1 Contents of Example Business Case Template 1 Executive Summary 2 Introduction and Overview 3 Market Analysis 4 Assessment of Benefits 5 Cost / Benefits Analysis 6 Options Appraisal 7 Key Assumptions and Dependencies 8 Risk and Sensitivity Analysis 9 Resource Requirements and Cost 10 Funding Source / Timing / Certainty 11 Timescales 12 Comments / Issues 13 Conclusions / Recommendations 14 Appendices 1. Executive Summary
2 The Executive Summary should provide a short, informative headline summary of the Business Case document to follow. It should typically be no longer than 1 page and contain: A short narrative to identify the subject, scope, method of analysis and key results and findings; A short list of the key objectives of the project A summary of the financial metrics ( table below, provides a very basic and high-level example of summarizing outlay and ROI)) from the investigation, highlighting the most significant; A brief summary of the conclusions as a result of the study. Year 1 Year 2 Year 3 Year.n Total Cash Outlay Investment Value ( ) Capital and Revenue Available / Committed Funding Return on Investment (ROI) x x x x x x x x x x x x x x x 2. Introduction and Problem Statement This section should describe the setting, background and context of the Business Case. It should serve to clarify and elaborate the subject matter of the Business Case. It should clearly state the purpose of the Business Case, e.g. To obtain financial approval to either commence a project or proceed to the next stage; To compare alternative solutions, etc It should explain the objectives, un-met needs and particularly the existing or future problems that
3 will be addressed by the requirement. The objectives should be stated in clear and measurable terms with a specified time frame, e.g.: To have improved communication systems against more competitive cost options; To invest xx in a performance improvement project that will ultimately provide a 10:1 return on the initial investment (spend to save) It should outline any relevant related initiatives is the project part of a larger programme? Are there dependencies on the delivery of other projects to realise the benefits? It should include a statement how the project is right-sized ; that is ensuring that the proposed solution is realistically scoped to ensure that the benefits and costs to deliver are in line. 3. Market analysis: What is relevant to include in this section will depend on the type of investment. The purpose of a PCP is to engage and direct R&D skills towards creating the solution to an identified problem or need which would not otherwise be wholly addressed by free market suppliers. Whilst full market engagement and market testing is an activity to be conducted during the active PCP project itself, evidence of sufficient supplier survey work and an absence of existing or near-to-market solutions must be included in the business case, else the whole argument to conduct a PCP is flawed. Such evidence may be historic, such as a continuous market horizon-scanning activity by the owning department, or it may draw from fresh information gathered during the Open Technical Dialogue stage. This section should provide a consideration of the political and economic environment that the project will take place in, and how those factors will (or will not) motivate suppliers to participate in the PCP. Factors to consider include confidence in likely supply-side providers being able to devise an acceptable solution, opportunities from emerging technology. 4. Assessment of benefits: The benefits to be gained from the investment compared to the alternative of doing nothing should be summarised. Benefits should be identified and quantified, as far as possible, in financial terms: as appropriate, this to include projected cost reduction against investments, impact if no investment,, reduction in risk, improvements in quality, reliability, accuracy and other tangible, non-tangible and consequential benefit i.e. what are the real benefits from making the investment? A full assessment / explanation of the benefits should be included as an Annex if appropriate.
4 5. Cost / Benefits Assessment This will clearly identify the cost benefit against the investment that is being made. This should consist of a simplified presentation of the financial cost/benefit analysis - presented in tables or graphs; This should include an assessment of: o Investment value Revenue and Capital o Cost Saving first 12 months ( ) o Cost Saving after first year ( ) o Depreciation costs o Total cost ( ) o Cash outlay ( ) Additionally, an assessment of unquantified Benefits and Costs, and Strategic Contribution should be considered: o Try very hard to quantify all costs and benefits o All direct costs should be included o Indirect costs should be included o If a non-financial benefit is significant, then define it Make the impact of the benefit tangible describe all likely effects and implication 6. Option appraisal Recommended option: When formulating an investment proposal the options available, including the do nothing option, should be considered and compared. Based on the outcome of the comparison of the options i.e. the option appraisal, a recommendation should be made for one option. The full option appraisal should include a cost/benefit/risk comparison between the options available to address the business problem / opportunity. Options to include do nothing, business and technical options, timing options and, if at all relevant, consideration of 3 rd party involvement contractors, joint ventures partnerships, PFI and funding options. When considering options, relevant strategies, standards and legal requirements should be taken into account. Depending on the situation the option appraisal may be simply qualitative or a detailed analysis. It may be done in two stages i.e. a broad sift of a wide range of options followed by a detailed examination of say, 3 of them.
5 7. Key assumptions and dependencies: Key assumptions, which, if they turn out to be wrong, may affect the projection for and the eventual success of the investment, should be identified. Key dependencies, which if not in place may affect the outcome, should also be clearly identified. Comments about likely inflation rates in the cost and benefit estimates should be included in this section as well. 8. Risk and Sensitivity analysis: The key business risks associated with the recommended option should be summarised, particularly those which may impact on the financial projections (costs and/or benefits). The summary should include an indication of the probability and likely impact of the risks and the measures being proposed to manage the risk(s) and / or to reduce their impact e.g. business case review prior to major cash expenditure. Political, Operational Economic / Financial and Technical (POET) risks should be taken into account as they could all contribute to the overall business risk. The financial projections presented in support of the recommended option should reflect the expected, or most likely, outcome of events. In presenting an analysis of the business risks, the Sponsor should identify the major sensitivities to which the investment could be exposed, typically the impact of cost overruns, time slippage which may result in higher costs and missed opportunities; failure to achieve the development/investment period. 9. Resource requirements and costs: The resource requirements and costs associated with the recommended option should be summarised i.e. external costs for equipment, external service costs e.g. for consultancy and internal staff costs. The summary is to include investment and running costs. Resource requirements and Man years Capital Running costs
6 External (bought in equipment) External services Internal costs costs: per annum (range) Total 10. Funding source / Timing / Certainty: The source and timing of the funding for the investment, be it required, known or suggested, should be identified and an indication given of the certainty or otherwise of the funding being available when required. 11. Timescales: The proposed start and end dates should be given together with a list of significant (particularly financially significant) milestones (events with dates). Where relevant, the milestones to include dates on which the investment should be reviewed. Main milestones and dates: Proposed start: Proposed end: Tba date date
7 12. Comments / Issues: This section to be used if needed to draw attention to additional points or issues, which should be taken into account when considering the business case. 13. Conclusions and Recommendations Bring the document to a close by concluding the findings and making recommendations. 14. Appendices Appendices are where to put the detailed calculations, figures, reference material and other back up data that may have a limited audience but is worthy of inclusion. You should put all of the detailed calculations in Appendices and only have summaries in the main body (referring to Appendices) if in doubt, put it in an Appendix. Detailed Assumptions and Risks may also be placed in Appendices but summaries should appear in the main body.
The Transport Business Cases
Do not remove this if sending to pagerunnerr Page Title The Transport Business Cases January 2013 1 Contents Introduction... 3 1. The Transport Business Case... 4 Phase One preparing the Strategic Business
Unit B5 Secure financial resources for your organisation s plans
Unit B5 Secure financial resources for your organisation s plans This Unit has been imported from the Management Standards Unit Summary Overview This unit is about managing your organisation s finance
Building a Benefits-driven Business Case
Building a Benefits-driven Business Case by Derek Hancock, Whitehouse Consultants Ltd These days it has become an accepted requirement that all new projects should be justified with a comprehensive business
Part B1: Business case developing the business case
Overview Part A: Strategic assessment Part B1: Business case developing the business case Part B2: Business case procurement options Part B3: Business case funding and financing options Part C: Project
Stakeholder management and. communication PROJECT ADVISORY. Leadership Series 3
/01 PROJECT ADVISORY Stakeholder management and communication Leadership Series 3 kpmg.com/nz About the Leadership Series KPMG s Leadership Series is targeted towards owners of major capital programmes,
The Human Capital Management Systems Business Case A Checklist to assist agencies developing a business case
The Human Capital Management Systems Business Case A Checklist to assist agencies developing a business case Final version for release Human Capital Management See more at psc.nsw.gov.au/hcm Index - Business
OE PROJECT CHARTER TEMPLATE
PROJECT : PREPARED BY: DATE (MM/DD/YYYY): Project Name Typically the Project Manager Project Charter Last Modified Date PROJECT CHARTER VERSION HISTORY VERSION DATE (MM/DD/YYYY) COMMENTS (DRAFT, SIGNED,
Does It Pay to Attend Clinical Research Conferences?
Vol. 6, No. 12, December 2010 Can You Handle the Truth? Does It Pay to Attend Clinical Research Conferences? By Norman M. Goldfarb Organizations send their employees to clinical research conferences for
Biobusines Plan. Ernst & Young
Biobusines Plan Ernst & Young CONTENTS 1 Biobusiness Planning 3 2 What is Different about Biotech Companies? 4 3 Preparing a Biobusiness Plan 6 4 Outline Contents and Structure 9 Executive Summary Background
Accessing finance. Developing a business case for your resource efficiency projects
Accessing finance Developing a business case for your resource efficiency projects Developing a business case for your resource efficiency projects 2 Contents 1 Planning a resource efficiency project?
The Key Performance Indicator Evaluation Process (KPI Process)
The Key Performance Indicator Evaluation Process (KPI Process) Aims Continuous improvement Quantitative and qualitative consultant, contractor and supply chain evaluation Identification and commendation
CRM for the Construction Industry: Building the Business Case David Howse Professional Services Director SevenThree Limited
SevenThree White Paper CRM for the Construction Industry: Building the Business Case David Howse Professional Services Director SevenThree Limited Copyright 2006 SevenThree Limited. All rights reserved.
Data Communications Company (DCC) price control guidance: process and procedures
Guidance document Contact: Tricia Quinn, Senior Economist Publication date: 27 July 2015 Team: Smarter Metering Email: [email protected] Overview: The Data and Communications Company (DCC) is required
Contract Management Part One Making the Business Case for Investment
Contract Management Part One Making the Business Case for Investment Executive Summary This paper is the first in a short series of three which will look at the business case for organisations to invest
Project Management Toolkit Version: 1.0 Last Updated: 23rd November- Formally agreed by the Transformation Programme Sub- Committee
Management Toolkit Version: 1.0 Last Updated: 23rd November- Formally agreed by the Transformation Programme Sub- Committee Page 1 2 Contents 1. Introduction... 3 1.1 Definition of a... 3 1.2 Why have
Building Business Case for the Enterprise From Vision to Outcomes IIBA Boston Sept. 20, 2012 Joseph Raynus ShareDynamics, Inc.
Building Business Case for the Enterprise From Vision to Outcomes IIBA Boston Sept. 20, 2012 Joseph Raynus ShareDynamics, Inc. Presentation Focus Business Situation Risk Assessment Sensitivity Analysis
Unit: CPC 506 Secure financial resources for your organisation s plans (Commissioning, Procurement and Contracting)
Unit: CPC 506 Secure financial resources for your organisation s plans (Commissioning, Procurement and Contracting) Key Purpose The key purpose identified for those working in commissioning, procurement
Project Evaluation Guidelines
Project Evaluation Guidelines Queensland Treasury February 1997 For further information, please contact: Budget Division Queensland Treasury Executive Building 100 George Street Brisbane Qld 4000 or telephone
How To Prepare A Business Plan That Gets Results
Contact Information: www.nebs.ca 1 800 461 7572 WHITE PAPER How To Prepare A Business Plan That Gets Results Writing A Good Business Plan Could Make Or Break Your Business Success A Good Business Plan
Writing The Business Case for Automated Software Testing and Test Management Tools
Writing The Business Case for Automated Software Testing and Test Management Tools How to successfully research, plan and present a convincing business case that will justify the budget and resources you
PROJECT MANAGEMENT FRAMEWORK
PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to
Business Plan Template for 2014-2020 Operations
Business Plan Template for 2014-2020 Operations Outline Guidance on Requirements for WEFO Assessment Page 1 of 27 Background Information for Applicants Please note: Key terms that have associated glossary
The Gateway Review Process
The Gateway Review Process The Gateway Review Process examines programs and projects at key decision points. It aims to provide timely advice to the Senior Responsible Owner (SRO) as the person responsible
<Business Case Name> <Responsible Entity> <Date>
(The entity Chief Information Officer, Chief Financial Officer and Business Area programme Lead must sign-off the completed business case) Signed: Date:
Date: 1 May 2013. Call for Expressions of Interest. Dear Colleagues,
Date: 1 May 2013 Call for Expressions of Interest Dear Colleagues, I am pleased to announce that the European Spallation Source (ESS) is preparing to move into the construction phase. When Sweden and Denmark
Project Management Guidebook
METHOD 12 3 empowering managers to succeed Project Management Guidebook ISBN 0-473-10445-8 A bout this e-book This e-book was created by Method123 (see www.method123.com) to help provide you with a simple
DRAFT V5. PFSC 16/05/2014 Appendix 1. Outline Plan to deliver the County Council s investment property Strategy
PFSC 16/05/2014 Appendix 1 Outline Plan to deliver the County Council s investment property Strategy 1. Strategic Drivers 1.1 The County Council s property investment strategy sets out how its property
NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013
APPENDIX 1 NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013 Page 1 of 10 1. INTRODUCTION It is widely recognised that asset management is a core component of effective
Project Management. Session 4 - Dr. Sepehri. Sharif MBA Fall 1385. Feasibility Study, Project Selection. Burke Chapter 4-5
Project Management Sharif MBA Fall 1385 Session 4 - Dr. Sepehri Feasibility Study, Project Selection Burke Chapter 4-5 1 Project Feasibility Feasibility study ensures that projects are technically and
Business Planning Workshop
Business Planning Workshop Facilitators: Roy Crosby Business Adviser, CEIS Alex Rooney Business Adviser, CEIS Today's Session... Will identify some tools & techniques that might work in your organisation
A COMPARISON OF PRINCE2 AGAINST PMBOK
Introduction This comparison takes each part of the PMBOK and gives an opinion on what match there is with elements of the PRINCE2 method. It can be used in any discussion of the respective merits of the
2010 MTEF: Budgeting for infrastructure and capital expenditure guidelines
2010 MTEF: Budgeting for infrastructure and capital expenditure guidelines Introduction The guidelines below provide departments and entities with information to make budget submissions for capital projects
Guidelines for Preparation of the Initial Project Proposal General Guidelines
Guidelines for Preparation of the Initial Project Proposal General Guidelines This document is provided as a guide for preparation and submission of an initial Project Proposal high level overview of a
Access Fund for Sustainable Travel Guidance on Bidding. Moving Britain Ahead
Access Fund for Sustainable Travel Guidance on Bidding Moving Britain Ahead July 2016 The Department for Transport has actively considered the needs of blind and partially sighted people in accessing this
Feature. A Framework for Estimating ROI of Automated Internal Controls. Do you have something to say about this article?
Feature A Framework for Estimating ROI of Automated Internal Controls Angsuman Dutta is the unit leader of the marketing and customer acquisition support teams at Infogix. Since 2001, he has assisted numerous
Unit 1 Contribute to the identification and co-ordination of stakeholders, their roles, needs and expectations... 2
This book provides an overview of project management techniques and tools that will assist the reader in defining projects, successfully managing projects and using appropriate and effective tools and
S-5100 PDM How to Evaluate, Select and Implement a PLM/PDM-Solution
Finding and selecting the product lifecycle management (PLM) and product data management (PDM) solution that can best meet your organization s immediate and long-term needs is a complex task. Making a
1. Background and business case
1. Background and business case This section explains the context and why the project is being undertaken. It provides the justification for investing the time and resources in the project. 1.1 Reasons
Chapter 11 Building Information Systems and and Managing Projects
1 Chapter 11 Building Information Systems and and Managing Projects LEARNING TRACK 1: CAPITAL BUDGETING METHODS FOR INFORMATION SYSTEM INVESTMENTS Traditional Capital Budgeting Models Capital budgeting
SAMPLE BUSINESS PLAN TEMPLATE <<COMPANY LOGO>> <<COMPANY NAME>> BUSINESS PLAN. <<Prepared by: >> <<Date>>
SAMPLE BUSINESS PLAN TEMPLATE BUSINESS PLAN Table of Contents Page Confidentiality Agreement ii 1) Executive Summary 1 2) Company Description
Australian Accounting Standards Board (AASB)
Standards Board () FACT SHEET September 2011 1038 Life Insurance Contracts (This fact sheet is based on the standard as at 1 January 2011.) Important note: This standard is an Australian specific standard
How To Manage Project Cost Management
Chapter 7 Project Cost Management (1) Dr. Feng-Jen Yang Objectives Understand the importance of project cost management Explain basic project cost management principles, concepts, and terms Discuss different
Step by Step Project Planning
Step by Step Project Planning Contents Introduction The Planning Process 1 Create a Project Plan...1 Create a Resource Plan...1 Create a Financial Plan...1 Create a Quality Plan...2 Create a Risk Plan...2
december 08 tpp 08-5 Guidelines for Capital Business Cases OFFICE OF FINANCIAL MANAGEMENT Policy & Guidelines Paper
december 08 Guidelines for Capital Business Cases OFFICE OF FINANCIAL MANAGEMENT Policy & Guidelines Paper Preface The NSW Government is committed to the ongoing improvement of public services by ensuring
Introduction to Discounted Cash Flow and Project Appraisal. Charles Ward
Introduction to Discounted Cash Flow and Project Appraisal Charles Ward Company investment decisions How firms makes investment decisions about real projects (not necessarily property) How to decide which
Procedure Notes For Management of Construction Projects
Isle of Man Government Reiltys Ellan Vannin Procedure Notes For Management of Construction Projects Issued by the Treasury Government Office Douglas, Isle of Man IM1 3PX April 2012 Record of Amendments
Effective objective setting provides structure and direction to the University/Faculties/Schools/Departments and teams as well as people development.
Effective objective setting provides structure and direction to the University/Faculties/Schools/Departments and teams as well as people development. The main purpose of setting objectives is to reflect
Strategies to successfully manage your major project
PROJECT ADVISORY Strategies to successfully manage your major project Whitepaper 1 Thought Leadership Series 10 kpmg.com/nz About this whitepaper KPMG s Project Advisory thought leadership series is aimed
BUSINESS PLAN OUTLINE
I - BUISNESS PLAN OUTLINE INTRODUCTION TO THE BUSINESS PLAN & CONCEPT Before starting a new business or expanding an existing business, you should develop a Business Plan. The Business Plan will serve
Description of Step Checklist Checklist. existing policy Please summarise the planned outcomes for the policy:
COUNTY COUNCIL FULL EQUALITY IMPACT ASSESSMENT TEMPLATE Stage of EIA Stage 1 Description of Step Checklist Checklist Is this a new or an existing policy? Defining policy objectives and how they will be
QUANTITATIVE MODEL FOR INFORMATION SECURITY RISK MANAGEMENT
QUANTITATIVE MODEL FOR INFORMATION SECURITY RISK MANAGEMENT Rok Bojanc ZZI d.o.o. [email protected] Abstract: The paper presents a mathematical model to improve our knowledge of information security and
Submitted to: NHS West Norfolk CCG Governing Body, 29 January 2015
Agenda Item: 11.2 Subject: Draft Financial Plan 2015/16 Presented by: John Ingham, Chief Financial Officer Submitted to: NHS West Norfolk CCG Governing Body, 29 January 2015 Purpose of Paper: For information
CAPITAL PLANNING GUIDELINES
CAPITAL PLANNING GUIDELINES 1. INTRODUCTION... 2 2. EXTENSION OF EXISTING INFRASTRUCTURE PROJECTS... 2 3. NEW CAPITAL PROJECTS... 2 4. MINIMUM INFORMATION REQUIRED... 3 5. PREPARATORY WORK... 3 5.1 NEEDS
ACCOUNTING STANDARDS BOARD DECEMBER 2000 FRS 18 FINANCIAL REPORTING STANDARD ACCOUNTING STANDARDS BOARD
ACCOUNTING STANDARDS BOARD DECEMBER 2000 FRS 18 18 ACCOUNTING POLICIES FINANCIAL REPORTING STANDARD ACCOUNTING STANDARDS BOARD Financial Reporting Standard 18 Accounting Policies is issued by the Accounting
Scotland Your project business plan
Scotland Your project business plan Scotland Your project business plan Further copies available from: Email [email protected] Phone 0870 240 2391 Textphone 0141 242 1500 Our website
Appendix 5 Oadby and Wigston Borough Council: HRA self-financing business plan model
Appendix 5 Oadby and Wigston Borough Council: HRA self-financing business plan model As we enter the final quarter of 2013/14, the HRA business plan model has been updated to reflect activity in 2013/14
Financial Planning Handbook
Financial Planning Handbook Effective for all colleges financial plans This handbook is of interest to principals and chief executives of colleges, finance directors at FE colleges and sixth form colleges,
CHAPTER 49 RELIABILITY & MAINTAINABILITY (R&M) PLANS & PROGRAMMES CONTENT
CHAPTER 49 RELIABILITY & MAINTAINABILITY (R&M) PLANS & PROGRAMMES CONTENT Page 1 Introduction 2 2 Background 2 3 The importance of R&M Plans and Programmes 2 4 Similarities and differences between R&M
Appendix 5D Ernst & Young Accounting Treatment
Appendix 5D Accounting Treatment (Ernst & Young) Appendix 5D Ernst & Young Accounting Treatment Introduction An off balance sheet treatment from the position of the Authorities is a fundamental requirement
ACCOUNTING STANDARDS BOARD DECEMBER 2004 FRS 27 27LIFE ASSURANCE STANDARD FINANCIAL REPORTING ACCOUNTING STANDARDS BOARD
ACCOUNTING STANDARDS BOARD DECEMBER 2004 FRS 27 27LIFE ASSURANCE FINANCIAL REPORTING STANDARD ACCOUNTING STANDARDS BOARD Financial Reporting Standard 27 'Life Assurance' is issued by the Accounting Standards
Financial Planning Handbook
Financial Planning Handbook Effective for all colleges financial plans This handbook is of interest to principals and chief executives of colleges, finance directors at FE colleges and sixth form colleges,
PROJECT TRACKING and CONTROL
PROJECT TRACKING and CONTROL 1 Outline of Project Tracking & Control 2 Project Planning & Control Context 3 Realistic and Measurable Plans Create Measurable Plans! 4 Data Sources for Project Tracking 5
Capital Works Management Framework
POLICY DOCUMENT Capital Works Management Framework Policy for managing risks in the planning and delivery of Queensland Government building projects Department of Public Works The concept of the asset
Value for Money Assessment Guidance: Capital Programmes and Projects
Value for Money Assessment Guidance: Capital Programmes and Projects October 2011 Value for Money Assessment Guidance: Capital Programmes and Projects Foreword This guidance has been prepared and issued
How to successfully manage your mega-project
How to successfully manage your mega-project Part I Early planning and organizing for success kpmg.com 2 Building, Construction & Real Estate How to successfully manage your mega-project A three-part series
Guidelines for Preparation of a Business Plan
Guidelines for Preparation of a Business Plan These notes are provided as a guide for preparation and submission of a Business Plan detailed presentation of a project, business venture or technology development,
Appendix 1 Business Case to Support the Relocation of Mental Health Inpatient Services in Manchester (Clinical Foreword and Executive Summary)
Appendix 1 Business Case to Support the Relocation of Mental Health Inpatient Services in Manchester (Clinical Foreword and Executive Summary) Together we are better Foreword by the Director of Nursing
Guidance on writing a business plan for your project
Guidance on writing a business plan for your project If you re requesting more than 500,000 from the Coastal Communities Fund (CCF), or if your total project cost is over 1 million, we would expect you
Afro Ant Conversation. Change Management Return on Investment 3 April 2014
Afro Ant Conversation Change Management Return on Investment 3 April 2014 Overview This report documents the information gathered at the Afro Ant Conversation held on the 3 rd of April 2014 on the topic
Single Stage Light Business Case Template
Better Business Cases Single Stage Light Business Case Template Prepared by: Prepared for: Date: Version: Status: Better Business Cases Single Stage Light Business Case Template Document Control Document
WEST LOTHIAN COLLEGE
WEST LOTHIAN COLLEGE ANNUAL REPORT TO THE BOARD OF GOVERNORS AND THE AUDITOR GENERAL FOR SCOTLAND ON THE EXTERNAL AUDIT FOR THE YEAR ENDED 31 JULY 2006 DECEMBER 2006 Wylie & Bisset Date of commencement
Summary of GAO Cost Estimate Development Best Practices and GAO Cost Estimate Audit Criteria
Characteristic Best Practice Estimate Package Component / GAO Audit Criteria Comprehensive Step 2: Develop the estimating plan Documented in BOE or Separate Appendix to BOE. An analytic approach to cost
SMS0045 Construction Health and Safety Policy and Procedures
SMS0045 Construction Health and Safety Policy and Procedures March 2015 Version 8 Please note that for projects utilising a CDM Co-ordinator under the transitional arrangements of CDM 2015 (between 6 April
1.20 Appendix A Generic Risk Management Process and Tasks
1.20 Appendix A Generic Risk Management Process and Tasks The Project Manager shall undertake the following generic tasks during each stage of Project Development: A. Define the project context B. Identify
Risk Management Plan template <TEMPLATE> RISK MANAGEMENT PLAN FOR THE <PROJECT-NAME> PROJECT
RISK MANAGEMENT PLAN FOR THE PROJECT Prepared by: Approved by: Reference: Version: Date: INTRODUCTION This document is the Risk Management
Accessing finance. Developing a business case for your resource efficiency projects
Accessing finance Developing a business case for your resource efficiency projects Developing a business case for your resource efficiency projects 2 Contents 1 Planning a resource efficiency project?
British School of Commerce
British School of Commerce Programme Specification for the Cardiff Metropolitan University Master of Business Administration (MBA) Major Project Stage 1 Contents Page 1 Programme Aims and Objectives 3
SUPPLEMENTARY GREEN BOOK GUIDANCE
SUPPLEMENTARY GREEN BOOK GUIDANCE ADJUSTING FOR TAXATION IN PFI vs PSC COMPARISONS 1 INTRODUCTION 1.1 This guidance looks at the differential tax receipts that arise from the use of the Private Finance
ALIGNING THE PIECES. National Cost Benchmarks for Nonprofit Strategic Plans and Business Plans. Kyle Crawford. Copyright 2011 The Forbes Funds
ALIGNING THE PIECES National Cost Benchmarks for Nonprofit Strategic Plans and Business Plans Kyle Crawford Copyright 2011 The Forbes Funds INTRODUCTION With a strong advocacy partnership of more than
Chapter 7 - Self Assessment
Chapter 7 - Self Assessment TABLE OF CONTENTS Introduction...1 High Level Must Dos...1 Completing the Self Assessment...1 Format of the Self Assessment...2 Evidence to support Self Assessment...2 Making
How to write a business plan
How to write a business plan Teaching note prepared January 2009 HOW TO WRITE A BUSINESS PLAN The purpose of this note is three-fold: To provide a set of guidelines on how to write a business plan. To
CHESHIRE FIRE AUTHORITY SUBJECT : 2014-15 DRAFT BUDGET, COUNCIL TAX AND MEDIUM TERM FINANCIAL PLAN
CHESHIRE FIRE AUTHORITY Item 2 ITEM: 2 MEETING OF : FIRE AUTHORITY DATE : 12 FEBRUARY 2014 REPORT OF : CHIEF FIRE OFFICER AUTHOR : HEAD OF FINANCE SUBJECT : 2014-15 DRAFT BUDGET, COUNCIL TAX AND MEDIUM