Army Environmental Policy and ISO 14001
|
|
|
- Ami Leonard
- 9 years ago
- Views:
Transcription
1 Army Environmental Policy and ISO Army Environmental Policy and ISO Rick Sinclair and Rochie Tschirhart Since the 1970s, the U.S. Army has instituted environmental policies, programs, regulations, and management systems to ensure that its mission and support activities have minimal effects on the environment and comply with national policy. In recent years, the Army has incorporated environmental management systems (EMSs) at some installations through the DOD ISO EMS pilot program, in anticipation of Executive Order 13148, Greening the Government through Leadership in Environmental Management. 1 While the EO does not require an EMS to be ISO compliant, many federal agencies are considering modeling their EMS after ISO This article presents how well current Army-wide policy and guidance aligns with the ISO environmental management standard and offers opportunities for improvements in policy. When viewed from a corporate perspective, the Army generally has the major components for an ISO EMS, which include environmental policy, planning, implementation and operations, checking and corrective action, and management review. Army policies and guidance that provide the framework and demonstrate general conformance with ISO fall into three groups: (1) strategies and plans (the Army Environmental Strategy into the 21st Century, the Army Strategic Environmental Assessment, 2 and the Army Environmental Campaign Plan and Operational Directive); (2) Army regulations (AR) for management, organization and function, and the environment; and (3) program management processes, reports, and databases (e.g., EPR, ISR II, EQR, ECAS, and EQCC). Additional documentation needed to meet ISO criteria include: (1) the unifying policy and guidance that integrates and streamlines the Army EMS; (2) a comprehensive assessment system that focuses on the management of the Army Environmental Program; (3) systems for updating administrative publications (e.g., ARs) in a timely manner (i.e., AR 200-1, Environmental Protection and Enhancement, and AR 200-3, National Resources Land, Forest, and Wildlife Management); and (4) new policy and procedures for Army outreach John Wiley & Sons, Inc. Rick Sinclair has 14 years of experience as an environmental professional and has worked for the Army Corps of Engineers since Since 1997 he has been on loan to the Army Environmental Policy Institute (AEPI) from the Corps South Atlantic Division. Rick participated in the twoyear DOD ISO Pilot Program ( ). He is trained as an ISO 9001 lead auditor and initiated its implementation at AEPI. Rochie Tschirhart is a fellow with AEPI. He is on loan from the Georgia Tech Research Institute, where he has served on the faculty for the last 14 years and has focused on improving industrial environmental performance. He conducts ISO audits and teaches on the subject. He has completed training as an ISO 9000 lead auditor and is a RAB-certified auditor of environmental management systems. The views expressed in this article are those of the authors and do not necessarily reflect the official policy or position of the Department of the Army, Department of Defense, or the U.S. government. Federal Facilities Environmental Journal/Summer John Wiley & Sons, Inc.
2 Report Documentation Page Form Approved OMB No Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. 1. REPORT DATE REPORT TYPE 3. DATES COVERED to TITLE AND SUBTITLE Army Environmental Policy and ISO a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) U.S. Army Environmental Policy Institute,1550 Crystal Drive Suite 1301,Arlington,VA, PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR S ACRONYM(S) 12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited 13. SUPPLEMENTARY NOTES 14. ABSTRACT 11. SPONSOR/MONITOR S REPORT NUMBER(S) 15. SUBJECT TERMS 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT a. REPORT unclassified b. ABSTRACT unclassified c. THIS PAGE unclassified Same as Report (SAR) 18. NUMBER OF PAGES 13 19a. NAME OF RESPONSIBLE PERSON Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18
3 Rick Sinclair and Rochie Tschirhart The Army s commitment to environmental stewardship can be demonstrated by the evolution of its environmental programs... INTRODUCTION In 1998 the Department of Defense (DOD) initiated a two-year pilot program for implementing ISO environmental management systems (EMSs) at Army, Air Force, Navy, and Marine Corps installations. This pilot program was intended to assess the costs and benefits of an ISO EMS for installations. While the results of this pilot were generally favorable, many questions remain. For the purpose of this article, it is assumed that an ISO EMS approach for the Army will be consistent with new administration and congressional priorities. It also assumes that many, if not all, of the ISO EMSs make good business sense and are adaptable to and consistent with satisfying military management requirements. The purpose of this assessment is to illustrate the extent to which environmental management policies and systems exist in the Army and what policies are needed if the Army chose to become ISO compliant. This article will attempt to answer the following questions about EMSs to illustrate how EMSs currently work in the Army and what policy gaps exist for the Army to build an ISO compatible EMS. What is the Army s existing EMS? What is an ISO EMS and what are its elements? What Army policies correspond to ISO 14001? What are the policy gaps? WHAT IS THE ARMY S EXISTING EMS? The Army s commitment to environmental stewardship can be demonstrated by the evolution of its environmental programs, and its reported progress over the years as a result of these programs. This is not to say that the Army has solved all of its environmental problems, but it does have a formal, regimented process that has led to significant progress and continues to do so. This formal corporate-wide process consists of a management structure that provides the framework for management of Army environmental programs. The Army s system for managing its environmental programs, while typically not called an EMS, is structured to fit within the existing overall management system/process and culture of the Army. Policy, planning, resourcing, and execution drive the Army s approach to environmental management. Two key milestones shaped the Army s current EMS: (1) Army Environmental Strategy into the 21st Century 3 and (2) the Army Environmental Organization Decision Memorandum of While many of the underlying systems for defining, resourcing, and addressing environmental requirements have evolved, four key processes constitute the functions of planning, implementation, measurement and evaluation, and review and improvement. These five processes (see Exhibit 1) include the: 1. Environmental Program Requirements (EPR); 2. Installation Status Report (ISR) Part II (Environment); 54 Federal Facilities Environmental Journal/Summer 2001
4 Army Environmental Policy and ISO Environmental Quality Report (EQR); 4. Environmental Compliance Assessment System (ECAS); and 5. Environmental Quality Control Committee (EQCC). The Army Environmental Campaign Plan integrates environmental stewardship with the Army s Transformation Strategy. The resources management process for the budget year and planning, programming, and budgeting for the out-years to build the Program Objective Memorandum (POM) is not listed above, even though it is the means by which environmental projects and activities are funded. It is not listed because it is part of the Army s larger planning, programming, budgeting, and execution system (PPBES) and is not a unique component of the Army Environmental Program management system. Today, the Army Environmental Campaign Plan and Operational Directive 5 provide direction for the Army s Environmental Program. The Army Environmental Campaign Plan integrates environmental stewardship with the Army s Transformation Strategy. Four focus areas are identified to add greater, three-dimensional depth to the four pillars of compliance, restoration, prevention, and conservation, identified in the environmental strategy. These focus areas are requirements, acquisition, and logistics; training and doctrine; installation management; and operations and deployments. They define the programs and initiatives considered critical to sustaining military readiness while at the same time preserving the environment, energy resources, and the health and safety of all Army members and their families. This plan also provides for implementing actions, in the form of an Operational Directive, and oversight, in the form of the Transformation Environmental Management Group. Exhibit 1 summarizes how Army Environmental Program management is supported by five key management processes: EPR, EQR, ISR II, ECAS, and EQCC. These processes combine to assist the Army as it identifies environmental requirements; secures resources for environmental programs and projects; executes the budget; tracks and reports on results; and assesses performance to ensure continual improvement. The purpose and design of these processes are described in the paragraphs below. The Environmental Program Requirements (EPR) The EPR is integral to the Army budgeting process and is intended to assist installation managers as they evaluate their environmental requirements and prepare project descriptions with appropriate classifications, realistic cost estimates, and adequate project descriptions. The EPR process is designed to ensure that planning and programming of environmental projects are done in a fashion that is consistent with DOD and Army policy and planning guidance, and is in alignment with administrative and congressional priorities. The EPR process is also a system that satisfies the DOD s environmental reporting requirements to Congress. The Environmental Quality Report (EQR) The EQR provides information on the Army s environmental program to senior Army and DOD leaders, Congress, and other federal agencies. The EQR is used for the quarterly compliance data calls and the compre- Federal Facilities Environmental Journal/Summer
5 Rick Sinclair and Rochie Tschirhart Exhibit 1: Key Processes in Army Environmental Program Management hensive annual pollution prevention, pest management, cultural and natural resources data calls. It is designed to provide an automated environmental reporting process to collect and track Army installation performance in relation to existing measures of merit for service headquarters, commands, and installations. The Installation Status Report (ISR) Part II (Environment) The ISR II is a reporting system designed to give commanders and senior leaders of installations, major Army commands (MACOMs), and Headquarters, Department of the Army (HQDA), a macro-level overview of the environmental status of Army installations. The ISR was developed by the Department of the Army in 1994, as a way to assess installation level conditions and performance against Army-wide standards. Data are provided annually from all Army installations. The data are then used to develop a three-part report covering infrastructure, environment, and services. The ISR uses the C rating system, similar to the Unit Status Report. The ISR integrates with the EPR, EQR, and Defense Sites Environmental Restoration Tracking Systems/Cost to Complete (DSERTS/CTC), which feed directly into the environmental portion of the ISR. 6 The purpose of ISR-Environment is to evaluate an installation s environmental programs and determine their status based on established Army-wide standards in 19 media areas and 5 pillars (compliance, conservation, pollution prevention, and restoration and foundation (program management)) Federal Facilities Environmental Journal/Summer 2001
6 Army Environmental Policy and ISO The Environmental Compliance Assessment System (ECAS) The ECAS was developed to support the environmental compliance pillar of the Army Environmental Strategy. 8 The purpose of the ECAS program is to assist the Army in achieving, maintaining, and monitoring compliance with federal, state, and local environmental regulations. The ECAS identifies environmental compliance deficiencies and helps develop corrective actions to address these deficiencies. The ECAS also identifies the resources required to implement and track the corrective actions. This system is also designed to give visibility to environmental issues at the installation staff level and to illustrate environmental trends and root causes of ongoing problems. The process for developing and implementing an EMS that aligns with ISO typically begins by conducting a gap analysis... The Environmental Quality Control Committee (EQCC) The mission of the EQCC is to advise the secretary of the Army and the chief of staff of the Army on environmental priorities, policies, strategies, and programs; and to resolve and/or coordinate Army policy concerning execution of environmental programs and activities listed in AR 200-1, Environmental Protection and Enhancement. The purpose of the EQCC is to focus high-level attention on critical environmental issues and ongoing Army environmental initiatives; to develop consensus, ensure coordination, and disseminate information about the Army s programs; to provide enhancement opportunities to focus Army Communities of Excellence (ACOE) on the Army Environmental Program; and to ensure that the total Army effort in the environmental arena is coordinated and directed toward accomplishment of common goals and objectives. 9 WHAT IS AN ISO EMS AND WHAT ARE ITS ELEMENTS? The ISO is a voluntary EMS standard that provides the framework for an organization to achieve environmental performance. Rather than focusing on environmental activities, the standard concentrates on the management activities. It asks what is the management structure and how do management activities achieve desired goals. The ISO standard is organized into five components: environmental policy, planning, implementation and operations, checking and corrective actions, and management review. The process for developing and implementing an EMS that aligns with ISO typically begins by conducting a gap analysis between the organization s existing EMS or process and the ISO standard. The standard contains four sections: (1) Scope; (2) Normative References; (3) Definitions; and (4) Environmental Management System Requirements. Section 4, which contains five subsections (see Exhibit 2), is used when an organization conducts a gap assessment or audit. The results from the gap analysis inform the organization on where their management process aligns with the standard, and where it diverges. From these divergences, the organization can then determine what it needs to do to align with the standard. Federal Facilities Environmental Journal/Summer
7 Rick Sinclair and Rochie Tschirhart Exhibit 2. ISO Environmental Management System Model 10 These subsections align with Edward Deming s management scheme for continual improvement: plan, do, check, and act. The five subsections of ISO can be broken down further into 17 elements or requirements (see Exhibit 3). Exhibit 3. ISO Environmental Management System Requirements 11 Environmental policy (4.2) Develop a policy that defines the organization s commitment to the environment and continual improvement, and communicates the policy to employees and public. Planning (4.3) Identify the organization s environmental aspects and associated impacts. Identify its legal requirements. Establish objectives and targets for its significant impacts. Develop management programs to fulfill the policy. Implementation and operations (4.4) Define roles, responsibilities, and authority, and allocate resources for ensuring an effective management program. Conduct training. Establish communication procedures, both internal and interested parties. Document core elements of the management system. Control relevant documents. 58 Federal Facilities Environmental Journal/Summer 2001
8 Army Environmental Policy and ISO Exhibit 3. ISO Environmental Management System Requirements (Continued) 11 Establish procedures to control operations. Develop procedures to respond to emergencies. Checking and corrective action (4.5) Establish system monitoring and measurement; Perform system and compliance audits; Implement corrective and preventive action of the system; Maintain records. Management review (4.6) Evaluate the system for suitability, adequacy, and effectiveness, and make adjustments to ensure continual improvement. WHAT ARMY POLICIES CORRESPOND TO ISO 14001? Before the emergence of the ISO series of international standards on EMS in 1996, many larger corporations had some form of an EMS. However, these systems did not necessarily fully align with the ISO standard (the specification standard to which companies register). With the adoption of ISO 14001, many of these companies have incorporated aspects of ISO into their EMS, and others have moved forward to becoming registered to ISO Executive Order mandates that federal agencies develop and implement, by 2005, an EMS that is consistent with the EPA Code of Environmental Management Principles and/or another appropriate management system. Because ISO is an international standard developed by consensus from countries around the world, and because the Army is deployed internationally, there is some justification for the Army to ensure that its EMS aligns with ISO even if EO did not exist. Exhibit 4 correlates Army policy and ISO Exhibit 4. General Army Policies and ISO Key Elements Compared Army Policy and Guidance AR 5-1 Army Management Philosophy, 12 Jun Vision a.... A total force trained and ready to fight... Serving our Nation at home and abroad... preserving the environment, and protecting America s natural resources. ISO Element 4.2 Environmental Policy Federal Facilities Environmental Journal/Summer
9 Rick Sinclair and Rochie Tschirhart Exhibit 4. General Army Policies and ISO Key Elements Compared (Continued) Army Policy and Guidance AR Environmental Protection and Enhancement, 21 Feb 97 Purpose... The Army is committed to environmental stewardship in all actions as an integral part of the Army mission. This regulation implements the U.S. Army Environmental Strategy into the 21st Century. ISO Element Environmental Policy AR 1-1 Army PPBES, 30 Jan 94 Purpose... (1) Establish the Army long-range plan, 4.3 Planning midterm plan and program, and near-term budget. 4.4 Implementation and 1-4. System and procedure... responsibilities for Operation system oversight, management, and operation. Draft AR Environmental Analysis of Army Actions 1-1 Purpose... (a) This part implements the National Environmental Policy Act of 1969 (NEPA),... the Army s policies and responsibilities for the early integration of environmental considerations into planning and decision-making. AR Environmental Protection and Enhancement Environmental Program Requirements (EPR) Report (formerly RCS 1383). a. The EPR Report supports programming, budgeting, and execution by tracking environmental requirements in all program areas.... It includes all projects and activities necessary to alleviate imminent environmental threats to human health; to comply with requirements of legal mandates, agreements and judgments; and to sustain environmental stewardship. AR 11-2 Management Control, 1 Aug Implementation and 1-1. Purpose... prescribes policies and responsibilities for the Operation Army s management control process. The provisions of this regulation apply to all Army organizations and programs. 4.5 Checking and Corrective Action AR Army Installation Status Report, 1 Jan 2001 Assist the Army leadership in making appropriate and responsible decisions required to sustain or improve the management of the installation s facilities, environmental programs, and services....d.... evaluate installation s environmental programs and determine their status based on established Army-wide standards in Compliance, Conservation, Pollution Prevention, and Restoration and Foundation (Program Management). 4.5 Checking and Corrective Action 4.6 Management Review 60 Federal Facilities Environmental Journal/Summer 2001
10 Army Environmental Policy and ISO Exhibit 4. General Army Policies and ISO Key Elements Compared (Continued) Army Policy and Guidance AR 25-1 Army InformationManagement, 1 Feb Record keeping requirements. This regulation requires the creation of records to document and support the business processes of the Army. ISO Element 4.4 Implementation and Operation 4.5 Checking and Corrective Action AR Modern Army Record Keeping System, 1 Oct Implementation 1-1. Purpose... to properly manage information, and Operation from its creation through final disposition, according 4.5 Checking and to Federal laws and Army record keeping requirements. Corrective Action c. Provides life cycle management instructions for the systematic identification, maintenance, storage, retirement, and destruction of Army information recorded on any medium To fully assess the Army s EMS, fundamental policies, and processes for management, planning, programming, budgeting, execution, and management control must be considered. These policies and processes are depicted in internal Army regulations (ARs) that communicate a uniform standard of performance across the Army. Exhibit 5 lists general Army policies that apply to all functional areas, including the environmental program and compares them to ISO ARs that directly apply to environmental considerations within the Army are as follows: AR AR AR AR AR Environmental Protection and Enhancement Environmental Analysis of Army Actions (for implementing NEPA) National Resources Land, Forest, and Wildlife Management Cultural Resources Management Pest Management These ARs have many elements that satisfy the requirements of ISO Comparisons are as follows: Environmental Policy (4.2) Although a comprehensive, overarching Army environmental policy does not exist in one AR, many issue-specific environmental policies are woven throughout most of these ARs, but most notably in AR and AR has 12 issue-specific environmental policies. Part (Army Policies) of AR has 15 policy statements. Planning (4.3) Although ARs 200-1, 200-3, 200-4, and have Federal Facilities Environmental Journal/Summer
11 Rick Sinclair and Rochie Tschirhart planning components, AR is most notable for the Army because it describes the Army s planning process and requirements when significant environmental considerations are a factor in proposed Army activities. Implementation and Operation (4.4) Each AR above defines the roles, responsibilities, and authorities for implementing the various management programs. They also mandate the allocation of resources and, to varying degrees, specify training, awareness, communication, and documentation. Operational control is comprehensively addressed in all of the ARs. AR extensively addresses external interested parties. Checking and Corrective Action (4.5) This requirement of ISO does not refer to checking and corrective action of environmental performance, but instead refers to checking conformance with AR procedures and for making corrective and preventive action for nonconformance with the procedures. Based on this understanding, processes for checking and corrective action are not strong components of these ARs. Management Review (4.6) Similar to Checking and Corrective Action, Management Review of AR procedures is lacking. Exhibit 5. ISO Elements and Army Policy and Procedures Gap Assessment ISO Elements Army Policy and Guidance 4 Environmental management Evidence Gap system requirements 4.1 General requirements Army Environmental Campaign Capstone Army EMS Policy Plan and Operational Directive (e.g., HQDA Letter or DA Memo) (see AR Listing in Exhibit 3) 4.2 Environmental policy Army Environmental Campaign Army Environmental Plan; AR Strategy is out of date (last update 1992) 4.3 Planning Environmental aspects AR Environmental Impacts New AR has been of Army Operations staffed and submitted for publication Legal and other AR Army Environmental Last updated 1997 requirements Quality Objectives and targets Army Environmental Operational Campaign Plan and Directive; Army Installation Operational Directive lacking Management Action Plan energy objectives and targets Environmental AR 200-1, -2, -3, -4, and -5 Many overdue for updates management program(s) 62 Federal Facilities Environmental Journal/Summer 2001
12 Army Environmental Policy and ISO Exhibit 5. ISO Elements and Army Policy and Procedures Gap Assessment (Continued) ISO Elements Army Policy and Guidance 4 Environmental management Evidence Gap system requirements 4.4 Implementation and operation Structure and AR 10-5 HQDA Organization Policies may require updating responsibility and Function; DA General Order 12; Training, awareness, AR Career program guidance for and competence environmental professionals Communication AR 25-1 Army Information Army outreach policy and guidance Management; AR Environmental management Policy and guidance for EPR, Comprehensive policy and guidance that system documentation EQR, ISRII, and ECAS integrates and streamlines the Army EMS Document control AR Modern Army Record Army EMS document control policy and Keeping System, 1 Oct 2000 procedures Operational control AR 11-2 Management Control Procedures for implementing Army Environmental Campaign the Operational Directive Plan and OD Emergency AR Army No gaps identified preparedness and response Environmental Quality ISO Elements Army Policy and Guidance 4 Environmental management Evidence Gap system requirements 4.5 Checking and corrective action Monitoring and EQR, ISR II, ECAS Comprehensive policy and measurement guidance that integrates and streamlines EMS; monitoring objectives in Campaign Plan and Operational Directive Nonconformance and ECAS Assessment system addressing corrective and preventive Environmental Program action Records AR Modern Army No gaps identified Record Keeping System, EQR, ISR, ECAS Environmental ECAS Program-wide management system audit assessment system 4.6 Management review Army Environmental Campaign No policy gaps identified Plan and Operational Directive Federal Facilities Environmental Journal/Summer
13 Rick Sinclair and Rochie Tschirhart CONCLUSION The Army s Environmental Program (its EMS) is extensive and complex. Overall, the Army Environmental Program reflects the five major components of ISO when general Army policies for leadership and management are augmented with the environmental policies of the AR 200 series and the existing program management processes represented by EPR, ISRII, EQR, ECAS, and EQCC (see Exhibit 6). The Army Environmental Program also addresses other legislative and legal requirements not typically required of most companies. This includes the National Environmental Policy Act and natural and cultural resources management. However, the assessment of the ISO elements reveals the potential differences between these elements and Army policy and guidance (see Exhibit 5). These potential differences include the lack of: unifying policy and guidance that integrates and streamlines the Army s EMS (the Army Environmental Program) as an umbrella to existing policy; an assessment system that focuses on the management of the Army Environmental Program; updated AR 200-1, Environmental Protection and Enhancement, and AR 200-3, National Resources Land, Forest, and Wildlife Management; policy that reflects current legislative and regulatory requirements; environmental career program policy; and outreach policy and procedures. Exhibit 6. Army Environmental Program Management System and ISO Key Elements 64 Federal Facilities Environmental Journal/Summer 2001
14 Army Environmental Policy and ISO Some examples of ISO approaches that address the above mentioned potential differences are as follows: Develop an overarching Army document that describes the components of Army environmental management and ties together the various existing ARs, directives, action plans, and other guidance. (ISO Element 4.4.4, EMS Documentation) Publish a procedure for identifying, at Army level, the Army s significant environmental aspects that need to be considered in setting Army-wide environmental goals/objectives and targets. (ISO Element 4.3.1, Environmental Aspects) Publish a consolidated list of Army-wide goals/objectives and targets that are stated in various Army environmental programs and highlighted within the Installation Management Action Plan. A procedure is needed for integrating a consolidated Army list, communicating them Army-wide, and addressing them in Army planning/programming. (ISO Element 4.3.3, Objectives and Targets) State the Army environmental training policy in AR200-1 and annually update requirements. (ISO Element 4.4.2, Training, Awareness and Competence) Develop a system for assessing the EMS and providing Army-level feedback as to its effectiveness. (ISO Element 4.5.4, EMS Audit) This article is not intended to address whether the existing corporatelevel Army EMS is adequate for or effective in achieving its stated goals or the expected level of environmental performance as envisioned by the ISO14000 standard. That would require a separate analysis. NOTES 1. EO Greening the Government Through Leadership in Environmental Management, April 22, Strategic Environmental Assessment for Army Transformation, Internal Report, November 17, US Army Environmental Strategy into the 21st Century, Signed by SA and CSA in ASA(ILE) Memo Subject: Army Environmental Organization Decision Memorandum, June 3, Under SECARMY and VCSA Directive, Army Environmental Campaign Plan and Operational Directive, 1 Dec Army Assistant Chief of Staff for Installations Management (ACSIM) Fact Sheet Subject: Why ISR? 16 December AR The Army Installation Status Report System, 01 January Ibid footnote 1 9. HQ Department of Army EQCC Charter, October 7, Derived from International Standard ISO 14001, American National Standards Institute, Environmental management systems Specification with guidance for use. Ref. No. ISO 14001:1996(E), 1st Ed Id. Federal Facilities Environmental Journal/Summer
ELECTRONIC HEALTH RECORDS. Fiscal Year 2013 Expenditure Plan Lacks Key Information Needed to Inform Future Funding Decisions
United States Government Accountability Office Report to Congressional July 2014 ELECTRONIC HEALTH RECORDS Fiscal Year 2013 Expenditure Plan Lacks Key Information Needed to Inform Future Funding Decisions
Issue Paper. Wargaming Homeland Security and Army Reserve Component Issues. By Professor Michael Pasquarett
Issue Paper Center for Strategic Leadership, U.S. Army War College May 2003 Volume 04-03 Wargaming Homeland Security and Army Reserve Component Issues By Professor Michael Pasquarett Background The President
Asset Management- Acquisitions
Indefinite Delivery, Indefinite Quantity (IDIQ) contracts used for these services: al, Activity & Master Plans; Land Use Analysis; Anti- Terrorism, Circulation & Space Management Studies; Encroachment
Overview Presented by: Boyd L. Summers
Overview Presented by: Boyd L. Summers Systems & Software Technology Conference SSTC May 19 th, 2011 1 Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the collection
Headquarters U.S. Air Force
Headquarters U.S. Air Force I n t e g r i t y - S e r v i c e - E x c e l l e n c e Air Force Technology Readiness Assessment (TRA) Process for Major Defense Acquisition Programs LtCol Ed Masterson Mr
DCAA and the Small Business Innovative Research (SBIR) Program
Defense Contract Audit Agency (DCAA) DCAA and the Small Business Innovative Research (SBIR) Program Judice Smith and Chang Ford DCAA/Financial Liaison Advisors NAVAIR 2010 Small Business Aviation Technology
In June 1998 the Joint Military Intelligence. Intelligence Education for Joint Warfighting A. DENIS CLIFT
Defense Intelligence Analysis Center, home of JMIC. Intelligence Education for Joint Warfighting Courtesy Joint Military Intelligence College By A. DENIS CLIFT In June 1998 the Joint Military Intelligence
THE MIMOSA OPEN SOLUTION COLLABORATIVE ENGINEERING AND IT ENVIRONMENTS WORKSHOP
THE MIMOSA OPEN SOLUTION COLLABORATIVE ENGINEERING AND IT ENVIRONMENTS WORKSHOP By Dr. Carl M. Powe, Jr. 2-3 March 2005 Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden
Using the Advancement Degree of Difficulty (AD 2 ) as an input to Risk Management
Using the Advancement Degree of Difficulty (AD 2 ) as an input to Risk Management James W. Bilbro JB Consulting International Huntsville, AL Multi-dimensional Assessment of Technology Maturity Technology
DEFENSE CONTRACT AUDIT AGENCY
DEFENSE CONTRACT AUDIT AGENCY Fundamental Building Blocks for an Acceptable Accounting System Presented by Sue Reynaga DCAA Branch Manager San Diego Branch Office August 24, 2011 Report Documentation Page
An Application of an Iterative Approach to DoD Software Migration Planning
An Application of an Iterative Approach to DoD Software Migration Planning John Bergey Liam O Brien Dennis Smith September 2002 Product Line Practice Initiative Unlimited distribution subject to the copyright.
Report Documentation Page
(c)2002 American Institute Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the collection of information is estimated to average 1 hour per response, including the
DEFENSE BUSINESS PRACTICE IMPLEMENTATION BOARD
Defense Business Practice Implementation Board DEFENSE BUSINESS PRACTICE IMPLEMENTATION BOARD Report to the Senior Executive Council, Department of Defense MANAGEMENT INFORMATION TASK GROUP Report FY02-3
The Cost and Economic Analysis Program
Army Regulation 11 18 Army Programs The Cost and Economic Analysis Program Headquarters Department of the Army Washington, DC 19 August 2014 UNCLASSIFIED SUMMARY of CHANGE AR 11 18 The Cost and Economic
73rd MORSS CD Cover Page UNCLASSIFIED DISCLOSURE FORM CD Presentation
73rd MORSS CD Cover Page UNCLASSIFIED DISCLOSURE FORM CD Presentation 21-23 June 2005, at US Military Academy, West Point, NY 712CD For office use only 41205 Please complete this form 712CD as your cover
FORT KNOX. Environmental Management System Manual EMS-01 FORT KNOX. Environmental Management System Manual. Reference Number: Revision Date: 19MAY15
This is an UNCONTROLLED DOCUMENT printed 05/20/15 for reference only. The current CONTROLLED copy is available on the Environmental Management Division s webpage. Reference Number: EMS-01 Manual Approved
IDEA PAPER 95-A %JANJO 5`1995' B TITLE. AUTHOR. :.a EFANIE B. DUNCAN PROFESSIONAL MILITARY COMPTROLLER SCHOOL DEFINING RESPONSIBILITY IN MAINTAINING
PROFESSIONAL MILITARY COMPTROLLER SCHOOL IDEA PAPER TITLE DEFINING RESPONSIBILITY IN MAINTAINING FINANCIAL ACCOUNTING SYSTEMS AUTHOR. :.a EFANIE B. DUNCAN r Class T7 95-A %JANJO 5`1995' B COLLEGE FOR PROFESSIONAL
IISUP-. NAVAL SUPPLY SVSTE:MS COMMAND. Ready. Resourceful. Responsive!
~ IISUP-. NAVAL SUPPLY SVSTE:MS COMMAND Ready. Resourceful. Responsive! Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the collection of information is estimated
Mobile Robot Knowledge Base
Mobile Robot Knowledge Base Tracy Heath Pastore* a, Mitchell Barnes** a, Rory Hallman b b SPAWAR Systems Center, San Diego, Code 2371, 53560 Hull Street, San Diego, CA 92152; b Computer Sciences Corporation,
Department of Defense INSTRUCTION
Department of Defense INSTRUCTION NUMBER 8910.01 May 19, 2014 DoD CIO SUBJECT: Information Collection and Reporting References: See Enclosure 1 1. PURPOSE. This instruction: a. Reissues DoD Instruction
CHAPTER 3 FINANCIAL MANAGEMENT SYSTEMS: POLICY, ROLES AND RESPONSIBILITIES FOR CONFORMANCE, EVALUATION, AND REPORTING
CHAPTER 3 FINANCIAL MANAGEMENT SYSTEMS: POLICY, ROLES AND RESPONSIBILITIES FOR CONFORMANCE, EVALUATION, AND REPORTING 0301. GENERAL. By statute the head of a Federal agency is responsible for establishing
Interagency National Security Knowledge and Skills in the Department of Defense
INSTITUTE FOR DEFENSE ANALYSES Interagency National Security Knowledge and Skills in the Department of Defense June 2014 Approved for public release; distribution is unlimited. IDA Document D-5204 Log:
PROBLEM STATEMENT: Will reducing the ASD for Kadena AB F-15 C/Ds increase the CPFH for this Mission Design Series (MDS)?
CONSULTING REPORT Kadena F-15 C/D Cost per Flying Hour Analysis PROJECT MANAGERS: Capt Jeremy Howe and Capt Kevin Dawson AFLMA PROJECT NUMBER: LM200520700 16 August 2005 BACKGROUND: Kadena AB is currently
DEPARTMENT OF THE NAVY. OFFICE OF THE SECRETARY JAN 3a2006 1000 NAVY PENTAGON WASHINGTON, D.C. 20350-1000
DEPARTMENT OF THE NAVY OFFICE OF THE SECRETARY JAN 3a2006 1000 NAVY PENTAGON WASHINGTON, D.C. 20350-1000 SECNAVINST 5090.8A ASN (I&E) SECNAV INSTRUCTION 5090.8A From: Subj: Secretary of the Navy POLICY
EAD Expected Annual Flood Damage Computation
US Army Corps of Engineers Hydrologic Engineering Center Generalized Computer Program EAD Expected Annual Flood Damage Computation User's Manual March 1989 Original: June 1977 Revised: August 1979, February
Internal Audit Checklist
Internal Audit Checklist 4.2 Policy Verify required elements Verify management commitment Verify available to the public Verify implementation by tracing links back to policy statement Check review/revisions
FIRST IMPRESSION EXPERIMENT REPORT (FIER)
THE MNE7 OBJECTIVE 3.4 CYBER SITUATIONAL AWARENESS LOE FIRST IMPRESSION EXPERIMENT REPORT (FIER) 1. Introduction The Finnish Defence Forces Concept Development & Experimentation Centre (FDF CD&E Centre)
Cancellation of Nongroup Health Insurance Policies
Cancellation of Nongroup Health Insurance Policies Bernadette Fernandez Specialist in Health Care Financing Annie L. Mach Analyst in Health Care Financing November 19, 2013 Congressional Research Service
DoD Cloud Computing Strategy Needs Implementation Plan and Detailed Waiver Process
Inspector General U.S. Department of Defense Report No. DODIG-2015-045 DECEMBER 4, 2014 DoD Cloud Computing Strategy Needs Implementation Plan and Detailed Waiver Process INTEGRITY EFFICIENCY ACCOUNTABILITY
AFRL-RX-WP-TP-2008-4023
AFRL-RX-WP-TP-2008-4023 HOW KILLDEER MOUNTAIN MANUFACTURING IS OPTIMIZING AEROSPACE SUPPLY CHAIN VISIBILITY USING RFID (Postprint) Jeanne Duckett Killdeer Mountain Manufacturing, Inc. FEBRUARY 2008 Final
Public Law 113 283 113th Congress An Act
PUBLIC LAW 113 283 DEC. 18, 2014 128 STAT. 3073 Public Law 113 283 113th Congress An Act To amend chapter 35 of title 44, United States Code, to provide for reform to Federal information security. Be it
Subj: CIVILIAN EMPLOYEE TRAINING AND CAREER DEVELOPMENT
SECNAV INSTRUCTION 12410.25 From: Secretary of the Navy DEPARTMENT OF THE NAVY OFFICE OF THE SECRETARY 1000 NAVY PENTAGON WASHINGTON DC 20350-1000 SECNAVINST 12410.25 ASN(M&RA) Subj: CIVILIAN EMPLOYEE
Pima Community College Planning Grant For Autonomous Intelligent Network of Systems (AINS) Science, Mathematics & Engineering Education Center
Pima Community College Planning Grant For Autonomous Intelligent Network of Systems (AINS) Science, Mathematics & Engineering Education Center Technical Report - Final Award Number N00014-03-1-0844 Mod.
RT 24 - Architecture, Modeling & Simulation, and Software Design
RT 24 - Architecture, Modeling & Simulation, and Software Design Dennis Barnabe, Department of Defense Michael zur Muehlen & Anne Carrigy, Stevens Institute of Technology Drew Hamilton, Auburn University
Graduate Level Credit for Resident EWS Students. Natasha McEachin CG 1
Graduate Level Credit for Resident EWS Students Natasha McEachin CG 1 February 20, 2009 1 Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the collection of information
Information Technology
May 7, 2002 Information Technology Defense Hotline Allegations on the Procurement of a Facilities Maintenance Management System (D-2002-086) Department of Defense Office of the Inspector General Quality
NAVSUP FLC NORFOLK PHILADELPHIA OFFICE
NAVSUP FLC NORFOLK PHILADELPHIA OFFICE Gerald Furey Deputy for Small Business Ready. Resourceful. Responsive! 1 Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the
GAO ELECTRONIC HEALTH RECORDS. DOD and VA Should Remove Barriers and Improve Efforts to Meet Their Common System Needs
GAO United States Government Accountability Office Report to February 2011 ELECTRONIC HEALTH RECORDS DOD and VA Should Remove Barriers and Improve Efforts to Meet Their Common System Needs Report Documentation
Army Regulation 702 11. Product Assurance. Army Quality Program. Headquarters Department of the Army Washington, DC 25 February 2014 UNCLASSIFIED
Army Regulation 702 11 Product Assurance Army Quality Program Headquarters Department of the Army Washington, DC 25 February 2014 UNCLASSIFIED SUMMARY of CHANGE AR 702 11 Army Quality Program This major
Enhanced Army Global Logistics Enterprise Basic Ordering Agreements and Task Orders Were Properly Executed and Awarded
Report No. DODIG-2014-095 I nspec tor Ge ne ral U.S. Department of Defense J U LY 2 5, 2 0 1 4 Enhanced Army Global Logistics Enterprise Basic Ordering Agreements and Task Orders Were Properly Executed
DoD Internal Information Collections Process and Procedures Training
DoD Internal Information Collections Process and Procedures Training DoD Internal Information Collections Team Washington Headquarters Service, Executive Services Directorate, Directives Division Updated
Mr. Steve Mayer, PMP, P.E. McClellan Remediation Program Manger Air Force Real Property Agency. May 11, 2011
Mr. Steve Mayer, PMP, P.E. McClellan Remediation Program Manger Air Force Real Property Agency May 11, 2011 Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the collection
Guide to Using DoD PKI Certificates in Outlook 2000
Report Number: C4-017R-01 Guide to Using DoD PKI Certificates in Outlook 2000 Security Evaluation Group Author: Margaret Salter Updated: April 6, 2001 Version 1.0 National Security Agency 9800 Savage Rd.
Final NPS Alternative Transportation Program Strategic Action Plan, 2012 2016
Final NPS Alternative Transportation Program Strategic Action Plan, 2012 2016 FY 2012 Executive summary This plan is an action oriented, performance based update to the 2002 2006 Alternative Transportation
An Overview of Romanian Command and Control Systems
Col. eng. Stefan Cantaragiu, Ph. D. Military Equipment and Technologies Research Agency P.O. Box 51-16 76550 Bucharest ROMANIA Tel.: +40 1 4231483 Fax: +40 1 4231030 [email protected] Lt. eng. Adrian
2010 2011 Military Health System Conference
2010 2011 Military Health System Conference Population Health Management The Missing Element of PCMH Sharing The Quadruple Knowledge: Aim: Working Achieving Together, Breakthrough Achieving Performance
BUDGET ACCOUNT STRUCTURES
BUDGET ACCOUNT STRUCTURES Paul Posner, George Mason University The account structure used to appropriate funds plays a formative influence in resource allocation. They structure the units of analysis that
DEPARTMENT-LEVEL ACCOUNTING ENTRIES FOR FY1999. Report No. D-2000-179 August 18, 2000. Office of the Inspector General Department of Defense
DEPARTMENT-LEVEL ACCOUNTING ENTRIES FOR FY1999 Report No. D-2000-179 August 18, 2000 Office of the Inspector General Department of Defense Additional Copies To obtain additional copies of this audit report,
DEPARTMENT OF THE NAVY RECORDS MANAGEMENT PROGRAM
...-=". DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASH INGTON, D.C. 20350 2000 IN REPLY RE FER T O SECNAVINST 5210.8D DONCIO SECNAV INSTRUCTION 5210.8D From: Subj:
COMMAND, CONTROL, COMMUNICATIONS, COMPUTERS AND INFORMATION TECHNOLOGY (C4&IT) INFRASTRUCTURE MANAGEMENT POLICY
Commandant United States Coast Guard 2100 Second Street, S.W. Washington, DC 20593-0001 Staff Symbol: CG-6 Phone: (202) 267-2767 Fax: (202) 267-2598 COMDTINST 5230.70 FEB 11 2005 COMMANDANT INSTRUCTION
Table of Contents. Chapter 3: ESTABLISH A COMMUNICATION PLAN... 39 3.1 Discussion Questions... 40 3.2 Documenting the Communication Element...
Table of Contents Chapter 1: LAY THE GROUNDWORK... 1 1.1 Obtain Management Commitment... 1 1.2 Choose a Champion... 9 1.3 Form an EMS Team... 12 1.4 Build Support and Involve Employees... 14 1.5 Conduct
Jack of All Trades, Master of None: Combat Engineer Officer Assignments in the Marine Corps. EWS Contemporary Issue Paper
Jack of All Trades, Master of None: Combat Engineer Officer Assignments in the Marine Corps Subject Area General EWS 2006 Jack of All Trades, Master of None: Combat Engineer Officer Assignments in the
Table of Contents: Chapter 2 Internal Control
Table of Contents: Chapter 2 Chapter 2... 2 2.1 Establishing an Effective System... 2 2.1.1 Sample Plan Elements... 5 2.1.2 Limitations of... 7 2.2 Approvals... 7 2.3 PCard... 7 2.4 Payroll... 7 2.5 Reconciliation
GAO MAJOR AUTOMATED INFORMATION SYSTEMS. Selected Defense Programs Need to Implement Key Acquisition Practices
GAO United States Government Accountability Office Report to Congressional Addressees March 2013 MAJOR AUTOMATED INFORMATION SYSTEMS Selected Defense Programs Need to Implement Key Acquisition Practices
Acquisition. Controls for the DoD Aviation Into-Plane Reimbursement Card (D-2003-003) October 3, 2002
October 3, 2002 Acquisition Controls for the DoD Aviation Into-Plane Reimbursement Card (D-2003-003) Department of Defense Office of the Inspector General Quality Integrity Accountability Report Documentation
August 21, 2001. Dear Valued Colleague and Stakeholder:
August 21, 2001 Dear Valued Colleague and Stakeholder: I am writing to ask for your help in updating the Strategic Plan for the Municipal Support Division (MSD) of the U.S. Environmental Protection Agency.
Department of Defense INSTRUCTION
Department of Defense INSTRUCTION NUMBER 4165.71 January 6, 2005 USD(AT&L) SUBJECT: Real Property Acquisition References: (a) DoD Directive 4165.6, Real Property, October 13, 2004 (b) DoD Directive 4275.5,
ort Office of the Inspector General Department of Defense YEAR 2000 COMPLIANCE OF THE STANDARD ARMY MAINTENANCE SYSTEM-REHOST Report Number 99-165
it ort YEAR 2000 COMPLIANCE OF THE STANDARD ARMY MAINTENANCE SYSTEM-REHOST Report Number 99-165 May 24, 1999 Office of the Inspector General Department of Defense Additional Copies To obtain additional
Department of Defense INSTRUCTION. Measurement and Signature Intelligence (MASINT)
Department of Defense INSTRUCTION NUMBER 5105.58 April 22, 2009 USD(I) SUBJECT: Measurement and Signature Intelligence (MASINT) References: See Enclosure 1 1. PURPOSE. This Instruction reissues DoD Instruction
Lessons Learned: Integrating EMS and Environmental Compliance Auditing
Lessons Learned: Integrating EMS and Environmental Compliance Auditing 2009 Environmental, Energy & Sustainability Symposium Pamela M. Klinger U.S. Army Environmental Command 6 May 2009 Our Mission: Lead
Navy Enterprise Resource Planning System Does Not Comply With the Standard Financial Information Structure and U.S. Government Standard General Ledger
DODIG-2012-051 February 13, 2012 Navy Enterprise Resource Planning System Does Not Comply With the Standard Financial Information Structure and U.S. Government Standard General Ledger Additional Copies
GAO. The Chief Financial Officers Act A Mandate for Federal Financial Management Reform. Accounting and Financial Management Division
GAO United States General Accounting Office Accounting and Financial Management Division September 1991 The Chief Financial Officers Act A Mandate for Federal Financial Management Reform GAO/AFMD-12.19.4
DISTRIBUTION: ASSISTANT G-1 FOR CIVILIAN PERSONNEL POLICY, DEPARTMENT OF THE ARMY DIRECTOR, PLANS, PROGRAMS, AND DIVERSITY, DEPARTMENT OF THE NAVY
DISTRIBUTION: ASSISTANT G-1 FOR CIVILIAN PERSONNEL POLICY, DEPARTMENT OF THE ARMY DIRECTOR, PLANS, PROGRAMS, AND DIVERSITY, DEPARTMENT OF THE NAVY DEPUTY DIRECTOR, PERSONNEL FORCE MANAGEMENT, DEPARTMENT
Advanced Micro Ring Resonator Filter Technology
Advanced Micro Ring Resonator Filter Technology G. Lenz and C. K. Madsen Lucent Technologies, Bell Labs Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the collection
Human Resources Management. Portfolio Management Concept of Operations
Human Resources Management Portfolio Management Concept of Operations September 30, 2012 Table of Contents 1.0 Overview... 2 1.1 Background... 2 1.2 Purpose... 2 1.3 Organization of This Document... 2
SUBJECT: Army Information Technology Service Management (ITSM) Policy
DEPARTMENT OF THE ARMY OFFICE OF THE SECRETARY OF THE ARMY 107 ARMY PENTAGON WASHINGTON DC 20310-0107 Office, Chief Information Officer/G-6 SAIS-PR MEMORANDUM FOR SEE DISTRIBUTION SUBJECT: Information
TITLE III INFORMATION SECURITY
H. R. 2458 48 (1) maximize the degree to which unclassified geographic information from various sources can be made electronically compatible and accessible; and (2) promote the development of interoperable
Sound Transit Internal Audit Report - No. 2014-3
Sound Transit Internal Audit Report - No. 2014-3 IT Project Management Report Date: Dec. 26, 2014 Table of Contents Page Background 2 Audit Approach and Methodology 2 Summary of Results 4 Findings & Management
OF CPAB INSPECTION FINDINGS
PROTOCOL FOR AUDIT FIRM COMMUNICATION OF CPAB INSPECTION FINDINGS WITH AUDIT COMMITTEES CONSULTATION PAPER NOVEMBER 2013 The Canadian Public Accountability Board ( CPAB ) is requesting comments on the
Department of Defense DIRECTIVE
Department of Defense DIRECTIVE NUMBER 7045.14 January 25, 2013 USD(C) SUBJECT: The Planning, Programming, Budgeting, and Execution (PPBE) Process References: See Enclosure 1 1. PURPOSE. This Directive:
"OTHER TRANSACTIONS" (OT) GUIDE FOR PROTOTYPE PROJECTS
"OTHER TRANSACTIONS" (OT) GUIDE FOR PROTOTYPE PROJECTS UNDER SECRETARY OF DEFENSE FOR ACQUISITION, TECHNOLOGY AND LOGISTICS Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden
Department of Defense DIRECTIVE
Department of Defense DIRECTIVE NUMBER 5400.11 October 29, 2014 DCMO SUBJECT: DoD Privacy Program References: See Enclosure 1 1. PURPOSE. This directive: a. Reissues DoD Directive (DoDD) 5400.11 (Reference
Information Technology
September 11, 2002 Information Technology The Defense Advanced Research Projects Agency s Transition of Advanced Information Technology Programs (D-2002-146) Department of Defense Office of the Inspector
GAO DEPARTMENT OF HOMELAND SECURITY. Actions Taken Toward Management Integration, but a Comprehensive Strategy Is Still Needed
GAO November 2009 United States Government Accountability Office Report to the Subcommittee on Oversight of Government Management, the Federal Workforce, and the District of Columbia, Committee on Homeland
Department of Veterans Affairs VA Directive 0057. VA Environmental Management Program
Department of Veterans Affairs VA Directive 0057 Washington, DC 20420 Transmittal Sheet January 15, 2010 VA Environmental Management Program 1. REASON FOR ISSUE. To update the Department of Veterans Affairs
John Mathieson US Air Force (WR ALC) Systems & Software Technology Conference Salt Lake City, Utah 19 May 2011
John Mathieson US Air Force (WR ALC) Systems & Software Technology Conference Salt Lake City, Utah 19 May 2011 Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the
CAPTURE-THE-FLAG: LEARNING COMPUTER SECURITY UNDER FIRE
CAPTURE-THE-FLAG: LEARNING COMPUTER SECURITY UNDER FIRE LCDR Chris Eagle, and John L. Clark Naval Postgraduate School Abstract: Key words: In this paper, we describe the Capture-the-Flag (CTF) activity
TITLE: The Impact Of Prostate Cancer Treatment-Related Symptoms On Low-Income Latino Couples
AD Award Number: W81WH-07-1-0069 TITLE: The Impact Of Prostate Cancer Treatment-Related Symptoms On Low-Income Latino Couples PRINCIPAL INVESTIGATOR: Sally L. Maliski, Ph.D., R.N. CONTRACTING ORGANIZATION:
Enterprise Security Tactical Plan
Enterprise Security Tactical Plan Fiscal Years 2011 2012 (July 1, 2010 to June 30, 2012) Prepared By: State Chief Information Security Officer The Information Security Council State of Minnesota Enterprise
Federal Segment Architecture Methodology (FSAM): An Overview
Information Resources Management College Federal Segment Architecture Methodology (FSAM): An Overview Dr. Stan Boddie & Prof. Matt Newman 1 a global learning community for government s most promising information
DOD BUSINESS SYSTEMS MODERNIZATION. Additional Action Needed to Achieve Intended Outcomes
United States Government Accountability Office Report to Congressional Committees July 2015 DOD BUSINESS SYSTEMS MODERNIZATION Additional Action Needed to Achieve Intended Outcomes GAO-15-627 July 2015
DODIG-2013-105 July 18, 2013. Navy Did Not Develop Processes in the Navy Enterprise Resource Planning System to Account for Military Equipment Assets
DODIG-2013-105 July 18, 2013 Navy Did Not Develop Processes in the Navy Enterprise Resource Planning System to Account for Military Equipment Assets Additional Copies To obtain additional copies of this
Department of Defense INSTRUCTION. Policy on Graduate Education for Military Officers
Department of Defense INSTRUCTION NUMBER 1322.10 April 29, 2008 USD(P&R) SUBJECT: Policy on Graduate Education for Military Officers References: (a) DoD Directive 1322.10, Policy on Graduate Education
U.S. Army Corps of Engineers, New York District Monitoring of a Hurricane Sandy Contract Needs Improvement
Inspector General U.S. Department of Defense Report No. DODIG-2016-028 DECEMBER 3, 2015 U.S. Army Corps of Engineers, New York District Monitoring of a Hurricane Sandy Contract Needs Improvement INTEGRITY
Department of Defense MANUAL
Department of Defense MANUAL NUMBER 1332.18, Volume 3 November 21, 2014 USD(P&R) SUBJECT: Disability Evaluation System (DES) Manual: Quality Assurance Program (QAP) References: See Enclosure 1 1. PURPOSE
U.S. Army Contracting Command Rock Island Needs to Improve Contracting Officer s Representative Training and Appointment for Contingency Contracts
Inspector General U.S. Department of Defense Report No. DODIG-2015-147 JULY 10, 2015 U.S. Army Contracting Command Rock Island Needs to Improve Contracting Officer s Representative Training and Appointment
THE SOUTH AFRICAN HERITAGE RESOURCES AGENCY MANAGEMENT OF PERFORMANCE INFORMATION POLICY AND PROCEDURES DOCUMENT
THE SOUTH AFRICAN HERITAGE RESOURCES AGENCY MANAGEMENT OF PERFORMANCE INFORMATION POLICY AND PROCEDURES DOCUMENT ACCOUNTABLE SIGNATURE AUTHORISED for implementation SIGNATURE On behalf of Chief Executive
Status of Enterprise Resource Planning Systems Cost, Schedule, and Management Actions Taken to Address Prior Recommendations
Report No. DODIG-2013-111 I nspec tor Ge ne ral Department of Defense AUGUST 1, 2013 Status of Enterprise Resource Planning Systems Cost, Schedule, and Management Actions Taken to Address Prior s I N T
Department of Defense INSTRUCTION
Department of Defense INSTRUCTION NUMBER 5015.02 February 24, 2015 DoD CIO SUBJECT: DoD Records Management Program References: See Enclosure 1 1. PURPOSE. This instruction reissues DoD Directive (DoDD)
