CAR Correlation Table - Equipment Leaks (40 CFR Part 63, Subpart H (HON) through )

Size: px
Start display at page:

Download "CAR Correlation Table - Equipment Leaks (40 CFR Part 63, Subpart H (HON) - 63.160 through 63.182)"

Transcription

1 AR orrelation Table - Equipment Leaks (40 FR (HO) through ) itations (HO Equipment Leaks) itations a,b Description (a) [Referencing Subpart] Applicability: list of subject equipment (c) Applicability: less than 300 hours per year exemption (b), (c), and (d) [Referencing Subpart] Applicability: interaction with other rules (e.g., subpart V and VV) (e) (d) Applicability: lines and equipment not containing process fluids (f) [Referencing Subpart] Applicability: research and development facilities and [Referencing Subpart] (a) 65.3(b) General standards: compliance determination (b)(1) and (b)(2) (b) hange c R R R omments The AR does not contain nor alter the list of equipment types subject to the referencing subparts (HO). See (a). The AR explicitly provides this exemption, along with a pointer to the associated identification requirements. The AR consolidates provisions from the referencing subparts and thus has its own provisions regarding overlap and applicability. The HO provisions are not applicable. The AR does not contain this applicability provision. Definitions R,S All AR definitions are in the AR general provisions. Terms not used in the AR and terms used only for applicability provisions are not defined in the AR. See the definitions correlation table. General standards: alternative means of emission limitation (c) (a) Equipment identification: general (d) (b) Applicability: vacuum service exemption (e) (c) Applicability: less than 300 hours per year exemption S The AR feature one consolidated set of general compliance determination procedures. The HO general standards are incorporated into the AR general provisions along with all other general compliance provisions. The AR language clarifies that if an owner or operator has obtained permission to use an alternative means of emission limitation, he or she may still choose to comply with the regulation as written. The AR adds "or by other appropriate methods" to explicitly state the flexibility inherent to the HO. The AR does not specify "each piece" of equipment, and therefore does not imply a requirement for individual identification numbers. AR correlation tables, Date Printed: October 10, 2001 version 6.0/K:\8597\72\001\correlationtbl\Honel-v6.wpd Page 1 of 24

2 AR orrelation Table - Equipment Leaks (40 FR (HO) through ) itations (HO Equipment Leaks) itations a,b Description hange c omments (f) [ot onsolidated] Leak identification: introduction This introductory language is not needed in the AR structure (f)(1) (e)(1) Leak identification: The AR does not require identification numbers. weatherproof marker (f)(2) (c)(1) Leak identification: removal (valves and connectors) (f)(3) (c)(2) Leak identification: removal (other equipment) (g) 65.3(d) ompliance times: general (g)(1) [ot onsolidated] ompliance times: interaction with initial compliance date (g)(2) 65.3(d)(1) ompliance times: changing through mutual agreement (g)(3) 65.3(d)(2) ompliance Times: what to do if initial compliance date occurs after beginning of the period (g)(4) 65.3(d)(3) ompliance times: multiple successive periods (h) [ot onsolidated] Statement of violation if a leak is not repaired (a) (a) Standards: pumps: compliance schedule (b)(1) (b) and (b)(1) Standards: pumps: monthly monitoring (b)(2) (b)(2) Standards: pumps: leak definition S S The AR clarifies the procedure by explicitly stating which monitoring must be performed prior to leak identification removal. The AR does not contain this provision; it is applicable only to HO sources before opting into the AR. The AR does not contain phase-in, tiered compliance schedules, nor does it contain wastewater provisions. The AR does not contain phased-in leak definitions. AR correlation tables, Date Printed: October 10, 2001 version 6.0/K:\8597\72\001\correlationtbl\Honel-v6.wpd Page 2 of 24

3 AR orrelation Table - Equipment Leaks (40 FR (HO) through ) itations (HO Equipment Leaks) itations a,b Description (b)(3) (b)(4), (b)(4)(i), and (b)(4)(ii) Standards: pumps: weekly visual inspection hange c (c)(1) (d) and (a) Standards: pumps: leak repair (c)(2), (c)(2)(i), and (c)(2)(ii) (a) Standards: pumps: first attempt at repair (c)(3) (b)(3) Standards: pumps: leak repair exception (d)(1) (c)(1) Standards: pumps: basis for percent leaking calculation omments, Under the HO, visual indications of liquids dripping from the pump seal are considered leaks. Under the AR, if such indications are found, the owner or operator can either monitor the pump to confirm a leak or fix ("eliminate the visual indications") the pump. S The AR does not provide for a phased-in compliance schedule. This provision therefore applies to all pumps complying with the AR. Under the HO, this provision was only applicable to "Phase III" pumps. The AR allows for alteration of the percent leaking basis through permit modifications. It also allows the basis to be a "group of process units," which is more flexible than the HO (process unit or source-wide basis only) (d)(2) (c)(2) Standards: pumps: QIP trigger S The AR does not provide for a phased-in compliance schedule. This provision therefore applies to all pumps complying with the AR. Under the HO, this provision was only applicable to "Phase III" pumps (d)(3) (c)(3) Standards: pumps: number of pumps (calculation procedure) (d)(4) (c)(4) Standards: pumps: percent leaking pumps (equation) (e) (e)(1) Standards: pumps: dual mechanical seal pumps (DMSP) (e)(1) (e)(1)(ii) DMSP: design and operation requirements (e)(1)(i) (e)(1)(ii)(A) DMSP requirements: barrier fluid pressure The AR clarifies that this requirement does not apply during startup, shutdown, or malfunction periods. AR correlation tables, Date Printed: October 10, 2001 version 6.0/K:\8597\72\001\correlationtbl\Honel-v6.wpd Page 3 of 24

4 AR orrelation Table - Equipment Leaks (40 FR (HO) through ) itations (HO Equipment Leaks) itations a,b Description (e)(1)(ii) (e)(1)(ii)(B) DMSP requirements: barrier fluid degassing reservoir (e)(1)(iii) (e)(1)(ii)() DMSP: barrier fluid purge system (e)(2) (e)(1)(iii) DMSP: barrier fluid is not in light liquid service hange c (e)(3) (e)(1)(iv) DMSP: sensor (e)(4) (e)(1)(v) DMSP: visual inspection (e)(4)(i) (e)(1)(v), (e)(1)(v)(a), and (e)(1)(v)(b) DMSP: indications of liquids dripping (e)(4)(ii) (e)(1)(v)(A) DMSP: leak definition (e)(5) (e)(1)(vii) DMSP: sensor daily checks (e)(6)(i) (e)(1)(i) DMSP: failure criteria (e)(6)(ii) (e)(1)(vi) DMSP: failure criteria exceeded (e)(6)(iii) (e)(1)(viii) and DMSP: leak repair (a) (e)(6)(iv) (a) DMSP: first attempt at repair (f) (e)(2) Standards: pumps: no externally actuated shaft (g) (e)(3) Standards: pumps: closed-vent systems (h) (e)(4) Standards: pumps: unmanned plant site (i) (e)(5) Standards: pumps: 90 percent exemption omments The AR allows either instrument monitoring to confirm the presence of a leak or elimination of the visual indications of liquids dripping. AR correlation tables, Date Printed: October 10, 2001 version 6.0/K:\8597\72\001\correlationtbl\Honel-v6.wpd Page 4 of 24

5 AR orrelation Table - Equipment Leaks (40 FR (HO) through ) itations (HO Equipment Leaks) itations a,b Description (j) (e)(6) Standards: pumps: unsafe-tomonitor pumps (j)(1) (c)(1) Standards: pumps: criteria for unsafe-to-monitor (j)(2) (c)(4)(i) Standards: pumps: written plan for unsafe-to-monitor (a) (b) Standards: compressors: seal system standard (b) (b) Standards: compressors: seal system requirements (b)(1) (b)(1) Standards: compressors: seal system design and operation: barrier fluid pressure (b)(2) (b)(2) Standards: compressors: seal system design and operation: control device (b)(3) (b)(3) Standards: compressors: seal system design and operation: purge system (c) (c) Standards: compressors: barrier fluid (d) (c) Standards: compressors: barrier fluid sensor (e)(1) (c) Standards: compressors: daily observation of the barrier fluid sensor (e)(2) (d)(1) Standards: compressors: failure criterion hange c omments The AR clarifies that the owner or operator shall monitor according to the written plan, not just shall have a written plan. The AR clarifies that this requirement does not apply during periods of startup, shutdown, or malfunction AR correlation tables, Date Printed: October 10, 2001 version 6.0/K:\8597\72\001\correlationtbl\Honel-v6.wpd Page 5 of 24

6 AR orrelation Table - Equipment Leaks (40 FR (HO) through ) itations (HO Equipment Leaks) itations a,b Description (f) (d)(1) Standards: compressors: failure criterion exceeded (g)(1) (d)(1) and (a) Standards: compressors: leak repair (g)(2) (a) Standards: compressors: first attempt at repair (h) (e) Standards: compressors: control device control option (i), (i)(1), and (i)(2) (f)(1) Standards: compressors: 500 ppm option hange c (a) (b) Standards: pressure relief devices (PRD) (b)(1) (c)(1) PRD: return to less than 500 ppm (b)(2) (c)(2) PRD: monitor within 5 days (c) (d) PRD: control device (d)(1) and (e) PRD: rupture disk exemption (d)(2) (a) (b) Standards: sampling connection systems (SS) (b), (b)(1), (b)(2), (b)(3), and (b)(4) (c), (c)(1), (c)(2), (c)(3), and (c)(4) SS: design and operation (c) (d) SS: in-situ sampling systems (a)(1) and (a)(2) (b)(1) Standards: open-ended valves or lines: equipment requirements omments AR correlation tables, Date Printed: October 10, 2001 version 6.0/K:\8597\72\001\correlationtbl\Honel-v6.wpd Page 6 of 24

7 AR orrelation Table - Equipment Leaks (40 FR (HO) through ) itations (HO Equipment Leaks) itations a,b Description (b) (b)(2) Standards: open-ended valves or lines: second valves (c) (b)(3) Standards: open-ended valves or lines: double block and bleed systems (d) (c) Standards: open-ended values or lines: emergency shutdown exemption (e) (d) Standards: open-ended valves or lines: polymerizing materials exemption (a) [title] Standards: valves: standards for valves in gas/vapor service or light liquid service (a)(1) and (a)(2) [ot onsolidated] Standards: valves: phased compliance schedule (a)(3) (b)(3)(ii) Standards: valves: use of existing monitoring data (b) (b) Standards: valves: instrument monitoring (b)(1) (b)(1) Standards: valves: monitoring method (b)(2) (b)(2) Standards: valves: leak definition (c) [ot onsolidated] Standards: valves: monitoring period for Phase I and II hange c S omments The AR does not provide for a phase-in compliance schedule. The AR provides the same intent as the HO by allowing pre-existing data to be used to initially qualify for extended monitoring periods. See (b)(6) for details. The AR does not provide for a phased-in approach to leak definitions. The AR does not provide for phased-in monitoring periods. AR correlation tables, Date Printed: October 10, 2001 version 6.0/K:\8597\72\001\correlationtbl\Honel-v6.wpd Page 7 of 24

8 AR orrelation Table - Equipment Leaks (40 FR (HO) through ) itations (HO Equipment Leaks) itations a,b Description (d) (b)(3) Standards: valves: monitoring frequency (d)(1), (d)(1)(i), and (d)(1)(ii) (d)(2), (d)(3), and (d)(4) (b)(3)(i) (b)(3)(ii), (b)(3)(iii), (b)(3)(iv), and (b)(3)(v) Standards: valves: monitoring frequency (>2 percent leakers) Standards: valves: extended monitoring frequencies (e)(1) (c)(1)(ii) Standards: valves: percent leaking valves (equation) (e)(2) (c)(2) Standards: valves: monitoring frequency calculation (e)(3)(i) and (e)(3)(ii) (f)(1) (c)(3)(i) and (c)(3)(ii) (d)(1) and (a) Standards: valves: nonrepairable valves Standards: valves: leak repair (f)(2) (a) Standards: valves: first attempt at repair (f)(3) (d)(2) Standards: valves: follow-up monitoring (g), and (g)(1) through (g)(4) (a) Standards: valves: examples of first attempt at repair (h) (e)(1) Standards: valves: unsafe-tomonitor valves hange c omments S, The AR simply requires monthly monitoring in this situation; it does not feature a QIP program for valves. Instead, the AR s subgrouping program captures the intent of the QIP by focusing attention on poorly performing valves. S The AR extends the monitoring period for well performing process units (or subgroups). For process units with less than 0.25 percent leaking valves, the monitoring period is once every two years. The AR does not include the optional credit for removed valves. This complicated credit involves additional recordkeeping and is seldom used in the industry. The AR specifies how to average the monitoring period leak percentages in order to determine the new monitoring frequency. The AR provisions are simpler and are established to coordinate with the valve subgrouping provisions and the extended monitoring periods. The AR clarifies that the owner or operator shall monitor according to the written plan, not just shall have the plan AR correlation tables, Date Printed: October 10, 2001 version 6.0/K:\8597\72\001\correlationtbl\Honel-v6.wpd Page 8 of 24

9 AR orrelation Table - Equipment Leaks (40 FR (HO) through ) itations (HO Equipment Leaks) itations a,b Description (h)(1) (c)(1) Standards: valves: criteria for unsafe-to-monitor (h)(2) (c)(4)(i) Standards: valves: written plan for unsafe-to-monitor (i) (c)(2) Standards: valves: difficult-tomonitor valves (i)(1) (c)(2)(i)(A) Standards: valves: criteria for difficult-to-monitor valves (i)(2) (c)(2)(i)(B) and (c)(2)(i)() Standards: valves: number of difficult-to-monitor valves (i)(3) (c)(4)(ii) Standards: valves: written plan for difficult-to-monitor valves (j) (e)(3) Standards: valves: less than 250 valves exemption (a) (b)(1) Standards: heavy liquid service, et. al. monitoring (b) (b)(2) Standards: heavy liquid service, et. al: leak definition (c)(1) (b)(2) and (a) Standards: heavy liquid service, et. al.: leak repair (c)(2) (a) Standards: heavy liquid service, et. al.: first attempt at repair (c)(3) (c) Standards: heavy liquid service, et. al.: leak repair (if no instrument monitoring) (d) (a) Standards: heavy liquid service, et. al.: examples of first attempt at repair hange c omments The AR clarifies that the owner or operator shall monitor according to the written plan, not just shall have the plan The AR uses general language instead of the HO term "new source." The AR clarifies that the written plan should specify that all leaks detected shall be repaired. AR correlation tables, Date Printed: October 10, 2001 version 6.0/K:\8597\72\001\correlationtbl\Honel-v6.wpd Page 9 of 24

10 AR orrelation Table - Equipment Leaks (40 FR (HO) through ) itations (HO Equipment Leaks) itations a,b Description Subpart Standards: surge control vessels and buttons receivers (a) (d)(1) Delay of repair: technically infeasible (b) (d)(2) Delay of repair: isolated equipment (c), (c)(1), and (c)(2) (d)(3), (d)(3)(i), and (d)(3)(ii) hange c (d) (d)(4) Delay of repair: pumps (d)(1), (d)(1)(i), (d)(1)ii), and (d)(1)(iii) (d)(4)(i), (d)(4)(i)(a), (d)(4)(i)(b), and (d)(4)(i)() omments These equipment more closely resemble storage vessels. They are treated as storage vessels under the AR; they are not specifically included under the AR equipment leak provisions. This extends several compliance options beyond the HO requirement for a control device. Delay of repair: valves The AR allows purged material to be routed to a process or fuel gas system. Delay of repair: pumps: upgrading the seal design (d)(2) (d)(4)(ii) Delay of repair: pumps: 6 month limit (e) (d)(5) Delay of repair: valve assembly replacement (a) [ot onsolidated] Standards: VS/D: introductory paragraph (b) (b)(1) Standards: VS/D: recovery or recapture devices (c) (b)(1) Standards: VS/D: enclosed combustion devices S The AR allows routing to a fuel gas system or process as an alternative to routing to a control device. This introductory paragraph is not needed in the AR structure. The AR does not feature a correction to 3 percent oxygen for comparison to the 20 ppmv standard (d) (b)(2) Standards: VS/D: flares The flare requirements of the part 63 general provisions [see 63.11(b)] are correlated to the AR flare requirements (see ) in the correlation table for the part 63 general provisions. AR correlation tables, Date Printed: October 10, 2001 version 6.0/K:\8597\72\001\correlationtbl\Honel-v6.wpd Page 10 of 24

11 AR orrelation Table - Equipment Leaks (40 FR (HO) through ) itations (HO Equipment Leaks) itations a,b Description (e) (c) Standards: VS/D: control devices must be monitored to ensure operation and maintenance in conformance with their design (f) (b)(1) Standards: VS/D: inspection requirement (f)(1), (f)(1)(i), and (f)(1)(ii) (f)(2), (f)(2)(i), and (f)(2)(ii) (b)(1)(i), (b)(1)(i)(a), and (b)(1)(i)(b) (b)(1)(ii) Standards: VS/D: inspection (hard-piping) Standards: VS/D: inspection (ductwork) (g) [ot onsolidated] Standards: VS/D: reference to the inspection procedures (h), (h)(1), and (h)(2) (d)(1), (d)(2), (d)(2)(i), and (d)(2)(ii) (i) (d)(3) Standards: VS/D: delay of repair (j), (j)(1), (j)(2), and (j)(3) (k), (k)(1), and (k)(2) (l), (l)(1), and (l)(2) (a)(3), (a)(3)(i), (a)(3)(ii) and (a)(1) (b)(2) (b)(3) hange c omments The AR references the inspection procedures of (c) whenever they are applicable; this avoids potential confusion where visual inspection methods are appropriate. Standards: VS/D: leak repair The AR allows more than 15 days for repair to occur as long as repair is completed before the next introduction of vapors to the system. The AR also provides for eliminating the indications of a leak instead of requiring instrument monitoring to confirm the presence or absence of a leak. Standards: VS/D: bypass monitoring Standards: VS/D: unsafe-toinspect Standards: VS/D: difficultto-inspect The AR removes a disincentive to repair by clarifying that "delay of repair" is allowed if repair within 15 days after a leak is detected is technically infeasible. AR correlation tables, Date Printed: October 10, 2001 version 6.0/K:\8597\72\001\correlationtbl\Honel-v6.wpd Page 11 of 24

12 AR orrelation Table - Equipment Leaks (40 FR (HO) through ) itations (HO Equipment Leaks) itations a,b Description (m) (a)(2) Standards: VS/D: period of operation (n) [ot onsolidated] Standards: VS/D: overlap with other rules (a)(1) (b)(1) Standards: agitators: monitoring requirement (a)(2) (b)(2) Standards: agitators: visual inspection (b)(1) and (b)(2) (c)(1) and (c)(2) (b)(3), (b)(3)(i), and (b)(3)(ii) Standards: agitators: visual inspection hange c omments The AR does not contain this HO-specific provision regarding VS monitoring, recordkeeping, and reporting overlap. The AR specifies that the equipment leak requirements apply to the agitator seal, and not to the agitator itself. This change is made throughout the AR but is only mentioned here. The AR allows owners and operators, upon discovering visual indications of a leak, to either instrument monitor to confirm a leak or eliminate the indications of liquids dripping (d) and (a) Standards: agitators: leak repair The AR allows owners and operators, upon discovering visual indications of a leak, to either instrument monitor to confirm a leak or eliminate the indications of liquids dripping (d) (e)(1) Standards: agitators: dual mechanical seal system (DMSS) (d)(1), (d)(1)(i), (d)(1)(ii), and (d)(1)(iii) (e)(1)(i), (e)(1)(i)(a), (e)(1)(i)(b), and (e)(1)(i)() (d)(2) (e)(1)(ii) DMSS: not in light liquid service (d)(3) (e)(1)(iii) DMSS: sensor (d)(4), (d)(4)(i), and (d)(4)(ii) (e)(1)(iv), (e)(1)(iv)(a), and (e)(1)(iv)(b) (d)(5) (e)(1)(v) DMSS: sensor daily checks DMSS: design and operation The AR clarifies that the barrier fluid pressure operation requirement does not apply during periods of startup, shutdown, or malfunction. DMSS: visual inspections The AR allows owners and operators, upon discovering visual indications of a leak, to either instrument monitor to confirm a leak or eliminate the indications of liquids dripping. AR correlation tables, Date Printed: October 10, 2001 version 6.0/K:\8597\72\001\correlationtbl\Honel-v6.wpd Page 12 of 24

13 AR orrelation Table - Equipment Leaks (40 FR (HO) through ) itations (HO Equipment Leaks) itations a,b Description (d)(6)(i), (d)(6)(ii), and (d)(6)(iii) (e)(1)(vi) and (e)(1)(vi)(a) DMSS: failure criteria hange c (d)(6)(iii) (a) DMSS: leak repair and (d)(6)(iv) (e) (e)(2) Standards: agitators: no external shaft (f) (e)(3) Standards: agitators: VS/D (g) (e)(4) Standards: agitators: unmanned plant site (h) (e)(5) Standards: agitators: difficult-tomonitor (h)(1) (c)(2)(ii)(A) Standards: agitators: difficult-tomonitor: criteria (h)(2) [ot onsolidated] Standards: agitators: difficult-tomonitor: number (h)(3) (c)(4)(ii) Standards: agitators: difficult-tomonitor: written plan (i) (e)(6) Standards: agitators: equipment obstructions (j) (e)(7) Standards: agitators: unsafe-tomonitor (j)(1) (c)(1) Standards: agitators: unsafe-tomonitor: criteria (j)(2) (c)(4)(i) Standards: agitators: unsafe-tomonitor: written plan omments The AR clarifies that the owner or operator shall monitor according to the written plan, not just shall have a plan. The AR clarifies that the owner or operator shall monitor according to the written plan, not just shall have a plan. AR correlation tables, Date Printed: October 10, 2001 version 6.0/K:\8597\72\001\correlationtbl\Honel-v6.wpd Page 13 of 24

14 AR orrelation Table - Equipment Leaks (40 FR (HO) through ) itations (HO Equipment Leaks) itations a,b Description (a) (a) Standards: connectors: compliance schedule (a)(1) (b) and (b)(1) Standards: connectors: monitoring method (a)(2) (b)(2) Standards: connectors: leak definition (b) (b)(3) Standards: connectors: monitoring periods (c) [ot onsolidated] Standards: connectors: nonrepairable and screwed connector alternative hange c omments The AR only requires initial connector monitoring if it has not been previously performed. The AR language elaborates on this concept. The AR provides for the same concept as the HO (i.e., better performing process units can be monitored less frequently). The AR, however, expands the concept out to an 8-year monitoring period. S, BI The AR does not contain these complicated burdensome options. Instead, the AR presents a very simple procedure for determining percent leakers: number leaking divided by number monitored (d) (d) and (a) Standards: connectors: leak repair (e) [ot onsolidated] [Reserved] (f) (e)(1) Standards: connectors: unsafeto-monitor (f)(1) (c)(1) Standards: connectors: unsafeto-monitor: criteria (f)(2) (c)(4)(i) Standards: connectors: unsafeto-monitor: written plan (g), (g)(1), and (g)(2) (h), (h)(1), and (h)(2) (d)(1), and (e) (e)(2), (e)(2)(i), and (e)(2)(ii) Standards: connectors: unsafeto-repair Standards: connectors: inaccessible, ceramic, or ceramiclined The AR clarifies that the owner or operator shall monitor according to the written plan, not just shall have the plan., The AR institutes "visual inspection repair" (i.e., eliminate the indicators of a leak) rather than the detailed leak repair provisions associated with leaks confirmed through instrument monitoring. AR correlation tables, Date Printed: October 10, 2001 version 6.0/K:\8597\72\001\correlationtbl\Honel-v6.wpd Page 14 of 24

15 AR orrelation Table - Equipment Leaks (40 FR (HO) through ) itations (HO Equipment Leaks) itations a,b Description (h)(2) and (h)(3) [ot onsolidated] Standards: connectors: inaccessible, ceramic, or ceramiclined: leak repair (i) (c) Standards: connectors: percent leaking (equation) (j) [ot onsolidated] Standards: connectors: credit for removed connectors hange c omments The AR institutes "visual inspection repair" (i.e., eliminate the indicators of a leak) rather than the detailed leak repair provisions associated with leaks confirmed through instrument monitoring. S, BI The AR greatly simplifies the percent leaking calculation by removing complicated, burdensome options which are infrequently used in the industry. See also (c). S, BI The AR greatly simplifies the percent leaking calculation by removing complicated, burdensome options which are infrequently used in the industry. See also (c) [ot onsolidated] QIP for valves The AR does not feature a QIP for valves. The valve subgrouping provisions of the AR provide for the same intent --focusing attention on poorly performing valves QIP for pumps The AR applies the pump QIP to all pumps (instead of Phase III pumps) because the AR does not feature a phased-in approach to compliance (a) (b) Alternative means of emission limitation (b), (b)(1), (b)(2), and (b)(3) (c) and (c)(1) through (c)(6) (d)(1), (d)(1)(i), (d)(12)(ii), and (d)(1)(iii) (d)(2) and (d)(2)(i) through (d)(2)(iv) Alternative means of emission limitation: equipment, design, or operational requirements Alternative means of emission limitation: work practice standards (d) (d)(3) Alternative means of emission limitation: unique approach (e)(1) and (e)(2) (c)(1) and (c)(2) Alternative means of emission limitation: requests by manufacturers (a) (a) Batch processes: general S The AR language is simpler but the provisions are the same. AR correlation tables, Date Printed: October 10, 2001 version 6.0/K:\8597\72\001\correlationtbl\Honel-v6.wpd Page 15 of 24

16 AR orrelation Table - Equipment Leaks (40 FR (HO) through ) itations (HO Equipment Leaks) itations a,b Description hange c omments (b) (b) Batch processes: pressure testing (c) (c) Batch processes: equipment monitoring (d) (e) Batch processes: delay of repair (a) Enclosed-vented processes: The AR clarifies that emissions from equipment leaks can be vented to a process general or fuel gas system (a) [ot onsolidated] Test methods and procedures: This introductory language is not necessary under the AR structure. general statement (b) (b) Monitoring The AR clarifies that these procedures are to be followed for instrument monitoring but not for visual checks (b)(1) (b)(1) Monitoring: Method (b)(2)(i) and (b)(2)(ii) (b)(2)(i) and (b)(2)(ii) Monitoring: detection instrument performance criteria (b)(3) (b)(3) Monitoring: calibrate the instrument (b)(4), (b)(4)(i), (b)(4)(ii), and (b)(4)(iii) (b)(4), (b)(4)(i), and (b)(4)(ii) The AR references the "representative" composition of the process stream, for cases where the "average" composition is not representative. Monitoring: calibration gas S The AR does not feature phased-in requirements for leak definitions. Therefore, it does not incorporate the HO phased-in requirements for calibration gases (b)(5) (b)(5) Monitoring: when to perform S The AR does not include the redundant allowance for a non-hap surrogate VO (b)(6) (b)(6) Monitoring: use of historical data (c) and (c)(1) through (c)(4) (d)(1) through (d)(4) (c) and (c)(1) through (c)(4) [Referencing Subpart] Monitoring: background adjustments Procedures: "in organic AP service" R The AR language is generalized, but the intent and the requirement are the same as the HO. The AR does not alter which equipment are subject to control. This provision is not needed (e) (b)(3)(i) Flares: visible emissions The AR explicitly states that the observation period should be 2 hours. AR correlation tables, Date Printed: October 10, 2001 version 6.0/K:\8597\72\001\correlationtbl\Honel-v6.wpd Page 16 of 24

17 AR orrelation Table - Equipment Leaks (40 FR (HO) through ) itations (HO Equipment Leaks) itations a,b Description (f) (b)(5) Batch processes: gas pressure test procedure (g) (b)(6) Batch processes: liquid pressure test procedure hange c omments (a) (a) Recordkeeping: one system (b) [ot onsolidated] Recordkeeping: requirement This introductory language is not necessary under the AR structure (b)(1)(i) (b)(1) Recordkeeping: connectors (b)(1) Recordkeeping: equipment The AR does not require identification numbers. identification (b)(1)(ii) (c)(1)(i) and Recordkeeping: valve and (c)(3) connector monitoring schedules (b)(1)(iii) (a) Recordkeeping: physical tagging is not necessary (b)(2)(i) (b)(3) Recordkeeping: VS/D, The AR clarifies that this applies to routing to processes and fuel gas systems. The AR does not require identification numbers (b)(2)(ii) (e) Recordkeeping: less than 500 ppm The AR does not require identification numbers (b)(2)(iii) [ot onsolidated] Recordkeeping: surge control vessels or bottoms receivers (b)(3)(i) [ot onsolidated] Recordkeeping: pressure relief devices (b)(3)(ii) (b)(4) Recordkeeping: pressure relief devices with rupture disks (b)(4) (b)(5) Recordkeeping: instrumentation systems (b)(5) [ot onsolidated] Recordkeeping: screwed connectors The AR treats these equipment as storage vessels, and the HO equipment leak provisions do not apply. The AR does not call out "standard" pressure relief devices for special identification or recordkeeping The AR does not require identification numbers. The AR does not contain special provisions for screwed connectors. AR correlation tables, Date Printed: October 10, 2001 version 6.0/K:\8597\72\001\correlationtbl\Honel-v6.wpd Page 17 of 24

18 AR orrelation Table - Equipment Leaks (40 FR (HO) through ) itations (HO Equipment Leaks) itations a,b Description (b)(6), (b)(6)(i), and (b)(6)(ii) (b)(7), (b)(7)(i), and (b)(7)(ii) (e)(1)(i), (e)(1)(vi)(B), (d)(2), (c)(2)(iii), (c)(4), and (c)(6)(i) (c)(3) and (a)(2) Recordkeeping: dual mechanical seal systems Recordkeeping: unsafe or difficult-to-monitor hange c omments The AR does not require identification numbers (b)(7)(iii) (d)(2) Recordkeeping: unsafe-to-repair The AR does not require identification numbers (b)(8)(i) and (b)(8)(ii) (b)(9)(i) and (b)(9)(ii) (c) (d), (d)(1), and (d)(2) [ot onsolidated] (d)(1) and (d)(2) (b)(4) and (e)(1)(v) (e)(2), (e)(2)(i), and (e)(2)(ii) (d)(2), (f) and (f)(1) (d)(3), (d)(4), through (f)(5) (d)(5), (d)(5)(i), (d)(5)(ii), and (d)(6) (d)(7)(i) and (d)(7)(ii) [ot onsolidated] Recordkeeping: removed valves and welded connectors Recordkeeping: added equipment in batch processes Recordkeeping: documentation of visual inspections The AR does not feature these programs, so the associated records are not necessary. Recordkeeping: leak is detected The AR clarifies that records should be kept for 5 years beyond the date of the data's use, if title V is applicable. Recordkeeping: leak is repaired Recordkeeping: connectors with seal broken (d)(8) (d)(3) Recordkeeping: tests for equipment added to a batch process (d)(9) [ot onsolidated] Recordkeeping: copies of periodic reports The AR does not have requirements for monitoring or recordkeeping for opened or seal broken connectors. The AR does not require copies of periodic reports to be maintained. AR correlation tables, Date Printed: October 10, 2001 version 6.0/K:\8597\72\001\correlationtbl\Honel-v6.wpd Page 18 of 24

19 AR orrelation Table - Equipment Leaks (40 FR (HO) through ) itations (HO Equipment Leaks) itations a,b Description (e) (b)(7) Recordkeeping: batch processes: pressure testing (f), (f)(1), and (f)(2) (g), (g)(1), and (g)(2)... except (g)(1)(iii) (c)(3) and (f)(2) (d), (d)(1), and (d)(2) Recordkeeping: less than 500 ppm (PRD and compressors) Recordkeeping: equipment leak VS hange c (g)(1)(iii) (b)(1) Recordkeeping: flare design (g)(3) and (g)(3)(i) (a)(4) Recordkeeping: VS inspection, no leaks detected BI omments The AR requires a record to be maintained of the engineering assessment that identifies the representative composition of the process fluid for instrument response factor criteria determinations (g)(3)(ii) (a)(3) Recordkeeping: VS inspection, leak detected (h), (h)(1), [ot onsolidated] Recordkeeping: valve QIP The AR does not feature a QIP for valves and (h)(2) (h)(3) [ot onsolidated] Recordkeeping: valve QIP The AR does not feature a QIP for valves through (h)(9) (e) Recordkeeping: pump QIP (i), (i)(1), (i)(2), and (i)(3) (f), (f)(1), (f)(2), and (f)(3) Recordkeeping: heavy liquid service (j) (b)(6) Recordkeeping: less than 300 hours per year (k), (k)(1), (k)(2), and (k)(3) (a) and (a)(1) through (a)(3) (b), (b)(1), (b)(2), and (b)(3) 65.5(a) and (a)(1) through (a)(6) Recordkeeping: enclosed-vented process units Reports: list of required reports S The AR list is more general because it applies to all sorts of emission points, not just equipment leaks. Reporting is similar to that required by the HO, but the single, consolidated set of reporting requirements is simpler to implement. AR correlation tables, Date Printed: October 10, 2001 version 6.0/K:\8597\72\001\correlationtbl\Honel-v6.wpd Page 19 of 24

20 AR orrelation Table - Equipment Leaks (40 FR (HO) through ) itations (HO Equipment Leaks) itations a,b Description (a)(4) and (a)(5) (a)(6) and (a)(6)(i) through (a)(6)(iii) hange c [ot onsolidated] [Reserved] [ot onsolidated] Reports: request for extension to the compliance date omments This provision applies to the HO compliance date and is not necessary for the AR. ompliance with the AR is optional and a compliance schedule is established by the owner or operator (b) [ot onsolidated] Reports: Initial otification While the AR contains a similar notice when an owner or operator decides to opt-in to the AR, there is not direct correlation to the HO Initial otification. This report is not necessary in the AR and is not consolidated (c) 65.5(d)(2) Reports: Initial ompliance Status Report (ISR): due date (c)(1) and (c)(1)(i) through (c)(1)(iii) The AR provides for this report to be submitted up to 240 days after the compliance date of the referencing subpart (or 60 days after completion of initial testing). The HO required this report within 90 days of the compliance date (a) ISR: requirement to submit The AR does not require an ISR if the information has previously been submitted (a)(1) and (a)(1)(i) through (a)(1)(iii) ISR: contents (general) (c)(1)(iv) [ot onsolidated] ISR: phase status The AR does not provide for a phased-in compliance schedule (c)(2), (c)(2)(i), and (c)(2)(ii) (c)(3), (c)(3)(i), and (c)(3)(ii) (a)(2), (a)(2)(i) and (a)(2)(ii) (a)(3), (a)(3)(i), and (a)(3)(ii) ISR: contents (batch process units) ISR: contents (enclosed-vented process units) (c)(4) [ot onsolidated] ISR: due date if subpart F of the HO is applicable (d) 65.5(e) Reports: periodic reports: requirement to submit The AR provides for this report to be submitted up to 240 days after the compliance date of the referencing subpart (or 60 days after completion of initial testing). The HO required this report within 90 days of the compliance date. AR correlation tables, Date Printed: October 10, 2001 version 6.0/K:\8597\72\001\correlationtbl\Honel-v6.wpd Page 20 of 24

21 AR orrelation Table - Equipment Leaks (40 FR (HO) through ) itations (HO Equipment Leaks) itations a,b Description hange c omments (d)(1) 65.5(e)(2) Periodic reports: due date The AR provides for initial testing to be completed before the 6 month periodic reporting schedule begins. The AR explicitly allows 60 days for completion of tests and writing the report; the reports are due 60 days after the end of each semiannual period (d)(2)(i) through (d)(2)(xii) [ot onsolidated] [Reserved] (b)(1) and (b)(1)(i) through (b)(1)(v) Periodic reports: contents: number of equipment and number of leaks detected (d)(2)(xiii) (b)(2) Periodic reports: contents: delay of repair (d)(2)(xiv) (b)(4) Periodic reports: contents: less than 500 ppm (d)(2)(xv) (b)(5) and (b)(6) Periodic reports: contents: initiation of monthly monitoring or pump QIP (d)(2)(xvi) and (d)(2)(xvii) (d)(3) and (d)(3)(i) through (d)(3)v) [ot onsolidated] (f) and (b)(8) Periodic reports: contents: connector monitoring alternatives Periodic reports: contents: batch process units (d)(4) (b)(9) Periodic reports: contents: change in method of compliance ew (a) Alternative means of emission limitation is not applicable to performance standards The AR does not feature a QIP for valves. The AR does not feature these compliance alternatives, so no reporting is necessary. The AR clarifies that alternative means of emission limitation are inapplicable to performance standards. AR correlation tables, Date Printed: October 10, 2001 version 6.0/K:\8597\72\001\correlationtbl\Honel-v6.wpd Page 21 of 24

22 AR orrelation Table - Equipment Leaks (40 FR (HO) through ) itations (HO Equipment Leaks) itations a,b Description ew (b)(3)(vi) Records of process unit monitoring schedule for valves ew (a), (a)(1), and (a)(2) Outline of instrument and sensory monitoring hange c BI omments This minimal record is designed to aid inspectors and owner/operators by tracking the appropriate schedule for each process unit or subgroup. It is an integral part of the burden reducing allowance to subgroup valves. This paragraph provides a roadmap to the standards by referencing each citation where either instrument or sensory monitoring occur. ew (d) Sensory monitoring methods The AR clarifies that sensory (non-instrument) monitoring includes visual, audible, olfactory, or any similar detection method. The AR makes distinctions, in terms of requirements, between sensory and instrument monitoring. ew (b)(4) Valve subgrouping The AR provides for the creation of subgroups of valves, within or across process unit boundaries. Each subgroup is eligible for performance-based reductions in monitoring frequency independently. The benefits, burden reductions, and safeguards are discussed in detail in the preamble to the proposed rule and in the enabling manual. ew (c) Percent leaking valves calculation To implement the burden reducing valve subgrouping program, the AR provides a percent leaking calculation procedure for valves. Included in this procedure is a correction for ''nonrepairable" valves. ew (c)(5) losed-purge system containers must be kept closed ew (b)(3) Routing emissions to a process or fuel gas system ew (b)and (c) Recordkeeping provisions, general and specific ew (a)(1) VS must collect emissions and route to a control device BI,S The AR adopts the common sense provision that when not in use, containers that are part of a closed-purge system must be covered or closed. The AR adds flexibility by providing for this additional compliance option. The AR is structured to be of use to difficult readers. For the operators of the equipment, all applicable requirements (including recordkeeping) are included in the standards sections. Section is a compiled lit of all the previously appearing recordkeeping requirements. This list is to aid the personnel responsible for recordkeeping. The AR clarifies that the VS must be designed and operated to collect the regulated material emissions and route it to a control device. AR correlation tables, Date Printed: October 10, 2001 version 6.0/K:\8597\72\001\correlationtbl\Honel-v6.wpd Page 22 of 24

23 AR orrelation Table - Equipment Leaks (40 FR (HO) through ) itations (HO Equipment Leaks) itations a,b Description ew and (a) Routing to a fuel gas system or process ew (a)(2) ontrol device must be operating when emissions are vented to it hange c omments The AR adds flexibility by adopting routing to a fuel gas system or process as a compliance option. The AR clarifies that a control device must be in operation when emissions are vented to it. ew (b) Performance test not required The AR explicitly states that a performance test is not required for a control device that is only controlling emissions from equipment leaks. ew (a), (b), and (c), and (b)(3) Flare compliance determination requirements ew (a) Flare compliance determination notifications and reports ew (b)(2) Submission of subsequent flare compliance determinations ew (a) General information in a periodic report BI The AR clarifies that waivers apply to the flare compliance determinations as well as performance tests. The AR also clarifies that the schedule for performance tests applies to flare compliance determinations. The AR requires the same type of report for the flare compliance determination as for the performance test. This includes a brief process description, descriptions of the sampling site and analysis procedures, record of operating conditions during the test, etc. The AR specifies that a report for a performance test conducted after the Initial ompliance Status Report is due 60 days after completing the test. The AR adds clarity by specifying some general information that must be in a periodic report, including reporting dates and total source operating period. AR correlation tables, Date Printed: October 10, 2001 version 6.0/K:\8597\72\001\correlationtbl\Honel-v6.wpd Page 23 of 24

24 AR orrelation Table - Equipment Leaks (40 FR (HO) through ) a b c [ot onsolidated] - Provisions that are not consolidated in the AR because they are not relevant to SOMI sources or needed in the AR. [Referencing Subpart] - Provisions that are not consolidated in the AR but remain in the Referencing Subpart and remain applicable to sources complying with the AR. Letters in this column indicate the following: - clarification S - simplification - burden reduction BI - burden increase - no significant change - not consolidated R - provisions retained in referencing subpart. AR correlation tables, Date Printed: October 10, 2001 version 6.0/K:\8597\72\001\correlationtbl\Honel-v6.wpd Page 24 of 24

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 FORM TA-1

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 FORM TA-1 OMB Approval OMB Number: 3235-0084 Expires: July 31, 2018 Estimated average burden hours per response...1.5 UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 FORM TA-1 UNIFORM FORM

More information

BEST PRACTICES IN LEAK DETECTION AND REPAIR (LDAR) PROGRAMS. November 06, 2014 By: François Thibodeau, Eng.

BEST PRACTICES IN LEAK DETECTION AND REPAIR (LDAR) PROGRAMS. November 06, 2014 By: François Thibodeau, Eng. BEST PRACTICES IN LEAK DETECTION AND REPAIR (LDAR) PROGRAMS November 06, 2014 By: François Thibodeau, Eng. 2 PRESENTATION OVERVIEW 1. Essential Components of a LDAR Program 2. LDAR Best Practices a. A

More information

TECHNICAL SUPPLEMENT 3: EQUIPMENT LEAK FUGITIVES

TECHNICAL SUPPLEMENT 3: EQUIPMENT LEAK FUGITIVES TECHNICAL SUPPLEMENT 3: EQUIPMENT LEAK FUGITIVES Technical Disclaimer This technical supplement is intended to help you accurately determine and correctly report equipment leak fugitive emissions. It does

More information

Control Device Requirements Charts For Oil and Gas Handling and Production Facilities

Control Device Requirements Charts For Oil and Gas Handling and Production Facilities Device Charts For Oil and Gas Handling and Production Facilities Purpose/Scope: The purpose of this document is to provide standardized guidance for use by the regulated community and air permit reviewers,

More information

New Zealand Certificate in Plumbing (Level 4)

New Zealand Certificate in Plumbing (Level 4) New Zealand Certificate in Plumbing (Level 4) Title New Zealand Certificate in Plumbing (Level 4) Version 1 Qualification type Certificate Level 4 Credits 249 NZSCED 040327 Architecture and Building >

More information

NSPS Subpart OOOO: Applicability and Compliance Basics

NSPS Subpart OOOO: Applicability and Compliance Basics NSPS Subpart OOOO: Applicability and Compliance Basics Kentucky Oil & Gas Association 2013 Western Kentucky Meeting September 12, 2013 Roy Rakiewicz All4 Inc. Rob Flynn Environmental Standards, Inc. www.all4inc.com

More information

Oregon Health Authority and United States Department of Justice (USDOJ) Performance Matrix OHA/USDOJ Agreement 07/30/2014

Oregon Health Authority and United States Department of Justice (USDOJ) Performance Matrix OHA/USDOJ Agreement 07/30/2014 Program Performance Measures 1 Date Reported I. AVAILABILITY OF COMMUNITY BASED SERVICES 1. For each County (geographically) 2, report on each of the following behavioral health services based on most

More information

Leak Detection and Repair. A Best Practices Guide

Leak Detection and Repair. A Best Practices Guide Leak Detection and Repair A Best Practices Guide United States Environmental Protection Agency Office of Compliance Office of Enforcement and Compliance Assurance 1200 Pennsylvania Avenue, NW (mail code)

More information

(Adopted July 7, 1989)(Amended December 7, 1990) (Amended May 13, 1994) FUGITIVE EMISSIONS OF VOLATILE ORGANIC COMPOUNDS

(Adopted July 7, 1989)(Amended December 7, 1990) (Amended May 13, 1994) FUGITIVE EMISSIONS OF VOLATILE ORGANIC COMPOUNDS (Adopted July 7, 1989)(Amended December 7, 1990) (Amended May 13, 1994) RULE 1173. FUGITIVE EMISSIONS OF VOLATILE ORGANIC COMPOUNDS (a) (b) Purpose This rule is intended to control volatile organic compounds

More information

Course Syllabus. CDEC 1313 Curriculum Resources for Early Childhood Programs. Revision Date: April 19, 2016

Course Syllabus. CDEC 1313 Curriculum Resources for Early Childhood Programs. Revision Date: April 19, 2016 Course Syllabus CDEC 1313 Curriculum Resources for Early Childhood Programs Revision Date: April 19, 2016 Catalog Description: A study of the fundamentals of developmentally-appropriate curriculum design

More information

Advertising, Consumer protection, Mortgages, Reporting and recordkeeping

Advertising, Consumer protection, Mortgages, Reporting and recordkeeping List of Subjects in 12 CFR Part 1026 Advertising, Consumer protection, Mortgages, Reporting and recordkeeping requirements, Truth in Lending. Authority and Issuance For the reasons set forth in the preamble,

More information

INSTRUCTIONAL GOALS AND PURPOSES

INSTRUCTIONAL GOALS AND PURPOSES Course Syllabus HITT 2261 Clinical Health Information Technology/Technician Revision Date: April 14, 2015 Catalog Description: A health-related work-based learning experience that enables the student to

More information

PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION Page 1 of 9 PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION COMPLIANCE DEMONSTRATION INSTRUCTIONS FOR THE CATEGORY NO. 38 AIR QUALITY PERMIT EXEMPTION CRITERIA The Category No. 38 exemption criteria

More information

National Emission Standards for Hazardous Air Pollutant Emissions: Petroleum Refinery Sector Amendments

National Emission Standards for Hazardous Air Pollutant Emissions: Petroleum Refinery Sector Amendments This document is scheduled to be published in the Federal Register on 02/09/2016 and available online at http://federalregister.gov/a/2016-02306, and on FDsys.gov 6560-50-P ENVIRONMENTAL PROTECTION AGENCY

More information

Summary of DSRIP Projects by Domain

Summary of DSRIP Projects by Domain Summary of DSRIP Projects by Domain : System Transformation Projects A. Create Integrated Delivery System Create Integrated Delivery Systems that are focused on Evidence Based Medicine / 2.a.i Population

More information

Subpart XX Standards of Performance. Terminals. Environmental Protection Agency 60.501

Subpart XX Standards of Performance. Terminals. Environmental Protection Agency 60.501 lpowell on DSK54DXVN1OFR with $$_JOB Environmental Protection Agency 60.501 a State under section 111(c) of the Act, approves reporting requirements or an alternative means of compliance surveillance adopted

More information

Crosswalk of Sustainability Goals and Targets In Executive Orders and Statutes

Crosswalk of Sustainability Goals and Targets In Executive Orders and Statutes Crosswalk of Sustainability Goals and Targets In Executive Orders and Statutes December 2, 2009 The new Executive Order (E.O.) 13514 Federal Leadership in Environmental, Energy, and Economic Performance

More information

22. Supplement I to part 1024 is added to the end thereof to read as follows:

22. Supplement I to part 1024 is added to the end thereof to read as follows: 22. Supplement I to part 1024 is added to the end thereof to read as follows: Supplement I to Part 1024 Official Bureau Interpretations Introduction 1. Official status. This commentary is the primary vehicle

More information

40 CFR Ch. I (7 1 13 Edition)

40 CFR Ch. I (7 1 13 Edition) 60.5360 Subpart OOOO Standards of Performance for Crude Oil and Natural Gas Production, Transmission and Distribution SOURCE: 77 FR 49542, Aug, 16, 2012, unless otherwise noted. 60.5360 What is the purpose

More information

Credit Card Account Management 1

Credit Card Account Management 1 1 Exam Date: Exam ID No.: Prepared By: Reviewer: Docket #: [Click&type] [Click&type] [Click&type] [Click&type] [Click&type] These (Procedures) consist of modules covering the various elements of credit

More information

in the province of, certify the following:

in the province of, certify the following: SCHEDULE (Sectioll 10) SCHEDULE (Sections 38 to -41 ) FORM 1 CERTIFICATION REGARDING WITHDRAWAL BASED ON FINANCIAL HARDSHIP 1. To: (insert name a/financial 2. List of applicable locked-in plans: (Please

More information

Rule Overview Regulation No.3, 6 and 7

Rule Overview Regulation No.3, 6 and 7 1 NMPA Rule Update 6/2/14 Rule Overview Regulation No.3, 6 and 7 June 3, 2014 Colorado Department of Public Health and Environment Air Pollution Control Division 2 NMPA Rule Update 6/2/14 Resources Send

More information

The Pipelines Regulations, 2000

The Pipelines Regulations, 2000 PIPELINES, 2000 P-12.1 REG 1 1 The Pipelines Regulations, 2000 being Chapter P-12.1 Reg 1 (effective April 1, 2000) as amended by the Statutes of Saskatchewan, 2014, c.21. NOTE: This consolidation is not

More information

HIPAA Security Checklist

HIPAA Security Checklist HIPAA Security Checklist The following checklist summarizes HIPAA Security Rule requirements that should be implemented by covered entities and business associates. The citations are to 45 CFR 164.300

More information

2013 Real Estate Settlement Procedures Act (Regulation X) and Truth in Lending Act (Regulation Z) Mortgage Servicing Final Rules

2013 Real Estate Settlement Procedures Act (Regulation X) and Truth in Lending Act (Regulation Z) Mortgage Servicing Final Rules JUNE 7, 2013 2013 Real Estate Settlement Procedures Act (Regulation X) and Truth in Lending Act (Regulation Z) Mortgage Servicing Final Rules SMALL ENTITY COMPLIANCE GUIDE 1 Please refer to our proposed

More information

Emissions Control - Hazardous Emissions & Bagle Detection Systems

Emissions Control - Hazardous Emissions & Bagle Detection Systems 63.11407 40 CFR Ch. I (7 1 15 Edition) (3) Approval of a major change to monitoring under 63.8(f). A major change to monitoring is defined in 63.90. (4) Approval of a major change to recordkeeping/reporting

More information

TILA-RESPA INTEGRATED DISCLOSURE

TILA-RESPA INTEGRATED DISCLOSURE TILA-RESPA INTEGRATED DISCLOSURE Guide to the Loan Estimate and Closing Disclosure forms Consumer Financial Protection Bureau Version log The Bureau updates this guide on a periodic basis to reflect finalized

More information

New York Stock Exchange

New York Stock Exchange 13 July 2015 New York Stock Exchange Corporate Governance Listing Standards (2013) As an international company listed in New York, Novo Nordisk is in compliance with US securities law including the Sarbanes

More information

ENVIRONMENTAL STANDARDS FOR PETROLEUM OIL REFINERIES EMISSIONS. Standards for emissions from furnaces, boilers and Power Plant

ENVIRONMENTAL STANDARDS FOR PETROLEUM OIL REFINERIES EMISSIONS. Standards for emissions from furnaces, boilers and Power Plant ENVIRONMENTAL STANDARDS FOR PETROLEUM OIL REFINERIES EMISSIONS Standards for emissions from furnaces, boilers and Power Plant S. Parameter Limiting concentration in mg/nm 3, unless stated Existing refineries

More information

General Services Administration

General Services Administration Vol. 80 Thursday, No. 127 July 2, 2015 Part III Department of Defense General Services Administration National Aeronautics and Space Administration 48 CFR Chapter 1 Federal Acquisition Regulation; Rules

More information

Owner-User Pressure Equipment Integrity Management Requirements

Owner-User Pressure Equipment Integrity Management Requirements the pressure equipment safety authority Owner-User Pressure Equipment Integrity Management Requirements AB-512 Edition 2, Revision 0 Issued 2015-06-25 Owner-user Pressure Equipment Integrity Management

More information

TILA-RESPA Integrated Disclosure rule. Small entity compliance guide

TILA-RESPA Integrated Disclosure rule. Small entity compliance guide TILA-RESPA Integrated Disclosure rule Small entity compliance guide September 2014 Version Log The Bureau updates this guide on a periodic basis to reflect finalized clarifications to the rule which impacts

More information

COURSE SYLLABUS INMT-1317 INDUSTRIAL AUTOMATION

COURSE SYLLABUS INMT-1317 INDUSTRIAL AUTOMATION COURSE SYLLABUS INMT-1317 INDUSTRIAL AUTOMATION Catalog Description: A study of the applications of industrial automation systems, including identification of system requirements, equipment integration,

More information

WITHDRAWAL OR TRANSFER FROM A FEDERALLY REGULATED LOCKED-IN PLAN BASED UPON FINANCIAL HARDSHIP PLANHOLDER INSTRUCTIONS

WITHDRAWAL OR TRANSFER FROM A FEDERALLY REGULATED LOCKED-IN PLAN BASED UPON FINANCIAL HARDSHIP PLANHOLDER INSTRUCTIONS WITHDRAWAL OR TRANSFER FROM A FEDERALLY REGULATED LOCKED-IN PLAN BASED UPON FINANCIAL HARDSHIP PLANHOLDER INSTRUCTIONS The attached forms must be completed if a planholder of a Federal Locked-in Registered

More information

Subpart I Delaware. 40 CFR Ch. I (7 1 98 Edition) (10) Amendments to Section V (Surveillance)

Subpart I Delaware. 40 CFR Ch. I (7 1 98 Edition) (10) Amendments to Section V (Surveillance) 52.420 Subpart I Delaware 52.420 Identification of plan. (a) Title of plan: State of Delaware Implementation Plans for Attainment and Maintenance of National Ambient Air Quality Standards. (b) The plan

More information

TILA-RESPA Integrated Disclosure rule. Small entity compliance guide

TILA-RESPA Integrated Disclosure rule. Small entity compliance guide TILA-RESPA Integrated Disclosure rule Small entity compliance guide March 2014 Table of contents Table of contents... 2 1. Introduction... 10 1.1 What is the purpose of this guide?... 11 1.2 Who should

More information

Colorado Oil and Gas Emissions Rules

Colorado Oil and Gas Emissions Rules Colorado Oil and Gas Emissions Rules GREEN COMPLETION PRACTICES shall mean those practices intended to reduce emissions of salable gas and condensate vapors during cleanout and flowback operations prior

More information

INDEX. Current to Release 2014-1 All references are to section of the text and not page numbers.

INDEX. Current to Release 2014-1 All references are to section of the text and not page numbers. Current to Release 2014-1 All references are to section of the text and not page numbers. Accountants. See also Auditors. chartered accountants, regulation of, 8.3(a) fiduciary duties, 8.8 generally, 8.1

More information

HIPAA Audit Processes HIPAA Audit Processes. Erik Hafkey Rainer Waedlich

HIPAA Audit Processes HIPAA Audit Processes. Erik Hafkey Rainer Waedlich HIPAA Audit Processes Erik Hafkey Rainer Waedlich 1 Policies for all HIPAA relevant Requirements and Regulations Checklist for an internal Audit Process Documentation of the compliance as Preparation for

More information

TILA-RESPA. Guide to the Loan Estimate and Closing Disclosure forms. Consumer Financial Protection Bureau

TILA-RESPA. Guide to the Loan Estimate and Closing Disclosure forms. Consumer Financial Protection Bureau TILA-RESPA Integrated Disclosure Guide to the Loan Estimate and Closing Disclosure forms Consumer Financial Protection Bureau What s inside 1. Introduction...6 1.1 What is the purpose of this guide?...

More information

RULE 1102. DRY CLEANERS USING SOLVENT OTHER THAN PERCHLOROETHYLENE

RULE 1102. DRY CLEANERS USING SOLVENT OTHER THAN PERCHLOROETHYLENE (Adopted January 6, 1978)(Amended August 3, 1979)(Amended July 11, 1980) (Amended August 3, 1990)(Amended December 7, 1990) (Amended November 17, 2000) RULE 1102. DRY CLEANERS USING SOLVENT OTHER THAN

More information

How To Get A Contract From The Federal Government

How To Get A Contract From The Federal Government Checklist for Reviewing Procurements by Federal Grant Grantees and Subgrantees This checklist was created to assist FEMA grantees and subgrantees in complying with the federal requirements that procurements

More information

TILA-RESPA INTEGRATED DISCLOSURE

TILA-RESPA INTEGRATED DISCLOSURE TILA-RESPA INTEGRATED DISCLOSURE Guide to the Loan Estimate and Closing Disclosure forms Consumer Financial Protection Bureau Version log The Bureau updates this guide on a periodic basis to reflect finalized

More information

Response to Revisions to the Permanent Certification Program for Health Information Technology NPRM (RIN 0991-AB82)

Response to Revisions to the Permanent Certification Program for Health Information Technology NPRM (RIN 0991-AB82) Response to Revisions to the Permanent Certification Program for Health Information Technology NPRM (RIN 0991-AB82) May 7, 2012 Secretary Kathleen Sebelius U.S. Department of Health and Human Services

More information

Highlights of Colorado s New Oil and Gas Hydrocarbon Emission Reduction Rules - Adopted February 2014

Highlights of Colorado s New Oil and Gas Hydrocarbon Emission Reduction Rules - Adopted February 2014 Highlights of Colorado s New Oil and Gas Hydrocarbon - Adopted February 2014 Presentation to the Colorado Counties, Inc. June 3, 2014 Mike Silverstein Colorado Department of Public Health and Environment

More information

INSTRUCTIONAL GOALS AND PURPOSES:

INSTRUCTIONAL GOALS AND PURPOSES: Course Syllabus HITT 1401 Health Data Content and Structure Revision Date: August 20, 2013 Catalog Description: Introduction to systems and processes for collecting, maintaining, and disseminating health

More information

2013 Real Estate Settlement Procedures Act (Regulation X) and Truth in Lending Act (Regulation Z) Mortgage Servicing Final Rules

2013 Real Estate Settlement Procedures Act (Regulation X) and Truth in Lending Act (Regulation Z) Mortgage Servicing Final Rules JANUARY 8, 2014 2013 Real Estate Settlement Procedures Act (Regulation X) and Truth in Lending Act (Regulation Z) Mortgage Servicing Final Rules SMALL ENTITY COMPLIANCE GUIDE 1 Version Log The Bureau updates

More information

Know Before You Owe Mortgage Disclosure Rule Construction Lending

Know Before You Owe Mortgage Disclosure Rule Construction Lending Know Before You Owe Mortgage Disclosure Rule Construction Lending Outlook Live Webinar March 1, 2016 Nick Hluchyj Senior Counsel Office of Regulations Kristin Switzer Regulatory Implementation Analyst

More information

Quality Assurance Program Quality Assurance Plan Periodic Audits Standard Operating Procedures Preventive Maintenance Outline Quality Assurance Plan (QAP) What is a QAP Why is a QAP required? What does

More information

NDEP Bureau of Corrective Actions Secondary Containment Regulations Guidance Document April 7, 2010 (Revision)

NDEP Bureau of Corrective Actions Secondary Containment Regulations Guidance Document April 7, 2010 (Revision) NDEP Bureau of Corrective Actions Secondary Containment Regulations Guidance Document April 7, 2010 (Revision) ADOPTED REGULATION OF THE STATE ENVIRONMENTAL COMMISSION LCB File No. R005-08 (Codified in

More information

Rules and Regulations

Rules and Regulations 1059 Rules and Regulations Federal Register Vol. 76, No. 5 Friday, January 7, 2011 This section of the FEDERAL REGISTER contains regulatory documents having general applicability and legal effect, most

More information

A Practical Guide to Free Energy Devices

A Practical Guide to Free Energy Devices A Practical Guide to Free Energy Devices Part PatE17: Last updated: 24th November 2006 Author: Patrick J. Kelly This is a patent application from Stephen Meyer, brother of the late Stan Meyer. While this

More information

ELECTRICAL - WIRING DESIGN AND PROTECTION SELF INSPECTION CHECKLIST

ELECTRICAL - WIRING DESIGN AND PROTECTION SELF INSPECTION CHECKLIST Name of School: OPTIONAL INFORMATION Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: ELECTRICAL - WIRING DESIGN AND PROTECTION SELF INSPECTION CHECKLIST Guidelines: This checklist

More information

PENRITH PERFORMING & VISUAL ARTS

PENRITH PERFORMING & VISUAL ARTS PENRITH PERFORMING & VISUAL ARTS JULY 2013- DECEMBER 2014 STRATEGIC PLAN Transitioning from a Not-for-Profit Cultural Organisation to a Creative Cultural Enterprise PPVA COMPANY VISION To be a cultural

More information

Spill Prevention, Control and Countermeasure (SPCC)

Spill Prevention, Control and Countermeasure (SPCC) Spill Prevention, Control and Countermeasure (SPCC) History Original promulgation 1973, effective 1974 Codified in 40 CFR 112 (EPA Jurisdiction) Proposed rulemaking 1991, 1993 and 1997 Amended July 17,

More information

POFT 2312 BUSINESS CORRESPONDENCE & COMMUNICATION

POFT 2312 BUSINESS CORRESPONDENCE & COMMUNICATION Course Syllabus POFT 2312 BUSINESS CORRESPONDENCE & COMMUNICATION Revision Date: 10/1/2015 Catalog Description: Development of writing and presentation skills to produce effective business communications.

More information

Colorado s Recent Efforts to Address Hydrocarbons from Oil and Gas Operations

Colorado s Recent Efforts to Address Hydrocarbons from Oil and Gas Operations Colorado s Recent Efforts to Address Hydrocarbons from Oil and Gas Operations Presentation to the Joint Meeting of the Southern Ute Indian Tribe/State of Colorado Environmental Commission and the Colorado

More information

Developing Colorado s s Oil and Gas Emissions Controls Overview of the Process and Requirements

Developing Colorado s s Oil and Gas Emissions Controls Overview of the Process and Requirements Developing Colorado s s Oil and Gas Emissions Controls Overview of the Process and Requirements Presentation for the Interstate Oil & Gas Compact Commission s Annual Business Meeting May 19, 2015 Mike

More information

INDUSTRIAL BOILER MACT FACTSHEET

INDUSTRIAL BOILER MACT FACTSHEET INDUSTRIAL BOILER MACT FACTSHEET The National Emission Standards for Hazardous Air Pollutants (NESHAP) for Industrial/Commercial/Institutional Boilers and Process Heaters (40 CFR Part 63, Subpart DDDDD),

More information

THE DETECTION OF GREENHOUSE GASES

THE DETECTION OF GREENHOUSE GASES THE DETECTION OF GREENHOUSE GASES Roy Montemarano Heath Consultants Incorporated KEYWORDS: greenhouse gas, remote detection, leak, natural gas, infrared, optical, imaging ABSTRACT Natural gas providers

More information

Texas Commission on Environmental Quality Page 1 Chapter 117 - Control of Air Pollution from Nitrogen Compounds

Texas Commission on Environmental Quality Page 1 Chapter 117 - Control of Air Pollution from Nitrogen Compounds Texas Commission on Environmental Quality Page 1 SUBCHAPTER G: GENERAL MONITORING AND TESTING REQUIREMENTS DIVISION 1: COMPLIANCE STACK TESTING AND REPORT REQUIREMENTS 117.8000, 117.8010 Effective June

More information

Sincerely, COMMENTS ON PROPOSED TITLE I REGULATIONS (August 6, 2002)

Sincerely, COMMENTS ON PROPOSED TITLE I REGULATIONS (August 6, 2002) Dr. Jacquelyn C. Jackson Acting Director Student Achievement and School Accountability Programs Office of Elementary and Secondary Education U.S. Department of Education 400 Maryland Avenue, SW, Room 3W230

More information

Federal Register / Vol. 74, No. 221 / Wednesday, November 18, 2009 / Rules and Regulations

Federal Register / Vol. 74, No. 221 / Wednesday, November 18, 2009 / Rules and Regulations 59688 Federal Register / Vol. 74, No. 221 / Wednesday, November 18, 2009 / Rules and Regulations DEPARTMENT OF EDUCATION 34 CFR Subtitle B, Chapter II [Docket ID ED 2009 OESE 0006] RIN 1810 AB07 Race to

More information

Electrical Safety-Related Work Practices; Electric Power Generation, Transmission, and

Electrical Safety-Related Work Practices; Electric Power Generation, Transmission, and This document is scheduled to be published in the Federal Register on 10/05/2015 and available online at http://federalregister.gov/a/2015-25062, and on FDsys.gov DEPARTMENT OF LABOR Occupational Safety

More information

Reproduction of Permit Terms and Conditions

Reproduction of Permit Terms and Conditions Page 1 of 339 Facility ID: 0243000024 Issuance type: Title V Draft Permit This version of facility specific terms and conditions was converted from a database format to an HTML file during an upgrade of

More information

Company Name: City, State, Zip Code: Annual Report Summary

Company Name: City, State, Zip Code: Annual Report Summary Company Information 2014 Company Name: Contact: Title: Address: City, State, Zip Code: Telephone: Fax: E-mail: Transmission Sector Summary BMP 1: Directed inspection and maintenance at compressor stations

More information

Help For Struggling Borrowers

Help For Struggling Borrowers DECEMBER 18, 2013 Help For Struggling Borrowers A guide to the mortgage servicing rules effective on January 10, 2014 Table of contents Introduction... 7 1. Applying for loss mitigation... 10 1.1 Introduction...

More information

Nuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants

Nuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants Nuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants Published in the Official State Gazette (BOE) No 283 of November 24 th 2009 Nuclear Safety Council Instruction

More information

Overview of the Final NSPS Ja for Refinery Flares And the Latest Developments on Flare Consent Decrees

Overview of the Final NSPS Ja for Refinery Flares And the Latest Developments on Flare Consent Decrees Overview of the Final NSPS Ja for Refinery Flares And the Latest Developments on Flare Consent Decrees October 24, 2012 Troy Boley & Raymond Allen Sage Environmental Consulting Overview of Ja & Flare CDs

More information

Title V Compliance Verification Process

Title V Compliance Verification Process em case study by Sara King and Jeffrey Meyers Development and Implementation of a Title V Compliance Verification Process Sara L. King is the environmental director at the ConocoPhillips Ponca City Refinery,

More information

Independent school standards compliance record

Independent school standards compliance record Independent school standards compliance record Independent school standard inspection School name DfE registration number Unique reference number (URN) URN for social care Inspection number Inspection

More information

Optimizing Flare System Performance at the Valero Sunray Refinery

Optimizing Flare System Performance at the Valero Sunray Refinery Engineering Excellence Webinar Series: Optimizing Flare System Performance at the Valero Sunray Refinery Presented by: James Holoboff Process Ecology April 28, 2011 2010 Aspen Technology, Inc. All rights

More information

HIPAA/HITECH PRIVACY & SECURITY CHECKLIST SELF ASSESSMENT INSTRUCTIONS

HIPAA/HITECH PRIVACY & SECURITY CHECKLIST SELF ASSESSMENT INSTRUCTIONS HIPAA/HITECH PRIVACY & SECURITY CHECKLIST SELF ASSESSMENT INSTRUCTIONS Thank you for taking the time to fill out the privacy & security checklist. Once completed, this checklist will help us get a better

More information

Evaluation and Assessment and Eligibility Regulations 2011

Evaluation and Assessment and Eligibility Regulations 2011 303.10 Developmental delay. As used in this part, developmental delay, when used with respect to an individual residing in a State, has the meaning given to that term under 303.300. 303.10 Developmental

More information

Standard Pneumatic Test Procedure Requirements for Piping Systems

Standard Pneumatic Test Procedure Requirements for Piping Systems the pressure equipment safety authority Standard Pneumatic Test Procedure Requirements for Piping Systems AB-522 Edition 2, Rev. 0 Issued 2012-06-28 Table of Contents FOREWORD... 3 1.0 INTRODUCTION...

More information

RESPA and TILA Mortgage Servicing Final Rules

RESPA and TILA Mortgage Servicing Final Rules This summary is provided by the Minnesota Credit Union Network for informational purposes only, and is intended to provide credit unions with the general regulatory requirements and effective dates for

More information

This notice provides guidance to foreign financial institutions (FFIs) entering into

This notice provides guidance to foreign financial institutions (FFIs) entering into Part III Administrative, Procedural, and Miscellaneous FFI agreement for Participating FFI and Reporting Model 2 FFI Notice 2013-69 SECTION I. Purpose. This notice provides guidance to foreign financial

More information

Spill Prevention, Control, and Countermeasures (SPCC) Regulations Update

Spill Prevention, Control, and Countermeasures (SPCC) Regulations Update Spill Prevention, Control, and Countermeasures (SPCC) Regulations Update The current deadline for most facilities (including typical mining and aggregate operations) is November 10, 2011. All facilities

More information

ABOVE-GROUND STORAGE TANKS

ABOVE-GROUND STORAGE TANKS ABOVE-GROUND STORAGE TANKS Above-ground storage tanks in Georgia are regulated by the State Fire Marshall and by the EPA. Above-ground tanks containing 1,100 gallons or less do not require any secondary

More information

GUIDE TO THE INTERNATIONAL REGISTRATION OF MARKS UNDER THE MADRID AGREEMENT AND THE MADRID PROTOCOL

GUIDE TO THE INTERNATIONAL REGISTRATION OF MARKS UNDER THE MADRID AGREEMENT AND THE MADRID PROTOCOL GUIDE TO THE INTERNATIONAL REGISTRATION OF MARKS UNDER THE MADRID AGREEMENT AND THE MADRID PROTOCOL (updated 2014) World Intellectual Property Organization GENEVA 2014 ii GUIDE TO THE INTERNATIONAL REGISTRATION

More information

Gas Standards and Safety. Guidance Note GAS INSTALLATIONS SUPPLIED FROM BIOGAS FACILITIES - ACCEPTANCE REQUIREMENTS GAS ACT 2000

Gas Standards and Safety. Guidance Note GAS INSTALLATIONS SUPPLIED FROM BIOGAS FACILITIES - ACCEPTANCE REQUIREMENTS GAS ACT 2000 Gas Standards and Safety Guidance Note January 2015 (GN106) Version 1.0 GAS INSTALLATIONS SUPPLIED FROM BIOGAS FACILITIES - ACCEPTANCE REQUIREMENTS GAS ACT 2000 A guide to assist in the design of biogas

More information

Adjustments Following Sales of Partnership Interests. SUMMARY: This document finalizes regulations relating to the

Adjustments Following Sales of Partnership Interests. SUMMARY: This document finalizes regulations relating to the [4830-01-u] DEPARTMENT OF THE TREASURY Internal Revenue Service 26 CFR Parts 1 and 602 [TD 8847] RIN 1545-AS39 Adjustments Following Sales of Partnership Interests AGENCY: Internal Revenue Service (IRS),

More information

Specific Course Objectives (includes SCANS): After studying all materials and resources presented in the course, the student will be able to:

Specific Course Objectives (includes SCANS): After studying all materials and resources presented in the course, the student will be able to: Course Syllabus Introduction to Accounting I Revision Date: July 2015 Catalog Description: A study of analyzing, classifying, and recording business transactions in a manual and computerized environment.

More information

Proposed Regulations on Basis Reporting by Securities Brokers and Basis Determination for Stock

Proposed Regulations on Basis Reporting by Securities Brokers and Basis Determination for Stock FINANCIAL SERVICES Proposed Regulations on Basis Reporting by Securities Brokers and Basis Determination for Stock TAX 1 Proposed Regulations on Basis Reporting by Securities Brokers and Basis Determination

More information

THE BASICS Q: What is VOC? Q: What are flashing losses/voc emissions from hydrocarbon storage tanks? - 1 -

THE BASICS Q: What is VOC? Q: What are flashing losses/voc emissions from hydrocarbon storage tanks? - 1 - Calculation of Flashing Losses/VOC Emissions from Hydrocarbon Storage Tanks THE BASICS Q: What is VOC? A: VOC is an acronym that stands for Volatile Organic Compounds. VOC are components of hydrocarbon

More information

RULE 8-8 - ORGANIC COMPOUNDS - WASTEWATER COLLECTION AND SEPARATION SYSTEMS

RULE 8-8 - ORGANIC COMPOUNDS - WASTEWATER COLLECTION AND SEPARATION SYSTEMS BAY AREA AIR QUALITY MANAGEMENT DISTRICT RULE 8-8 - ORGANIC COMPOUNDS - WASTEWATER COLLECTION AND SEPARATION SYSTEMS (ADOPTED: January 17, 1979) (AMENDED: November 1, 1989; October 6, 1993; June 15, 1994;

More information

Source Sampling Manual Volume II

Source Sampling Manual Volume II Source Sampling Manual Volume II December, 1980 Revisions: May, 1981 January, 1992 April, 2015 Operations Division 811 SW 6 th Avenue Portland, OR 97204 Phone: 503-229-5696 800-452-4011 Fax: 503-229-5850

More information

ITNW 1325 Fundamentals of Networking Technologies

ITNW 1325 Fundamentals of Networking Technologies Course Syllabus ITNW 1325 Fundamentals of Networking Technologies Catalog Description: Instruction in networking technologies and their implementation. Topics include the OSI reference model, network protocols,

More information

NOTIFICATION OF PERFORMANCE TESTING FOR GASOLINE DISPENSING FACILITIES (GDFs) NESHAP 40 CFR, Part 63, Subpart CCCCCC (Sections 63.11110 63.

NOTIFICATION OF PERFORMANCE TESTING FOR GASOLINE DISPENSING FACILITIES (GDFs) NESHAP 40 CFR, Part 63, Subpart CCCCCC (Sections 63.11110 63. MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ), OFFICE OF ENVIRONMENTAL ASSISTANCE NOTIFICATION OF PERFORMANCE TESTING FOR GASOLINE DISPENSING FACILITIES (GDFs) NESHAP 40 CFR, Part 63, Subpart CCCCCC

More information

IMPORTANT SAFETY NOTICE

IMPORTANT SAFETY NOTICE IMPORTANT SAFETY NOTICE To: Our Valued Customers User safety is a major focus in the design of our products. Following the precautions outlined in this manual will minimize your risk of injury. ITT Goulds

More information

Section 1 Source Identification. Section 2 - Certification

Section 1 Source Identification. Section 2 - Certification Section 1 Source Identification Company Name: Facility Location: Facility Name: Facility AIRS ID: Date of Construction of Storage Tank: Section 2 - Certification Certification All information for the Storage

More information

Course Syllabus. GAME 1403 Introduction to Game Design and Development

Course Syllabus. GAME 1403 Introduction to Game Design and Development 1 Course Syllabus GAME 1403 Introduction to Game Design and Development Catalog Description: Introduction to electronic game development and game development careers. Includes examination of history and

More information

Further Guidance on the Implementation of FATCA and Related Withholding Provisions

Further Guidance on the Implementation of FATCA and Related Withholding Provisions Further Guidance on the Implementation of FATCA and Related Withholding Provisions Notice 2014-33 I. PURPOSE This notice announces that calendar years 2014 and 2015 will be regarded as a transition period

More information

VMware vcloud Air HIPAA Matrix

VMware vcloud Air HIPAA Matrix goes to great lengths to ensure the security and availability of vcloud Air services. In this effort VMware has completed an independent third party examination of vcloud Air against applicable regulatory

More information

Enclosed are the General Permits issued pursuant to our review of your applications (General Permit No. GPEG-101, GPEG-102 and GPEG-103).

Enclosed are the General Permits issued pursuant to our review of your applications (General Permit No. GPEG-101, GPEG-102 and GPEG-103). 5 March 2012 David F. Gaipo, Superintendent East Providence Wastewater Treatment Facility 1 Crest Avenue East Providence, RI 02915 Dear Mr. Gaipo: The Department of Environmental Management, Office of

More information

Industrial Process Pump Safety Manual IMPORTANT SAFETY NOTICE

Industrial Process Pump Safety Manual IMPORTANT SAFETY NOTICE Industrial Process Pump Safety Manual IMPORTANT SAFETY NOTICE To: Our Valued Customers User safety is a major focus in the design of our products. Following the precautions outlined in this manual will

More information

www.klmtechgroup.com TABLE OF CONTENT

www.klmtechgroup.com TABLE OF CONTENT Page : 1 of 13 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 2 REFERENCES

More information

NUCLEAR REGULATORY COMMISSION. [Docket No. 52-039; NRC-2008-0603] PPL Bell Bend, LLC; Combined License Application for Bell Bend Nuclear Power Plant

NUCLEAR REGULATORY COMMISSION. [Docket No. 52-039; NRC-2008-0603] PPL Bell Bend, LLC; Combined License Application for Bell Bend Nuclear Power Plant [7590-01-P] NUCLEAR REGULATORY COMMISSION [Docket No. 52-039; NRC-2008-0603] PPL Bell Bend, LLC; Combined License Application for Bell Bend Nuclear Power Plant AGENCY: Nuclear Regulatory Commission. ACTION:

More information

bankerstitleshenandoah.com 1.888.259.7184

bankerstitleshenandoah.com 1.888.259.7184 Delivered in partnership with your local title and settlement agency bankerstitleshenandoah.com 1.888.259.7184 About this Manual In an effort to provide a thorough condensed training reference, this manual

More information

POWER ENGINEERS REGULATION

POWER ENGINEERS REGULATION Province of Alberta SAFETY CODES ACT POWER ENGINEERS REGULATION Alberta Regulation 85/2003 With amendments up to and including Alberta Regulation 84/2014 Office Consolidation Published by Alberta Queen

More information