 100 MW Fotomontage of PARQUE EÓLICO DEL ALTO VALLE 100 MW VILLA EL CHOCÓN DEPARTMENT OF CONFLUENCIA PROVINCE OF NEUQUÉN Parque Eólico del Alto Valle S.A. is a company created by
Marine and Hydrokinetic U.S. Resource Assessments and Technologies
Marine and Hydrokinetic U.S. Resource Assessments and Technologies Presented by Brooke White, Knauss Fellow, Wind and Water Power Program U.S. Department of Energy September 6 th 2012, Silver Spring MD
Case Study 5 Use of Wind Turbine Technology
Case Study 5 Use of Wind Turbine Technology 1. Context Hong Kong relies on an adequate and reliable electricity supply for its economic development. Our electricity needs are met by the two electricity
Nordex SE. Capital Markets Day Products & Sales - Lars Bondo Krogsgaard
Nordex SE Capital Markets Day Products & Sales - Lars Bondo Krogsgaard Rostock, 13 October 2011 SUMMARY The situation in the wind industry has changed: Attractive medium-term growth prospects Overcapacity
offshore wind The future of
The future of offshore wind As a subsidiary company of Mitsubishi Heavy Industries Ltd (MHI), Mitsubishi Power Systems Europe (MPSE) is part of one of the world s most innovative, successful and responsible
Cat Electronic Technician 2015A v1.0 Product Status Report 4/20/2016 2:49 PM
Page 1 of 19 Cat Electronic Technician 2015A v1.0 Product Status Report 2:49 PM Product Status Report Parameter Value Product ID WRK00337 Equipment ID WRK00337 Comments A01-52 C9 330D (THX37891) Parameter
R&D in Vattenfall Johan Söderbom
R&D in Vattenfall Johan Söderbom Agenda 1 2 3 Vattenfall in brief R&D portfolio Smart Grids Vattenfall in brief Net sales 2011: 181 billion SEK (20 billion ) Electricity Generation: 166,7 TWh 7.8 million
HYDRAULICS. H91.8D/C - Computerized Open Surface Tilting Flow Channel - 10, 12.5, 15 and 20 m long
HYDRAULICS H91.8D/C - Computerized Open Surface Tilting Flow Channel - 10, 12.5, 15 and 20 m long 1. General The series of channels H91.8D has been designed by Didacta Italia to study the hydrodynamic
RT100 ROUGH TERRAIN CRANE DATASHEET - IMPERIAL. Features:
ROUGH TERRAIN CRANE DATASHEET - IMPERIAL Features: Rated capacity: 100 ton @ 10 ft working radius Maximum boom length: 174 ft Maximum tip height: 183 ft Maximum hook height: 174.5 ft CONTENTS Key............................................................................................
Energy Efficiency in New and Existing Data Centers-Where the Opportunities May Lie
Energy Efficiency in New and Existing Data Centers-Where the Opportunities May Lie Mukesh Khattar, Energy Director, Oracle National Energy Efficiency Technology Summit, Sep. 26, 2012, Portland, OR Agenda
Offshore Wind: some of the Engineering Challenges Ahead
Offshore Wind: some of the Engineering Challenges Ahead David Infield CDT in Wind Energy Systems Institute of Energy and Environment University of Strathclyde International context (from IPCC report) Greenhouse
Finavera Renewables. Integrates 2 technologies originally from Sweden (IPS Buoy and Hosepump)
OFFSHORE TECHNOLOGIES: AquaBuOY Finavera Renewables finavera.com/en/wave Ireland Offshore; Point Absorber Integrates 2 technologies originally from Sweden (IPS Buoy and Hosepump) The 'AquaBuOY' point absorber
Siemens D3 platform 3.0-MW, 3.2-MW, 3.3-MW, and 3.4-MW direct drive turbines. Reduced complexity, increased profitability. siemens.
Siemens D3 platform 3.0-MW, 3.2-MW, 3.3-MW, and 3.4-MW direct drive turbines Reduced complexity, increased profitability siemens.com / wind As the major driver of innovation with more than 30 years of
Unit 24: Applications of Pneumatics and Hydraulics
Unit 24: Applications of Pneumatics and Hydraulics Unit code: J/601/1496 QCF level: 4 Credit value: 15 OUTCOME 2 TUTORIAL 2 HYDRAULIC AND PNEUMATIC CYLINDERS The material needed for outcome 2 is very extensive
Summary technical description of the SUNSTORE 4 plant in Marstal
Summary technical description of the SUNSTORE 4 plant in Marstal The purpose of the SUNSTORE concept implemented in Marstal is to show that district heating can be produced with 100 % RES of which solar
Context: significant penetration of DG = increased risks for system security
Distributed Generation: towards an effective contribution to power system security IEEE Tampa GM 2007: Panel on Impact of Dispersed Generation on Power System structure & security Bruno Meyer Outline Context:
Modelling of wind power fluctuations and forecast errors. Prof. Poul Sørensen Wind Power Integration and Control Wind Energy Systems
Modelling of wind power fluctuations and forecast errors Prof. Poul Sørensen Wind Power Integration and Control Wind Energy Systems Modelling of wind power fluctuations Simulation tool: CorWind Based on
AREVA's Energy Storage Solutions
AREVA's Energy Storage Solutions January 28th and 29th, 2015 Kerstin GEMMER-BERKBILEK AREVA Karlstein / Main (Germany) January 29th, 2015 Rising share of renewables in Europe brings necessity to store
Vattenfalls investment in ocean energy and the Maren project at Runde island
Vattenfalls investment in ocean energy and the Maren project at Runde island The conference "Berekraftig energiframtid, February 10-11 th 2009, Kristiansund, Norway José Silva Kristin Andersen Vattenfall
GREEN POWER ISLAND DENMARK GOTTLIEB PALUDAN ARCHITECTS RISØ-DTU
DENMARK GOTTLIEB PALUDAN ARCHITECTS RISØ-DTU - the instant and low tech answer to the growing problem of green energy overflow Pumped hydro Definition: Pumped storage hydroelectricity is a type of hydroelectric
INSTALLATION and LOGISTICS of OFFSHORE WIND FARMS
POWER Offshore Summer School 2006 INSTALLATION and LOGISTICS of OFFSHORE WIND FARMS Gerard van Bussel The Netherlands Offshore transport and installation vessels Semi Submersible Sheer leg crane Ship type
WIND TURBINE TECHNOLOGY
Module 2.2-2 WIND TURBINE TECHNOLOGY Electrical System Gerhard J. Gerdes Workshop on Renewable Energies November 14-25, 2005 Nadi, Republic of the Fiji Islands Contents Module 2.2 Types of generator systems
V52-850 kw The turbine that goes anywhere
V2-8 kw The turbine that goes anywhere Versatile, efficient, dependable and popular The highly efficient operation and flexible configuration of the V2 make this turbine an excellent choice for all kinds
HVAC Efficiency Definitions
HVAC Efficiency Definitions Term page EER - 2 SEER - 3 COP - 4 HSPF - 5 IPLV - 6 John Mix May 2006 Carrier Corporation 1 Energy Efficiency Ratio (EER) The energy efficiency ratio is used to evaluate the
EXPERT REMANUFACTURED WIND TURBINE
EXPERT REMANUFACTURED WIND TURBINE Repowering Solutions is a division of Jeraneas Group of companies. Our core business is the remanufacturing of wind turbines of different sizes; a work that we have been
New Jeep Cherokee Technical specifications
New Jeep Cherokee Technical specifications Specifications are based on the latest product information available at the time of publication. All dimensions are in millimeters at curb weight and with standard
COWI offshore wind marine engineering services
COWI offshore wind marine engineering services 2 COWI expertise COWI is a highly versatile and multidisciplinary company. We provide services within engineering, environment and economics and operate worldwide
Presentation to: Federal Renewable Ocean Energy Working Group Oregon Military Department (OMD) Marine Renewable Energy
Presentation to: Federal Renewable Ocean Energy Working Group Oregon Military Department (OMD) Marine Renewable Energy Energy Independence Energy Security Disaster Resilience Camp Rilea Energy The Model
BARRIER LIFT SYSTEM 2 BARRIER LIFT SYSTEM
BARRIER LIFT SYSTEM BARRIER LIFT SYSTEM The crash rated elkosta Barrier Lift System BLS offers maximum security for highly sensitive entry or exit points against unauthorised vehicles attempting to break
Saving energy by solar collector and heat pump combination in hot water production in residential and hotel sectors
Saving energy by solar collector and heat pump combination in hot water production in residential and hotel sectors Dr. Nguyen Nguyen An, HUST CONTENTS Energy consumption to produce hot water in residential
Non-technical barriers to wave energy development, comparing progress in Ireland and Europe
Non-technical barriers to wave energy development, comparing progress in Ireland and Europe G. Dalton 1, N. Rousseau, F. Neumann, B. Holmes 1 Hydraulics and Maritime Research centre, UCC, Cork. http://www.ucc.ie/research/hmrc
How To Develop A Smart Grid In Danesland
Smart Grid Strategy The intelligent energy system of the future Danish Ministry of Climate, Energy and Building May 2013 Smart Grid Strategy 3 Content Foreword 5 Summary of the strategy and key initiatives
The Delft Offshore Wind Turbine Concept (DOT)
December 2009 The Delft Offshore Wind Turbine Concept (DOT) A hydraulic solution for offshore wind energy Antonio Jarquín Laguna Delft University of Technology Challenge the future Table of Contents Current
Comparison of Recent Trends in Sustainable Energy Development in Japan, U.K., Germany and France
Comparison of Recent Trends in Sustainable Energy Development in Japan, U.K., Germany and France Japan - U.S. Workshop on Sustainable Energy Future June 26, 2012 Naoya Kaneko, Fellow Center for Research
Power consumption (kw)
OS Series Series description LIT OS systems are applied to wastewater disinfection. The models of this series were developed on base of high-efficiency low-pressure amalgam lamps and have all components
301.7D. Mini Hydraulic Excavator
301.7D Mini Hydraulic Excavator Engine Weights Gross Power (ISO 14396) 17.9 kw 24.3 hp Operating Weight with Canopy 1610 kg 3,550 lb Net Power 13.2 kw 17.7 hp Operating Weight with Cab 1720 kg 3,792 lb
Databases. by David Cerda Salzmann
Databases by David Cerda Salzmann In the previous lecture... What data you need What you use it for This hour: where to get data from Introduction OWT Design Procedure Fatigue Loads Extreme Loads Site-specific
Renewable Energy Concept of Thy Region, Denmark
Biomass Renewable Energy Concept of Thy Region, Denmark Preben Maegaard, Director, Nordic Folkecenter for Renewable Energy President, Solar Super State Association. Chairman, WCRE, World Council for Renewable
net flywheel power 74 kw - 99 hp max operating weight 16 300 kg PAT DOZER BLADE CAPACITY 2.19 m 3
net flywheel power 74 kw - 99 hp max operating weight 16 300 kg PAT DOZER BLADE CAPACITY 2.19 m 3 150BBLADE Specifications ENGINE STAGE IIIA Net flywheel power (ISO 14396/ECE R120)...74 kw/99 hp Rated...2000
Energy Supply Technologies: Wind Power
Energy Supply Technologies: Wind Power IEA EGRD: Monitoring Progress towards a Cleaner Energy Economy Sascha T. Schröder Birte Holst Jørgensen November 16 th, 2011 Outline 1. Wind power: world market and
DONG Energy. Biomass for heat and power experience and perspectives
DONG Energy Biomass for heat and power experience and perspectives Workshop om faste biobrændsler til el og varmeproduktion i Danmark Wednesday 10 March 2010 Jeppe Bjerg, Senior Innovation Manager DONG
STENSEA. Stored Energy in Sea. The Feasibility of an Underwater Pumped Hydro Storage System. Dr. Andreas Garg Christoph Lay Robert Füllmann
STENSEA Stored Energy in Sea The Feasibility of an Underwater Pumped Hydro Storage System Presentation IRES, 12 November 2012 Dr. Andreas Garg Christoph Lay Robert Füllmann 1 Market Status Quo and Forecasts
WindPRO version 2.7.473 jun 2010 Project:
-0-0 :09 / Vattenfall Vindkraft /S PRK - Main Result Calculation: 0 Parkberegning Tamholt 5 x SWT.0dd ise OK Wake Model N.O. Jensen (RISØ/) Calculation Settings ir density calculation mode Result for WTG
Seconda Università degli studi di Napoli Progetti di Ateneo di Rilevante Interesse Scientifico e Tecnologico 2007 (PRIST 2007) Energy
Seconda Università degli studi di Napoli Progetti di Ateneo di Rilevante Interesse Scientifico e Tecnologico 2007 (PRIST 2007) PhD Course on Wave Energy Converters Introduction, Research Activities and
MOVING YOU FURTHER HYUNDAI HEAVY INDUSTRIES
Electric Counterbalance Trucks MOVING YOU FURTHER HYUNDAI HEAVY INDUSTRIES Your satisfaction is our priority! Hyundai introduces a new line of 9-series battery forklift trucks. The newly designed 4 wheel
Cold milling machine W 1000 F. Technical specification
Cold milling machine W 1000 F Technical specification Technical specification 2 Cold milling machine W 1000 F on four wheels Cold milling machine W 1000 F on four crawler tracks Milling width max. mm 1,000
Highly flexible couplings
Construction and operation 8.03.00 Instructions for installation 8.03.00 Types of stress 8.04.00 Diagrams for static deformation of the coupling ring 8.05.00 Coupling size 8.07.00 Examples of combinations
NOTE. Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand
Journal of Hydrology (NZ) 44 (2): 131-135, 2005 New Zealand Hydrological Society (2005) NOTE Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand W. E. Bardsley Department