Casing Design Review of Design Methodology

Size: px
Start display at page:

Download "Casing Design Review of Design Methodology"

Transcription

1 ODBP.doc Casing Design Review of Design Methodology Review performed for PSA at BP by Rock-Well Consultants 2004 Report No. RWC 5/04, rev. 1. 1

2 Contents: Page: Summary 3 1. Project description 4 2. Review of BP casing design procedures BP s governing documentation 2.2 Discussion of BP Casing and Tubing Design Manual. 3. Well failure on Valhall Description of incident 3.2 Operational summary of 2/8-A Design of well 2/8-A8B Valhall general casing design 4.2 Well 2/8-A8B 4.3 Worst case considerations 4.4 Summary of incident 5. Summary of review Recommendations 31 Abbreviations 32 References 33 Appendix A: Design factors for well 2/8-A8B 34 2

3 Summary: The design documentation used by BP is reviewed. The casing design manuals are of high quality. This report also presents an evaluation of BP methodology for well construction using a well incident of well 2/8-A5B at Valhall as a case. Severe circulation losses led to pumping of a gunk pill. This plugged the drill string leading to a shut-in wellhead pressure. A well control operation stabilized the well, which was eventually sidetracked. The review found that the casings had sufficient strength in burst and tension and collapse. It is, however, recommended to consider more realistic design scenario. Severe losses indicate that a gas filled casing scenario should be appliad rather than a kick margin for burst design. This will require a higher casing test pressure. Likewise, circulation losses gives more severe loading than base-oil filled casing for collapse design. However, in the subsequent sidetrack (A-08 C9 more severe design scenario were used. The risk worksheet cover normal losses, but does not identify total losses in the reservoir as a potential risk. A strategy for combating lost circulation in the reservoir should be developed. The decision to continue to circulate the well after a positive flow check, and the unsuccessful pumping of a gunk pill should be re-visited, with a view to clarifying what procedures would be applicable in a future similar situation. 3

4 1. Project Description The objective of the project is to investigate the methodology for casing design for several operating companies in Norway. The present report focuses on BP. The project will evaluate the design manuals, the methodology for data collection, the quality and the use of these in the course of the well design. The background for the project is that the PSA has observed cases where the casing design was the limiting factor for the well at several operating companies. Because one expects a number of HPHT wells in the near future, the design basis each operator uses is identified to search for improvements. This project uses a well control incident of well 2/8-A8B as a case to search for improvements. A review of the operational aspects of the incident has also been performed. 4

5 2. Review of BP s casing design procedures 2.1 BP s governing documentation After the merger a few years ago between BP and Amoco, the documentation has been revised. References 1 through 5 identify the manuals related to well construction. The overall impression is a set of manuals that are modern, updated and of high quality. The manuals are in electronic format, allowing for yearly updates. In the following we will review ref. 3 which is the Casing Design Manual. This manual contains the following chapters: Authorisation for Issue Amendment Summary Distribution List Preface List of Abbreviations Part 1: Overview and Policies Part 2: Quick Guide Part 3: Detailed Manual Part 4: Design Example Part 5: Useful Information Addendum References Part 1 contains the following subchapters: 1. Overview 2. Changes to This Manual 3. Policy Statement for casing Design 4. Pressure Test Requirements 5. Contravention of policy Statements Under Policy Statement the following policies are defined: - All wells require casing design, checked and approved - Pore and frac pressure design basis required - Setting depth selected to provide safety margin. - Kick tolerance calculations required - Burst loading design required, with less risk of casing failure than of exposed formation. - Tubing leak design required for production casing - Tri-axial design recommended - Exploration and appraisal wells require gas filled casing design, whilst development wells reservoir fluid should be used. - Recommended to run leak-off-tests. 5

6 It is implied in these policy statements that the importance of design criteria (pore and frac pressure) and, the assessment of risk (setting depth-safety margin) are key factors in the design of a well. Part 2: Quick Guide contains the following subchapters: 1. Introduction 2. Data needed before design 3. Design summary 4. Casing setting depths 5. Collapse design 6. Burst design 7. Tension design 8. Tri-axial design 9. Buckling and compression 10. Casing wear 11. Temperature 12. Special design cases 13. Reliability 14. Connection selection 15. Materials selection 16. Kick tolerance This part is a compact reference for well designers familiar with the remainder of the manual. References are provided to details defined in other chapters. The Quick Guide provides a good summary. We will not discuss this further, but provide comments to the chapters to follow. Part 3: Detailed Manual contains the following subchapters: 1. Introduction 2. Data needed before design 3. Casing design software in BP Amoco 4. Casing setting depth guidelines 5. Collapse design criteria 6. Burst design criteria 7. Tensile design criteria 8. Tri-axial design analysis 9. Buckling and compression design considerations 10. Casing wear 11. Temperature considerations 12. Special design cases 13. Casing design reliability 14. Connections 15. Corrosion 16. Kick tolerance Part 3 is the major part of the manual and contains a lot of information. Although different design criteria can be applied, the manual reflects current industry understanding. A few comments will be tied to certain subchapters. 6

7 Under 1. Introduction it is stated: "While this manual identifies minimum requirements it must be recognized that government regulations and/or local considerations may require that casing designs be carried out to standards exceeding those in the manual." Under 3. Casing Design Software in BP Amoco, the software packages are defined. Most of these are used by many other operating companies and are considered industry standard. A discussion about each program is also presented, addressing limitations and giving practical advice. Subchapter 4: Casing Setting Depth Guidelines is a key chapter in the design process. The initial setting depth based on pore and frac pressures is the start of the design. The chapter further addresses mud weight, hole inclination and other important factors. The chapter gives a good overview over the well design process. The following statement is reproduced from this chapter: Sensitivity studies should be considered to identify the contingency provisions required to accommodate pore or fracture pressures during drilling which differ from those assumed during design. Kick tolerances which may be acceptable for seat selection are not an acceptable basis for mechanical burst design. Subchapter 4 further presents methods to derive fracture gradient and overburden prognosis. Methods by Daines, Hubbert and Willis, Mathew and Kelly, Pennebaker, Eaton, MacPherson and Berry and Zamora are recommended. These are all correlation methods from the 1970 s and 1980 s. Daines method has in particular been popular to establish fracture prognosis in vertical wells. Most wells today are deviated. Also, in-situ stress analysis has proven useful. It is recommended to consider these newer approaches for fracture gradient predictions. The inversion method derived by Aadnøy(ref. 6) has in particular provided good results. Reference 7 presents alternative modeling methods. Subchapter 6 covers burst design. It is stated that: Local regulatory agencies, e.g. MMS in the Gulf of Mexico, may impose specific local criteria which differ from those in the manual. Nevertheless wherever possible, casing design in BP Amoco should: - Provide casing stronger in burst than the fracture pressure of exposed formation beneath the shoe. - Take account of the possibility of a hydrocarbon column to the wellhead. The first condition implies that a weak point in the well should never be beneath the wellhead, but below the casing shoe, a sound approach. Reference 7 discusses this requirement in 7

8 detail. The second comment about gas(oil) filled casing will be addressed in the discussion of well A8B later in this report. Also the burst design chapter discusses the external pressure profiles for burst load design. In summary, the following conditions are given(our short version of the conditions): -External pressure equal to pore pressure in cemented intervals. -External pressure equal to mud mix fluids (i.e. hydrostatic of water for waterbased mud and hydrostatic of base oil for oil based mud). -Mud density for short time applications. The classical back-pressure used in the oil industry is the pressure caused by water. Because water is the only mobile phase, and particles settles out over time, this very conservative criterion is used by many operators. However, for critical wells the mud weight is used as a short time scenario. It should be stated that the back-pressure issue is not fully resolved throughout the industry. Subchapter 10 covers casing wear. Their treatment includes practical experience, experimental tests on casing, tool joints and mud. They also state the well known fact that the theoretical solutions for wear are not particularly good. Casing wear reduces the burst and collapse strength of the casing strings. Equations are presented to perform these calculations. Additional comments that could be included are: 1) Tools that measure casing wear have a given resolution, and may not give a correct picture, and, 2) in critical wells it may be advisable to pressure test casings if there is uncertainty about the degree of casing wear. Subchapter 13 covers casing design reliability. It is interesting to observe the following statement: The most important parameter in determining the reliability and success of a casing design is the pore pressure. This means drilling engineers must work closely with all supporting groups to determine pore pressure confidence levels and ensure that all parameters impacting pore pressure predictions have been addressed. This demonstrates the fundamental coupling between various elements of the well design. Part 5 presents a design example. This worked example serves well as a guide as many important elements are included. 2.2 Discussion of BP s Casing and Tubing Design Manual. The manual is modern and a document of high quality. The manual reflects the understanding and emphasize the four key parameters: -the pore pressure -the fracture pressure -the density of the formation fluid 8

9 -the back pressure on the casing We did not find any errors in the manual, but have supplied a few comments as seen from an outside observer. BP Amoco may consider including these. The manual is very comprehensive and well organized. Such a manual should also be accompanied by a competence requirement for the personnel using it. The quality of the design still depends on the competency of the well designer and the quality of the design verification. One difficulty with such governing documentation is to impose the policies at all levels, well design, procurement and the actual well operations. 9

10 3. Well failure on Valhall 3.1 Description of Incident The second task is to investigate the well problems on well 2/8-A-8 B. The summary from the Incident Investigation Report (ref. 8) will be reproduced below to give the overview. Quote from Reference 8: 2. Summary Well 2/8-A B was spudded in October The A-8 slot was reclaimed and the A-8 B bore was drilled out of the 13 3/8 casing of the mother-bore. During November and December 2003 the well was drilled according to plan with setting an 11 ¾ liner and then drilling a 9 ½ x 12 ¼ section. After setting and cementing the 9 5/8 drill-in liner in the top of the reservoir, the shoe was drilled out and a 10.5 ppg equivalent FIT was performed. The 13 3/8 liner/11 ¾ liner was tested to 1500 psi. An inflow test was performed on the 9 5/8 liner. The test showed no flow. Drilling ahead approximately 62 m from the shoe, total losses were encountered. Loss rates up to 600 bbl/hr were experienced with the 8.3 ppg oil base mud originally in the hole. The loss rate was gradually reduced as the rig attempted to keep the hole full by filling it with premix and base oil and then eventually seawater. The well was then stabilized by placing a total of 65 bbls LCM in the open hole section. The drill string was round-tripped to lay down the radioactive source. As the string washed down from the top of the 9 5/8 liner, dynamic losses were again induced. At the shoe a flow check gave 10 bbls gain in 25 min, suspected to be ballooning. The well was circulated for 15 min before a new flow check gave 2 bbls gain in 5 min. Circulation with the well open was performed for 1 hour until a sharp increase in returns was observed. The well was shut in on the annular preventer with SIDPP of 0 psi and SICP of 200 psi. Attempts were made to stabilize the well by circulating out gas through the choke. Returns were again lost and then two annular volumes of seawater were bullheaded on the annulus side while the losses increasing up to 100 bbl/hr. Two LCM pills were displaced in attempt to cure the losses without success. Casing pressure was still rising slowly. It was then attempted to kill the well using 9.0 ppg water based mud. During the circulation, dynamic losses were experienced and the returns contained crude oil. After circulating the full well, the casing pressure was 534 psi while the drill pipe pressure was 450 psi. Another LCM pill was displaced down and squeezed to cure the losses, but unsuccessful. It was then attempted to kill the well by circulating 10 ppg mud around through the choke. Due to high gas peaks and unstable returns the well was shut in and it was attempted bullhead the gas on annulus side by seawater and 10 ppg mud. Gas readings were still high and a gunk pill was pumped through the drill pipe to plug off the open hole. The gunk pill plugged off the drill pipe and the ability to circulate the well was lost. The casing pressure continued to rise leveling off at 800 psi. An attempt to pressure test the annulus broke down the formation and gave injectivity at 850 psi. The casing pressure 10

11 Quote from ref. 8, continued: was still rising so the annulus was bullheaded with 2 annulus volumes of seawater making the casing pressure to drop to 0 psi. When circulating 4 bpm across the BOP the loss rate was 55 bbl/hour. To stem the losses, a 54 bbl LCM pill was bullheaded down and squeezed into the formation. The well was then shut in and monitored showing a rapid pressure build-up on the casing side. The pressure was bled off and kept at max 1400 psi to be below the 13 3/8 casing test pressure at 1500 psi. At the same time it was started to lubricate in 15.0 ppg mud to increase the hydrostatic head on the annulus side, and a mix of free gas and 9-11 ppg mud was bled off. While continuing to bleed off and lubricate on the annulus side, wireline equipment was rigged up on top of the drill string. After a wireline drift run, and a tubing perforator mis-run, the drill string was successfully perforated at 2700 m. The surface pressure was then allowed to stabilize, giving a SIDPP of 1530 psi and a SICP of 1900 psi (the outer annulus was backed up with 500 psi to stay within the 13 3/8 test pressure). Preparations were then made to kill the well with 14.0 ppg mud. After circulated the well to even mud through the choke, the annular was opened and the well circulated conventionally. A flow check was performed and the well was static. 3. Conclusions Root cause of lost circulation. The most likely explanation for the losses is that within the reservoir there are several hard ground units on centimeter scale. These fractured hard grounds, likely to be found in the crestal area, may act as flow units and free gas may accumulate in the fractures, which will allow for easy flow of drill fluid even at low-pressure differentials. Cores from the hard grounds in a similar well (F-11) prove large voids, which support the current failure explanation. (see details in appendix 3) The subsurface team will use some more time to look at other possible causes. They will check details on the plot (appendix 4) to see if there are other reasons for the loss problem. This information will be used for future planning on similar wells on Valhall Crest. Well Control root cause The well control incident initially developed on the trip to lay down the radioactive source, but escalated when gunk plugged the drill string and circulation was no longer possible. This investigation has not been able to establish the root cause for the incident, but the preliminary results from the A-8B influx study seems to confirm that we most likely got the influx of oil&gas from the Tor reservoir and not the Mid Miocene reservoir. 3 possible root cause scenarios has been identified. Ref. Section Recommendations -If new wells are planned to be drilled into areas with a combination of hard beds and free gas into such areas, make sure a rigorous risk assessment and a plan for how to mitigate the high risks are in place. 11

12 Quote from ref. 8, continued: -Evaluate to utilize a more robust port collar design to avoid possible leaks. -Evaluate improved isolation around the shoe of the casing/liner entering the reservoir. For additional recommendations see chapter 8 Recommended Corrective Action. Quote from Ref. 8 ended. 12

13 3.2 Operational summary 2/1-A-08 Conclusions from operational summary 1. Well control response offshore as would be expected apart from the decision to circulate the well open after a positive flow check. The background for this decision should be evaluated to give guidelines for the future. 2. The risk of lost circulation in the Tor reservoir does not appear to be identified in the risk worksheet and an agreed strategy may not have been in place. 3. Activities that should be instigated should include investigation into the best loss circulation combating strategy, with identification of applicable LCM materials (including gunk) and combination of same, together with procedures for use of them. 4. The procedures used to place the gunk pill need to be investigated and improved to avoid blocking the drill string, possibly in the form of a best practice procedure to ensure optimal execution. Discussions The actions taken during the lost circulation problems on Valhall well 2/1-A-08A were, as far as can be seen from the daily drilling reports, as would be expected. It can also be seen that they took time to agree with a Management of Change process with the BP land organisation. From the actions taken in the initial phases of the incident, BP seem to have lacked a plan for dealing with lost circulation. Total losses were first encountered at 0315 hrs , but the first lost circulation pill was pumped at 1000 hrs on the same day, after losing over 4000 bbl of fluid (oil based mud, base oil, and sea water). This observation appears to be confirmed by the risk worksheet listing potential risks with the well. Several similar aspects were addressed: Risk #13. Destabilise natural fractured rock (around faults and in potential problem area) with the risk description including ballooning with losses while drilling and flow back with the pumps off. The mitigation strategy was to limit the maximum ECD and to follow the mud weight increase set out in the drilling fluid BOD (basis of design). Combating losses was not addressed Risk Unexpected faults. Poor seismics in the upper 1000 m may make it difficult to identify faults, leading to the possibility of drilling unexpectedly through a fault. The mitigation here was to specify in detail how to weigh up, and to avoid weighing up too quickly. Combating losses was not addressed Please note that the two risks above refer to the overburden section, not the reservoir. The incident described in this report is the first time breathing in the reservoir has been seen. 13

14 Risk Loss of circulation during running casing and cementing. Consequences were indicated as poor zonal isolation behind casing and mitigation was good drilling practices and Opticem cement job calculation. This does not address total losses while drilling Risk Run out of active mud while drilling down the 9 5/8 liner if major losses occur. The mitigation strategy was to ensure sufficient mud reserves available by storage on boats so that drilling without returns would be possible. This risk is addressed at the 12 ¼ hole section and, as such, does not cover the 8 ½ hole section. The mitigation strategy certainly does not seem to have been in place for this incident. Risk 77. Mud losses penetrating the Tor with drilling string. This again addresses losses in the 12 ¼ section with the mitigating strategy to have a gunk system ready for use. Gunk was first pumped on this incident about 5 days after losses were seen. Losses did in fact come in the Tor formation, but not while drilling down the liner, and 62 m below the shoe after the mud weight had been cut back. It appears that total losses in the 8 ½ section were not expected/considered as a risk, and a mitigating strategy had not been considered. Although the internal BP report indicate that the reservoir drilling risk evaluation identified losses was a risk, and contingency plans made, the risk worksheet does not confirm this. Although the losses were stopped and a trip to change the BHA and remove the radioactive source was made successfully, well integrity was not sufficient, and losses were again induced, finally leading to an influx being taken. Activities that should be instigated should include investigation into the best total loss circulation combating strategy, with identification of applicable LCM materials (including gunk) and combination of same, together with procedures for use of them. The gain seen during the flow check after the trip to change the BHA was interpreted as ballooning, which in this case may have been erroneous. In hindsight, a full circulation over the choke at constant bottom hole pressure would have been advisable to confirm the gain was, in fact, ballooning. Most well control policies demand the well be shut in if a gain is seen at a flow check. Due to the loss problem, it is perhaps understandable that circulating over the choke was not done. This again goes back to evaluation of applicable strategies for combating loss circulation. The strategy chosen led to the use of the gunk pill, which was identified as a mitigating strategy in the 12 ¼ section. The result of this action, was possibly the worst possible. The drill string was blocked during this process, and the losses were not cured. This worsened the situation significantly. The procedures used in this case need to be investigated and improved to avoid blocking the drill string, possibly in the form of a best practice procedure to ensure optimal execution. We are in agreement with the need to focus on both temperature differences to normal gunk pill jobs on Valhall, and the base fluid type (sea water). 14

15 2/8-A-08B Daily Operations Summary Date Description Comments Repaired annular preventer on BOP Retrieved wear bushing, jet washed wellhead and BOP Ran wear bushing Changed wash pipe on top drive Picked up 12 ¼ BHA (6 ¾ bent housing mud motor w/lwd, float sub, SDC + HWDP RIH P/U 5 DP from deck RIH w/5 DP to 1407 m. RIH w/5 ½ DP Washed down to landing collar at 2983 m. Hung up in Tam collar at 2932 m Displaced well from 14.6 ppg to 8.5 ppg OBM mud Inflow tested well for 15 m well stable Milled landing collar, drilled shoe track. Tagged shoe at 2993 m. Drilled shoe Drilled out shoe. String stalled out several times, got stuck, pulled free with 70K lbs O/P. Broke through shoe at m MD. Flow checked well stable Drilled 8.5 hole to 3001 m in rotary mode (11 m/hr ave ROP) Drilled 8.5 hole 3001 to 3013 m in oriented mode (4.5 m/hr ROP) Pulled into shoe and circulated BU Took FIT to 10.5 ppg OK Drilled in oriented mode from 3013 m to 3036 m. ECD 8.78 ppg. Unable to slide, sticky formation (50 klbs O/P) Reduced mud weight to 8.3 ppg Rotary drilled from 3036 to 3037 m (8 m/hr) ECD 8.59 ppg Drilled 8 ½ hole from 3037 m to 3056 m. ROP 8-10 m/hr. When sliding at 3056 m pressure increased from 1600 psi to 2200 psi Well went into total losses Started filling annulus with 7.6 ppg base oil, pulled into shoe Annulus full with 700 bbls of base oil pumped. Total losses 1050 bbls mud Kept annulus full with base oil, loss rate 250 bbl/hr. Annulus entirely full with base oil. No decrease in loss rate. Total losses 1412 bbl mud, 341 bbl base oil 13 3/8 casing set at 1297 m MD 12 ¼ hole drilled to 2994 m MD/2437 m TVD 9 5/8 liner run to TD Problems with Hitec Cyberbase system. Lost 2.5 hrs plus more problems off the critical path FIT 900 psi at 2437 m TVD with 8.4 ppg mud (Check!!) 7 hrs downtime with Cyberbase system Differential sticking indications Mud motor stall out? Packed off annulus? Base oil to formation 15

16 Date Description Comments Switched to filling annulus with sea water. Pumped 1265 bbl SW, loss rate increased to 600 bbl/hr, decreased when SW hit TOR formation. Total losses 1412 bbl mud, 1191 bbl base oil, 415 bbl SW Pumped 65 bbl LCM pill into annulus, kept annulus full of SW Loss rate slowed down before LCM plug reached loss zone at 3056 m. 130 bbl early. Losses stopped Total losses 2603 bbl mud + base oil, 1135 bbl SW Pumped slug and POOH POOH P/U new BHA (negative pulse MWD) RIH. Took kick drill. RIH to 2176 m and broke circulation no losses Washed down from 2076 m to 2132 m with 200 gpm. Losses increased gradually to 4 bbl/stand. At 2132 m losses suddenly increased. Flow checked well losses stopped after 20 min. Lost 15 bbl in 15 min. Washed down from 2132 to 2475 m. Losses 2 bbl/stand from 2475 m to 2562 m. Flow checked well no static losses. Washed down to 2736 m. LC lube, Mica F, Ultraseal, Venfyber, CaCo3, nut plug fine, nut plug medium Similar BHA to previous Got LCM in returns over shaker. Again, LCM seen in returns over shaker Washed down to casing shoe at 2994 m. Got LCM in returns over shaker. Flow checked well Gained 10 bbl in 25 min Flow back after losses? This was what was assumed Circulated with 200 gpm open well. 15 minutes Flow checked well 2 bbl gain in 5 min Circulated with 450 gpm open well. 1 hour. Well shut in after sudden increase in returns. Start drillers kill method DP pressure held constant (brought up pumps correctly) 120 gpm Shut in well to check pressures SICP 200 psi (9 min) SIDPP 0 (ported float) No losses SICP 70 psi SIDPP 0 psi Resumed circulation thru choke. After 640 bbl gas increased. Gas up to 12%. Shut in well. Circulated gas out from BOP. Resumed circulating over choke, 120 gpm, DP constant 180 psi, CP 40 psi. Circulated across BOP to monitor losses. Auto choke leaking, switched over to manual choke Resumed circulating over choke, 70 gpm DP 270, CP 350/400 psi 16

17 Date Description Comments Lost returns while circulating shut in well. SIDPP 0 SICP 236 psi Performed injection test: 4 bbl/min 1175, 9.5 bbl/min 1125 psi Bullheaded 1050 bbl at 9.5 bbl/min, psi Correct pressure development indicating influx removed from annulus Indicating well killed Observed annulus pressure. Pressure dropped to 0 psi in 8 min Circulated over BOP to monitor losses. 78 bbl/hr Bullheaded 1050 bbl at 1100 psi Circulated over BOP to monitor losses. 100 bbl/hr Pumped 65 bbl of LCM down the string. Losses reduced while pumping LCM out of string. Lost 17 bbl under displacement Flow checked well. Gained 2 bbl in 4 min. SIDPP 0 SICP 155 psi Hesitation squeezed 60 bbl LCM pill Slowly pumped down string to avoid plugging Observed pressures. Level in DP dropping - Injectivity test. Bullheaded 1700 bbl SW at 16 bbl/min Monitored losses Bullheaded annulus with LCM pill. Pumped down string with cement unit to keep string open. Hesitation squeezed LCM pill into loss zone. Squeezed 5.1 bbl Monitored well. Gained 4.3 bbl in 20 min Shut in well Pumped down string2.6 bbl Pumped down both DP and annulus Pumped down string 190 gpm.. DP pressure >800 psi. Pumped 5.5 bbl down annulus. LCM outside 9 5/8 shoe Shut in well DP 0 CP 160 psi 112 bbl/hr Some rig power problems in connection with ESD SIDPP 675 psi SICP 750 psi SIDPP 896 psi DP 940 psi CP 913 psi Formation fracturing? SIDPP 511 psi SICP 544 psi Displaced LCM out into open hole. Observed SIDPP 780 psi-> 570 psi well. SICP 870 psi->930 psi W&W circulated in 9 ppg polymer mud ICP 750 FCP 600 psi Circulated gas out from below BOP. Crude oil CP 1050 psi seen in returns 17

18 Date Description Comments Circulated in 9 ppg WBM (W&W) 50 bbl crude oil, 70 bbl, crude oil + water ICP 750 psi FCP 600 psi Max gas after poor boy 56.8% Traces of LCM in returns Circulated annulus to 9 ppg mud. Losses 0-18 bl/hr Gas in returns 10-16% No decrease Shut in well SIDPP 450 psi SICP 534 psi Circulated over choke to bring down gas levels, Losses 10 bbl/hr circ in LC Lube LCM Shut in well Pumped LCM pill down string. Hesitation squeeze 8 bbl into loss zone Circulated over choke at 3 bbl/min Shut in well (over 15 min) Circulated well to 10 ppg mud. No losses Circulated well to 10 ppg mud. Gas 10-18% 38% at BU Shut in well Attempted to circ over choke no returns Shut in well Attempted to circ over choke regained returns Shut in well due to high gas levels 70% Bullheaded sea water into annulus 1723 bbl Verified string free by shutting in well on annular preventer OK PU 273 klbs w/900 psi closing pressure Bullheaded annulus with 10 ppg mud Monitored losses Pumped gunk pill down string (base oil spacer 10 bbls, 20 bbl gunk, 10 bbl base oil) Shut in annulus and squeezed gunk out of string at 2 bbl/min. 200 psi 2000 psi at end. Meanwhile pumped down annulus at 0.5 bbl/min w/cement unit. Pulled one stand string blocked Shut in well. Reciprocated/rotated pipe Pumped 16 bbl SW into annulus Gas 14 16% SIDPP 603 psi SICP 700 psi DP 652 psi CP 630 psi Gas peak 25% SIDPP 475 > 537 psi SICP 548 -> 605 psi Gas migration SIDPP 56 psi ->229 psi SICP 199 psi -> 350 psi SIDPP 82 psi SICP 200 psi SIDPP 56 psi SICP 240 psi Pumped down string to avoid plugging nozzles 100 bbls ->80 bbls/hr SIDPP 0 (blocked) SICP 840 psi SICP 899 psi 18

19 Date Description Comments Bled off annulus to 851 psi. Gas/water in returns SICP 851 -> 854 psi Observe well SICP 1000 psi Bullheaded annulus with 917 bbl SW. CP > 960 psi Shut in well SICP 830 psi -> 319 psi Bullheaded annulus with 920 bbl SW. CP >850 psi Shut in well SICP 645 psi -> 0 Circ over BOP to monitor losses Losses 55 bbl/hr RIH to shoe no gunk tag (wt). No circ possible Observe shut in well Bullheaded annulus volume with SW, 60 bbls hivis mud, second annulus volume, 64,5 bbls hi-vis mud, SW, 30 bbl hi-vis mud, 52.4 bbl LCM pill, 30 bbl hi-vis behind, SW Squeezed LCM pill in gently in stages Observed pressure Allow to build to 1300 psi, bleed back to ca psi continually Allowed pressure to build to 1450 psi, bled off to SICP-> 550 psi migration velocity 39 m/hr SICP 1310 psi Gas started to increase, crude oil bled off. Free gas bled off 1300 psi Lubricate 15 ppg WBM into annulus Surface pressure kept at 1400 psi R/U W/L. Continue lubricating mud into hole RIH with W/L drift. Problems coming out of pipe Continue lubricating mud into hole M/U JRC perforating string, attempt to fire no go. Wait on JRC (out of hours) Continue lubricating mud into hole POOH w/jrc tool. Re-ran same. Perforated and confirmed communication. Continue lubricating mud into hole Allowed SICP to increase to 1900 psi. Gunk in pipe? Increased pressure on 20 x 13 3/8 annulus to 500 psi SIDPP 1530 psi Bled off dry gas tp keep SICP <1900 psi, SIDPP psi W&W pumped 14 ppg kill weight mud. Crude in returns Shut in well Removed gas from BOP s. Opened annular well static Circulated long way with open well with 14 ppg kill mud. SIDPP 0 SICP 40 Gas 8% - 0.9% 19

20 Well Schematic Valhall 2/8 A-08A TOC at 270 m 20 at 370 m 13 3/8 window at /1251 m 11 ¾ TOL at m 9 5/8 TOL at 2092 m 11 ¾ liner at 2292/2103 m 9 5/8 liner at 2994/2437 m Influx Losses TD at 3056 m Figure 3.1: Details of incident. 20

21 4. Design of well 2/8-A8B 4.1 Valhall general casing design We will review the initial design of the Valhall wells. Reference 9 presents the general design for all Valhall wells. Quote:..The generic casing design in this section will cover most of design conditions on Valhall and it should not be required to do individual casing design for each well. A well/section specific casing design will be required if the design criteria is outside this generic design. Special design cases and/or cases with low safety factor should be checked by running Amoco s Tube program or equivalent recognized industry casing design program. We will, in the following, briefly summarize the most important design criteria from ref. 9. The following general design formulas are recommended: Casing collapse uses API recommended procedure and considers the following 4 collapse modes: yield, plastic, transition and elastic. For burst pressure API is not recommended, but the 3-dimensional von Mises approach. Increase in burst pressure due to axial tension is not recommended. Bending stresses are included. Joint strength is also included, as well as casing wear. The following main criteria are listed for each casing size: The 20 /18-5/8 casing: Collapse: Burst: Tension: Lost circulation at max. 13-3/8 setting depth. Mud weight 12.5 ppg (frac grad. at shoe) Mud level drop to 10.5 ppg at bottom, that is to 216 m TVD. 800 psi surface pressure, for 12.5 ppg frac gradient. Buoyed weight of casing, bending and a test/bump pressure of 700 psi The 13-3/8 production casing: Collapse: Collapse: Burst: During drilling: Lost circulation at max. 9-5/8 setting depth (maximum 2600 mtvd). Mud weight 15.8 ppg (frac grad. at 13-3/8 shoe) Mud level drop to 10.5 ppg at bottom, that is to 872 m TVD. During production: Collapse at 9-5/8 liner lap. 5.0 ppg inside, 12.5 ppg outside(frac press. at 20 shoe). Both collapse scenario corrected for wear. P-110 casing. 21

22 5000 psi surface pressure. Brine both inside/outside casing. N-80 casing. Critical at KOP because of bending. Max. inside pressure equal to frac. press. at 13-3/8 shoe., i.e ppg at 1350 m. Assume empty casing, with brine outside. Tension: Buoyed weight of casing, bending and a test/bump pressure of 2500 psi. Wear included for P-110 casing. The 11-3/4 production casing: Collapse: Collapse: Burst: During drilling: Lost circulation at max. 9-5/8 setting depth (maximum 2600 mtvd). Mud weight 15.8 ppg (frac grad. at 13-3/8 shoe) Mud level drop to 10.5 ppg at bottom, that is to 872 m TVD. During drilling, loss zone, reservoir pressure below 6 ppg.: 8.6 ppg inside, 15.8 ppg outside pressure. Depth 2250 or 2450 mtvd. Kick with max frac. Grad at casing shoe equal to 16.4 ppg. Reservoir fluid density is 5.0 ppg. External pressure equal to pore pressure at 13-3/8 shoe equal to 10.5 ppg. Tension: Buoyed weight of casing, bending and a test/bump pressure of 2500 psi. The 9-5/8 production casing: Collapse: Burst: Inside 5.0 ppg, outside 15.8 ppg mud, plus temperature induced pressure behind of 2000 psi. Design depth at 13-3/8 shoe at 1360 mtvd, alternatively at 2600 mtvd Maximum surface pressure of 5000 psi. Design point at 400 m, just below the 20 shoe. Tension: Buoyed weight of casing, bending and a test/bump pressure of 2500 psi. Critical point at 180 m. The 7-5/8 liner (Q 125): Collapse: Inside 5.0 ppg, outside 15.8 ppg mud, plus temperature induced pressure behind of 2000 psi. Design depth at 13-3/8 shoe at 1360 mtvd, alternatively at 2600 mtvd 22

23 Burst: Maximum surface pressure of 5000 psi. Inside/outside fluids are brines. Tension: Buoyed weight of liner, bending and a test/bump pressure of 2500 psi. Critical point at 180 m. The 7 liner (29 ppf): Same design conditions as for the 7-5/8 liner above The reservoir liner (Q 125): Collapse: Burst: Tension: Inside 5.0 ppg, outside 15.8 ppg mud. Design depth 2800 mtvd. Maximum surface pressure of 9000 psi during well stimulation jobs. Outside pressure 8.6 ppg, inside 5 ppg. Design depth 2800 mtvd. Weight of liner, bending and a test/bump pressure of 3500 psi. Critical point at 180 m. The table below summarizes the results of the generic design that gives lowest design factor. Casing size(in, grade, ppf): Depth (mtvd): Design factor, Collapse Design factor, Burst Design factor, Tension Design factor, Coupling: 20, K55, /8, P110, /8. N /4, /8, NT95HS, /8, Q125, ,, , Q125, It is observed from the table above that casing collapse is the most critical parameter except for the 5 in. liner. All safety factors are well above minimum, except for the 11-3/4 in. casing. For burst design, all strings except the production casing, are based on a limited fracture gradient. This implies that a kick margin defines the safe pressure levels. Full well integrity is obtained if the influx to the borehole is less than the kick margin. Reference 7 discusses in detail the aspects of full or reduced well integrity. Because of the fracture criterion, the strings are not designed for gas filled casing. 23

24 4.2 Design of well 2/8-A8B Well Schematic (Planned) Valhall 2/8 A-8B RKB-MSL: 43.5 m Water depth: 69.2 m Casing Depths Prognosed (except 20 ) NPD PERMIT NR Per Survey revision RIG Valhall DP TOTAL DEPTH 4071 m MD / m TVD RISK BASED DURATION DAYS 106 TOC ~ 270m ACP 352 m m MD, 370 m TVD FIT to 12.3 ppg (Actual) PRESET SIZE WT GRADE CONNECTION ID Drift ID (in) (ppf) TYPE (inches) x K-55 Buttress / P-110 New Vam ¾ Q-125 H-SLX / H / Q-125/C-95 H / Q-125 Hydril MAC - II ¾ 1270 m MD 13 3/8 window 1300 m MD, 1270 m TVD 13-3/8 casing is preset 9 5/8 Planned tied-back to surface 9 5/8 m MD 14 Hole to 2284 m MD, 2100 m TVD 11 3/4" 2284 m MD, 2100 m TVD 62 inclination 6-5/8 TOL approx m MD (300 m TVD above top Tor) 8-1/2 X 12-1/4 hole to 3040 m, m TVD 9-5/8 Drilling Liner w/drilling shoe 68 inclination 9 5/8" casing m MD, 2465 m TVD 6-5/8 ~ 4044 m MD, 2495 m TVD * 8-1/2 x 9-1/4 hole to 4071m MD, 2495 m TVD 6-5/8 liner will have 5 shoe track Note: Error in Table above. 13-3/8 csg. is N80 quality, not P110. After the well control incident, BP performed a casing design evaluation for well 2/8 A8B, which is given reference 10. In the following the main criteria from ref. 10 will be listed. 24

25 The 13-3/8 production casing: Collapse: Lost returns filling up annulus with base oil. Burst: Pressure tested to 1500 psi, with a 12 ppg mud. Gas kick. Circulating out 100 bbls gas from 3030 m asuming a pore pressure of 14.6 ppg. The 11-3/4 production casing: Collapse: Lost returns filling up annulus with base oil, and cementing phase. Burst: Pressure tested to 900 psi, with a 14.6 ppg mud. While setting the liner hanger the casing was subjected to 2800 psi over 2 minutes. Tension: lbs over pull, pre- and post-cementing static loads, running in hole loads and service loads. The 9-5/8 production casing: Collapse: Burst: Lost returns filling up annulus with base oil, and cementing phase. Pressure tested to 2500 psi, with 14.6 ppg mud.(equivalent to 4500 psi surface pressure). Tension: lbs over pull, pre- and post-cementing static loads, running in hole loads and service loads. 4.3 Worst case considerations In the following we will perform an evaluation of the design factors reported by BP. Because there is significant reservoir pressure depletion we will not use virgin conditions, but will suggest alternative scenarios for BP s considerations. As stated later, the exact pressures are not known. Burst design. It is clear from the summary above that the well was designed for a limited kick scenario. During the well control event, the well was exposed to a more severe condition, approaching full gas filled casing. The following case is presented to compare these two scenarios. 25

26 We assume that the well is completely gas filled. It is difficult to determine the actual pore pressure from the documentation received, as the reservoir is depleted to a low pressure. However, the overburden just above the reservoir has a pore pressure gradient of about 14 ppg at 2400 mtvd (ref. 11). If we assume that this formation has a kick potential (permeability), the following parameters are used: Depth: Reservoir pressure grad: Reservoir fluid density: Density behind casings: 2400 mtvd 14 ppg (1.68 s.g.) 5.0 ppg (0.60 s.g.) 8.6 ppg (1.03 s.g.) Reservoir pressure: x 1.68 x 2400 = 395 bar Weight of reservoir fluid: x 0.6 x 2400 = 141 bar Surface pressure if shut-in gas-filled casing: = 254 bar = 3683 psi At surface, there is no back pressure. Worst case scenario is therefore that the 13-3/8 in. casing is exposed to the surface pressure above. The burst strength of the casing is 510 bar. Worst case burst design factor, 13-3/8 in. P110, 72 lbs/ft casing: 510 = If we assume that the reservoir fluid is nearly weightless gas, the design factor would become: 510 = which exceeds a minimum requirement of In Appendix A this calculation is also performed for a fully 3-dimensional design. The result of this calculation is a design factor of 2.17, exceeding the minimum requirement of 1.25 for 3-D. The top of the exposed 11-3/4 in. Q lbs/ft casing is at 1296 mtvd. Repeating the computation for this casing: Weight of reservoir fluid to 1296 mtvd: x 0.6 x ( ) = 65 bar Pressure at 1296 m if shut-in gas-filled casing: = 330 bar With a wellhead elevation of 40 m above the sea level, the back pressure becomes: x 1.03 x ( ) = 127 bar The burst load is: = 203 bar The burst strength of the casing is 685 bar. Worst case burst design factor, 11-3/4 in. casing: 26

27 685 = For completeness, this evaluation is also performed for the 9-5/8 in. Q125 53,5 lbs/ft production casing which starts at 2292 mtvd. Weight of reservoir fluid to 2292 mtvd: x 0.6 x ( ) = 6.4 bar Pressure at 2292 m if shut-in gas-filled casing: = bar Assuming a wellhead elevation of 40 m above the sea level, the back pressure becomes: x 1.03 x ( ) = bar The burst load is: = bar The burst strength of the casing is 854 bar. Worst case burst design factor, 9-5/8 in. casing: 854 = Below is a comparison between the two design approaches: Casing, BP limited kick Worst case, gas in: margin: filled casing: 13-3/ /1.29* 11-3/ / Table 3.1.: Comparison of burst design factors, not corrected for wear. *Assuming weightless gas The exposed 13-3/8 in casing has highest load. All design factors are considerable higher than the minimum requirements The well has sufficient burst resistance. Please observe that the reason for difference in design factors is different design assumptions. This will be further discussed in the following. Casing test pressure. Assumes virgin pore pressure, the wellhead pressure would be 4680 psi. However, the field is depleted. According to ref. 11, the expected pressure in the Tor formation was 2760 psi at reservoir level. This leads to a surface pressure of: = 218 psi assuming reservoir fluid of 0.6 s.g. density or: 2760 psi assuming methane (weightless) gas The well control incident measured a casing pressure of 1900 psi, as opposed to the test pressure of 1500 psi. The casing should have been tested to a higher pressure for three 27

28 reasons: 1) there is uncertainty about the pore pressure. The reservoir is highly depleted, but it is uncertain if a formation above has sufficient permeability to produce a kick, and 2) it is uncertain what density this formation fluid has. For future wells methane gas may be assumed as it is the gas with lowest density, and 3) a gas filled casing scenario probably applies rather than the limited kick size used. We will not define an exact test pressure in this report, but it should for future wells exceed 1900 psi. BP should base the on analysis on realistic scenarios. Collapse design: The basic design criterion from ref. 10 is lost returns filling up annulus with base oil. A more severe, but realistic scenario is lost returns with 14.6 ppg mud in the hole. Assuming that the annulus level stabilizes at a bottom-hole-pressure equal to normal pore pressure, the depth of the annulus fluid level becomes: x 1.03 x ( ) = x 1.75 x (2495 H) H = 1445 m This is near the shoe of the 13-3/8 in. casing. We will perform a collapse evaluation at this position. The well is empty (zero inside pressure) down to this depth. Assume that the back-pressure is caused by 13.3 ppg (1.60 s.g.) mud, as used by ref. 10. The collapse load then becomes: x 1.6 x 1445 = 226 bar With a collapse rating of 323 bar, the design factor in collapse for the 11-3/4 in casing becomes: 323 = Wear and bi-axial derating is not included in the calculation above. Ref. 10 operates with a design factor of 2.03 in collapse. The discrepancy is caused by their assumption of a base-oil-filled casing. It appears that this condition is not creating the most severe collapse loading. The casing back-pressure is the most important factor for the low design factor above. The two extreme conditions are (from ref. 7): -A short time scenario using mud weight above the cemented interval. -A long time scenario assuming that particles settles out leaving only water as the mobile phase creating pressure. There is not yet full consensus in the oil industry about the application of these criteria. For the above analysis we will conclude that the well have not been exposed to a loading exceeding the collapse strength of the casing. It has been difficult to determine the bottom-hole pressures when circulation losses arose. It is possible that a sub-normal loss pressure exists due to reservoir depletion. The above collapse calculation would become more critical for this case. 28

29 4.4 Summary of incident The well is designed with a tie-back production casing. This was not in place during the well control incident, so both the 13-3/8 in, the 11-3/4 in and the 9-5/8 in casing string were simultaneously exposed to the reservoir pressure. Each of the two largest casings were designed for the drilling phase, and not for reservoir penetration. The well was not designed for full a gas filled casing scenario, but for a reduced integrity case with the casing shoe fracture pressure as the weak point in the well. However, the casing strings used are of sufficient strength. This brings up a general problem. If we assume a kick entering the well at the bottom, we can base the design on circulating this out. This implies a pressure distribution throughout the well caused by the pore pressure, the gas column and the mud column on top. If we on the other hand assume completely gas filled well, a totally different pressure distribution arise, with a surface pressure equal to the pore pressure minus the weight of the gas column. In the present case it appears that BP based the design on a limited gas kick, whereas the kick control incident approached a gas filled casing scenario. Please also note BP s philosophy as quoted on page 7 in this report. The well was designed for drilling with a casing test pressure of 1500 psi. However, during the well control incident a surface pressure of 1900 psi was recorded. Clearly, the well was not exposed to a limited gas kick situation. For future wells gas filled casing should be considered. The collapse evaluation was based on a base-oil filled casing. Circulation loss with drop in fluid level is in some instances a more severe 29

30 5. Summary of review The review concludes that BP s casing design manual is a document of high quality. It addresses the many factors of importance for a good well design. The lost circulation/kick problem of well 2/8-A8B has also been reviewed. The following conclusions came out of this investigation: -The 13-3/8 in. casing was the weakest exposed casing string. It was sufficiently strong for burst and collapse. -The well section was designed for a limited gas kick scenario. However, due to circulation losses, a gas filled casing may be a more realistic scenario. This will require a casing test pressure exceeding 1900 psi. (1500 psi was used). -There is uncertainty about the depth of the kick, the pore pressure and the fluid density. A revised analysis of this and a risk analysis is required to determine the magnitude of the casing test pressure. -The assumption of base oil filled annulus may not be the most severe collapse scenario. Circulation losses with drop in fluid level is in some instances more severe than base oil filled annulus and should be considered as a design criterion. -Risk evaluation of the incident appears to be incomplete. It should also include the risk of losses in the Tor formation. -After a positive flow check, the well was circulated with an open well. This procedure should be clarified. -Well design of the particular well is missing, as BP uses a common design used many well. The contingency solution for lost circulation should be reviewed. Operational procedures for setting the gunk pill should be evaluated. 30

31 6. Recommendations It is recommended to perform a casing design for each well, and to accurately address changes in design conditions. The increasing reservoir pressure depletion, and also the subsidence, increase the likelihood of lost circulation during drilling. For this reason BP may consider a stronger burst criterion, that is designing for full gas filled casing instead of assuming a maximum kick margin. It is advisable that all reservoir penetration is designed for gas filled casing as this scenario is realistic during production of the well. Furthermore, loss zones, formation pressures and formation fluid densities should be reviewed to obtain improved design conditions for future wells. The results of this evaluation will define the required casing test pressures. In the event of considering circulation losses as a future challenge, it is recommended to initiate a separate program to handle these. One example of such a program is to set up a task force to follow up all operations. This group may measure mud properties systematically before, during and after the loss events to derive a data base. In this way the drilling fluids can be tailored to Valhall. Such a program can be developed using Stavanger University s unique fracturing lab. Risk evaluation should include lost circulation potential in the Tor formation. It is advisable to develop a strategy for use of gunk material and LCM, and also a best practice document to help ensure efficient lost circulation procedures. 31

32 Abbreviations BOP BHA BU CP DP ECD FCP FIT ICP LCM LOT LWD MD M/U MT OBM POOH P/U PBR R/T RIH RT RWC ROP SW SICP SIDPP TD TRSCSSSV TVD W&W WL WBM Blow out preventer Bottom hole assembly Bottom up casing pressure Drill pipe, drill pipe pressure Equivalent circulating density Final casing pressure Formation integrity test Initial casing pressure Lost circulation materials Leak-off test Logging while drilling tool Measured depth Make up Metric tons Oil based mud Pull out of hole Pull up Polished bore receptable Running tool Run in hole Rotary table Rock-Well Consultants Rate of penetration Sea water Shut in casing pressure Shut in drill pipe pressure Total depth, m Tubing safety valve Total vertical depth Wait and weigh method Wire line Water based mud 32

33 References 1. BPA-D-001 BP Drilling and Well Operations Policy 2. BPA-D-002 Well Control Manual 3. BPA-D-003 Casing Design Manual 4. BPA-D-004 Directional Survey Handbook 5. BPA-D-005 Offshore Site Investigation Manual 6. B.S.Aadnøy (1990): Inversion Technique to Determine the In-Situ Stress Field from Fracturing Data. Journal of Petroleum Science and Engineering, (1990); Modern Well Design by B. S. Aadnøy. A.A.Balkema Publishers Rotterdam/Brookfield, 1996, ISBN Valhall A-8 B Investigation of Lost Circulation and Wellcontrol Incident. Internal BP report of , rev.1 of Authors: E.Braune/S.Samuelsen. 9. Valhall General Drilling Plan, DRL-M-002: 6.0 Casing Design. Amoco Document of 09/23/ Valhall well A-08B Casing Evaluation. T.J. Tjøstheim Valhall Field Well 2/8-A-8 B Drilling Program. Date: 1/

34 Appendix A: Design factors for well 2/8-A8B 34

35 Casing Wizard The Casing Wizard software is developed by Well Experts for casing planning and design. The Casing Wizard software presents both 1D standard analyses and exact 3D analyses for burst and collapse design. Well Experts

36 Casing Wizard Select units of input data Metric units (default) Oilfield units Burst Design Criteria Assume gas filled casing for burst design. Fluid density 0.6 s.g. inside and seawater of 1.03 s.g. outside casing. Highest load at top of casing string. Design parameters* Formation depth 2400,0 m 7874,0 ft Casing shoe depth 1251,0 m 4104,3 ft Casing top depth 0,0 m 0,0 ft Depth to seabed m ft Depth to sealevel 40,0 m 131,2 ft Depth to top of cement m ft Formation pressure gradient 1,68 s.g. 14,0 ppg Formation/influx fluid density 0,6 s.g. 5,0 ppg Mud density s.g. ppg Cement density s.g. ppg Density behind casing 1,03 s.g. 8,6 ppg Bouancy factor 0,87 0,87 * All depths are true vertical depth (TVD) Casing data** Casing OD 33,97 cm 13,37 inch Casing ID 31,36 cm 12,35 inch Specific weight 107,20 kg/m 71,97 ppf Crossectional area 133,92 cm 2 20,76 inch 2 Wall thickness (API) 1,14 cm 0,45 inch OD-thickness ratio (API) 29,75 29,75 Geometry factor, β (API) 15,39 15,39 Yield strength 7584,24 bar psi Burst strength 510 bar 7396,92 psi Collapse resistance 199,3 bar 2890 psi Pipe body yield strength 1,016 kdan 2284 klbf ** Note that a API 12.5% reduced wall thickness is applied for 3D analysis Casing burst loading* Inside pressure, bottom 395,1 bar 5731,0 psi Inside pressure, top 254,0 bar 3684,2 psi Outside pressure, bottom 126,3 bar 1831,5 psi Outside pressure, top 0 bar 0 psi Axial load, top 114,2 kdan klbf Axial stress, top 852,7 bar psi Inside stress ratio, x 0,1459 0,1459 Pressure differential ratio, y 0,5155 0,5155 Design Factor (3D model) 2,17 2,17 Design Factor (1D model) 2,01 2,01

WELL COMMANDER Versatile multi-cycle ball-activated drilling valve for mitigating downhole hazards

WELL COMMANDER Versatile multi-cycle ball-activated drilling valve for mitigating downhole hazards WELL COMMANDER Versatile multi-cycle ball-activated drilling valve for mitigating downhole hazards Note: Operating instructions updated July 2014 WELL COMMANDER: Versatile multicycle ball-activated drilling

More information

Irresponsible of Statoil

Irresponsible of Statoil Irresponsible of Statoil Having reviewed all the available information, Bellona feels it is irresponsible of Statoil to resume production at Gullfaks C. All production from the Gullfaks C platform was

More information

Drilling Problems. pull

Drilling Problems. pull Drilling Problems Pipe Sticking Lost Circulation Hole Deviation Pipe Failures Borehole Instability Mud Contamination Formation Damage Hole Cleaning H S General Equipment & Personnel Pipe Sticking Can not

More information

Energize your mind. www.halliburton.com April 2007. Lightweight Cement Meets Challenges of Weak Formations and Depleted Zones

Energize your mind. www.halliburton.com April 2007. Lightweight Cement Meets Challenges of Weak Formations and Depleted Zones Energize your mind. www.halliburton.com April 2007 Lightweight Cement Meets Challenges of Weak Formations and Depleted Zones Today, operators are forced to drill in increasingly challenging environments

More information

Step Rate Testing: Determining Fracture Pressure for Injection Wells 2016 UNDERGROUND INJECTION CONTROL CONFERENCE DENVER, CO LEWIS WANDKE, PE

Step Rate Testing: Determining Fracture Pressure for Injection Wells 2016 UNDERGROUND INJECTION CONTROL CONFERENCE DENVER, CO LEWIS WANDKE, PE 1 Step Rate Testing: Determining Fracture Pressure for Injection Wells 2016 UNDERGROUND INJECTION CONTROL CONFERENCE DENVER, CO LEWIS WANDKE, PE AND KEN COOPER, PE PETROTEK ENGINEERING CORPORATION Overview

More information

NORSOK Standard D-010 Rev. 4, August 2012

NORSOK Standard D-010 Rev. 4, August 2012 Below is a listing of the main changes 1. Definitions of suspension, temporary and permanent abandonment 2. Included more examples of well barrier schematics 3. Included illustrations for permanent abandonment

More information

DecisionSpace Well Engineering Software

DecisionSpace Well Engineering Software DATA SHEET DecisionSpace Well Engineering Software DecisionSpace Drilling & Completions Key features Configure the right tools to drill any type of well Dramatically simple to use, complete complex fluids

More information

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM WORKOVER & COMPLETION OPERATIONS CORE CURRICULUM AND RELATED FORM WCT-2WF FUNDAMENTAL LEVEL The purpose of the core curriculum is to identify a body of knowledge

More information

Rigorous Qualification and Development Program

Rigorous Qualification and Development Program FMC Subsea High Capacity 20K Wellhead System Overview 03/20/2013 UWD HC-20 Subsea Wellhead System Rigorous Qualification and Development Program 2 1 Qualification program Qualification testing is performed

More information

10 Wireline operations

10 Wireline operations 10 WIRELINE OPERATIONS... 1 10.1 GENERAL... 1 10.2 WELL BARRIER SCHEMATICS... 1 10.3 WELL BARRIER ACCEPTANCE CRITERIA... 1 10.3.1 Well control equipment configuration... 1 10.3.2 Deployment of toolstrings...

More information

Argentina Tataru*, Marcel Adrian Piteiu*, Dan-Paul Stefanescu*, Ioana Vlasin*

Argentina Tataru*, Marcel Adrian Piteiu*, Dan-Paul Stefanescu*, Ioana Vlasin* WIERTNICTWO NAFTA GAZ TOM 24 ZESZYT 1 2007 Argentina Tataru*, Marcel Adrian Piteiu*, Dan-Paul Stefanescu*, Ioana Vlasin* NEW TECHNICAL CONSIDERATIONS OF ROMGAZ COMPANY REGARDING DRILLING, COMPLETION AND

More information

Plug and Abandonment Forum

Plug and Abandonment Forum Plug and Abandonment Forum Developments in Non-Traditional Plug and Abandonment Methods Thomas Ferg ConocoPhillips Norway June 13, 2013 Efficient P&A Thoughts - Do as Much as Possible Without a Rig Remove

More information

HPHT CAPPING STACKS AND NEW TECHNOLOGY FOR SUBSEA WELL CONTROL. December 3, 2014 Presenter: Mike Cargol

HPHT CAPPING STACKS AND NEW TECHNOLOGY FOR SUBSEA WELL CONTROL. December 3, 2014 Presenter: Mike Cargol HPHT CAPPING STACKS AND NEW TECHNOLOGY FOR SUBSEA WELL CONTROL December 3, 2014 Presenter: Mike Cargol Agenda Development Update HPHT Capping Stack Mudline Closure Device Divert and Flow System Well Kill

More information

Introduction to Subsea Production System

Introduction to Subsea Production System Introduction to Subsea Production System 04 Xmas Tree Systems Bjørn Søgård Xmas Tree Systems This module will cover: Main codes for XT equipment XT Principles and functions Typical schematic Main types

More information

A CRITICAL REVIEW OF AN IMPROVED WELL CONTROL PROCEDURE FOR THE PREVENTION OF BLOWOUTS

A CRITICAL REVIEW OF AN IMPROVED WELL CONTROL PROCEDURE FOR THE PREVENTION OF BLOWOUTS A CRITICAL REVIEW OF AN IMPROVED WELL CONTROL PROCEDURE FOR THE PREVENTION OF BLOWOUTS By Muhammad Imran B00535042 Submitted In partial fulfillment of the requirements for the degree of MEng in Petroleum

More information

BS PROGRAM IN PETROLEUM ENGINEERING (VERSION 2010) Course Descriptions

BS PROGRAM IN PETROLEUM ENGINEERING (VERSION 2010) Course Descriptions BS PROGRAM IN PETROLEUM ENGINEERING (VERSION 2010) Course Descriptions PETE201 Introduction to Petroleum Engineering (Core) (1-0-1) The course's main goal is to provide the student with an overview of

More information

The Impact Of Cementing On Proper Well Control

The Impact Of Cementing On Proper Well Control The Impact Of Cementing On Proper Well Control Lee Dillenbeck Senior Advisor, Cementing Chevron ETC Drilling and Completions 2010 Chevron Learning Objectives Explain the main reasons for cementing wells

More information

E-Line and Braided Line. E-Line Open Hole wireline

E-Line and Braided Line. E-Line Open Hole wireline E-Line and Braided Line E-Line Open Hole wireline Braided Line More strength Less feel Harder to seal Much harder to fish Braided line stronger (2800 to 3500 lb working strength, but less feel when fishing

More information

Introduction. The following is an outline of the contents of this paper: Definition of Artificial Lift Page 2. How an Oil Well is Produced Page 2

Introduction. The following is an outline of the contents of this paper: Definition of Artificial Lift Page 2. How an Oil Well is Produced Page 2 Introduction Canadian Oilwell Systems Company and it s subsidiaries are suppliers of oil well Electric Submersible Pumping systems (ESPs). Such pumps are used to lift oil from oil wells so that the oil

More information

Deepwater Horizon Summary of Critical Events, Human Factors Issues and Implications

Deepwater Horizon Summary of Critical Events, Human Factors Issues and Implications Deepwater Horizon Summary of Critical Events, Human Factors Issues and Implications 23 Sept 2010 Alison Hubbard David Embrey Deepwater Horizon Summary of Critical Events, Human Factors Issues and Healthcare

More information

BOP PRESSURE TESTING PROCEDURE

BOP PRESSURE TESTING PROCEDURE 0 Discuss Operator BOP requirements WITH RIG MANAGER. Insure that all Romfor's BOP equipment is tested consistent with Romfor's policy. This may require Nabors to incur the cost for the testing subcontractor

More information

DIRECTIONAL DRILLING

DIRECTIONAL DRILLING DIRECTIONAL DRILLING 1. General. Installation of pipelines through the levee embankment using directional drilling technology is prohibited. Installation of pipelines through a flood control project foundation

More information

DEPARTMENT OF PETROLEUM ENGINEERING Graduate Program (Version 2002)

DEPARTMENT OF PETROLEUM ENGINEERING Graduate Program (Version 2002) DEPARTMENT OF PETROLEUM ENGINEERING Graduate Program (Version 2002) COURSE DESCRIPTION PETE 512 Advanced Drilling Engineering I (3-0-3) This course provides the student with a thorough understanding of

More information

Best Practice for Stand-alone Screens

Best Practice for Stand-alone Screens Best Practice for Stand-alone Screens Ian Wattie Completion Engineering Consultant Yala Peak Limited Sand Management Forum 26 th 27 th March 2014 Aberdeen 1 Stand-alone Screens Best Practices Completion

More information

Selection and Determination of Tubing and Production Casing Sizes

Selection and Determination of Tubing and Production Casing Sizes CHAPTER 3 Selection and Determination of Tubing and Production Casing Sizes OUTLINE 3.1 Overview 3.2 Overview of Nodal Analysis 3.3 Selection and Determination of Tubing and Production Casing Sizes for

More information

SIEM WIS AS. Siem WIS. UTC June 2008 By Jan Atle Andresen

SIEM WIS AS. Siem WIS. UTC June 2008 By Jan Atle Andresen Siem WIS UTC June 2008 By Jan Atle Andresen Agenda Background Challenges- Technology- Solutions Siem WIS background Well Intervention Solutions AS (Siem WIS), was established in February 2005 and is located

More information

Drill String Design. The following topics will be discussed

Drill String Design. The following topics will be discussed Drill String Design The following topics will be discussed Kelly Drill pipe Drill collars Accessories; heavy wall drill pipe, jars, stabilizers, reamers, shock sub and bit sub Drill bits 1 Kelly Used to

More information

ADX ENERGY. Sidi Dhaher Well test Briefing Live Webcast, 4 July 2012. Wolfgang Zimmer, Paul Fink

ADX ENERGY. Sidi Dhaher Well test Briefing Live Webcast, 4 July 2012. Wolfgang Zimmer, Paul Fink ADX ENERGY Sidi Dhaher Well test Briefing Live Webcast, 4 July 2012 Wolfgang Zimmer, Paul Fink Decision to test ASX announcement, 3 October 2011 2 Decision to test: First Evidence Wellsite geologists (highly

More information

Case Study of Emergency Disconnect Sequence in the Gulf of Mexico

Case Study of Emergency Disconnect Sequence in the Gulf of Mexico Case Study of Emergency Disconnect Sequence in the Gulf of Mexico Trent Fleece Subsea BOP Operations Team Lead May 8, 2015 Case Study of Emergency Disconnect Sequence in Gulf of Mexico Industry Standards

More information

BHA Design. 2011 Best-drilling-practices.tk. All rights reserved.

BHA Design. 2011 Best-drilling-practices.tk. All rights reserved. BHA Design Drill Collar vs. Heavy Weight Drill Pipe Use minimum number of drill collars in the BHA. The noticeable exception is the drilling of vertical wells. The main advantages of omitting drill collars

More information

An Introduction to Oil and Gas Well Servicing

An Introduction to Oil and Gas Well Servicing An Introduction to Oil and Gas Well Servicing Educational Material from the IOM 3 Oil and Gas Division The global network for the materials cycle Introduction The Institute of Materials, Minerals & Mining

More information

NORSOK STANDARD DRILLING & WELL OPERATIONS

NORSOK STANDARD DRILLING & WELL OPERATIONS NORSOK STANDARD DRILLING & WELL OPERATIONS D-010 Please note that whilst every effort has been made to ensure the accuracy of the NORSOK standards neither OLF nor TBL or any of their members will assume

More information

PSAC/SAIT Well Testing Training Program Learning Outcomes/Objectives Level D

PSAC/SAIT Well Testing Training Program Learning Outcomes/Objectives Level D s/objectives Level D ENVS 6006: Environmental Operating Procedures When you complete this module, you will be able to Describe how and where environmental operating procedures can be employed in industry.

More information

Tubular Design and Downhole Equipment

Tubular Design and Downhole Equipment Well Construction Basics How Wells are Designed & Constructed Minimum Expectations and Best Practices Assessing Completion Reliability and Risk Key Performance Indicators Tubular Design and Downhole Equipment

More information

Subsea Drilling Systems

Subsea Drilling Systems Subsea Drilling Systems 2 Reliable, cost-effective solutions for offshore drilling... FMC Technologies Subsea Drilling Systems lead the industry with reliable and cost-effective drilling solutions which

More information

Introducing OXAND. ~ 850 projects > 1,250bn OF CAPEX CAPITALISED IN SIMEO TM

Introducing OXAND. ~ 850 projects > 1,250bn OF CAPEX CAPITALISED IN SIMEO TM Introducing OXAND Independent international engineering consultancy firm specialised in industrial life cycle asset management 5 Business Units (Europe, North America), +120 consultants to support investors,

More information

Directive 059: Well Drilling and Completion Data Filing Requirements

Directive 059: Well Drilling and Completion Data Filing Requirements Directive 059 Directive 059: Well Drilling and Completion Data Filing Requirements December 19, 2012 Effective June 17, 2013, the Energy Resources Conservation Board (ERCB) has been succeeded by the Alberta

More information

Hydraulic Fracturing Operations Well Construction and Integrity Guidelines API GUIDANCE DOCUMENT HF1 FIRST EDITION, OCTOBER 2009

Hydraulic Fracturing Operations Well Construction and Integrity Guidelines API GUIDANCE DOCUMENT HF1 FIRST EDITION, OCTOBER 2009 Hydraulic Fracturing Operations Well Construction and Integrity Guidelines API GUIDANCE DOCUMENT HF1 FIRST EDITION, OCTOBER 2009 Hydraulic Fracturing Operations Well Construction and Integrity Guidelines

More information

TECHNICAL PUBLICATION

TECHNICAL PUBLICATION TECHNICAL PUBLICATION Title: Permanent Wellbore Monitoring Components of the Page 1/9 COPYRIGHT NOTATION: This paper is copyright material of PROMORE, A Core Laboratories Company. Publication rights are

More information

Green Thread Product Data

Green Thread Product Data Green Thread Product Data Applications Dilute Acids Caustics Produced Water Industrial Waste Hot Water Condensate Return Materials and Construction All pipe manufactured by filament winding process using

More information

number 2) proposed well's type, location, elevation, total depth, etc. 3) site inspection, 2) assess the adequacy of the proposed engineering

number 2) proposed well's type, location, elevation, total depth, etc. 3) site inspection, 2) assess the adequacy of the proposed engineering APPENDIX 8 - FORMS USED IN THE OIL, GAS AND SOLUTION MINING PROGRAM Application for Permit to Drill, Deepen, Plug Back or Convert a Well Subject to the Oil, Gas and Solution Mining Law (185-12-5). - Applicant

More information

Drilling, Completion & Well Intervention and its relation to Geology

Drilling, Completion & Well Intervention and its relation to Geology Drilling, Completion & Well Intervention and its relation to Geology Kjell Kåre Fjelde A more detailed presentation on drilling & geology can be found on the resource CD Exercise related to the Festningen

More information

66 National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling

66 National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling 66 National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling Chief Counsel s Report Chapter 4.3: Cement 67 Chapter 4.3 Cement Figure 4.3.1. Typical completed cement job. Well Cementing

More information

Huldra PP&A project. - from five to one double barrier. Audun Golberg / Jan Reidar Johnsen

Huldra PP&A project. - from five to one double barrier. Audun Golberg / Jan Reidar Johnsen Huldra PP&A project - from five to one double barrier Audun Golberg / Jan Reidar Johnsen PAF Seminar, Stavanger 29.10.2015 Classification: Internal 2015-03-25 The Huldra Field Huldra is a gas/condensate

More information

Maersk Resilient. Maximised drilling efficiency and uptime. Optimised for concurrent activities

Maersk Resilient. Maximised drilling efficiency and uptime. Optimised for concurrent activities Maersk Resilient Maximised drilling efficiency and uptime Optimised for concurrent activities Maersk Resilient TYPE MSC CJ50-X100 MC, 350 ft jack-up drilling rig BUILT Keppel FELS, 2008 CLASS American

More information

Drilling for Deepwater Data: A Forensic Analysis of the Gulf of Mexico Deepwater Horizon Disaster

Drilling for Deepwater Data: A Forensic Analysis of the Gulf of Mexico Deepwater Horizon Disaster Paper SAS1865-2015 Drilling for Deepwater Data: A Forensic Analysis of the Gulf of Mexico Deepwater Horizon Disaster ABSTRACT Steve Walker and Jim Duarte, SAS Institute Inc., Cary, NC During the cementing

More information

How to avoid fluid losses that slow drilling

How to avoid fluid losses that slow drilling How to avoid fluid losses that slow drilling OVERVIEW As a result of the highly fractured geology in Kurdistan, operators encounter constant fluid and cement losses. Many report that wells expected to

More information

OFFSHORE FIELD DEVELOPMENT

OFFSHORE FIELD DEVELOPMENT OFFSHORE FIELD DEVELOPMENT OPTIONS & STRATEGY By: Nguyen Ngoc Hoan M.Sc of Petroleum Engineering [email protected] PRESENTATION CONTENT Field Development Consideration Field Development Options & Strategy

More information

Florinel ªuþoiu*, Argentina Tãtaru*, Bogdan Simescu* RIGLESS JOBS IN GAS WELLS

Florinel ªuþoiu*, Argentina Tãtaru*, Bogdan Simescu* RIGLESS JOBS IN GAS WELLS AGH DRILLING, OIL, GAS Vol. 30 No. 1 2013 http://dx.doi.org/10.7494/drill.2013.30.1.221 Florinel ªuþoiu*, Argentina Tãtaru*, Bogdan Simescu* RIGLESS JOBS IN GAS WELLS 1. INTRODUCTION At the same time with

More information

Report as Per Consulting Services Agreement Causation Factors for the Banjar Panji No. 1 Blowout

Report as Per Consulting Services Agreement Causation Factors for the Banjar Panji No. 1 Blowout Neal Adams Services 16434 DeLozier Street Houston, Texas 77040 Office 713-849-4323 Fax 713-849-1943 www.nealadamsservices.com Registered in Texas, Louisiana, Oklahoma, Colorado and New Mexico Friday, September

More information

Graduate Courses in Petroleum Engineering

Graduate Courses in Petroleum Engineering Graduate Courses in Petroleum Engineering PEEG 510 ADVANCED WELL TEST ANALYSIS This course will review the fundamentals of fluid flow through porous media and then cover flow and build up test analysis

More information

An Introduction to Well Integrity

An Introduction to Well Integrity An Introduction to Well Integrity Rev 0, 04 December 2012 0 Preface This document has been prepared as a joint project between members of the Norwegian Oil and Gas Association's Well Integrity Forum (WIF)

More information

Perforating Basics. How the perforating processes work. George E. King Engineering GEKEngineering.com 3/14/2009 1

Perforating Basics. How the perforating processes work. George E. King Engineering GEKEngineering.com 3/14/2009 1 Perforating Basics How the perforating processes work 3/14/2009 1 Perforating Methods 1. The vast majority of all perforating work is performed with shaped charge or jet perforating charges. 2. Bullet

More information

C O M P L E T I O N S E R V I C E S

C O M P L E T I O N S E R V I C E S Well Screens Well Screens Contents ProWeld TM ProWeld TM TOP DynoFlo TM DB UniFlo HELICAL Inflow Control Screen UniFlo TM ROI Inflow Control Screen SlimFlo TM Pre-packed CoilFlo TM DB Screen Communication

More information

4D reservoir simulation workflow for optimizing inflow control device design a case study from a carbonate reservoir in Saudi Arabia

4D reservoir simulation workflow for optimizing inflow control device design a case study from a carbonate reservoir in Saudi Arabia 4D reservoir simulation workflow for optimizing inflow control device design a case study from a carbonate reservoir in Saudi Arabia O. Ogunsanwo, 1* B. Lee, 2 H. Wahyu, 2 E. Leung, 1 V. Gottumukkala 1

More information

Certificate Programs in. Program Requirements

Certificate Programs in. Program Requirements IHRDC Online Certificate Programs in OIL AND GAS MANAGEMENT Program Requirements IHRDC 535 Boylston Street Boston, MA 02116 Tel: 1-617-536-0202 Email: [email protected] Copyright International Human

More information

Analysis of the Deepwater Horizon Accident in Relation to Arctic Waters

Analysis of the Deepwater Horizon Accident in Relation to Arctic Waters Analysis of the Deepwater Horizon Accident in Relation to Arctic Waters Prof. ir. C.A. Willemse MBA, Dr. ir. P.H.A.J.M. van Gelder Delft University of Technology Delft, The Netherlands ABSTRACT One of

More information

Underbalanced drilling of oil wells in Saudi Arabia: case history and lessons learned

Underbalanced drilling of oil wells in Saudi Arabia: case history and lessons learned Underbalanced drilling of oil wells in Saudi Arabia: case history and lessons learned By Muhammad A Muqeem and Clark M Jarrett, Saudi Aramco; Hassan J Abdul, Weatherford CPD&T UNDERBALANCED DRILLING (UBD)

More information

Specification for Rotary Drill Stem Elements

Specification for Rotary Drill Stem Elements Addendum 1 March 2007 Effective Date: September 1, 2007 Specification for Rotary Drill Stem Elements ANSI/API SPECIFICATION 7-1 FIRST EDITION, MARCH 2006 EFFECTIVE DATE: SEPTEMBER 2006 ISO 10424-1:2004

More information

Society of Petroleum Engineers SPE Global Training Committee Training Course Review Process

Society of Petroleum Engineers SPE Global Training Committee Training Course Review Process Society of Petroleum Engineers SPE Global Training Committee Training Course Review Process The following guideline describes the process of evaluating a proposed training course for consideration by the

More information

FORMATION DAMAGE AND WELL TREATMENT SYSTEM

FORMATION DAMAGE AND WELL TREATMENT SYSTEM FORMATION DAMAGE AND WELL TREATMENT SYSTEM FDWTS-10K Includes ability to test Liquid Permeability & Gas Permeability Fines migration & critical velocity Static Filtration Drilling mud invasion evaluation

More information

Offshore Structures. Offshore Drilling Equipment

Offshore Structures. Offshore Drilling Equipment Offshore Structures Offshore Drilling Equipment The drill string is lowered through a conduit (riser). The drill string consists of a drill bit, drill collar and drill pipe. Drill pipe sections are added

More information

Oil and Gas Exploration and Production Oil and gas exploration and production... 22a-472-1

Oil and Gas Exploration and Production Oil and gas exploration and production... 22a-472-1 Department of Environmental Protection Sec. 22a-472 page 1 (4-97) TABLE OF CONTENTS Oil and Gas Exploration and Production Oil and gas exploration and production... 22a-472-1 Department of Environmental

More information

COMPARISON OF DRILLING TECHNOLOGIES BETWEEN TOP DRIVE AND ROTARY TABLE IN GEOTHERMAL FIELDS: A CASE STUDY OF OLKARIA GEOTHERMAL FIELDS.

COMPARISON OF DRILLING TECHNOLOGIES BETWEEN TOP DRIVE AND ROTARY TABLE IN GEOTHERMAL FIELDS: A CASE STUDY OF OLKARIA GEOTHERMAL FIELDS. Proceedings 5 th African Rift geothermal Conference Arusha, Tanzania, 29-31 October 2014 COMPARISON OF DRILLING TECHNOLOGIES BETWEEN TOP DRIVE AND ROTARY TABLE IN GEOTHERMAL FIELDS: A CASE STUDY OF OLKARIA

More information

WHAT YOU DON T KNOW ABOUT ACCUMULATORS CAN KILL YOU!

WHAT YOU DON T KNOW ABOUT ACCUMULATORS CAN KILL YOU! WHAT YOU DON T KNOW ABOUT ACCUMULATORS CAN KILL YOU! Atlanta (Monroe) GA 770-267-3787 [email protected] www.gpmhydraulic.com What You Don t Know About Hydraulic Accumulators Can Kill You TABLE OF CONTENTS

More information

Deepwater Horizon Accident Investigation Report

Deepwater Horizon Accident Investigation Report Deepwater Horizon Accident Investigation Report September 8, 2010 This is the report of an internal BP incident investigation team. The report does not represent the views of any individual or entity other

More information

Versalab Print Washer Operating Notes

Versalab Print Washer Operating Notes Versalab Print Washer Operating Notes David Elden [email protected] 1 Description... 2 VERSALAB PRINT WASHER OPERATION QUICK GUIDE... 3 Cautions... 3 Operating the Washer... 3 2 Operation Full Manufacturer

More information

Tax Executives Institute

Tax Executives Institute Tax Executives Institute Texas Oil and Gas Transactions May 6, 2013 Circular 230 disclaimer Any US tax advice contained herein was not intended or written to be used, and cannot be used, for the purpose

More information

Introduction to Solid Modeling Using SolidWorks 2012 SolidWorks Simulation Tutorial Page 1

Introduction to Solid Modeling Using SolidWorks 2012 SolidWorks Simulation Tutorial Page 1 Introduction to Solid Modeling Using SolidWorks 2012 SolidWorks Simulation Tutorial Page 1 In this tutorial, we will use the SolidWorks Simulation finite element analysis (FEA) program to analyze the response

More information

Rotary Vertical Drilling System (RVDS)

Rotary Vertical Drilling System (RVDS) 1 Rotary Vertical Drilling System (RVDS) 2 www.micon-drilling.de phone +49.5144.4936.0 Contents Company Profile... 03 MICON Rotary Vertical Drilling System (RVDS)... 04/05 RVDS 7.3/4...06/07 RVDS 10...08/09

More information

Varel International Workover Bits for remedial, re-entry AND frac plug Drilling Applications

Varel International Workover Bits for remedial, re-entry AND frac plug Drilling Applications Varel International Workover Bits for remedial, re-entry AND frac plug Drilling Applications Varel International offers the industry's broadest selection of high quality drill bits for remedial, re-entry

More information

WELL DEVELOPMENT COMPARING SEVERAL METHODS OF WELL

WELL DEVELOPMENT COMPARING SEVERAL METHODS OF WELL WELL DEVELOPMENT This continuing education course is primarily written for an audience of groundwater professionals who live in a water rich state, Florida. Because Florida is blessed with one of the most

More information

GRADATION OF AGGREGATE FOR CONCRETE BLOCK

GRADATION OF AGGREGATE FOR CONCRETE BLOCK GRADATION OF AGGREGATE FOR CONCRETE BLOCK Although numerous papers have been written concerning the proper gradation for concrete mixes, they have generally dealt with plastic mixes, and very little published

More information

UNDER DRAINAGE AND FILTER DESIGN

UNDER DRAINAGE AND FILTER DESIGN UNDER DRAINAGE AND FILTER DESIGN Tailings and HLP Workshop 28 April to 1 May 2010 INTRODUCTION The internal drainage is of crucial importance to the reliability and safety of a tailings dam throughout

More information

W.E. AUDIT 2010 09.12.2010 1

W.E. AUDIT 2010 09.12.2010 1 W.E. AUDIT 2010 - Well Design Assessment - Well Construction Assessment - Well Control Assessment - Emergency Response Assessment - General Aspect Assessment - Final Conclusions 09.12.2010 1 Preliminary

More information

Fiber Optics in a Bakken Multi-Stage Fractured Well. Montana Tech 2011 SPE Drilling Symposium Presented by: Chelsea Kadler

Fiber Optics in a Bakken Multi-Stage Fractured Well. Montana Tech 2011 SPE Drilling Symposium Presented by: Chelsea Kadler Fiber Optics in a Bakken Multi-Stage Fractured Well Montana Tech 2011 SPE Drilling Symposium Presented by: Chelsea Kadler Agenda FracPoint Design FracPoint Real-time Monitoring System Downhole Equipment

More information

HDD High Definition Data. defining a new standard for Open Hole, Cased Hole & Production Logging

HDD High Definition Data. defining a new standard for Open Hole, Cased Hole & Production Logging HDD High Definition Data defining a new standard for Open Hole, Cased Hole & Production Logging Get More Accurate Data At No Extra Cost From RECON s Standard Logging Service At 10 samples per foot (33

More information

Status of existing and possible new production in Greece. S. Xenopoulos, N. Roussos, Hellenic Petroleum S.A., Athens, Greece

Status of existing and possible new production in Greece. S. Xenopoulos, N. Roussos, Hellenic Petroleum S.A., Athens, Greece Status of existing and possible new production in Greece. S. Xenopoulos, N. Roussos, Hellenic Petroleum S.A., Athens, Greece Prinos and South Kavala fields in Northern Aegean Sea, currently operated by

More information

A Review of Gel Polymer Treatments in the Arbuckle Formation of Kansas

A Review of Gel Polymer Treatments in the Arbuckle Formation of Kansas A Review of Gel Polymer Treatments in the Arbuckle Formation of Kansas For West Coast PTTC Workshop Hyatt Valencia Conference Center Valencia, California Thursday, January 23, 2003 Rich Pancake Tertiary

More information

Guidelines For Sealing Groundwater Wells

Guidelines For Sealing Groundwater Wells Guidelines For Sealing Groundwater Wells Government of Newfoundland and Labrador Department of Environment and Conservation Water Resources Management Division Government of Newfoundland and Labrador Department

More information

An Overview of Drill Cuttings Re-Injection Lessons Learned and Recommendations ABSTRACT

An Overview of Drill Cuttings Re-Injection Lessons Learned and Recommendations ABSTRACT 11 th International Petroleum Environmental Conference Albuquerque, New Mexico, October 12-15, 24. An Overview of Drill Cuttings Re-Injection Lessons Learned and Recommendations M-I SWACO ABSTRACT Drill

More information

Comparison of Steel Tubes and Thermoplastic Hoses in Umbilical Service

Comparison of Steel Tubes and Thermoplastic Hoses in Umbilical Service Comparison of Steel Tubes and Thermoplastic Hoses in Umbilical Service Users of this Guidance Note should ensure that they are referring to the latest issue which can be downloaded from www.umf.as. No

More information

The Precharge Calculator

The Precharge Calculator 5116 Bissonnet #341, Bellaire, TX 77401 Telephone and Fax: (713) 663-6361 www.mcadamsengineering.com The Precharge Calculator Purpose: The Precharge Calculator by Interlink Systems, Inc. is a Windows based

More information

Modelling and Simulation Multi-stage Fracturing Propagation in Tight Reservoir through Horizontal Well

Modelling and Simulation Multi-stage Fracturing Propagation in Tight Reservoir through Horizontal Well Modelling and Simulation Multi-stage Fracturing Propagation in Tight Reservoir through Horizontal Well Smail ALIOUI (1) (1) Sonatrach First Calgary Petroleums, Association Division, Hassi Messaoud, 30500,

More information

Drilling Performance Benchmark Metrics Overview: Benchmark Metric Definitions Below the Mudline (BML) SPUD Date Kick Off Point (KOP) KOP Date

Drilling Performance Benchmark Metrics Overview: Benchmark Metric Definitions Below the Mudline (BML) SPUD Date Kick Off Point (KOP) KOP Date Page 1 of 7 Drilling Performance Benchmark Metrics Overview: The primary application of the Dodson Drilling Performance Benchmark Database System is to measure and rank drilling performance for wells drilled

More information

An Approach To Oil Spill Containment For Floating Drilling Operations In Canadian Beaufort Sea Pack Ice Conditions

An Approach To Oil Spill Containment For Floating Drilling Operations In Canadian Beaufort Sea Pack Ice Conditions For Floating Drilling Operations In Canadian Beaufort Sea Pack Ice Conditions Canada - US Northern Oil and Gas Research Forum Calgary, Alberta December 2 nd, 2010 An Overview An Overview Of Same Season

More information

WELL LOGGING TECHNIQUES WELL LOGGING DEPARTMENT OIL INDIA LIMITED

WELL LOGGING TECHNIQUES WELL LOGGING DEPARTMENT OIL INDIA LIMITED WELL LOGGING TECHNIQUES WELL LOGGING DEPARTMENT OIL INDIA LIMITED The Hydrocarbon E & P Process In the exploration process, a most probable hydrocarbon bearing rock structure is defined based on seismic

More information

World-Class Oil Sampling It is Possible

World-Class Oil Sampling It is Possible www.lubecontrol.com.au World-Class Oil Sampling It is Possible Lube Control Pty Ltd Providing lubrication solutions! Unit 5/53 Norfolk Rd, Marion, SA 5043 t: (08) 8298 5563 f: (08) 8298 6253 e: [email protected]

More information

RESERVOIR EVALUATION. The volume of hydrocarbons in a reservoir can be calculated:

RESERVOIR EVALUATION. The volume of hydrocarbons in a reservoir can be calculated: RESERVOIR EVALUATION The volume of hydrocarbons in a reservoir can be calculated: 1. directly by volumetric methods 2. indirectly by material balance methods Volumetrics provide a static measure of oil

More information

Remediation Services & Technology

Remediation Services & Technology Remediation Services & Technology Miranda Cruttenden- Well Remediation Engineer Todd Studer- Business Development Manager September 2011 Agenda Near wellbore remediation Causes of formations damage Field

More information

Gas Well Deliverability Testing

Gas Well Deliverability Testing Gas Well Deliverability Testing What is deliverability testing? The "deliverability" of a gas well can be defined as the well's capacity to produce against the restrictions of the well bore and the system

More information

product manual HS-4210 HS-4210_MAN_09.08 Digital Static Cone Penetrometer

product manual HS-4210 HS-4210_MAN_09.08 Digital Static Cone Penetrometer HS-4210_MAN_09.08 product manual HS-4210 Digital Static Cone Penetrometer Introduction This Manual covers the measurement of bearing capacity using the Humboldt Digital Static Cone Penetrometer (DSCP).

More information

SJT / SJM / SJP Large Vertical Pumps

SJT / SJM / SJP Large Vertical Pumps SJT / SJM / SJP Large Vertical Pumps The Heart of Your Process SJT, SJM, SJP Large Vertical Pumps Product Overview SJT Turbine Ns 1800 < 5000 nq 35 < 110 SJM Mixed Flow Ns 5800 < 8300 nq 113 < 161 SJP

More information

MAIN TECHNICAL ISSUES REGARDING PROBLEMS WHEN DRILLING GEOTHERMAL WELLS

MAIN TECHNICAL ISSUES REGARDING PROBLEMS WHEN DRILLING GEOTHERMAL WELLS GEOTHERMAL TRAINING PROGRAMME Reports 2012 Orkustofnun, Grensasvegur 9, Number 36 IS-108 Reykjavik, Iceland MAIN TECHNICAL ISSUES REGARDING PROBLEMS WHEN DRILLING GEOTHERMAL WELLS Bayu Wedaj Habtemariam

More information

California Department of Transportation Doyle Drive Test Program Contract No. 04A3362

California Department of Transportation Doyle Drive Test Program Contract No. 04A3362 California Department of Transportation Doyle Drive Test Program Deep Soil Mixing (DSM) /Cutter Soil Mixing (CSM) Testing Report By Malcolm Drilling Company, Inc. 3524 Breakwater Ave., Suite 108 Hayward,

More information

Deepwater Horizon Accident Investigation Report

Deepwater Horizon Accident Investigation Report Deepwater Horizon Accident Investigation Report September 8, 2010 This is the report of an internal BP incident investigation team. The report does not represent the views of any individual or entity other

More information

Understanding Well Construction and Surface Footprint

Understanding Well Construction and Surface Footprint Understanding Well Construction and Surface Footprint Well Construction Timeline Well Site Planning & Preparation Drilling Stage 1: Planning and Preparation Acquire Surface Lease Agreement Determination

More information

Introduction of Gravel Pack with Inflow Control Completion in Brazil

Introduction of Gravel Pack with Inflow Control Completion in Brazil Introduction of Gravel Pack with Inflow Control Completion in Brazil 6 th European Sand Management Forum Abrahão Jardim / Alberto Costa / Tobias Rocha / Hang Nguyen / Peter Kidd Baker Hughes Daniela Leite

More information