US:IT Proposed Work Plan. January 20 16
|
|
|
- Laura George
- 9 years ago
- Views:
Transcription
1 US:IT Proposed Work Plan January 20 16
2 Today we would like to share: Four IT Initiatives Proposals Timelines
3 Complete a detailed analysis of positions, salaries and benefits for Information Technology positions within US:IT.
4 Develop positions for nineteen (19) new technology professionals and direct support staff to: support campus training and assistance needs in the classr oom address exist ing responsiveness challenges complete projects suppor t ent er pr ise syst ems address the network communications infrastructure.
5 9 Direct support center and technical staff hired by M ay within direct support team 1system administrators 1database analyst 1senior classroom t echnology specialist 2 net work engineer/ com m unication specialist
6 4 Direct support center and technical staff hired by January1, Direct support center, project manager and technical staff hired by Ju l y1,20 17
7 Proposed Expense Budget FY16 FY17 FY18 FY19 FY20 TOTAL Staffing Operat ional St af f $200,000 $900,000 $1,500,000 $1,500,000 $1,500,000 Ongoing HR Consulting $50,000 One t ime
8
9 Upgrade wireless service including associated cabling and equipment at all campuses to bring wireless capacity to gigabit speeds, supporting learning and living spaces.
10 US:IT proposes a nearly complete replacement of the antiquated communications cabling at all campuses. M odern wired and wireless network electronics will be installed at approximately 35 University locations across the state.
11 Year1 - Plan & Design: The first year will focus on planning, designing and other startup efforts. Work will be coordinated with the Classrooms of the Future initiative to ensure the network infrastructure they will need is in place in a building prior to classrooms being upgraded.
12 Year 1Deliverables: Contracts for design and installation services Inventory of current state for all buildings Communications cable plant design/ engineering Wireless AP deployment (for buildings with modern cabling) Service redesign/ augment at ion
13 Year 2 - Build Out: Year two work will begin in earnest for buildings that need significant (re)construction in order to install new communications cabling. Classroom buildings as well as buildings that tend to attract large gatherings of students (libraries, student unions, etc) will be given higher priority.
14 Year 3 - Build Out: In year three the installation of new communications cabling will be completed. Administrative and other non-academic spaces are included in this phase.
15
16 Upgr ade classr ooms acr oss all campuses and UC wit h modern, high definition and smart technologies to create high efficiency teaching and learning environments. Uniform devices and systems will be installed with training and documentation to provide reliable operation by faculty and students.
17 During the Fall the Classroom Technology team assessed 551classr ooms and will meet wit h campus facult y, st udent s, instructional design professionals, facilities and academic leaders t o discuss findings and develop classroom st andards.
18
19
20 As rooms are upgraded, both documentation and training are essential and will be coordinated with the campus stakeholders. The Classroom Technology team will have a dedicated staff member coordinate with the campuses to produce documentation.
21 Year 1- Planning with stakeholder input, plus high-priority replacements covering approximately 10 % of the project s planned classrooms. Year 2 - Installations increase, covering 20-25% of the project s planned classr ooms --including the pilot of active learning spaces. Tot al t o dat e 35%. Year 3 - Installations continue with necessary modifications Total classroom completion 60 %.
22 Year 4 - Installations continue with necessary modifications. Total classroom completion at year four will reach approximat ely 85% Year 5 - Installations continue with necessary modifications. All planned classrooms will be completed. Estimated number Project does not end at year 5, as maint enance and upgrades will continue.
23 Upgrade and modernize M ainestreet to support the One University concept, including program integration goals, unified online learning, student services, Human Resources initiatives and the unified budget plan.
24 Initiative 3 - User experience improvements for faculty. We will engage faculty in focus groups and other feedback mechanisms t o r edesign wor kflow and business pr ocesses that affect them. Initiative 4 - Adapting M ainestreet to One University. One University will introduce entirely new business processes and require us to rebuild current ones. This initiative will begin the process reengineering and redesign as guided by seasoned consult ant s.
25 Initiative 1- M ainestreet M obile Creat ing a facile and at t ract ive mobile int erface for st udent s and faculty will improve the experience for students and faculty alike. Initiative 2 - Streamlined course registration We will create stand beside software that uses M ainestreet data and business process functions but provides an enhanced, modern, seamless and easily maint ained st udent experience.
26 Year 1 Planning, stakeholder engagement, licensing of product, procurement of consulting and contracted services, begin implementation. Year 2 Development completed on each initiative, testing, training, implementation and project closeout. Total duration 18 to 24 months.
27 Proposed Expense Budget FY16 FY17 FY18 FY19 FY20 TOTAL Wireless Long Term Investment $1,000,000 $2,000,000 $7,000,000 $6,050,000 $16,050,000 Short Term Invest ment $2,500,000 $4,000,000 $2,243,945 $8,743,945 Classrooms Long Term Investment $1,560,000 $2,600,000 $2,600,000 $2,600,000 $900,000 $10,260,000 Short Term Invest ment $1,035,000 $1,725,000 $1,725,000 $1,725,000 $744,500 $6,954,500 MaineStreet Modifications $100,000 $1,100,000 $800,000 $2,000,000 TOTAL FY EXPENSES $3,695,000 $9,925,000 $16,125,000 $12,618,945 $1,644,500 $44,008,445
Information Technology Plan 2010 2011
Information Technology Plan 2010 2011 September 2010 The FY10-11 IT plan was developed through collaboration with IT staff and engagement with IT governance groups. In the budget-constrained environment,
The Project Management Knowledge Areas as defined by PMI (PMBOK, 2004)
The Project Management Knowledge Areas as defined by PMI (PMBOK, 2004) is the processes required to ensure that the various elements of the project are properly coordinated. the processes required to ensure
Board of Trustees IT Subcommittee Meeting. November 3, 2014 2:00-2:50 PM Harper Center 3023
Board of Trustees IT Subcommittee Meeting November 3, 2014 2:00-2:50 PM Harper Center 3023 Agenda Introductions June 2, 2014 Meeting Minutes Creighton University Digital Strategy Information Technology
Integrated Technology Plan (FY10 FY12)
(FY10 FY12) Anne Arundel Community College embraces and promotes a seamless integration of appropriate technologies in support of the learning community within the framework of the college s mission and
BUILDING A STRATEGIC PROCUREMENT FUNCTION. William M. Cooper, C.P.M. University of Missouri System
BUILDING A STRATEGIC PROCUREMENT FUNCTION William M. Cooper, C.P.M. University of Missouri System Abstract "Procurement as a function, regardless of the industry, is incredibly strategic to the bottom
University of Regina Information Services Report on Operations May 1, 2014 to October 31, 2014
University of Regina Information Services Report on Operations May 1, 2014 to October 31, 2014 Item Activity Name and Purpose Major Issues 1 Service Agreements Service agreements ensure that critical services
Complete College Ohio COTC Completion Plan
Complete College Ohio COTC Completion Plan Focus: Connection Strategy Leadership Others Outcome Measure Timeline What will we do differently? What are the action steps for intervention?? How will we measure
Charting the Future FY 2016 Work Plan. Gantt Charts. February, 2016
Charting the Future FY 2016 Work Plan Gantt Charts February, 2016 1 Overview The Gantt charts will be reviewed and updated on a quarterly basis Significant changes to tasks or milestones that affect progress
FY13 Information Technology Operational Plan
1a: Work toward building a modern data center and providing data services that support campus units and the strategic goals of the University. Create a technical and financial plan for a data center Q1-
Stabilization & Sustainability: A Progress Report from CampusWorks. Presented by: Liz Murphy, CEO Mike Russell, SJECCD CISO
Stabilization & Sustainability: A Progress Report from CampusWorks Presented by: Liz Murphy, CEO Mike Russell, SJECCD CISO The path is rarely clear Fundamental operational framework has decayed Infrastructure
4000 OPERATIONS AND MAINTENANCE OF PLANT
4000 OPERATIONS AND MAINTENANCE OF PLANT Most of the expenditures in this category are specific to the Department of Public Facilities and have been transferred out of the School Department budget. However,
Fundamentals of Information Systems, Fifth Edition. Chapter 8 Systems Development
Fundamentals of Information Systems, Fifth Edition Chapter 8 Systems Development Principles and Learning Objectives Effective systems development requires a team effort of stakeholders, users, managers,
Eastern Illinois University information technology services. strategic plan. January,
Eastern Illinois University information technology services strategic plan January, 2014 Introduction With the selection of emerging technologies as one of the six themes of the university s recent strategic
Robert M. Ford Director of Technology Entry Plan
Robert M. Ford Director of Technology Entry Plan Thank you for the opportunity to join the team at the Lincoln Public Schools. I am very excited about the chance to work with faculty, staff, administrators,
IUSD TECHNOLOGY PLAN. November 2013. Irvine Unified School District Information Technology Department 1
IUSD TECHNOLOGY PLAN November 2013 1 AGENDA Agenda 1 Scope and Purpose of the Plan 2 Plan Development 3 Plan Content 3.1 Current Access and Use 3.2 Curriculum Goals 3.3 Professional Learning Goals 3.4
JBoss EntErprisE ApplicAtion platform migration guidelines www.jboss.com
JBoss Enterprise Application Platform Migration Guidelines This document is intended to provide insight into the considerations and processes required to move an enterprise application from a JavaEE-based
Information Technology Services. Roadmap 2014-2016
Information Technology Services Roadmap 2014-2016 Introduction This document charts the direction for Humboldt State University s Information Technology Services department over the next three years. It
Information Technology Plan Technology Vision for the Community College
Information Technology Plan Technology Vision for the Community College At Caldwell Community College and Technical Institute, information technology will be a primary resource for students, faculty, staff,
Information Technology Services
Information Technology Services 2015 Annual Report The 2015 Information Technology Services Annual Report Key Performance Indicators (KPIs) and Highlights of the 2014-2015 Academic Year Information Technology
University of Maine System
University of Maine System November 2015 ThinkMissionExcellence.Maine.edu Table of Contents I. Introduction. 3 II. III. IV. Unified Online: Center of Excellence in Teaching and Learning 5 Recommendations
Fixed Scope Offering for Oracle Fusion HCM. Slide 1
Fixed Scope Offering for Oracle Fusion HCM Slide 1 Today s Business Challenges Adopt leading Global HCM practices. Streamline the HCM processes and achieve measurable efficiencies. Achieve HR excellence
Planning Process and Methodology
Executive Summary Our mission is to provide students and staff with technology to meet their instructional and administrative needs. This incorporates all aspects of technology including networking, end
THE FUNDAMENTALS OF PROJECT MANAGEMENT
THE FUNDAMENTALS OF PROJECT MANAGEMENT Learning the Essential Elements for Effective Management at UW-Stout WHAT IS A PROJECT? 1. Improve the efficiency of a specific production line. 2. Organize the annual
Hamilton Campus. Information Technology Strategic Project Plan
Hamilton Campus Information Technology Strategic Project Plan July 2007 Revised: June 2009 C:\Users\lipnicje\Documents\Documents\MUH IT SP\MUHITSP_final.doc 12/19/12 Page: 1 Table of Contents Executive
HR Service Delivery: Campus Initiatives
HR Service Delivery: Campus Initiatives David Odato, UCSF Jeannine Raymond, UCB Ramona Agrela, UCI Karen Hull, UCD Facilitated by: Scott Bolman, Mercer University of California Human Resources December
University Libraries Strategic Plan FY 2015 2017 Proposed FY2015 Actions
University Libraries Strategic Plan FY 2015 2017 Proposed FY2015 Actions These goals are to be completed during the 2015 2017 time period. Each goal is assigned to the administrator responsible for overseeing
Assessment PLANS. An effective assessment plan includes several important characteristics:
Assessment PLANS What is an assessment plan? An assessment plan is a document that outlines the student learning outcomes (for academic programs) or unit outcomes (for support units), the direct and indirect
Summary of Critical Success Factors, Action Items and Performance Measures
Summary of Critical Success Factors, Action Items and Performance Measures Goals Critical Success Factors Performance Measures Action Items 1) Acquisition decisions are informed by and 1) Proportion of
Project Scope Statement
Project Scope Statement Project Name: Going Digital Department: Information Technology Department/Operations Department Project Manager: Colby Clark, Director of Information Technology Date: January 17,
Information Technology Services
Information Technology Services Preliminary 2011 13 Initiatives and Priorities Information Technology Initiatives at a Glance In Support of: Data Integrity and Security Acquire funding to support an institutional
Human Capital Update
Finance & Administration Committee Information Item IV-A July 10, 2014 Human Capital Update Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number:
Department of Finance & Management Strategic Plan V.3.3
Department of Finance & Management Strategic Plan V.3.3 Planning Period: 2012 2015 Table of Contents Message from the Commissioner... 3 Department Overview... 4 Department Strategic Planning Process...
ENGINEER - DEVELOPER ADVANCED HT ML - CSS - JAVASCRIPT. 28 years old - 7 years of experience
A0243 ENGINEER - DEVELOPER ADVANCED HT ML - CSS - JAVASCRIPT 28 years old - 7 years of experience Business expert ise: Languages: Software editors, Healthcare, E- commerce Romanian (Native speaker), English
Unit Specific Questions Administrative
Unit Specific Questions Administrative Name of individual completing this report: Charles D. Warner E-mail address of individual completing this report: [email protected] Goals and Mission 1. How are
How To Implement An Enterprise Resource Planning Program
ERP Implementation Program Key phases of ERP implementation: Analysis of the company existing or designing new business process descriptions Inventory of the company s existing formal workflows or designing
Practical Cost Savings Strategies
Practical Cost Savings Strategies Eileen G. McLoughlin, Assistant Vice President of Finance and Budgeting Kelli Perry, Assistant Vice President for Finance and Controller Ron Moraski, Director of Procurement
Information Services and Technology Operational Plan for FY2012
Information Services and Technology Operational Plan for FY2012 Message from the Head of IS&T FY2011 was a productive year for IS&T. We began implementing the first year of our three year strategic plan
Application of Standard Project Management Processes in Fiber Optic Cable Plant Project Management. Introduction. Alfred Sankara, DigiBridge TelCo
Application of Standard Project Management Processes in Fiber Optic Cable Plant Project Management Alfred Sankara, DigiBridge TelCo Introduction The Project Management Institute (PMI) is the world's leading
UNIVERSITY OF WISCONSIN SYSTEM INFORMATION TECHNOLOGY SUMMARY FISCAL YEAR 2015
UNIVERSITY OF WISCONSIN SYSTEM INFORMATION TECHNOLOGY SUMMARY FISCAL YEAR 2015 This page intentionally left blank. UW System IT Summary FY 2015 Page 2 CONTENTS INTRODUCTION... 5 GENERAL IT SERVICES...
CORPORATE PROFILE www.erbrains.com [email protected]
CORPORATE PROFILE About US ERBrains IT Solutions Pvt Ltd., is an independent IT consulting firm based in Bangalore India, that provides ERP Services, software development, project management, packaged
Action Project 11. Project Detail
Action Project 11 Title: "Ready, Set, College!" - GED Transition Program Version: 1 Institution: Blackhawk Technical College Status: Active Submitted: 2014-08-06 Category: 2 - Meeting Student and Other
DIANNA SADLOUSKOS BACKGROUNDER www.sadlouskos.com EXPERIENCE
EXPERIENCE SADLOUSKOS CONSULTING SERVICES March 2006 to present FOUNDER, PRINCIPAL CONSULTANT Dianna Sadlouskos is a management consultant with twenty years experience supporting higher education institutions
Case Study: Drager acquires GasSecure for $61 million
Case Study: Drager acquires GasSecure for $61 Colleen Kennedy Analyst Energy and Infrastructure 5/10/2016 Gas leak detection market set for disruption Existing Gas Detection Systems Existing gas detectors
The ITS Project Management Framework
The ITS Project Management Framework Information Technology Services Project Management Framework v1.0 1 Table of Contents Introduction 3 Why Create a Project Management Framework? 4 Projects versus Operational
STAFF. Summary of Results. 13638_University of Minnesota Crookston_STAFF. HumanResources. Office of
Summary of Results 13638_University of Minnesota Crookston_STAFF 1 Survey Administration Summary When October 13 31, 2014 What Separate faculty and staff surveys 36 scored questions in each survey Assess
HR Transformation Update. HR Community Town Hall June 18, 2013
HR Transformation Update HR Community Town Hall June 18, 2013 1 Today s agenda Review HR Transformation initiative Discuss results of HR Online Survey Review guiding principles and HR Vision Share leading
SMB Update on Service Information Gathering
SMB Update on Service Information Gathering Overview SMB governance framework overview 3 In 2015, SMB proposed this initial (probably annual) governance process. Provide roadmaps for service sets Evolve
Technology Services Strategic Direction
Technology Services Strategic Direction 2014-2016 Update If we are not serving the student directly, we are serving someone who is Who we are: Technology Services currently reports to the Vice Chancellor
Cost Benefit Analysis for Network Edge and Infrastructure Upgrade
Cost Benefit Analysis for Network Edge and Infrastructure Upgrade October 2000 Doc #/Location This document was prepared by: David P. Huchette, Senior Manager KPMG Consulting, LLC Higher Education Consulting
MULTI - PHASED, STRATEGIC APPROACH ENHANCES COMMUNICATIONS
CASE STUDY HEAVY EQUIPMENT RENTAL COMPANY MULTI - PHASED, STRATEGIC APPROACH ENHANCES COMMUNICATIONS The challenge? Deploy a cost effective, easy-to-use Unified Communications (UC) phone solution that
Admissions Marketing Plan Assessments
Admissions Marketing Plan Assessments Mission: Supporting undergraduate and graduate enrollment. Goals: 1. Create a unified Institutional social media presence 2. Reach and engage prospective students
NANUET UFSD Instructional Technology Plan - Annually - 2015
LEA Information A. LEA Information 1. What is the total student enrollment based on the most recent BEDS Day submission? 2. 2,209 What is the student enrollment by grade band based on the latest BEDS Day
Information Technology Strategic Plan 2013 9/23/2013
Information Technology Strategic Plan 2013 9/23/2013 Unit Mission Statement: Information Technology Shared Services is dedicated to providing unparalleled service and support to the UC Davis College of
Technology/Smart Schools Investment Plan 2016-2019
Technology/Smart Schools Investment Plan 2016-2019 Important Contributors Carol Eckl - DDC Alex Spada - Director of Technology Audrey Varney - Business Manager The Technology Committee (~20 Staff Members,
1. Project Charter. Sheri Kellogg. Phyllis Short. Project Title: PeopleSoft CSS / HCM Split Description:
1. Stakeholder Name Cecilia Castellano Chris Cox Laura Emch Andy Grant Sheri Kellogg Chastity McCartney Beth Ann Rife Phyllis Short Michelle Simmons Brian Skelding Sharon Swartz Department Admissions Registrar
The Business Case for D om aink ey s I d ent ified M ail Andy Spillane V ic e P r es ident, Y ah o o! M February 13, 2006 ail 1 Fighting Spam & Email Abuse R eq uir es a M ulti-fac eted Appr o ac h DomainKeys
2013 2015 Technology Plan
Hopkins Public Schools Independent School District 270 Hopkins, Minnesota ORGANIZATION INFORMATION District/Agency/School HOPKINS PUBLIC SCHOOLS (legal name): District Number: 270 IDENTIFIED OFFICIAL WITH
Division/Unit/Department: Information Technology Plan 2012-2017
Administrative Plan - 1 Division/Unit/Department: Information Plan 2012-2017 I. Introduction State your administrative department/unit/division mission statement. The Information Division's mission is
The University of Alabama at Birmingham. Information Technology. Strategic Plan 2011 2013
The University of Alabama at Birmingham Information Technology Strategic Plan 2011 2013 Table of Contents Message from the Vice President... 3 About UAB... 4 About UAB Information Technology Meeting needs
MONTGOMERY COLLEGE INFORMATION TECHNOLOGY STRATEGIC PLAN FY 2012-2014
MONTGOMERY COLLEGE INFORMATION TECHNOLOGY STRATEGIC PLAN FY 2012-2014 Strategic Planning Requests December 23, 2010 INFORMATION TECHNOLOGY STRATEGIC PLAN TABLE OF CONTENTS EXECUTIVE SUMMARY 3 INFORMATION
Chancellor s Workgroup: Fund the Vision
Chancellor s Workgroup: Fund the Vision Sharon Boyd AVC, Business Services Dr. Rob Burrus Dean, Cameron School of Business Dr. Carrie Clements Professor, Dept. of Psychology Dr. Jennifer Horan Associate
Mt. San Antonio College. Information Technology Report Card. EDUCAUSE: 2013 Top 10 IT Issues
Mt. San Antonio College Information Technology Report Card EDUCAUSE: 2013 Top 10 EDUCAUSE releases an annual list of the top 10 issues affecting higher education institutions. The 2013 list emphasizes
CARLETON UNIVERSITY POSITION DESCRIPTION. Position Title: Manager, HR Systems Position No.: 298879. Approved by:
CARLETON UNIVERSITY POSITION DESCRIPTION Position Title: Manager, HR Systems Position No.: 298879 Reports to: Department: Assistant Director HR, Talent Programs Human Resources Approved by: (Incumbent/Date)
Informix Product St rat egy and Roadmap Dat a, Cloud, Analyt ics, Int ernet of Things
Informix Product St rat egy and Roadmap Dat a, Cloud, Analyt ics, Int ernet of Things Lalitha Krishnamoorthy Program Director, IBM Inf ormix Development Email: [email protected] Agenda IBM St rat egy IBM