1 VII. The Feasibility Study What is a Feasibility Study? Types of Feasibility Cost/Benefit Analysis Risk Analysis Comparing Alternatives Information Acquisition Feasibility Study Contents Do it! 2004 Jaelson Castro and John Mylopoulos The Feasibility Study -- 1 The Feasibility Study The objective of a feasibility study is to find out if an information system project can be done, and if so, how. A feasibility study should tell management: Whether the project can be done; What are alternative solutions? What are the criteria for choosing among them? Is there a preferred alternative? After a feasibility study, management makes a go/no-go decision. A feasibility study is a management-oriented activity 2004 Jaelson Castro and John Mylopoulos The Feasibility Study -- 2
2 Dimensions of Feasibility Operational -- how will the solution work? Technical -- is the technology needed available? Economic -- return on investment Schedule -- can the system be delivered on time? Constraints may be hard or soft 2004 Jaelson Castro and John Mylopoulos The Feasibility Study -- 3 Economic Feasibility The bottom line for many projects! Economic feasibility amounts to judging whether possible benefits of the project are worthwhile. As soon as a specific solution has been identified, the analyst can weigh the costs and benefits of each alternative. This is called cost-benefit analysis Jaelson Castro and John Mylopoulos The Feasibility Study -- 4
3 Cost/Benefit Analysis The purpose of a cost/benefit analysis is to answer questions such as: Is the project justified (benefits outweigh costs)? Can the project be done, within cost constraints? What is the minimal cost to attain a certain system? Difficulties -- discovering and assessing benefits and costs; they can both be intangible, hidden and/or hard to estimate, it's also hard to rank multi-criteria alternatives 2004 Jaelson Castro and John Mylopoulos The Feasibility Study -- 5 Types of Benefits Benefits may be classified into one of the following categories: Monetary -- when $-values can be calculated; Tangible (Quantified) -- when benefits can be quantified, but $-values can't be calculated; Intangible -- when neither of the above applies. How to identify benefits? By organizational level (operational, lower/middle/higher management) or by department (production, purchasing, sales,...) 2004 Jaelson Castro and John Mylopoulos The Feasibility Study -- 6
4 Types of Costs Project-related costs Development and purchasing costs; Installation, training and conversion costs. Operational costs (on-going) Maintenance: hardware, software, facilities Personnel: operation, maintenance. For a small business that wants to introduce a PC-based information system, these cost categories amount to: Project costs: purchase hardware, software, furniture; customize software, train, install, file conversion On-going costs: operating the system (data entry, backups, helping users, vendors etc.), maintenance (software) and user support, hardware and software maintenance, supplies, Jaelson Castro and John Mylopoulos The Feasibility Study -- 7 Personnel: 2 System Analysts (400 hours/ea $35.00/hr) $28,000 4 Programmer/Analysts (250 hours/ea $25.00/hr) $25,000 1 GUI Designer (200 hours/ea $35.00/hr) $7,000 1 Telecommunications Specialist (50 hours/ea $45.00/hr) $2,250 1 System Architect (100 hours/ea $45.00/hr) $4,500 1 Database Specialist (15 hours/ea $40.00/hr) $600 1 System Librarian (250 hours/ea $10.00/hr) $2,500 Expenses: 4 Smalltalk training registration ($ /student) $14,000 New Hardware & Software: 1 Development Server (Pentium Pro class) $18,700 1 Server Software (operating system, misc.) $1,500 1 DBMS server software $7,500 7 DBMS Client software ($ per client) $6,650 Total Development Costs: $118,200 PROJECTED ANNUAL OPERATING COSTS Personnel: 2 Programmer/Analysts (125 hours/ea $25.00/hr) $6,250 1 System Librarian (20 hours/ea $10.00/hr) $200 Expenses: 1 Maintenance Agreement for Pentium Pro Server $995 1 Maintenance Agreement for Server DBMS software $525 Preprinted forms $3,300 Total Projected Annual Costs: $11,270 Sample Costs for a Client- Server Devel/nt Project 2004 Jaelson Castro and John Mylopoulos The Feasibility Study -- 8
5 Accounting Methods Payback Analysis: how long will it take (usually, in years) to pay back the project, and accrued costs: Total costs (initial + incremental) - Yearly return (or savings) Return on Investment Analysis: compares the lifetime profitability of alternative solutions. Lifetime benefits - Lifetime costs Lifetime costs Net Present Value Analysis: determines the profitability of the new project in terms of today's dollar values. Will tell you that if you invest in the proposed project, after n years you will have $XXX profit/loss on your investment 2004 Jaelson Castro and John Mylopoulos The Feasibility Study -- 9 Discount Rate A dollar today is worth more than a dollar tomorrow The dollar values used in this type of analysis should be normalized to refer to current year dollar values. For this, we need a number, the discount rate, which measures the opportunity cost of investing money. The number is company/industry-specific. To calculate the present value, i.e., the real dollar value given the discount rate i, n years from now, we use the formula Present 1 Value(n) (1 + i) n For example, if the discount rate is 12%, then Present Value (1) = 1/( ) 1 = Present Value (2) = 1/( ) 2 = Jaelson Castro and John Mylopoulos The Feasibility Study -- 10
6 Payback Analysis Basically, we need to compute Total costs (initial + incr.) - Yearly return (or savings) but it must be done with present dollar values. Cash Flow Year 0 Year 1 Year 2 Year 3 Year 4 Dev. Costs ($100,000) Oper.Costs ($4,000) ($4,500) ($5,000) ($5,500) Present Value Time-adj Costs ($100,000) ($3,572) ($3,587) ($3,560) ($3,816) Cumulative Costs ($100,000) ($103,572) ($107,159) ($110,719) ($114,135) Benefits 0 $25,000 $30,000 $35,000 $50,000 T-adj Benefits 0 $22,325 $23,910 $24,920 $31,800 Cumulative Benefits 0 $22,325 $46,235 $71,155 $102,955 Net Costs+Benefits ($100,000) ($81,243) ($60,924) ($39,564) ($11,580) The net present value of the investment in the project after 5 years is $13,652, and after 6 years is $36,168, assuming the same figures as for year Jaelson Castro and John Mylopoulos The Feasibility Study Jaelson Castro and John Mylopoulos The Feasibility Study -- 12
7 How to Compute Exactly the Payback Period Need to determine the time period when lifetime benefits will overtake the lifetime costs; This is the break-even point. Determining the fraction of a year when a payback actually occurs: beginningyear amount (endyear amount + beginningyear amount ) For our last example, 51,611 / (70, ,611) = 0.42 Therefore, the payback period is 3.42 years 2004 Jaelson Castro and John Mylopoulos The Feasibility Study Net Present Value After discounting all costs and benefits, subtract the sum of the discounted costs from the sum of the discounted benefits to determine the net present value. If it is positive, the investment is good. If negative, the investment is bad. When comparing multiple solutions or projects, the one with the highest positive net present value is the best investment Jaelson Castro and John Mylopoulos The Feasibility Study -- 14
8 2004 Jaelson Castro and John Mylopoulos The Feasibility Study Return on Investment (ROI) ROI analysis compares the lifetime profitability of alternative solutions or projects. ROI for a solution measures the amount the business gets back from an investment vs the amount invested. ROI is calculated as follows: ROI = (Est. lifetime benefits - Est. lifetime costs) Estimated lifetime costs Or, ROI = Net Present value / Estimated lifetime costs For our example, ROI = (795, ,692)/ 488,692= 306,748 / 488,692 = 62.76% The solution offering the highest ROI is the best alternative Jaelson Castro and John Mylopoulos The Feasibility Study -- 16
9 Risk Analysis One of the criteria for comparing alternatives often has to do with an evaluation of the risks for each alternative. For example, one alternative may have a higher risk of rejection by users of the system. Or, an alternative may have better backing from top management, which means that it has lower risk of failure because top management changed its mind Jaelson Castro and John Mylopoulos The Feasibility Study Risk Factors: A Sample System requirements: Poorly understood requirements at scheduling time; Customer changes requirements; IS staff insist on unnecessary features; Tools and technology: Unsuitable target deployment environment; Unsuitable development tools; New tools; No technology standards 2004 Jaelson Castro and John Mylopoulos The Feasibility Study -- 18
10 More Risk Factors People: Inadequate participation by users in development process; Poor project management; Poorly trained developers; Environment: Weak upper management commitment; Changing environment; Changing technological environment; Government action Jaelson Castro and John Mylopoulos The Feasibility Study Feasibility Analysis Matrix Description Operational Feasibility Technical Feasibility Schedule Feasibility Economic Feasibility Ranking Candidate 1 Name Candidate 2 Name Candidate 3 Name 2004 Jaelson Castro and John Mylopoulos The Feasibility Study -- 20
11 Feasibility Criteria Wt. Candidate 1 Candidate 2 Candidate 3 Candidate.. Operational Feasibility 30% Only supports Member Services requirements Fully supports user required functionality. Same as candidate 2. Functionality. Describes to what degree the alternative would benefit the organization and how well the system would work. and current business processes would have to be modified to take advantage of software functionality Political. A description of how well received this solution would be from both user management, user, and organization perspective. Technical Feasibility Technology. An assessment of the maturity, availability (or ability to acquire), and desirability of the computer technology needed to support this candidate. Expertise. An assessment to the technical expertise needed to develop, operate, and maintain the candidate system. Score: 60 30% Current production release of Platinum Plus package is version 1.0 and has only been on the market for 6 weeks. Maturity of product is a risk and company charges an additional monthly fee for technical support. Required to hire or train C++ expertise to perform modifications for integration requirements. Score: 100 Although current technical staff has only Powerbuilder experience, the senior analysts who saw the MS Visual Basic demonstration and presentation, has agreed the transition will be simple and finding experienced VB programmers will be easier than finding Powerbuilder programmers and at a much cheaper cost. MS Visual Basic 5.0 is a mature technology based on version number. Score: 100 Although current technical staff is comfortable with Powerbuilder, management is concerned with recent acquisition of Powerbuilder by Sybase Inc. MS SQL Server is a current company standard and competes with SYBASE in the Client/Server DBMS market. Because of this we have no guarantee future versions of Powerbuilder will play well with our current version SQL Server. Score: 50 Score: 95 Score: Jaelson Castro and John Mylopoulos The Feasibility Study Feasibility Criteria Wt. Candidate 1 Candidate 2 Candidate 3 Candida te.. Operational Feasibility 30% Score: 60 Score: 100 Score: 100 Technical Feasibility 30% Score: 50 Score: 95 Score: 100 Economic Feasibility 30% Cost to develop: Payback period (discounted): Approximately $350,000. Approximately 4.5 years. Approximately $418,040. Approximately 3.5 years. Approximately $400,000. Approximately 3.3 years. Net present value: Approximately $210,000. Approximately $306,748. Approximately $325,500. Detailed calculations: See Attachment A. See Attachment A. See Attachment A. Schedule Feasibility Score: 60 10% Less than 3 months. Score: months Score: 90 9 months An assessment of how long the solution will take to design and Score: 80 Score: 85 implement. Score: 95 Ranking 100% Jaelson Castro and John Mylopoulos The Feasibility Study -- 22
12 Another Example Consider a scenario: You want to adopt a programming environment for your Zeus project; there are three alternatives: Strobe, KEE and Loops Criteria Alternatives Strobe Strobe KEE KEE Loops Loops Zeus Zeus reqs reqs (H+) (H+) H H+ H+ H Min Min costs costs (H) (H) H L Unresolved** Customizability H-* H-* M H *: H-, provided source code is available. **: the following questions need answers: (I) hardware platform for the project? (ii) do we get free copy? 2004 Jaelson Castro and John Mylopoulos The Feasibility Study Comparing Alternatives with Multiple Criteria Assign a weight to each criterion. Use dominating criteria. Eliminate unsatisfactory alternatives by setting "acceptability" threshold levels Jaelson Castro and John Mylopoulos The Feasibility Study -- 24
13 The Better Way: Use Collection effort Minimal effort Matching effort Quality of schedule Minimal conflicts Degree of participation + - Goal Analysis Schedule meeting - + Collect timetables By person By system Manually Choose schedule By all means By Have updated timetables Collect them Automatically 2004 Jaelson Castro and John Mylopoulos The Feasibility Study MinEffort SchedQuality By all means/manually By /manually By system/manually By all means/automat By /automat By system/automat Jaelson Castro and John Mylopoulos The Feasibility Study -- 26
14 Information Acquisition There are many techniques for acquiring the information used in a feasibility study. Study available documents and data; Sampling; Interviews; Questionnaires; Observation. You need to know which method to choose, and how to actually use it Jaelson Castro and John Mylopoulos The Feasibility Study Feasibility Study Contents Purpose and scope of the study -- objectives, who commissioned it, who did it, sources of information, process used for the study, how long did it take,... Description of current situation -- organizational setting, current system(s). Related factors and constraints. Problems and requirements. Objectives of the new system. Possible alternatives -- including, possibly, the present situation. Criteria for comparison -- definition of the criteria Analysis of alternatives -- includes description of each alternative, evaluation with respect to criteria, including cost/benefit analysis and special implications. Recommendations -- what is recommended, implications, what to do next; sometimes it makes sense to recommend an interim solution and a permanent solution. Appendices that include supporting material Jaelson Castro and John Mylopoulos The Feasibility Study -- 28
15 An Example Your friendly campus bookstore wants to improve handling of textbook orders. Right now, the orders come in on a paper form from instructors, the information is copied on cards for a card file, and purchase orders are generated for publishers. A clerk keeps track of incoming shipments. All information is thrown away at the end of the year, so instructors can t say same as last year. Can you (as systems analyst) help? Here are the steps you may want to follow: Talk to the manager, convince her that a feasibility study is a good idea, generate a proposal, sign a contract and get started; Find out how other kinds of information are handled (payroll, scheduling of employees,...); it turns out that they are not problems, so the new system need not deal with such information (scoping) Talk to the people who handle orders; what do they do? where is the problem, if any? what would they like to see? (information acquisition) 2004 Jaelson Castro and John Mylopoulos The Feasibility Study An Example (cont d) d) As you begin to understand the setup, you begin to form an idea of how different processes are done: HandleOrder, AnswerQuery, PurchaseBooks, GetUsedBooks,... Confirm your understanding with the manager. Next you consider alternatives: (a) improve the manual system with redesigned cards, new card-filing system; (b) install a personal computer with a database where you keep all book orders; (c) install a network of PCs to handle orders, purchase orders, inventory. You confirm with the manager that his criteria for evaluating alternative solutions are: (1) cost -- no more than $30K; (2) improved service; (3) ease of use. Next, you evaluate each alternative with respect to each criterion. To do this, you talk to your technical people who help you with advice on the size of programming tasks etc. Once you are done, you show the results to the manager. You don t show him any conclusions yet. Finally, you prepare your report and you hand it in Jaelson Castro and John Mylopoulos The Feasibility Study -- 30
VI. The Feasibility Study. The Feasibility Study Phase
VI. The Feasibility Study What is a feasibility study? What to study and conclude? Benefits and costs Cost/Benefit analysis Accounting methods Comparing alternatives Do it! 2002 Jaelson Castro and John
VI. The Feasibility Study. Do it!
VI. The Feasibility Study What is a feasibility study? What to study and conclude? Benefits and costs Cost/Benefit analysis Accounting methods Comparing alternatives Do it! 2003 Giorgini The Feasibility
Lecture 7: the Feasibility Study. Content of a feasibility study
Lecture 7: the Study What is a feasibility study? What to study and conclude? Types of feasibility Technical Economic Schedule Operational Quantifying benefits and costs Payback analysis Net Present Value
Why a feasibility study? Content of a feasibility study. When to do Feasibility Study? Lecture 3, Part 2: Feasibility Study
Why a feasibility study? Lecture 3, Part 2: Study Jennifer Campbell CSC340 - Winter 2007 Objectives of a feasibility study: To find out if an system development project can be done:...is it possible?...is
Chapter 11 Building Information Systems and and Managing Projects
1 Chapter 11 Building Information Systems and and Managing Projects LEARNING TRACK 1: CAPITAL BUDGETING METHODS FOR INFORMATION SYSTEM INVESTMENTS Traditional Capital Budgeting Models Capital budgeting
- centred on human factors (ie. ergonomics, desire to have a new computer system) - Are there unused computer terminals in the company now?
Feasibility and Cost-Benefit Analysis Feasibility Operational Feasibility - centred on human factors (ie. ergonomics, desire to have a new computer system) - Is the problem worth solving? - How do the
ROI VOI Feasibility Analysis
ROI VOI Feasibility Analysis Pink Elephant White Paper PinkLink November 2006 Table Of Contents 1 VOI vs ROI... 3 2 VOI & The ITIL Business Case... 4 2.1 Why ROI/VOI & IT Governance... 4 3 Project Initiation...
Hotel Example: ROI Analysis
Hotel Example: ROI Analysis The ROI Analysis needs to be done on all design options considered in a Feasibility Study. Option 1: Stay with Current System Background Information Note: For this hypothetical
Capital Investment Appraisal Techniques
Capital Investment Appraisal Techniques To download this article in printable format click here A practising Bookkeeper asked me recently how and by what methods one would appraise a proposed investment
Project Selection and Project Initiation
Chapter 4 Project Selection and Project Initiation Objectives Understand how to select right projects and why selecting the right projects to work on is important and sometimes difficult for an organization
Project Management. Systems Analysis and Design, 8e Kendall & Kendall
Project Management Systems Analysis and Design, 8e Kendall & Kendall Learning Objectives Understand how projects are initiated and selected, define a business problem, and determine the feasibility of
Chapter 5 Initiating and Planning Systems Development Projects
Chapter 5 Initiating and Planning Systems Development Projects Multiple Choice Questions 1. As a rule of thumb estimate, what percentage of the entire development effort should be devoted to the project
Investment Appraisal INTRODUCTION
8 Investment Appraisal INTRODUCTION After reading the chapter, you should: understand what is meant by the time value of money; be able to carry out a discounted cash flow analysis to assess the viability
ECONOMIC JUSTIFICATION
ECONOMIC JUSTIFICATION A Manufacturing Engineer s Point of View M. Kevin Nelson, P.E. President Productioneering, Inc. www.roboautotech.com Contents: I. Justification methods a. Net Present Value (NPV)
Reducing the Costs of Employee Churn with Predictive Analytics
Reducing the Costs of Employee Churn with Predictive Analytics How Talent Analytics helped a large financial services firm save more than $4 million a year Employee churn can be massively expensive, and
Systems Analysis and Design Life Cycle
Systems Analysis and Design Life Cycle 2.1 The major goal of requirement determination phase of information system development is a. determine whether information is needed by an organization b. determine
Review Solutions FV = 4000*(1+.08/4) 5 = $4416.32
Review Solutions 1. Planning to use the money to finish your last year in school, you deposit $4,000 into a savings account with a quoted annual interest rate (APR) of 8% and quarterly compounding. Fifteen
Understanding the Business Value of Systems and Managing Change
Chapter 9 Understanding the Business Value of Systems and 9.1 2006 by Prentice Hall OBJECTIVES Evaluate models for understanding the business value of information systems Analyze the principal causes of
PRODUCTIVITY & GROWTH
Productivity Financial Tools There are a number of financial tools that can be used to measure the financial performance and potential contribution of improvement projects to the productivity of a business.
Glossary of Accounting Terms
Glossary of Accounting Terms Account - Something to which transactions are assigned. Accounts in MYOB are in one of eight categories: Asset Liability Equity Income Cost of sales Expense Other income Other
What s a Business Case? And Other Frequently Asked Questions Marty J. Schmidt, President, Solution Matrix Ltd.
A Solution Matrix White Paper What s a Business Case? And Other Frequently Asked Questions Marty J. Schmidt, President, Solution Matrix Ltd. Contents What's a business case? Cost of ownership, ROI, and
Process Improvement Guidelines with Project Proposal Template
Process Improvement Guidelines with Project Proposal Template Contents Project Improvement Guidelines... 1 Step 1- Define the Problem... 1 Step 2 Research Causes... 1 Step 3 Analyze Alternatives... 2 Step
Executive Summary... 2. Factors Affecting Benefits And Costs... 4. Disclosures... 5. TEI Framework And Methodology... 6. Analysis...
TABLE OF CONTENTS Executive Summary... 2 Factors Affecting Benefits And Costs... 4 Disclosures... 5 TEI Framework And Methodology... 6 Analysis... 7 Interview Highlights... 7 Costs... 9 Benefits... 10
Quality Meets the CEO
Quality Meets the CEO Jeffery E. Payne [email protected] Reliable Software Technologies Corporate management does not care about quality. This is the cold, hard reality of the software world. Management
Section 1 - Covered Call Writing: Basic Terms and Definitions
Section 1 - Covered Call Writing: Basic Terms and Definitions Covered call writing is one of the most often-used option strategies, both at the institutional and individual level. Before discussing the
Economic Analysis and Economic Decisions for Energy Projects
Economic Analysis and Economic Decisions for Energy Projects Economic Factors As in any investment project, the following factors should be considered while making the investment decisions in energy investment
Do You Need ERP? The Magnum Group Technical Publications Division
Do You Need ERP? A Cost-Benefit Analysis of ERP with Respect to Small and Medium Business Enterprises Compiled by the Database Services Division of The Magnum Group What is ERP? Today s business scenario
Writing an Asset Management System Business Case
Cover Article Writing an Asset Management System Business Case By Brian E. Thompson, CPPM, Los Angeles Chapter Introduction The intent of this paper is to provide the critical elements and methodology
CONNECTICUT HOUSING FINANCE AUTHORITY REQUEST FOR PROPOSAL FOR Development of Strategic Information Technology Plan
Overview The Connecticut Housing Finance Authority (CHFA) was created in 1969 as a public instrumentality by the State Legislature. As a quasi-public agency and political subdivision of the State of Connecticut,
EXAM - E20-027. nterprise Backup Recovery Design Exam for Data Center Architects Exam. http://www.examskey.com/e20-027.html
EMC EXAM - E20-027 nterprise Backup Recovery Design Exam for Data Center Architects Exam TYPE: DEMO http://www.examskey.com/e20-027.html Examskey Cisco E20-027 exam demo product is here for you to test
Fundamentals of Information Systems, Fifth Edition. Chapter 8 Systems Development
Fundamentals of Information Systems, Fifth Edition Chapter 8 Systems Development Principles and Learning Objectives Effective systems development requires a team effort of stakeholders, users, managers,
Do you have difficulty making purchasing decisions? Have you ever wished you could figure out how to decide more easily?
Portable Skills Handout #1 Conducting a Cost Benefit Analysis Do you have difficulty making purchasing decisions? Have you ever wished you could figure out how to decide more easily? Some decisions, such
W H I T E P A P E R H o w P r o j e c t a n d P o r t f o l i o Management Solutions Are Delivering Value to Organizations
W H I T E P A P E R H o w P r o j e c t a n d P o r t f o l i o Management Solutions Are Delivering Value to Organizations Sponsored by: CA Randy Perry September 2008 Eric Hatcher EXECUTIVE SUMMARY Global
Tools for Project Evaluation. Nathaniel Osgood 1.040/1.401J 2/11/2004
Tools for Project Evaluation Nathaniel Osgood 1.040/1.401J 2/11/2004 Basic Compounding Suppose we invest $x in a bank offering interest rate i If interest is compounded annually, asset will be worth $x(1+i)
Quantifying ROI: Building the Business Case for IT and Software Asset Management
Quantifying ROI: Building the Business Case for IT and Software Asset Management Benefits of IT and Software Asset Management In today s increasingly competitive business environment, companies are realizing
P2 Performance Management November 2014 examination
Management Level Paper P2 Performance Management November 2014 examination Examiner s Answers Note: Some of the answers that follow are fuller and more comprehensive than would be expected from a well-prepared
True or False: A statement of cash flow (SCF) documents the changes in a company s cash position over an accounting period.
ENGM 401 & 620 - X1 Fundamentals of Engineering Finance Fall 2010 Lecture 15: Statement of Cash Flow (2) Let all the learned say what they can, Tis ready money makes the man. -Shakespeare M.G. Lipsett
Project Evolution & Estimation :cash flow forecasting, cost benefit evolution techniques, risk evolution, Cost benefit analysis
Project Evolution & Estimation :cash flow forecasting, cost benefit evolution techniques, risk evolution, Cost benefit analysis EA Cost-benefit Analysis A standard way to assess the economic benefits Two
Why Cloud BI? of Software-as-a-Service Business Intelligence. Executive Summary. This white paper explores the 10 substantial
of Software-as-a-Service Business Intelligence Executive Summary Smart businesses are pursuing every available opportunity to maximize performance and minimize costs. Business Intelligence tools used to
This paper was presented at the 1995 CAUSE annual conference. It is part of the proceedings of that conference, "Realizing the Potential of
This paper was presented at the 1995 CAUSE annual conference. It is part of the proceedings of that conference, "Realizing the Potential of Information Resources: Information, Technology, and Services--Proceedings
Introduction to Systems Analysis and Design
Introduction to Systems Analysis and Design What is a System? A system is a set of interrelated components that function together to achieve a common goal. The components of a system are called subsystems.
NPV Versus IRR. W.L. Silber -1000 0 0 +300 +600 +900. We know that if the cost of capital is 18 percent we reject the project because the NPV
NPV Versus IRR W.L. Silber I. Our favorite project A has the following cash flows: -1 + +6 +9 1 2 We know that if the cost of capital is 18 percent we reject the project because the net present value is
MOST FREQUENTLY ASKED INTERVIEW QUESTIONS. 1. Why don t you tell me about yourself? 2. Why should I hire you?
MOST FREQUENTLY ASKED INTERVIEW QUESTIONS 1. Why don t you tell me about yourself? The interviewer does not want to know your life history! He or she wants you to tell how your background relates to doing
The Total Economic Impact Of SAS Customer Intelligence Solutions Intelligent Advertising For Publishers
A Forrester Total Economic Impact Study Commissioned By SAS Project Director: Dean Davison February 2014 The Total Economic Impact Of SAS Customer Intelligence Solutions Intelligent Advertising For Publishers
Information Technology Resource Services
Information Technology Resource Services RTI specializes in resource solutions ranging from Help Desk, Workstation, Network Infrastructure and Telecommunications services to Software and Web Site Developers.
Total Cost of Ownership and Return On Investment Financial Benefits of Our Software Solutions
Total Cost of Ownership and Return On Investment Financial Benefits of Our Software Solutions Your evaluation of a software vendor s application product should not only involve considering factors such
Course Syllabus. GAME 1403 Introduction to Game Design and Development
1 Course Syllabus GAME 1403 Introduction to Game Design and Development Catalog Description: Introduction to electronic game development and game development careers. Includes examination of history and
IMPLEMENTING TENNISCOLLECT
IMPLEMENTING TENNISCOLLECT Revised January, 2013 For Additional Assistance, Please Contact: TennisConnect Support Services [email protected] 888.620.6696 XT 2 -or- Charlie Ruddy TCPS, LLC Account
Telemarketing Services Buyer's Guide By the purchasing experts at BuyerZone
Introduction: reasons to outsource The main reason companies outsource telemarketing operations is that setting up a large scale telemarketing call center is expensive and complicated. First you ll need
CITY OF SALEM DATA CENTER INFORMATION SYSTEMS SPECIALIST SERIES
CITY OF SALEM DATA CENTER INFORMATION SYSTEMS SPECIALIST SERIES 0854 INFORMATION SYSTEMS SPECIALIST 1 0858 INFORMATION SYSTEMS SPECIALIST 5 0855 INFORMATION SYSTEMS SPECIALIST 2 0859 INFORMATION SYSTEMS
Microsoft s Acquisition of WebTV: Valuation and Real Options Analysis 1
FIN 673 Professor Robert B.H. Hauswald Mergers and Acquisitions Kogod School of Business, AU Microsoft s Acquisition of WebTV: Valuation and Real Options Analysis 1 In May of 1997, Microsoft paid $425
Business Plan for Implementing Electronic Commerce
Introduction to Electronic Commerce Business Plan for Implementing Electronic Commerce Objectives In this chapter, you will learn about: Planning electronic commerce initiatives Strategies for developing
Calculator and QuickCalc USA
Investit Software Inc. www.investitsoftware.com. Calculator and QuickCalc USA TABLE OF CONTENTS Steps in Using the Calculator Time Value on Money Calculator Is used for compound interest calculations involving
Could a Managed Services Agreement Save Your Company Tens of Thousands of Dollars Each Year?
MANAGED IT SERVICES Could a Managed Services Agreement Save Your Company Tens of Thousands of Dollars Each Year? A lot of business owners, executives, and managers have a love-hate relationship with managed
How to Forecast Your Revenue and Sales A Step by Step Guide to Revenue and Sales Forecasting in a Small Business
How to Forecast Your Revenue and Sales A Step by Step Guide to Revenue and Sales Forecasting in a Small Business By BizMove Management Training Institute Other free books by BizMove that may interest you:
Succession Plan. Planning Information and Plan Template December 2010. Succession Planning 2010
Succession Plan Planning Information and Plan Template December 2010 Northland Foundation The Keeley Group Page 1 Introduction Succession Planning is an important component often addressesd as part of
Process Models and Metrics
Process Models and Metrics PROCESS MODELS AND METRICS These models and metrics capture information about the processes being performed We can model and measure the definition of the process process performers
Why Cloud BI? The 10 Substantial Benefits of Software-as-a-Service Business Intelligence
The 10 Substantial Benefits of Software-as-a-Service Business Intelligence Executive Summary Smart businesses are pursuing every available opportunity to maximize performance and minimize costs. Business
Project, Portfolio Management (PPM) for the Enterprise Whose System is it Anyway?
Project, Portfolio Management (PPM) for the Enterprise Whose System is it Anyway? Protecting Your Investment with a Bottom-up Approach Revised December 2012 Heather Champoux, PMP http://epmlive.com Contents
Guide to Financial Ratios Analysis A Step by Step Guide to Balance Sheet and Profit and Loss Statement Analysis
Guide to Financial Ratios Analysis A Step by Step Guide to Balance Sheet and Profit and Loss Statement Analysis By BizMove Management Training Institute Other free books by BizMove that may interest you:
Cost Benefit and Opportunity Cost Analysis Guidelines
The Commonwealth of Virginia Cost Benefit and Opportunity Cost Analysis Guidelines For the Public-Private Education Facilities and Infrastructure Act of 2002 December 2015 Document Version control Version
ICASL - Business School Programme
ICASL - Business School Programme Quantitative Techniques for Business (Module 3) Financial Mathematics TUTORIAL 2A This chapter deals with problems related to investing money or capital in a business
Preparing Financial Statements
Preparing Financial Statements Understanding financial statements is essential to the success of a small business. They can be used as a roadmap to steer you in the right direction and help you avoid costly
The Cost and Benefits of On-Demand vs. On-Premise Procurement Software
The Cost and Benefits of On-Demand vs. On-Premise Procurement Software A Coupa Executive White Paper Executive Summary Procurement software enables organizations to save time, money, and effort throughout
ITNW 1325 Fundamentals of Networking Technologies
Course Syllabus ITNW 1325 Fundamentals of Networking Technologies Catalog Description: Instruction in networking technologies and their implementation. Topics include the OSI reference model, network protocols,
Why Your Business Needs a Website: Ten Reasons. Contact Us: 727.542.3592 [email protected]
Why Your Business Needs a Website: Ten Reasons Contact Us: 727.542.3592 [email protected] Reason 1: Does Your Competition Have a Website? As the owner of a small business, you understand
The Concept of Present Value
The Concept of Present Value If you could have $100 today or $100 next week which would you choose? Of course you would choose the $100 today. Why? Hopefully you said because you could invest it and make
WHITE PAPER Linux Management with Red Hat Network Satellite Server: Measuring Business Impact and ROI
WHITE PAPER Linux Management with Red Hat Network Satellite Server: Measuring Business Impact and ROI Sponsored by: Red Hat Tim Grieser Randy Perry October 2009 Eric Hatcher Global Headquarters: 5 Speen
Big Data Services From Hitachi Data Systems
SOLUTION PROFILE Big Data Services From Hitachi Data Systems Create Strategy, Implement and Manage a Solution for Big Data for Your Organization Big Data Consulting Services and Big Data Transition Services
Building a Business Case for IP Telephony for Small and Medium Businesses
Building a Business Case for IP Telephony for Small and Medium Businesses Helen Chan Senior Analyst Small & Medium Business Strategies The Yankee Group [email protected] Copyright 2003, the Yankee
CHAPTER 13. Acquiring Information Systems and Applications
CHAPTER 13 Acquiring Information Systems and Applications CHAPTER OUTLINE 13.1 Planning for and Justifying IT Applications 13.2 Strategies for Acquiring IT Applications 13.3 The Traditional Systems Development
Key Metrics for Determining ROI for Business Intelligence Implementations. Elliot King, Research Analyst August 2007
Key Metrics for Determining ROI for Business Intelligence Implementations Elliot King, Research Analyst August 2007 Sponsored by Produced by 2 TABLE OF CONTENTS Introduction and Key Findings............................................................................................................................3
Buy versus Build Considerations for Clients Purchasing CLO Dashboard
Buy versus Build Considerations for Clients Purchasing CLO Dashboard Prepared by Zeroed-In Technologies for use by clients evaluating CLO Dashboard against their internal development of similar executive
FTA Technology 2009 IT Modernization and Business Rules Extraction
FTA Technology 2009 IT Modernization and Business Rules Extraction August 5th, 2009 _experience the commitment TM Agenda IT Modernization Business Rules Extraction Automation Tools for BRE BRE Cost and
PPM Maturity Value Assessment for Your Company
PPM Maturity Value Assessment for Your Company Date Sponsored by: Prepared For: Valued Customer Name Third party model, methodology and data provided by: Disclaimer: NOTICE - THIS INFORMATION IS PROVIDED
PROJECT RISK MANAGEMENT
PROJECT RISK MANAGEMENT DEFINITION OF A RISK OR RISK EVENT: A discrete occurrence that may affect the project for good or bad. DEFINITION OF A PROBLEM OR UNCERTAINTY: An uncommon state of nature, characterized
Time Value of Money. 2014 Level I Quantitative Methods. IFT Notes for the CFA exam
Time Value of Money 2014 Level I Quantitative Methods IFT Notes for the CFA exam Contents 1. Introduction...2 2. Interest Rates: Interpretation...2 3. The Future Value of a Single Cash Flow...4 4. The
Executive Summary... 2. OpenEdge Streamlines Development and Support... 2. Factors Affecting Benefits And Costs... 3. Disclosures...
TABLE OF CONTENTS Executive Summary... 2 OpenEdge Streamlines Development and Support... 2 Factors Affecting Benefits And Costs... 3 Disclosures... 3 TEI Framework And Methodology... 5 Analysis... 7 Interview
The Business Case for Migrating from IBM to the SharePoint Platform: The Cost Advantages
The Business Case for Migrating from IBM to the SharePoint Platform: The Cost Advantages JULY 2011 Visit www.piquesolutions.com to learn more about our market research and consulting services. 795 Folsom
The Total Economic Impact Of Virtual Hold s Virtual Queuing Solutions
Prepared for Virtual Hold Technology June 2006 The Total Economic Impact Of Virtual Hold s Virtual Queuing Solutions Project Director: Dan Merriman TABLE OF CONTENTS Executive Summary...4 Purpose...4 Methodology...4
15 Most Typically Used Interview Questions and Answers
15 Most Typically Used Interview Questions and Answers According to the reports made in thousands of job interviews, done at ninety seven big companies in the United States, we selected the 15 most commonly
hp calculators HP 17bII+ Net Present Value and Internal Rate of Return Cash Flow Zero A Series of Cash Flows What Net Present Value Is
HP 17bII+ Net Present Value and Internal Rate of Return Cash Flow Zero A Series of Cash Flows What Net Present Value Is Present Value and Net Present Value Getting the Present Value And Now For the Internal
Consulting Performance, Rewards & Talent. Measuring the Business Impact of Employee Selection Systems
Consulting Performance, Rewards & Talent Measuring the Business Impact of Employee Selection Systems Measuring the Business Impact of Employee Selection Systems Many, if not all, business leaders readily
IT SERVICE MANAGEMENT: HOW THE SAAS APPROACH DELIVERS MORE VALUE
1 IT Service Management: How the SaaS Approach Delivers More Value IT SERVICE MANAGEMENT: HOW THE SAAS APPROACH DELIVERS MORE VALUE EXECUTIVE SUMMARY Today s companies are very reliant on their technology