Title: Planning Effort as an Effective Risk Management Tool
|
|
|
- Monica Valerie Williams
- 9 years ago
- Views:
Transcription
1 Title: Planning Effort as an Effective Risk Management Tool uthor: Ofer Zwikael PII: S07-696(06)006-X DOI: doi:0.06/j.jom Reference: OPEMN 6 To appear in: OPEMN Received date: ccepted date: Please cite this article as: Zwikael, O., Planning Effort as an Effective Risk Management Tool, Journal of Operations Management (006), doi:0.06/j.jom This is a PDF file of an unedited manuscript that has been accepted for publication. s a service to our customers we are providing this early version of the manuscript. The manuscript will undergo copyediting, typesetting, and review of the resulting proof before it is published in its final form. Please note that during the production process errors may be discovered which could affect the content, and all legal disclaimers that apply to the journal pertain.
2 Planning Effort as an Effective Risk Management Tool Ofer Zwikael, Victoria University of Wellington, New Zealand rik Sadeh, Holon Institute of Technology, Israel Contact details: Ofer Zwikael, Ph.D., PMP Victoria Management School Victoria University of Wellington Rutherford House, Lambton Quay PO ox 600, Wellington, New Zealand. Tel: +6 6 [email protected] Page of 8
3 Planning Effort as an Effective Risk Management Tool bstract In project management, high levels of risk are considered to be a significant obstacle for project success. This paper investigates whether improving the project plan can lead to improved success for high risk projects. quality of planning index was designed to explore how the presence of high risk affects the quality of planning and project success. The index includes managerial aspects such as costs, human resources, procurement and quality, as well as organizational support aspects based on organization maturity models. In a field study based on data collected from 0 project managers regarding their most recent projects, it was found that the levels of risk at the beginning of projects has no effect on their final success. Drilling down to find an explanation for this surprising phenomenon, we found that in the presence of high risk, project managers significantly improve their project plans. Hence, in highrisk projects, better project plans improve all four dimensions of project success: schedule overrun, cost overrun, technical performance and customer satisfaction. However, in low risk projects, better project plans did not contribute to reducing schedule or cost overruns. In other words, while endless risk management tools are developed, we found that improving the project plan is a more effective managerial tool in dealing with high risk projects. Finally, the paper presents the most common planning tools currently being used in high risk projects. Keywords: Risk Management, Project Management, Uncertainty, Planning processes. Page of 8
4 . Introduction The area of project management has recently received vast attention in the business discipline. One of the major characteristics of projects is their high level of risk. This means that too many undesirable events may cause delays, excessive spending, unsatisfactory project results or even total failure (Raz et al., 00). In order to increase the chance of project success, project managers are motivated to reduce risks by implementing better planning and control. Risks must be managed throughout the entire life cycle of the project, starting with the planning phase, when risks must be identified and analyzed. Next, solutions, which may reduce threats, must be developed and a response plan to some of the critical risks should be implemented. Throughout the execution phase of the project, risk monitoring is needed in order to keep track of the identified risks, monitor residual risks, identify new risks and ensure the execution of risk plans (PMI Standards Committee, 00). The objective of this paper is to explore the influence of project planning on project success under different levels of project risk. Specifically, we are interested in examining (i) the impact of the presence of risk on project managers planning; (ii) the impact of an organizational support environment on planning efforts; (iii) the impact of the presence of risk on a project s success and (iv) the impact of planning efforts on project success in the presence of risk. The following section introduces the relevant literature from the areas of project management, project planning and risk management. Page of 8
5 . Literature Review project is defined as a temporary endeavor undertaken to create a unique product or service (Project Management Institute, 00). ccording to the Project Management ody of Knowledge (PMOK), a project includes the following four phases: initiation, planning, execution and closure (PMI, 00). Initiation is the phase where a new project is formally authorized. This phase links the project to the ongoing work of the performing organization. Planning processes define and refine objectives and select the best of the alternative courses of action to attain the objectives that the project was undertaken to address. Executing processes coordinate people and other resources to carry out the plan. Finally, closing processes formalize acceptance of the project and bring it to an orderly end. Planning was found to be a critical phase in project management (Pinto & Slevin, 987; Johnson et al., 00; Turner, 999 and others). Project planning specifies a set of decisions concerning the ways that things should be done in the future, in order to execute the design for a desired product or service. The project manager is responsible for completing the project to the satisfaction of all relevant stakeholders. Therefore, he/she must ensure not only that actions are executed according to plan, but also that the plan is reliable and properly represents stakeholders requirements. Kerzner (006) finds uncertainty reduction to be one of the basic reasons for planning a project. Meredith & Mantel (00) identified six planning sequences, including preliminary coordination, detailed description of tasks, adhering to project budget, adhering to project schedule, a precise description of all status reports and planning the project s termination. Russell & Taylor (00) identified seven planning processes defining project objectives, identifying activities, establishing precedence Page of 8
6 6 relationships, making time estimates, determining project completion time, comparing project schedule objectives and determining resource requirements to meet objectives. De Meyer et al., 00 claim that deciding of the best way of planning the project is influenced by the level of risk, whether it is a "variation", "foreseen uncertainty", unforeseen uncertainty" or a "chaos" project. Since a project manager has to deal with high uncertainty levels, the subject of risk management has received much attention, being one of the nine knowledge areas of a project (PMI, 00). ccording to Wideman (99), risks can be divided into five groups: () external, unpredictable and uncontrollable risks, () external, predictable and uncontrollable risks, () internal, non technical and controllable risks, () internal, technical and controllable risks and () legal and controllable risks. However, Shtub et al. (00) and Couillard (99) classified risk events into three groups: () risks linked to technical performance, () risks linked to budget and () risk linked to schedule. Risk management deals with identifying and reducing the project s risk level, including risk management planning, monitoring and control processes (PMI, 00). Risk management planning processes include risk identification, qualitative and quantitative risk analysis and risk response plans. Risk monitoring and control is the last risk management process, which is performed during the project s execution phase. In order to deal with risks, project managers may choose to use several tools from the vast variety of risk management software and tools available, both from finance and project management disciplines, such as planning meetings, risk rating and risk control. Software packages for project risk management Risk+, Crystal all simulation tool, Predict and others. Literature shows that despite Page of 8
7 7 the high number of available tools, frequency of implementation by project managers is still very low (Zwikael & Globerson, 00; Raz et al., 00). The reason for this could be their low impact on project success (Zwikael & Globerson, 00). These facts point to a specific need to improve project managers handling of risk events. For summary, literature emphasizes the current problems with risk management tools within the project management environment. Literature also shows the high impact of project planning on project success. Hence, we may raise the hypothesis that improving the project plan may be an effective tool in order to deal with high risk projects. This theory, which includes the improvement of all planning processes, (i.e. schedule planning and quality planning) may replace the traditional approach which focuses only on the improvement of risk management processes. The model proposed is described in Figure. < Figure The Research Theory > The first research s hypothesis states that planning contributes to project success (hypothesis ). The second hypothesis states that project managers and organizations that usually face high risk projects tend to plan their projects better than those who usually face low risk projects (hypothesis ). s a result, with better preparations, high risk projects don t increase project failure (hypothesis ). The last research hypothesis states that the quality of planning affects project success at different intensities depending on the level of risk (hypothesis ). Page 6 of 8
8 8 H : Project managers and organizations that plan their projects better succeed more in their projects. H 0 : Project managers and organizations that plan their projects better succeed in their projects as those who have a low quality project plan. H : Project managers and organizations that face high risk projects plan their projects better than those facing low risk projects. H 0 : Project managers and organizations that face high risk projects plan their projects in the same quality as those facing low risk projects. H : Project managers and organizations that face high risk projects succeed less in their projects than those who face low risk projects. H 0 : Project managers and organizations that face high risk projects succeed in their projects in the same level as those who face low risk projects. H : The impact of project planning on project success is influenced by the level of project risk. H 0 : The impact of project planning on project success is not influenced by the level of project risk. The next section describes the study s methodology, the designing of an index to assess the quality of project planning processes, its variables and data collection. Then, we test the validity of the index and explore the impact of risk on planning processes and derive conclusions. Page 7 of 8
9 9. Methodology Following the high importance of project planning, this section introduces an index developed to measure the processes implemented by project managers during the planning phase of a project. This index is used to find out which planning processes work better in high risk project environments and result in better project results. First, we introduce the developed planning index, followed by the research description.. Quality of Planning Index The Quality of Planning (QP) index assesses the way in which project plans are being developed in organizations. The QP index, introduced in Zwikael & Globerson (00), consists of two parts: () Project know how processes, defined as planning processes executed by the project manager; and () Organizational support processes, defined as the means that the organization places at the disposal of the project manager to enable proper project planning, execution and completion. The first part of the index, 'project know how processes', is based on the planning processes that are included in the most common project management body of knowledge, called Project Management ody of Knowledge (PMOK) developed by the Project Management Institute (PMI Standards Committee, 00). Quality of planning is measured by the frequency with which project managers achieve the desired outcomes of planning processes. The output of the process was chosen to reflect the quality of each process for the following three reasons: First, models such as the learning curve have proved an ongoing improvement as a function of the number of repetitions (e.g. Yiming & Hao, 000; Snead & Harrell, 99; Griffith, Page 8 of 8
10 0 996; Watson & ehnke, 99). Second, the expectancy theory model suggests that one will not repeat a process that has no significant benefit to his objectives (Vroom, 96). Finally, the control models suggest output control when it comes to operational processes, such as project management (Veliyath et al., 997). Since the output of a planning process may include several products, the most significant product was chosen to describe process output. Each project manager was asked to indicate the usage frequency of planning products in projects that were under his or her responsibility within the past year. The list of planning products appears in the questionnaire (ppendix ), while their frequency of use was measured as follows: The product is always obtained. The product is quite frequently obtained. The product is frequently obtained. The product is seldom obtained. The product is hardly ever obtained. pilot study was executed in order to ensure that all products were essential. The pilot phase involved 6 questionnaires, completed by project managers and others involved in the project. s a result, five planning products having too high a correlation among them were combined and the number of planning products was reduced to 6. These were then grouped into the nine knowledge areas included in the PMOK (see Figure ). The final list of planning products that are included in the QP (Quality of Planning) index is presented in the questionnaire (ppendix ). The second part of the QP index, 'organizational support processes', was based on top management support in projects, which was found to be critical for project success (rown & Eisenhardt, 99; Cooper & Kleinschmidt, 987; Gupta & Page 9 of 8
11 Wilemon, 990). The organizational support processes are divided into four areas according to the PMOK classification, namely, organizational systems, organizational cultures and styles, organizational structure, and project office. One significant supporting product was identified for each area, according to what is described in the PMOK. For example, the project office area includes the product extent of project office involvement. The list of organizational support variables was enriched by variables taken from a few dozen maturity models developed over the past few years, e.g. the Capability Maturity Model (Paulk et al., 99). From more than a hundred organizational support processes that have been recognized, only mutually exclusive processes remained, and each organizational support process is represented by a single product. These products were added to the four PMOK products mentioned earlier, to include the 7 organizational supporting products which appear in Table. Each project manager was asked to describe the level of each organizational support product that was available for his or her projects. The organizational support level ranges from one to five, in which one represents a low level and five represents a high level of organizational support for the projects in their planning stages. In conclusion, the QP index has two groups of products, associated with project know how and organizational support. Since there is no identification for the level of process influence, each group has an equal weight. Therefore, each group was divided into equally weighted areas, each area including equal weight products. The QP index contains products, 6 relating to project know how processes and the other 7 to organizational support processes, as illustrated in Figure. Page 0 of 8
12 < Figure : The QP (Quality of Planning) Index reakdown Structure >. Data Collection The questionnaire was administered to 9 different project management workshops in Israel; nine workshops were administered as part of an internal project management training program. n average of individuals belonging to the same company participated in each of the nine workshops. Participants in the other 0 workshops came from different companies. ll together, 0 project managers and other individuals working in a project environment completed the model s questionnaire, each for the projects that he had lately been responsible for. The questionnaire appears in ppendix. The data contains 6 project know how variables, 7 organizational support variables, four success dimensions and the level of risk variable. Each project manager was asked to report average values for these variables regarding his recent projects, assuming those projects were of the same nature, e.g. software development projects or engineering projects. Four variables describing success dimensions were adopted from project management literature. They include cost overrun and schedule overrun, measured in percentages from the original plan. Success dimensions also included technical performance and customer satisfaction measured on a scale of one to ten. One represents low technical performance and low customer satisfaction, while ten represents high technical performance and high customer satisfaction. In this paper, the level of risk represents the uncertainty of a project that a project manager has recently managed, as was estimated at the beginning stage of that project, including technical, financial, human resources and other uncertainties. ll project managers were given clear instructions regarding the way to assess the level of risk and were asked to estimate the level of risk in the beginning of the project on the Page of 8
13 scale of one to ten. In this study, the level of risk index is treated as a two level variable, in which one is considered to be a low risk project ( 6), while two is considered to be a high risk project (7 0). Lastly, the QP index was calculated as a weighted average of all products. In all 0 questionnaires, we found percent of missing values. These were filled in by the mode value of the variable calculated from the same organization s observations. For the variables of cost overrun and schedule overrun, the missing values were filled in by the average of the same variable from the observations of the same organization. Finally, the source of the questionnaires, according to industry type is presented in Table. < Table : Source of Questionnaires in the Sample, according to Industry Types >. The Model s Reliability and Validity The reliability of the QP index and its variables was tested first. Reliability was calculated using a number of statistical tests. For example, Cronbach alpha s value (0.9) was found to be much higher than the minimum (0.80) required by the statistical literature (Garmezy et al., 967). This result reflects internal consistency, meaning that all variables contribute to the QP index and none of them are redundant. The model s validity was evaluated by comparing the overall project planning quality indicator (QP index) derived from the model, with the projects success, as estimated by a separate set of questions. It was found that QP index was highly correlated with the perception of projects success, as measured by cost, time, performance envelope and customer satisfaction, as well as with the perceived quality of planning. The correlation remained very high and significant for several other Page of 8
14 options of weighting. summary of the analysis is presented in Table. ll results are statistically significant with p values under.0. < Table Validity Tests for the PMPQ Model > The QP index was correlated with each of the project s final results, supporting the first research hypothesis. In other words, better planning contributes to project success. The second conclusion from the above statistical analysis is that the model is reliable and valid and can be used in this study. Further validity and reliability tests for the model can be found in Zwikael & Globerson, 00.. nalysis and Findings The next sections analyze the relationships among the quality of project planning, project success and level of risk.. Influence of Risk on Project Planning The managerial objective in this section is whether the quality of project plan improved in the presence of high risk. The impact of risk on the quality of planning index is measured using two levels of low and high risk and three aggregation levels of the quality of planning. The first aggregation level is a weighted linear combination of all planning variables, called the QP index. The second aggregation level includes a weighted linear combination of the 6 project manager related variables, named the QPM index. The third aggregation level includes a weighted linear combination of the 7 organizational support related variables, named the QPO index. Page of 8
15 Table describes the impact of risk levels on the quality of planning. It shows the means of quality of planning for all three main indices, for both low and high levels of risk. The percentage difference is presented along with the t test significance level under the assumption of unequal variance. < Table : Influence of Risk Level on the Quality of Planning > The results indicate a significant difference between project managers who face low and high risk projects when it comes to the quality of the project plan. Results support the first hypothesis. This means that project managers who usually manage high risk projects invest more planning effort in an attempt to cope with the risk. s seen in Table, better planning effort derives from steps taken by both the organization and the project managers. The former takes the needed steps towards handling the presence of risk, while the latter enhances these steps. more detailed analysis is presented in Table, in a breakdown of the nine areas of knowledge. The means of quality for all 6 planning products, divided into the PMOK's nine knowledge areas are presented for both low and high levels of risk, along with the percentage of increase in the quality of the processes and its significance (p value). < Table : Influence of Risk Level on Quality of Planning Products > Page of 8
16 6 There is a significant increase in the means of quality of planning between low and high risk projects in each of these four knowledge areas: Scope (%), Cost (%), Quality (%) and Human Resources (%). This means that project managers who manage high risk projects tend to make much more of an effort in performing the planning processes, which are included in these knowledge areas, compared to project managers who usually manage low risk projects. This means that project managers who confront high levels of risk pay more attention to the areas they can more easily control, e.g. cost management. Project managers seem to believe that they can exercise better cost control if they have a project plan. Therefore, they try to construct a better cost plan, under high risk levels. The same holds true for human resources, scope and quality management. These four knowledge areas have some complexity in their planning, hence project managers tend to seriously deal with them only in high risk projects. In the Scope knowledge area, the processes are clear and the tools are available, but the processes are time consuming (e.g. developing a detailed work breakdown structure chart). In the Cost knowledge area, although the know how is available, the processes require the participation of a cost specialist, such as an economist or a cost accountant. Project managers tend to ignore the need for detailed cost planning. In general, project managers do not have a good enough quality management background to develop a quality control plan and it is often customary to leave such activities to the organization s quality assurance staff. In the Human Resources knowledge area, one reason that project managers don t have a high quality plan is their desire to avoid conflicts regarding their employees when it comes to defining responsibility and authority. Page of 8
17 7 Hence, it seems that in the presence of a high risk project, project managers take additional steps in the planning phase, for example, investing more effort in identifying project activities, paying more attention to cost analysis, involving the quality personnel in the planning team or defining clear role and responsibility assignments. In the Time knowledge area, know how is common and the available tools are popular, user friendly and do not require special skills. Therefore, project managers perform these processes at a high frequency (.8 out of ), regardless of the level of risk. In this knowledge area, defining exact start and end dates for each project activity is the only process, which shows a significant difference in the frequency of use between high and low risk projects. The Integration knowledge area is necessary and therefore normally performed at a very high frequency (.9). Consequently, there is no significant difference between low and high levels of risk. In the Risk knowledge area, it was found that project managers tend not to prepare risk management plans, which should include specific responses to the critically risky events of a project (PMI, 00). In this study, the average frequency of developing risk management plans was found to be very low, ranging from. to.8. These findings support and enhance previous ones reported by Raz et al. (00), who claim that project managers do not take more efficient steps in initiating risk management plans in the presence of high risk. This means that project managers do not see the process of developing a risk management plan as being an adequate tool when confronting risks. Page 6 of 8
18 8 The same analysis, which was illustrated for the project know how group was also performed for the second part of the model, which is the organizational support group, as is shown in Table. This group includes all activities performed by the organization in order to improve project management planning. < Table : Influence of Risk Level on Quality of Planning by Organizational Support reas > The first supporting area in this group, the organizational system area, is associated with a strategic concept. It was found that organizations facing frequent high risk projects have already adjusted their attitude toward a project management approach and became project based organizations. Therefore, they are different from organizations, which usually face low risk projects. For example, these organizations tend to manage both resources and budget at the project level, rather than at the functional level. High scores were found in the organizational cultures and styles supporting area. In this area, project managers reported receiving wide support from their organizations, regardless of the project s level of risk. Only in a particular case, refreshing project procedures, the presence of risk raises the level of organizational support from.7 to.. This level of support of this process is relatively low, meaning that organizations who seldom face high risk projects do not invent time and effort in updating project management procedures. Page 7 of 8
19 9 The processes included in the organizational structure supporting area are more tactical than the previous processes. It was found that organizations infrequently perform these processes, regardless of the level of risk, e.g. project management training. In the project office supporting area, there is no significant difference between low and high risk projects. Some organizations have no project office at all. The activities related to the project office area are of a technical orientation. Organizations perform these types of activities at low (i.e., identification of new tools and techniques) or high (i.e., project management software) frequencies, regardless of the level of risk. In conclusion, organizations which usually face high risk projects tend to adapt a proper organizational structure, such as a pure project, which gives more authority to project managers. However, these organizations do not supply their project managers more tactical tools to cope with the high level of risk, i.e. project management software or project management training. In these cases, it is only selfexcellence and extensive efforts on the part of the project manager that can elevate the quality of the plan.. Influence of Risk on Project Success The analysis of different approaches in choosing project planning processes to be performed for high vs. low risk projects might be of interest only if it makes a significant impact on project success. For this purpose, results for project success were also collected in this research. In general, it was found that the average cost overrun was %, ranging from saving 0% of the budget up to spending 00% of the original budget. The average schedule overrun was %, ranging from % ahead of Page 8 of 8
20 0 time up to a schedule overrun of 00%. Technical performance average was 8.0, ranging from one to ten, while the customer satisfaction average was 8., ranging from four to ten. n interesting managerial question is whether project success is influenced by the level of risk. The third research hypothesis is that project managers who usually face low risk projects tend to succeed more than project managers facing high risk projects. We examined the direct impact of risk on project success. Table 6 represents the value of four dimensions of project success under the influence of low and high levels of risk, according to the two risk levels and four project success measures that have already been described. It shows the means of project success for all four main success indices, for both low and high levels of risk. The percentage difference is presented along with the t test significance level, under the assumption of unequal variance. < Table 6: Influence of Risk Level Presence on Project Success > Following the high p values seen in Table 6, we are not able to reject the third null hypothesis. This means that there is no significant difference in project success between projects performed by project managers facing low or high risk levels in their projects. Similar results were reported in Raz et al. (00). One explanation for this may be the improvement of project plans in high risk projects, as was found in the previous section. The next section drills down the results in order to expand the understanding of this behavior. Page 9 of 8
21 . Project Success versus Quality of Planning in the Presence of Risk Let us summarize some findings both from this study and from the literature: () In a previous section, it was found that project managers who report higher levels of risk result in better quality of planning in their projects. () In this study, it was also found that the level of risk doesn t impact project success. () In previous studies, it was found that planning has a positive impact on project success (Zwikael & Globerson, 00; Pinto & Slevin, 987). This section combines the effect of level of risk and quality of planning on project success. The last research hypothesis states that the quality of planning affects project success at different intensities depending on the level of risk. Since a high correlation was found between level of risk and quality of planning, their interaction on project success was investigated along with their implicit impact on success. We based our model on the design of the risk variable as a dichotomy variable. Results were analyzed using linear regression, while the suggested model is: Success = a o + a * R + b 0 * QP + b * QP * R In this equation, the dependent variable (success) is any of the four success variables for measuring project success (cost overrun, schedule overrun, technical performance and customer satisfaction). The independent variable QP is the average level of Quality of Planning on a scale of to that a project manager exercised. The qualitative variable R represents the average level of risk, 0 for low average and for high average risk level. The product of R and QP reflects the impact of risk on the slope of success against quality of planning for projects with high risk. The arguments a 0, a, b 0, and b are coefficients to be estimated. Page 0 of 8
22 If the risk level has no impact on the intercept of the regression, then the hypothesis that a is zero is accepted, otherwise rejected. If the risk level has no impact on the slope of the regression, then the hypothesis that b is zero is accepted, otherwise rejected. For each success dimension, there are eight possible regression models of explanatory variables (including the null regression). series of F tests were conducted to choose the significant models with all significant coefficients. The results from the four runs are presented in Table 7 (t values in brackets): < Table 7: Coefficients Estimates and their t Values for Success versus Quality of Planning and Level of Risk > The quality of planning was correlated with the project s final results in various ways, depending on the nature of the success dimension and the presence of risk, meaning at least one b coefficient was significant in each run. In the presence of high risk, there is a significant impact of quality of planning on each success measure. There is a reduction of percent in cost overrun and percent in schedule overrun due to an increase by one unit of quality of planning. On the other hand, there is an increase of 0.67 and 0.6 units (on a scale of to 0) on the project s technical performance and customer satisfaction, respectively, because of an increase by one unit of quality of planning. The intercepts of all four models, cost overrun, schedule overrun, technical performance and customer satisfaction, in the presence of high risk are (0.+0.8=.06), ( =.0),.8 and 6., respectively. In the presence of low risk, the intensity of quality of planning on project success is equal for technical performance (0.67) and customer satisfaction (0.6), and diminishes for cost and schedule overrun. ctually, in the presence of low risk, there Page of 8
23 is no impact of quality of planning on cost and schedule overrun. The average cost overrun is 0. and schedule overrun is 0.. These two numbers match the findings of Table, as expected. These findings are explained by previous analyses (see Tables and ), which showed that in the presence of low risk, project managers tended to pay more attention to available planning tools, but did not take any special steps toward implementing better planning tools and techniques.. Conclusion This paper shows that the practical solution being implemented by most project managers in order to deal with high project risk is the improvement of the project plan. This approach significantly improves project success. Hence, due to these efforts, project managers facing high risk projects do not tend to fail more than project managers managing low risk projects. In addition, it was found that in the presence of high risk, increasing the quality of the project plan improves project success. However, in the presence of low risk, increasing the quality of planning doesn t reduce cost and schedule overrun. The impact of increasing the quality of planning on better customer satisfaction has the same intensity in the presence of both low and high risk. The same finding holds true for the technical performance success measure. These results emphasize the importance of a high quality project plan to be performed by project managers that manage high risk projects. Project managers use more advanced tools and techniques when the level of risk is high. Since these planning tools takes time and require special expertise, project managers tend to ignore them in low risk conditions, and to use them extensively only in the presence of a high risk level. The tools that are currently being Page of 8
24 used more frequently in high risk projects include definition of project deliverables, development of the project work breakdown structure, definition of exact start and end dates for each project activity, resource cost estimation, role and responsibility assignments and quality management plans. Project managers tend to use simple project planning tools at a high frequency, regardless of the level of risk. One example of this is developing a Gantt chart, in which project management software is easily accessible. t the organizational support level, it was found that top management increases its project management involvement when the level of project risk rises. Yet, in most organizations this involvement affects only the strategic level support, rather than daily activities. This means that organizations regularly face high risk projects, i.e. R&D organizations are equipped with the suitable organizational structure and updated project management procedures. The problem is located with organizations that are not used to facing high risk projects on a regular basis. When high risk projects appear in an organization, which is not used to managing such projects, no unique organizational support is offered to assist the project manager. This paper also repeats the well known finding (Raz et al., 00; Couture & Russett, 998; Mullaly, 998; Ibbs & Kwak, 000, etc.) in which risk management practices are not widely used. It reveals that even in high risk projects, no special efforts are being made in this field. The reason for this may be a lack of relevant knowledge on the part of project managers. It may also appear due to an organizational failure in implementing the use of risk management tools as part of the mainstream of project management practices. oth explanations reinforce the conclusion that project managers should adopt a different risk management attitude. Various risk management tools are available, but unfortunately they aren t suitable for Page of 8
25 many industries, organizations and projects. Only further research that will identify the best tools for each project type may help to implement these skills in organizations. Finally, some methodology limitations should be discussed. First, this paper highlighted only those processes that should be performed during the planning phase of a project. Secondly, the results reflect projects that have been performed in one country only. Further research should be conducted in other countries, using the same methodology, aimed at identifying any existing cultural differences. Finally, the QP index assumes an equal weight for all planning products, due to the lack of relative importance of planning processes in literature. Further research that will identify the importance of each planning process is being performed regarding this matter. Page of 8
26 6 References rown, S. L, Eisenhardt, K. M. 99. Product development: Past research, present findings, and future. cademy of Management. The cademy of Management Review. riarcliff Manor: Vol. 0 (), 78. Cooper, R. G., & Kleinschmidt, E. J New products: What separates winners from losers? Journal of Product Innovation Management,, Couillard, J. 99. The role of project risk in determining project management approach. Project Management Journal, December, 9. Couture, D. & Russett, R ssessing Project Management Maturity in a Supplier Environment. Proceedings of the 9 th nnual Project Management Institute, Long each, C. Newtown Square, P: PMI. De Meyer,., Loch, C. H., Pich, M. T. 00. Managing project uncertainty: From variation to chaos. MIT Sloan Management Review. Cambridge: Winter. Vol. (), p. 60. Garmezy, N., Harlow, H. F., Jones, L. V. & Stevenson, H. W Principles of general psychology. New York, Ronald Press Co. Griffith, T. L Negotiating Successful Technology Implementation Motivation Perspective. Journal of Engineering & Technology Management, (), 9. Gupta,. K., & Wilemon, D. L ccelerating the development of technology based new products. California Management Review, (),. Ibbs, C. W. & Kwak, Y. H ssessing Project Management Maturity. Project Management Journal, (),. Page of 8
27 7 Johnson, J., Karen, D., oucher, K. C. & Robinson, J. 00. Collaborating on Project Success. Software Magazine, February/March. Kerzner, H Project Management: Systems pproach to Planning, Scheduling and Controlling. 9 th edition, John Wiley and Sons. Meredith J. R. & Mantel, S. J. 00. Project Management Managerial pproach, (th Ed.) John Wiley & Sons Inc. Mullaly, M Canadian Project Management aseline Study. Proceedings of the 9 th nnual Symposium, Long each, C. Newtown Square, P: PMI, 7 8. Paulk, M. C., Curtis,., Chrissis, M.. & Weber, C. V. 99. The Capability Maturity Model for Software, SEI. Pinto, J. K. & Slevin, D. P Critical Factors in Successful Project Implementation. IEEE Transactions on Engineering Management. EM, February, 7. PMI Standards Committee. 00. Guide to the Project Management ody of Knowledge. Newtown Square, P: Project Management Institute. Raz, Z., Shenhar,. J. & Dvir, D. 00. Risk Management, Project Success and Technological Uncertainty. R&D Management, (), Russell, R. S. & Taylor,. W. 00. Operations Management. th Ed. Pearson Education, New Jersey. Sadeh,., Dvir, D & Shenhar, The Role of Contract Type in the Success of R&D Defense Projects under Increasing Uncertainty. Project Management Journal, (),. Shtub,., ard, J. F. & Globerson, S. 00. Project Management Processes, Methodologies, and Economics, nd Edition, Prentice Hall Page 6 of 8
28 8 Snead, K. C. & Harrell,. M. 99. n pplication of Expectancy Theory to Explain a Manager s Intention to Use a Decision Support System. Decision Sciences, (), 99. Turner, J. R The handbook of project based management: Improving the processes for achieving strategic objectives. London: McGraw Hill. Veliyath, R., Hermanson, H. M., & Hermanson, D. R Organizational Control Systems: Matching Controls with Organizational Levels. Review of usiness, winter. Vroom, V.H. 96. Work and Motivation, New York: John Wiley & Sons. Watson, W. E. & ehnke, R. R. 99. pplication of Expectancy Theory and User Observations in Identifying Factors which ffect Human Performances on Computer Projects. Journal of Educational Computing Research, 7 (), Wideman R. M. 99. Project and program Risk Management: guide to managing project risks and opportunities. Project management Institute. Yiming, C. & Hao, L Toward an Understanding of the ehavioral Intention to Use a Groupware pplication. Proceedings of 000 Information Resource Management ssociation International Conference, nchorage, K, US, Idea Group Publishing, p. 9. Zwikael, O. & Globerson, S. 00. Evaluating the Quality of Project Planning: Model and Field Results. International Journal of Production Research, (8), p. 6. Zwikael, O., Shimizu, K., Globerson, S. 00. Cultural Differences in Project Management Processes: Field Study. International Journal of Project Management, Vol. (6), p. 6. Page 7 of 8
29 9 ppendix Project Planning ssessment Quest ionnaire Please indicate the most suitable answer for each planning product as it relates to the projects you are currently involved in, according to the following scale: The product is always obtained. The product is quite frequently obtained. The product is frequently obtained. The product is seldom obtained. The product is hardly ever obtained. The product is irrelevant to the projects I am currently involved in. I do not know whether the product is obtained. Part Project Planning Planning Product. Project Plan. Project Deliverables. WS (Work reakdown Structure) Chart. Project ctivities. PERT or Gantt Chart 6. ctivity Duration Estimate 7. ctivity Start and End Dates 8. ctivity Required Resources 9. Resource Cost 0. Time phased udget. Quality Management Plan. Role and Responsibility ssignments. Project Staff ssignments. Communications Management Plan. Risk Management Plan 6. Procurement Management Plan Never lways Do not know Irrelev ant Page 8 of 8
30 0 Part Organizational Support Planning Product Never lways Do not know Irrele vant 7. Project ased Organization 8. Extent of Existence of Project s Procedures 9. ppropriate Project Manager ssignment 0. Extent of Refreshing Project Procedures. Extent of Involvement of the Project Manager during Initiation Stage. Extent of Communication between the Project Manager and the Organization during the Planning Phase. Extent of Existence of Project Success Measurement. Extent of Supportive Project Organizational Structure. Extent of Existence of Interactive Inter Departmental Project Planning Groups 6. Extent of Organizational Projects Resource Planning 7. Extent of Organizational Projects Risk Management 8. Extent of Organizational Projects Quality Management 9. Extent of On going Project Management Training Programs 0. Extent of Project Office Involvement. Extent of Use of Standard Project Management Software (e.g. Ms Project). Extent of Use of Organizational Projects Data Warehouse. Extent of Use of New Project Tools and Techniques Page 9 of 8
31 Project risk + Project + plan Project success Figure The research theory Page 0 of 8
32 Quality of Planning Index Organizational Support Project Know-how Organizational Support reas containing 7 Organizational Support Products Organizational Systems Organizational Cultures Organizational Structure Project Office Integration Scope Time Cost Quality Human Resource Communications Risk Management Procurement Figure : The QP (Quality of Planning) Index reakdown Structure 9 Knowledge reas Containing 6 Planning Products Page of 8
33 Industry Type Percentage of Questionnaires Construction & Engineering 7% Software & Communications 9% Services 9% Production & Maintenance % Table : Source of Questionnaires in the Sample, according to Industry Types Page of 8
34 Success Measure R p value Cost Overrun 0. Schedule Overrun Technical Performance Customer Satisfaction Table Validity Tests for the PMPQ Model < 0.00 < 0.00 = 0.00 < 0.00 Page of 8
35 Index Means of Quality of Planning for Difference t test Managers of Projects with between Means sig. Low Risk Level High Risk Level (%) level QP.. +0% 0.00 ** QPM.. +0% 0.00 ** QPO.. +6% 0.08 * Table : Influence of Risk Level on the Quality of Planning * p<0.0; ** p<0.0 Page of 8
36 6 PMOK Knowledge rea Planning Product Means of Quality of Planning for Project Managers that Face Projects with Low Risk Level High Risk Level Difference between Means (%) t test sig. level Integration Project plan.9.0 +% 0.66 Scope Project.8. +% 0.0 * deliverables WS (Work reakdown Structure) chart..8 +9% 0.00 ** Scope average..0 +% 0.00 ** Time Project activities.9. +% 0.09 PERT or Gantt.. +6% 0.6 chart ctivity duration.. 0% estimates ctivity start and end dates.8. +8% 0.0 * Time average.8.0 +% 0. Cost ctivity required..8 +9% 0.0 * resources Resource cost.6. +9% 0.08 * Time phased budget.9. +% 0.07 Cost average.0. +% ** Quality Quality.6.0 +% 0.00 * management plan Human Role and..0 +8% 0.00 ** Resources responsibility assignments Project staff assignments..7 +6% 0.7 HR average..9 +% 0.00 ** Communications Communications.. +9% 0.77 management plan Risk Risk management..8 +% 0.09 plan Procurement Procurement management plan.7. +% 0.06 Table : Influence of Risk Level on Quality of Planning Products * p<0.0; ** p<0.0 Page of 8
37 7 Supporting rea Organizational Systems Organizational Cultures and Styles Organizational Structure Project Office Supporting Product Means of Quality of Planning for Project Managers that Face Projects with Low Risk Level High Risk Level Difference between Means (%) t test sig. level Project based organization..8 9% 0.00 ** Project procedures.6.9 8% Organizational systems..9 % 0.00 ** average ppropriate project.6.7 % 0. management assignment Refreshing project procedures.7. 9% 0.0 * Project manager takes part in.8.8 0% 0.9 initiating phase Fluent communication.9.0 % 0.7 between project manager and the organization during planning phase Project measurement existing.. 6% 0.87 Organizational cultures and..6 6% styles average Project supportive.. 6% 0.0 organizational structure Interactive inter department.. % 0.60 project planning groups Organizational projects.8. % 0.69 resource planning Organizational projects risk.8.9 % 0. management Organizational projects quality.8. % management Fluent project management.6.8 8% 0.7 training Organizational structure.9. 7% 0.09 average Project office involvement.6.7 % 0.8 Project management software.. % 0.0 Organizational previous.7.8 % project data warehouse New project tools and.6.8 8% 0.9 techniques identification Project office average.0. % 0.70 Table : Influence of Risk Level on Quality of Planning by Organizational Supporting reas * p<0.0; ** p<0.0 Page 6 of 8
38 8 Success Measure verage Project Success Difference t test Low Level of High Level of between sig. Risk Risk Means (%) level Cost Overrun % 7% +% 0.77 Schedule Overrun % % % 0.9 Technical Performance % 0.9 Customer Satisfaction % 0.09 Table 6: Influence of Risk Level Presence on Project Success Page 7 of 8
39 9 Success Measure Intercept (a 0 ) R (a ) QP (b 0 ) QP*R (b ) R t test sig. level Cost Overrun Schedule Overrun Technical Performance Customer Satisfaction 0. (.) 0. (8.0).8 (0.) 6. (.0) 0.8 (.8) 0.69 (.6) 0.67 (.) 0.6 (.6) 0. (.8) 0. (.0) Table 7: Coefficients Estimates and their t Values for Success versus Quality of Planning and Level of Risk 0. < < < <0.00 Page 8 of 8
Top management involvement in project management A cross country study of the software industry
The current issue and full text archive of this journal is available at wwwemeraldinsightcom/1753-8378htm IJMPB 1,4 498 Received 17 April 2008 Revised 6 June 2008 Top management involvement in project
Project Management. [Student s Name] [Name of Institution]
1 Paper: Assignment Style: Harvard Pages: 10 Sources: 7 Level: Master Project Management [Student s Name] [Name of Institution] 2 Project Management Introduction The project management also known as management
Effects of Project Management on the Performance of a Construction Firm in Nigeria
Effects of Project Management on the Performance of a Construction Firm in Nigeria Irefin, Isaac Adeyemi, PhD African Institute for Science Policy and Innovation Obafemi Awolowo University Ile-Ife, Nigeria
9 TH INTERNATIONAL ASECU CONFERENCE ON SYSTEMIC ECONOMIC CRISIS: CURRENT ISSUES AND PERSPECTIVES
Matilda Alexandrova Liliana Ivanova University of National and World Economy,Sofia, Bulgaria CRITICAL SUCCESS FACTORS OF PROJECT MANAGEMENT: EMPIRICAL EVIDENCE FROM PROJECTS SUPPORTED BY EU PROGRAMMES
PROJECT MANAGEMENT PLAN CHECKLIST
PROJECT MANAGEMENT PLAN CHECKLIST The project management plan is a comprehensive document that defines each area of your project. The final document will contain all the required plans you need to manage,
Project Management Organization
Project Management Organization Article Info:, Vol. 3 (2008), No. 1, pp. 003-009 Received 12 Januar 2008 Accepted 24 April 2008 UDC 005.8 Summary In our work we will try to show, according to recent and
The Project Management Body of Knowledge, generally known as PMBOK, deals with nine fundamental subjects for the project management.
Knowledge Areas The Project Management Body of Knowledge, generally known as PMBOK, deals with nine fundamental subjects for the project management. These are: Project Integration Management Project Scope
How to Get More Value from Your Survey Data
Technical report How to Get More Value from Your Survey Data Discover four advanced analysis techniques that make survey research more effective Table of contents Introduction..............................................................2
Risk management, project success, and technological uncertainty
Risk management, project success, and technological uncertainty Tzvi Raz, 1 Aaron J. Shenhar 2 and Dov Dvir 3 1 Faculty of Management, Tel Aviv University, Ramat Aviv 69978 Israel. [email protected]
A Success Measurement Model for Construction Projects
2011 International Conference on Financial Management and Economics IPEDR vol.11 (2011) (2011) IACSIT Press, Singapore A Success Measurement Model for Construction Projects Shahrzad Khosravi 1 + and Hamidreza
Developing Greater Professionalism in GIS Project Management
Bill Haaker Senior Project Manager ASI Technologies 1935 Jamboree Drive Colorado Springs, CO 80920 Developing Greater Professionalism in GIS Project Management Introduction Project management is widely
Incorporating Systems Engineering and Project Management Concepts in First Year Engineering Curriculum
Incorporating Systems Engineering and Project Management Concepts in First Year Engineering Curriculum Muhammad Faysal Islam 1 and Mohammed Nazrul Islam 2 1 Department of Engineering Management and Systems
The Impact of Management Information Systems on the Performance of Governmental Organizations- Study at Jordanian Ministry of Planning
The Impact of Management Information Systems on the Performance of Governmental Organizations- Study at Jordanian Ministry of Planning Dr. Shehadeh M.A.AL-Gharaibeh Assistant prof. Business Administration
Software Project Management. Objective. Course Objectives. Introduction to SPM
Software Project Management Lecture 01 Introduction to SPM 1 Objective Course Introduction (learning objectives) Course Contents & Grading Policy Motivation of Studying SPM What is Project What is Project
Performance (conformance to specifications) Cost Time
TED UNIVERSITY SDT Space & Defense Technologies Project Management Seminars To discuss project organizations, their advantages and introduce principles, functions and methods of project management Focus:
The Project Management Knowledge Areas as defined by PMI (PMBOK, 2004)
The Project Management Knowledge Areas as defined by PMI (PMBOK, 2004) is the processes required to ensure that the various elements of the project are properly coordinated. the processes required to ensure
Project Management Competencies in the Project Oriented Organization
Project Management Competencies in the Project Oriented Organization In the project-based organization, project management (pm) competences are not only required by individuals, but also by project teams
Rachel J. Goldberg, Guideline Research/Atlanta, Inc., Duluth, GA
PROC FACTOR: How to Interpret the Output of a Real-World Example Rachel J. Goldberg, Guideline Research/Atlanta, Inc., Duluth, GA ABSTRACT THE METHOD This paper summarizes a real-world example of a factor
Brillig Systems Making Projects Successful
Metrics for Successful Automation Project Management Most automation engineers spend their days controlling manufacturing processes, but spend little or no time controlling their project schedule and budget.
A CASE STUDY ON SOFTWARE PROJECT MANAGEMENT IN INDUSTRY EXPERIENCES AND CONCLUSIONS
A CASE STUDY ON SOFTWARE PROJECT MANAGEMENT IN INDUSTRY EXPERIENCES AND CONCLUSIONS P. Mandl-Striegnitz 1, H. Lichter 2 1 Software Engineering Group, University of Stuttgart 2 Department of Computer Science,
A Study on Customer Orientation as Mediator between Emotional Intelligence and Service Performance in Banks
International Journal of Business and Management Invention ISSN (Online): 2319 8028, ISSN (Print): 2319 801X Volume 2 Issue 5 ǁ May. 2013ǁ PP.60-66 A Study on Customer Orientation as Mediator between Emotional
Hansani Chathurika Dassanayake a a University of Peradeniya, Sri Lanka. [email protected]. Abstract
Reshaping Management and Economic Thinking through Integrating Eco-Friendly and Ethical Practices Proceedings of the 3 rd International Conference on Management and Economics 26-27 February 2014 Faculty
APPLICABILITY OF PROJECT MANAGEMENT TECHNIQUES IN SMEs: EVIDENCE FROM GREECE
STUDIA UNIVERSITATIS BABEŞ-BOLYAI, NEGOTIA, L, 1, 2005 APPLICABILITY OF PROJECT MANAGEMENT TECHNIQUES IN SMEs: EVIDENCE FROM GREECE SDROLIAS L. 1, SIRAKOULIS K. 2, TRIVELLAS P. 3, POULIOS T. 4 ABSTRACT.
International Journal of Business and Social Science Vol. 3 No. 2 [Special Issue January 2012]
International Journal of Business and Social Science Vol. 3 No. 2 [Special Issue January 2012] THE IMPACT OF CUSTOMER RELATIONSHIP MARKETING ON COSTUMERS' IMAGE FOR JORDANIAN FIVE STAR HOTELS Abstract
Project Management Framework
Project Management Framework Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Points to Note Please
Introduction to the ITS Project Management Methodology
Introduction to the ITS Project Management Methodology In September 1999 the Joint Legislative Committee on Performance Evaluation and Expenditure Review (PEER) produced a report entitled Major Computer
IRNOP VIII. Brighton, United Kingdom, 2007. Title: A study of project categorisation based on project management complexity
IRNOP VIII Brighton, United Kingdom, 2007 Title: A study of project categorisation based on project management complexity Authors: Alicia Aitken, Dr Lynn Crawford ESC Lille, France and Bond University,
SPSS Guide: Regression Analysis
SPSS Guide: Regression Analysis I put this together to give you a step-by-step guide for replicating what we did in the computer lab. It should help you run the tests we covered. The best way to get familiar
PMLead. Project Management Professional. edition. Based on PMBOK Guide 4 th. www.pmlead.net
PMLead Project Management Professional Based on PMBOK Guide 4 th edition www.pmlead.net SECTION II Chapter 3 Project Management Processes Chapter 3 Project Process Groups A process is a set of interrelated
Interpreting the Management Process in IEEE/EIA 12207 with the Help of PMBOK
Interpreting the Management Process in IEEE/EIA 12207 with the Help of PMBOK Lewis Gray, Ph.D., PMP Abelia Fairfax, Virginia USA www.abelia.com Copyright 2002 by Abelia Corporation. All rights reserved
Evaluating the Effectiveness of MBA Internship Programme An Experiential Approach
Evaluating the Effectiveness of MBA Internship Programme An Experiential Approach Dr Gunmala Suri & Shikha Sharma Abstract MBA internship is the opportunity for full-time a MBA student, that generally
" Y. Notation and Equations for Regression Lecture 11/4. Notation:
Notation: Notation and Equations for Regression Lecture 11/4 m: The number of predictor variables in a regression Xi: One of multiple predictor variables. The subscript i represents any number from 1 through
Project Management. Introduction. Prof. Dr. Joachim Hering Faculty of Computer Science. Joachim Hering, Hochschule Ulm
Project Management Introduction Prof. Dr. Joachim Hering Faculty of Computer Science Joachim Hering, Hochschule Ulm 1 Goals Goal(s) of this lecture: Brief introduction to project management A few basics
Using Risk Assessment to Improve Highway Construction Project Performance
Using Risk Assessment to Improve Highway Construction Project Performance Mohamed F. Diab, MBA, Ph.D. and Amiy Varma, Ph.D., PE North Dakota State University Fargo, ND Khaled Nassar, Ph.D. American University
pm4dev, 2007 management for development series Introduction to Project Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS
pm4dev, 2007 management for development series Introduction to Project Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS A methodology to manage
Soft Skills Requirements in Software Architecture s Job: An Exploratory Study
Soft Skills Requirements in Software Architecture s Job: An Exploratory Study 1 Faheem Ahmed, 1 Piers Campbell, 1 Azam Beg, 2 Luiz Fernando Capretz 1 Faculty of Information Technology, United Arab Emirates
The Extent to Which Human Resources Managers in the Kuwaiti Insurance Sector Perceived the Modern Roles Human Resources Management
The Extent to Which Human Resources Managers in the Kuwaiti Insurance Sector Perceived the Modern Roles Human Resources Management Abstract Dr. Salah A. Alabduljader Assistant Professor, Department of
CHAPTER 13 SIMPLE LINEAR REGRESSION. Opening Example. Simple Regression. Linear Regression
Opening Example CHAPTER 13 SIMPLE LINEAR REGREION SIMPLE LINEAR REGREION! Simple Regression! Linear Regression Simple Regression Definition A regression model is a mathematical equation that descries the
Unit 31 A Hypothesis Test about Correlation and Slope in a Simple Linear Regression
Unit 31 A Hypothesis Test about Correlation and Slope in a Simple Linear Regression Objectives: To perform a hypothesis test concerning the slope of a least squares line To recognize that testing for a
TAM Analysis of College Students Online Banking Brand Selection Factors
ISSN(Print): 2377-0082 ISSN(Online): 2377-0163 EQUILIBRIUM, CHAOS, AND CONERGENCE IN DYNAMICAL NETWORK In Press TAM Analysis of College Students Online Banking Brand Selection Factors Jing Xu*, Xue Liu,
Effect of the learning support and the use of project management tools on project success: The case of Pakistan
Effect of the learning support and the use of project management tools on project success: The case of Pakistan Muhammad Javed 1 Atiq ur Rehman 2* M. Shahzad N.K. Lodhi 3 1. Student MSPM, SZABIST, Islamabad
J. Appl. Environ. Biol. Sci., 5(5)220-226, 2015 2015, TextRoad Publication
2015, TextRoad Publication ISSN: 2090-4274 Journal of Applied Environmental and Biological Sciences www.textroad.com Evaluation of the Impact of Change Management Dimensions on Increasing Organizational
How To Teach Project Management
Leadership and Negotiation Skills for Project Managers Course designed to enhance and develop the personal skills required for effective management of the project team as well as management and involvement
International Statistical Institute, 56th Session, 2007: Phil Everson
Teaching Regression using American Football Scores Everson, Phil Swarthmore College Department of Mathematics and Statistics 5 College Avenue Swarthmore, PA198, USA E-mail: [email protected] 1. Introduction
AC 2009-803: ENTERPRISE RESOURCE PLANNING: A STUDY OF USER SATISFACTION WITH REFERENCE TO THE CONSTRUCTION INDUSTRY
AC 2009-803: ENTERPRISE RESOURCE PLANNING: A STUDY OF USER SATISFACTION WITH REFERENCE TO THE CONSTRUCTION INDUSTRY I. Choudhury, Texas A&M University American Society for Engineering Education, 2009 Page
Influence of Project Management Software Tools Usage on Project Success
Influence of Project Management Software Tools Usage on Project Success Kristina Brodar University of Zagreb Faculty of Organization and Informatics, Varaždin [email protected] Igor Pihir University of Zagreb
Chapter 2: Project Time Management
Chapter 2: Project Time Management Learning Objectives o o o o Understand the importance of project schedules and good project time management. Define activities as the basis for developing project schedules.
Course Overview. Course Learning Objectives
TCMG-506-6R1 University of Bridgeport Technology Management Advanced Program and Project Management ---------------------------------------------------------------------------------------------------------------------
Portfolio Management 101:
THOUGHT LEADERSHIP WHITE PAPER In partnership with Portfolio Management 101: Moving from Just Project Management to True PPM A lot of organizations claim that they carry out project & portfolio management
A Report on. December 17, 2013 COMPARISON OF PROGRAMS OBJECTIVES AND TAGET POPULATIONS:
A Report on Florida Institute of Technology s Proposed Master of Science in Project Management and its Duplication of MSU s Existing Master of Science in Project Management December 17, 2013 This report
Project success depends on
Project success depends on many factors both within and outside the control of the project team. One of the aspects that is within the control of the project team is the planning. Almost everything we
Methodological Approaches to Evaluation of Information System Functionality Performances and Importance of Successfulness Factors Analysis
Gordana Platiša Neđo Balaban Methodological Approaches to Evaluation of Information System Functionality Performances and Importance of Successfulness Factors Analysis Article Info:, Vol. 4 (2009), No.
Improving project management competency by using an OPM3 approach
2010 International Conference on Economics, Business and Management IPEDR vol.2 (2011) (2011) IAC S IT Press, Manila, Philippines Improving project management competency by using an OPM3 approach Abbas
www.aryanengineering.com Email: [email protected]
What is PMP Certification exam? www.aryanengineering.com PMP stands for Project Management Professional certification exam. PMP, is one of the most respected and globally recognized certification is offered
THE INFLUENCE OF MARKETING INTELLIGENCE ON PERFORMANCES OF ROMANIAN RETAILERS. Adrian MICU 1 Angela-Eliza MICU 2 Nicoleta CRISTACHE 3 Edit LUKACS 4
THE INFLUENCE OF MARKETING INTELLIGENCE ON PERFORMANCES OF ROMANIAN RETAILERS Adrian MICU 1 Angela-Eliza MICU 2 Nicoleta CRISTACHE 3 Edit LUKACS 4 ABSTRACT The paper was dedicated to the assessment of
Nydia González 1, Franck Marle 1 and Jean-Claude Bocquet 1. Ecole Centrale Paris, FRANCE
INTERNATIONAL CONFERENCE ON ENGINEERING DESIGN, ICED 07 28-31 AUGUST 2007, CITE DES SCIENCES ET DE L'INDUSTRIE, PARIS, FRANCE Nydia González 1, Franck Marle 1 and Jean-Claude Bocquet 1 1 Ecole Centrale
THE IMPORTANCE OF BRAND AWARENESS IN CONSUMERS BUYING DECISION AND PERCEIVED RISK ASSESSMENT
THE IMPORTANCE OF BRAND AWARENESS IN CONSUMERS BUYING DECISION AND PERCEIVED RISK ASSESSMENT Lecturer PhD Ovidiu I. MOISESCU Babeş-Bolyai University of Cluj-Napoca Abstract: Brand awareness, as one of
USING THE ETS MAJOR FIELD TEST IN BUSINESS TO COMPARE ONLINE AND CLASSROOM STUDENT LEARNING
USING THE ETS MAJOR FIELD TEST IN BUSINESS TO COMPARE ONLINE AND CLASSROOM STUDENT LEARNING Andrew Tiger, Southeastern Oklahoma State University, [email protected] Jimmy Speers, Southeastern Oklahoma State
THE RELATIONSHIP BETWEEN WORKING CAPITAL MANAGEMENT AND DIVIDEND PAYOUT RATIO OF FIRMS LISTED IN NAIROBI SECURITIES EXCHANGE
International Journal of Economics, Commerce and Management United Kingdom Vol. III, Issue 11, November 2015 http://ijecm.co.uk/ ISSN 2348 0386 THE RELATIONSHIP BETWEEN WORKING CAPITAL MANAGEMENT AND DIVIDEND
From Body of Knowledge to Embodied Knowledge: Leveraging the Project Management Professional (PMP) Certification
From Body of Knowledge to Embodied Knowledge: Leveraging the Project Management Professional (PMP) Certification By Jennifer Tucker, PMP OKA (Otto Kroeger Associates), [email protected] Abstract. The
Project Management Practices: The Criteria for Success or Failure
234 Iman Attarzadeh Siew Hock Ow Department of Software Engineering Faculty of Computer Science & Information Technology University of Malaya, 50603 Kuala Lumpur, MALAYSIA Email: [email protected],
Space project management
ECSS-M-ST-80C Space project management Risk management ECSS Secretariat ESA-ESTEC Requirements & Standards Division Noordwijk, The Netherlands Foreword This Standard is one of the series of ECSS Standards
Project Management in the Information Technology Industry
Project Management in the Information Technology Industry MASTER OF SCIENCE IN MANAGEMENT OF PROJECTS AND PROGRAMS Rabb School of Continuing Studies Division of Graduate Professional Studies Brandeis University
LIST OF SUBJECTS MBA (EXECUTIVE) SEM.I 2015 1. Fundamental of Management 2. Organizational Behaviour 3. Accounting for Managers 4.
LIST OF SUBJECTS MBA (EXECUTIVE) SEM.I 2015 1. Fundamental of Management 2. Organizational Behaviour 3. Accounting for Managers 4. Statistics for Management 5. Business Communication 6. Managerial Economics
Bachelor's Degree in Business Administration and Master's Degree course description
Bachelor's Degree in Business Administration and Master's Degree course description Bachelor's Degree in Business Administration Department s Compulsory Requirements Course Description (402102) Principles
Earned Value Management for Enterprise Resource Planning Implementations
Earned Value Management for Enterprise Resource Planning Implementations Venu Kotamraju Abstract ERP implementations are a special breed of projects. They are often characterized by aggressive timelines,
Effectiveness of Performance Appraisal: Its Outcomes and Detriments in Pakistani Organizations
Effectiveness of Performance Appraisal: Its Outcomes and Detriments in Pakistani Organizations Hafiz Muhammad Ishaq Federal Urdu University of Arts, Science and Technology, Islamabad, Pakistan E-mail:
ISO, CMMI and PMBOK Risk Management: a Comparative Analysis
ISO, CMMI and PMBOK Risk Management: a Comparative Analysis Cristine Martins Gomes de Gusmão Federal University of Pernambuco / Informatics Center Hermano Perrelli de Moura Federal University of Pernambuco
Application of Project Management Framework into the Simulation of International Commodity Exhibition on Campus
Universal Journal of Management 1(2): 63-68, 2013 DOI: 10.13189/ujm.2013.010204 http://www.hrpub.org Application of Project Management Framework into the Simulation of International Commodity Exhibition
Service Quality Value Alignment through Internal Customer Orientation in Financial Services An Exploratory Study in Indian Banks
Service Quality Value Alignment through Internal Customer Orientation in Financial Services An Exploratory Study in Indian Banks Prof. Tapan K.Panda* Introduction A high level of external customer satisfaction
PMP Project Management Professional Study Guide, Third Edition
PMP Project Management Professional Study Guide, Third Edition Joseph Phillips McGraw-Hill is an independent entity from the Project Management Institute, Inc. and is not affiliated with the Project Management
Metadata-Based Project Management System. A Case Study at M-Files Corporation. Iulia Adomnita
Metadata-Based Project Management System. A Case Study at M-Files Corporation Iulia Adomnita University of Tampere School of Information Sciences Computer Science M.Sc. Thesis Supervisors: Timo Poranen,
Develop Project Charter. Develop Project Management Plan
Develop Charter Develop Charter is the process of developing documentation that formally authorizes a project or a phase. The documentation includes initial requirements that satisfy stakeholder needs
Running Head: HUMAN RESOURCE PRACTICES AND ENTERPRISE PERFORMANCE. Pakistan. Muzaffar Asad. Syed Hussain Haider. Muhammad Bilal Akhtar
Running Head: HUMAN RESOURCE PRACTICES AND ENTERPRISE PERFORMANCE Human Resource Practices and Enterprise Performance in Small and Medium Enterprises of Pakistan Muzaffar Asad Syed Hussain Haider Muhammad
IT Project Management Methodology. Project Scope Management Support Guide
NATIONAL INFORMATION TECHNOLOGY AUTHORITY - UGANDA IT Project Management Methodology Project Scope Management Support Guide Version 0.3 Version Date Author Change Description 0.1 23 rd Mar, 2013 Gerald
Project Management Competences in the Project-oriented Organisation
Project Management Competences in the Project-oriented Organisation Roland Gareis, Martina Huemann University of Economics and Business Administration Vienna PROJEKTMANAGEMENT GROUP, Franz Klein-Gasse
Multi-Dimensional Success Factors of Agile Software Development Projects
Multi-Dimensional Success Factors of Agile Software Development Projects Nagy Ramadan Darwish Department of Computers and Information Sciences Institute of Statistical Studies and Research Cairo University
The Project Planning Process Group
3 The Project Planning Process Group............................................... Terms you ll need to understand: Activity Activity attributes Activity list Activity on arrow diagram (AOA) Activity
Comparing PMBOK Guide 4 th Edition, PMBOK Guide 5 th Edition and ISO 21500
Project Training Company Comparing PMBOK Guide 4 th Edition, Edition and STS Sauter Training & Simulation S.A. Avenue de la Gare 10 1003 Lausanne Switzerland Web: www.sts.ch E-mail: [email protected] Phone:
The Study of Relationship between Customer Relationship Management, Patrons, and Profitability (A Case Study: all Municipals of Kurdistan State)
International Journal of Basic Sciences & Applied Research. Vol., 3 (SP), 316-320, 2014 Available online at http://www.isicenter.org ISSN 2147-3749 2014 The Study of Relationship between Customer Relationship
Introduction to project management and concepts
37E01500 Project Management and Consulting Practice Introduction to project management and concepts Matti Rossi, Professor Dept. of Information and Service Economy Lecture 1, Mon 26.10.2015 Learning objectives
THE ROLE OF MARKETING IN MULTINATIONAL SUBSIDIARIES: STANDARDIZATION VERSUS LOCALIZATION
THE ROLE OF MARKETING IN MULTINATIONAL SUBSIDIARIES: STANDARDIZATION VERSUS LOCALIZATION Miroslav Karlíãek, Zuzana Chytková, Nikola Hofiej, Hana Mohelská, Jakub Fischer Introduction In the international
Calculating the Probability of Returning a Loan with Binary Probability Models
Calculating the Probability of Returning a Loan with Binary Probability Models Associate Professor PhD Julian VASILEV (e-mail: [email protected]) Varna University of Economics, Bulgaria ABSTRACT The
Certification Preparation Course LATVIKON (R.E.P.)Centre
PMP Certification Preparation Course LATVIKON (R.E.P.)Centre ABOUT THIS COURSE Your ability as a project manager to demonstrate best practices in Project Management both on the job and through professional
Chapter 13 Introduction to Linear Regression and Correlation Analysis
Chapter 3 Student Lecture Notes 3- Chapter 3 Introduction to Linear Regression and Correlation Analsis Fall 2006 Fundamentals of Business Statistics Chapter Goals To understand the methods for displaing
THE LINK BETWEEN ORGANIZATIONAL CULTURE AND PERFORMANCE MANAGEMENT PRACTICES: A CASE OF IT COMPANIES FROM ROMANIA
THE LINK BETWEEN ORGANIZATIONAL CULTURE AND PERFORMANCE MANAGEMENT PRACTICES: A CASE OF IT COMPANIES FROM ROMANIA Dobre Ovidiu-Iliuta The Bucharest University of Economic Studies (Institute of Doctoral
MEASURING USABILITY OF ICONIC BASED GUIs OF MOBILE EMERGENCY SERVICE SOFTWARE BY USING HCI. Y.Batu Salman, Adem Karahoca
MEASURING USABILITY OF ICONIC BASED GUIs OF MOBILE EMERGENCY SERVICE SOFTWARE BY USING HCI Y.Batu Salman, Adem Karahoca Bahcesehir University, Engineering Faculty, Computer Engineering Department Bahcesehir,
Univariate Regression
Univariate Regression Correlation and Regression The regression line summarizes the linear relationship between 2 variables Correlation coefficient, r, measures strength of relationship: the closer r is
Importance of Project Schedules. matter what happens on a project. projects, especially during the second half of projects
Project Time Management Chapter 6 Importance of Project Schedules Managers often cite delivering projects on time as one of their biggest challenges Time has the least amount of flexibility; it passes
Linking Management Information Systems (MIS) Applications with High Performance: A Case Study of Business Organizations in Saudi Arabia
International Journal of Business and Social Science Vol. 5 No. 1; January 2014 Linking Management Information Systems (MIS) Applications with High Performance: A Case Study of Business Organizations in
DESCRIPTION OF COURSES
DESCRIPTION OF COURSES MGT600 Management, Organizational Policy and Practices The purpose of the course is to enable the students to understand and analyze the management and organizational processes and
Calculating, Interpreting, and Reporting Estimates of Effect Size (Magnitude of an Effect or the Strength of a Relationship)
1 Calculating, Interpreting, and Reporting Estimates of Effect Size (Magnitude of an Effect or the Strength of a Relationship) I. Authors should report effect sizes in the manuscript and tables when reporting
Additional sources Compilation of sources: http://lrs.ed.uiuc.edu/tseportal/datacollectionmethodologies/jin-tselink/tselink.htm
Mgt 540 Research Methods Data Analysis 1 Additional sources Compilation of sources: http://lrs.ed.uiuc.edu/tseportal/datacollectionmethodologies/jin-tselink/tselink.htm http://web.utk.edu/~dap/random/order/start.htm
The 10 Knowledge Areas & ITTOs
This document is part of a series that explain the newly released PMBOK 5th edition. These documents provide simple explanation and summary of the book. However they do not replace the necessity of reading