Best Practices of IT Organization Design
|
|
|
- Hubert Francis
- 9 years ago
- Views:
Transcription
1 Best Practices of IT Organization Design Version 1.0 Date: 04/06/2007 The Saudi e-government Program (Yesser) has exerted its best effort to achieve the quality, reliability, and accuracy of the information contained in this document. Yesser assumes no liability for inaccurate, or any actions taken in reliance thereon. Yesser encourages readers/visitors to report suggestions on this document through the Contact Us.
2 Table of Contents 1. Introduction Purpose Document Structure Referenced Documents Executive Summary Towards IT Organizational Design IT Organization Design Goals IT Organization Design Activities Overview of IT Organizations IT Vision and Mission Vision Mission IT Strategy, Goals and Objectives IT Model IT Customers IT Services IT Functions IT Organization Design Activities Step 1 Validate the Need for Change Step 2 Collect Critical Design Factors Quantitative Factors Qualitative Factors Step 3 - Construct a candidate design Coverage Project Management Alternatives Structure and sections Staffing Requirement for Sections Step 4 Transform into Actual Design Step 5 Plan for Implementation Lessons Learned...35 e-government Program (yesser) 2
3 List of Tables Table 1 - Comparison between Organization Chart Vs Organization Design...6 Table 2 - IT Organization Design Process...7 Table 3 - services from a customer perspective...11 Table 4 - Comparison Between IT Functions and IT Processes...12 Table 5 - IT Functions Aspects / Dimentions...14 Table 6 - IT Functions Frame...15 Table 7 - Customer Satisfaction Assessment Template...17 Table 8 - Checklist for Problems caused by Organization Structure...18 Table 9 - Services Definition Template...19 Table 10- ervice Effort Estimation...20 Table 11 - Priorities at Different Stages...27 Table 12 - Recommended IT Structure Layout...27 Table 13 - IT Department Main sections...28 Table 14 - Input to Job Design Example...31 Table 15 - Option 1 for Job Design Example...31 Table 16 - Option 2 for Job Design Example...32 Table 17 - Guidelines and Justifications...33 List of Figures Figure 1 - Process Flow Chart for Organization Structure...8 Figure 2 - IT Model...10 Figure 3 - Organization Structure Components...22 Figure 4 - Strategy According to Structure Gaps...23 Figure 5 - Special Projects Department...24 Figure 6 - Strategic Options...25 Figure 7 - Horizontal Layout...26 Figure 8 - Vertical Layout...26 Figure 9 - Balanced Layout...27 Figure 10 - Sample Preliminary Chart...29 Figure 11 - Comprehensive Chart with Roles...30 e-government Program (yesser) 3
4 1. Introduction This document is a guide to conducting IT organizational design for the IT departments in the kingdom of Saudi Arabia government. It is a living document, and it will be further developed and regularly reviewed to ensure that it continues to serve the IT department needs in the government Purpose The purpose of this document is to provide guidance for IT managers in selecting appropriate unit structure that suits their strategy, needs and constraints. It has an Arabic version of it residing on the government website (Yesser) for public use. The document is targeting the IT managers as the main audience, because they make the decision makers regarding the application the design process or not Document Structure The document starts with an executive summary, to provide a brief of the content of this document. Then it moves to emphasize the approach of organizational design, and briefly explain its steps. After that, it describes a simplified IT organizational model, to bring consensus on the basic concepts used throughout the document. Finally, it provides detailed description of each step in the organizational design process. The design of the document aims for simplicity and straightforward reading. It moved the too detailed and long material into appendices, to keep the reader in the context; It also uses references to other documents in the program, see Section 1.5 Reference Referenced Documents The documents listed below represent relevant material to the subject of IT organization structure and they provide details on their designated subjects: 1. Guidelines for Project Management 2. IT Job Descriptions 3. Guidance for IT Strategic Planning 4. IT Processes Documentation e-government Program (yesser) 4
5 2. Executive Summary The IT organization structure should serve the purpose of the IT department depending on its strategy. IT managers must select the most appropriate structure based on sound justification and based on explicit coverage of their needs. If the structure does not fit the purpose, problems will begin to arise in performance, roles, communications and many others. As the Information Technology field is continuously changing and emerging, IT department managers should review the structure of their IT departments and adjust them according to any changes in the strategy or any input that contributed in the current structure. The IT Organization structure should not be a mere chart of units and positions. It is actually a design produced by a systematic and well thought process based on facts, standards and experience. The process of designing the IT department starts by validating the need for re-design. It is important to make sure that the IT department has problems related or caused by the structure. The process then moves to collection of facts, and making strategic decisions about how the IT department wishes to proceed with the process. The IT department can adopt a comprehensive design, and then tune it according to their need, or it can build the design progressively following a series of logical steps. The process also describes how to use the facts to action the design, by staffing it, then adapt it to the existing situation of the IT department, and finally implement it. As there are so many options and variations of the IT organization design, the approach of the process strived to make it as generic as possible in terms of fitting to all types of IT Organizations/Departments in the government. Nevertheless, the process produces a very specific and custom structure that aligns with and complies to the IT department strategy, needs, and situation. e-government Program (yesser) 5
6 3. Towards IT Organizational Design IT Organization Design is a broader and more comprehensive concept than mere organizational chart or structure. The following table summarizes the main differences: Table 1 - Comparison between Organization Chart Vs Organization Design Criteria Organization chart Organization Design Nature Driver Scope Flexibility Communication Integration An output in a diagram or chart A process that produces not only the organization chart, but also the supporting justification and details Driven by the laws and regulations in the Government Focus on structure and the static part of the IT department Tends to be stable, with minimal changes Defines hieratical communication paths and reporting All variations need to be aligned with its static form Meets the laws and regulations but driven by Vision, Mission, Strategy, Goals and objectives Focus on requirements, structure and behavioral (how it works) aspects of the IT department Flexible and reacts to changes in its drivers and requirements Defines all communication paths (horizontal and vertical), roles and functional responsibilities Integrated and aligned with business goals and environmental changes In designing an organization, it is very tempting to move into chartering the required sections, assigning managers, and distribute the current staff or planned staff over the identified sections. However, we have to keep in mind that the IT organization design process is systematic, well thought and logical. It moves from high-level requirements that emerge from the objectives and goals, into clear factors that affect the design, and then carries on to build the design itself incrementally with multiple iterations of designing and validating until the process reaches an appropriate design. In describing the best practice of the IT Organization design, the document provides a detailed and explained process with supporting examples and templates. This approach will: 1. Allow the IT departments to quickly adapt a ready design 2. Clarify process steps as it is applied by example 3. Encourage customization and tuning according to specific IT department needs e-government Program (yesser) 6
7 3.1. IT Organization Design Goals The IT management conducts the IT organization design process at strategic and tactical levels. It aims to achieve the following objectives: 1. Alignment to new strategic directions of the organization 2. Solve problems resulting from structure inefficiencies 3. Eliminate job conflicts 4. Minimize errors and deficiency resulting from human behavior 5. Clarify uncertainty regarding the hierarchy and distribution of work and responsibilities 6. Enable the ability of predicting results by minimizing the personal behavior options 3.2. IT Organization Design Activities The purpose of this process is to change the current IT department structure into the one that fits the purpose {being vision, strategy, goals, etc }. The input to this process is a management decision to initiate it. The output of it is an actionable plan to implement the change or the decision to abort this exercise. The following table summarizes the process: Input Steps Output Initiation from the IT manager to apply the IT Organization Design process 1. Validation of the need to change 2. Identify critical design factors 3. Construct a candidate design 4. Transform into actual design 5. Plan for implementation New Organization Structure and how to implement it The purpose of this process is to change the IT department structure in order to meet set plans and objectives Table 2 - IT Organization Design Process The following diagram depicts the main process steps and their activities: e-government Program (yesser) 7
8 IT Diagnosis Assessment Report Customer Satisfaction Assessment Report IT Manager Initiates the Process Assessment Problems Analysis Step 1 Validate the need for Change Problems caused by Organization Structure? Quantitative Design Factors Qualitative Design Factors Yes Service Assessment and Estimation Department Management Style and Stage in its life-cycle Step 2 Collect Critical Design Factors Decide on the Project Management Section No Define Structure and Sections Customizing a predefined Organization Structure Staff the Organization Structure Follow Top-Down Approach Identify the Generic Structure Layout Identify the Building Blocks Sections Step 3 Construct a Candidate Design Using Estimated Workloads Using Recommended Quantitative Standards Chart the IT department Apply Design Guidlines Step 4 Transform into Actual Design Plan Change, Execute and Control Step 5 Plan for Implementation End of Process Figure 1 - Process Flow Chart for Organization Structure Please refer to Section 5.0 IT Organization Design Activities to have the details required to implement each step. e-government Program (yesser) 8
9 4. Overview of IT Organizations 4.1. IT Vision and Mission The purpose of the IT department represented by its vision and mission statements has direct influence on the recommended IT organization design activities Vision Most IT Organizations/Departments are looking for providing a quality professional service for its customers. They aim to achieve customer satisfaction and support the business of the entity they belong to it. During the analysis of some IT Organizations/Departments in the Government of Saudi Arabia, their IT managers provided the following set of vision statements: To be a service based entity that provides quality and professional services to the internal organization users Enhance the services on a national level and be a raw model for cultural improvements by increasing the computer usage, the Internet, the awareness of IT, training and reduce piracy To provide the best possible services with quality, professionalism and on time, resulting in happy and satisfied end users To provide service and support for the all the business departments Mission Very few IT Organizations/Departments are differentiating its vision statement from the mission statement. However, those who do, have a mission statement stating a goal to achieve short-term plans and objectives. The mission statement encourages and directs the daily actions of the IT staff toward the achievement of the most important and aspired objectives. It is usually focused, specific, simple and easy to remember. Below are some examples: Achieve customer satisfaction Execute the yearly plan Meet or exceed each customer expectation in each service It is important to spend time while setting the vision and mission. More details on that will be covered in the IT Strategic Planning document: Best Practices of IT Strategic Planning. e-government Program (yesser) 9
10 4.2. IT Strategy, Goals and Objectives The IT strategy summarizes the long-term goals and direction. It affects the design of the IT department directly. Moving from generic to specific, the planning focus moves chronologically in the following order: 1. Vision and Mission 2. IT strategy Plan 3. Goals and Objectives 4. Detailed plans for a. Budget b. Projects c. Work (Tasks per resources) For more details regarding the IT strategy, please refer to Best Practices of IT Strategic Planning 4.3. IT Model This following model is a simplification of the generic IT elements in most of the IT Departments. This model establishes the main concepts addressed in this document: Organization Structure Arranged in Arranged in Responsibilities IT Functions & Roles Fullfill IT Staff Deliver IT Services Benefit Customers Fulfill Apply Processes Figure 2 - IT Model It is important to emphasize that the customers are not very much interested in the IT department internals or work procedures. They only see and make use of the provided services. e-government Program (yesser) 10
11 4.4. IT Customers The majority of IT department customers are the internal employees and end users in the governmental entity. However, some IT departments extend service to external customers like: 1. Other IT departments in the government 2. Vendors and suppliers of HW/SW 3. Citizens with problems, issues or suggestions, especially customers of e-services The IT staff itself is an internal customer. Especially if human resources development, training, recognition and reward systems exist and properly managed IT Services The IT department exists to provide services to its customers. These services vary in nature and importance, and they require different skill sets from its providers. The IT services are very important because they: 1. Form the relation between the IT departments and its customers 2. Shape the structure of the IT department 3. Coupled with scale and demand, they justify the budget 4. Drive resource requirement and IT staff development Some services do not have direct and visible value to the customers; however, these services contribute to the stability and reliability of intrinsic infrastructure benefits. They also prevent problems or loss of data. The following summarizes the possible services from a customer perspective: Table 3 - services from a customer perspective Category Project Management Services Business process support Automation Tools and utilities Office tools Applications Help Desk- Desktop Support Hardware Operating systems Office tools and applications support Personal Applications User Training e-government Program (yesser) 11
12 Category Help Desk- Connectivity Help Desk- Business Applications Support Indirect Services Services Telecommunications Internet/Intranet Printing Storage Issues Management Reports Integration Applications Data and information Quality Security Reliability Availability Performance enhancement Disaster recovery Procurement Sourcing and supplier management 4.6. IT Functions The purpose of this section is to define the functions carried out to develop, deliver and support the services defined in section 3.3 IT Services The IT Organization functions form the basis of the IT organization design. They are the building blocks of the department sections and processes performed by the IT staff. The focus on functions is important because functions provide specialization and visibility to the IT work. Unlike processes, they provide the how-to, and they span multiple functions, sections and IT staff members. The following table summarized the differences: Table 4 - Comparison Between IT Functions and IT Processes Criteria IT Function IT Process Answers What need to be done How it will be done, by whom and when Nature High level description of a group of related and similar tasks or activities As set of ordered steps or activities to achieve a defined purpose or output Performed by A role, specialist A group of people who are involved in the process e-government Program (yesser) 12
13 Criteria IT Function IT Process Grouping Output Combination Resources Integration Importance Similar functions are grouped based on nature, subject specialty and the needed skills Fulfillment of a job description or a responsibility Can be combined or further broken down depending on the demand or limitations As less as possible, also might be fulfilled by multiple people of the same role Designed to be as less interdepended on each other IT functions are the principles by which processes are designed and implemented. They solve special cases and situations where there is no identified process or when the process conditions differ. Grouping of activities depend on the purpose of the process Defined purpose Each process is atomic and independent. Two processes cannot be combined, however, complex activities can be further broken down for simplicity but not as a response to demand or low resources Spans anyone who is involved or affected by the process Integrates multiple activities, many people from different sections to achieve the purpose Processes have specific purpose and conditions, if the conditions differ (or an exceptional situation appears), the process will not be adequate to solve the situation. Then, people refer to the basic principles of work: the IT functions. When designing an IT organization, the design process maps each supported function explicitly to an organization structure role that fulfills it. The design process also groups the IT functions according to similarity of work, specialization and domain experience. It does not however, link, map, or group the IT Functions to the recommended structure. The design process can simply list the IT Functions. However, listing them without a solid reference and categorization will lead to duplication and redundancy, a long with confusion and difficulty to manage, grasp and update them. The solution to the listing issue is framing. If we frame the dimensions and the aspects of the IT functions, we can then use a solid reference. A reference that capture and categorize systematically and clearly any IT function. In light of the above, the process depended on few concepts/aspects and used them to create this frame: 1. Engineering: The concept of engineering relies on technology. It uses the technology to produce technical solutions using design, development, testing, etc 2. Management: The IT department as any organization (or part of and organization or institute) needs management effort. In fact, it requires mature and keen management because it depends on people, the most valuable asset. These functions are the basic management functions: Organizing, Planning, Controlling, etc e-government Program (yesser) 13
14 3. Generic Business Support: These functions support running any organization, they relate to the regular, well-known and applied functions, like accounting, procurement, customer service, recruitment, training, etc 4. IT Specific Elements: There are elements that are specific to the Information Technology domain. The previous three aspects actually act on these elements, producing variations and shapes that suit the IT needs. These elements include Computer Hardware, software, operating systems, networking, applications, etc 5. Work Nature: Recently, the industry put huge focus on projects and there difference from regular day-to-day operations. The project is unique in nature and has time requirement and an end result/product. However, operations are continuous and long term with requirements on productivity and efficiency. There is also a mix between the two, some work functions take place several times and each time, there is a time allocated for it, we call it Recurring work. The following diagram depicts the described aspects: Table 5 - IT Functions Aspects / Dimentions Technical Engineering Analysis Research Design Development / Implementation Testing / Quality Deployment / Deliver Support / Maintain Evaluate Performance Enhance and Update Specialization Pure Management Organizing Planning Executing & Controlling Supervision Investigation Evaluation Coordination Communicating Leading/Directing Generic Business Elements Budgeting Marketing Accounting Procurement Recruitment Outsourcing Asset management Business Continuity Logistics Compliance with regulations Services User Incidents Training Configuration Disaster Recovery Audit IT Technology Areas Computers Operating Systems Networks and Connectivity Office Applications and tools Business Applications- Automation Telecommunicatio ns Security Data-Information- Knowledge Tools Software Development IT Staff Users e-government Program (yesser) 14
15 The following table represents all the possible IT functions. In this table, the IT specific elements are represented as columns, while different functional categories apply on these elements in different ways as follows: 1. As Project: The function is applied under a project context, the project is a unique and temporary effort conducted to achieve a specific objective. 2. As Operation: The function is applied as an operation; the operation is a continuous nature of work. 3. As Recurring Function: The function is applied periodically, but it is not continuous, and at the same time not temporary, it has time line, but it recurs every week, month, or sometimes yearly. Each entry in the table below represents a possible IT function. Each filled entry with (P: Project, O: Operation, R: Recurring) represents a known IT function that can be later on managed, assigned, and organized under the responsibility of a section, or a person in the organization structure. Table 6 - IT Functions Frame Functions Computers Operating Systems Networks and Connectivity Office Applications and Tools Business Applications- Telecommunications Security Data-Information-Knowledge Tools Software development IT Staff Users Category Analysis R R R R P R R P R P R Technical/Engineering Research R R R R P P O P R P Technical/Engineering Design R R R R P P O R R P Technical/Engineering Development/Implementation P P O P P P Technical/Engineering Testing/Quality R R R R P R O R R P Technical/Engineering Deployment/Deliver R R R R P R O R P P Technical/Engineering Support/ Maintain O O O O O O O O O O O Technical/Engineering Evaluate Performance R O O R R O O O R R Technical/Engineering Enhance and Update O O O O R O O O R R Technical/Engineering Specialization O O O O O O O R R Technical/Engineering Organizing R R O Pure Management Planning R O R P R R R R P O R Pure Management Executing & Controlling O O P P O O R R P O O Pure Management Supervision R R P R O R P O Pure Management Investigation R R R Pure Management Evaluation R R R O R Pure Management Coordination O R Pure Management Communicating O R Pure Management Leading/Directing R R O Pure Management Budgeting R R R R R R R R R R R R Business Support e-government Program (yesser) 15
16 Functions Computers Operating Systems Networks and Connectivity Office Applications and Tools Business Applications- Telecommunications Security Data-Information-Knowledge Tools Software development IT Staff Users Category Marketing R R R R R O R Business Support Accounting R R R R P R R R R P R Business Support Procurement R R R R P R R R R P Business Support Recruitment O Business Support Outsourcing P P P R P P P P P Business Support Asset management O O O O R O O R R P O Business Support Business Continuity R O O R O O O R O O Business Support Logistics O O P O O P O Business Support Compliance with regulations R O O O R O O R P O Business Support Services O O O O O O O O O P O Business Support User Incidents O O O O O O O O O O O Business Support Training R R R R R R R R R R R R Business Support Configuration O O O O O O O O O O Business Support Disaster Recovery O O O O O O O O O O O Business Support Audit R R R R R R R R P R Business Support P= Project type O=Operation Type R=Recurring e-government Program (yesser) 16
17 5. IT Organization Design Activities 5.1. Step 1 Validate the Need for Change Some IT departments are well established and mature. Thus, before spending time and effort in collecting data, and creating organizational design, it is important to validate that the IT department needs this exercise. That is why this step is vital at the beginning. Following are the steps to validate the need for IT Department restructuring or re-design: 1. Conduct self assessment of the IT organization using the IT Diagnosis Template 2. Record all problems, issues, unmet objectives and slippage 3. Conduct customer satisfaction assessment by letting customers anonymously answer the questions in the customer satisfaction assessment template below: Table 7 - Customer Satisfaction Assessment Template Question Answer [1 Poor 5 Far Exceed] 1. Are the services provided by the IT department are consistent with what was communicated or announced? 2. Does the IT staff meet the expectations in terms of the Quality of service? 3. Does the IT staff meet the expectations in terms of the Professional interaction? 4. Does the IT staff meet the expectations in terms of the Response time? 5. Does the IT staff meet the expectations in terms of the Technical expertise? 6. Does the IT staff meet the expectations in terms of the understanding the domain specific business? 7. How do you evaluate the value of the provided services? 8. Are you encouraged to call the IT department if you faced a problem? 9. Are there any services needed that are not currently provided by the IT department? Please specify. 10. Is the IT staff available during regular business hours? 11. Does the IT staff provide explanation and clarification on the actions and resolutions performed to solve the problems? 12. Do you feel embarrassed when you report a problem or incident? 13. Does the IT department understand your needs? 14. Does the IT department provide adequate business applications that facilitate or automate your work? e-government Program (yesser) 17
18 Question Answer [1 Poor 5 Far Exceed] 15. Is the technology infrastructure adequate to your business and technology needs? 16. Are you happy with the IT services? Why? 4. Conduct cause-effect analysis, were problems are analyzed to find the real causes. Appendix IV gives a brief description of this process. 5. If there are real causes related to the organization structure, proceed. Otherwise, there is no need to continue this exercise! The following checklist can be used to decide weather there are problems caused by the organization structure or not: Table 8 - Checklist for Problems caused by Organization Structure Question Delays in work and not meeting deadlines Arising of unanticipated problems Answer [1 Poor 5 Far Exceed] Ineffective coordination of activities Competing and overlapping responsibilities Duplication of work Insufficient staff competencies invisibility of work of the lower-level employees The output of this process is a decision on whether the IT department needs redesign or not. e-government Program (yesser) 18
19 5.2. Step 2 Collect Critical Design Factors The Purpose of this step is to gather the information/factors affecting the organization design in order to base the IT department design on solid grounds. For that, the IT department should collect this information based on facts. Step three (3) and step four (4) depend on them to construct the organization structure design. These factors can be quantitative or qualitative according to their nature, which affects the activities as follows: Quantitative Factors 1. Define the different location categories and their numbers. For example: a. Headquarters (One location) b. Large Location(3 locations: Jeddah, Riyadh and Dammam) c. Small Location (1 location in Medina) 2. Identify the needed services at each location and specify if the IT department is currently providing these services or planning to provide them in the future. This will help determining the requirements to provide the planned services. 3. Prioritize and assess the services in terms of: a. Importance: High, medium or low, taking into account the customer opinion on it and the IT perspective as well because some customers may not fully understand the importance of a service until they lose it! b. Remote: Can the service be provided remotely or not c. Demand: The expected number of service requests per day The IT Services definition template below facilitates this assessment: Table 9 - Services Definition Template Location Head Quarters Olayya Branch Service Phone and extension Connectivity, Help Desk Phone and extension Connectivity, Help Desk Importanc e Remote/ Onsite Provided/ Planned Demand/day High Onsite Provided.33 High Remote Planned.75 e-government Program (yesser) 19
20 4. Estimate the average time for providing the service based on the associated roles. This step covers the activities of the Operation and Recurring nature. However, The IT department handles the activities of Project nature on case-by-case basis, because they depend on the scope of the project. You can use the template for Service Effort Estimation below. This (with the information collected in the previous point) will help in quantifying the expected workload per role, and hence will help in identifying the needed manpower per role and section. This is also a major input in identifying the recommended size of the IT team as whole. The following table is used to estimate the effort needed to provide IT services: Table 10- ervice Effort Estimation Location Service Roles involved Required Effort-Hours Head Quarters Head Quarters Phone and extension Connectivity, Help Desk Internet Access Connectivity, Help Desk Service Desk 0.15 Telecommunication Engineer Telecommunication Manager Service Desk 0.15 System Administrator.5 IT System Manager Identify the estimated workloads of the roles required to provide the services. Note that this step covers both existing and planned IT services. e-government Program (yesser) 20
21 Qualitative Factors 1. Determine the planned management style (Autocratic, Consultative, Participative, or empowering/delegating). This will help in determining the level of supervision and section level structure. 2. Identify the stage in the life cycle of the IT department (Starting, building, Stabilizing, mature). This in combination of the management style will determine the basic characteristics of the IT Organization structure: a. Starting: The IT organization is very young or very small (2-3 people) b. Building: The IT organization is at the beginning of its first expansion, It is being established, and there is a considerable demand on systems, infrastructure services and IT people c. Stabilizing: IT Processes are being applied, most of the infrastructure systems have been created, and the IT department is looking for a structure that best suits the maintenance and support demand together with the demand for project and new systems d. Mature: Processes are optimized, stability achieved, minor problems and issues are arising. 3. Identify constraints of time, money, and people. e-government Program (yesser) 21
22 5.3. Step 3 - Construct a candidate design The organization structure consists of sections, positions, roles, and IT functions. All linked together as in the following hierarchal view: Organization Structure Organization Sections Structure Qualitative and Logical Nature Quantitative and base on Estimates Titles per section Roles per Title Functions per Role Based on Experience and Best Practices Figure 3 - Organization Structure Components As the diagram above clarifies, the Structure and sections depend on logical interpretation of the qualitative factors. However, how we staff the IT departments with Titles and Roles depend on estimated workload on each role. On the other hand, the responsibilities per role depend on similarities and the structure of proven methodologies. e-government Program (yesser) 22
23 Coverage Depending on the strategy for the implementation, this step can cover: 1. The existing services only, if there is no immediate plans for expansion 2. The existing and planned services together, where implementation will be done immediately in one shot for both existing and new services If the IT department wishes to implement the appropriate structure for the current services, and then move as second implementation phase to implement the structure changes for the new/planned services altogether, the IT department should cover poin-1 and point-2 above. The recommended approach is to cover both because this will allow looking at a comprehensive view of the three structures and find the appropriate strategy implementation accordingly. The following diagram clarifies the recommendation: Existing IT Services New IT Services Based on Based on Based on Current Phase1 Recommended for existing services Phase2 Recommended for existing and new services Difference Justifying Phase2 Figure 4 - Strategy According to Structure Gaps If the difference between recommended structure for existing services and the one covering all services (existing and new), then the implementation can be divided into two stages. e-government Program (yesser) 23
24 Project Management The design approach focuses on the activities of Operation and Recurring nature. However, Project management by nature is a temporary effort, which means the size of its team and its structure is totally dependants on the number and duration of current and planned projects. It is also flexible and driven by project needs. Most of the IT department standards do not concentrate on the projects, due to their temporary and highly flexible and varying nature. Nevertheless, there are specific standards that focus on project management as a practice regardless of being part of an IT department or not. Recently, organizations are recognizing the need for dedicated project management unit as Special Projects Department. This department has a manager as a project director, and project manager and team for each project. Figure 5 - Special Projects Department The main concern in the special projects department is staffing projects. It is difficult to determine whether the team member is dedicated to a project/s, or supporting them by the required percentage of his time. This issue depends actually on the situation. However, staffing project should never depend on people who are fully dedicated to operations work. The IT department allocates the project team from the special projects department or from other departments that have recurring work nature and can afford to contribute to the project and carry the assigned project responsibilities. Allocating a dedicated unit for project is actually a form of realizing a strong matrix organization structure. Instead of classifying how the organization prioritizes all of its projects (and how it allocates and authorizes project managers on an organization level), the process recommends handling each project alone. Some project may have higher priorities than every thing else in the IT department, while others can work simultaneously with supporting operations depending on the availability of its team. e-government Program (yesser) 24
25 The project management best practices document elaborates on the methodology and processes of project management Alternatives There are many approaches to conduct this step. Each approach can combine any of the quantitative structure decisions with the qualitative ones as follows: 1. Structure and sections (qualitative) a. Apply the guidelines to build the structure incrementally in top-down mechanism b. Alternatively, adapt the initial proposed comprehensive design and tune it according to the management style, organization state, constraints to reach a strong structure candidate. The initial comprehensive design is outlined in Comprehensive IT Structure 2. Job titles and roles (quantitative) a. Applying the workload estimates in man-days to divide the work and estimate the size of each section b. Alternatively, apply standard recommendations to staff the IT department. These estimates can be applied independently of the estimated workload The following diagram represents the available options: Figure 6 - Strategic Options The proceeding sections clarify each option. e-government Program (yesser) 25
26 Structure and sections Structure and sections define the layout, communication direction, and level. The two options are: Top Down Approach The top down approach to design the organization depend on the qualitative design factors. It also moves from top sections to lower level sections as follows: Identify the Generic Structure Layout The generic structure layout depends on the management style of IT department as follows: 1. The horizontal layout applies to autocratic and consultative management style. It looks like a flat or semi-flat layout that exposes the manager to a large set of IT staff. See the sample chart below: Figure 7 - Horizontal Layout 2. The vertical layout applies to the empowering management style. The manager empowers lower sections, and he is less involved in details or visibility of work of the lowest level. See the sample below: IT Department IT Manager Section Section Section Section Section Section Section Section Section Section Section Section Figure 8 - Vertical Layout e-government Program (yesser) 26
27 3. The balanced layout suits the democratic management style. It is not too broad horizontally neither deep vertically. The sample below gives an example: Figure 9 - Balanced Layout The generic structure also depends on the lifecycle state of the organization, since the priorities differ depending on the stage as follows: Table 11 - Priorities at Different Stages State Starting Building Stabilizing Mature Communication and efficiency Priorities Communication, visibility and alignment Efficiency, performance tracking and processes implementation Formality and optimized The following table summarizes the recommended layouts per stage: Table 12 - Recommended IT Structure Layout State\Pattern Horizontal Balanced Vertical Starting ß ß Building Stabilizing Mature ß ß ß e-government Program (yesser) 27
28 Identify the Building Blocks Common sections The main sections fall in level-one and level-two hierarchal ranks. Level-one sections report directly to the IT manager, while level-two sections report to level-one sections. The following table summarized the main sections: Table 13 - IT Department Main sections Section Hardware Infrastructure Network Support System Support User Support Database Support Management Support Quality Management Security Support Application Support Software Support Telecommunication Project Management Justification Mandatory: This section is concerned with managing the hardware requirements, the hardware inventory and the policies and rules of hardware management. Mandatory: This section is responsible for the development of communications, networking, and systems standards and policies for connected computing environments. Mandatory: The system support is responsible for the mission-critical and production-support functions. Mandatory: This section is has the responsibility of first-level problem resolution. It provides a central point of contact for customer help, problem status, and feedback to customers Database Systems, information, and knowledge need support Considerable size and logistics Needed on all states except the starting state Needed on all states except the starting state Business Applications exists and need support Integration and reporting is needed Scale and control is needed to support telecommunications Considerable number of projects, especially in the build state e-government Program (yesser) 28
29 Chart the IT department high level Based on the identified sections and the recommended pattern, create a chart of the main sections. There is no problem in adding more sections or combining the main ones. But this will be systematically performed in step-4. An example of such a structure can look like the following chart: Figure 10 - Sample Preliminary Chart Customizing a predefined Organization Structure The second approach is to start with a comprehensive and complex organization chart. Then, customize it by removing sections, combining them, or renaming them to a more used and common name. The output of this option is a customized chart that is more suitable for the IT department performing the re-design. The comprehensive chart contains the section roles. It included roles in order to leave staffing and grouping of roles into job titles until actual staffing takes place inside each section as described in step-4. The following depicts a comprehensive chart: e-government Program (yesser) 29
30 IT Department Hardware Infrastructure Software Support Network Support Application Support Computer HW Engineer Software Engineer Network Engineer Application Support Engineer Computer HW Designer Software Manager Network Manager Application Manager Computer HW Manager Software Architect Network Designer Application Engineer Application Designer Project Management User Support System Support Quality Management Service Desk Engineer System Designer Quality Control Service Desk Manager System Manager Quality Assurance System Administrator Security Support Management Support Database Support Telecommuni cation Security Administrator IT Tools Engineer Database Administrator Telecommunication s Manager Security Designer Accountant Database Support Engineer Telecommunication s Engineer Security Manager HW Asset Manager Database Architect Telecommunication s Designer E-Asset Manager Database Manager Figure 11 - Comprehensive Chart with Roles e-government Program (yesser) 30
31 Staffing Requirement for Sections In this activity, the IT department identifies the required jobs and the associated roles. There are two ways to conduct that: Using Estimated workloads According to the estimated workloads for each role, the manpower needed in each section is assigned. This will give a view about the number of the IT staff. Within each section, the distribution of roles on formal job titles can be performed now, or it can be left to the section manager (if exists). There is a difference though, between identifying the needed job position per section, and what rolls the job position will fulfill. The following table summarizes an example: Input Date: Table 14 - Input to Job Design Example Roles in Network Section Network Engineer Network Administrator Total Estimated Workload per Role (Hours/Day) 12 h/d 6 h/d 18 h/d Assuming that the average workload per day is 6 hours, hence we have two options. Option 1: Proposed Positions Table 15 - Option 1 for Job Design Example Position Roles Number of Required Positions Networking Engineer Network Engineer 2 Vacancies Networking Administrator Network Administrator 1 Vacancy Comment: Note that there is a turnover risk on the Networking Administrator. (if he left, no one will, or be ready to play his role) e-government Program (yesser) 31
32 Option 2: Proposed Positions Networking Engineer Comment: Table 16 - Option 2 for Job Design Example Position Roles Network Engineer Network Administrator Number of Required Positions 3 Vacancies 1. The risk was mitigated, if one of the 3 leaves, the role will still be covered 2. This design created a challenging job with multiple roles to fill. This might increase the motivation. It is important as well, to take into consideration the training time, and the expected yearly vacations Using Recommended Quantitative Standards IT studies assessment performed on a variety of IT Departments around the world are showing that there are some trends in identifying the resource requirement depending on the number of service users. These standards vary from one research to another, but there are a consensus that the ratio of serviced users per IT support person is not less that 40:1. In addition, it grows linearly as the number of users increases. This ratio excludes product and application development. Hence the IT department can include a lot more than that if they are insourcing some of the development or implementation projects work. Other statistics include: Help desk phone calls average from five-seven (5-7) minutes Problems start to arise when the number of directly supervised people by a manager or a supervisor exceed eleven (11) persons The recommended number of hierarchal vertical levels is seven (7) levels The effective working hours for a person attending to work for eight (8) hours a day are six (6) hours. At least 2 hour goes for other activities. e-government Program (yesser) 32
33 5.4. Step 4 Transform into Actual Design In this step, the regulations and rules of the Saudi government are applied. In addition, any constrains or risks that have impact on the structure are reflected on the candidate design. The result of this might be consolidating of jobs or sections, or further breakdown of them. The following table summarizes some of the guidelines, with their justification. These guidelines apply on the candidate design to produce and actual and implement-able one. Table 17 - Guidelines and Justifications Guideline Empower sections to plan and organize their internal work Environmental changes and preparation Alternative or replacement for each core position (Succession Planning) Load the titles with more roles, planning responsibilities, authority, and exposure to end users Justification Challenging and empowering jobs Readiness for the e-government services Eliminate the identified risk in KSA regarding high turnover in IT staff Creates job challenge and satisfaction because it : Increase the since or responsibility Allow them to understand the meaning of the work Let them know the feedback on their performance Grouping around measurable results, immeasurable result should be distributed between other sections Facilitate performance evaluation and increase variety of work e-government Program (yesser) 33
34 5.5. Step 5 Plan for Implementation The purpose of this step is to plan to achieve the actual design. The planning covers each of the following: Recruiting Vs Firing Time table Current Staff changes in roles and positions Logistics and formal approvals Documenting, Communicating and formalizing the new design Establishing the reporting of the IT department to the upper level of management Each action item in the plan should have a time line and a committed owner. The IT manager should track this plan as any regular work plan. The implantation does not stop here. The IT manager follows it through until it is completed. After that, The IT manager assesses the situation and by evaluating the new design, and by making sure the problems that were caused by the structure are resolved or minimized. If they problems persist, The IT manager takes the appropriate corrective action accordingly. He might also consult other IT departments about possible solutions. However, the one thing the IT manager should avoid is to leave the problems as is without response or action. e-government Program (yesser) 34
35 6. Lessons Learned The organization structure of the IT department is the visible representation of the IT department Organization. By looking at it, it describes the functions and to a certain degree the services provided by the IT department. It also gives an idea about the size and the nature of work being performed. The more the IT organization structure is aligned with the IT vision, mission and objectives, the more it will serve its purpose, and facilitate the implementation of needed changes. The design process in this document is based on few principles and lessons learned in organizational design/re-design. The application of these principles is actually more important than the how-to and the mythological representation of it (However, the design process inherently applies all of them). The following list summarizes these principles as lessons learned or general design recommendations: 1. Base management decisions on facts and adequate understanding of the situation 2. Align the organization structure with the IT strategy 3. Keep the customers in mind and seek the state of being Customer Centric 4. Address real causes of problems, not just its symptoms 5. Design the organization based on required services, functions, and the estimated workload 6. Keep the end results in mind, the end results of the IT department are its services to the customers 7. Take into consideration the environment, the stage of the IT department, and the planned management style that will be applied in managing the IT department 8. Dedicate the suitable setup for project management as it is one of the major functions of the IT department 9. In re-designing the organization structure, ignore the current design and apply the concept of re-engineering (the current design with its problems can affect the design process) seeking a radical change rather that an enhancement or minor improvement 10. Apply world standards as much as possible 11. The change process is one of the most challenging endeavors, it requires careful and comprehensive planning, execution, tracking, and corrective action when deviation occurs 12. The organization design process is a systematic process, based on facts and experience in the IT field. If done well, the organization structure can be one of the strongest and most helpful tools in implementing strategy, change and improvement in general 13. It is recommended to make the IT Department reporting directly to the top management of the organization e-government Program (yesser) 35
IT PROCESSES BEST PRACTICES FOR. Version 1.0 Date: 04/06/2007
BEST PRACTICES FOR IT PROCESSES Version 1.0 Date: 04/06/2007 The Saudi e-government Program (Yesser) has exerted its best effort to achieve the quality, reliability, and accuracy of the information contained
Business Continuity Position Description
Position Description February 9, 2015 Position Description February 9, 2015 Page i Table of Contents General Characteristics... 2 Career Path... 3 Explanation of Proficiency Level Definitions... 8 Summary
Description of Program Management Processes (Initiating, Planning) 2011 PROGstudy.com. All rights reserved
Description of Program Management Processes (Initiating, Planning) Topics Covered Program Management Process Groups salient features Description of all processes in Initiating Process Group: Initiate Program
Office of the Auditor General AUDIT OF IT GOVERNANCE. Tabled at Audit Committee March 12, 2015
Office of the Auditor General AUDIT OF IT GOVERNANCE Tabled at Audit Committee March 12, 2015 This page has intentionally been left blank Table of Contents Executive Summary... 1 Introduction... 1 Background...
Information Technology Project Oversight Framework
i This Page Intentionally Left Blank i Table of Contents SECTION 1: INTRODUCTION AND OVERVIEW...1 SECTION 2: PROJECT CLASSIFICATION FOR OVERSIGHT...7 SECTION 3: DEPARTMENT PROJECT MANAGEMENT REQUIREMENTS...11
IT STRATEGIC PLANNING
BEST PRACTICES FOR IT STRATEGIC PLANNING Version 1.0 Date: 04/06/2007 The Saudi e-government Program (Yesser) has exerted its best effort to achieve the quality, reliability, and accuracy of the information
Project Management Process
Project Management Process Description... 1 STAGE/STEP/TASK SUMMARY LIST... 2 Project Initiation 2 Project Control 4 Project Closure 5 Project Initiation... 7 Step 01: Project Kick Off 10 Step 02: Project
Value to the Mission. FEA Practice Guidance. Federal Enterprise Architecture Program Management Office, OMB
Value to the Mission FEA Practice Guidance Federal Enterprise Program Management Office, OMB November 2007 FEA Practice Guidance Table of Contents Section 1: Overview...1-1 About the FEA Practice Guidance...
System/Data Requirements Definition Analysis and Design
EXECUTIVE SUMMARY This document provides an overview of the Systems Development Life-Cycle (SDLC) process of the U.S. House of Representatives. The SDLC process consists of seven tailored phases that help
Project Management Guidebook
METHOD 12 3 empowering managers to succeed Project Management Guidebook ISBN 0-473-10445-8 A bout this e-book This e-book was created by Method123 (see www.method123.com) to help provide you with a simple
NASCIO EA Development Tool-Kit Solution Architecture. Version 3.0
NASCIO EA Development Tool-Kit Solution Architecture Version 3.0 October 2004 TABLE OF CONTENTS SOLUTION ARCHITECTURE...1 Introduction...1 Benefits...3 Link to Implementation Planning...4 Definitions...5
pm4dev, 2007 management for development series Project Management Organizational Structures PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS
pm4dev, 2007 management for development series Project Management Organizational Structures PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS A methodology
ITSM Process Description
ITSM Process Description Office of Information Technology Incident Management 1 Table of Contents Table of Contents 1. Introduction 2. Incident Management Goals, Objectives, CSFs and KPIs 3. Incident Management
Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects
State of Arkansas Office of Information Technology 124 W. Capitol Ave. Suite 990 Little Rock, AR 72201 501.682.4300 Voice 501.682.4020 Fax http://www.cio.arkansas.gov/techarch Best Practices Statement
The purpose of Capacity and Availability Management (CAM) is to plan and monitor the effective provision of resources to support service requirements.
CAPACITY AND AVAILABILITY MANAGEMENT A Project Management Process Area at Maturity Level 3 Purpose The purpose of Capacity and Availability Management (CAM) is to plan and monitor the effective provision
MEMORANDUM FOR THE HEADS OF DEPARTMENTS AND AGENCIES
MEMORANDUM FOR THE HEADS OF DEPARTMENTS AND AGENCIES FROM: SUBJECT: Peter R. Orszag Director Managing the Multi-Sector Workforce Federal agencies use both federal employees and private sector contractors
Measurement Information Model
mcgarry02.qxd 9/7/01 1:27 PM Page 13 2 Information Model This chapter describes one of the fundamental measurement concepts of Practical Software, the Information Model. The Information Model provides
ITRM Guideline CPM 110-01 Date: January 23, 2006 SECTION 4 - PROJECT EXECUTION AND CONTROL PHASE
PROJECT MANAGEMENT GUIDELINE SECTION 4 - PROJECT EXECUTION AND CONTROL PHASE Table of Contents Introduction... 3 Project Execution and Control Phase Overview... 3 Activities and Documents in the Execution
NEEDS BASED PLANNING FOR IT DISASTER RECOVERY
The Define/Align/Approve Reference Series NEEDS BASED PLANNING FOR IT DISASTER RECOVERY Disaster recovery planning is essential it s also expensive. That s why every step taken and dollar spent must be
Recruitment and Selection
Recruitment and Selection The recruitment and selection belongs to value added HR Processes. The recruitment is about: the ability of the organization to source new employees, to keep the organization
Copyright 2014 Carnegie Mellon University The Cyber Resilience Review is based on the Cyber Resilience Evaluation Method and the CERT Resilience
Copyright 2014 Carnegie Mellon University The Cyber Resilience Review is based on the Cyber Resilience Evaluation Method and the CERT Resilience Management Model (CERT-RMM), both developed at Carnegie
Develop Project Charter. Develop Project Management Plan
Develop Charter Develop Charter is the process of developing documentation that formally authorizes a project or a phase. The documentation includes initial requirements that satisfy stakeholder needs
Building a Strategic Workforce Planning Capability at the U.S. Census Bureau 1
Building a Strategic Workforce Planning Capability at the U.S. Census Bureau 1 Joanne Crane, Sally Obenski, and Jonathan Basirico, U.S. Census Bureau, and Colleen Woodard, Federal Technology Services,
Quick Guide: Meeting ISO 55001 Requirements for Asset Management
Supplement to the IIMM 2011 Quick Guide: Meeting ISO 55001 Requirements for Asset Management Using the International Infrastructure Management Manual (IIMM) ISO 55001: What is required IIMM: How to get
Contents. viii. 4 Service Design processes 57. List of figures. List of tables. OGC s foreword. Chief Architect s foreword. Preface.
iii Contents List of figures List of tables OGC s foreword Chief Architect s foreword Preface Acknowledgements v vii viii 1 Introduction 1 1.1 Overview 4 1.2 Context 4 1.3 Purpose 8 1.4 Usage 8 2 Management
ITIL V3 and ASL Sound Guidance for Application Management and Application Development
For IT V3 and Sound Guidance for Application and Application Development Machteld Meijer, Mark Smalley & Sharon Taylor Alignment White Paper January 2008 V3 & : A Comparison Abstract In May 2007, the Office
State of Washington. Guide to Developing Strategic Workforce Plans. Updated December 2008
State of Washington Guide to Developing Strategic Workforce Plans Updated December 2008 Table of Contents Introduction... 3 What Is Workforce Planning?... 3 Workforce Planning Strategy Areas... 4 Strategic
How To Develop Software
Software Engineering Prof. N.L. Sarda Computer Science & Engineering Indian Institute of Technology, Bombay Lecture-4 Overview of Phases (Part - II) We studied the problem definition phase, with which
What is Business Process Design and Why Should I Care?
What is Business Process Design and Why Should I Care? by Jay Cousins and Tony Stewart, RivCom Ltd Introduction No matter how hard individuals work, they cannot overcome a flawed process design, much less
TDWI strives to provide course books that are content-rich and that serve as useful reference documents after a class has ended.
Previews of TDWI course books offer an opportunity to see the quality of our material and help you to select the courses that best fit your needs. The previews cannot be printed. TDWI strives to provide
Recovery Management. Release Data: March 18, 2012. Prepared by: Thomas Bronack
Recovery Management Release Data: March 18, 2012 Prepared by: Thomas Bronack Section Table of Contents 8. RECOVERY MANAGEMENT... 4 8.1. INTRODUCTION TO RECOVERY MANAGEMENT... 4 8.1.1. DEFINITION... 4 8.1.2.
IT Service Desk Health Check & Action Plan
IT Service Desk Health Check & Action Plan Version: 1.0 Date: April, 2003 Authors: Fatima Cabral, Gary Case, David Ratcliffe Pink Elephant Leading the Way in IT Management Best Practices www.pinkelephant.com
<name of project> Software Project Management Plan
The document in this file is adapted from the IEEE standards for Software Project Management Plans, 1058-1998, which conforms to the requirements of ISO standard 12207 Software Life Cycle Processes. Tailor
ITIL by Test-king. Exam code: ITIL-F. Exam name: ITIL Foundation. Version 15.0
ITIL by Test-king Number: ITIL-F Passing Score: 800 Time Limit: 120 min File Version: 15.0 Sections 1. Service Management as a practice 2. The Service Lifecycle 3. Generic concepts and definitions 4. Key
How Technology Supports Project, Program and Portfolio Management
WHITE PAPER: HOW TECHNOLOGY SUPPORTS PROJECT, PROGRAM AND PORTFOLIO MANAGEMENT SERIES 4 OF 4 How Technology Supports Project, Program and Portfolio Management SEPTEMBER 2007 Enrico Boverino CA CLARITY
PROJECT RISK MANAGEMENT
PROJECT RISK MANAGEMENT DEFINITION OF A RISK OR RISK EVENT: A discrete occurrence that may affect the project for good or bad. DEFINITION OF A PROBLEM OR UNCERTAINTY: An uncommon state of nature, characterized
PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE:
PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE: Project Name Project Management Plan Document Information Document Title Version Author Owner Project Management Plan Amendment History
Fundamentals of Measurements
Objective Software Project Measurements Slide 1 Fundamentals of Measurements Educational Objective: To review the fundamentals of software measurement, to illustrate that measurement plays a central role
PASB Information Technology Strategy 2015-2019. Information Technology Services (ITS) January 2015
PASB Information Technology Strategy 2015-2019 Information Technology Services (ITS) January 2015 Table of Contents Executive Summary The Need for a New IT Strategy Vision for IT in PAHO Vision Statement
PROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE
PROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE Table of Contents Introduction...3-1 Overview...3-1 The Process and the Project Plan...3-1 Project Objectives and Scope...3-1 Work Breakdown Structure...3-1
Information Technology Services Project Management Office Operations Guide
Information Technology Services Project Management Office Operations Guide Revised 3/31/2015 Table of Contents ABOUT US... 4 WORKFLOW... 5 PROJECT LIFECYCLE... 6 PROJECT INITIATION... 6 PROJECT PLANNING...
ájoƒ ùdg á«hô dg áµلªÿg Yesser Overall SDLC Process Definition
ájoƒ ùdg á«hô dg áµلªÿg Yesser Overall SDLC Process Definition Version 0.6 - Page 3 / 43 Table of Contents 1. Process Introduction... 5 1.1. Process Scope... 5 1.2. Process Objectives and Benefits... 5
Step by Step Project Planning
Step by Step Project Planning Contents Introduction The Planning Process 1 Create a Project Plan...1 Create a Resource Plan...1 Create a Financial Plan...1 Create a Quality Plan...2 Create a Risk Plan...2
U.S. Nuclear Regulatory Commission. Plan of Action Strategic Workforce Planning
U.S. Nuclear Regulatory Commission Plan of Action Strategic Workforce Planning January 19, 2001 Strategic Workforce Planning Plan of Action January 19, 2001 Content Overview This plan of action outlines
Availability Management: A CA Service Management Process Map
TECHNOLOGY brief: AVAILABILITY MANAGEMENT Availability : A CA Process Map Malcolm Ryder ARCHITECT CA SERVICES Table of Contents Executive Summary 1 SECTION 1: CHALLENGE 2 Simplifying ITIL How to Use the
JOURNAL OF OBJECT TECHNOLOGY
JOURNAL OF OBJECT TECHNOLOGY Online at www.jot.fm. Published by ETH Zurich, Chair of Software Engineering JOT, 2006 Vol. 5. No. 8, November-December 2006 Requirements Engineering Tasks Donald Firesmith,
The following is intended to outline our general product direction. It is intended for informational purposes only, and may not be incorporated into
The following is intended to outline our general product direction. It is intended for informational purposes only, and may not be incorporated into any contract. It is not a commitment to deliver any
Principles of IT Governance
Principles of IT Governance Governance of enterprise IT focuses on delivering services to support top line growth while moving operational savings to the bottom line. The management of IT services has
Best practices in project and portfolio management
Business white paper Best practices in project and portfolio management Practical advice for achieving greater value and business benefits Table of contents 3 Introduction 3 The importance of best practices
Software Project Management Plan (SPMP)
Software Project Management Plan (SPMP) The basic template to be used is derived from IEEE Std 1058-1998, IEEE Standard for Software Project Management Plans. The following is a template for the SPMP.
Business Analyst Position Description
Analyst Position Description September 4, 2015 Analysis Position Description September 4, 2015 Page i Table of Contents General Characteristics... 1 Career Path... 2 Explanation of Proficiency Level Definitions...
Technology Lifecycle Management. A Model for Enabling Systematic Budgeting and Administration of Government Technology Programs
Technology Lifecycle Management A Model for Enabling Systematic Budgeting and Administration of Government Technology Programs Even as technology improves, government s fundamental IT challenge remains
pm4dev, 2011 management for development series Project Management Information PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS
pm4dev, 2011 management for development series Project Management Information PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS A methodology to manage development
Development, Acquisition, Implementation, and Maintenance of Application Systems
Development, Acquisition, Implementation, and Maintenance of Application Systems Part of a series of notes to help Centers review their own Center internal management processes from the point of view of
Project Knowledge Areas
From Houston S: The Project Manager s Guide to Health Information Technology Implementation. Chicago: HIMSS; 2011; pp 27 39. This book is available on the HIMSS online bookstore at www. himss.org/store.
Application Support Solution
Application Support Solution White Paper This document provides background and administration information on CAI s Legacy Application Support solution. PRO00001-MNGMAINT 080904 Table of Contents 01 INTRODUCTION
Guide on Developing a HRM Plan
Guide on Developing a HRM Plan Civil Service Branch June 1996 Table of Contents Introduction What is a HRM Plan? Critical Success Factors for Developing the HRM Plan A Shift in Mindset The HRM Plan in
Assessing the Appropriate Level of Project, Program, and PMO Structure
PMI Virtual Library 2011 Daniel D. Magruder Assessing the Appropriate Level of Project, Program, and PMO Structure By Daniel D. Magruder, PMP Executive Summary Does your organization have in-flight projects
ICT Competency Profiles framework Job Stream Descriptions
ICT Competency Profiles framework Job Stream Descriptions Cluster: Software Products Analysis Design: In the field of analysis, you apply investigative skills to business, technical or organizational problems
(Refer Slide Time: 01:52)
Software Engineering Prof. N. L. Sarda Computer Science & Engineering Indian Institute of Technology, Bombay Lecture - 2 Introduction to Software Engineering Challenges, Process Models etc (Part 2) This
IT Project Management Practices Guide
IT Project Management Practices Guide Introduction The IT Project Management Practices Guide (Guide) contains a repeatable, institutionwide approach for the management of application development and/or
Five best practices for deploying a successful service-oriented architecture
IBM Global Services April 2008 Five best practices for deploying a successful service-oriented architecture Leveraging lessons learned from the IBM Academy of Technology Executive Summary Today s innovative
WHITE PAPER APRIL 2012. Leading an Implementation Campaign to Address the Convergence of Healthcare Reform Initiatives
WHITE PAPER APRIL 2012 Leading an Implementation Campaign to Address the Convergence of Healthcare Reform Initiatives New healthcare reforms have created an unprecedented impact on hospital systems operations.
Positive Train Control (PTC) Program Management Plan
Positive Train Control (PTC) Program Management Plan Proposed Framework This document is considered an uncontrolled copy unless it is viewed online in the organization s Program Management Information
ITIL V3 Foundation Certification - Sample Exam 1
ITIL V3 Foundation Certification - Sample Exam 1 The new version of ITIL (Information Technology Infrastructure Library) was launched in June 2007. ITIL V3 primarily describes the Service Lifecycle of
The ITIL v.3. Foundation Examination
The ITIL v.3. Foundation Examination ITIL v. 3 Foundation Examination: Sample Paper 4, version 3.0 Multiple Choice Instructions 1. All 40 questions should be attempted. 2. There are no trick questions.
Service Catalog Management: A CA Service Management Process Map
TECHNOLOGY BRIEF: SERVICE CATALOG MANAGEMENT Catalog : A CA Process Map JULY 2009 Enrico Boverino SR PRINCIPAL CONSULTANT, TECHNICAL SALES ITIL SERVICE MANAGER ITAC CERTIFIED Table of Contents Executive
Leadership Competency Self Assessment
USDA Virtual University School of Talent Management Leadership Essentials Certificate Program Leadership Competency Self Assessment Building Blocks for Workforce Development Based on OPM Competencies Updated:
integrate 2: Business Process Redesign
Nevada System of Higher Education integrate 2: Business Process Redesign Executive Summary TABLE OF CONTENTS I. BACKGROUND AND OBJECTIVES 2 II. METHODOLOGY AND APPROACH 3 III. PROJECT OUTCOMES 5 IV. MAJOR
Financial and Cash Management Task Force. Strategic Business Plan
Financial and Cash Management Task Force January 30, 2009 Table Of Contents 1 Executive Summary... 4 2 Introduction... 6 2.1 External Reports on Project Aspire... 7 2.1.1 Council on Efficient Government
PHASE 9: OPERATIONS AND MAINTENANCE PHASE
PHASE 9: OPERATIONS AND MAINTENANCE PHASE During the Operations and Maintenance Phase, the information system s availability and performance in executing the work for which it was designed is maintained.
MANAGING USER DATA IN A DIGITAL WORLD
MANAGING USER DATA IN A DIGITAL WORLD AIRLINE INDUSTRY CHALLENGES AND SOLUTIONS WHITE PAPER OVERVIEW AND DRIVERS In today's digital economy, enterprises are exploring ways to differentiate themselves from
Information Technology Strategic Plan 2013 9/23/2013
Information Technology Strategic Plan 2013 9/23/2013 Unit Mission Statement: Information Technology Shared Services is dedicated to providing unparalleled service and support to the UC Davis College of
EXIN.Passguide.EX0-001.v2014-10-25.by.SAM.424q. Exam Code: EX0-001. Exam Name: ITIL Foundation (syllabus 2011) Exam
EXIN.Passguide.EX0-001.v2014-10-25.by.SAM.424q Number: EX0-001 Passing Score: 800 Time Limit: 120 min File Version: 24.5 http://www.gratisexam.com/ Exam Code: EX0-001 Exam Name: ITIL Foundation (syllabus
Call for Tender for Application Development and Maintenance Services
ADM Partners Reference #: 100001200 Call for Tender for Application Development and Maintenance Services Annex 2 - Agile Application Development and Maintenance Appendix A - OECD s Agile Practices and
ITRM Guideline CPM 110-01 Date: January 23, 2006 SECTION 5 PROJECT CLOSEOUT PHASE
PROJECT MANAGEMENT GUIDELINE SECTION 5 PROJECT CLOSEOUT PHASE Table of Contents Introduction... 3 Project Closeout Phase... 3 Activities and Documents in the Closeout Phase... 4 Project Closeout Task...
Project Portfolio Management: James C. Brown Sr. Manager, Research PMO Pioneer Hi-Bred International
Project Portfolio Management: Metrics that Work James C. Brown Sr. Manager, Research PMO Pioneer Hi-Bred International Agenda PPM Interest What is Project Portfolio Management? Challenges Myths Benefits
Computing & Communications Services
2010 Computing & Communications Services 2010 / 10 / 04 Final Kent Percival, M.Sc., P.Eng. Defining the Value of the Business Analyst In achieving its vision, key CCS partnerships involve working directly
1 What does the 'Service V model' represent? a) A strategy for the successful completion of all service management projects
1 What does the 'Service V model' represent? a) A strategy for the successful completion of all service management projects b) The path to Service Delivery and Service Support for efficient and effective
Minnesota Health Insurance Exchange (MNHIX)
Minnesota Health Insurance Exchange (MNHIX) 1.2 Plan September 21st, 2012 Version: FINAL v.1.0 11/9/2012 2:58 PM Page 1 of 87 T A B L E O F C O N T E N T S 1 Introduction to the Plan... 12 2 Integration
A COMPARISON OF PRINCE2 AGAINST PMBOK
Introduction This comparison takes each part of the PMBOK and gives an opinion on what match there is with elements of the PRINCE2 method. It can be used in any discussion of the respective merits of the
Cisco Network Optimization Service
Service Data Sheet Cisco Network Optimization Service Optimize your network for borderless business evolution and innovation using Cisco expertise and leading practices. New Expanded Smart Analytics Offerings
First Call/Visit Resolution Getting It Fixed the First Time
RTM Consulting First Call/Visit Resolution Getting It Fixed the First Time Randy Mysliviec Managing Partner RTM Consulting 2 2015 All rights reserved. OVERVIEW Every field services or support services
Software Development Life Cycle (SDLC)
Software Development Life Cycle (SDLC) Supriyo Bhattacharjee MOF Capability Maturity Model (CMM) A bench-mark for measuring the maturity of an organization s software process CMM defines 5 levels of process
State of Washington Supervisors Guide to Developing Operational Workforce Plans. Updated December 2008
State of Washington Supervisors Guide to Developing Operational Workforce Plans Updated December 2008 Table of Contents Introduction... 3 What Is Workforce Planning?... 3 Workforce Planning Strategy Areas...
Project Management Standards: A Review of Certifications/Certificates
Project Standards: A Review of Certifications/Certificates Standards for Project Supporting Certification and Certificates Certificate Certification The Project Body of Knowledge PMBOK Guide Projects in
Mature Agile with a twist of CMMI
Mature Agile with a twist of CMMI Carsten Ruseng Jakobsen Systematic Software Engineering [email protected] Kent Aaron Johnson AgileDigm, Incorporated [email protected] Abstract Systematic is
US Department of Education Federal Student Aid Integration Leadership Support Contractor January 25, 2007
US Department of Education Federal Student Aid Integration Leadership Support Contractor January 25, 2007 Task 18 - Enterprise Data Management 18.002 Enterprise Data Management Concept of Operations i
Capacity Plan. Template. Version X.x October 11, 2012
Template Version X.x October 11, 2012 This is an integral part of infrastructure and deployment planning. It supports the goal of optimum provisioning of resources and services by aligning them to business
Agency HRIT Migrations to Shared Service Centers: Consolidated Lessons Learned Report
United States Office of Personnel Management Human Resources Line of Business Agency HRIT Migrations to Shared Service Centers: Consolidated Lessons Learned Report March 2015 Table of Contents 1 Table
Project Management Framework
Project Management Framework Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Points to Note Please
Asset Management Systems Scheme (AMS Scheme)
Joint Accreditation System of Australia and New Zealand Scheme (AMS Scheme) Requirements for bodies providing audit and certification of 13 April 2015 Authority to Issue Dr James Galloway Chief Executive
The PMO as a Project Management Integrator, Innovator and Interventionist
Article by Peter Mihailidis, Rad Miletich and Adel Khreich: Peter Mihailidis is an Associate Director with bluevisions, a project and program management consultancy based in Milsons Point in Sydney. Peter
Report of Audit OFFICE OF INSPECTOR GENERAL. Information Technology Infrastructure Project Management A-07-02. Tammy Rapp Auditor-in-Charge
OFFICE OF INSPECTOR GENERAL Report of Audit Information Technology Infrastructure Project Management A-07-02 Tammy Rapp Auditor-in-Charge FARM CREDIT ADMINISTRATION Memorandum Office of Inspector General
Business Continuity Plan
Business Continuity Plan October 2007 Agenda Business continuity plan definition Evolution of the business continuity plan Business continuity plan life cycle FFIEC & Business continuity plan Questions