1 Mena-OECD Network on Public Procurement Workshop on Good Practices in Modernizing Public Procurement Kuwait May 2013 Demand Aggregation, Market Research, Feasibility Studies: Options, Actions and Risks Isabella Rapisarda Senior Account Manager Consip SpA
2 Contents 1. Overall vision inside EU 2. Reasoning as a Central Purchasing Body (CBP) 3. Towards feasibility study for a CPB: Key Phases and possible actions in Project Cycle 3.1 demand Aggregation 3.2 Market analysis 4. Costs acquisition projection 1
3 Overall vision inside EU In EU, the financial constraints and the Public Demand responsibility to sustain the domestic economy require Public Authorities to address public procurement by centralizing and standardizing the purchasing needs. Objectives: To reduce public expenditure for goods & services purchasing through the large scale economy benefits; To allow the massive collection of common classification data on public procurement with the purpose to establish standardized costs for Public sector; To contain the number of public tenders in order to reduce notification costs and legal expenses coming up from single procedure; To ensure a more effective planning and monitoring of the public procurement cycle; To implement e-tools. Actions: European Legal Framework introducing the concept of Central Purchasing Body (CPB) by EU Directive; Central Purchasing Bodies (CPB) set-up across Europe; Mandatory use of eprocurement across the EU by 2016, according to the new EU directives draft on Public procurement; Member State actions towards mandatory use for centralization and use of etools.
4 Reasoning as a Central Purchasing Body: key points (1/2) Article 11, Directive 2004/18/EC defines a Central Purchasing Body: Contracting ti authority which h acquires goods or services, or awards contracts, or concludes framework agreements intended for one or more contracting authority.. More emphasis on the Centralization and use of etools.. New EU Directive draft stresses the Centralized purchasing concepts: Member States shall provide for the contracting authorities the possibility of recourse to centralized purchasing activities offered by central purchasing bodies established in another Member State ; All procedures for the award of contracts carried out by a central purchasing bodies are made using electronic means of communication. 3
5 Reasoning as a Central Purchasing Body: key points and risks (2/2) KEY POINTS Stricter obligation to get best value for money vs fairness; Large volumes at stake: need to adequately assess each procurement choice in terms of impact on private sector; RISKS!!! Excessive attention for applying the rules to the detriment of supply/service quality; Market immaturity to comply with ih PA requests : Risk to restrict and distort competition; Identifying best governance model (i.e responsibilities, roles, deliverables, milestones, project timeframe); Inside CPB conflicts might rise within functions. Public demand centralization requires higher transparency standards and key stakeholders (final users on top) involvement. Hostile attitude by final users and public opinion. 4
6 Key stakeholders for a CPB Ministries Monitoring Authorities High level public Institutions... Other regional or local CPBs and Public Buyers Institutional representatives Central Purchasing Body... Supplier & Trade Organizations... i... Public Opinion Public Administrations Enterprises
7 CPB Project cycle: the expected results To ensure impartiality of procedure; Non discrimination; Equal access; Appropriate time limits; Transparent/objective approach; High level l of stakeholders participation i and satisfaction; Quality and cost effective framework agreements realization; Opportunities for learning by doing; Key quality issues included into aggregated initiative design from the beginning. 6
8 Towards feasibility study for a CPB: Defining the scope Demand management Purchasing strategies and supplier selection Logistic management Payment /einvoice phase Goods & services delivery monitoring tools When it comes to purchasing aggregation, the most crucial phase is the design and deployment of the purchasing strategy. The first important decision to make in designing the procurement system of a complex organization concerns its degree of centralization. 7
9 Towards feasibility study for a CPB: the roles Each phase can be conceived as an independent project with a complete life cycle. Programming Development of a purchasing strategy Development of tender documentation Supplier selection Contract execution CPB with PA CPB with (suppliers & PA representatives) CPB CPB PA (CPB) 8
10 CPB Project Cycle Phases common features Programming Development of a purchasing strategy Development of tender documentation Supplier selection Contract execution CPB with Pa CPB and suppliers and Pa representatives) CPB CPB PA (CPB) 1. Key decisions, requirements and responsibilities are defined in each phase. 2. Cycle phases are progressive each phase needs to be completed until the next is successfully tackled. 3. New programming relies on evaluation, to build experience for next initiatives; 9
11 Towards feasibility study for a CPB: Key Phases and possible actions in Project Cycle Programming and Planning Feasibility study and definition of procurement strategy Supplier selection and contract t award Contract management Service Level monitoring Opportunity identification Tender documentatio ti n preparation Maximum quantity tracking Service level inspection Feasibility study Procurement strategy definition Authority opinion aquisition Tender documentation publication Contract unit extension (if necessary) Contract time extension (if necessary) Surveys Complaint analysis Contract conclusion Corrective measures 10
12 Step 1. Programming (1/2) It represents a crucial phase, in any centralization for the pursue of the benefits coming from aggregation and standardization. It comprises designing and implementing of the procurement strategic plan according to the CPB priorities: iti (i.e for the Italian Central Purchasing Body is defined according to the National Public Finance Policy). The historic expenses data may might balance the inadequacy of good & services public expenditure sources. Planning includes re-planning. The initially iti prepared strategic t plan document (on multi years basis) is regularly reviewed, refined, and updated accordingly. 11
13 Step 1.Programming: g the Drivers (2/2) National budget and public finance focus Contract focus Final users focus 12 Value and Volume of Timetable Users Segmentation public procurement Continuance Cluster analysis and savings expected; Numbers of public buyers; Innovation (example: GPP); Completeness of frameworks offer
14 Step 2.Feasibility Study and Procurement Strategy (1/6) - - Opportunity identification - PA needs analysis Main Tasks - Market analysis (specific of market concerned: size, structure) - Definition of contract requirements -Savings forecast - Procurement strategy definition Deliverables - Feasibility study - Summary of pros & cons - Executive summary - Procurement Strategy 13
15 Step 2.Feasibility Study and Procurement Strategy : Category Selection criteria (2/6) Value of the expenditure The higher the value of the purchase, the higher the savings. Impact on final users (PA) The higher effect on the final users (PA), the lower the chances to aggregate the volume will be. Easily-standardized goods The higher easily standardize goods, the higher the chance to aggregate the volumes will be Competitiveness of the supply market The more competitive the market is, the more successful the aggregated tender 14 This analysis results in a PRIORITIES CHART for suitable categories for an aggregated tender
16 Step 2.Feasibility Study and Procurement Strategy : Category Selection criteria (3/6) high critical strategic products / products / services services market complexity non critical products / services product / services with economies of scale low low economical relevance high
17 Step 2.Feasibility Study and Procurement Strategy : Category Selection criteria (4/6): i.e Healthcare sector Monitors PRIORITY 1 Suitability Indicato or HIGH MEDIUM LOW Haemo fluids Medicinali veterinari Dental devices PRIORITY 3 PRIORITY 2 Vaccines TNT sterilitation Test tubes Plastic surgery and respiratory system protheses Gastroenteral protheses Dialysiis solutions Electrodes Neuro surgery protheses Medical Gases Sterilisation Dialysis devices Filters X-Rays devices Magnetic resonance scanners Sutures devices Cardiac valves Vascular protheses Otolaryngology implant TNT Alcohol & disinfectants Diapers Surgical gloves Laroscopy s surgical material Sutures Pace makers, stimulators Clinical chemistry system Orthopaedic protheses Stent Pharmaceuticals Medical aids Reagents & diagnostic devices Needles & syringes Resuscitation devices X-Ray & films Tomography devices IV fluids 16 LOW MEDIUM HIGH Expenditure Indicator
18 Step 2. Feasibility Study and Procurement Strategy: PA needs analysis (5/6) Strictly based on the PA estimated needs, this phase aims at analyzing the PA supply process and seizing the value of potential demand coming up from information such as: Public buyers geographical distribution; Annual total needs identification; Total Demand value; Total Demand value distinguished by PA type & geographical area. Procurement method applied; Purchased supply and services detailed description; Purchasing tender criteria (lowest price, quality-price); Outsourcing. 17
19 Step 2.Feasibility Study and Market Research: Suppliers market analysis (6/6) Market opportunity identification means selecting the most effective buying procedure in terms of: Market (global sourcing, local sourcing); Number of suppliers (single, dual sourcing, multi sourcing); Type of relationship (partnership, long term contract, short term contract); Market trend: evolution and innovation Supplier reputation: quality Drivers analysis: Economical (total spending /yr) technical complexity (product and/or evolution) strategic impact of Central initiative on market 18
20 Costs acquisition projection: the savings and benefits purpose (1/2) Grouped procurement can lead to significant savings BY ACCURATE PROCESS OF TRACKING AND QUANTIFYING CONTRACT FINANCIAL BENEFITS. Public procurement is mainly focused on Budgetary benefits (also referred to as cashable, tangible or hard benefits): PRICE REDUCTION ON FINAL CONTRACT PRICE Savings and benefits Process 1 2 Define the scope Baseline current costs 3 Predict future costs Baseline spend Spend after procurement = Savings/Benefits (Volume x Price) (Volume x Price)
21 Costs acquisition projection: savings and benefits (2/2) Baseline current costs Historic expenditure data (Such as CPB data warehouse) MEF reports PA Direct feedback, Questionnaires, focus groups, annual forecast, account managers vs Predicted Costs Average standard costs; arrangements on new components or categories; higher or lower service level all these elements combine to bring about initial tender price Public tenders notice analysis (EU Official Notice Systems as TED GUUE, PA web sistes) KEY SUCCESS FACTOR 2008 National Budget Law made mandatory for Central entities to send annual forecast of their requirements for goods and services to Consip and MEF. indicates sustainable spending indicators.
22 Thank you for your attention! Contact Details: Isabella Rapisarda it
E. Specific requirements for innovation procurement (PCP/PPI) supported by Horizon 2020 grants
E. Specific requirements for innovation procurement (PCP/PPI) supported by Horizon 2020 grants The following requirements apply to PCPs and PPIs for which the tender preparation and/or the call for tender
Performance Measurement
Brief 21 August 2011 Public Procurement Performance Measurement C O N T E N T S What is the rationale for measuring performance in public procurement? What are the benefits of effective performance management?
Project Management Guidebook
METHOD 12 3 empowering managers to succeed Project Management Guidebook ISBN 0-473-10445-8 A bout this e-book This e-book was created by Method123 (see www.method123.com) to help provide you with a simple
Guidance on Framework Agreements
1. Introduction Guidance on Framework Agreements The purpose of this document is to provide guidance to public purchasers on the operation of framework agreements as provided for under current public procurement
Develop Project Charter. Develop Project Management Plan
Develop Charter Develop Charter is the process of developing documentation that formally authorizes a project or a phase. The documentation includes initial requirements that satisfy stakeholder needs
An integrated approach in healthcare e-procurement: the case-study of the ASL of Viterbo
Dipartimento degli Studi Aziendali, Tecnologici e Quantitativi An integrated approach in healthcare e-procurement: the case-study of the ASL of Viterbo Tommaso Federici Università della Tuscia Dipartimento
PROJECT MANAGEMENT PLAN CHECKLIST
PROJECT MANAGEMENT PLAN CHECKLIST The project management plan is a comprehensive document that defines each area of your project. The final document will contain all the required plans you need to manage,
Crosswalk Between Current and New PMP Task Classifications
Crosswalk Between Current and New PMP Task Classifications Domain 01 Initiating the Project Conduct project selection methods (e.g., cost benefit analysis, selection criteria) through meetings with the
E. Specific requirements for innovation procurement (PCP/PPI) supported by Horizon 2020 grants
E. Specific requirements for innovation procurement (PCP/PPI) supported by Horizon 2020 grants This annex applies to PCPs and PPIs for which the tender preparation and/or the call for tender implementation
Procurement Performance Measurement System
Public Procurement and Disposal of Public Assets Authority Procurement Performance Measurement System User's Guide August 2008 Public Procurement and Disposal of Public Assets Authority Procurement Performance
Balanced Scorecard: & Challenges. 23rd July 2007. Organized by: SMR
Balanced Scorecard: Implementation & Challenges 23rd July 2007 Organized by: SMR 1 Program Schedule» 9.00 am 10.30am» 2.00pm 3.30pm > Introduction PMS > BSC Terminology & Principles > Understanding BSC
Australian National Audit Office. Report on Results of a Performance Audit of Contract Management Arrangements within the ANAO
Australian National Audit Office Report on Results of a Performance Audit of Contract Management Arrangements within the ANAO Commonwealth of Australia 2002 ISBN 0 642 80678 0 10 December 2002 Dear Mr
AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP)
AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP) Copyright: Australian Institute of Project Management Document Information Document
To be used in conjunction with the Invitation to Tender for Consultancy template.
GUIDANCE NOTE Tendering for, choosing and managing a consultant Using this guidance This information is not intended to be prescriptive, but for guidance only. Appointing consultants for relatively small
Optimizing the Source to Contract Process to Maximize and Lock in Savings Patrick Eckhert Cardinal Health Head of Indirect Procurement
Optimizing the Source to Contract Process to Maximize and Lock in Savings Patrick Eckhert Cardinal Health Head of Indirect Procurement Program Goals and Overview Goal Share our strategy and approach for
UK Medical Marketing Courses 2011 / 2012 Programme
UK Medical Marketing Courses 2011 / 2012 Programme To book your place, please call: 0845 4090 897 or email: [email protected] Winning Product Launches Date: 3 rd and 4 th October 2011 Cost:
Future Council Programme Evaluation Framework
Future Council Programme Evaluation Framework Overview of the Evaluation Framework for the Future Council Programme DRAFT v0.7 August 2015 Contents 1. Evaluation Framework Overview 2. Evaluation Framework
Contract Management Guideline
www.spb.sa.gov.au Contract Management Guideline Version 3.2 Date Issued January 2014 Review Date January 2014 Principal Contact State Procurement Board Telephone 8226 5001 Contents Overview... 3 Contract
TOOL D14 Monitoring and evaluation: a framework
TOOL D14 Monitoring and evaluation: a framework 159 TOOL D14 Monitoring and evaluation: a framework TOOL D14 For: About: Purpose: Use: Resource: Commissioners in primary care trusts (PCTs) and local authorities
Part B1: Business case developing the business case
Overview Part A: Strategic assessment Part B1: Business case developing the business case Part B2: Business case procurement options Part B3: Business case funding and financing options Part C: Project
Existing Analytical Market Assessment Tools - Definitions
Existing Analytical Market Assessment Tools - Definitions November, 2003 This list of market assessment tools was prepared by Development Alternatives Inc. (DAI) as an internal working document to support
Final. North Carolina Procurement Transformation. Governance Model March 11, 2011
North Carolina Procurement Transformation Governance Model March 11, 2011 Executive Summary Design Approach Process Governance Model Overview Recommended Governance Structure Recommended Governance Processes
Sample marketing plan template
Sample marketing plan template Table of Contents 1) Executive summary Page # 2) Situation analysis Page # 3) Marketing strategy Page # 4) Financials Page # 5) Implementation and Contingency Page # http://www.entrepreneurmag.co.za/
Chapter 2 INDUSTRIAL BUYING BEHAVIOUR: DECISION MAKING IN PURCHASING
Chapter 1 THE ROLE OF PURCHASING IN THE VALUE CHAIN The role and importance of the purchasing and supply function in the value chain. The difference between concepts such as ordering, buying, purchasing,
The Legal basis for CPB and framework agreements
Brief 20 August 2011 Public Procurement Central Purchasing Bodies C O N T E N T S The legal basis for CPB and framework agreements The rationale for establishing a CPB Typical product and service areas
Prepared by David Willson, OCIO in consultation with Marc Buchalter, Procurement Please send comments to David Willson at dwillson@berkeley.
Technology RFX Customer Guide Introduction This guide is intended for those that have identified a need to solicit bids from suppliers but may unclear on the different types of documents, the roles various
Implementation progress of the EASEE-gas Common Business Practices (CBP's)
1 Implementation progress of the EASEE-gas Common Business Practices (CBP's) 1. Introduction The European Association for the Streamlining of Energy Exchange-gas, or EASEE-gas, was established on March
Digital Inclusion Programme Started. BL2a
PROJECT BRIEF Project Name Digital Inclusion Programme Status: Started Release 18.05.2011 Reference Number: BL2a Purpose This document provides a firm foundation for a project and defines all major aspects
The Global Fund experience on malaria RDTs. Rationale to enhance harmonization
The Global Fund experience on malaria RDTs Rationale to enhance harmonization Stakeholder Consultation on enhanced Harmonization of malaria Rapid Diagnostic Tests 3rd 5th December 2013, Antwerp (Belgium)
UNSOLICITED PROPOSALS
UNSOLICITED PROPOSALS GUIDE FOR SUBMISSION AND ASSESSMENT January 2012 CONTENTS 1 PREMIER S STATEMENT 3 2 INTRODUCTION 3 3 GUIDING PRINCIPLES 5 3.1 OPTIMISE OUTCOMES 5 3.2 ASSESSMENT CRITERIA 5 3.3 PROBITY
Procurement Strategy 2013-2017 Delivering Social Value for our Community
Procurement Strategy 2013-2017 Delivering Social Value for our Community Making Bath & North East Somerset an even better place to live, work and visit 1 Picture courtesy of Bath & News Media Group Our
EFFECTS+ Clustering of Trust and Security Research Projects, Identifying Results, Impact and Future Research Roadmap Topics
EFFECTS+ Clustering of Trust and Security Research Projects, Identifying Results, Impact and Future Research Roadmap Topics Frances CLEARY 1, Keith HOWKER 2, Fabio MASSACCI 3, Nick WAINWRIGHT 4, Nick PAPANIKOLAOU
STEPS IN THEATRE PROJECT PLANNING
Janis A. Barlow & Associates Research, Planning and Management Consultants Specializing in Theatre since 1981 STEPS IN THEATRE PROJECT PLANNING Janis A. Barlow & Associates www.barlowandassociates.com
Partnership Satisfaction & Impact Survey
Partnership Satisfaction & Impact Survey Page 1 of TABLE OF CONTENTS Contents I INTRODUCTION... 3 II SATISFACTION SURVEY... 4 II.1 What?... 4 II.1.1 Definition... 4 II.1.2 Satisfaction survey in Practice...
Six top tips for travel managers to create savings in 2015
Six top tips for travel managers to create savings in 2015 E-Guide 2 Introduction Savings remain a key focal point for Travel Managers in 2015 and through regular reviews and analysis, using management
Computing Services Network Project Methodology
Computing Services Network Project Prepared By: Todd Brindley, CSN Project Version # 1.0 Updated on 09/15/2008 Version 1.0 Page 1 MANAGEMENT PLANNING Project : Version Control Version Date Author Change
Procurement, Contracting and Contract Management Policy
Procurement, Contracting and Contract Management Policy Corporate policy 8.4 Responsible Officer: Group Manager Accounting and Taxation Policy Custodian: Chief Finance Officer Division: Finance and Resources
Government leadership in assuring better quality healthcare in South Africa: policy into practice
Government leadership in assuring better quality healthcare in South Africa: policy into practice Authors: Marshall CA (Dr); Msibi EB Office of Standards Compliance, National Department of Health, SOUTH
Developing and implementing e-procurement
Developing and implementing e-procurement Public Procurement in the EU the 2020 Agenda Governments and Public Administration: 5 Major IT Trends e-services: Increasing efficiency and transparency by delivering
INCREASING THE PROFITABILITY OF LOGISTICS
INCREASING THE PROFITABILITY OF LOGISTICS Despite increasing revenues, only a small number of logistics services providers are seeing increased profitability. Companies that want to grow their logistics
Marketing (Marketing Principles)
Marketing (Marketing Principles) Main Aim(s) of the Unit: To provide students with a foundation for the analysis of marketing within organizations including decision making processes, segmentation, the
How the Ministry of Education managed the 2008 national school bus transport tender process. Report to the Ministry of Education October 2009
How the Ministry of Education managed the 2008 national school bus transport tender process Report to the Ministry of Education October 2009 Contents 1: Introduction... 3 What is school transport?... 3
E-Procurement - thoughts on EU initiatives and UK context. Martin Leverington Efficiency and Reform Group
E-Procurement - thoughts on EU initiatives and UK context Martin Leverington Efficiency and Reform Group UKNeF 9 December 2013 Context: Why Procurement Matters Government priorities include: Deficit reduction
Engineering a EIA - 632
es for Engineering a System EIA - 632 SE Tutorial es for Engr Sys - 1 Fundamental es for Engineering a System Acquisition and Supply Supply Acquisition es for Engineering A System Technical Management
What Tech Buyers Think TM
What Tech Buyers Think TM Who We Are Tech Buyer Perceptions, a division of the Perceptions Group, is a leader in providing the technology industry with research-based, tech buyer insight and data-driven
YOUR MRI EXAM: QUESTIONS AND ANSWERS
YOUR MRI EXAM: QUESTIONS AND ANSWERS What is MRI? MRI is short for Magnetic Resonance Imaging. MRI is an advanced technology that lets your doctor see internal organs, blood vessels, muscles, joints, tumors,
One Voice for Health Procurement
Ways of Working 161014 HEALTH BUSINESS SERVICES One Voice for Health Procurement Ways of Working 16/10/2014 1. Introduction and Background... 2 Health Business Services... 2 Procurement... 3 Implementation
QUALITY ASSURANCE POLICY
QUALITY ASSURANCE POLICY ACADEMIC DEVELOPMENT & QUALITY ASSURANCE OFFICE ALPHA UNIVERSITY COLLEGE 1. BACKGROUND The Strategic Plan of 2003-2005 E.C of Alpha University s defines the direction Alpha University
Standard operating procedure
Standard operating procedure Title: Steps involved in outsourcing of services Status: PUBLIC Document no.: SOP/EMA/0083 Lead author Approver Effective date: 18-12-2014 Name: Caroline Maignen Name: Stefano
ISO 20000-1:2005 Requirements Summary
Contents 3. Requirements for a Management System... 3 3.1 Management Responsibility... 3 3.2 Documentation Requirements... 3 3.3 Competence, Awareness, and Training... 4 4. Planning and Implementing Service
GUIDELINES FOR PILOT INTERVENTIONS. www.ewaproject.eu [email protected]
GUIDELINES FOR PILOT INTERVENTIONS www.ewaproject.eu [email protected] Project Lead: GENCAT CONTENTS A Introduction 2 1 Purpose of the Document 2 2 Background and Context 2 3 Overview of the Pilot Interventions
TECHNICALS LEVEL 2016 3 BUSINESS
2016 Suite Cambridge TECHNICALS LEVEL 3 BUSINESS Unit 16 Principles of project management M/507/8163 Guided learning hours: 60 Version 2 - Revised content - March 2016 ocr.org.uk/business LEVEL 3 UNIT
How To Improve Your Business
IT Risk Management Life Cycle and enabling it with GRC Technology 21 March 2013 Overview IT Risk management lifecycle What does technology enablement mean? Industry perspective Business drivers Trends
Step by Step Project Planning
Step by Step Project Planning Contents Introduction The Planning Process 1 Create a Project Plan...1 Create a Resource Plan...1 Create a Financial Plan...1 Create a Quality Plan...2 Create a Risk Plan...2
Corporate Governance Service Business Plan 2011-2016. Modernising Services
Corporate Governance Service Business Plan 2011-2016 Modernising Services Index 1. Executive Summary 3 2. Vision and Strategy 4 3. Service Overview 3.1 What Services do we and Will we Deliver? 5 3.2 How
National Public Procurement Policy Framework NPPPU NATIONAL PUBLIC PROCUREMENT POLICY UNIT
National Public Procurement Policy Framework NPPPU NATIONAL PUBLIC PROCUREMENT POLICY UNIT ARNA FHOILSIÚ AG OIFIG AN tsoláthair Le ceannach díreach ón OIFIG DHÍOLTA FOILSEACHÁN RIALTAIS, TEACH SUN ALLIANCE,
4 Tips and 3 Pitfalls to Avoid when Sourcing Professional Services
4 Tips and 3 Pitfalls to Avoid when Sourcing Professional Services a Little Planning can Save Companies Millions S a f e S o u r c i n g, I n c. 2 8 1 5 0 N. A l m a S c h o o l P k w y S u i t e 1 0 3
Takeda UPI Contribution to Conference. Vendor selection process for Serialization and product Tracking. May 2014. Authors: Bahman Didar
Takeda UPI Contribution to Conference Vendor selection process for Serialization and product Tracking May 2014 Authors: Bahman Didar Delivering the Unified Product Identifier Program at Takeda Agenda 1.
e-procurement implementation history and best practices from Lombardy Region
e-procurement implementation history and best practices from Lombardy Region Francesco Gardenal 26/11/2014, Torino ITCILO - ELECTRONIC GOVERNMENT PROCUREMENT MANAGEMENT course A G E N D A Q u i c k f a
NHS Supply Chain - An SME Champion
NHS Supply Chain - An SME Champion Parliamentary brief Summer 2015 Current landscape The Coalition s Programme for Government published after the General Election in May 2010 outlined its overarching commitment
Procurement & Supply Chain Team. Purpose of the Role
Role: Responsible To: Responsible For: Location: Procurement & Supply Chain Manager Assistant Director of Finance Procurement & Supply Chain Team Liverpool Purpose of the Role Oversee the group s procurement
Office of Government Procurement
Public Service Spend and Tendering Analysis for 2013 Foreword Foreword by the Minister for Public Expenditure and Reform, Mr Brendan Howlin T.D., and the Minister of State at the Department of Public
Electronic public procurement in the EU
Electronic public procurement in the EU Recent developments EIPA International Public eprocurement seminar Donostia-San Sebastian, 23-24 April 2008 Julia FERGER European Commission Directorate-General
Standard operating procedure
Standard operating procedure Title: How to conduct a procurement procedure Status: PUBLIC Document no.: SOP/EMA/0121 Lead author Approver Effective date: 04.09.14 Name: Caroline Maignen Name: Stefano Marino
Certification in Humanitarian Supply Chain Management (CHSCM) Competence Model. Final Version 2007
Certification in Humanitarian Supply Chain Management (CHSCM) Competence Model Final Version 2007 Contents Competence Model Context... 3 Functional Map... 6 UNIT 1 Supply Chain Planning... 7 UNIT 2 Supply
PROJECT MANAGEMENT FRAMEWORK
PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to
PRINCE2:2009 Glossary of Terms (English)
accept (risk response) acceptance acceptance criteria activity agile methods approval approver assumption assurance A risk response to a threat where a conscious and deliberate decision is taken to retain
How To Manage Assets
INSTITUTE OF CERTIFIED PUBLIC ACCOUNTANTS OF KENYA ASSET MANAGEMENT SEMINAR SEPTEMBER 9 TH -11 TH, 2015 Asset Information Credibility. Professionalism. AccountAbility 1 Asset Information 2 Content 1. Stakeholders
Selecting a Standard Bidding Document for IT Procurement
The World Bank Operational Policy and Country Services Vice Presidency Procurement Unit IT Procurement Guidance Note 8 Selecting a Standard Bidding Document for IT Procurement CONTENTS I. Background on
AS9100:2016 Transition Guide
AS9100:2016 Transition Guide Updated August 24, 2016 AS9100 Series Overview AS9100 Aerospace Management Systems is a widely adopted and standardized quality management system for the aerospace industry.
The post holder will be guided by general polices and regulations, but will need to establish the way in which these should be interpreted.
JOB DESCRIPTION Job Title: Membership and Events Manager Band: 7 Hours: 37.5 Location: Elms, Tatchbury Mount Accountable to: Head of Strategic Relationship Management 1. MAIN PURPOSE OF JOB The post holder
2014 15 Statement of Priorities
2014 15 Statement of Priorities Agreement between Minister for Health and Ambulance Victoria Department of Health Contents Background 3 Policy directions 3 Part A: Strategic overview 6 Mission statement
Dean Gauthier General Manager KLB Group Canada
Productivity in the Supply Chain Application in a manufacturing environment Dean Gauthier General Manager KLB Group Canada About me DEAN GAUTHIER General Manager KLB Group Canada Over 25 years of experience
Essentials of Project Management
Institut de recherche en sciences psychologiques Essentials of Project Management Stephan Van den Broucke Université catholique de Louvain EAHC Workshop on Joint Actions Luxembourg, 10 December 2012 What
Risk Management Primer
Risk Management Primer Purpose: To obtain strong project outcomes by implementing an appropriate risk management process Audience: Project managers, project sponsors, team members and other key stakeholders
Frequently Asked Questions regarding European Innovation Partnerships
May 2012 Frequently Asked Questions regarding European Innovation Partnerships 6 December 2010 FAQs 1. What are the objectives behind European innovation partnerships? 2. What concrete benefits can be
World Tourism Organization RECOMMENDATIONS TO GOVERNMENTS FOR SUPPORTING AND/OR ESTABLISHING NATIONAL CERTIFICATION SYSTEMS FOR SUSTAINABLE TOURISM
World Tourism Organization RECOMMENDATIONS TO GOVERNMENTS FOR SUPPORTING AND/OR ESTABLISHING NATIONAL CERTIFICATION SYSTEMS FOR SUSTAINABLE TOURISM Introduction Certification systems for sustainable tourism
Project Management Certificate (IT Professionals)
Project Management Certificate (IT Professionals) Whether your field is architecture or information technology, successful planning involves a carefully crafted set of steps to planned and measurable goals.
2.3. The management in each HCF shall be responsible for ensuring good waste management practices in their premises.
1. PURPOSE Health-care activities lead to production of medical waste that may lead to adverse health effects. Most of this waste is not more dangerous than regular household waste. However, some types
Table of Contents INTEGRATED MANAGEMENT SYSTEM MANUAL
Table of Contents INTRODUCTION... 4 COMMON REQUIREMENTS... 5 1. SCOPE... 7 1.1 DESCRIPTION OF ORGANIZATION... 7 1.2 SCOPE OF CERTIFICATION... 7 1.3 THIRD PARTY CERTIFICATION... 7 2. REFERENCES... 8 3.
How to Build a Business Case for Automated E-procurement
How to Build a Business Case for Automated E-procurement Introduction Any time an organization needs to make change, start a new program or implement new technologies, the first step in the process is
Certificate in procurement and supply operations
Certificate in procurement and supply operations Unit content guide Leading global excellence in procurement and supply Introduction The Chartered Institute of Purchasing & Supply qualifications ladder
The role will require the management of consultancy and in-house teams in the successful execution of the estates strategy.
Senior Project Manager Job Description Reference: 102014/51 Job Title: Senior Project Manager Purpose of Role: The University is committed to providing an environment conducive to high quality teaching
What is the Public-Private Partnership Laboratory and Diagnostic Directory?
What is the Public-Private Partnership Laboratory and Diagnostic Directory? The Public-Private Partnership Laboratory and Diagnostic Directory is a joint publication between the Medical Laboratory Scientists
eprocurement in South Africa
eprocurement in South Africa November 2009 Content The Journey Business Requirements Solution Offering The Journey The Integrated Financial Management System IFMS project is the lead phase of a priority
Department of Management and Budget
Director Debt Deputy Director and Budget FOCUS Business Support Group Budget Development & Production Revenue & Tax Analysis Customer & Information Technology Core Financial Processing Capital Projects/CIP
Call for social security experts ETUC project on Letterbox companies
Call for social security experts ETUC project on Letterbox companies This is a call for a subcontractor to provide expertise as part of the implementation of the ETUC project on Letterbox companies. In
Unit 4: Marketing Principles
Unit 4: Marketing Principles Unit code: F/601/0556 QCF level: 4 Credit value: 15 credits Aim This unit aims to provide learners with understanding and skills relating to the fundamental concepts and principles