1 THE UNIVERSITY OF TEXAS SYSTEM UNIVERSITY LANDS P.O. BOX 553 MIDLAND, TEXAS (432) Web Site Link: I. Well Locations and Oil & Gas Lease Appurtenances Page 1 II. Material Sales Page 3 III. Geophysical Surveys Page 3 IV. Commercial Surface Contracts (Non-Grazing) Page 4 V. Roads Page 5 VI. Pipeline Easements Page 6 VII. Utility Line Easements Page 8 VIII. Fresh Water and Brine Page 9 IX. SWD Contracts Page 11 X. Assignments Page 12 XI. Amendments Page 12 XII. Payment Information Page 13 XIII. University Lands Representatives Page 14 EFFECTIVE September 1, 2014 This schedule supersedes all previous Rate and Damage Schedules
2 I. WELL LOCATIONS AND OIL & GAS LEASE APPURTENANCES The location fee (damages) must be paid before any construction begins. The location fee includes damages exclusively on the applicable company oil/gas lease for well location, tank battery on existing well pad, flow-lines, power lines, etc. and use of existing roads for ingress/egress. Damaged area includes pads, drilling/reserve pits, laydown area, etc. All other appurtenances (e.g., tanks located off well pad, meters, flow-lines, power lines, etc.) will require easements or commercial surface leases if benefiting more than one oil & gas lease. Caliche is not included in the location fee. Any caliche taken from University land, other than reclaimed caliche, requires a payment for consideration. (See page 3, II. Material Sales) Any new road access to a location requires a damage payment. (See page 5, V. Roads and Road Easements) Royalty due on oil and gas lease includes any lost product resulting from a leak or spill. ADVANCE NOTIFICATION to the University Lands Designated Field Representative is REQUIRED BEFORE ANY WORK IS INITIATED. Failure to properly notify University representative may subject operator to a penalty of a minimum of $1, per occurrence. LOCATION FEES ARE BASED ON TOTAL MEASURED DEPTH INCLUDING HORIZONTAL SECTION OF THE WELLBORE. A. New Location - Including Multiple Wellbores on Same Pad 1. Less than 4,000 feet measured depth (up to 90,000 sq. ft. 2. 4,000 feet to 7,999 feet measured depth (up to 140,000 sq. ft. 3. 8,000 feet to 13,000 feet measured depth (up to 200,000 sq. ft. 4. Greater than 13,000 feet measured depth (up to 250,000 sq. ft. Damages $9, $14, $20, $26, Each additional wellbore located on the same well pad $7, B. Re-Entry (New University Lease) 1. Less than 4,000 feet measured depth (up to 90,000 sq. ft. 2. 4,000 feet to 7,999 feet measured depth (up to 140,000 sq. ft. 3. 8,000 feet to 13,000 feet measured depth (up to 200,000 sq. ft. 4. Greater than 13,000 feet measured depth (up to 250,000 sq. ft. Damages $4, $7, $10, $12, Rate & Damage Schedule 1
3 (Section I. continued) C. Fresh Water Frac Pit Site Requires a five (5) year contract prior to construction. Pit area calculated from the outside base of the berm. Unused pits must be closed by the end of primary term. Requires reseeding with University Land s seed mixture upon closure of pit. All caliche must be returned to the pit. 1. Maximum 40,000 sq. ft. pit area Min. $10, Pit area greater than 40,000 sq. ft. Min. $0.25/sq. ft. over and above C. 1. D. Renewal of Fresh Water Frac Pit Site 1. Fresh water frac pit site Min. $ E. Stacked Rig Damages 1. Stacked drilling rig Min. $500.00/day F. General Damages Damages 1. Remediation of ground surface Min. $0.10/sq.ft. 2. Off-pad construction Min. $0.10/sq.ft. 3. Pad extensions Min. $0.10/sq.ft. 4. On-lease central tank battery (up to 75,000 sq. ft.) (contract not required) 5. On-lease central tank battery (greater than 75,000 sq. ft.) (contract not required) 6. Temporary pipeline not requiring an easement (prior approval of UL Designated Field Representative required) $7, Min $0.10/sq. ft. Rate & Damage Schedule 2
4 II. UNIVERSITY LANDS MATERIAL SALES ADVANCE NOTIFICATION to the University Lands Designated Field Representative is REQUIRED BEFORE ANY WORK IS INITIATED. Failure to properly notify University representative may subject operator to a penalty of a minimum of $1,000 per occurrence. 1. Caliche or Limestone (for use on University Lands) 2. Caliche or Limestone (for use off University Lands) 3. Reclaimed Caliche (for use on or off University Lands) All reclaimed caliche must be completely removed down to ground level. After removal, the area must be ripped and/or reseeded if so directed by the University Lands Designated Field Representative. Fee Min. $5.00/yd 3 Min. $8.00/yd 3 None 4. Other materials 5. Opening of new material pit (in addition to any fees listed in II.1. through II.4.) Min. $25, III. GEOPHYSICAL PERMITS A non-refundable payment is due before the work begins. ADVANCE NOTIFICATION to the University Lands Designated Field Representative is REQUIRED BEFORE ANY WORK IS INITIATED. Failure to properly notify University representative may subject operator to a penalty of $1, per occurrence D Min. $3,000.00/mile 2. 3-D Min. $20.00/acre 3. Other 4. Brush removal (by written permission only) Min. $500.00/mile 5. If geophysical activity occurs during big game hunting season (in permit area) or during lambing season (potentially year round), an income loss assessment per affected acre is due from the permit holder to the UL Grazing Lessee. All such payments will be determined and monitored by UL personnel. Hunting Maximum $3.00/acre* Lambing Maximum $5.00/acre* *Separate payment required, delivered to University Lands office, payable to grazing lessee. Rate & Damage Schedule 3
5 IV. UNIVERSITY LANDS COMMERCIAL SURFACE CONTRACTS (NON-GRAZING) Contracts are required and negotiated by the Midland office. ADVANCE NOTIFICATION to the University Lands Designated Field Representative is REQUIRED BEFORE ANY WORK IS INITIATED. Failure to properly notify University representative may subject operator to a penalty of a minimum of $1,000 per occurrence. 1. Commercial surface lease 2. Off-lease/multi-lease tank battery (up to 75,000 sq. ft.) (contract required) 3. Off-lease/multi-lease tank battery (greater than 75,000 sq. ft.) (contract required) $7, Min. $0.10/sq. ft. Rate & Damage Schedule 4
6 V. ROADS Road easements for convenience to access non-university Lands are normally discouraged and must show a significant benefit to the University. Road easements are usually only required for roads that are built on University Lands whose purpose is to access property off University Lands. Most roads on University Lands do not require an easement. If there are questions as to whether an easement is required, contact the Midland office or the University Lands Designated Field Representative. Any caliche taken from University land other than reclaimed University caliche requires a payment fee as stated on page 3, II. Material Sales. For new road construction that does not require an easement, a payment for University caliche is still required. All roads, gates, and cattle guards on University Lands must be located, constructed, and maintained in accordance with specifications determined by the University Lands Designated Field Representative. Existing roads must be upgraded to accommodate additional traffic in accordance with specifications determined by the University Designated Field Representative. Annual road and cattle guard maintenance by the oil and gas lessee is required at a minimum. University Lands may assess a penalty for improper road or cattle guard maintenance. DRIVING AROUND POTHOLES AND POORLY MAINTAINED AREAS is considered excessive surface use and will result in administrative fines or other penalties up to and including expulsion from University Lands. Minimum penalty is $3,000. No unauthorized off-road travel is permitted for any reason unless permission is given by the University Lands Designated Field Representative. All vehicles must remain on existing roads at all times. Poorly maintained roads may not be traveled. ADVANCE NOTIFICATION to the University Lands Designated Field Representative is REQUIRED BEFORE ANY WORK IS INITIATED. Failure to properly notify University representative may subject operator to a penalty of a minimum of $1,000 per occurrence. A. Roads (Maximum 10-year term for roads requiring easements) 1. Road requiring an easement Min. $50.00/rod 2. Renewal of a road easement Min. $30.00/rod 3. Road construction not requiring an easement (ingress/egress to own University oil and gas lease) Damages Min. $30.00/rod Rate & Damage Schedule 5
7 VI. UNIVERSITY LANDS PIPELINE EASEMENTS Any line which exclusively serves the oil and gas lease on which it is located does not require a separate easement. All other lines require easements. Pipelines must be removed at expiration of easement or lease. ADVANCE NOTIFICATION to the University Lands Designated Field Representative is REQUIRED BEFORE ANY WORK IS INITIATED. Failure to properly notify University representative may subject operator to a penalty of a minimum of $1,000 per occurrence. A. New Pipeline Easement (Maximum 10-year term) All Pipe Sizes are Nominal Ordinary Construction Damages Included 1. Less than 6 Min. $24.00/rod 2. 6 to Less than 12 Min. $45.00/rod to Less than 24 Min. $65.00/rod or Greater Min. $90.00/rod B. Renewal of Pipeline Easement (Maximum 10-year term) All Pipe Sizes are Nominal 1. Less than 6 Min. $15.00/rod 2. 6 to Less than 12 Min. $35.00/rod to Less than 24 Min. $45.00/rod or Greater Min. $65.00/rod (Section VI. continued on next page) Rate & Damage Schedule 6
8 (Section VI. continued) C. Maintenance of Pipeline Easement 1. Repair or replacement of pipeline (To avoid penalty, removal of replaced line from University premises required within 30 days) 2. Termination of easement Damages Min. $12.00/rod None (Removal of pipe is required) 3. Remediation of leak/spill Min. $0.10/sq. ft. 4. Temporary pipeline not requiring an easement (prior approval of UL Designated Field Representative required) Rate & Damage Schedule 7
9 VII. UNIVERSITY LANDS UTILITY LINE EASEMENTS Utility lines and poles must be removed at expiration of easement or lease. Any line which exclusively serves the oil and gas lease on which it is located does not require a separate easement. All other lines require easements. ADVANCE NOTIFICATION to the University Lands Designated Field Representative is REQUIRED BEFORE ANY WORK IS INITIATED. Failure to properly notify University representative may subject operator to a penalty of a minimum of $1,000 per occurrence. A. New Utility Line Easement (Maximum 10-year term) Ordinary Construction Damages Included 1. Less than 69,000 volts line capacity (maximum width 30 feet) 2. 69,000 volts line capacity but less than 138,000 volts line capacity (maximum width 60 feet) ,000 volts line capacity but less than 300,000 volts line capacity (maximum width 80 feet) ,000 volts line capacity but less than 345,000 volts line capacity (maximum width 145 feet) 5 345,000 volts line capacity and above volts line capacity (maximum width 180 feet) 6. Fiber optic or telephone line (line serving fewer than 100 end users) 7. Fiber optic or telephone line (line serving 100 or more end users) Min. $25.00/rod Min. $62.00/rod Min. $87.00/rod Min. $208.00/rod Min. $255.00/rod Min. $2.50/rod Min. $5.00/rod B. Renewal of Utility Easement (Maximum 10-year term) 1. Less than 69,000 volts line capacity (maximum width 30 feet) 2. 69,000 volts line capacity but less than 138,000 volts line capacity (maximum width 60 feet) ,000 volts line capacity but less than 300,000 volts line capacity (maximum width 80 feet) ,000 volts line capacity but less than 345,000 volts line capacity (maximum width 145 feet) 5 345,000 volts line capacity but less than 500,000 volts line capacity (maximum width 180 feet) 6. Fiber optic or telephone line (line serving fewer than 100 end users) 7. Fiber optic or telephone line (line serving 100 or more end users) Min. $10.00/rod Min. $20.00/rod Min. $30.00/rod Min. $155.00/rod Min. $190.00/rod MIN. $2.50/rod Min. $5.00/rod Rate & Damage Schedule 8
10 VIII. FRESH WATER AND BRINE CONTRACTS AND SALES All fresh water wells must comply with the University Lands Groundwater Management Plan found at: A. Water Sales Contracts (Maximum 5-year term) 1. Water for municipal use B. Brine Sales Contracts (Maximum 5-year term) 1. Brine used for any purpose Min. $0.06/barrel or 1/5 of highest actual selling price, whichever is greater (Section VIII. continued on next page) Rate & Damage Schedule 9
11 (Section VIII. continued) C. Water Sales for Drilling and Completion on University Leases Operators shall follow the University Lands Ground Water Management Plan and Subchapter 6.4 Water Wells and Water Usage Board for Lease Rules. All water wells must have an identification plate. Water fees are based on total measured depth including horizontal section of the wellbore. Groundwater produced from University Lands groundwater wells shall be metered and reported. Payment due for each oil & gas well regardless of water source. 1. Water used for drilling & completion of one oil or gas well on University Lands a. Less than 4,000 feet measured depth Min. $9,500.00/oil or gas well b. 4,000 feet to 7,999 feet measured depth Min. $16,500.00/oil or gas well c. 8,000 feet to 13,000 feet measured depth Min. $26,500.00/oil or gas well d. Greater than 13,000 feet measured depth Min. $46,000.00/oil or gas well Fee 2. Water used for re-entry of plugged well a. Less than 4,000 feet measured depth Min. $6,500.00/oil or gas well b. 4,000 feet to 7,999 feet measured depth Min. $12,000.00/oil or gas well c. 8,000 feet to 13,000 feet measured depth Min. $19,000.00/oil or gas well d. Greater than 13,000 feet measured depth Min. $34,500.00/oil or gas well Rate & Damage Schedule 10
12 IX. UNIVERSITY LANDS SALT WATER DISPOSAL CONTRACTS (SWD) (Disposal of water produced from oil and gas operations) A. Operator of University Oil and Gas Lease - Operates Water Disposal Well Located on the Lease - Pipeline Transport Only 1. University leases only (disposal of produced water from multiple University leases by single or multiple operators) 2. University and non-university leases commingled (disposal of water produced from both University leases and nonuniversity leases by one or more operators) Min. Prepaid $8,000 for 5-year term plus $0.05/bbl injected into the disposal well Min. Prepaid $12,500 for 5-year term plus $0.10/bbl injected into the disposal well All new Salt Water Disposal Wells must pay a location fee in addition to the fees listed above. See page 1 for location fees required. Rate & Damage Schedule 11
13 X. ASSIGNMENTS, MERGERS, ACQUISITIONS, CONSOLIDATIONS AND NAME CHANGES A. Assignments Payment due before assignment occurs or by due date established by agreement. Easements must be assigned separately from oil and gas lease assignments and require University Lands consent. 1. Each commercial surface lease, easement, produced water disposal contract or water contract $ Each additional contract $ B. Mergers, Acquisitions, Consolidations and Name Changes 1. Each commercial surface lease, easement, produced water disposal contract or water contract $ Each additional contract $ XI. AMENDMENTS 1. Each commercial surface lease or easement $1, Rate & Damage Schedule 12
14 XII. PAYMENT INFORMATION UNIVERSITY LANDS A. All consideration, fees and damage checks should be made payable to: THE UNIVERSITY OF TEXAS SYSTEM B. Unless otherwise noted in this schedule the minimums are as follows: Minimum is $ C. Payments should be delivered to University Lands: US Mail P. O. Box 553 Midland, TX Physical Address 704 W. Dengar Ave. Midland, TX Telephone Contact Midland Office Rate & Damage Schedule 13
15 XIII. UNIVERSITY LANDS REPRESENTATIVES P.O. Box 553, Midland, Texas Office: Designated Field Representatives Lazaro Acosta ( Crane & Pecos Counties Drew McEachern ( Andrews, Dawson, Ector, Gaines & Martin Counties Jeff White ( Crockett (Blk 29-33, 38-52, 55 & 56), Irion, Reagan (Blk 43, 48 & 49) & Schleicher Counties Joe Petersen ( Terrell County Michael Taylor ( Loving, Ward, Winkler, Culberson, El Paso & Hudspeth Counties Cellular Brazos Peacock ( Range and Wildlife Representatives Jeff White ( Crockett, Irion & Schleicher Counties Joe Petersen ( Pecos, Reagan, Terrell & Upton Counties Drew McEachern ( Andrews, Crane, Culberson, Dawson, Ector, El Paso, Gaines, Hudspeth, Loving, Martin, Ward & Winkler Counties Brazos Peacock ( Crockett, Reagan, & Upton Counties Easements and Commercial Leases Representatives Cellular Midland Office Jim Buice ( Cindy Gomez ( Surface Lease Inspections, Produced Water Disposal, Water and Brine Representative Cellular Daniel Bryant ( Geophysical Permits Representative Midland Office James Holtzclaw ( Associate Director of Surface Interests Midland Office Richard Brantley ( Note: To maintain accuracy of contact information, staff will update Section XIII of the Rate and Damage Schedule as needed without providing advance notice to the Board of Regents. Rate & Damage Schedule 14
RATE AND DAMAGE SCHEDULE
THE UNIVERSITY OF TEXAS SYSTEM UNIVERSITY LANDS P.O. BOX 553 MIDLAND, TEXAS 79702-0553 (432) 684 4404 Website Link: http://www.utlands.utsystem.edu I. Well Locations and Oil & Gas Lease Appurtenances Page
Tuesday, March 17, 2015 Houston, TX. Energy Exchange 9:20 9:50 a.m. and 9:55 10:25 a.m. OIL AND GAS: ENVIRONMENTAL INSURANCE IS IT NECESSARY?
Tuesday, March 17, 2015 Houston, TX Energy Exchange 9:20 9:50 a.m. and 9:55 10:25 a.m. OIL AND GAS: ENVIRONMENTAL INSURANCE IS IT NECESSARY? Copyright 2015 International Risk Management Institute, Inc.
The Pipelines Regulations, 2000
PIPELINES, 2000 P-12.1 REG 1 1 The Pipelines Regulations, 2000 being Chapter P-12.1 Reg 1 (effective April 1, 2000) as amended by the Statutes of Saskatchewan, 2014, c.21. NOTE: This consolidation is not
Effective July 1, 2010 WYOMING STATE LAW Title 37 Public Utilities Chapter 12 Article 3. DAMAGE TO UNDERGROUND PUBLIC UTILITY FACILITIES
Effective July 1, 2010 WYOMING STATE LAW Title 37 Public Utilities Chapter 12 Article 3. DAMAGE TO UNDERGROUND PUBLIC UTILITY FACILITIES 37-12-301. Short title; definitions. (a) This act may be known and
Much of the data contained herein can be accessed through our website: www.albrechtai.com.
EXECUTIVE SUMMARY, LP and their partners ( ExL ) are offering the Properties described in this brochure for sale. This will be a negotiated sale. The Data Room will be open from July 20, 2009 through August
1004 VEHICLE AND FLEET SERVICE POLICY. I. Legislative Authority:
1004 VEHICLE AND FLEET SERVICE POLICY I. Legislative Authority: This policy is written in accordance with legislation passed by the Arkansas General Assembly, (Arkansas Code: 19-4-902, 19-4-905, 19-4-907,
2880 - Oil and Natural Gas Pipelines
2880 - Oil and Natural Gas Pipelines 1. Explanation of Material Transmitted: This Manual release provides procedural guidance for issuing right-of-way grants for oil and natural gas pipelines. 2. Reports
Texas. Sample Oil and Gas Lease and Surface Use Agreement. Oil & Gas Accountability Project A program of Earthworks EARTHWORKS TM
Texas Sample Oil and Gas Lease and Surface Use Agreement Oil & Gas Accountability Project A program of Earthworks EARTHWORKS TM EARTHWORKS TM EARTHWORKS TM 2 Texas Sample Oil and Gas Lease and Surface
Negotiating Pipeline Easements
FACT SHEET Ohio State University Extension, 2120 Fyffe Road, Columbus, OH 43210 Introduction Shale Oil and Gas Development Fact Sheet Series Negotiating Pipeline Easements Peggy Kirk Hall Director, OSU
SANTA FE COUNTY'S OIL DEVELOPMENT ZONING ORDINANCE
SANTA FE COUNTY'S OIL DEVELOPMENT ZONING ORDINANCE Stephen C. Ross Santa Fe County Attorney 102 Grant Avenue P.O. Box 287 Santa Fe, New Mexico 87504-0287 (505) 989-6279 December 5, 2013 Existing oil field
Tax Treatment of Damages and Easements in Oil and Gas Operations. Presented by: James R. Browne Strasburger & Price L.L.P.
Tax Treatment of Damages and Easements in Oil and Gas Operations Presented by: James R. Browne Strasburger & Price L.L.P. Dallas, Texas Speaker Strasburger & Price, LLP 901 Main Street, Suite 4400 Dallas,
Incident Reporting Requirements
Incident Reporting Requirements Directive PNG014 February 2016 Revision 1.0 Governing Legislation: Acts: The Oil and Gas Conservation Act The Pipelines Act, 1998 Regulations: The Oil and Gas Conservation
Well Site Spill Protection: Impacts, Trends and Technologies for Preventing Releases to Water Sources
Well Site Spill Protection: Impacts, Trends and Technologies for Preventing Releases to Water Sources Presented by: Tekla Taylor, R.G. and Archie Filshill, Ph.D. InterGEO Services, now a part of Golder
Insurance Market Solutions Group, LLC Sub-Producer Agreement
Insurance Market Solutions Group, LLC Sub-Producer Agreement This Producer Agreement is made and entered into effective the day of, 20, by and between Insurance Market Solutions Group, LLC a Texas Company
Reclamation Plants, Separation Facilities & Stationary Treatment Facilities
RAILROAD COMMISSION OF TEXAS Reclamation Plants, Separation Facilities & Stationary Treatment Facilities Grant Chambless, P.G. Manager, Environmental Permits & Support Oil & Gas Division 1 Disclaimer These
Inquiring Minds Want to Know: Questions Landowners Should Ask in Negotiations with Companies Seeking Easements
Inquiring Minds Want to Know: Questions Landowners Should Ask in Negotiations As a property owner, you should make a decision about granting an easement based on the same level of information available
Schneps, Leila; Colmez, Coralie. Math on Trial : How Numbers Get Used and Abused in the Courtroom. New York, NY, USA: Basic Books, 2013. p i.
New York, NY, USA: Basic Books, 2013. p i. http://site.ebrary.com/lib/mcgill/doc?id=10665296&ppg=2 New York, NY, USA: Basic Books, 2013. p ii. http://site.ebrary.com/lib/mcgill/doc?id=10665296&ppg=3 New
Charting Your Course for Midstream Solutions. Bernie Thomas. Co-Founder and Vice President, Commercial
Charting Your Course for Midstream Solutions Bernie Thomas Co-Founder and Vice President, Commercial Permian Congress Houston, Texas July 29 & 30, 2015 AGENDA Who is Navigator? Why the Permian Basin? Where
Regulation of Natural Gas Pipelines. June 23, 2008
Regulation of Natural Gas Pipelines June 23, 2008 Federal and State Regulations Federal: 49 United States Code 60101. et. seq. Title 49 Code of Federal Regulations The Office of Pipeline Safety (OPS),
When does a Landowner own all rights, including Minerals and Royalty?
Tommy Smart When does a Landowner own all rights, including Minerals and Royalty? When there have been no conveyances, donations or reservations of minerals or royalty, by the owner or his predecessors
ERIC C. CAMP WHITAKER, CHALK, SWINDLE & SAWYER, LLP 301 COMMERCE STREET, SUITE 3500 FORT WORTH, TEXAS 76102 (817) 878-0500 ECAMP@WHITAKERCHALK.
NATURAL GAS PIPELINE EASEMENT AND RIGHT-OF-WAY AGREEMENTS: ERIC C. CAMP WHITAKER, CHALK, SWINDLE & SAWYER, LLP 301 COMMERCE STREET, SUITE 3500 FORT WORTH, TEXAS 76102 (817) 878-0500 [email protected]
UNIVERSITY of HOUSTON MANUAL OF ADMINISTRATIVE POLICIES AND PROCEDURES
UNIVERSITY of HOUSTON MANUAL OF ADMINISTRATIVE POLICIES AND PROCEDURES SECTION: Administrative Operations Number: 03.01.04 AREA: General SUBJECT: Fleet Management Plan I. PURPOSE AND SCOPE This document
Permit No. Permit Fee: $295.00. Permit Expires (D+90 days): Business Name: Applicants Name: Telephone Number: E-mail Address:
City of Woodland Park Internet Service Provider (IPS) Permit for Installation of Telecommunication Infrastructure within City Owned Rights-of-Way (up to five locations per single permit) Permit No. Permit
SAMPLE MULTI-YEAR LEASE AGREEMENT
SAMPLE MULTI-YEAR LEASE AGREEMENT This Lease Agreement is entered into on this day of, 2009, by and between as lessor ( Lessor ), and, as lessee ( Lessee ), for the Lease of certain land bounded by in,
Maximizing Production at Eagle Ford
Maximizing Production at Eagle Ford Laredo Energy focuses on energy revolution and economic development at one of the most active shales in the world PRESIDENT AND CEO Laredo Energy Glenn Hart LOCATION
AN OHIO LANDOWNER S GUIDE TO HYDRAULIC FRACTURING
AN OHIO LANDOWNER S GUIDE TO HYDRAULIC FRACTURING ADDRESSING ENVIRONMENTAL AND HEALTH ISSUES IN NATURAL GAS LEASES Harvard Law School Emmett Environmental Law and Policy Clinic Cambridge, MA May 2011 (Revised
Oil and Gas Exploration and Production Oil and gas exploration and production... 22a-472-1
Department of Environmental Protection Sec. 22a-472 page 1 (4-97) TABLE OF CONTENTS Oil and Gas Exploration and Production Oil and gas exploration and production... 22a-472-1 Department of Environmental
MONTANA STATE HOSPITAL POLICY AND PROCEDURE OCCUPATIONAL HOUSING POLICY
MONTANA STATE HOSPITAL POLICY AND PROCEDURE OCCUPATIONAL HOUSING POLICY Effective Date: January 27, 2014 Policy #: HR-10 Page 1 of 2 I. PURPOSE: To provide considerations attached to the provision of employee
Shale Energy Fluids Management Practices
Shale Energy Fluids Management Practices Forum on Hydraulic Fracturing Bogota, Colombia, December 1, 2014 Presented by Dave Yoxtheimer, PG Hydrogeologist Penn State Marcellus Center for Outreach and Research
LENGTH OF LEASE TERMS How long is the PRIMARY TERM of the lease? 3yrs? 5yrs? 10yrs?
Natural Gas Lease Forms and Addendum Presented for informational and educational purposes only. Consult with an attorney familiar with gas law before signing any lease. OVERVIEW Understanding what is in
ALBUQUERQUE BERNALILLO COUNTY WATER UTILITY AUTHORITY WATER WASTE ORDINANCE
4-1-1 SHORT TITLE... 1 4-1-2 INTENT... 1 4-1-3 DEFINITIONS... 1 4-1-4 WATERING RESTRICTIONS... 4 4-1-5 WATER WASTE... 5 4-1-6 SPECIAL PERMITS... 6 4-1-7 VARIANCES, EXEMPTIONS AND APPEALS... 7 4-1-8 FEES;
APPROVED. PXP 2009 Tank Leak Detection and Containment at Inglewood Oil Field. Baldwin Hills CSD Conditions L.18. and E.29.e.
PXP 2009 Tank Leak Detection and Containment at Inglewood Oil Field Baldwin Hills CSD Conditions L.18. and E.29.e. WORKING DRAFT SUBJECT TO CHANGE BASED ON COUNTY REVIEW AND ACCEPTANCE Prepared for: May
Remediation of Sodium Contaminated Sites
Remediation of Sodium Contaminated Sites Environmental Challenges and Innovations Conference: Gulf Coast 2007 Mark Landress P.G. Project vigator, Ltd. 10497 Town & Country Way Suite 830 Houston, TX 77024
Long Service Leave. Your obligations as an employer of construction industry workers
Long Service Leave Your obligations as an employer of construction industry workers Employees in the construction industry have access to a portable long service leave Scheme funded by a compulsory levy
Degree/ Higher Education Jobs:
Ohio s Natural Gas and Crude Oil Industry Degree/ Higher Jobs Job Title Degree/ Higher Jobs: for field positions may require 2 to 4 year, or higher degrees that are industry specific and/ or technical
Ordinances Governing ALARM SYSTEMS. in the CITY OF ARLINGTON TEXAS. Amended by Ordinance No. 14-029. (May 27, 2014)
Chapter Ordinances Governing ALARM SYSTEMS in the CITY OF ARLINGTON TEXAS Amended by Ordinance No. 14-029 (May 27, 2014) (Chapter Designator: ALARM SYSTEMS) History ORDINANCE HISTORY Date of Number Adoption
ARTICLE XI ALARM SYSTEMS
ARTICLE XI ALARM SYSTEMS Section 15-232. DEFINITIONS ALARM SYSTEM means a device or system that emits, transmits, or relays a signal that is intended to notify the public safety department of an unauthorized
Title 27A. Environment and Natural Resources Chapter 1 - Oklahoma Environmental Quality Act Article III - Jurisdiction of Environmental Agencies
ODAFF AEMS Reference Date March 1, 2014 Title 27A. Environment and Natural Resources Chapter 1 - Oklahoma Environmental Quality Act Article III - Jurisdiction of Environmental Agencies 1-3-101. Responsibilities
CITY OF EDMONTON BYLAW 10922 ALARM SYSTEMS BYLAW (CONSOLIDATED ON JUNE 12, 2001)
CITY OF EDMONTON BYLAW 10922 ALARM SYSTEMS BYLAW (CONSOLIDATED ON JUNE 12, 2001) Bylaw 12596 Page 2 of 10 BYLAW 10922 ALARM SYSTEMS BYLAW Whereas, pursuant to section 7 of the Municipal Government Act,
Public and Products Liability Amendments for Manufacturing
These Amendments are only operative if the Public Liability or Public and Products Liability Section is shown as operative in the Schedule. Subject to all of the terms, definitions, exclusions, provisions
APPLICATION FOR LIQUEFIED PETROLEUM GAS PERMIT TYPE OR PRINT LEGIBLY
LIQUEFIED PETROLEUM GAS COMMISSION DEPARTMENT OF PUBLIC SAFETY AND CORRECTION Public Safety Services Bobby Jindal Governor John W. Alario Executive Director APPLICATION FOR LIQUEFIED PETROLEUM GAS PERMIT
NON-RESIDENTIAL BUILDING PERMIT PROCEDURES
TOWAMENCIN TOWNSHIP NON-RESIDENTIAL BUILDING PERMIT PROCEDURES PART I Location of Property Address, Zoning District, Parcel Number and Lot & Block must be provided on all applications. PARTS II thru VIII
RULES AND REGULATIONS PERTAINING PLUMBERS LICENSE FEE, EXPIRATION, RENEWAL, JOURNEYMAN, AND MASTER PLUMBER QUALIFICATIONS
RULES AND REGULATIONS PERTAINING TO PLUMBERS LICENSE FEE, EXPIRATION, RENEWAL, JOURNEYMAN, AND MASTER PLUMBER QUALIFICATIONS SECTION I AUTHORITY The following Amendment to the Arkansas State Plumbing Code
Legal Aid Society of Orange County Low Income Taxpayer Clinic
Legal Aid Society of Orange County Low Income Taxpayer Clinic Presented by: Renato L. Izquieta, Esq. Legal Aid Society of Orange County Presented by: Richard Silva, Paralegal Legal Aid Society of Orange
SCHUYLER DEPARTMENT OF UTILITIES SCHUYLER, NEBRASKA ELECTRIC RATES
SCHUYLER DEPARTMENT OF UTILITIES SCHUYLER, NEBRASKA ELECTRIC RATES TABLE OF CONTENTS SECTION I SECTION II SECTION III SECTION IV SECTION V SECTION VI SECTION VII SECTION VIII SECTION IX SECTION X SECTION
Oil & Gas: Valuation, Surface Rights and Mineral Interests. Rita Beth Whatley Barbara D. Nunneley
Oil & Gas: Valuation, Surface Rights and Mineral Interests Rita Beth Whatley Barbara D. Nunneley Mineral Interests Created by: Grant Reservation/Exception Mineral Deed Conveyance with Exception ALL or
Royalty and Surface Owner Information Brochure
ARKANSAS OIL AND GAS COMMISSION 2215 West Hillsboro P. O. Box 1472 El Dorado, Arkansas 71731-1472 Phone: (870) 862-4965 Lawrence E. Bengal FAX Number: (870) 862-8823 Director E-Mail: [email protected]
PRIVATE EQUITY INSIGHTS
In this Energy Investment Education Whitepaper, we discuss, Why It Is Financially Better To Own A Portfolio Of Producing Oil & Gas Working Interest Instead of Producing Royalty Interest. Paul Anthony Thomas
District of Columbia Municipal Regulations UNDERGROUND STORAGE TANKS: GENERAL PROVISIONS 5500 COMPLIANCE WITH OTHER DISTRICT LAWS
CHAPTER 55 UNDERGROUND STORAGE TANKS: GENERAL PROVISIONS Section 5500 Compliance with Other District Laws 5501 Applicability of UST Regulations 5502 Partial Applicability of UST Regulations to Particular
1 of 7 31/10/2012 18:34
Regulatory Story Go to market news section Company TIDM Headline Released Number Ironveld PLC IRON Holding(s) in Company 18:01 31-Oct-2012 0348Q18 RNS Number : 0348Q Ironveld PLC 31 October 2012 TR-1:
PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY
PIPELINE ROUTING PERMIT For A NATURAL GAS PIPELINE IN DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PUC DOCKET No. G002/GP-05-1706 In accordance with the requirements
Guide to Tank Insurance
Guide to Tank Insurance OCTOBER 2011 Prepared by: ASTSWMO State Funds Task Force Association of State and Territorial Solid Waste Management Officials 444 North Capitol Street, N.W., Suite 315 Washington,
LOCAL LAW NO. 3-2015 LOCAL ALARM LAW
LOCAL LAW NO. 3-2015 LOCAL ALARM LAW Pursuant to Mun. Home Rule Law 10: BE IT ENACTED by the Town Board of the Town of Ellicottville, New York (collectively and individually, Town ) as follows: Article
How to find an Attorney experienced in Gas Drilling Leases
How to find an Attorney experienced in Gas Drilling Leases Canyon By Sue Tejml Mayor of Copper Many homeowners in Copper Canyon and surrounding areas are receiving offers to lease their mineral interests.
CITY OF POMPANO BEACH Broward County, Florida
RESOLUTION NO. 2015-399 CITY OF POMPANO BEACH Broward County, Florida A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF POMPANO BEACH, FLORIDA, OPPOSING THE OIL DRILLING PERMIT APPLICATION SUBMITTED BY
Recommended Practices Associated with Hydraulic Fracturing Operations
Recommended Practices Associated with Hydraulic Fracturing Operations API standards program includes best-practices for hydraulic fracturing which include: Proper well construction and integrity Zonal
Remediation of Sodium Contaminated Sites
Remediation of Sodium Contaminated Sites..\..\3918b1ca23763e9e9a12ffd67acb0ceb.jpg 21 st International Petroleum Environmental Conference, Houston, Texas Mark Landress P.G. Project Navigator, Ltd. 10497
City of Clayton Event Guidelines
With due consideration of the needs of the and its residents, events will be scheduled to promote the City and provide for the entertainment and cultural opportunities of the citizens. Events held on City
Evaluating Oil & Gas Lease Proposals
Evaluating Oil & Gas Lease Proposals Theodore A. (Ted) Feitshans Department of Agricultural & Resource Economics North Carolina State University 919-515-5195 [email protected] April 26, 2011 The author
[Docket ID BSEE-2015-0007; OMB Control Number 1014-0013; 15XE1700DX. Information Collection Activities: Global Positioning Systems (GPS) for
This document is scheduled to be published in the Federal Register on 08/26/2015 and available online at http://federalregister.gov/a/2015-21103, and on FDsys.gov 4310-VH-P DEPARTMENT OF THE INTERIOR Bureau
STATE OF CALIFORNIA DEPARTMENT OF INSURANCE 45 Fremont Street, 21 st Floor San Francisco, California 94105
STATE OF CALIFORNIA DEPARTMENT OF INSURANCE 45 Fremont Street, 21 st Floor San Francisco, California 94105 Proposed Amendments to Title 10, California Code of Regulations, Chapter 5, Subchapter 4.7, Section
Cabot Oil & Gas Corporation
Information you need to know regarding Cabot Oil & Gas Corporation s natural gas production activities and hydraulic fracturing About Cabot Cabot Oil & Gas Corporation (Cabot) is a leading independent
MODEL LAW ON MOTOR VEHICLE INSPECTION BY INDEPENDENT CONTRACTORS AND SELF INSPECTORS
MODEL LAW ON MOTOR VEHICLE INSPECTION BY INDEPENDENT CONTRACTORS AND SELF INSPECTORS Section 1. Definitions.-- As used in this act, the term: (1) "Contractor" means any person, corporation, or partnership
Authorized Merchant Agreement
Authorized Merchant Agreement THIS LEASE PURCHASE PROGRAM AGREEMENT ("Agreement") is made this day of 2014 by and between CREST FINANCIAL SERVICES LLC, whose address is 15 West Scenic Pointe Dr. Ste.350,
Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan
Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan Scope: This Extraction Oil and Gas Waste Management Plan has been prepared to provide operations personnel at the
OIL POLLUTION PREVENTION REGULATIONS
OIL POLLUTION PREVENTION REGULATIONS The Newly Revised SPCC Rules Spill Prevention Control and Countermeasure NON-TRANSPORTATION RELATED ONSHORE AND OFFSHORE FACILITIES Code of Federal Regulations Title
FERC NGA GAS TARIFF. Fifth Revised Volume No. 1. (Supersedes Fourth Revised Volume No. 1) TRANSWESTERN PIPELINE COMPANY, LLC.
FERC NGA GAS TARIFF Fifth Revised Volume No. 1 (Supersedes Fourth Revised Volume No. 1) Of TRANSWESTERN PIPELINE COMPANY, LLC Filed with the FEDERAL ENERGY REGULATORY COMMISSION Communications concerning
PAID UP OIL AND GAS LEASE NO.
PAID UP OIL AND GAS LEASE NO. STATE OF COUNTY OF This OIL AND GAS LEASE (this "Agreement") is made effective as of this day of, (the "effective date"), by and between the THE UNIVERSITY OF TEXAS SYSTEM
SECTION 7 - CHARGES, FEES AND DEPOSITS
SECTION 7 - CHARGES, FEES AND DEPOSITS 7.1 Charges, fees, and deposits for areas managed or served by the District may be established and approved by the Board of Directors based on actual costs to serve
28. Time is of the essence in this Lease and in each and all of its provisions.
COMMERCIAL VEHICLE/EQUIPMENT LEASE AGREEMENT Please print and fax to: 281-842-9345 Stutes Enterprise Systems, Inc. ("Lessor"), located at 1426 Sens Rd #5, LaPorte, Texas 77571, leases to, ("Lessee"), located
GROUP LIFE INSURANCE ENROLLMENT INFORMATION
North Dakota Public Employees Retirement System 400 East Broadway, Suite 505 Box 1657 Bismarck, North Dakota 58502-1657 Sparb Collins Executive Director (701) 328-3900 1-800-803-7377 FAX: (701) 328-3920
Law of Mongolia on Concessions
Economic Policy Reform and Competitiveness Project April 2005 Ulaanbaatar, Mongolia This publication was produced for review by the United States Agency for International Development The views expressed
SECTION 7 UNDERDRAIN SERVICE
SECTION 7 UNDERDRAIN SERVICE ARTICLE I USE OF THE PUBLIC UNDERDRAIN SYSTEM 7.100 The purpose of the District s underdrain system is to provide a method for conveying ground water from around building foundations
Food, Fiber and Natural Resource Literacy All About State Trust Lands. Colorado State Board of Land Commissioners, also known as the State Land Board.
Colorado Reader AG IN THE CLASSROOM HELPING THE NEXT GENERATION UNDERSTAND THEIR CONNECTION TO AGRICULTURE COLORADO FOUNDATION FOR AGRICULTURE - GROWINGYOURFUTURE.COM Millions of Acres of Land Food, Fiber
SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS
1 SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS TABLE OF CONTENTS I. Introduction II. General Information and Requirements A. Applying for Sewer connection B. Excavation C. Cutting Concrete and Asphalt
Western Pipelines. Greg Ruben, Director, EPNG Marketing Greg Gettman, Manager, Business Development November 1-2, 2011
Western Pipelines www.elpaso.com NYSE:EP Greg Ruben, Director, EPNG Marketing Greg Gettman, Manager, Business Development November 1-2, 2011 D E P E N D A B L E N A T U R A L G A S El Paso Corporation
SANGER BANK ONLINE BANKING AGREEMENT AND DISCLOSURE
SANGER BANK ONLINE BANKING AGREEMENT AND DISCLOSURE This Online Banking Agreement and Disclosure ("Agreement") describes your rights and obligations as a user of the Online Banking service or the Bill
PIPELINE / WIRE LINE PROCESS INSTRUCTIONS
PIPELINE / WIRE LINE PROCESS INSTRUCTIONS Licensing Process: 1. Once the application package is received by Jones Lang LaSalle Brokerage, Inc. (JLL), the application and drawing will be forwarded to the
CHAPTER 10.80 SECURITY ALARM SYSTEMS
CHAPTER 10.80 SECURITY ALARM SYSTEMS ORDINANCE NO. 1724 10.80.010. LEGISLATIVE PURPOSE AND INTENT. The Merced County Board of Supervisors finds and declares that: 1. Inadequately maintained security alarm
Texas Pipeline Easement Negotiation Checklist
EAG-009 6/14 Texas Pipeline Easement Negotiation Checklist Tiffany Dowell Assistant Professor and Extension Specialist Texas A&M AgriLife Extension Service In response to the oil and gas boom in Texas,
OSU Extension FACT SHEET
OHIO STATE UNIVERSITY EXTENSION! OSU Extension FACT SHEET Ohio State University Extension, 2120 Fyffe Road, Columbus, OH 43210 Shale Oil and Gas Development Fact Sheet Series A Landowner s Guide to Understanding
ORDINANCE NO. WHEREAS, Grantee shall pay the City of El Paso for this special privilege;
ORDINANCE NO. AN ORDINANCE GRANTING A SPECIAL PRIVILEGE TO YEK #2 L.P. TO PERMIT AERIAL, SURFACE, AND SUBSURFACE ENCROACHMENTS WITHIN A PORTION OF THE ALLEY BETWEEN SAN ANTONIO STREET AND TEXAS STREET
Maryland Containment System Testing Protocol. The individual performing the inspection and testing as outlined in this protocol must be either:
MARYLAND DEPARTMENT OF THE ENVIRONMENT Oil Control Program, Suite 620, 1800 Washington Blvd., Baltimore MD 21230-1719 4 410-537-3442 410-537-3092 (fax) 1-800-633-6101 http://www.mde.state.md.us Maryland