Scheduling of Jobs and Maintenance Activities on Parallel Machines
|
|
|
- Janis Fitzgerald
- 9 years ago
- Views:
Transcription
1 Scheduling of Job and Maintenance Activitie on Parallel Machine Chung-Yee Lee* Department of Indutrial Engineering Texa A&M Univerity College Station, TX Zhi-Long Chen** Department of Sytem Engineering Univerity of Pennylvania Philadelphia, PA September 1998 (Accepted by Naval Reearch Logitic) *Supported in part by NSF Grant DMI **Supported in part by the Univerity of Pennylvania Reearch Foundation
2 ABSTRACT Mot machine cheduling model aume that the machine are available all the time. However, in many realitic ituation, machine need to be maintained and hence may become unavailable during a certain period. In thi paper, we tudy the problem of proceing a et of ob on parallel machine in which each machine mut be maintained once in the planning horizon. Our obective i to chedule ob and maintenance activitie o that total weighted completion time of ob i minimized. Two cae are tudied in thi paper. In the firt cae, there i a ufficient amount of reource and hence different machine can be maintained imultaneouly if neceary. In the econd cae, only one machine can be maintained at any given time. In thi paper, we firt how that, even when all the ob have the ame weight, both cae of the problem are NP-hard. We then propoe branch and bound algorithm baed on the column generation approach for olving both cae of the problem. The algorithm are capable of olving optimally medium ized problem within a reaonable computational time. 1
3 1. Introduction The maority of machine cheduling literature aume that the machine are available for proceing ob all the time in the planning horizon. However, in many manufacturing ituation, machine are maintained periodically to prevent malfunction from happening. During a maintenance period, a machine i not available for proceing any ob. Therefore, a more realitic cheduling model hould take into account aociated machine maintenance activitie. The chedule of maintenance activitie can be determined either before the chedule of ob, or ointly with the chedule of ob. In the firt cae, maintenance period are already known and fixed at the time when ob are to be cheduled. The problem of cheduling ob with thi type of maintenance reduce to the problem often referred in the literature a cheduling with machine availability contraint becaue during maintenance period the machine i not available for proceing ob. Schmidt (1984, 1988) tudie a parallel machine problem where each machine ha different availability interval. Adiri et al. (1989) and Lee and Liman (1992) tudy a ingle machine problem with a machine availability contraint. Lee (1991) tudie a parallelmachine problem where machine are available tarting from different time. Lee and Liman (1993) conider a two-parallel-machine problem where one machine ha an availability contraint. Moheiov (1994) tudie the ame problem by auming that each machine i available in an interval. Lee (1996, 1997) conider cheduling problem with availability contraint under different machine configuration and performance meaure. Note that all thee reult aume that the machine unavailability i known and fixed in advance. In our experience with indutry application, epecially in emiconductor manufacturing, it i often oberved that a machine i idle, yet ob are waiting and the machine i not broken down but waiting for maintenance peronnel to come do preventive maintenance. Thi i due to lack of coordination between production planning peronnel and maintenance peronnel. Obviouly, a careful coordination between maintenance and ob proceing will turn out a better overall chedule. Hence the cheduling problem to be tudied in thi paper i to determine imultaneouly when to 2
4 perform each maintenance activity and when to proce each ob o that a certain performance meaure i optimized. Little reearch ha been done in the literature for the model of ointly cheduling maintenance activitie and ob. Qi et al (1997) conider a problem where multiple maintenance activitie need to be cheduled ointly with ob on a ingle machine. Grave and Lee (1998) clarify the complexity of variou ingle machine problem with thi model. Lee and Leon (1997) tudy a ingle machine problem with thi model where proceing time of ob may change after a maintenance activity. Our experience with indutry alo how that preventive maintenance i uually performed within every precribed number of period. In ome planning horizon we may not have maintenance activity. However, after certain planning horizon, ome period have elaped, and one maintenance activity ha to be cheduled for each machine within the current planning horizon. In thi paper we tudy the problem in which the maintenance for each machine mut be completed within T period. More pecifically, we tudy the problem of ointly cheduling a et of n ob, N={1, 2,..., n}, and maintenance activitie on m identical parallel machine. Each machine mut be maintained exactly once with a contant maintenance length t during the given time interval [, T], where T t. Each ob ha a proceing time p and weight w. Our goal i to find a oint chedule of ob and maintenance activitie to minimize total weighted completion time of ob Σ N w C, where C i the completion time of ob in a chedule. We aume that the ob proceing i nonreumable, i.e. a ob mut be reproceed fully after the maintenance if it proceing i interrupted by the maintenance activity on a machine. We conider two cae of maintenance. In the firt cae, call it independent cae, there i a ufficient amount of maintenance reource uch that any number of machine can be maintained imultaneouly if neceary. In the econd cae, call it dependent cae, the amount of maintenance reource i limited o that only one machine can be maintained at any given time and hence the maintenance activity on one machine cannot be overlapped with that on another machine. In thi cae, we aume that T mt for otherwie there i imply no feaible chedule. Following the three-field notation of 3
5 Pinedo (1995), we denote the two correponding problem a, Pm ind w C and Pm dep w C, in the independent and dependent cae of maintenance, repectively, when the number of machine i fixed a m. The remainder of thi paper i organized a follow. In the next ection, we give ome baic propertie aociated with thee problem and analyze their computational complexity. More pecifically, we how that Pm ind C and Pm dep C, problem with equal weight, are NP-hard even though the correponding claical problem, the one without maintenance i polynomially olvable. Thi mean that our problem are more difficult than the claical counterpart without maintenance. Note that the claical total weighted completion time problem without maintenance, Pm w C, can be olved by a dynamic programming approach (Rothkopf 1966) with the time complexity O(nmP m-1 ), where P i the total proceing time of all the ob. However, it can be expected that an algorithm with uch high complexity can only olve problem with a mall ize. Belouadah and Pott (1995) ue a Lagrangian relaxation baed branch and bound algorithm to olve the problem Pm w C with up to 2 ob and 5 machine or 3 ob and 4 machine. By a column generation approach, van den Akker (1995) and Chen and Powell (1996) are able to olve thi ame problem with a much larger ize (1 ob and 2 machine). Chen and Powell (1998, 1999), demontrate that the column generation approach i very effective for olving many other parallel-machine cheduling problem. It can be hown that we can modify the dynamic programming approach by Rothkopf (1966) to olve our problem Pm ind w C and Pm dep w C. However, the time complexity will be even higher than O(nmP m-1 ). Clearly, uch an approach can only olve our problem with a very mall ize. Hence, in Section 3, we propoe optimal algorithm for the problem Pm ind w C and Pm dep w C by uing the column generation approach. Our computational reult in Section 4 demontrate that the column generation baed algorithm are capable of olving problem of medium ize to optimality within a reaonable computational time. Finally, we conclude the paper in Section 5. 4
6 2. Optimality Propertie and Complexity Analyi We firt give ome baic propertie of the problem Pm ind w C and Pm dep w C in Section 2.1. Then we analyze the complexity of Pm ind C and Pm dep C in Section Optimality Propertie In thi ection, we introduce ome propertie aociated with optimal chedule of the problem Pm ind w C and Pm dep w C. Thee propertie will be ued later to retrict the earch pace when we earch for optimal chedule for thee problem. For eae of preentation, we ay a et of ob are in their WSPT order if thee ob are equenced in the non-increaing order of the ratio w /p. Property 1: (1) For both problem Pm ind w C and Pm dep w C, there exit an optimal chedule uch that on each machine ob cheduled before the maintenance are in their WSPT order, and thoe cheduled after the maintenance are in their WSPT order a well. (2) For the problem Pm ind w C, there exit an optimal chedule uch that there i no idle time on each machine, and the maintenance tart at time zero or at the completion time of ome ob. Proof: By adacent pairwie interchange rule. We omit the detail of the proof. QED Note that for the problem Pm dep w C, in an optimal chedule, there may exit idle time between the completion time of a ob and the tarting time of the maintenance. Property 2: There exit an optimal chedule for the problem Pm ind w C uch that on each machine, (i) the lat ob cheduled before the maintenance i completed no later than the time R 1 = [P+(m-1)t-p max ]/m + p max (1) (ii) the lat ob cheduled after the maintenance i completed no later than the time R 2 = [P-p max ]/m + t + p max (2) 5
7 where P = N p and p max = max{p N}. Proof: (i) Conider it partial chedule on any machine k for a given optimal chedule. Let ob be the lat ob cheduled before the maintenance on machine k and let be the tarting time of ob. At time, any other machine i (i k) mut be buy (either proceing ob or doing maintenance). For otherwie, we hould have aigned ob to that machine. Hence by Property 1, we mut have m P - p + (m-1)t Thi implie that the completion time of will be C = + p [P + (m-1)t p ]/m + p R 1. (ii) A imilar proof can be ued to prove the relation (2). QED. Property 3: For the problem Pm dep w C, there i an optimal chedule uch that on each machine, (i) the lat ob cheduled before the maintenance i completed no later than R 3 = [P+(m-1)t+(m-2)p max ]/m + p max, (3) (ii) the lat ob cheduled after the maintenance i completed no later than R 4 = [P+(m-1)p max ]/m + t + p max (4) Proof: Firt note that in an optimal chedule if ome ob are cheduled after the maintenance on a machine, then on that machine the idle time immediately before the maintenance mut be le than p max. For otherwie, we can move a ob cheduled after the maintenance to the poition right before the maintenance to improve the chedule. (i) Let be the lat ob cheduled before the maintenance on a machine k in an optimal chedule and let be the tarting time of ob. At time, any other machine i (i k) mut not have idle time more than p. For otherwie, we hould have aigned ob to that machine. Hence we have m (P - p ) + (m-1)t + (m-1)p (P - p ) + (m-1)t + (m-1)p max Thi implie that the completion time of will be C [P + (m-1)t p +(m-1)p max ]/m + p R 3. (ii) The relation (4) can be proved imilarly. QED. 6
8 2.2. NP-hardne of Pm ind C and Pm dep C Note that the claical parallel-machine problem Pm C can be olved eaily by cheduling ob in the nondecreaing order of their proceing time. In thi ection, we how, however, that the problem Pm ind C and Pm dep C are NP-hard. Hence the problem with general weight Pm ind w C and Pm dep w C are NP-hard a well. The following Partition Problem, a well-known NP-hard problem, will be ued later in the NP-hardne proof. Partition Problem (PP): Given poitive integer a 1, a 2,..., a h, and A uch that 2A, the problem ak if there exit a ubet S H={1, 2,, h} uch that a A. Theorem 1: The problem Pm dep C i NP-hard. S = h a i i= 1 Proof: We prove it by a reduction from the Partition Problem. Given an intance of PP, we contruct the following intance for the problem Pm dep C : m=2 machine, n=h+1 ob, N=H {h+1}={1, 2,, h+1} proceing time: p =a, for H; and p h+1 =B, where B=2hA 2 maintenance length t = B maintenance for each machine mut be finihed before or at T=A + 2B obective function threhold y = 2B In the following we how that there i a chedule for the contructed intance of the problem Pm dep C with the total completion time no more than y if and only if there i a partition S H for the PP intance uch that a S = A. = Given a partition S H for the PP intance, we contruct a chedule a follow: Machine 1: chedule all the ob in et S, followed by the maintenance Machine 2: chedule all the ob in et H\S, then ob h+1, followed by the maintenance It i eay to check that thi chedule i feaible becaue the maintenance on the firt machine tart at time A and that on the econd machine tart at time A+B. The completion time of each ob in H i no more than A, and that of ob h+1 i A + B, o the total completion time i no more than ha + A + B < y. 7
9 Given a chedule with the total completion time no more than y, firt we can ee that no ob hould be cheduled after the maintenance on any machine becaue of the following reaon. Suppoe that there i ome ob cheduled after the maintenance on ome machine. There are two cae. If thi ob i from H, then it completion time i more than B. Since ob h+1 mut have a completion time no le than B, thi mean that the total completion time of all the ob i more than 2B=y. On the other hand, if the ob cheduled after the maintenance i ob h+1, then it completion time will be at leat 2B, which implie that the total completion time of all the ob mut be more than 2B=y. Furthermore, we can ee that in the given chedule no ob from H can be cheduled after ob h+1. Thi can be hown uing the ame argument a above. Without lo of generality, we aume that ob h+1 i proceed on machine 2. Thu the given chedule ha the following tructure: Machine 1: chedule a ubet of ob of H, denoted a S, followed by the maintenance Machine 2: chedule the ret of ob in H, H\S, then ob h+1, followed by the maintenance. Now uppoe that p S > A, then the maintenance on the firt machine will occupy the time interval [r, q] with r>a and q>a+b, which implie that the maintenance on the econd machine will not be feaible. On the other hand, if p S < A, then H \ S p > A, which alo implie that the maintenance on the econd machine will not be feaible. Therefore, p S = A, and hence there i a olution to the PP intance. QED. Problem. The following theorem can be proved imilarly by a reduction from the Partition Theorem 2: The problem Pm ind C i NP-hard. 3. Branch and Bound Algorithm for Pm ind w C and Pm dep w C In thi ection, we develop branch and bound algorithm baed on column generation for olving optimally thee problem. Our algorithm are baed on a imilar 8
10 approach propoed recently by Chen and Powell (1996) for olving other parallel machine cheduling problem. A we will how in Section 4, our algorithm can efficiently olve problem of medium ize. Column generation method ha been ued in the literature to olve large-cale combinatorial optimization problem, including vehicle routing (Derocher et al., 1992), cutting tock (Vance, et al., 1994), capacitated lot izing (Cattrye et al., 1993), and air crew cheduling (Lavoie et al., 1988). Recently, it ha been uccefully applied to olving large-cale cheduling problem, ee for example, van den Akker et al.(1995), and Chen and Powell (1996, 1998, 1999). Chan and Simchi- Levi (1998) provide error bound analyi of uing column generation for olving parallelmachine cheduling problem. Following the column generation approach, we will firt formulate in Section 3.1 the problem Pm ind w C and Pm dep w C a et partitioning type formulation. In thee formulation, there are an exponential number of column, each of which repreent a partial chedule on a ingle machine. Then branch and bound algorithm can be deigned to olve the et partitioning type formulation. In the branch and bound tree, each node i a linear relaxation of a et partitioning type problem. Thi linear relaxation problem i olved in Section 3.2 following the idea of the tandard column generation procedure (ee, e.g. Ladon 197) for large-cale linear programming problem. In thi procedure, neceary column are generated iteratively by olving ome ingle-machine cheduling problem uing peudo-polynomial dynamic programming algorithm. The olution of a branch and bound node i ued to quantify ome value aociated with individual ob and pair of ob. Branching procedure (decribed in Section 3.3) are baed on thee value Set Partitioning Type Formulation Clearly, to find an optimal chedule for the problem Pm ind w C, we only need to conider chedule atifying Propertie 1 and 2. Similarly, for the problem Pm dep w C, we only need to conider chedule atifying Propertie 1 and 3. Define a feaible partial chedule on a machine a a oint chedule of a ubet of ob and a maintenance activity where the maintenance i completed before or at the time 9
11 T. Let S k be the et of all feaible partial chedule on machine k, k {1, 2,..., m}, atifying Propertie 1 and 2 in the cae of Pm ind w C, and Propertie 1 and 3 in the cae of Pm dep w C. Let S = S 1 S 2... S m. For each S, we define, f = the total weighted completion time of the ob in the chedule, a = the number of time ob i covered in the chedule, c = the completion time of the maintenance in the chedule, x = 1 if the chedule i elected in the optimal olution and otherwie. Note that given a partial chedule S, the parameter f, a, and c are known. With the above defined notation, the two problem Pm ind w C and Pm dep w C can be formulated into the following et partitioning type program, denoted a [IND] and [DEP], repectively. [IND] Min f x.t. a x S S x S (5) = 1, N (6) = m (7) x = or 1, S (8) [DEP] Min f x c x S k + 1.t. a x S Sk x S (9) = 1, N (1) = 1, k = 1, 2,, m (11) c t, k = 1, 2,, m-1 (12) x S k x = or 1, S (13) In [IND], the obective (5) i to minimize the total weighted completion time of all the elected partial chedule. The contraint (6) enure that each ob i covered exactly once. The contraint (7) guarantee that exactly m partial chedule are elected ince we have m machine. In [DEP], the obective (9) and the firt contraint (1) have the ame meaning a (5) and (6) in [IND], repectively. The contraint (11) mean that 1
12 exactly one partial chedule i elected for each machine. Thi contraint i different from (7). In (7), we do not ditinguih different machine becaue the machine in the problem Pm ind w C are mutually independent and really identical and hence S 1 =S 2 =...=S m. On the contrary, the machine in the problem Pm dep w C are mutually dependent and not identical in term of maintenance cheduling. Without lo of generality, we aume that the machine are maintained following the order (1, 2,..., m). The contraint (12) enure that the maintenance activitie on different machine are not overlapped. Without (7), the formulation [IND] would be a et partitioning problem. Similarly, the formulation [DEP] would be a et partitioning problem without (12). So we call thee formulation et partitioning type formulation (with ide contraint). Note that each column in thee formulation repreent a chedule on a ingle machine and the number of column in thee formulation could be extremely large a the et S contain an exponential number of chedule. Thu it i not practical to olve thee formulation directly uing traditional branch and bound cheme. In the following ection, we develop nontraditional branch and bound algorithm to olve thee formulation Column Generation Approach Relaxing the contraint (8) and (13) by allowing x to take any value in the interval [, 1], we get the linear relaxation problem, denoted by [LIND] and [LDEP], repectively, of the et partitioning type formulation [IND] and [DEP]. In our branch and bound algorithm, each branch and bound node i a linear relaxation problem [LIND] or [LDEP] with additional contraint impoed by branching rule. We will dicu branching rule in Section General Framework To olve [LIND] and [LDEP], we ue the idea of the tandard column generation procedure (Ladon 197) for large cale linear programming problem. Thi procedure tart with a limited number of column in [LIND] or [LDEP] and generate neceary column iteratively. In each iteration, we firt olve the retricted verion of the problem [LIND] or [LDEP] (called retricted mater problem) with the column generated o far. 11
13 Then we generate column with mot negative reduced cot by olving one or more ingle-machine cheduling problem (called ingle-machine ubproblem) that are cloely related to the underlying parallel machine problem. Newly generated column are then added to the retricted mater problem which i then updated. When no new column with negative reduced cot can be found, the procedure terminate and the problem [LIND] or [LDEP] i olved In the column generation procedure, retricted mater problem are linear programming problem and can be olved very efficiently. Our computational experience ha hown that ingle-machine ubproblem uually conume much more computational time than retricted mater problem. Thu it i crucial to find an efficient algorithm for olving ubproblem. In [LIND], let the dual variable value be π for index in (6), and σ for (7). Similarly, in [LDEP], let the dual variable value be π for index in (1), σ k for index k in (11), and ρ k for index k in (12). Then the reduced cot r of the column correponding to a chedule S in [LIND] i given by the following formula (14), and that of the column correponding to a chedule S i in [LDEP] i given by the following formula (15). r = f - a π - σ (14) N r = f - N f - N f - N a π + c ρ1 - σ i, if i=1 a π - c ρ i 1 + c ρ i - a π - c ρ m 1 - σ i, if i=m σ i, if 1<i<m (15) There i only one ingle-machine ubproblem involved in the column generation procedure for [LIND], that i to find a chedule S with the mot negative reduced cot r defined by (14). More preciely, thi ubproblem i to elect a ubet of ob and find a oint chedule of thee elected ob and a maintenance activity on one machine uch that the maintenance i completed no later than T and the total weighted completion time of 12
14 thee elected ob (i.e. the quantity f ) minu the total dual variable value of thee elected ob (i.e. the quantity aπ N in (14) becaue it i identical for all chedule in S. ) i minimized. Here we can ignore the third term For [LDEP], there are m ingle-machine ubproblem involved, one correponding to each machine. The ith ubproblem correponding to machine i i to find a chedule S i on machine i with the mot negative reduced cot r defined by (15). Thi ubproblem i imilar to the one involved in [LIND] except that one more quantity (given by a linear function of the completion time of the maintenance c ) i involved in the obective function Solving the Subproblem Involved in [LIND] Without the maintenance activity, thi ubproblem would be equivalent to the ubproblem involved in the column generation procedure for the claical problem P m w C tudied in Chen and Powell (1996). They howed the NP-hardne of their ubproblem. Thu, the ubproblem aociated with [LIND] i alo NP-hard. In order to find an effective algorithm to olve thi ubproblem, we need to modify it in a way that it can be more tractable while the optimality of the integer problem [IND] i not affected by thi modification. In any chedule in the original et S, a ob can be covered at mot once, either before the maintenance or after the maintenance. We relax thi retriction and allow a ob to be covered both before and after the maintenance on a machine. We firt re-index ob in N in the WSPT order, and denote the maintenance on a given machine a ob n+1. For notational convenience, we denote N(1) = N = {1, 2,..., n}. Then we create another n ob, indexed a n+2,, 2n+1, uch that ob n++1 i identical to ob, i.e. p n++1 =p, w n++1 =w, and π n++1 =π, for =1, 2,, n. Denote N(2) ={ n+2,, 2n+1}. We precribe that on any machine, ob from N(1) can only be cheduled before the maintenance (i.e. ob n+1), and ob from N(2) can only be cheduled after the maintenance. Now we conider the modified ubproblem of finding a ubet of ob from N(1) to be cheduled in the ame order a their indice before the maintenance and a ubet of ob from N(2) to be cheduled in the ame order a their 13
15 indice after the maintenance uch that (i) the maintenance i completed no later than time T, and (ii) the total weighted completion time of thee ob minu the total dual variable value of thee ob i minimized. It i eay to ee that the olution pace of thi modified ubproblem contain the et S. Given a chedule to thi problem, if, for each =1, 2,, n, at mot one of the ob and n++1 i covered, then thi chedule i feaible to the original ubproblem. For each ob {1, 2,, 2n+1}, we denote B a the et of ob that can be cheduled immediately before ob in an optimal chedule to the modified ubproblem, that i, B ={1, 2,, -1} for N(1) {n+1}, and B ={n+1, n+2,, -1} for N(2). Note that in our branch and bound algorithm, ome B may be changed by branching procedure. In the following, we give a peudo-polynomial dynamic programming algorithm for optimally olving thi modified ubproblem. DP Algorithm 1 Define R 1 and R 2 by (1) and (2). Define F(, x) a the minimum reduced cot of a partial chedule of the modified ubproblem, containing a ubet of ob {1, 2,, }, where (i) ob i the current lat ob and completed at time x, and (ii) if n+2, then the maintenance (i.e. ob n+1) i already covered and completed before or at time T. Initial condition: F(, ) = -σ ; F(, x) = for all x ; and F(n+1, x) = for all x>t. Recurive relation: For = 1, 2,, n; x =, 1,..., R 1, F(, x) min{ F( k, x p ) + w x π k B {}} = For = n+1; x =,..., R 2, F(, x) min{ F( k, x t) k B {}} = For = n+2,,2n+1; x =, 1,..., R 2, F(, x) = min{ F( k, x p ) + w x π k B } 14
16 Optimal olution: min{f(, x) = n+1,..., 2n+1; x =, 1,..., R 2 }. Jutification: By principle of optimality. Time complexity: O(n 2 R 2 ). Thi i becaue in the DP, there are a total of O(nR 2 ) tate and the value of each tate i calculated in O(n) time. We note that in our branch and bound algorithm, branching rule (ee detail in Section 3.3) may impoe retriction on which ob can be cheduled immediately before a given ob before the maintenance or after the maintenance, which i equivalent to updating the et B or B n++1. Clearly, Algorithm 1 till work after B are updated becaue we have explicitly incorporated B into the algorithm. Alo note that if both ob and n++1 are covered in an optimal chedule of the modified ubproblem of [LIND], the parameter a (ued in the formulation [LIND]) i 2, and thu by the contraint (6) it i guaranteed that thi chedule will not be elected a part of the optimal chedule for the original integer problem [IND]. However, in the olution of the linear relaxation problem [LIND], the value of x may be poitive Solving the Subproblem Involved in [LDEP] Clearly, each ubproblem involved in [LDEP] i at leat a hard a the one involved in [LIND] and hence i NP-hard. In order to olve a given ubproblem of [LDEP] efficiently, we modify the problem exactly the ame way a what we have done for the ubproblem of [LIND] in Section We ue the ame notation a in Section The following algorithm olve the modified ubproblem of the ith ubproblem of [LDEP] correponding to machine i. DP Algorithm 2 Define P, and B imilarly to the repective one in Algorithm 1. Define R 3 and R 4 by (3) and (4). Define F(, x) a the minimum reduced cot of a partial chedule of the modified ubproblem of machine i, containing a ubet of ob {1, 2,, }, where (i) ob i the 15
17 current lat ob and completed at time x, and (ii) if n+2, then the maintenance (i.e. ob n+1) i already covered and completed before or at time T. Initial condition: F(, ) = -σ i ; F(, x) = for all x ; and F(n+1, x) = for all x>t. Recurive relation: For = 1, 2,, n; x=, 1,, R 3, F(, x) min{ F( k, x p ) + w x π k B {}} = For = n+1; x=, 1,, T, F(, x) min{ F( k, y) + g( i) x y min( x t, R3 ) ; k B {}} = where ρ i if i = 1 g(i) = ρ i -ρ i-1 if 1<i<m -ρ m-1 if i= m For = n+2, n+3,, 2n+1; x =, 1,, R 4, F(, x) = min{ F( k, x p ) + w x π k B } Optimal olution: min{ F( n + 1, x) x =,1,..., T} min min{ F(, x) = n + 2,...,2n + 1; x =,1,..., Time complexity: O(n 2 R 4 +nr 3 T). Thi i becaue in the DP, there are a total of O(nR 4 ) tate (, x) with n+1, the value of each calculated in O(n) time, and O(T) tate, the value of each calculated in O(nR 3 ) time. Jutification: By principle of optimality. We note that, imilar to Algorithm 1, Algorithm 2 may generate chedule where both ob and n++1 are covered. In thi cae, the parameter a (ued in the formulation [LDEP]) i 2. The contraint (1) guarantee that uch a chedule will not be elected in the optimal olution of the integer problem [DEP]. R 4 } 16
18 3.3. Branching Strategie In the branch and bound algorithm, each node in the branch and bound tree i a linear relaxation problem, [LIND] or [LDEP], with additional contraint impoed by branching rule. The linear relaxation problem i olved uing the column generation approach propoed in Section 3.2. The olution of uch a problem i ued to meaure the percentage of each ob covered in the olution, and quantify ordering relation of ob. Then branching procedure are performed baed on thee value. Given the olution of a branch and bound node, x for S, we define the value of ordering relation, λ k for each ob pair (k, ), for k B, and N(1) N(2), a follow: λ k = S b (16) k x where b k i 1 if in the chedule ob k i cheduled immediately before ob, and otherwie. Roughly peaking, the bigger the value λ k, the tronger the ordering relation of the ob pair (k, ). Similarly, we define the value of coverage, v for each ob N(1) N(2) a follow: v = λ k (17) k B Since the formulation [LIND] and [LDEP] guarantee that each ob i covered exactly once in any olution, thu it mut hold that v +v n++1 =1 for each N. Alo it i eay to ee that λ k [, 1] for each ob pair (k, ), for k B, and N(1) N(2). Given the olution to a branch and bound node, we only need to conider the following three cae where branching procedure may be performed. Cae 1: The olution i fractional, the integer part of it obective value i le than that of the bet integer olution generated o far, and ome of the v are fractional. In thi cae, we branch down thi node a follow. We firt chooe a ob N(1) N(2) with the value v cloet to.5. Then we create two child node (called Child 1 and Child 2), i.e. two new [LIND] (or [LDEP]) problem, uch that the olution of Child 1 will reult in v =1 and that of Child 2 will reult in v =. Note that, if N(1), then ob i forced to be 17
19 cheduled before maintenance in Child 1 and after maintenance in Child 2. Similarly, if N(2), then ob k (with k=-n-1) i forced o. Thi can be accomplihed by the following procedure. For Child 1, (1) Suppoe that ob h i identical to ob, i.e. h=n++1, if n, and =n+h+1, if n+2. Then ob h cannot be included in the olution of Child 1. Update B k :=B k \{h}, for each k N(1) N(2), and do not conider ob h in the algorithm for ubproblem. (2) Form the initial retricted mater problem [LIND] (or [LDEP]) of Child 1 by electing all the column already generated in the parent node except the one that contain ob h. For Child 2, we perform the ame procedure except that everything done to ob h in the cae of Child 1 i now done to ob intead. Cae 2: The olution i fractional, the integer part of it obective value i le than that of the bet integer olution generated o far, all the v are integral, but ome of the λ k are fractional. In thi cae, we branch down thi node a follow. We firt chooe a pair of ob (k, ) with k B, and N(1) N(2) uch that the value λ k i cloet to.5. Then we create two child node, Child 1 and Child 2, uch that the olution of Child 1 will reult in λ k =1 and that of Child 2 will reult in λ k =. Note that, in Child 1, ob k i forced to be cheduled immediately before ob, while in Child 2, ob k i prohibited to be cheduled immediately before ob. To thi end, we perform the following procedure. For Child 1, (1) Suppoe that ob l and h are identical to ob k and, repectively. Then ob l and h cannot be included in the olution of Child 1. Update B k :=B k \{l, h}, for each k N(1) N(2), and do not conider ob l and h in the algorithm for ubproblem. Alo, we need to make ure that in the olution of Child 1, λ ku = for all u, and λ q = for all q k. Thi can be achieved by updating B u :=B u \{k}, for all u, and B :={k}. (2) Form the initial retricted mater problem [LIND] (or [LDEP]) of Child 1 by electing all the column already generated in the parent node except the one that contain the ob l, or ob h, or any pair of ob (k, u) with u, or (q, ) with q k. 18
20 For Child 2, we imply update B :=B \{k} and elect all the column in the parent node except the one that contain the ob pair (k, ) a the initial column in the retricted mater problem. Cae 3: The olution i fractional, the integer part of it obective value i le than that of the bet integer olution generated o far, and all the v and λ k are integral. We claim that thi cae will not happen to the problem [LIND], which can be proved following directly the proof given in Chen and Powell (1996) for a imilar claim for another parallel machine cheduling problem. However, for the problem [LDEP], thi cae could happen in theory. For example, if, in the formulation, there are two column covering the ame et of ob but with different completion time of maintenance, then it i poible that both column are with fractional value in the olution. In our computational experiment, however, thi cae never happened. In other word, in every problem we teted for the problem Pm dep w C, if all the v and λ k are integral in a branch and bound node, then the olution of thi node x are all integral. The reaon why thi did not happen in computation i probably due to the fact that only good column are generated in the dynamic programming algorithm. It i worth noting that one difference of [LIND] and [LDEP] i that in the earlier problem there i no idle time before the maintenance while there may be ome idle time before maintenance in the latter problem. Thu, in the problem [LIND], different column mut cover different et of ob, while in [LDEP], two column could cover the ame et of ob (but with different completion time of maintenance). We note that, if thi cae doe happen, we can branch on completion time of ob and maintenance activitie. Denote C a the completion time of ob N(1) {n+1} N(2) in a given chedule S. Given the olution of a branch and bound node, x for S, we define the completion time of ob correponding to thi olution a C = S x C. It i eay to how that when thi cae happen, there mut exit ome ob or/and maintenance activitie with fractional C. We can elect one fractional C and branch on it by creating two child node, one requiring that in it olution the completion time of mut be greater than or equal to C, and the other requiring that mut be le 19
21 than or equal to C, where the notation z i the leat integer greater than or equal to z, and z i the larget integer le than or equal to z. Thee retriction can be eaily incorporated into Algorithm Computational Reult In thi ection, we report computational reult of the branch and bound algorithm developed in Section 3 for the problem Pm ind w C and Pm dep w C. All the algorithm involved are coded in C and teted on a Sun Ultra 1 worktation (164 MHZ). Linear programming problem involved in the column generation approach are olved by CPLEX Verion 5.. To generate a tet problem, there are ix parameter to be determined: number of ob n, number of machine m, proceing time p, weight p, maintenance length t, and the maintenance deadline T by which all maintenance activitie mut be finihed. The firt four parameter are generated independent of one another a follow: (1) Three cae for the number of ob, n {2, 3, 4}. (2) Four cae for the number of machine, m {2, 4, 6, 8}. (3) Two cae for proceing time, p =U[1, 1], or p =U[1, 3], where U[x, y] i an integer uniformly drawn from the interval [x, y]. (4) One cae for weight, w =U[1, 1]. The parameter t and T are generated baed on n, m, and p. In a tet problem, denote the average proceing time of a ob a p avg =( p )/n, and the average total N proceing time on a machine a P avg =( p )/m. Then t and T are generated a follow: N (5) Three cae for the maintenance length, t=αp avg, where the parameter α {1, 2, 4}. (6) Three cae for the maintenance deadline, T=βP avg +t, for the problem Pm ind w C, and T=βP avg +mt, for the problem Pm dep w C, where the parameter β {.2,.4,.8}. 2
22 We note that t and T generated thi way atify the baic feaibility requirement: T t for Pm ind w C, and T mt for Pm dep w C. The parameter α control the maintenance length t, and β control the maintenance deadline T. Our computational experiment how that for fixed n, m, p, w, and α, the cpu time required for olving a tet problem doe not vary much with the parameter β. Thu we will not report tet reult directly baed on the parameter β. Table 1 and 2 how the tet reult for the problem Pm ind w C where proceing time of ob drawn uniformly from the interval [1, 3] and [1, 1], repectively. Table 3 and 4 how the tet reult for the problem Pm dep w C with the ame cae of proceing time, repectively. For each given combination of n, m, and α, a total of thirty tet problem, ten for each of the three cae of β, are generated and olved. In thee table, each row ummarize the computational reult baed on the thirty tet problem olved. The performance meaure hown in thee table are a follow. Column (4) and (5) are, repectively, the average gap and the maximum gap in percentage between the linear relaxation olution value of the root node in the branch and bound tree and the optimal integer olution value. Thi percentage reflect the tightne of the lower bound obtained by olving the linear relaxation of the original integer problem. Column (6) i the number of problem out of the thirty tet problem olved at the root node without any branching. Column (7) and (8) repreent, repectively, the average number and the maximum number of node explored in the branch and bound tree for olving the problem. Note that at leat one node (the root node) mut be explored to olve any problem. Column (9) and (1) repreent, repectively, the average and the maximum cpu time in econd conumed to olve the problem to optimality. From thee table, we can make the following obervation: (1) The integrality gap i extremely mall. Every problem teted ha an integrality gap within 1%. Due to thi, few node need to be explored in the branch and bound tree, and many tet problem are olved at the root node without any branching. Thi reult i conitent with the reult obtained by van den Akker (1995), and Chen and Powell 21
23 (1996, 1998, 1999) in olving other parallel-machine cheduling problem uing the column generation approach. (2) When n and α are fixed, a problem with a larger m can uually be olved fater than a problem with a maller m. Thi reult i alo conitent with thoe obtained in van den Akker (1995), and Chen and Powell (1996, 1998, 1999). Thi reult i probably caued by the fact that, for fixed n, if m i maller, then an ideal partial chedule on a machine hould contain more ob, and hence there are more poible ideal partial chedule and more column may have to be generated in the coure of the column generation, which thu take more time. (3) Our algorithm are capable of olving both problem Pm ind w C and Pm dep w C with 4 ob and any number of machine within a reaonable amount of cpu time. The algorithm are very promiing, particularly, for problem with the ratio n/m no more than Concluion We have analyzed the complexity of the problem Pm ind w C and Pm dep w C and propoed branch and bound exact olution algorithm for olving thee problem to optimality. The computational reult have demontrated that the algorithm are capable of olving problem of medium ize. An intereting topic for future reearch i to invetigate other parallel machine cheduling problem with maintenance activitie, for example, problem with due date related obective function. 22
24 Reference Adiri, I., J. Bruno, E. Frotig, and A.H.G. Rinnooy Kan, Single Machine Flow-Time Scheduling with a Single Breakdown, Acta Informatica, 26 (1989), Belouadah, H., and C. N. Pott, Scheduling Identical Parallel Machine to Minimize Total Weighted Completion Time, Dicrete Applied Mathematic, 48 (1995), Cattrye, D., M. Salomon, R. Kuik, and L.N. Van Waenhove, A Dual Acent and Column Generation Heuritic for the Dicrete Lot Sizing and Scheduling Problem with Setup Time, Management Science, 39 (1993), Chan, L.M.A., P. Kaminky, A. Muriel, and D. Simchi-Levi. Machine Scheduling, Linear Programming, and Parameter Lit Scheduling Heuritic, Operation Reearch, 46 (1998), Chen, Z.-L. and W.B. Powell, Solving Parallel Machine Scheduling Problem by Column Generation, To Appear in INFORMS Journal on Computing, Chen, Z.-L. and W.B. Powell, A Column Generation Baed decompoition Algorithm for a Parallel Machine Scheduling Jut-In-Time Scheduling Problem, European Journal of Operational Reearch, 116 (1999), Chen, Z.-L. and W.B. Powell, Network Repreentation, Column Generation and Branch and Bound for Parallel Machine Scheding with Multiple Job Familie, Working Paper 98-2, Department of Sytem Engineering, Univerity of Pennylvania, Philadelphia, PA , Derocher, M., Derocher, M., J. Deroier, and M. Solomon, A New Optimization Algorithm for the Vehicle Routing Problem with Time Window, Operation Reearch, 4 (1992), Garey, M.R. and D.S. Johnon, Computer and Intractability: A Guide to the Theory of NP-Completene. (1979), W.H. Freeman and Company, New York. Grave, G.H. and C.-Y. Lee, Scheduling Maintenance and Semireumable Job on a Single Machine, (1998), Working Paper, Department of Indutrial Engineering, Texa A&M Univerity, College Station, TX Ladon, L.S. Optimization Theory for Large Sytem. MacMillan, New York Lavoie, S., M. Minoux, and E. Odier, A New Approach for Crew Pairing Problem by Column Generation with an Application to Air Tranport, European Journal of Operational Reearch, 35 (1988), Lee, C.-Y., Parallel Machine Scheduling with Non-Simultaneou Machine Available Time, Dicrete Applied Mathematic, 3 (1991),
25 Lee, C.-Y., Machine Scheduling with an Availability Contraint, Journal of Global Optimization. 9 (1996), Lee, C.-Y., Minimizing the Makepan in the Two-Machine Flowhop Scheduling Problem with an Availability Contraint, Operation Reearch Letter, 2 (1997), Lee, C.-Y. and J. Leon, Machine Scheduling with Rate-Modifying Activity, (1998), to appear in European Journal of Operational Reearch. Lee, C.-Y. and S.D. Liman, Single Machine Flow-Time Scheduling with Scheduled Maintenance, Acta Informatica, 29 (1992), Lee, C.-Y. and S.D. Liman, Capacitated Two-Parallel Machine Scheduling to Minimize Sum of Job Completion Time, Dicrete Applied Mathematic, 41 (1993), Lentra, J.K., A.H.G. Rinnooy Kan and P. Brucker, Complexity of Machine Scheduling Problem, Annal of Dicrete Mathematic, 1 (1977), Moheiov, G., Minimizing the Sum of Job Completion Time on Capacitated Parallel Machine, Mathl. Comput. Modelling, 2 (1994), Pinedo, M. Scheduling: Theory, Algorithm, and Sytem, Prentice Hall, Englewood Cliff, NJ, Rothkopf, M.H. Scheduling Independent Tak on Parallel Proceor. Management Science, 12 (1966), Qi, X., T. Chen and F. Tu., Scheduling with the Maintenance on a Single Machine, (1997), Working Paper, Department of Computer and Sytem Science, Nankai Univerity, Tianin, P.R. China. Schmidt, G., Scheduling on Semi-identical Proceor, ZOR-Zeitchrift fur Operation Reearch, 28 (1984), Schmidt, G., Scheduling Independent Tak with Deadline on Semi-identical Proceor, Journal of Operational Reearch Society, 39 (1988), Van den Akker, J.M., J.A. Hoogeveen, and S.L. van de Velde, Parallel Machine Scheduling by Column Generation, (1995), Technical Report, Center for Operation Reearch and Econometric, Univerity Catholique de Louvain, Belgium. Vance, P.H., C. Barnhart, E.J. Johnon, and G.L. Nemhauer, Solving Binary Cutting Stock Problem by Column Generation and Branch-and-bound,, Computational Optimization and Application, 3 (1994),
26 Table 1: Computational Reult for the Problem P ind w C with Proceing Time Drawn from the Uniform Ditribution U[1, 1] Problem n m α (1) (2) (3) Integrality gap avg max (4) (5).9%.29%.38%.82%.62%.9%.1%.55%.18%.56%.3%.88%.9%.3%.35%.88%.27%.54% % % <.1% <.1% <.1% <.1%.3%.19%.21%.6%.5%.87%.1%.23%.33%.85%.26%.96% <.1%.2%.8%.49%.31%.87% <.1%.3%.5%.17%.8%.23%.6%.15%.14%.25%.2%.47%.1%.24%.14%.31%.27%.58%.9%.2%.24%.53%.42%.94%.3%.13%.7%.26%.33%.62% Problem olved at root node (6) b&b node avg max (7) (8) CPU time () avg max (9) (1)
27 Table 2: Computational Reult for the Problem P ind w C with Proceing Time Drawn from the Uniform Ditribution U[1, 3] Problem n m α (1) (2) (3) Integrality gap avg max (4) (5).2%.48%.4%.9%.53%.99%.9%.4%.27%.96%.25%.49%.7%.39%.8%.27%.14%.45%.1%.7% % %.1%.5%.5%.14%.14%.27%.3%.63%.11%.49%.22%.86%.45%.9% <.1%.8%.5%.26%.2%.91% <.1%.2%.15%.28%.15%.79%.8%.23%.12%.38%.24%.53%.7%.18%.17%.38%.38%.62%.5%.15%.17%.4%.38%.67%.2%.8%.6%.18%.33%.76% Problem olved at root node (6) b&b node avg max (7) (8) CPU time () avg max (9) (1)
28 Table 3: Computational Reult for the Problem P dep w C with Proceing Time Drawn from the Uniform Ditribution U[1, 1] Problem n m α (1) (2) (3) Integrality gap avg max (4) (5).19%.31%.21%.37%.59%.91%.1%.26% <.1% <.1%.9%.19% <.1%.25% <.1% <.1%.17%.53% <.1%.1% % %.6%.13%.4%.8%.11%.24%.13%.25%.5%.9%.1%.4%.6%.14%.2%.16% <.1% <.1% <.1% <.1% <.1% <.1%.1%.3%.8%.26%.15%.43%.18%.67%.48%.9%.4%.12%.3%.9%.11%.31% <.1%.4% <.1% <.1%.2%.7% <.1% <.1%.2%.8%.9%.25% Problem olved at root node (6) b&b node avg max (7) (8) CPU time () avg max (9) (1)
29 Table 4: Computational Reult for the Problem P dep w C with Proceing Time Drawn from the Uniform Ditribution U[1, 3] Problem n m α (1) (2) (3) Integrality gap avg max (4) (5).22%.5%.21%.62% <.1% <.1%.1%.1% <.1% <.1% <.1%.2% % % <.1% <.1% <.1% <.1% <.1% <.1%.1%.7% <.1% <.1%.21%.67%.4%.14%.27%.59% <.1%.8% <.1% <.1% <.1%.2%.2%.9% % %.7%.12%.1%.7%.3%.1%.1%.39%.19%.73%.8%.31%.23%.67% <.1%.8%.1%.1%.3%.22%.4%.31%.4%.24% <.1%.7% <.1% <.1%.5%.29%.13%.52% Problem olved at root node (6) b&b node avg max (7) (8) CPU time () avg max (9) (1)
DISTRIBUTED DATA PARALLEL TECHNIQUES FOR CONTENT-MATCHING INTRUSION DETECTION SYSTEMS. G. Chapman J. Cleese E. Idle
DISTRIBUTED DATA PARALLEL TECHNIQUES FOR CONTENT-MATCHING INTRUSION DETECTION SYSTEMS G. Chapman J. Cleee E. Idle ABSTRACT Content matching i a neceary component of any ignature-baed network Intruion Detection
DISTRIBUTED DATA PARALLEL TECHNIQUES FOR CONTENT-MATCHING INTRUSION DETECTION SYSTEMS
DISTRIBUTED DATA PARALLEL TECHNIQUES FOR CONTENT-MATCHING INTRUSION DETECTION SYSTEMS Chritopher V. Kopek Department of Computer Science Wake Foret Univerity Winton-Salem, NC, 2709 Email: [email protected]
A note on profit maximization and monotonicity for inbound call centers
A note on profit maximization and monotonicity for inbound call center Ger Koole & Aue Pot Department of Mathematic, Vrije Univeriteit Amterdam, The Netherland 23rd December 2005 Abtract We conider an
A Spam Message Filtering Method: focus on run time
, pp.29-33 http://dx.doi.org/10.14257/atl.2014.76.08 A Spam Meage Filtering Method: focu on run time Sin-Eon Kim 1, Jung-Tae Jo 2, Sang-Hyun Choi 3 1 Department of Information Security Management 2 Department
Queueing systems with scheduled arrivals, i.e., appointment systems, are typical for frontal service systems,
MANAGEMENT SCIENCE Vol. 54, No. 3, March 28, pp. 565 572 in 25-199 ein 1526-551 8 543 565 inform doi 1.1287/mnc.17.82 28 INFORMS Scheduling Arrival to Queue: A Single-Server Model with No-Show INFORMS
SCM- integration: organiational, managerial and technological iue M. Caridi 1 and A. Sianei 2 Dipartimento di Economia e Produzione, Politecnico di Milano, Italy E-mail: [email protected] Itituto
Bi-Objective Optimization for the Clinical Trial Supply Chain Management
Ian David Lockhart Bogle and Michael Fairweather (Editor), Proceeding of the 22nd European Sympoium on Computer Aided Proce Engineering, 17-20 June 2012, London. 2012 Elevier B.V. All right reerved. Bi-Objective
Assessing the Discriminatory Power of Credit Scores
Aeing the Dicriminatory Power of Credit Score Holger Kraft 1, Gerald Kroiandt 1, Marlene Müller 1,2 1 Fraunhofer Intitut für Techno- und Wirtchaftmathematik (ITWM) Gottlieb-Daimler-Str. 49, 67663 Kaierlautern,
Optical Illusion. Sara Bolouki, Roger Grosse, Honglak Lee, Andrew Ng
Optical Illuion Sara Bolouki, Roger Groe, Honglak Lee, Andrew Ng. Introduction The goal of thi proect i to explain ome of the illuory phenomena uing pare coding and whitening model. Intead of the pare
Review of Multiple Regression Richard Williams, University of Notre Dame, http://www3.nd.edu/~rwilliam/ Last revised January 13, 2015
Review of Multiple Regreion Richard William, Univerity of Notre Dame, http://www3.nd.edu/~rwilliam/ Lat revied January 13, 015 Aumption about prior nowledge. Thi handout attempt to ummarize and yntheize
Risk Management for a Global Supply Chain Planning under Uncertainty: Models and Algorithms
Rik Management for a Global Supply Chain Planning under Uncertainty: Model and Algorithm Fengqi You 1, John M. Waick 2, Ignacio E. Gromann 1* 1 Dept. of Chemical Engineering, Carnegie Mellon Univerity,
Control of Wireless Networks with Flow Level Dynamics under Constant Time Scheduling
Control of Wirele Network with Flow Level Dynamic under Contant Time Scheduling Long Le and Ravi R. Mazumdar Department of Electrical and Computer Engineering Univerity of Waterloo,Waterloo, ON, Canada
CHARACTERISTICS OF WAITING LINE MODELS THE INDICATORS OF THE CUSTOMER FLOW MANAGEMENT SYSTEMS EFFICIENCY
Annale Univeritati Apuleni Serie Oeconomica, 2(2), 200 CHARACTERISTICS OF WAITING LINE MODELS THE INDICATORS OF THE CUSTOMER FLOW MANAGEMENT SYSTEMS EFFICIENCY Sidonia Otilia Cernea Mihaela Jaradat 2 Mohammad
TRADING rules are widely used in financial market as
Complex Stock Trading Strategy Baed on Particle Swarm Optimization Fei Wang, Philip L.H. Yu and David W. Cheung Abtract Trading rule have been utilized in the tock market to make profit for more than a
A Note on Profit Maximization and Monotonicity for Inbound Call Centers
OPERATIONS RESEARCH Vol. 59, No. 5, September October 2011, pp. 1304 1308 in 0030-364X ein 1526-5463 11 5905 1304 http://dx.doi.org/10.1287/opre.1110.0990 2011 INFORMS TECHNICAL NOTE INFORMS hold copyright
MBA 570x Homework 1 Due 9/24/2014 Solution
MA 570x Homework 1 Due 9/24/2014 olution Individual work: 1. Quetion related to Chapter 11, T Why do you think i a fund of fund market for hedge fund, but not for mutual fund? Anwer: Invetor can inexpenively
Redesigning Ratings: Assessing the Discriminatory Power of Credit Scores under Censoring
Redeigning Rating: Aeing the Dicriminatory Power of Credit Score under Cenoring Holger Kraft, Gerald Kroiandt, Marlene Müller Fraunhofer Intitut für Techno- und Wirtchaftmathematik (ITWM) Thi verion: June
Apigee Edge: Apigee Cloud vs. Private Cloud. Evaluating deployment models for API management
Apigee Edge: Apigee Cloud v. Private Cloud Evaluating deployment model for API management Table of Content Introduction 1 Time to ucce 2 Total cot of ownerhip 2 Performance 3 Security 4 Data privacy 4
Unit 11 Using Linear Regression to Describe Relationships
Unit 11 Uing Linear Regreion to Decribe Relationhip Objective: To obtain and interpret the lope and intercept of the leat quare line for predicting a quantitative repone variable from a quantitative explanatory
Project Management Basics
Project Management Baic A Guide to undertanding the baic component of effective project management and the key to ucce 1 Content 1.0 Who hould read thi Guide... 3 1.1 Overview... 3 1.2 Project Management
Two Dimensional FEM Simulation of Ultrasonic Wave Propagation in Isotropic Solid Media using COMSOL
Excerpt from the Proceeding of the COMSO Conference 0 India Two Dimenional FEM Simulation of Ultraonic Wave Propagation in Iotropic Solid Media uing COMSO Bikah Ghoe *, Krihnan Balaubramaniam *, C V Krihnamurthy
MECH 2110 - Statics & Dynamics
Chapter D Problem 3 Solution 1/7/8 1:8 PM MECH 11 - Static & Dynamic Chapter D Problem 3 Solution Page 7, Engineering Mechanic - Dynamic, 4th Edition, Meriam and Kraige Given: Particle moving along a traight
Senior Thesis. Horse Play. Optimal Wagers and the Kelly Criterion. Author: Courtney Kempton. Supervisor: Professor Jim Morrow
Senior Thei Hore Play Optimal Wager and the Kelly Criterion Author: Courtney Kempton Supervior: Profeor Jim Morrow June 7, 20 Introduction The fundamental problem in gambling i to find betting opportunitie
Mixed Method of Model Reduction for Uncertain Systems
SERBIAN JOURNAL OF ELECTRICAL ENGINEERING Vol 4 No June Mixed Method of Model Reduction for Uncertain Sytem N Selvaganean Abtract: A mixed method for reducing a higher order uncertain ytem to a table reduced
Solution of the Heat Equation for transient conduction by LaPlace Transform
Solution of the Heat Equation for tranient conduction by LaPlace Tranform Thi notebook ha been written in Mathematica by Mark J. McCready Profeor and Chair of Chemical Engineering Univerity of Notre Dame
Research Article An (s, S) Production Inventory Controlled Self-Service Queuing System
Probability and Statitic Volume 5, Article ID 558, 8 page http://dxdoiorg/55/5/558 Reearch Article An (, S) Production Inventory Controlled Self-Service Queuing Sytem Anoop N Nair and M J Jacob Department
CASE STUDY ALLOCATE SOFTWARE
CASE STUDY ALLOCATE SOFTWARE allocate caetud y TABLE OF CONTENTS #1 ABOUT THE CLIENT #2 OUR ROLE #3 EFFECTS OF OUR COOPERATION #4 BUSINESS PROBLEM THAT WE SOLVED #5 CHALLENGES #6 WORKING IN SCRUM #7 WHAT
A Resolution Approach to a Hierarchical Multiobjective Routing Model for MPLS Networks
A Reolution Approach to a Hierarchical Multiobjective Routing Model for MPLS Networ Joé Craveirinha a,c, Rita Girão-Silva a,c, João Clímaco b,c, Lúcia Martin a,c a b c DEEC-FCTUC FEUC INESC-Coimbra International
Bidding for Representative Allocations for Display Advertising
Bidding for Repreentative Allocation for Diplay Advertiing Arpita Ghoh, Preton McAfee, Kihore Papineni, and Sergei Vailvitkii Yahoo! Reearch. {arpita, mcafee, kpapi, ergei}@yahoo-inc.com Abtract. Diplay
Socially Optimal Pricing of Cloud Computing Resources
Socially Optimal Pricing of Cloud Computing Reource Ihai Menache Microoft Reearch New England Cambridge, MA 02142 [email protected] Auman Ozdaglar Laboratory for Information and Deciion Sytem Maachuett
Profitability of Loyalty Programs in the Presence of Uncertainty in Customers Valuations
Proceeding of the 0 Indutrial Engineering Reearch Conference T. Doolen and E. Van Aken, ed. Profitability of Loyalty Program in the Preence of Uncertainty in Cutomer Valuation Amir Gandomi and Saeed Zolfaghari
A technical guide to 2014 key stage 2 to key stage 4 value added measures
A technical guide to 2014 key tage 2 to key tage 4 value added meaure CONTENTS Introduction: PAGE NO. What i value added? 2 Change to value added methodology in 2014 4 Interpretation: Interpreting chool
HUMAN CAPITAL AND THE FUTURE OF TRANSITION ECONOMIES * Michael Spagat Royal Holloway, University of London, CEPR and Davidson Institute.
HUMAN CAPITAL AND THE FUTURE OF TRANSITION ECONOMIES * By Michael Spagat Royal Holloway, Univerity of London, CEPR and Davidon Intitute Abtract Tranition economie have an initial condition of high human
Acceleration-Displacement Crash Pulse Optimisation A New Methodology to Optimise Vehicle Response for Multiple Impact Speeds
Acceleration-Diplacement Crah Pule Optimiation A New Methodology to Optimie Vehicle Repone for Multiple Impact Speed D. Gildfind 1 and D. Ree 2 1 RMIT Univerity, Department of Aeropace Engineering 2 Holden
THE IMPACT OF MULTIFACTORIAL GENETIC DISORDERS ON CRITICAL ILLNESS INSURANCE: A SIMULATION STUDY BASED ON UK BIOBANK ABSTRACT KEYWORDS
THE IMPACT OF MULTIFACTORIAL GENETIC DISORDERS ON CRITICAL ILLNESS INSURANCE: A SIMULATION STUDY BASED ON UK BIOBANK BY ANGUS MACDONALD, DELME PRITCHARD AND PRADIP TAPADAR ABSTRACT The UK Biobank project
Scheduling Jobs and Preventive Maintenance Activities on Parallel Machines
Scheduling Jobs and Preventive Maintenance Activities on Parallel Machines Maher Rebai University of Technology of Troyes Department of Industrial Systems 12 rue Marie Curie, 10000 Troyes France [email protected]
MSc Financial Economics: International Finance. Bubbles in the Foreign Exchange Market. Anne Sibert. Revised Spring 2013. Contents
MSc Financial Economic: International Finance Bubble in the Foreign Exchange Market Anne Sibert Revied Spring 203 Content Introduction................................................. 2 The Mone Market.............................................
Auction-Based Resource Allocation for Sharing Cloudlets in Mobile Cloud Computing
1 Auction-Baed Reource Allocation for Sharing Cloudlet in Mobile Cloud Computing A-Long Jin, Wei Song, Senior Member, IEEE, and Weihua Zhuang, Fellow, IEEE Abtract Driven by pervaive mobile device and
DUE to the small size and low cost of a sensor node, a
1992 IEEE TRANSACTIONS ON MOBILE COMPUTING, VOL. 14, NO. 10, OCTOBER 2015 A Networ Coding Baed Energy Efficient Data Bacup in Survivability-Heterogeneou Senor Networ Jie Tian, Tan Yan, and Guiling Wang
Health Insurance and Social Welfare. Run Liang. China Center for Economic Research, Peking University, Beijing 100871, China,
Health Inurance and Social Welfare Run Liang China Center for Economic Reearch, Peking Univerity, Beijing 100871, China, Email: [email protected] and Hao Wang China Center for Economic Reearch, Peking
Design of Compound Hyperchaotic System with Application in Secure Data Transmission Systems
Deign of Compound Hyperchaotic Sytem with Application in Secure Data Tranmiion Sytem D. Chantov Key Word. Lyapunov exponent; hyperchaotic ytem; chaotic ynchronization; chaotic witching. Abtract. In thi
LECTURE 2. TURÁN S THEOREM : BIPARTITE GRAPHS
LECTURE 2. TURÁN S THEOREM : BIPARTITE GRAPHS. Complete bipartite graph.. Kövari-Só-Turán theorem. When H i a bipartite graph, i.e., when χ(h) = 2, Erdő and Stone theorem aert that π H = 0. In other word,
A Review On Software Testing In SDlC And Testing Tools
www.ijec.in International Journal Of Engineering And Computer Science ISSN:2319-7242 Volume - 3 Iue -9 September, 2014 Page No. 8188-8197 A Review On Software Teting In SDlC And Teting Tool T.Amruthavalli*,
Growth and Sustainability of Managed Security Services Networks: An Economic Perspective
Growth and Sutainability of Managed Security Service etwork: An Economic Perpective Alok Gupta Dmitry Zhdanov Department of Information and Deciion Science Univerity of Minneota Minneapoli, M 55455 (agupta,
Progress 8 measure in 2016, 2017, and 2018. Guide for maintained secondary schools, academies and free schools
Progre 8 meaure in 2016, 2017, and 2018 Guide for maintained econdary chool, academie and free chool July 2016 Content Table of figure 4 Summary 5 A ummary of Attainment 8 and Progre 8 5 Expiry or review
CASE STUDY BRIDGE. www.future-processing.com
CASE STUDY BRIDGE TABLE OF CONTENTS #1 ABOUT THE CLIENT 3 #2 ABOUT THE PROJECT 4 #3 OUR ROLE 5 #4 RESULT OF OUR COLLABORATION 6-7 #5 THE BUSINESS PROBLEM THAT WE SOLVED 8 #6 CHALLENGES 9 #7 VISUAL IDENTIFICATION
Solutions to Sample Problems for Test 3
22 Differential Equation Intructor: Petronela Radu November 8 25 Solution to Sample Problem for Tet 3 For each of the linear ytem below find an interval in which the general olution i defined (a) x = x
Return on Investment and Effort Expenditure in the Software Development Environment
International Journal of Applied Information ytem (IJAI) IN : 2249-0868 Return on Invetment and Effort Expenditure in the oftware Development Environment Dineh Kumar aini Faculty of Computing and IT, ohar
Algorithms for Advance Bandwidth Reservation in Media Production Networks
Algorithm for Advance Bandwidth Reervation in Media Production Network Maryam Barhan 1, Hendrik Moen 1, Jeroen Famaey 2, Filip De Turck 1 1 Department of Information Technology, Ghent Univerity imind Gaton
Mobile Network Configuration for Large-scale Multimedia Delivery on a Single WLAN
Mobile Network Configuration for Large-cale Multimedia Delivery on a Single WLAN Huigwang Je, Dongwoo Kwon, Hyeonwoo Kim, and Hongtaek Ju Dept. of Computer Engineering Keimyung Univerity Daegu, Republic
Report 4668-1b 30.10.2010. Measurement report. Sylomer - field test
Report 4668-1b Meaurement report Sylomer - field tet Report 4668-1b 2(16) Contet 1 Introduction... 3 1.1 Cutomer... 3 1.2 The ite and purpoe of the meaurement... 3 2 Meaurement... 6 2.1 Attenuation of
Network Architecture for Joint Failure Recovery and Traffic Engineering
Network Architecture for Joint Failure Recovery and Traffic Engineering Martin Suchara Dept. of Computer Science Princeton Univerity, NJ 08544 [email protected] Dahai Xu AT&T Lab Reearch Florham Park,
v = x t = x 2 x 1 t 2 t 1 The average speed of the particle is absolute value of the average velocity and is given Distance travelled t
Chapter 2 Motion in One Dimenion 2.1 The Important Stuff 2.1.1 Poition, Time and Diplacement We begin our tudy of motion by conidering object which are very mall in comparion to the ize of their movement
Turbulent Mixing and Chemical Reaction in Stirred Tanks
Turbulent Mixing and Chemical Reaction in Stirred Tank André Bakker Julian B. Faano Blend time and chemical product ditribution in turbulent agitated veel can be predicted with the aid of Computational
Cluster-Aware Cache for Network Attached Storage *
Cluter-Aware Cache for Network Attached Storage * Bin Cai, Changheng Xie, and Qiang Cao National Storage Sytem Laboratory, Department of Computer Science, Huazhong Univerity of Science and Technology,
Sector Concentration in Loan Portfolios and Economic Capital. Abstract
Sector Concentration in Loan Portfolio and Economic Capital Klau Düllmann and Nancy Machelein 2 Thi verion: September 2006 Abtract The purpoe of thi paper i to meaure the potential impact of buine-ector
Morningstar Fixed Income Style Box TM Methodology
Morningtar Fixed Income Style Box TM Methodology Morningtar Methodology Paper Augut 3, 00 00 Morningtar, Inc. All right reerved. The information in thi document i the property of Morningtar, Inc. Reproduction
1 Introduction. Reza Shokri* Privacy Games: Optimal User-Centric Data Obfuscation
Proceeding on Privacy Enhancing Technologie 2015; 2015 (2):1 17 Reza Shokri* Privacy Game: Optimal Uer-Centric Data Obfucation Abtract: Conider uer who hare their data (e.g., location) with an untruted
1) Assume that the sample is an SRS. The problem state that the subjects were randomly selected.
12.1 Homework for t Hypothei Tet 1) Below are the etimate of the daily intake of calcium in milligram for 38 randomly elected women between the age of 18 and 24 year who agreed to participate in a tudy
Growing Self-Organizing Maps for Surface Reconstruction from Unstructured Point Clouds
Growing Self-Organizing Map for Surface Recontruction from Untructured Point Cloud Renata L. M. E. do Rêgo, Aluizio F. R. Araújo, and Fernando B.de Lima Neto Abtract Thi work introduce a new method for
Ohm s Law. Ohmic relationship V=IR. Electric Power. Non Ohmic devises. Schematic representation. Electric Power
Ohm Law Ohmic relationhip V=IR Ohm law tate that current through the conductor i directly proportional to the voltage acro it if temperature and other phyical condition do not change. In many material,
T-test for dependent Samples. Difference Scores. The t Test for Dependent Samples. The t Test for Dependent Samples. s D
The t Tet for ependent Sample T-tet for dependent Sample (ak.a., Paired ample t-tet, Correlated Group eign, Within- Subject eign, Repeated Meaure,.. Repeated-Meaure eign When you have two et of core from
Auction Mechanisms Toward Efficient Resource Sharing for Cloudlets in Mobile Cloud Computing
1 Auction Mechanim Toward Efficient Reource Sharing for Cloudlet in Mobile Cloud Computing A-Long Jin, Wei Song, Ping Wang, Duit Niyato, and Peijian Ju Abtract Mobile cloud computing offer an appealing
RISK MANAGEMENT POLICY
RISK MANAGEMENT POLICY The practice of foreign exchange (FX) rik management i an area thrut into the potlight due to the market volatility that ha prevailed for ome time. A a conequence, many corporation
REDUCTION OF TOTAL SUPPLY CHAIN CYCLE TIME IN INTERNAL BUSINESS PROCESS OF REAMER USING DOE AND TAGUCHI METHODOLOGY. Abstract. 1.
International Journal of Advanced Technology & Engineering Reearch (IJATER) REDUCTION OF TOTAL SUPPLY CHAIN CYCLE TIME IN INTERNAL BUSINESS PROCESS OF REAMER USING DOE AND Abtract TAGUCHI METHODOLOGY Mr.
6. Friction, Experiment and Theory
6. Friction, Experiment and Theory The lab thi wee invetigate the rictional orce and the phyical interpretation o the coeicient o riction. We will mae ue o the concept o the orce o gravity, the normal
Multi-Objective Optimization for Sponsored Search
Multi-Objective Optimization for Sponored Search Yilei Wang 1,*, Bingzheng Wei 2, Jun Yan 2, Zheng Chen 2, Qiao Du 2,3 1 Yuanpei College Peking Univerity Beijing, China, 100871 (+86)15120078719 [email protected]
How Enterprises Can Build Integrated Digital Marketing Experiences Using Drupal
How Enterprie Can Build Integrated Digital Marketing Experience Uing Drupal acquia.com 888.922.7842 1.781.238.8600 25 Corporate Drive, Burlington, MA 01803 How Enterprie Can Build Integrated Digital Marketing
Analysis of Mesostructure Unit Cells Comprised of Octet-truss Structures
Analyi of Meotructure Unit Cell Compried of Octet-tru Structure Scott R. Johnton *, Marque Reed *, Hongqing V. Wang, and David W. Roen * * The George W. Woodruff School of Mechanical Engineering, Georgia
Utility-Based Flow Control for Sequential Imagery over Wireless Networks
Utility-Baed Flow Control for Sequential Imagery over Wirele Networ Tomer Kihoni, Sara Callaway, and Mar Byer Abtract Wirele enor networ provide a unique et of characteritic that mae them uitable for building
FEDERATION OF ARAB SCIENTIFIC RESEARCH COUNCILS
Aignment Report RP/98-983/5/0./03 Etablihment of cientific and technological information ervice for economic and ocial development FOR INTERNAL UE NOT FOR GENERAL DITRIBUTION FEDERATION OF ARAB CIENTIFIC
Linear energy-preserving integrators for Poisson systems
BIT manucript No. (will be inerted by the editor Linear energy-preerving integrator for Poion ytem David Cohen Ernt Hairer Received: date / Accepted: date Abtract For Hamiltonian ytem with non-canonical
σ m using Equation 8.1 given that σ
8. Etimate the theoretical fracture trength of a brittle material if it i known that fracture occur by the propagation of an elliptically haped urface crack of length 0.8 mm and having a tip radiu of curvature
REVISTA INVESTIGACIÓN OPERACIONAL V ol. 29, No. 2,,95-105 2007
REVISTA INVESTIGACIÓN OPERACIONAL V ol. 29, No. 2,,95-105 2007 GENETIC OPERATORS FOR THE MULTIOBJECTIVE FLOWSHOW PROBLEM Magdalena Bandala*, María A. Oorio-Lama** School of Computer Science, Univeridad
Performance of a Browser-Based JavaScript Bandwidth Test
Performance of a Brower-Baed JavaScript Bandwidth Tet David A. Cohen II May 7, 2013 CP SC 491/H495 Abtract An exiting brower-baed bandwidth tet written in JavaScript wa modified for the purpoe of further
Chapter 10 Velocity, Acceleration, and Calculus
Chapter 10 Velocity, Acceleration, and Calculu The firt derivative of poition i velocity, and the econd derivative i acceleration. Thee derivative can be viewed in four way: phyically, numerically, ymbolically,
Parallel Adaptive Multigrid Methods in Plane Linear Elasticity Problems
Numerical Linear Algebra with Application, Vol. 1(1), 1 1 (1996) Parallel Adaptive Multigrid Method in Plane Linear Elaticity Problem Peter Batian, Stefan Lang Intitut für Computeranwendungen III, Univerität
Pekka Helkiö, 58490K Antti Seppälä, 63212W Ossi Syd, 63513T
Pekka Helkiö, 58490K Antti Seppälä, 63212W Oi Syd, 63513T Table of Content 1. Abtract...1 2. Introduction...2 2.1 Background... 2 2.2 Objective and Reearch Problem... 2 2.3 Methodology... 2 2.4 Scoping
Performance of Multiple TFRC in Heterogeneous Wireless Networks
Performance of Multiple TFRC in Heterogeneou Wirele Network 1 Hyeon-Jin Jeong, 2 Seong-Sik Choi 1, Firt Author Computer Engineering Department, Incheon National Univerity, [email protected] *2,Correponding
Support Vector Machine Based Electricity Price Forecasting For Electricity Markets utilising Projected Assessment of System Adequacy Data.
The Sixth International Power Engineering Conference (IPEC23, 27-29 November 23, Singapore Support Vector Machine Baed Electricity Price Forecating For Electricity Maret utiliing Projected Aement of Sytem
Physics 111. Exam #1. January 24, 2014
Phyic 111 Exam #1 January 24, 2014 Name Pleae read and follow thee intruction carefully: Read all problem carefully before attempting to olve them. Your work mut be legible, and the organization clear.
Introduction to the article Degrees of Freedom.
Introduction to the article Degree of Freedom. The article by Walker, H. W. Degree of Freedom. Journal of Educational Pychology. 3(4) (940) 53-69, wa trancribed from the original by Chri Olen, George Wahington