Infusion Pump Inventory and Distribution Optimization Final Report

Size: px
Start display at page:

Download "Infusion Pump Inventory and Distribution Optimization Final Report"

Transcription

1 University of Michigan Hospital Materiel Services Infusion Pump Inventory and Distribution Optimization Final Report December 11, 2012 Submitted to: Hank Davis, Patient Equipment Manager, Program and Operations Analysis Amanda Silva, Lean Coach, Program and Operations Analysis Matthew Claysen, Industrial Engineer, Program and Operations Analysis Mark Van Oyen, Supervising Faculty Member, Department of Industrial and Operations Engineering Submitted by: IOE Team 10 - Fall 2012 Jason Handerhan, Jueying Liu, Carolyn Zick

2 Table of Contents Executive Summary... 1 Background... 1 Methodology... 1 Findings and Conculsions... 2 Recommendations... 3 Introduction... 4 Background... 5 Goals and Objectives... 6 Key Issues... 6 Project Scope... 7 Methods... 7 Scanning Process Data... 7 Pump Ordering Data... 9 Secondary Demand Data Internally Maintained Pump Data Cultural Norms Data Findings and Reulting Conclusions Scanning Process Data Pump Ordering Data Secondary Demand Data Internally Maintained Pump Data Cultural Norms Data Scenarios Comparison of Scenarios Conclusions from Scenarios Assumptions used for Recommendation Recommendation Expected Impact Future Steps Appendices... 30

3 List of Figures and Tables Figure Figure Figure Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table

4 Executive Summary The University of Michigan Health System (UMHS) has a shortage of Alaris infusion pumps and currently rents pumps to meet demand. Due to variable patient usage and inconsistent utilization of the pump distribution system currently in place, it is difficult to determine the true demand for infusion pumps in order to optimize the number in inventory. Therefore, the Patient Equipment Manager asked the IOE 481 team to analyze the current scanning system that tracks pump location, determine demand by unit, and recommend storage location distribution and the daily available inventory needed to meet demand. Background UMHS delayed a decision to purchase new infusion pumps, and instead, pumps were rented to help meet increased demand following the opening of Children and Women s Hospital (C&W). Despite the additional rented pumps, shortages and delayed deliveries of pumps still occur, as reported to the team by the project coordinators and Patient Equipment employees. Currently, pumps are stored either in the Patient Equipment area or in storage areas in 41 units throughout UMHS. Periodic Automatic Replenishment (PAR) levels of pumps are set in each of these units. Although the current system is set for PAR levels to be replenished hourly by Patient Equipment employees, some locations are not regularly replenished. Additionally, at times not enough pumps are available to replenish PAR level or fill web orders. When stock-outs occur, nurses and technicians often clean dirty pumps themselves and reuse them, resulting in untracked pumps usages. In addition to the main distribution system, the Cancer Center and the Bone Marrow Transplant infusion areas maintain their own supply of pumps. Methodology The team performed the following tasks to collect and evaluate data from five data sets and to develop pump storage and PAR level scenarios: Scanning system data: o Obtained scanning system data. The team received MEMS scanning system data from fiscal year (FY) 2012 from the project coordinators. o Grouped units and analyzed scanning system data. The team grouped the hospital units into 12 unit categories, into hospital floors, and into hospital wings. The team sorted the data to find the average daily demand for each grouping. o Calculated percentiles of demand. The team used the demand for each grouping to calculate various percentiles which represented daily available inventory required to meet demand. Ordering data: o Obtained ordering data. The team received data from FY 2012 of all nurse orders of Alaris pumps o Assessed accuracy of ordering data vs. scanning data. The team compared the two sets of data to determine which more accurately represented true demand Secondary demand data (data representing true demand for pumps): o Shadowed Patient Equipment employees. 1

5 o Interviewed nurse managers from each major unit category. The team interviewed nurse managers to understand their usage of the pumps distribution system and to find ways to collect data for true demand for pumps o Conducted surveys with nurses and technicians. The team surveyed nurses and technicians in order to try to find true demand for pumps Internally maintained pump data o Interviewed BMT and Cancer Center nurse managers o Obtained monthly infusion records Cultural norms data o Interviewed nurse managers and St. Joseph Mercy Hospital nurse Findings and Conclusions The scanning data showed a large variance in daily demand for each unit. The team found that the Adult Inpatient units had the highest demand in FY 2012, followed by Adult Intensive Care units and Adult Operating Room units, according to the scanning data. Pump ordering data showed irregular patterns due to a lack of standardization as to when pump orders are made. Therefore, the team concluded that ordering data does not provide a good representation of hourly demand. The team observed irregular PAR replenishment and soiled room sweeps while shadowing Patient Equipment employees. From interviews with 5 nurse managers from units request pumps from Patient Equipment center, the team learned that many of the major units, especially the Adult Intensive Care Units, experience pump shortages and delayed deliveries. The team also learned that pump usage is generally determined based on medication and different units have different numbers of pumps needed per patient, with trends found within unit categories. The team collected 168 nurses and technician surveys to qualitatively analyze the demand data. According to survey results, the average number of pumps cleaned by nurse or technicians varies between unit categories. The adjusted demand using the survey results showed an increase of over 400% for some units. The team believes this does not accurately represent true demand due to the difficulty of estimating the number of pumps cleaned. Rather, the team believes the results of the surveys demonstrate that true demand is higher than demand found through the scanning system. The most common suggestions made by nurses and technicians in the surveys were to decrease delivery times, keep PAR levels stocked, and perform more regular sweeps of soiled rooms. The team developed five PAR and storage location scenarios. The first scenario is to maintain a PAR level for each unit high enough to meet one day s demand for each unit. The second scenario is to maintain a PAR level that covers 1/3 of daily demand. The other 2/3 of daily demand is met by central storage inventory. The third scenario is to group units by floors and establish one storage location for each floor. The PAR storage meets 1/3 of daily demand and central storage inventory meets the other 2/3. The fourth scenario is to have only a central storage location. The fifth scenario is to group units by hospital wing, with each wing having its own storage location with a PAR set to meet 1/3 of daily demand. The other 2/3 of daily demand is met by central storage inventory. If the PAR level is set to meet a lower percentage of daily demand, more demand is met by inventory at the central storage location (Patient Equipment area). As a result, the total inventory 2

6 needed to meet daily demand decreases. However, the trade-off of setting lower PAR levels is that employees would have to deliver pumps and collect dirty pumps more frequently. If the units are grouped by floor, the total available inventory needed to meet daily demand decreases. However, nurses and technicians would have farther distances to retrieve pumps or employees would have to be assigned on floors to deliver pumps from floor storage areas to units. Recommendations If only considering inventory, the team recommends implementing central inventory storage. If considering lead time and work capacity, the team recommends implementing hospital wing storage based on assumptions made by the team. The wing storage system provides what the team believes to be the lowest total available inventory per day needed to meet daily demand without imposing overbearing workloads on Patient Equipment employees and extensive walking distances on nursing staff. The team also recommends that further analysis to obtain accurate demand data, quantitative delivery lead time capabilities, and workload capacities be done before implementing a new system. 3

7 Introduction An Alaris infusion pump is a piece of equipment used to infuse medication or fluids into a patient s bloodstream at a steady rate. Infusion pumps are used throughout the University of Michigan Health System (UMHS), including units in the University Hospital (UH), the Cardiovascular Center (CVC), the Cancer Center, and the Children and Women s Hospital (C&W). True demand and required inventory of infusion pumps has always been difficult to gauge. The difficulty in gauging demand is due to variable patient usage and inconsistent utilization of the pump distribution system currently in place, as reported to the IOE 481 student team by the project coordinators. The Patient Equipment Manager wants to know the true demand for pumps in each unit, the required available daily inventory needed to meet daily demand for varying distribution systems, and the best physical storage and distribution of pumps. Therefore, the Patient Equipment Manager asked the team to analyze the current scanning system that tracks pump location, determine demand by unit, and analyze how the distribution of pumps among storage locations affects daily available inventory required to meet demand. The Patient Equipment Manager also asked the team to determine how pump usage varies among hospital units and between institutions. Finally, the Patient Equipment Manager asked the team to review areas with internally maintained pumps, including the Cancer Center infusion area and the Bone Marrow Transplant infusion areas, to verify that current inventory is justified in those areas. The team analyzed scanning system and pump ordering data, conducted interviews and distributed surveys to achieve the project goal. Based on the data and analysis, the team built five scenarios for distributing pump inventory throughout the hospital as well as calculators that can be used to develop more scenarios. If the only factor considered is inventory, the team recommends implementing central inventory storage to minimize inventory. Given the limited scope of the team s project, the team had to make several assumptions before making a recommendation considering factors of lead time and work capacity. If the assumptions discussed in the Assumptions used for Recommendation section are validated, the team recommends that the hospital use one storage location for each wing of the UH, C&W, and one storage location for each floor of the CVC. This scenario provides the lowest total available inventory per day required to meet daily demand without imposing what the team believes would be overbearing workloads for Patient Equipment employees and extensive delivery lead times (based on assumptions made from observations while shadowing Patient Equipment employees and speaking with nurse managers). The project is one component of a larger institutional initiative to improve the Alaris infusion pump distribution process. The team s data and analyses of pump demand will be utilized in conjunction with other project teams analyses of pump delivery lead times and rate of pump return to Patient Equipment. An improved pump distribution system will be implemented based on these combined analyses. 4

8 Background UMHS delayed a decision to purchase new infusion pumps, and instead, pumps were rented to help meet increased demand following the opening of C&W. Despite the additional rented pumps, shortages and delayed deliveries of pumps still occur, as reported to the team by the project coordinators and Patient Equipment employees. Currently, pumps are stored either in the central Patient Equipment area or in storage areas in 41 units throughout UMHS. Periodic Automatic Replenishment (PAR) levels of pumps are set in each of the units and replenished by Patient Equipment employees. The main feeder areas for Alaris infusion pump usage are the Emergency Department (ED), where many patients are given pumps that they use for the rest of their hospital stay. Because of this, PAR levels are set the highest in the main ED and Children s Emergency Services (CES). When a unit s stock of pumps is depleted, or when unit employees (nurses, technicians, and clerks) do not have time to check the stock, web orders are sent to the Patient Equipment department. Patient Equipment employees then deliver the requested pumps to the unit. If the inventory of pumps in the Patient Equipment area is depleted, the Patient Equipment employees report that they have to search the soiled rooms and other storage areas to find pumps to deliver. To keep track of pump location, a scanning process is currently in place in which Patient Equipment employees scan pumps when ordered, when delivered, and when returned. In addition to the main distribution system, the Cancer Center and the Bone Marrow Transplant units maintain their own supply of pumps. Figure 1 depicts the major steps in the current process of distributing pumps throughout UMHS in the areas that do not maintain their own pumps. Figure 1. Current Pump Distribution Process Flow As shown in Figure 1, pumps are not scanned on and off with every use as some pumps are cleaned by unit staff and are reused, causing scanning data to underestimate true demand for pumps. 5

9 The criteria for deciding whether or not to give medication or fluids through an infusion pump vary between hospital units as well as between hospital institutions, as reported by the project coordinators. These criteria constitute cultural norms and need to be better understood. A study was completed in winter 2012 on the distribution of pumps in the Emergency Department. This study found that pump shortages were common in the ED, and that a lot of time was wasted searching for pumps during these shortages. The study led to an increase in the PAR level of pumps in the ED. Following this study, pump availability problems continued throughout the entire hospital, as reported by the project coordinators. The continuation of availability problems led to the request of this project. Goals and Objectives The primary goal of the project was to analyze the effects of altering the distribution of pumps throughout storage locations on daily inventory requirements. Secondary goals of the project included: Determining if inventory in areas that internally maintain pumps is justified Assessing the accuracy of data obtained from the scanning process Understanding how pump cultural norms vary between departments and institutions The team achieved these goals by performing the following tasks: Determined daily demand by unit Determined daily available inventory required to meet various percentiles of demand Modeled effects on required daily inventory of: o Changing the number of storage locations o Changing the proportion of daily demand met by central inventory Determined the seasonality in demand by day of week Qualitatively assessed the accuracy of the scanning process data Analyzed how determination of patient need for pumps varies between units and institutions (cultural norms) Obtained the average daily demand for units that internally maintain pumps Key Issues The following key issues led to the request for this project. The overall shortage of infusion pumps led UMHS to rent more pumps, at a cost three times that of purchasing. Employees time is often wasted searching for or requesting delivery of pumps. Nurses and technicians tend to order pumps without checking their storage unit and sometimes sub-stock pumps for later usage, decreasing efficiency of resource allocation. Based on observations from shadowing Patient Equipment employees, due to a lack of daily available pump inventory, the large number of PAR storage locations, and the time it takes to 6

10 deliver a pump, the current goal of hourly PAR inventory replenishment is not possible. As a result the current system s procedures are loosely followed. Nurses sometimes clean dirty pumps in the soiled room without scanning them as returned to Patient Equipment and/or order a pump without checking their unit storage location for available pumps. As a result, scanning data does not accurately represent true demand. Project Scope This project scope includes all Alaris infusion pumps maintained by Patient Equipment and all of the units that use those pumps in the Ann Arbor campus of the UMHS. Areas that maintain their own pumps, including the Cancer Center and Bone Marrow Transplant infusion areas are also within the scope of this project. The scope does not include pump repairs or lost pumps, which are pumps not scanned within fiscal year (FY) 2012, July June Off-site locations are not within the scope of this project. Syringe pumps are outside of the scope of this project. Pump return rate to Patient Equipment, quantitative delivery lead times, and Patient Equipment work capacity are also out of scope. Methods The five data sets the team analyzed for this project were scanning process data, pump ordering data, secondary demand data, internally maintained pump data, and cultural norms data. The following describes the methods the team used to collect and analyze each of the five data sets. Scanning Process Data Scanning process data is data obtained from the MEMS scanning system that the Patient Equipment employees use to track pump usage and location. Sorting data The project coordinators provided the team with an Excel spreadsheet containing scanning data. These data consisted of 64,617 demand points specifying scan-on and scan-off dates and delivery locations for each pump delivery within FY The delivery locations included 132 units and locations. The data also specified whether the pump was a single pump or a dual pump. To make dual points count as two pumps, the team added an extra demand point for each dual pump. Additionally, the team deleted scan records to the areas that maintain their own pumps, the Cancer Center and Bone Marrow Transplant transfusion areas, since the team analyzed these areas separately. The team deleted any data points with scan-on dates before June 30, The project coordinators provided a list of 12 unit categories that organize units throughout the hospital based on pump usage practices. These categories were: Adult Intensive Care Units, Pediatric Intensive Care Units, Birth Center Units, Adult Inpatient Units, Pediatric Inpatient Units, Adult Observation Units, Adult Operating Rooms, Pediatric Operating Rooms, Adult Procedure Units, Adult Emergency, and Pediatric Emergency. The team assigned each of the units to one of these categories, or to an other category which 7

11 included off-site and training locations. Due to the December 2011 opening of the Children and Women s hospital, some of the units only included demand before December 2011, and the new units replacing them only contained demand after December As a result, for some analyses, the team only utilized the data points from the last 6 months of the fiscal year. Finally, the team categorized the units by floor and by hospital wing (east and west side of a floor) to be able to look at demand by floor and by wing. The team later utilized these unit groupings while developing scenarios. Analyzing demand Once the data points were categorized, the team sorted demand by unit, category, floor, and wing using Excel pivot tables. The sum of all of the scan-on dates for each sorting throughout the year represented the yearly demand for pumps for that sorting. The sum of scan-on points for a particular date in the year for each sorting represented the demand for pumps on that day for that sorting. From these daily demand points, the team was able to calculate average daily demand and daily demand and variance for each unit, category, floor, and wing. Determining daily available inventory required to meet demand After determining daily demands by unit, category, floor, and wing, the team then determined the necessary daily available pump inventory required to meet demand if the hospital were to use the following storage location scenarios: one storage location for each unit, one storage location for each category, one storage location for each floor, and one storage location for each wing. The team developed Excel spreadsheets that allow the user to input the percentage of daily demand met by each PAR location. The team then multiplied this percentage by the daily demand for each day of the year for each unit, category, floor, or wing (depending on the storage location scenario being analyzed). The team then calculated various percentiles of the resulting fractions of daily demand using the Excel PERCENTILE function. These percentiles represent the amount of infusion pump inventory required at each PAR storage location to meet the user specified percentage of daily demand at varying confidence levels. Next, the team subtracted the demand met by inventory at PAR storage locations from the total daily demand for each day of the year. The team then calculated various percentiles of this unmet demand using the Excel PERCENTILE function to determine the central inventory required to meet the daily demand that is not met by PAR location inventory at varying confidence levels. The sum of the central inventory and PAR location storage inventory represents the total daily available pump inventory required to meet demand for a given percentage of the time. For example, the sum of the PAR storage location inventory required to meet 1/3 of daily demand 99% of the time, plus the sum of the central storage location inventory required to meet the remaining 2/3 of demand 99% of the time, represents the total available daily pump inventory required to meet daily demand 99% of the time in the case of three daily replenishments when PAR levels are set to meet 1/3 of daily demand. 8

12 Pump Ordering Data Pump ordering data is data generated from computer records of orders to Patient Equipment from unit staff. Assessing accuracy of pump ordering data vs. scanning process data The project coordinators provided the team with an Excel spreadsheet containing pump ordering data. These data consisted of 35,814 demand points specifying order date, delivery date, and location for pumps within FY Unlike the scanning data, the ordering data contained the time of day of order and delivery. The delivery locations included 105 units and locations. The data also specified whether the pump was a single pump or a dual pump. As with the scanning system data, the team counted dual pumps as two single pumps. Demand found from the ordering data differed from demand found from the scanning data. Figure 2 represents this discrepancy in demand for some of the major units in UMHS. Figure 2. Demand found from ordering data differs from demand found from scanning data Source: Scanning data - MEMS scanning system, FY 2012 Ordering data - UMHS Alaris pump ordering data, FY 2012 Demand FY Operating Room Units Inpatien t Units CVOR PHS1 8B1 7B 5C 7C 7A1 4C 4B 4AS 6A 6D CVC4 4DNI 8DNS 10E PCTU NICU ESA 9WEM 7W1 9WWM Scanning Data Intensive Care Units Ordering Data EDs Birth Center As shown in Figure 2, there is no trend to the differences between the sets of demand. In cases where the order data showed higher demand than the scanning data, it is likely that more pumps were ordered than were actually scanned, especially in cases where nurses ordered multiple pumps at a time. In cases where the ordering data showed lower demand than the scanning data, it is likely that pumps were scanned to replenish PAR levels without being ordered. Furthermore, the pump ordering data showed less pump demand overall than the scanning data. 9

13 The team considered two assumptions as to the accuracy of the demand sets. First, the team assumed that the scanning data always more accurately represented true demand. For the rest of this paper, all of the PAR levels were found using this assumption. Next, the team assumed that whichever data set showed higher demand for each unit more accurately represented true demand for that unit. The team made required inventory calculators for this assumption, found in PumpInventoryCalculators-CombinedData.xlsx. Secondary Demand Data Secondary demand data represents actual pump demand, including demand not recorded in the scanning process. This data is used to identify the error in demand data obtained from the scanning process. To obtain secondary demand data, the team shadowed Patient Equipment employees, interviewed nurse managers, distributed registered nurse surveys, and compared length of stay found in the scanning data to true length of stay. Shadowing Patient Equipment employees The team shadowed Patient Equipment employees on two occasions (for a total of 20 personhours) while they distributed pumps throughout the hospital. Through these observations, the team gained an understanding of how the scanning system is used, and how the PAR levels are maintained, and why Patient Equipment employees are unable to follow the pump distribution system that is currently in place. Interviewing nurse managers To determine how to best collect secondary demand data, the team met with nurse managers from the categories with the highest demand, which were Adult Inpatient Units, Adult Intensive Care Units, Adult Operating Rooms, Pediatric Inpatient Units, Pediatric Intensive Care Units, and Birth Center Units. During interviews with nurse managers, the team had the goal of determining the best method to obtain actual demand data for that unit by preparing a list of interview questions. The interviews included general questions about the source of patient admittances, the percentage of patients that use pumps, and how patient need for pumps is determined. The interviews also included questions about the unit s usage of the pump distribution system. Through these questions, the team found out generally how often pumps are ordered with and without checking the storage areas, how often the units have no pumps in the storage areas, and how often pumps are cleaned by unit staff and reused. Finally, the interviews included questions to evaluate the idea of using different methods to obtain secondary demand data. The team s ideas included asking the unit staff to record pump usage, distributing surveys to unit nurses, using nurse notes to identify pump usage, and asking nurses to record each time they clean a pump. 10

14 Surveying nurses and technicians Following the nurse manager interviews, the team prepared a survey to distribute to nurses and technicians which included 12 questions. The team submitted the survey to nurse managers for approval, and several nurse managers advised that the survey be fewer than 6-7 questions. The final questions and purpose of each question are listed in Appendix A. Comparing to true duration-of-stay Another method the team attempted to obtain secondary demand data was to compare average patient length of stay in the hospital to duration of use data from the scanning process. The duration of use from the scanning process was calculated by subtracting the scan on date from the scan off date. The team assumed that on average, the duration of use for pumps would be longer than the patient length of stay because pumps were being used multiple times in units during long periods between the scan-on and scan-off dates. In order to test this, the team obtained patient admittance and discharge data for FY However, these records only noted the units of admittance and discharge, and didn t specify how long patients stayed in a particular unit. Because of this, comparing the length of usage of pumps to patient stays yielded varying results that didn t help to quantify increased demand for pumps. Internally Maintained Pump Data The BMT and Cancer Center infusion areas internally maintain their infusion pumps, and are only maintained by Patient Equipment if they need to be repaired. Interviewing BMT and Cancer Center infusion area nurse managers The team interviewed nurse managers from the BMT and Cancer Center infusion areas to understand the current system that these areas use to maintain their pumps and to obtain data for patient pump usage. This data included the times of infusions and numbers of pumps used during a week for the Cancer Center, and a count of the pumps in inventory. Obtaining monthly infusion records The team obtained monthly infusion record data in order to find daily averages for the numbers of infusions in the Cancer Center and the Bone Marrow Transplant infusion areas. If these data are paired with data on the number of pumps used and length of use, a number of pumps required for inventory can be found. Cultural Norms Data The interviews with nurse managers throughout the hospital helped the team to determine standards used for decisions regarding patient need for infusion pumps in each unit. This information was used to identify differences in cultural norms among the unit categories. The 11

15 team also interviewed a nurse from St. Joseph Mercy Hospital in Ypsilanti to compare their system and pump usage standards to those of UMHS. Findings and Resulting Conclusions The five data sets the team considered for this project were: scanning process data, pump ordering data, secondary demand data, internally maintained pump data, and cultural norms data. The following describes the findings from the collection and analysis of these data sets. Scanning Process Data This section highlights the findings from the scanning process data grouped by category. The findings for the scanning process data grouped by unit, floor, and wing can be found in ScenarioGroupings-ScanningData.xlsx Figure 3 shows the distribution for demand throughout the unit categories. Figure 3. Demand for Alaris infusion pumps by unit category from scanning data Source: MEMS scanning system, FY 2012 As shown in Figure 3, Adult Inpatient, Adult ICU, and Adult Operating Room units have the highest demand for infusion pumps according to the scanning data. FY 2012 Total Demand for Alaris Pumps

16 Table 1 shows statistics for infusion pump demand in the unit categories. Table 1. Statistics for Alaris pump demand from scanning data Source: MEMS scanning system, FY 2012 Unit Category Mean daily demand Daily demand variance Index of dispersion Percentiles of daily pump demand Operating rooms - Adult Operating rooms - Peds Observation units - Adult Inpatient Units - Adult Inpatient Units - Peds ICU - Adult ICU - Peds Emergency - Adult Emergency - Peds Procedure Units - Adult Procedure Units - Peds Birth Center Offsite/ Outpatient/ Other The index of dispersion noted in Table 1 is a figure representing the ratio of the variance to the mean of demand. A high index of dispersion indicates high variability in demand due to days with no demand and other days with demand greater than 30 pumps. In cases where the index of dispersion is highest, as in the Adult operating room units, the 50 th -99 th percentiles of daily pump demand are much higher than the mean daily demand. The findings and conclusions from determining the required daily available pump inventory required to meet demand are discussed in detail in the Scenarios section. Pump Ordering Data Table 2 demonstrates an example of the sorted ordering data for one unit, 6D. Table 2. Example of three days of sorted ordering data from unit 6D Source: UMHS Ordering data FY 2012 Hour Day Day Day

17 Table 2 shows that the ordering of pumps is very irregular, and currently there is little standardization as to when pump orders are made. For example, on day 1, in hour 14, twelve pumps were ordered. It is not likely that there was a demand for twelve pumps in that specific hour, but rather that nurses ordered pumps to cover demand for the hours ahead. Because of this order pattern, the team believes that the ordering data does not accurately represent hourly demand. Secondary Demand Data The following section describes findings relating to secondary demand data representing true demand for pumps from Patient Equipment employee observations, nurse manager interviews, and nurse and technician surveys. Patient Equipment employee shadowing Through shadowing and speaking with Patient Equipment employees, the team made the following observations with regard to understanding the scanning data. Due to the large number of equipment orders, long travel times from the Patient Equipment area to hospital units, and the overall number of pump storage locations, the following trends were noted: Many PAR storage areas are not restocked regularly Full sweeps of soiled rooms are completed once per shift (according to Patient Equipment employee) These observations suggest that Patient Equipment employees lack the work capacity to follow the current pump distribution procedure to replenish PAR locations hourly. Furthermore, these observations indicate that demand from the scanning system is an underestimate of true demand. Nurses and technicians rely less on pump PAR levels in the storage rooms and instead must clean pumps from the soiled room and reuse them. As a result, these pumps are not scanned as returned to Patient Equipment, and there is no record of demand for this pump in the scanning data. Nurse manager interviews To determine how to best collect secondary demand data, the team met or spoke with nurse managers from the categories with the highest demand, which were: -Adult inpatient units -Adult intensive care units -Adult operating rooms -Pediatric inpatient units -Pediatric intensive care units -Birth center units Table 3 presents an overview of results from the in-person nurse manager interviews that the team was able to conduct. 14

18 Table 3. Nurse manager interview results Unit Category Storage area Pump Ordering 5D SICU ICU - Adult Storage areas often have zero pumps (more than 75% of time) Clinicians often order pre-order pumps without checking storage area 6D CCMU ICU - Adult Storage areas often have zero pumps (more than 50% of time) 9 C &W Birth Center Storage areas often have zero pumps (more than 80% of time) Nurses often order pumps without checking storage area Nurses order pumps without checking the storage area 100% of the time UH 7D Adult Inpatient Storage areas often have zero pumps (more than 80% of time) Nurses order pumps without checking the storage area 100% of the time C&W PACU Pediatric Operating Rooms Storage areas often have zero pumps (more than 75% of time) Nurses often order pumps without checking the storage area In addition to the in-person nurse manager interviews, the team also performed five and phone interviews. About 90% of nurse managers stated that the storage areas rarely have Alaris pumps and often are not checked before pump orders are made. Nurse managers also noted that the soiled rooms often contain several pumps. All of the nurse managers informed the team that any sort of staff collection of infusion pump usage data would be impossible because the unit staff is too busy. Instead, they all recommended using nurse and technician surveys. Nurse and technician survey Table 4 presents the results of the nurse and technician surveys. Full survey results are found in Surveys.xlsx 15

19 Table 4. Nurse and technician survey results Unit Category (Number of responses) ICU-Adults (60) Operating Room - Adults (14) Birth Center (20) ICU - Peds (28) Inpatient Peds (13) Inpatient Adults (33) Average pumps needed by patient in unit 4.22 (range 2-9) 1.07 (range 1-2) 1.90 (range 1-3) 1.41 (range 0-3) 1.88 (range 1-3) 1.58 (range 1-3) Average pumps cleaned by nurse/tech per week 4.14 (range 0-15) 1.46 (range 0-3) 2.78 (range 0-6) 1 (range 0-5) 3.27 (range 1-10) 3.14 (range 1-6) Average maximum reported acceptable delivery lead time 31.6 min. (range 10-60) 21.0 min. (range 15-45) 32.2 min. (range 15-60) 28.3 min. (range 10-60) 35.8 min. (range 15-60) 30.6 min. (range 10-60) Average times out of ten patient coming from ED arrives with all necessary pumps 3.22 (range 0-9) N/A N/A N/A 5.42 (range 0-10) 2.73 (range 0-7) Average times out of ten patient coming from OR arrives with all necessary pumps 1.32 (range 0-8) N/A N/A N/A 3.60 (range 0-10) 4.20 (range 0-9) As shown in Table 4, the nurses and technicians in the Adult ICU units have to clean the most pumps. This indicates the need for higher PAR levels in the ICU units, better PAR maintenance, or faster delivery times. Table 5 presents the findings of using the nurse and technician survey results to estimate increase in demand coming from nurses and technicians cleaning and reusing pumps. 16

20 Table 5. Apparent increase in demand from nurses/techs cleaning pumps 5D-CICU (Adult ICU) 6D-CCMU (Adult ICU) 6B (Adult Inpatient) Nurses and techs working in unit Nurses and techs who responded to survey Average weekly demand for pumps from scanning data Average weekly pumps cleaned per nurse/tech, as reported form surveys Increased average weekly demand from pumps reported and extrapolated to be cleaned by ALL nurses and techs in unit Apparent percent increase in demand 687% 445% 494% Increased average weekly demand from pumps reported to be cleaned by nurses and techs who responded to survey Apparent percent increase in demand 174% 152% 61% As Table 5 shows, the increase in demand found by multiplying the number of nurses/techs by the pumps cleaned in a week is very large, even if only considering nurses and technicians who responded to the survey. The team doesn t believe that these numbers can accurately represent the increase in demand due to the difficulty of estimating the number of pumps cleaned per week. Instead, these numbers demonstrate a general trend of significantly increased demand. The requests or suggestions made by nurses and technicians to improve the infusion pump distribution system are attached in Appendix B. Internally Maintained Pump Data The units that internally maintain their own pumps, including the Cancer Center and Bone Marrow Transplant infusion areas have relatively stable demand compared with units with PAR 17

21 levels maintained by Patient Equipment, according to nurse managers in the Cancer Center and BMT infusion areas. Cancer Center infusion areas interview with nurse manager In the Cancer Center there are a total of 114 pumps: 2 at each of the 17 infusion chairs, 9 medinn spaces, 6 expansion areas, and 9 bedsides, in addition to 24 pumps used in the research areas. Table 6 presents data of a day of infusions in the Cancer Center. Table 6. One day of infusion data at the Cancer Center Source: Nurse record for November 14, 2012 Chairside Expansion Bedside Med Inn Total Average pumps per patient Total infusions in one day The Nurse Manager stated that this day was typical. The hours for the infusions are from 7:30 AM until 9:00 PM, with an influx of infusions in the evening and fewer infusions in the morning. BMT infusion area interview with nurse manager Every patient requires at least one pump. Usable pumps are set up by patient beds, and dirty pumps are placed in the soiled room. Nurses clean pumps in the soiled room and place them by a patient bed once they are cleaned. Pumps never leave the unit, unless they are broken. The unit rarely has a shortage of pumps and often has more pumps available than needed. The hours of operation for the BMT infusion areas are from 8am to 5pm. Monthly infusion records Table 7 and 8 present the average daily infusions for the BMT and Cancer Center transfusion areas by month. Table 7. Monthly infusion records for BMT infusion areas Source: Ambulatory Care Activity Report Infusions Summary FY12 Average # Patients / Average Workday C&W: Auxiliary Visits: Jul FY 2012 Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun Average Adult BMT Infusion Peds Hem/Onc & BMT Infusion Photopheresis SUBTOTAL C&W INFUSION

22 Table 8. Monthly infusion records for Cancer Center infusion areas Source: Ambulatory Care Activity Report Infusions Summary FY12 Average # Patients / Average Workday CANCER CENTER: Auxiliary Visits: FY 2012 Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun Avg. Team Infusion Phase I - Infusion Urgent Care SUBTOTAL INFUSION As shown in figures 7 and 8, the average number of daily infusions was 37 patients per workday in the BMT transfusion areas and 133 patients per workday in the Cancer Center transfusion areas. Cultural Norms Data Table 9 presents nurse manager reported standards for determining patient need for pumps. Table 9. Standards for pump usage Source: Nurse manager interviews Unit Category Patient pump requirements 5D SICU ICU - Adult All patients require pumps, most multiple 6D CCMU ICU - Adult All patients require pumps, most multiple 9 C &W Birth Center Women being induced or receiving C- sections all require at least one pump UH 7D Adult Inpatient 70-80% of patients use pumps, usage is set by medication C&W PACU Cancer Center Infusion Area BMT Infusion Area Operating Room Peds Cancer Center BMT 100% of patients use pumps, 15-20% of patients are transplant patients and can use either syringe or Alaris pumps Other than patients who just receive a medication injection, all patients receive medication by infusion pump All patients require pumps 19

23 The team gathered more cultural norms information by interviewing a nurse working in an adult inpatient unit at St. Joseph Mercy Hospital. This information can be used to compare the pump distribution systems between UMHS and the much smaller St. Joseph Mercy Hospital system. Pump distribution system of St. Joseph Mercy Hospital Pumps are charged to patient by day, making them easier to track Pumps are delivered from central storage within 15 minutes and one pump is kept on each unit in case of emergency Pump shortages and delayed deliveries don t occur (according to nurse interviewed) Pump usage of St. Joseph Mercy Hospital Restrictions were recently lifted on pump usage; now nurses can use pumps in whatever situation they choose Pumps are usually used for saline Similar to UMHS, St. Joe s uses a list of medications that require a pump: heparin, nitroglycerin, potassium, and more Nurses use pumps when specific drip rates needed (e.g. exactly 125mL/hr) Scenarios From the findings about demand in the areas that don t maintain their own pumps, the team developed four pump distribution scenarios to illustrate the trends that result from changing different aspects of the pump distribution system. From these trends, and assumptions later discussed in the Assumptions used for Recommendation section, the team developed a fifth scenario to serve as the team s recommended pump distribution system. This section will first discuss the inventory calculators that were developed to calculate the required daily available inventory for each of the five scenarios. The following discussion will describe each of the five scenarios in detail. Note: The Excel inventory calculator worksheets (found in PumpInventoryCalculators.xlsx) calculate the required daily available inventory to meet one day s demand for only the units that utilize the MEMS scanning system. Additional inventory would be required to meet the demand in the areas that internally maintain pumps. Inventory Calculators The team created Excel worksheets to calculate the required inventory to meet various percentiles of daily demand (i.e. the inventory that would need to be available in the central storage location and PAR inventory locations at the beginning of the day to meet demand for that day a certain percentage of the time) in the units that utilize the scanning system. The calculated required inventory is based on the ratio of daily demand met by central inventory vs. PAR storage inventory for the following PAR storage location scenarios: One PAR storage location for each hospital unit that utilizes Alaris infusion pumps 20

24 One PAR storage location for each previously defined unit category (defined in the Methods section under Data sorting) One PAR storage location for each hospital floor that utilizes Alaris infusion pumps One PAR storage location for each hospital wing that utilizes Alaris infusion pumps. There are two wings on each floor (east wing and west wing) Each of the above storage location scenarios also has one central storage inventory location. How the Calculator Works This section briefly describes how to use the inventory calculators, and how the daily required inventory to meet one day s demand is calculated. User instructions are numbered, and descriptions of how required inventory is calculated follow bullet points. They are intended for the team s project coordinators who already have a general understanding of how to use the calculators and how they work. To use the calculator: 1.) Select a PAR storage location scenario from the available Excel worksheets. 2.) Input the fraction of daily demand to be met by PAR storage inventory. The input cell is near the top of the worksheet under cell with the text % of daily demand met by PAR. The calculator uses the inverse of the entered fraction to calculate the number of daily PAR replenishments needed The calculator multiplies the entered fraction by each storage location s pump demand for each day of FY 2012 (or second half of FY 2012 for the wing and floor storage location scenarios). The Excel PERCENTILE function is used to calculate various percentiles of the fractions of daily demand to be met by PAR inventory for each storage location. The calculated percentiles are the required PAR inventory levels for each storage location to meet the entered fraction of daily demand to be met by PAR inventory a certain percentage of the time. The PAR inventory levels are summed for each different calculated percentile to determine the total daily available PAR inventory required to meet one day s demand. The fractions of each storage location s daily demand are summed for each day of FY 2012 (or second half of FY 2012). The resulting sums represent the demand that is met by PAR inventory for each day. The calculator subtracts each day s met demand from the total system (excluding areas that maintain their own pumps) to determine the demand that is not met by PAR inventory for each day. The Excel PERCENTILE function is then used to calculate various percentiles of the daily demand that is not met by PAR inventory. These percentiles represent the central inventory required to meet the daily demand not met by PAR inventory a certain percentage of the time. 21

25 The calculated total PAR inventory and central inventory are summed to determine the total daily available inventory required to meet demand for one day a certain percentage of the time. 3.) The user may also choose to input the fraction of daily demand to be met by PAR inventory for each individual storage location instead (i.e. set one storage location to have inventory to meet 1/4 of a day s demand, and another to meet 1/3 of a day s demand). These input cells are located at the bottom of the worksheet. When this is done, the calculator multiplies each storage location s demand by the entered fraction of demand to be met by PAR inventory for that storage location. The rest of the calculations are performed in the same manner as described above. Note: The team also developed the same inventory calculators using a combination of the ordering data and scanning data (found in PumpInventoryCalculators-CombinedData.xlsx). For these calculators the team used the ordering data to represent demand for units in which the ordering data indicated higher demand, and the scanning data for the units in which scanning data indicated higher demand. All analyses using the inventory calculators in this report use the inventory calculators that are based solely on the scanning data. Scenario 1: Unit PAR levels determined by daily demand The first scenario is similar to the current system for pump distribution. For this scenario, each unit with appreciable demand has its own PAR storage location. A central location replenishes PAR levels once per day. Table 10 lists the total daily pump inventory required to stock each of the PAR locations to meet demand for various percentiles of time. With this scenario, no central inventory is needed to meet one day s demand for the units with PAR levels greater than one (determined by the 99 th percentile of demand). Table 10. Scenario 1 Daily PAR pump inventory required Daily available inventory Percentile required

University of Michigan Health System Team 1: Cable Management Analysis Program and Operations Analysis Project Final Report

University of Michigan Health System Team 1: Cable Management Analysis Program and Operations Analysis Project Final Report University of Michigan Health System Team 1: Cable Management Analysis Program and Operations Analysis Project Final Report To: Frank J. Krupansky, Materiel Services Department, Director Hank Davis, Materiel

More information

Optimizing PACU Patient Transport Equipment Management at C.S. Mott Children s Hospital and Von Voigtlander Women s Hospital.

Optimizing PACU Patient Transport Equipment Management at C.S. Mott Children s Hospital and Von Voigtlander Women s Hospital. Optimizing PACU Patient Transport Equipment Management at C.S. Mott Children s Hospital and Von Voigtlander Women s Hospital Final Report Submitted To: Kristie Barazsu Administrative Manager C.S. Mott

More information

Analysis of New Patient Access to Appointments in the Adult and Child Ambulatory Psychiatry Clinics. Project Final Report.

Analysis of New Patient Access to Appointments in the Adult and Child Ambulatory Psychiatry Clinics. Project Final Report. Analysis of New Patient Access to Appointments in the Adult and Child Ambulatory Psychiatry Clinics Project Final Report Project 1 To: Ms. Annemarie Lucas, Director of Operations Rachel Upjohn Building,

More information

Analysis One Code Desc. Transaction Amount. Fiscal Period

Analysis One Code Desc. Transaction Amount. Fiscal Period Analysis One Code Desc Transaction Amount Fiscal Period 57.63 Oct-12 12.13 Oct-12-38.90 Oct-12-773.00 Oct-12-800.00 Oct-12-187.00 Oct-12-82.00 Oct-12-82.00 Oct-12-110.00 Oct-12-1115.25 Oct-12-71.00 Oct-12-41.00

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun

More information

University of Michigan Health System. Determining Patient Volumes, Staffing Volumes, and Patient-to-Staff Ratios in the Cardiac Procedures Unit

University of Michigan Health System. Determining Patient Volumes, Staffing Volumes, and Patient-to-Staff Ratios in the Cardiac Procedures Unit University of Michigan Health System Determining Patient Volumes, Staffing Volumes, and Patient-to-Staff Ratios in the Cardiac Procedures Unit Final Report To: Robert Keast, Director of Cardiovascular

More information

University of Michigan Health System Program and Operations Analysis. Utilization of Nurse Practitioners in Neurosurgery.

University of Michigan Health System Program and Operations Analysis. Utilization of Nurse Practitioners in Neurosurgery. University of Michigan Health System Program and Operations Analysis Utilization of Nurse Practitioners in Neurosurgery Final Report To: Laurie Hartman, Director of Advanced Practice Nurses, UMHS School

More information

AT&T Global Network Client for Windows Product Support Matrix January 29, 2015

AT&T Global Network Client for Windows Product Support Matrix January 29, 2015 AT&T Global Network Client for Windows Product Support Matrix January 29, 2015 Product Support Matrix Following is the Product Support Matrix for the AT&T Global Network Client. See the AT&T Global Network

More information

University of Michigan Health System

University of Michigan Health System University of Michigan Health System Implementing an Ambulatory Diagnostic & Treatment Center at the Taubman Health Center to Provide Specialty Outpatient Services Final Report Submitted to: Ms. Katie

More information

Analysis of Pediatric Acute Physical and Occupational Therapy Patient Care Delivery

Analysis of Pediatric Acute Physical and Occupational Therapy Patient Care Delivery Analysis of Pediatric Acute Physical and Occupational Therapy Patient Care Delivery University of Michigan, Program & Operations Analysis Final Report Proposal Prepared For: Jose Kottoor, PT Occupational

More information

Go With The Flow- From Charge Nurse to Patient Flow Coordinator. Donna Ojanen Thomas, RN, MSN Cynthia J. Royall, RN, BSN

Go With The Flow- From Charge Nurse to Patient Flow Coordinator. Donna Ojanen Thomas, RN, MSN Cynthia J. Royall, RN, BSN Go With The Flow- From Charge Nurse to Patient Flow Coordinator Donna Ojanen Thomas, RN, MSN Cynthia J. Royall, RN, BSN Primary Children s Medical Center About PCMC Not for profit hospital, part of Intermountain

More information

Creating a Hospital Based Bedside Delivery Program to Enhance the Patient Experience at Cleveland Clinic s Community Hospitals

Creating a Hospital Based Bedside Delivery Program to Enhance the Patient Experience at Cleveland Clinic s Community Hospitals Learning Objectives Creating a Hospital Based Bedside Delivery Program to Enhance the Patient Experience at Cleveland Clinic s Community Hospitals Describe the 5 steps needed to create an effective hospital

More information

Analysis of the medication management system in seven hospitals

Analysis of the medication management system in seven hospitals Analysis of the medication management system in seven hospitals James Baker, Clinical Director, Marketing, Medication Technologies, Cardinal Health Marcy Draves, Clinical Director, Marketing, Medication

More information

Unstoppable Report Removing a Barrier to Patient Flow by Nursing Process Redesign

Unstoppable Report Removing a Barrier to Patient Flow by Nursing Process Redesign Unstoppable Report Removing a Barrier to Patient Flow by Nursing Process Redesign 17th Annual Society for Health Systems Management Engineering Forum February 12-13, 2005 Dallas, Texas Norwalk Hospital

More information

Elimination of delays in consultant care

Elimination of delays in consultant care perfectserve.com 866.844.5484 @PerfectServe SUCCESS STORY Elimination of delays in consultant care Hospital: Munroe Regional Medical Center Location: Ocala, FL Beds: 421 Key results: Standardized clinical

More information

How to Conduct a Physical Inventory. Instructions. Forms. And. Sample Memos

How to Conduct a Physical Inventory. Instructions. Forms. And. Sample Memos How to Conduct a Physical Inventory Instructions Forms And Sample Memos Produced for NAILM Audio Conference Program July 20, 2006 CIRCULATING INVENTORY The total amount of linen required to operate a healthcare

More information

FORECASTING. Operations Management

FORECASTING. Operations Management 2013 FORECASTING Brad Fink CIT 492 Operations Management Executive Summary Woodlawn hospital needs to forecast type A blood so there is no shortage for the week of 12 October, to correctly forecast, a

More information

IT S ALL ABOUT THE CUSTOMER FORECASTING 101

IT S ALL ABOUT THE CUSTOMER FORECASTING 101 IT S ALL ABOUT THE CUSTOMER FORECASTING 101 Ed White CPIM, CIRM, CSCP, CPF, LSSBB Chief Value Officer Jade Trillium Consulting April 01, 2015 Biography Ed White CPIM CIRM CSCP CPF LSSBB is the founder

More information

LeSueur, Jeff. Marketing Automation: Practical Steps to More Effective Direct Marketing. Copyright 2007, SAS Institute Inc., Cary, North Carolina,

LeSueur, Jeff. Marketing Automation: Practical Steps to More Effective Direct Marketing. Copyright 2007, SAS Institute Inc., Cary, North Carolina, Preface. Overview. PART 1: Marketing Financials. Chapter 1 Profit and Loss Fundamentals. Chapter 2 Profit and Loss Component Details. Chapter 3 Managing the P&L. Chapter 4 Measuring Marketing Effectiveness.

More information

Fife NHS Board Activity NHS FIFE. Report to the Board 24 February 2015 ACTIVITY REPORT

Fife NHS Board Activity NHS FIFE. Report to the Board 24 February 2015 ACTIVITY REPORT 1 AIM OF THE REPORT NHS FIFE Report to the Board 24 February 2015 ACTIVITY REPORT This report provides a snapshot of the range of activity that underpins the achievement of key National Targets and National

More information

Accident & Emergency Department Clinical Quality Indicators

Accident & Emergency Department Clinical Quality Indicators Overview This dashboard presents our performance in the new A&E clinical quality indicators. These 8 indicators will allow you to see the quality of care being delivered by our A&E department, and reflect

More information

The University of Michigan University Hospitals and Health Centers Adult Anesthesiology Department

The University of Michigan University Hospitals and Health Centers Adult Anesthesiology Department The University of Michigan University Hospitals and Health Centers Adult Anesthesiology Department Analysis of Anesthesia Disposal Methods at The University of Michigan Hospital Final Report Delivered

More information

Customer-Centered Utility Billing & Energy Information

Customer-Centered Utility Billing & Energy Information Customer-Centered Utility Billing & Energy Information Kenneth R. Davis, P.E. Assistant Director, Campus Facilities-Energy Management University of Missouri-Columbia 417 South Fifth St. Columbia, MO 65211

More information

Eliminating inefficiencies with PerfectServe. SUCCESS STORY Elimination of delays in consultant care. perfectserve.com 866.844.

Eliminating inefficiencies with PerfectServe. SUCCESS STORY Elimination of delays in consultant care. perfectserve.com 866.844. perfectserve.com 866.844.5484 @PerfectServe SUCCESS STORY Elimination of delays in consultant care Hospital: Munroe Regional Medical Center Location: Ocala, FL Beds: 421 Key results: Standardized clinical

More information

OBJECTIVE ASSESSMENT OF FORECASTING ASSIGNMENTS USING SOME FUNCTION OF PREDICTION ERRORS

OBJECTIVE ASSESSMENT OF FORECASTING ASSIGNMENTS USING SOME FUNCTION OF PREDICTION ERRORS OBJECTIVE ASSESSMENT OF FORECASTING ASSIGNMENTS USING SOME FUNCTION OF PREDICTION ERRORS CLARKE, Stephen R. Swinburne University of Technology Australia One way of examining forecasting methods via assignments

More information

Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8

Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8 Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138 Exhibit 8 Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 2 of 138 Domain Name: CELLULARVERISON.COM Updated Date: 12-dec-2007

More information

Socio-economic benefits of interoperable electronic health record systems in Europe the evidence -

Socio-economic benefits of interoperable electronic health record systems in Europe the evidence - Socio-economic benefits of interoperable electronic health record systems in Europe the evidence - Karl A. Stroetmann FRSM PhD MBA with Alexander Dobrev, Tom Jones, Yvonne Vatter empirica Communication

More information

Minimizing Regulated Medical Waste

Minimizing Regulated Medical Waste Minimizing Regulated Medical Waste Marcy Yeshnowski Tetra Tech EM Inc. Take Home Message 1. While we re talking about RMW minimization, NEVER compromise safety and compliance. 2. Focus on what you can

More information

Analysis of the Instrument Picking Process in a Case Cart System at the University of Michigan Hospital Team 6 Final Recommendation Report

Analysis of the Instrument Picking Process in a Case Cart System at the University of Michigan Hospital Team 6 Final Recommendation Report Analysis of the Instrument Picking Process in a Case Cart System at the University of Michigan Hospital Team 6 Final Recommendation Report University of Michigan Health System: Program and Operations Analysis

More information

Gloucestershire Health and Care Scrutiny Committee

Gloucestershire Health and Care Scrutiny Committee Gloucestershire Health and Care Scrutiny Committee Report Title Purpose of Report Is this for information or decision? Author Organisation Gloucestershire Clinical Commissioning Group update on Non- Emergency

More information

Performance Management Dashboard May 2015

Performance Management Dashboard May 2015 Performance Management Dashboard May 2015 Paper No: SET/43/15 May 2015 Performance Summary Overview Of 78 performance measures, 37 were status red in April, 13 Amber and 28 Green. Increase of 372 new and

More information

Industry Environment and Concepts for Forecasting 1

Industry Environment and Concepts for Forecasting 1 Table of Contents Industry Environment and Concepts for Forecasting 1 Forecasting Methods Overview...2 Multilevel Forecasting...3 Demand Forecasting...4 Integrating Information...5 Simplifying the Forecast...6

More information

BEHAVIORAL HEALTH AND DETOXIFICATION - MEETING DEMAND FOR SERVICES UNIVERSITY OF PITTSBURGH MEDICAL CENTER MERCY HOSPITAL Publication Year: 2013

BEHAVIORAL HEALTH AND DETOXIFICATION - MEETING DEMAND FOR SERVICES UNIVERSITY OF PITTSBURGH MEDICAL CENTER MERCY HOSPITAL Publication Year: 2013 BEHAVIORAL HEALTH AND DETOXIFICATION - MEETING DEMAND FOR SERVICES UNIVERSITY OF PITTSBURGH MEDICAL CENTER MERCY HOSPITAL Publication Year: 2013 Summary: The development of separate intake area for behavioral

More information

Financial Operating Procedure: Budget Monitoring

Financial Operating Procedure: Budget Monitoring Financial Operating Procedure: Budget Monitoring Original Created: Jan 2010 Last Updated: Jan 2010 1 Index 1 Scope of Procedure...3 2 Aim of Procedure...3 3 Roles & Responsibilities...3 Appendix A Timetable...7

More information

Consumer ID Theft Total Costs

Consumer ID Theft Total Costs Billions Consumer and Business Identity Theft Statistics Business identity (ID) theft is a growing crime and is a growing concern for state filing offices. Similar to consumer ID theft, after initially

More information

Type of paper: Board Briefing Title of Paper: Board Briefing of Nursing and Midwifery Staffing Levels

Type of paper: Board Briefing Title of Paper: Board Briefing of Nursing and Midwifery Staffing Levels Type of paper: Board Briefing Title of Paper: Board Briefing of Nursing and Midwifery Staffing Levels Date of Briefing December 2015 (November 2015 data) This paper is for: Sponsor: Chief Nurse- Dame Eileen

More information

Based on Chapter 11, Excel 2007 Dashboards & Reports (Alexander) and Create Dynamic Charts in Microsoft Office Excel 2007 and Beyond (Scheck)

Based on Chapter 11, Excel 2007 Dashboards & Reports (Alexander) and Create Dynamic Charts in Microsoft Office Excel 2007 and Beyond (Scheck) Reporting Results: Part 2 Based on Chapter 11, Excel 2007 Dashboards & Reports (Alexander) and Create Dynamic Charts in Microsoft Office Excel 2007 and Beyond (Scheck) Bullet Graph (pp. 200 205, Alexander,

More information

Improving Pediatric Emergency Department Patient Throughput and Operational Performance

Improving Pediatric Emergency Department Patient Throughput and Operational Performance PERFORMANCE 1 Improving Pediatric Emergency Department Patient Throughput and Operational Performance Rachel Weber, M.S. 2 Abbey Marquette, M.S. 2 LesleyAnn Carlson, R.N., M.S.N. 1 Paul Kurtin, M.D. 3

More information

Computing & Telecommunications Services Monthly Report March 2015

Computing & Telecommunications Services Monthly Report March 2015 March 215 Monthly Report Computing & Telecommunications Services Monthly Report March 215 CaTS Help Desk (937) 775-4827 1-888-775-4827 25 Library Annex helpdesk@wright.edu www.wright.edu/cats/ Last Modified

More information

University Hospital Preoperative Patient Flow & Work Flow Analysis. Final Report

University Hospital Preoperative Patient Flow & Work Flow Analysis. Final Report University Hospital Preoperative Patient Flow & Work Flow Analysis Final Report Submitted to: Beverly Smith, RN, Manager, UH Post-Anesthesia Care Unit/Pre-Op Christine Carroll, RN, BSN, OP/AP Coordinator

More information

Project Management Planning

Project Management Planning Overview of Resource Planning Every organization has a limited number of resources to perform tasks. A project manager's primary role is to find a way to successfully execute a project within these resource

More information

Integrated Financial Plan FY2012

Integrated Financial Plan FY2012 Integrated Financial FY Delivering The new reality The fiscal year Integrated Financial (IFP) has an Operating with a projected Operating Loss of $3.0 billion, versus a loss of $2.2 billion in, despite

More information

HEALTHCARE SIMULATION

HEALTHCARE SIMULATION HEALTHCARE SIMULATION SIMULATION IS USED BY HEALTH CARE AND HUMAN SERVICE ORGANIZATIONS ACROSS THE WORLD TO IMPROVE THEIR SYSTEMS OF CARE AND REDUCE COSTS. SIMULATION OFFERS EVIDENCE BASED, RISK FREE DECISION

More information

Case Studies in Change Management: Applied ADKAR

Case Studies in Change Management: Applied ADKAR Objectives Pharmacist Objectives: Case Studies in Change Management: Applied ADKAR Jason Glowczewski, Pharm.D., MBA Director of Pharmacy UH Community Hospitals Jason.Glowczewski@UHhospitals.org 1. Explain

More information

Case Studies in Change Management: Applied ADKAR

Case Studies in Change Management: Applied ADKAR Case Studies in Change Management: Applied ADKAR Jason Glowczewski, Pharm.D., MBA Director of Pharmacy UH Community Hospitals Jason.Glowczewski@UHhospitals.org Objectives Pharmacist Objectives: 1. Explain

More information

Assessing Schedule Performance with Earned Value

Assessing Schedule Performance with Earned Value FEATURED PAPER OCTOBER 2007 Time Is Up: Assessing Schedule Performance with Earned Value By Robert Van De Velde Time drives projects. Quick and accurate evaluation of schedule performance is crucial. Quantitative

More information

Enhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017

Enhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017 From -JAN- To -JUN- -JAN- VIRP Page Period Period Period -JAN- 8 -JAN- 8 9 -JAN- 8 8 -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -FEB- : days

More information

Managing Staffing in High Demand Variability Environments

Managing Staffing in High Demand Variability Environments Managing Staffing in High Demand Variability Environments By: Dennis J. Monroe, Six Sigma Master Black Belt, Lean Master, and Vice President, Juran Institute, Inc. Many functions within a variety of businesses

More information

Report on a QI Project Eligible for Part IV MOC

Report on a QI Project Eligible for Part IV MOC Report on a QI Project Eligible for Part IV MOC Instructions Determine eligibility. Before starting to complete this report, go to the UMHS MOC website [ocpd.med.umich.edu], click on Part IV Credit Designation,

More information

South Dakota Board of Regents. Web Time Entry. Student. Training Manual & User s Guide

South Dakota Board of Regents. Web Time Entry. Student. Training Manual & User s Guide South Dakota Board of Regents Web Time Entry Student Training Manual & User s Guide Web Time Entry Self Service Web Time Entry is a web-based time entry system designed to improve accuracy and eliminate

More information

REWRITING PAYER/PROVIDER COLLABORATION July 24, 2015. MIKE FAY Vice President, Health Networks

REWRITING PAYER/PROVIDER COLLABORATION July 24, 2015. MIKE FAY Vice President, Health Networks REWRITING PAYER/PROVIDER COLLABORATION July 24, 2015 MIKE FAY Vice President, Health Networks AGENDA ACO Overview ACO Financial Performance ACO Quality Performance Observations 2 AGENDA ACO OVERVIEW ACO

More information

The New Complex Patient. of Diabetes Clinical Programming

The New Complex Patient. of Diabetes Clinical Programming The New Complex Patient as Seen Through the Lens of Diabetes Clinical Programming 1 Valerie Garrett, M.D. Medical Director, Diabetes Center at Mission Health System Nov 6, 2014 Diabetes Health Burden High

More information

Choosing a Cell Phone Plan-Verizon

Choosing a Cell Phone Plan-Verizon Choosing a Cell Phone Plan-Verizon Investigating Linear Equations I n 2008, Verizon offered the following cell phone plans to consumers. (Source: www.verizon.com) Verizon: Nationwide Basic Monthly Anytime

More information

CASE STUDY: E-PHARMACY AT CHELSEA AND WESTMINSTER HOSPITAL, UK

CASE STUDY: E-PHARMACY AT CHELSEA AND WESTMINSTER HOSPITAL, UK e-business W@tch European Commission, DG Enterprise & Industry E-mail: entr-innov-ict-ebiz@ec.europa.eu, info@ebusiness-watch.org This document is based on sector studies, special reports or other publications

More information

Infographics in the Classroom: Using Data Visualization to Engage in Scientific Practices

Infographics in the Classroom: Using Data Visualization to Engage in Scientific Practices Infographics in the Classroom: Using Data Visualization to Engage in Scientific Practices Activity 4: Graphing and Interpreting Data In Activity 4, the class will compare different ways to graph the exact

More information

Emergency Department Directors Academy Phase II. May 19-23, 2014 Dallas, TX. Breakout Session III: Hiring and Retention - Transforming the Workforce

Emergency Department Directors Academy Phase II. May 19-23, 2014 Dallas, TX. Breakout Session III: Hiring and Retention - Transforming the Workforce (+)Ghazala Sharieff, MD, MBA, FACEP Emergency Department Directors Academy Phase II Breakout Session III: Hiring and Retention - Transforming the Workforce Urban hospitals compete for qualified staff,

More information

PROJECT MANAGEMENT PLAN <PROJECT NAME>

PROJECT MANAGEMENT PLAN <PROJECT NAME> PROJECT MANAGEMENT PLAN TEMPLATE This Project Management Plan Template is free for you to copy and use on your project and within your organization. We hope that you find this template useful and welcome

More information

CALL VOLUME FORECASTING FOR SERVICE DESKS

CALL VOLUME FORECASTING FOR SERVICE DESKS CALL VOLUME FORECASTING FOR SERVICE DESKS Krishna Murthy Dasari Satyam Computer Services Ltd. This paper discusses the practical role of forecasting for Service Desk call volumes. Although there are many

More information

Critical Steps for a Successful Data Conversion Moving Legacy Data to Your Case Management System

Critical Steps for a Successful Data Conversion Moving Legacy Data to Your Case Management System White Paper Critical Steps for a Successful Data Conversion Moving Legacy Data to Your Case Management System Author: Matt Ryan, Senior Consultant Contents Executive Summary... 1 Find The Right Location...

More information

Illinois Job Index. Jan 2012 Negative. Talking Points. Illinois Notes. Nation Notes. www.real.illinois.edu

Illinois Job Index. Jan 2012 Negative. Talking Points. Illinois Notes. Nation Notes. www.real.illinois.edu Illinois Job Index Release Data Issue 01/31/2011 Jan 1990 / Dec 2011 2012.01 www.real.illinois.edu For November Illinois Job Index, the state and the Nation had positive job growth, the RMW had negative

More information

Brammer Invend TM. > Convenience & simplicity > Reduce consumption > Lower inventory costs > Improve productivity. 28 th July 2015

Brammer Invend TM. > Convenience & simplicity > Reduce consumption > Lower inventory costs > Improve productivity. 28 th July 2015 Brammer Invend TM > Convenience & simplicity > Reduce consumption > Lower inventory costs > Improve productivity 28 th July 2015 Agenda What is Invend? Benefits for Brammer s customers Benefits for Brammer

More information

Important Dates Calendar 2014-2015 FALL

Important Dates Calendar 2014-2015 FALL Important Dates Calendar 204-205 FALL Rev. 6-8-4 st 8 H st 0 2nd 0 st 5 2nd 5 3rd 5 LSC Advanced Registration Begins May 27 May 27 May 27 May 27 May 27 May 27 May 27 May 27 May 27 Returning Students Advanced

More information

Introduction of a Dedicated Admissions Nurse to Improve Access to Care for Surgical Patients

Introduction of a Dedicated Admissions Nurse to Improve Access to Care for Surgical Patients Introduction of a Dedicated Admissions Nurse to Improve Access to Care for Surgical Patients Editor s Note: In Introduction of a Dedicated Admissions Nurse to Improve Access to Care for Surgical Patients

More information

Temporally Allocating Emissions with CEM Data. Scott Edick Michigan Department of Environmental Quality P.O. Box 30260 Lansing MI 48909

Temporally Allocating Emissions with CEM Data. Scott Edick Michigan Department of Environmental Quality P.O. Box 30260 Lansing MI 48909 Temporally Allocating Emissions with CEM Data Scott Edick Michigan Department of Environmental Quality P.O. Box 30260 Lansing MI 48909 Mark Janssen Lake Michigan Air Directors Consortium (LADCO) 2250 East

More information

Scott Market Report. Weather Affects Winter Sales

Scott Market Report. Weather Affects Winter Sales Mar. Apr. 2014 Scott Market Report Weather Affects Winter Sales Sales of real estate through the Outer Banks Association of Realtors MLS system for the last few months has been similar to the last two

More information

Demand forecasting & Aggregate planning in a Supply chain. Session Speaker Prof.P.S.Satish

Demand forecasting & Aggregate planning in a Supply chain. Session Speaker Prof.P.S.Satish Demand forecasting & Aggregate planning in a Supply chain Session Speaker Prof.P.S.Satish 1 Introduction PEMP-EMM2506 Forecasting provides an estimate of future demand Factors that influence demand and

More information

Impact of 24/7 Emergency Department. Pharmacy Satellite on Emergency Department Operations

Impact of 24/7 Emergency Department. Pharmacy Satellite on Emergency Department Operations Impact of 24/7 Emergency Department Pharmacy Satellite on Emergency Department Operations Final Report To: Clients: Brian Callahan Pharmacy Assistant Director, Decentral Pharmacy Services Pam Walker Clinical

More information

Climatography of the United States No. 20 1971-2000

Climatography of the United States No. 20 1971-2000 Climate Division: CA 4 NWS Call Sign: Month (1) Min (2) Month(1) Extremes Lowest (2) Temperature ( F) Lowest Month(1) Degree s (1) Base Temp 65 Heating Cooling 1 Number of s (3) Jan 59.3 41.7 5.5 79 1962

More information

DATA QUALITY VISUALIZATION TOOLS ON ARCHIVED HISTORICAL FREEWAY TRAFFIC DATA

DATA QUALITY VISUALIZATION TOOLS ON ARCHIVED HISTORICAL FREEWAY TRAFFIC DATA DATA QUALITY VISUALIZATION TOOLS ON ARCHIVED HISTORICAL FREEWAY TRAFFIC DATA Jothan P. Samuelson, Maricopa Association of Governments TRB NATMEC Conference June 6, 2012 2012, All Rights Reserved 1 Project

More information

Department of Public Welfare (DPW)

Department of Public Welfare (DPW) Department of Public Welfare (DPW) Office of Income Maintenance Electronic Benefits Transfer Card Risk Management Report Out-of-State Residency Review FISCAL YEAR 2012-2013 June 2013 (March, April and

More information

INTRODUCTION TO COTTON FUTURES Blake K. Bennett Extension Economist/Management Texas Cooperative Extension, The Texas A&M University System

INTRODUCTION TO COTTON FUTURES Blake K. Bennett Extension Economist/Management Texas Cooperative Extension, The Texas A&M University System INTRODUCTION TO COTTON FUTURES Blake K. Bennett Extension Economist/Management Texas Cooperative Extension, The Texas A&M University System Introduction For well over a century, industry representatives

More information

Michigan Pathology Department - Inpatient Phlebotomy Unit. University of Michigan Health System Program and Operations Analysis

Michigan Pathology Department - Inpatient Phlebotomy Unit. University of Michigan Health System Program and Operations Analysis Michigan Pathology Department - Inpatient Phlebotomy Unit University of Michigan Health System Program and Operations Analysis Analysis of AM Phlebotomy Process Flow Final Report To: Harry Neusius, SM(ASCP)

More information

Driving Patient Safety and Pharmacy Efficiency

Driving Patient Safety and Pharmacy Efficiency CASE STUDY Driving Patient Safety and Pharmacy Efficiency Sterile Compounding, Error Reduction and Workflow Management at Indiana University Health Bloomington Hospital Steve I am totally sold on the benefits

More information

Improving the Marketing Strategy for Survival Flight. Final Report. Submitted To:

Improving the Marketing Strategy for Survival Flight. Final Report. Submitted To: Improving the Marketing Strategy for Survival Flight Final Report Submitted To: Denise Landis Manager, Critical Care Transport University of Michigan Health System 1500 E. Medical Center Dr. Ann Arbor,

More information

Climatography of the United States No. 20 1971-2000

Climatography of the United States No. 20 1971-2000 Climate Division: CA 6 NWS Call Sign: SAN Month (1) Min (2) Month(1) Extremes Lowest (2) Temperature ( F) Lowest Month(1) Degree s (1) Base Temp 65 Heating Cooling 100 Number of s (3) Jan 65.8 49.7 57.8

More information

Comparing share-price performance of a stock

Comparing share-price performance of a stock Comparing share-price performance of a stock A How-to write-up by Pamela Peterson Drake Analysis of relative stock performance is challenging because stocks trade at different prices, indices are calculated

More information

Registered Actively Seeking Work May 2015

Registered Actively Seeking Work May 2015 Registered Actively Seeking Work May 2 Statistics Unit: www.gov.je/statistics Summary On 31 May 2: on a seasonally adjusted 1 basis, the total number of people registered as actively seeking work (ASW)

More information

UTILIZAÇÃO DA LEAN METODOLOGIA. Desmistificando Aplicações Reais Para CME. Apresentado por John Kimsey

UTILIZAÇÃO DA LEAN METODOLOGIA. Desmistificando Aplicações Reais Para CME. Apresentado por John Kimsey UTILIZAÇÃO DA METODOLOGIA LEAN Desmistificando Aplicações Reais Para CME Apresentado por John Kimsey STERIS LEAN CME SIMULATION SAO PAULO, RIO, PORTO ALEGRE 2 STERIS LEAN CME SIMULATION SAO PAULO, RIO,

More information

Ashley Institute of Training Schedule of VET Tuition Fees 2015

Ashley Institute of Training Schedule of VET Tuition Fees 2015 Ashley Institute of Training Schedule of VET Fees Year of Study Group ID:DECE15G1 Total Course Fees $ 12,000 29-Aug- 17-Oct- 50 14-Sep- 0.167 blended various $2,000 CHC02 Best practice 24-Oct- 12-Dec-

More information

Tracking Real Estate Market Conditions Using the HousingPulse Survey

Tracking Real Estate Market Conditions Using the HousingPulse Survey Tracking Real Estate Market Conditions Using the HousingPulse Survey May 2011 Copyright 2011 Campbell Communications, Inc. Tracking Real Estate Market Conditions Using the HousingPulse Survey May 2011

More information

Building a Financing Plan For the Entrepreneur For the Investor

Building a Financing Plan For the Entrepreneur For the Investor Building a Financing Plan For the Entrepreneur For the Investor Founded by: Sections B asics Entrepreneur vs. Investor Fund Raising Environment Sources of information Questions Where do you start? You

More information

Performance Dashboard Appendix 1 Trust Board - 19th June 2012

Performance Dashboard Appendix 1 Trust Board - 19th June 2012 Performance Dashboard Appendix 1 Trust Board - 19th June 2012 Code Integrated Performance Measure Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Criteria for Traffic

More information

College of Arts and Humanities Asset Management Policy and Procedures Effective 8/8/13

College of Arts and Humanities Asset Management Policy and Procedures Effective 8/8/13 Asset Management Policy and Procedures Effective 8/8/13 CAH ASSET MANAGEMENT POLICY INCLUDING HISTORICAL INFORMATION AND DEFINITIONS Historical Information and Background In 2011, the ceased accounting

More information

ideas from RisCura s research team

ideas from RisCura s research team ideas from RisCura s research team thinknotes april 2004 A Closer Look at Risk-adjusted Performance Measures When analysing risk, we look at the factors that may cause retirement funds to fail in meeting

More information

April Gross Receipts Show Impact of Low Oil and Gas Prices

April Gross Receipts Show Impact of Low Oil and Gas Prices OKLAHOMA STATE TREASURER KEN MILLER For Immediate Release: May 5, 2015 April Gross Receipts Show Impact of Low Oil and Gas Prices OKLAHOMA CITY Oklahoma s April Gross Receipts to the Treasury report shows

More information

Presented by Bob Ruebusch, Senior Project Manager Office of Design & Construction

Presented by Bob Ruebusch, Senior Project Manager Office of Design & Construction Presented by Bob Ruebusch, Senior Project Manager Office of Design & Construction Florida Hospital Snapshot 2 Part of Adventist Health Systems faith-based non-profit nationwide 44 hospital chain 8 Campuses

More information

Using Futures Markets to Manage Price Risk for Feeder Cattle (AEC 2013-01) February 2013

Using Futures Markets to Manage Price Risk for Feeder Cattle (AEC 2013-01) February 2013 Using Futures Markets to Manage Price Risk for Feeder Cattle (AEC 2013-01) February 2013 Kenny Burdine 1 Introduction: Price volatility in feeder cattle markets has greatly increased since 2007. While

More information

Walton Centre. Document History Date Version Author Changes 01/10/2004 1.0 A Cobain L Wyatt. Monitoring & Audit

Walton Centre. Document History Date Version Author Changes 01/10/2004 1.0 A Cobain L Wyatt. Monitoring & Audit Page 1 Walton Centre Monitoring & Audit Document History Date Version Author Changes 01/10/2004 1.0 A Cobain L Wyatt Page 2 Table of Contents Section Contents 1 Introduction 2 Responsibilities Within This

More information

The work breakdown structure can be illustrated in a block diagram:

The work breakdown structure can be illustrated in a block diagram: 1 Project Management Tools for Project Management Work Breakdown Structure A complex project is made manageable by first breaking it down into individual components in a hierarchical structure, known as

More information

Qi Liu Rutgers Business School ISACA New York 2013

Qi Liu Rutgers Business School ISACA New York 2013 Qi Liu Rutgers Business School ISACA New York 2013 1 What is Audit Analytics The use of data analysis technology in Auditing. Audit analytics is the process of identifying, gathering, validating, analyzing,

More information

Why Service Matters Susan Osborne RN, MSN, MBA Vice President Service Excellence

Why Service Matters Susan Osborne RN, MSN, MBA Vice President Service Excellence Why Service Matters Susan Osborne RN, MSN, MBA Vice President Service Excellence Objectives The Piedmont Journey Current Service Results Importance of personal connection Financial impact for service

More information

HOW MUCH INVENTORY DO YOU NEED? Presented By: Tracy Moffatt AGM Education Team K&K Consulting

HOW MUCH INVENTORY DO YOU NEED? Presented By: Tracy Moffatt AGM Education Team K&K Consulting HOW MUCH DO YOU NEED? Presented By: Tracy Moffatt AGM Education Team K&K Consulting Many stores carry 2 to 3 times more inventory than they need Many stores have no idea how much inventory they need to

More information

Unifying Compensation:

Unifying Compensation: Unifying Compensation: The Lehigh Valley Physicians Group Experience American Medical Group Association Orlando, FL March 15, 2013 Edward Norris, M.D. Chair, Compensation Committee Michael A. Rossi, M.D.,

More information

University of Michigan Health System Adult and Children s Emergency Departments

University of Michigan Health System Adult and Children s Emergency Departments University of Michigan Health System Adult and Children s Emergency Departments Efficiency and Effectiveness of Electronic Health Record (EHR) Use in the Emergency Department Final Report To: Jeffrey Desmond,

More information

South Carolina Nurse Supply and Demand Models 2008 2028 Technical Report

South Carolina Nurse Supply and Demand Models 2008 2028 Technical Report South Carolina Nurse Supply and Demand Models 2008 2028 Technical Report Overview This document provides detailed information on the projection models used to estimate the supply of and demand for Registered

More information

Technical Note: Monthly Early Estimates of Income Support Lone Parent s (ISLP) and Employment and Support Allowance (ESA) and Incapacity Benefits

Technical Note: Monthly Early Estimates of Income Support Lone Parent s (ISLP) and Employment and Support Allowance (ESA) and Incapacity Benefits Technical Note: Monthly Early Estimates of Income Support Lone Parent s (ISLP) and Employment and Support Allowance (ESA) and Incapacity Benefits Client Groups Updated 11 November 2015 1 Technical Note:

More information

Mapping Your Retirement Destination. ING Secure Index Seven Annuity. Flexible Premium Deferred Fixed Index Annuity. Your future. Made easier.

Mapping Your Retirement Destination. ING Secure Index Seven Annuity. Flexible Premium Deferred Fixed Index Annuity. Your future. Made easier. Mapping Your Retirement Destination ING Secure Index Seven Annuity Flexible Premium Deferred Fixed Index Annuity Your future. Made easier. Where will retirement take you? Before and during your retirement,

More information

Sandia National Laboratories New Mexico Wind Resource Assessment Lee Ranch

Sandia National Laboratories New Mexico Wind Resource Assessment Lee Ranch Sandia National Laboratories New Mexico Wind Resource Assessment Lee Ranch Data Summary and Transmittal for September December 2002 & Annual Analysis for January December 2002 Prepared for: Sandia National

More information

Insurance and Banking Subcommittee

Insurance and Banking Subcommittee Insurance and Banking Subcommittee Citizens Depopulation Update September 16, 2015 Christine Ashburn VP Communications, Legislative and External Affairs 2 3 Depopulation Customer Communications 1. 40 days

More information