1 Item #: SS: 1st: 2nd: 9d City of Aurora Council Agenda Commentary Item Title: Consideration to AWARD A CHANGE ORDER TO THE COMPETITIVELY BID CONTRACT with Western Summit Constructors, Inc., Englewood, Colorado in the amount of $1,309, for completing the first phase of flood damage repairs to the Everist Reservoir Site Water Storage Cell Improvements Project, Project Number 5315A. Item Initiator: Simmons, R B - Projects Administrator - Internal Services Staff Source: Catalano, Lawrence - Manager Water Capital Projects - Aurora Water City Manager/Deputy City Manager Signature: Skip Noe Outside Speaker: Council Goal: 2012: 3.3--Pursue a water resource aquisition and delivery plan ACTIONS(S) PROPOSED (Check all appropriate actions) Approve Item as proposed at Study Session Approve Item with Waiver of Reconsideration Approve Item and Move Forward to Regular Meeting Approve Item as proposed at Regular Meeting Information Only HISTORY (Dates reviewed by City council, Policy Committees, Boards and Commissions, or Staff. Summarize pertinent comments. ATTACH MINUTES OF COUNCIL MEETINGS, POLICY COMMITTEES AND BOARDS AND COMMISSIONS.) City Council approved the award of an openly solicited contract to Deere & Ault Consultants, Inc. for the initial engineering design and site planning services for the Everist Reservoir Project in the amount of $1,355, on March 3, 2008, Agenda Item #9e. City Council approved the award of the competitively bid contract to Western Summit Constructors, Inc. for the construction of the Everist Reservoir Project in the amount of $13,511, on September 30, 2013, Agenda Item #9c. An amendment to the openly solicited contract to Deere & Ault Consultants, Inc. for additional engineering services to complete the design of flood-related repairs in the amount of $158, was reported to City Council as an emergency on the Weekly Report of October 21, ITEM SUMMARY (Brief description of item, discussion, key points, recommendations, etc.) Background The Everist Reservoir Site (Site) is a planned, multi-cell water storage facility located approximately two miles northwest of Fort Lupton, Colorado. The Site, which currently is being mined by LG Everist, will provide storage for current and future augmentation of the Prairie Waters Project well pumping for both City use and Water Infrastructure Supply Efficiencies (WISE) deliveries. Water storage becomes available to the City at the Site as LG Everist completes mining and reclamation activities at each cell. Currently, three cells (Golden, Hill Oakley, Fort Lupton East) have been mined, reclaimed, and delivered to the City for water storage. Delivery of the remaining eight cells is anticipated to occur over the next 20 years. The original contract awarded to Western Summit Constructors, Inc. in the amount of $13,511, was approved by City Council on September 30, The original contracted work included a 14 million March 24, 2014 Council Meeting, Page 37
2 gallon per day pump station, piping extending from the pump station to three water storage cells, discharge piping from the pump station to the South Platte River, various diversion structures, and cell inlet improvements. The Site experienced damage from the September 2013 storm flood event that has made it impossible for the work originally contracted to proceed without first repairing the flood damage. The currently identified flood damage includes: 1) breaching of multiple earthen berms between the South Platte River and the Site; 2) breach of a storage cell slurry wall; 3) damage to multiple storage cell interior liners; 4) accumulation of over 850 acre feet of water within the storage cells; and 5) accumulation of an unknown quantity of debris (including general trash, trees, silts, etc.). See Attachment 6, which is an aerial photo of flood damage. Proposed Change Order Aurora Water is requesting approval of a change order to the contract awarded to Western Summit Constructors, Inc. for completing the first phase of flood damage repair work associated with the Everist Reservoir Site Water Storage Cell Improvements Project. The City, Western Summit Constructors, Inc. and Deere & Ault Consultants, the design engineer, collaborated on a two-phase design for completing the flood damage repairs. The change order proposed under this commentary is for completing the first phase of the flood repair work. Once the first phase is completed, another change order will be brought forward for Council approval. The first phase of flood repair work consists of isolating the Site from the South Platte River by reconstructing the breached berms and dewatering the Site by pumping accumulated water to the South Platte River. These efforts are anticipated to eliminate the uncontrolled flow of surface and ground water into the Site, permit damage assessment of currently submerged features, facilitate subsequent repair efforts, and allow the Site improvements work originally contracted to commence. The specific details regarding the scope of work and cost breakdowns for providing the first phase Site repair work are included in Attachment-A to this commentary. The second phase of flood damage repair will collect and remove accumulated debris, repair currently submerged or partially submerged features (e.g., storage cell liners), address other damage currently not identified, and where necessary, augment first phase repairs. The total price for these second phase efforts currently is unknown, but likely will range from $400,000 to $1,100,000. Based on the critical timing for completing the work, there is not enough time to solicit bids from other contractors for completing the flood repairs. Because Western Summit Constructors, Inc. has mobilized to the Site and has procured equipment and materials for completing the original project work, they are in the best position to immediately start performing flood-related repairs. Another contractor would need significant time to study the Site and provide pricing for performing the necessary repairs, which would further delay and increase the overall costs for completing the original project. As a result, staff has determined that a change order to the contract that was awarded to Western Summit Constructors, Inc. is in the best interest of the City. Pursuant to City Code 2-674(6) that allows for negotiated purchases under a reduced total cost approach associated with more advantageous time allowances, a change order proposal was requested from Western Summit Constructors, Inc. for all costs associated with completing the flood repair work. Negotiations included detailed discussions regarding the specific scope of work elements and project schedule for completing the additional work. After negotiations were completed, the final amount agreed upon was $1,309, The agreed upon amount is within the established budget that has been set aside for completing the repair work for this project. No contingency funding that was approved for the original contract is being used to complete the flood repair work. The cost of the repair work is eligible for partial reimbursement from the Federal Emergency Management Administration (FEMA). The hourly labor rates and material markup costs proposed by Western Summit Constructors, Inc. for this additional work reflect the same pricing structure they offered under their original bid and are in accordance with the contract provisions. An independent cost estimate prepared by the design engineer confirmed that the pricing proposed by Western Summit Constructors, Inc. for the additional work is fair and reasonable. The original awarded contract of $13,511, and this proposed change order of $1,309, will bring the new total contract not-to-exceed amount to $14,820, March 24, 2014 Council Meeting, Page 38
3 Recommendation Based on the above, staff recommends that the City award a change order to the competitively bid contract with Western Summit Constructors, Inc., Englewood, Colorado in the amount of $1,309, for completing the first phase of flood damage repairs to the Everist Reservoir Site Water Storage Cell Improvements Project. QUESTIONS FOR COUNCIL Does City Council approve the change order to the competitively bid contract with Western Summit Constructors, Inc. in the amount of $1,309, for completing the first phase of flood damage repairs to the Everist Reservoir Site Water Storage Cell Improvements Project? LEGAL COMMENTS Due to the flood from last summer, there was extensive damage to the construction site where Western Summit was working on the north campus of the Prairie Waters Project. The proposed change order in the amount of $1,309, is for restoration work caused by the flood. City Council is required to approve this change order since staff negotiated for the work. (2-376 ( II) (b)(3))(mckenney) Mike Hyman PUBLIC FINANCIAL IMPACT (If Yes, EXPLAIN) Yes No Funding for this contract change order will be from the Capital Improvement Program, Water Fund, in the amount of $1,309, ORG USED: Everist/Flood Repairs-FEMA PW#5 (52394) PRIVATE FISCAL IMPACT (If Significant or Nominal, EXPLAIN) Not Applicable Significant Nominal Not applicable. EXHIBITS ATTACHED: 1. Attachment A - Scope of Work and Cost Schedule.pdf 2. Council Minutes pdf 3. Council Minutes pdf 4. Weekly Report of pdf 5. Project Location Map for Everist Reservoir.pdf 6. Everist Reservoir Aerial Photo.pdf March 24, 2014 Council Meeting, Page 39
4 March 24, 2014 Council Meeting, Page 40
5 March 24, 2014 Council Meeting, Page 41
6 March 24, 2014 Council Meeting, Page 42
7 March 24, 2014 Council Meeting, Page 43
8 March 24, 2014 Council Meeting, Page 44
9 March 24, 2014 Council Meeting, Page 45
10 March 24, 2014 Council Meeting, Page 46
11 March 24, 2014 Council Meeting, Page 47
12 March 24, 2014 Council Meeting, Page 48
13 March 24, 2014 Council Meeting, Page 49
14 March 24, 2014 Council Meeting, Page 50
15 March 24, 2014 Council Meeting, Page 51
16 March 24, 2014 Council Meeting, Page 52
17 March 24, 2014 Council Meeting, Page 53
18 March 24, 2014 Council Meeting, Page 54
19 March 24, 2014 Council Meeting, Page 55
20 36K //0 +,-+++ D?242:7E:0/27F+FGHFIGHFHJ LMM 12" 7 2! "#$% "#$ "#$& "#$' "#$ "#$! "#$( "#$!) "#$! "#$!* "#$!% "#$! "#$!& "#$!' "#$! "#$!! "#$!( March 24, 2014 Council Meeting, Page 56
21 March 24, 2014 Council Meeting, Page 57
City of Aurora Council Agenda Commentary
City of Aurora Council Agenda Commentary Item #: SS: 1st: 2nd: 9f Item Title: Consideration to AMEND AN OPENLY SOLICITED CONTRACT with Stantec Consulting Services, Inc., Denver, Colorado in the amount
How To Install An Overhead Sewer
Village of Broadview Flood Control Assistance Program Village of Broadview 2350 S. 25 th Avenue, Broadview, IL 60155 INTRODUCTION The Village of Broadview is served by combined sewers which carry sewage
Dewatering - Time and Cost Relief by way of Trenchless Construction
North American Society for Trenchless Technology (NASTT) NASTT s 2015 No-Dig Show Denver, Colorado March 15-19, 2015 TA-T3-04 Dewatering - Time and Cost Relief by way of Trenchless Construction Jenn Stillman,
Historic Flood Impact on the Nashville Drinking Water System. Scott Potter, Director Metro Water Services, Nashville, TN
Historic Flood Impact on the Nashville Drinking Water System Scott Potter, Director Metro Water Services, Nashville, TN Historic Event = 13.53 /48 Hours May 1 6.32 of Rain = 3rd greatest one-day rainfall
MASSWORKS INFRASTRUCTURE PROGRAM 2011 GRANT RECIPIENT HANDBOOK
MASSWORKS INFRASTRUCTURE PROGRAM 2011 GRANT RECIPIENT HANDBOOK Table of Contents Introductory Letter 1 Table of Contents 2 Contracts...4 Eligible MassWorks Infrastructure Program Recipients Contract Execution
Debris Contracting Guidance
RP9580.201 I Debris Contracting Guidance Overview Debris removal and monitoring contracts must meet rules for Federal grants, as provided for in Title 44 Code of Federal Regulations (CFR) 13.36, Procurement
PUBLIC ASSISTANCE DAMAGE ASSESSMENT
PUBLIC ASSISTANCE DAMAGE ASSESSMENT Who does it? Political Subdivisions, Special Districts, Local/Regional Authorities, Public Schools/Colleges/Universities, Certain Private Non-Profit Organizations (PNP)
Prattsville Berm Removal Project. 1.0 Project Location
Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed
State of Rhode Island Department of Administration / Division of Purchases ADDENDUM # 4 RFP # 7479367
State of Rhode Island Department of Administration / Division of Purchases One Capitol Hill, Providence, Rhode Island 02908-5855 Tel: (401) 574-8100 Fax: (401) 574-8387 Solicitation Information July 23,
SEWER BACKUP PREVENTION PROGRAM
SEWER BACKUP PREVENTION PROGRAM PROGRAM DESCRIPTION The Village will provide partial funding for a Village approved overhead sewer, backflow prevention device and/or related equipment to single-family
IT IS RECOMMENDED THAT YOUR BOARD: 1. Find that this project is statutorily exempt from the provisions of the California Environmental Quality Act.
October 11, 2011 The Honorable Board of Supervisors County of Los Angeles 383 Kenneth Hahn Hall of Administration 500 West Temple Street Los Angeles, California 90012 Dear Supervisors: ADOPT, ADVERTISE,
Terry Biederman, PE- Director of Public Works Greg Gucwa, PE- Principal Johnson and Anderson Engineering
DON T JUST REHAB IT, RENEW IT! WATERFORD TOWNSHIP, MICHIGAN IMPROVEMENTS TO A 3.0 MGD SEWAGE PUMPING STATION Terry Biederman, PE- Director of Public Works Greg Gucwa, PE- Principal Johnson and Anderson
EXHIBIT A SCOPE OF WORK Montgomery Reservoir Improvements
EXHIBIT A SCOPE OF WORK Montgomery Reservoir Improvements 1.0 INTRODUCTION Colorado Springs Utilities (Utilities) is requesting proposals to provide final engineering, design, and construction management
CITY OF DANA POINT AGENDA REPORT BRAD FOWLER, DIRECTOR OF PUBLIC WORKS AND ENGINEERING SERVICES
03/09/05 Page 1 Item #11 CITY OF DANA POINT AGENDA REPORT Reviewed By: DH X CM X CA DATE: MARCH 9, 2005 TO: FROM CITY MANAGER/CITY COUNCIL BRAD FOWLER, DIRECTOR OF PUBLIC WORKS AND ENGINEERING SERVICES
Watertown City Council
City of Watertown Watertown City Council October 13 th, 2015 Agenda Item: Highland Park Roof and Dugout Repairs Request for Action: Approve Resolution #2015-103, Approving Bid from JLF Homes, Inc. Department:
6. Q: A: No, however it is anticipated that the PM firm will need to understand FEMA and HUD CDBG compliance as part of the scope of services. 7.
HHC Program Manager Request for Proposals (RFP) for Consulting Services Project # 6161 Questions & Answers Date: October 1, 2015 1. Q: In CR#2017007 would schedule outsourcing be considered as an appropriate
:: REQUEST FOR INFORMATION :: DEMOLITION SERVICES
:: REQUEST FOR INFORMATION :: DEMOLITION SERVICES 4200 Canal Street, Suite B New Orleans, LA 70119 PROPOSAL SUBMITTAL DEADLINE: Friday, June 15, 2012 @ 2:00pm NOTE: Proposal to be submitted in one (1)
SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY
SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY AGENDA REGULAR MEETING To Be Held at 3:00 PM APRIL 24, 2014 1234 Market Street, Mezzanine Level Philadelphia, PA 1. Approval of Minutes of the Regular
Sanitary Sewer Overflow Report Form
Preliminary report Final report Revised final report Sanitary Sewer Overflow Report Form Sanitary Sewer Overflow Sequential Tracking Number: Reported to: Sent Regional Board a fax Left Regional Board a
* 765 million tons of recoverable reserves as of 1970; W.E. Edmonds, Pennsylvania Geologic Survey
IV. PROPOSED PLAN FOR AMD ABATEMENT GOALS AND OBJECTIVES Although the major natural resource in the Wyoming Valley is anthracite coal*, its importance to the present and future economy of the area is limited
City of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather
AUDIT TIPS FOR MANAGING DISASTER-RELATED PROJECT COSTS
AUDIT TIPS FOR MANAGING DISASTER-RELATED PROJECT COSTS Department of Homeland Security Office of Inspector General September 2012 I. Introduction The Department of Homeland Security (DHS), Office of Inspector
COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY
COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY Revised: April 2014 Village of Wilmette, Illinois NPDES CSO Permit No. ILM580012 Chapter 1 Introduction This Operational and Maintenance
APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P-12686. Turbidity Monitoring Plan
APPENDIX F Baker County Mason Dam Hydroelectric Project FERC No. P-12686 Turbidity Monitoring Plan April 2011 857 Table of Contents 1.0 Introduction 1 2.0 Purpose and Scope 2 3.0 Turbidity Monitoring and
MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E.
MIAMI-DADE LATERAL PILOT PROGRAM James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. Hazen and Sawyer, P.C. 4000 Hollywood Boulevard Hollywood, FL 33021 ABSTRACT Since 1994 the Miami-Dade
K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name
K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY 1. Applicant's Name Address (Street or Rural Route) (City & State) (Zip) Person to contact Title Phone Fax
FHWA Emergency Relief (FHWA-ER) Training
FHWA Emergency Relief (FHWA-ER) Training Training Developed and Coordinated By Colorado Department of Transportation 2 Agenda FHWA Flowchart Policies, Purpose, Agency Roles Application Process Eligibility
Napa County, California, Needs Additional Technical Assistance and Monitoring to Ensure Compliance with Federal Regulations
Napa County, California, Needs Additional Technical Assistance and Monitoring to Ensure Compliance with Federal Regulations OIG-15-135-D August 28, 2015 August 28, 2015 Why We Did This On August 24, 2014,
Fiscal Year 2013-2014 St. Lucie River Issues Team Surface Water Restoration Grant Package
Fiscal Year 2013-2014 St. Lucie River Issues Team Surface Water Restoration Grant Package Grant Guidelines.. 2 Grant Application & Statement of Work. 7 Fiscal Year 2013-2014 St. Lucie River Issues Team
1. RECOMMENDATIONS. It is recommended that:
Clause No. 7 in Report No. 3 of was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on February 20, 2014. (Mayor Hackson declared an interest in this
5.14 Floodplains and Drainage/Hydrology
I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION (1) Project Name: (2) Project Contractor: (3) Erosion Control Supervisor/SWMP Administrator: (4) CDOT Project
NOTICE OF BOARD OF DIRECTORS SPECIAL TELEPHONE MEETINGS
NOTICE OF BOARD OF DIRECTORS SPECIAL TELEPHONE MEETINGS CALL TO ORDER NEW JERSEY TRANSIT CORPORATION NJ TRANSIT BUS OPERATIONS, INC. NJ TRANSIT RAIL OPERATIONS, INC. NJ TRANSIT MERCER, INC. NJ TRANSIT
UPDATE: Contingency Requirements for Close Out of the RREM Program
UPDATE: Contingency Requirements for Close Out of the RREM Program If you are participating in the RREM Program and meet the following conditions; Reconstruction, Rehabilitation, Elevation, and Mitigation
SEWER LINE CLEANING, DEBRIS AND GREASE REMOVAL, DEBRIS AND GREASE DISPOSAL
SEWER LINE CLEANING, DEBRIS AND GREASE REMOVAL, DEBRIS AND GREASE DISPOSAL This contract shall consist of cleaning, debris and grease disposal, of 7048 (+/-) feet of sewer pipe in accordance with the bid
Table of Contents ESF-3-1 034-00-13
Table of Contents Primary Coordinating Agency... 2 Local Supporting Agencies... 2 State, Regional, and Federal Agencies and Organizations... 3 Purpose... 3 Situations and Assumptions... 4 Direction and
REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR A ROOF CONSULTANT
REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR A ROOF CONSULTANT Durango School District 9 R (Owner) 201 East 12 th Street Durango, Colorado 81301 Phone (970) 247 5411, ext. 1458 PROPOSAL DUE DATE/DELIVERY
Request for Qualifications for Disaster Debris Monitoring
Request for Qualifications for Disaster Debris Monitoring Franklin County invites qualified firms to respond to this request for qualifications (RFQ) by providing their qualifications and experience for
Neversink River East Branch
Neversink River East Branch Management Unit 10 Summary of Post-Flood Recommendations Intervention Level Full restoration of the stream reach including the eroding bank site between Station 38380 and Station
HERNDON/MUNCEY, INC. Office: (281) 579-0515 INVESTIGATIVE PLUMBING
HERNDON/MUNCEY, INC. Office: (281) 579-0515 INVESTIGATIVE PLUMBING Fax: (281) 579-1960 August 23, 2013 INVOICE NO.: HR18297 Cheryl Hooten RE: Vladimir Gorshunin Nationwide Insurance One Nationwide Gateway
Johnson County Wastewater s. BackUp. Prevention Program A continuing partnership to help protect properties from sanitary sewer backups.
J o h n s o n J o h n s o n C o u n t y W a s t e w a t e r C o u n t y, K a n s a s Johnson County Wastewater s BackUp Prevention Program A continuing partnership to help protect properties from sanitary
OBJECTIVE To establish procedures for administration of construction manager agreements, including negotiation, contracting and payments.
OP-B-11-D2 ADMINISTRATION OF CONSTRUCTION MANAGER AGREEMENTS SPECIFIC AUTHORITY Sections 240.209(3)(p), 1001.74, 1013.46, F. S. OBJECTIVE To establish procedures for administration of construction manager
Oakwood Beach Storm Damage Prevention Project NJDEP-Bureau of Coastal Engineering Glenn Golden, Project Manager U.S. Army Corps Civil Works Programs
Oakwood Beach Storm Damage Prevention Project NJDEP- Glenn Golden, Project Manager U.S. Army Corps Civil Works Programs Branch Dwight Pakan, Project Manager, Philadelphia District The State of New Jersey
Standard Operating Procedures for Flood Preparation and Response
Standard Operating Procedures for Flood Preparation and Response General Discussion Hurricanes, tropical storms and intense thunderstorms support a conclusion that more severe flooding conditions than
REQUEST FOR PROPOSAL. for CONSTRUCTION MANAGEMENT SERVICES. for the ENCINA WASTEWATER AUTHORITY FY 2015 MAJOR PLANT REHABILITATION PROJECT
REQUEST FOR PROPOSAL for CONSTRUCTION MANAGEMENT SERVICES for the ENCINA WASTEWATER AUTHORITY FY 2015 MAJOR PLANT REHABILITATION PROJECT Ref: Admin.15 12265c September 23, 2015 Proposals Due November 2,
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers
Ann Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015
Ann Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015 The Facilities Master Plan was completed in 2004 and identified the need for improvements to the City of Ann Arbor s Wastewater
CITY OF DALLAS. Request for Competitive Sealed Proposal (RFCSP) BUZ1524. For. SCADA Repair, Parts and Support
CITY OF DALLAS Request for Competitive Sealed Proposal (RFCSP) BUZ1524 For SCADA Repair, Parts and Support Purpose The purpose of this specification is to establish a thirty-six (36) month service agreement
Aquatera 2015/16 Business Plan Highlights
Who We Are Aquatera 2015/16 Business Plan Highlights Aquatera is a full-service utility corporation the provider of choice for governments, businesses, and communities. Our business is to provide high-quality
The FEMA Programs and Insurance
The Integration of FEMA & Insurance FEMA Programs Individual Assistance Public Assistance Hazard Mitigation NFIP FMAG 2 Applicable Laws & Regulations Robert T. Stafford Disaster Relief and Emergency Assistance
Appendix VIII: Spill Prevention, Control and Countermeasure (SPCC) Plans
Appendix VIII: Spill Prevention, Control and Countermeasure (SPCC) Plans Background What is a Spill Prevention, Control and Countermeasure (SPCC) Plan? An SPCC plan is a written document that describes
ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING
ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING 1.0 General 1.1 The work covered by this section consists of providing all labor, equipment, material and supplies, insurance, accessories, tools, transportation,
General Utility Work Obligations
General Utility Work Obligations This Section addresses the Utility Company (or Utility Owner) requirements. It does not apply to existing stormwater facilities, irrigation ditches, Intelligent Transportation
REQUEST FOR QUOTATION RFQ-FH-08-09-10118 ROOF REPAIR
DEPARTMENT OF CENTRAL SERVICES REQUEST FOR QUOTATION RFQ-FH-08-09-10118 ROOF REPAIR 1. GENERAL CONDITIONS A. The City of Farmington Hills DPW is requesting quotes to repair the existing flat roof on the
CLIFTY CREEK PLANT MADISON, INDIANA
2015 DAM AND DIKE INSPECTION REPORT GERS-15-018 CLIFTY CREEK PLANT MADISON, INDIANA PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION 1 RIVERSIDE PLAZA COLUMBUS, OHIO Annual Dam and Dike Inspection
JASON IKEN CITY OF HOUSTON TXWARN 1
LESSONS LEARNED FROM RESPONSE TO HURRICANE IKE IN HOUSTON THE TEXAS WATER/WASTEWATER AGENCY RESPONSE NETWORK Pflugerville, Texas June 28, 2013 Jason Iken, P.E., Senior Assistant Director Wastewater Operations
ESCAMBIA COUNTY FLOOD RECOVERY: 1- YEAR ANNIVERSARY REPORT
Joy D. Blackmon, P.E. Director, County Engineer Public Works Department ESCAMBIA COUNTY FLOOD RECOVERY: 1- YEAR ANNIVERSARY REPORT EXECUTIVE SUMMARY One year after the devastating April 2014 floods hit
STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS. SECTION DESCRIPTION Page
STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS SECTION DESCRIPTION Page 1 Executive Summary / Brief History 2 2 Services Provided / Administration
ATTACHMENT B PROPOSAL SUBMITTAL FORMS. For WEB FILTER REPORTING TOOL RFP #0413-242
ATTACHMENT B PROPOSAL SUBMITTAL FORMS For WEB FILTER REPORTING TOOL RFP #0413-242 FORM NAME Page General Company Information Form.. 2 Proposal Cost Summary Form.. 3 Signature Page Form... 4 Buy Local Packet
LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN
1 AUGUST 2011 LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN KEY ELEMENTS OF THE PLAN: 1. Replace the existing unsafe Ragged Mountain dam with a new dam and raise the reservoir pool level initially
Florida Division of Emergency Management ITB-DEM-14-15-023 Disaster Recovery Services Questions and Answers (ANSWERS IN BOLD)
Florida Division of Emergency Management ITB-DEM-14-15-023 Disaster Recovery Services Questions and Answers (ANSWERS IN BOLD) 1) How can the Division attempt to procure Disaster Recovery Services valued
SERVICE PROVIDER CRITERIA AND CONTRACT REQUIREMENTS
OBJECTIVE: ERATE 470 REQUEST AND REQUEST FOR PROPOSAL (RFP) FOR: SCOE WIDE VOICE OVER IP AS A HOSTED SERVICE FY2016 SHASTA COUNTY OFFICE OF EDUCATION (SCOE) is seeking proposals for the upcoming Year 16
Scope Statement for North Carolina State University. Administrative Computing Services. Disaster Recovery Services
Authorization to Award to Vendor: Inflow Group, Inc. February 18, 2002 Scope Statement for North Carolina State University Disaster Recovery Services BCRS Contract Attachment #3 #ITS-000826 December 14,
Beseck Switching Station Inspection
Page 1 of 5 Docket No. 272 Development and Management Plan Inspection The Connecticut Light and Power Company Certificate of Environmental Compatibility and Public Need for the construction of a new 345-kV
CITY OF DEWITT Page 1 Regular City Council Meeting Tuesday, May 13, 2014
CITY OF DEWITT Page 1 CALL TO ORDER: Mayor Rundborg called the to order at 7:00 p.m. He led the Pledge of Allegiance. ROLL CALL: Council Members Present: Sue Erickson, Dave Hunsaker, Sheryl Landgraf, and
Challenges. Estimated Damages from 100-Year Flood
Suffield Suffield is a rural community located along the Massachusetts border. It encompasses about 42.2 square miles and has a population of about 15,735. Suffield s terrain rises from an elevation of
FEMA P-936 Floodproofing Non-Residential Buildings ASFPM 2013
FEMA P-936 Floodproofing Non-Residential Buildings ASFPM 2013 1.1 Floodproofing Non-Residential Buildings Design Manual (FEMA P-936) 1. Existing non-residential buildings in riverine areas subject to shallow
DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS
DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS The City of DeSoto s Department of Development Services is the point of contact for storm drainage related issues. The following are some frequently
BACKFLOW PREVENTION PROGRAM
BACKFLOW PREVENTION PROGRAM Approved November 10, 2014 TABLE OF CONTENTS Page Program Introduction 2 Program Description 3 Eligible Properties 3 Eligible Subsidies 3 Eligible Improvements 3-4 Disconnection
Estimated Cost of Repair
1 Applicant: Property: Home: Business: Assessor: Applicant Number: Type of Loss: Hurricane Date Contacted: 1/18/2014 Date of Loss: 10/29/2012 Date Received: 1/14/2014 Date Inspected: 2/4/2014 Date Entered:
City of Beaumont, Texas Grading Permit Information
General Information City of Beaumont, Texas Grading Permit Information The permit application shall be signed by the property owner (or lessee) or his authorized representative and by the contractor (if
Beacon Hill Sewer District Standard Specifications
Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Provisions
Solicitation Addendum One (1) RFQ 09-07 CARPET CLEANING SERVICES
Solicitation Addendum One (1) RFQ 09-07 6829 North 58th Drive, Suite 202 Glendale, Arizona 85301-2599 A signed copy of this Addendum must be received by on or before the Offer Due Date and time. This solicitation
# 14-28: Water Enterprise Plan Development
City of Beverly Hills Public Works Services Department 345Foothill Road Beverly Hills, CA. 90210 # 14-28: Water Enterprise Plan Development Request for Proposal For Professional Planning and Engineering
Massachusetts Local Disaster Debris Management Plan Checklist Updated July 2014
Massachusetts Local Disaster Debris Management Plan Checklist Updated July 2014 This checklist is a companion document to the Massachusetts Disaster Debris Management Planning: An Introduction for Local
APPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY
ALAMEDA POINT MASTER INFRASTRUCTURE PLAN March 31, 2014 APPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY Carlson, Barbee & Gibson, Inc. Backbone Infrastructure Engineer
General Frost-Freeze FAQs
General Frost-Freeze FAQs Groundwater Pumping: 1) Why do farmers use water to protect their crops during frost-freeze events? a. During frost-freeze events, farmers spray water onto their crops to protect