CAPACITY BUILDING OF LOCAL CONSULTANTS AND CONTRACTORS THE MOROGORO MODEL. Urs J. Studeli *
|
|
|
- Dinah Chandler
- 10 years ago
- Views:
Transcription
1 CAPACITY BUILDING OF LOCAL CONSULTANTS AND CONTRACTORS THE MOROGORO MODEL by Urs J. Studeli * ABSTRACT Since independence there have been number of initiatives geared towards fostering the local construction industry. Despite such interventions, the state of the local construction industry has remained poor. Performance constraints include inadequate capacity of local contractors and consultants, erratic work opportunities and poor state of the economy. Tanzania is now embarking on a long-term development strategy which aims at achieving sustainable human resources development. The policy of the Swiss Agency for Development and Co-operation (SDC) in the Infrastructure and transport sector is in line with the Economic Recovery Program (ERP) target and fits into the framework of the Integrated Roads Project (IRP). The aspect of sustainability is one of the key criteria for designing and evaluating SDC development programmes. Therefore, special emphasis is on the promotion of private initiatives and local ownership. The Swiss Government through SDC has been putting emphasis on local private sector promotion since years. A civil engineering contractors development programme; known as The Contractor Involvement Component (CIC), of the Morogoro Roads Support Project (MRSP), managed by the Supporting Agency (SA) ITECO Engineering Ltd was started in 1996 in Morogoro Region. For building up capacity of local contractors formal training on road and bridge works including classroom sessions for management and field staff, practical training on demonstration sites and award of trial contracts, together with the formation of a Contractors Association as a future pressure group and promoter was seen as appropriate. The programme started with 28 contractors, and 13 only completed the programme successfully. The contractors went through two cycles of training. The 13 winners gained confidence, which is the most positive result of CIC. They managed to stabilise their companies. Many of them also got jobs outside CIC, some of them even more than through trial contracts of the training programme. They employed more permanent staff and purchased at least some basic equipment. It shows that their outlook into the future is optimistic. The promotion and capacity building of local consultants has been mainly through exposure within SDC financed projects of MRSP. This set up was considered to be * Consultants and Contractors Advisor of Consultants and Contractors Involvement Component of Tanzania Road Sector Support Programme, M.Sc. Civil Engineer, Reg. Cons. Eng. ERB, ITECO Engineering Ltd, CH 8910, Affoltern a. A, Switzerland 353
2 adequate for the promotion and capacity building of local consultants. However, the reality was a bit different. As a matter of fact all consultants did not deliver works according to set standards, and the role of the SA being an advisor only made it at times difficult to initiate necessary changes and interventions in time. SDC is ready to finance another mid to long-term promotion programme for local contractors and consultants in Tanzania, which started on July 1 st, 2000 by using the Morogoro Model. Further more the two professional associations, Tanzania Civil Engineering Contractors Association (TACECA) for contractors and The Association of Consulting Engineers Tanzania (ACET) for consultants, will be strengthened and take over the ownership of the programme. There is a commitment for a three years period by SDC for this programme, with an option for extension. Appropriate number of contracts for the training will be awarded to the consultants and contractors taking part in the programme. These contracts will be part of the yearly business plans of the Tanzania Roads Agency (TANROADS). 1. INTRODUCTION In 1986 the United Republic of Tanzania launched the Economic Recovery Programme (ERP) to stimulate the ailing economy of the country. As an essential component of the ERP, the Integrated Roads Project (IRP) was launched in 1990 as a mid-term programme aimed at stabilisation and restoration of the road network. Since independence there have been a number of initiatives geared towards fostering the local construction industry. Despite such interventions, the state of the local construction industry has remained poor. Performance constraints include inadequate capacity of local contractors and consultants, erratic work opportunities and poor state of the economy. Tanzania is now embarking on a long-term development strategy which aims at achieving sustainable human resources development. The Construction Industry Policy (CIP) aims at establishing an enabling environment upon which sustained growth of the construction industry can be realised. The economy of Tanzania undergoes a privatisation process; with increased outsourcing of works it is important for both the Government and the contractors and consultants that deficiencies in the performance are alleviated. Improved performance will result in better value of works for the Client and profitable business for contractors and consultants. 2. SDC PROJECT HISTORY SECTOR TRANSPORT AND INFRASTRUCTURE The Swiss Agency for Development and Cupertino (SDC) provided financial and technical assistance for rehabilitation and maintenance of approximately 400 km of selected rural roads in the southern parts of the Morogoro Region of Tanzania since 1981 through the Kilombero and Ulanga Rural roads Project (KURRP). 354
3 In 1990 Swiss assistance was extended to Morogoro Rural District. The Morogoro Rural Roads Project (MRSP) Phase 1 was designed to provide a basis for future assistance with improvements to the infrastructure and organisational set-up of the Regional Engineer s Office and to undertake limited bridge and road trouble spots repairs in Morogoro Rural District. Based on the above projects, the Morogoro Roads Support Project (MRSP Phase II) started in 1993 aiming at improvement of the regional road transportation system including institutional support to the Regional Engineer's Office (REO). In line with the policy of increasing contracting out of road works the development of local contractors in Morogoro Region was seen as being crucial to meet the requirement of availability of adequate number of capable contractors. That s why the Contractor Involvement Component (CIC) was newly introduced in MRSP III and continued during another year until June 2000 (MRSP Intermediate Phase). It included the formation of the Local Contractors Association Morogoro (MRCA) as a branch of TACECA and a training programme in labour and equipment based road and bridge works. During this phase the training of local contractors shall be continued and extended to other regions. At the same time, a training programme for local consultants will be started in design and supervision of road and bridge works, and shall include classroom and field training. 3. PROMOTING AND BUILDING LOCAL CAPACITY 3.1 The SDC Approach The policy of SDC in the Infrastructure and Transport Sector is in line with the ERP target and fits into the framework of IRP. The aspect of sustainability is one of the key criteria for designing and evaluating SDC development programmes. Therefore, special emphasis is on the promotion of private initiatives, participation and empowerment of communities and target groups, the establishment and strengthening of decentralised capacities, and local ownership. In our context, development of the private sector means enabling local consultants and contractors to do their job in a professional way and using their capacity. 3.2 Promotion of Local Contractors For building up capacity of local contractors formal training including classroom sessions, practical training and award of trial contracts together with the formation of a Contractors Association as a future pressure group and promoter was seen as appropriate. This approach was adopted first by the Contractor Involvement Component (CIC) of the Morogoro Roads Support Project (MRSP) Phase III, which started in Following were the goal and objectives of MRSP - CIC. Project Goal ƒ Adequate number of capable contractors in Morogoro Region is available for road works Project Objectives: ƒ A Regional Contractors Association is formed and active; 355
4 ƒ ƒ The competence, capacities and business footing of local contractors in Morogoro Region as well as the quality of works executed by local contractors is improved; and CIC trained contractors are gender sensitised The Regional Contractors Association Morogoro (MRCA) The development of contractors can be accelerated if the contractors are organised in a suitable manner as to provide practical advice, expertise and information to contractors, to act as a strong body towards clients when negotiating e.g. general contract items or tender board rates for emergency works. The Regional Contractors Association Morogoro (MRCA) as a branch of TACECA was actually formed in June 97.Until today, 33 contractors in Morogoro region have joined the Association. This figure shows that there is will power to move forward. However, MRCA showed typical signs of infancy and lack of traditions. At the beginning, there was no concept of strong and dedicated services for the members, a lack of democratic representation of the members interest, little transparency and in general a low level of structure and strategy. In its outside links the branch showed a low profile and hardly any public relations. That s why it was decided to employ a full time organisation development specialist (OD) as an adviser to the formal leadership body of the Association. The OD was actually employed by The OCD assisted the TACECA Branch Executive Committee in Morogoro and the Head office in Dar to instil and maintain the following developments: - ƒ True democratic membership representation; ƒ Strong and attractive member services; ƒ Active participation of members; ƒ Transparency and accountability; ƒ Strong public relations; ƒ Formulation of strategy and operation plans; ƒ Professional management; ƒ Cohesion of branches and interchange of services across the branches; and ƒ Gender Mainstreaming of Contractors Association. He was employed by TACECA and will be sponsored, for a limited period, by the SDC. He rotates also through other upcoming TACECA branches. The active part of ITECO as a Supporting Agency (SA) in assisting and advising MRCA at the beginning was gradually reduced until the end of MRSP CIC (June 2000) The Training of Local Contractors Structuring of the Training The Morogoro Training Model includes labour and equipment based training according to the type of works, each with three training phases, namely: - ƒ Training sessions in a classroom environment including lectures, group discussions, film and video demonstrations and practical assignments; 356
5 ƒ ƒ Practical training for Gravel Road Works and Bituminous Road Works on a Demonstration Site organised and managed by the Training Consultant; and Trial Contracts awarded and managed by the REO, but works executed with guidance and assistance to the Contractors provided by the Training Consultant at the planning, tendering, mobilisation, construction and completion phases (on the job training). Courses were held separately for managers/engineers and supervisors. The courses started in April The National Construction Council (NCC) was employed by the Supporting Agency (SA) to provide trainers (2-3) employed on a full time bases. The first cycle of training with two trial contracts was implemented during MRSP Phase III. The second cycle came to an end by September
6 Table 1: CLASSROOM AND FIELD TRAINING Duration from to Main topics GRC Supervisors: Introduction Course Road Construction and Maintenance, Construction Mathematics and computing Skills, Operations, Activities and Task Rates, Ministry of Works Standards and Technical Specifications, Surveying and Setting out, Site Planning and Organization, Measurements and Estimating, Site Supervision and Administration, Concrete and Masonry for drainage structures, Soil Mechanics, Gravelling Works, Tools and Equipment, Field Training on a Demonstration Site for GRC Supervisors Human Resources Management Planning and Works Scheduling Labour Based Methods of Road Instruction Classroom Training incl. Site visit New Managers BRC Equipment Based Methods of Road Construction GRC Managers Tendering Procedure, Road Construction and Maintenance, MoW Standard Specifications, Project Planning and Work Scheduling, Contract Administration, Environmental Issues, Pricing and Unit Rates Build up, Project Cost Control, Cash Flow Management and Procurement of Equipment and Materials. GRC Supervisors (Advanced Course in Road Construction and Maintenance by Equipment, Site Organisation and Administration, Planning and Work Scheduling, Tendering equipment based methods) Procedures, Pricing and Unit Rates Build up, Preparation of Payment Certificates, Contract Supervision and Administration. BRC Managers Tendering Procedures, Bridge Construction and Maintenance, MoW Standard Specifications, Project Planning and Work Scheduling, Contract Administration, Pricing and Unit Rates Build up, Project Cost Control, and Cash Flow Management. BRC Supervisors Road Network and Type of River Crossings in Morogoro, Interpretation of Technical Drawings, Bridge Construction and Maintenance, River Control Works, Site Planning and Organisation, Pricing and Rate Build-up, Planning and Work Scheduling and Contract Administration. Briefing Seminar for Regional Engineers Staff Technical Specifications, Contracts, Supervision and Administration, Measurement and Pricing. Bit RC Supervisors Aggregates, General Road Repair, Surface Dressing, Asphalt Concrete, Asphalt Emulsion, Plant and Equipment, Laboratory Tests Bit RC Managers General Road Repair, Resource Management, Contracts Administration. Field training on Demonstration Site for Bit RC Supervisors December 98 April 99 Refresher Courses Managers BRC/GRC Communication, Financial Planning, Pricing, Claims Management Refresher Courses Supervisors GRC Project Planning, Work Scheduling, Work Organisation, Preparation of Claims, Setting out Road Drainage, Road Engineering. REO Road Inspectors Training 15.2/ Measurement of Works REO Management Staff Claims Management` Bridge Works REO Road Inspectors Bridge Inventory, Measurements, Inspection, Maintenance, Specifications, Supervision Classroom Training incl. Field visits New supervisors GRC Road Construction/Maintenance, Mow Standard Specifications, Personnel Management, Surveying And Setting Out, Site Planning and Organization, Works Organization, Drainage Structures, Soil Mechanics, Gravelling Works Demonstration site Practical Training, Setting Out, Clearing, Road Formation, Gravelling, Drainage Works GRC New Supervisors GRC Classroom Training Site Organization/Administration, Pricing, Preparation Of IPC, Tendering, Works Scheduling, Contracts Administration Old and New Supervisors GRC Classroom Training incl. Site visit New Managers GRC Tendering, Human Resources Management, Standard Specification, Contract Administration, Environmental Issues, Pricing, Works Scheduling, Cost Control, Cash Flow Management. Classroom Training incl. Site Visits BRC New Supervisors Bridge Maintenance, Pricing and Rate Build up, Contracts Administration, Tendering Procedures, River Control Works, Concrete and Masonry Works, Setting out, work Planning and Scheduling, Accident and Safety Precaution, Site Planning and Organization, Reinforcement, Formwork and False work, MoW Technical Specifications for Bridge Works River crossings Morogoro, Bridge Construction, Planning and Programming, MoW Standard Specifications, Tendering Procedures, Pricing and Rate Build up, Contract Administration, Project Cost Control, Cash flow Management 358
7 3.2.3 Access to Equipment One of the key elements in road and bridge construction is the availability of equipment. Owning equipment is seen by most of the contractors as the most important element for the development of their enterprises. As for the access to equipment, the idea of establishing a financing scheme on commercial basis for its purchase created big expectations among them. However, a study done by a consultant (FACET EAST AFRICA, Facilitation of Equipment Procurement, September 1997, Pages17, 23-27) showed the following: 1. A medium scale contractor needs to do business worth between TShs. 200 and 500 m a year to remain viable. 2. For the medium scale road contractors with a need for purchasing heavy equipment the purchasing cost would be several hundred million TShs. The business turn over does not allow them to service loans of such a magnitude. 3. For the small civil engineering contractor the basic equipment costs between Tsh m. Given that the loan would have to be repaid within 5 years at commercial rates of interest the borrower would have to pay about TShs. 13m 17m a year, which is not possible with regard to the actual poor turn over of most of the contractors. 4. The Equipment Hiring Unit (EHU) at the Regional Engineer s Office Morogoro was set up to make basic equipment available to contractors. It is this unit that can be strengthened to continue to play this role. That s why with regard to: - the poor financial potential of the contractors; - the small volume of works that could actually be contracted out by the Ministry of Works as the main client; and - the actual availability of equipment on hire basis to contractors. It was decided not to establish any financing scheme for purchasing of equipment and to leave it to the market forces Relaxed Conditions for Bidding In order to promote small contractors some conditions for bidding were relaxed at the beginning as follows: Tender documents were free. No bid bond was required. In lieu of a security bond for advance payments evidence of assets such as title deeds and registration cards for vehicle were accepted by the client. These relaxed conditions were dropped after the second cycle of training in order to expose the contractors to free market condition Financing Formal training (Classroom): was almost fully financed by the Government of Switzerland through SDC. Trial and Demonstration Site Contracts: Co- financed by GoT, 10% and SDC, 90%. Allowances for Trainees: were covered by the trained contractors. The contracts for practical training prepared by the REO s office were part of the REO s road works programme. 358
8 3.2.6 Methodology for the Implementation of Trial Contracts a) Award of Contracts To allow for competition among the invited contractors, the following two approaches were chosen: The number of invited contractors was identical with the number of awarded contracts, but the contract sums differ. For each batch the invited contractors quoted for the total number of contracts. Award was done according to the overall ranking, with the biggest contract awarded to the best bidder. The number of invited contractors was bigger than the number of contracts to be awarded. The contractors ranked on top were awarded a contract, and the remaining contractors invited to tender again with the next following batch. The contractors were invited individually for negotiations. As these meetings were seen as part of the training, the trainers were also present. The contractors present the brake down of their rates, and adjustments were done if necessary. b) Execution of Contracts Each contractor was awarded a first Trial Contract. During the execution of the works, the trainers visited regularly their sites and advised the contractors on technical and managerial matters. Besides there were formal site meetings with the client every 2 weeks. In addition to the above, the trainers ran a help desk for the contractors. The performance of the latters was assessed during the whole contract period. A final evaluation was also done as a basis for the selection of the contractors for another trial contract. Another evaluation form was filled in by the contractors after finishing of the works. It was used for identifying additional training inputs, getting information about the communication between contractor, client, and trainers, as well as experiences made on equipment hiring. 359
9 CIC Training Statistics for the Period July 1996 to June 2000 Table 2: CIC Training Statistics for the period July 1996 to June 2000 (* contractor went into big loss and failed) GRC BRC Bit RC REO Number of executed contracts n.a. Value of executed works T.Shs 2,126 m TShs 872 m 136 m n.a. Average Contract Sum T.Shs 56 m TShs 38 m T.shs 68m n.a. Number of km rehabilitated n.a. /maintained Number of contractors At the beginning At the end CRB Classification of Contractors (Status: June 2000) 161 Increased Regravelling Spot Improvement n.a. 136 Periodic Maintenance (pothole filling and resealing on most critical sections) n.a. Class 1: - Class 1: - Class 2: 1 Class 2: - Class 2: 1 Class 3: 3 Class 3: - Class 3: 1 Class 4: - Class 4: 2 Class 5: 1 Class 5: 2 Class 5: 2 Class 6: 1 Class 6: 1 Class 7: 1 Class 7: - Number of trained management staff 22 ( 1 Female) (1 Fem. ) Number of trained supervisors Number of trained female supervisors Average cost/km of rehabilitated road Kidatu-Ifakara 16m Kisaki Road 15.4 m Overall 13.2 m - 1m n.a. 29.8m n.a. n.a. n.a. Maximum cost/km of rehabilitated road Minimum cost/km of rehabilitated 4.4m (*) n.a. n.a. n.a road Course days classroom Managers Course days classroom Supervisors Demonstration sites (days) Approx. 30(part time training) Financial loss caused to client EHU Contracted out works 15m 35m Strength and Constraint The promotion programme for local civil engineering contractors started in January 1997 and ended by end of September of this year. The main achievements were: The establishment and strengthening of the Regional Contractors Association (MRCA) in Morogoro with to date 38 members. Training of civil engineering contractors enabling them to deliver road and bridge works that meet the set standards. The programme started with 28 contractors, and finally 13 only ended the programme successfully. This shows that more attention should be paid in future to the selection of the training participants. Only potential survivors under free market conditions should be given a chance for attending such courses n.a. 360
10 The 13 winners gained confidence, which is the most positive result of CIC. They managed to stabilise their companies. Many of them got also jobs outside CIC, some of them even more than through trial contracts of the training programme. They employed more permanent staff and purchased at least some basic equipment. It shows that their outlook into the future is optimistic. However, there are still many constraints to overcome. The equipment bottleneck is still there given the fact that EHU as the main provider cannot satisfy all the needs as regards quality and quantity of equipment needed, and the allocation of funds from the Government to civil engineering works has been too little and erratic to allow the contractors to survive in the long run. But it seems that contractors expect a change for the better from the road sector reform. Another challenge is unfair competition. Local contractors have tendered for road works outside the region and experienced that colleagues with alarmingly low rates won tenders, which is detrimental to the construction industry. This problem needs to be tackled, e.g. by TACECA in order to establish fair competition. TACECA as a growing professional association is on the right track to become a strong body towards clients and leader with authority to its members, and is then in a position to develop the construction industry for the benefit of all stakeholders Outreach An external evaluation attested the MRSP CIC an outright success, and recommended implementing the Morogoro Model beyond the boundaries of Morogoro Regions. At the same time ownership of the programme should be with TACECA. Since the Morogoro Model has been managed by TACECA, and the role of the supporting Agency is to advise the Management. For the FY 2000/01 local civil engineering contractors are being trained along the Central Corridor in basic of gravel road works. 22 contractors from Dodoma, Singida, Shinyanga, Mwanza, Dar es Salaam and Morogoro Regions are involved. The training is partly financed by SDC (trainers) and TANROADS (physical works); administrative costs are covered by TACECA, and allowances for trainees by the trained firms themselves. 3.3 Promotion of Local Consultants The promotion and capacity building of local consultants has been mainly through exposure within SDC financed projects of MRSP. Between July 1996 and June 2000 T.Shs 9.39 million was spent by the REO Morogoro on consulting services of local consultants, which is 9% of the value of the executed works. See also table on next page (Source: MRSP Half Yearly Reports, ). The overall percentage of outsourced works to local consultants in relation to the value of physical works executed shows that there is still potential for improvement. Quite a lot of design and supervision was still done in house by the REO staff, mainly for minor and emergency works. However, the most positive aspect of the figures in the table is, that the outsourced works to consultants were fully awarded to local consulting firms. The biggest project of T.shs 6 billion was the upgrading to bitumen standard of Mikumi Kidatu Road, including several bridges. There was also a pilot project on using emulsion aggregate cold mix on Bigwa Road as an alternative to bitumen hot mix, a project also 361
11 designed and supervised by a local consultant. It shows that local capable consultants are available in this country and should therefore be given a fair chance. But the impact of the SDC policy on the overall development of local consultants and contractors should not be overestimated since the released funds are minor compared to other donors, multilateral agencies and even the Government of Tanzania. Only about 2% of the annual disbursements by bilateral donors and multilateral agencies come from the Government of Switzerland. (Seco: Tanzania Swiss Country Programme , 1999, page 4). Table 3: MRSP - Involvement of Local Consultants 42 in Million T. Sh. 2HY96 1HY97 2HY97 1HY98 2HY98 1HY99 2HY99 1HY 00 Total Value of works , , , , Local Consultants , , percentage 8.52% 11.83% 15.80% 6.18% 6.60% 17.82% 7.49% % MRSP - Involvement of Local Consultants Million in Tsh Local Consultants Value of works Half yearly July 96 - Dec The role of the Supporting Agency (SA) and the client The role of the SA has been mainly the one of an advisor to the REO Morogoro since 1996 (MRSP III). Only a very limited number of short courses given by specialists on specific topics were conducted for consultants through MRSP. As for the procurement of consultants the REO fully assumes its role as a client for letting contracts and enforcing delivery of consultants services within the specified schedule and set standards Training needs for consultants The set up above was considered to be adequate for the promotion and capacity building of local consultants. However, the reality was a bit different. As a matter of fact, all consultants did not deliver works according to set standards, and the role of the SA being 362
12 an advisor only made it at times difficult to initiate necessary changes and interventions in time. These constraints are well known and studies have been undertaken on how to tackle them. This refers to two studies conducted by a Canadian Consultant and M-Konsult with financial support from the World Bank (IDA) in 1996, and a recently finished assessment by a British training consultant on the same topic. The envisaged training programmes cover business development and practice, computer aided design, environmental assessment, finance and accounting, project management, technical matters, and quality assurance. The long-term solution for financing such training appears to be a training levy. However, even before that, we have to look for other sources. The SDC approach is as follows: For the intermediate need a less ambitious and tailor made training programme covering design and supervision of road and bridge works makes a lot of sense. The project goal of such a programme that started in July 2000 is as follows: Adequate number of capable local consultants is available in Tanzania. Project objectives are: The Association of Consulting Engineers Tanzania (ACET) representing the interests of a majority of local civil engineering consulting firms is strengthened, gender sensitive and active. The performance of local consultants in design and supervision of road and bridge works is improved. In order to identify weaknesses to be addressed by training, a workshop (J.G. Mamiro: Report on Workshop on the Consultants Involvement in MRSP, March 2000, pages 4,5) with participants of all stakeholders of such a training programme was held, and areas where training is most needed were identified. These are (among others): - Review of literature on design aspects (codes, standards) - Site investigation for design purposes - Personnel management - Practical aspects on site management (recording, safety aspects, reporting, store keeping) - Practical site supervision and quality control - Technology transfer - Preparation of Road/Bridge inventories - Obligations of supervising engineer The workshop further analysed the Civil Engineering Association (ACET) as the manager of the training. It was observed that some ACET deficiencies need to be mitigated, and the strength mainly of individual members used for the implementation of the training programme. The training is focused mainly on the junior staff of local consultants. Inputs on higher level are being given through other programmes. The costs are borne partly by SDC, trained ACET firms, and TANROADS for physical works. The programme also applies the Morogoro Model approach with classroom training and field training and consists of three modules: 363
13 Module I: Project Studies/Planning Module II: Project Design Module III: Project Supervision 3.4 Outlook and Recommendations It goes without saying that this basic training can only be the beginning of a mid to longterm commitment by the stakeholders to foster the local construction industry. The guiding principles of this support are: - It has to be demanded driven The beneficiaries are to contribute financially Management of any training shall be with the respective professional associations TACECA and ACET There must be a commitment by TACECA and ACET for continued development of their members once the donor support will have come to an end. The two packages together will contribute to promote the local construction industry in Tanzania, provided that The framework conditions for the local construction industry will change for the better. Potential clients and more donors are willing to use the capacity of local consulting firms. REFERENCES 1. FACET EAST AFRICA; Facilitation of Equipment Procurement, September J.G. Mamiro; Report on the Workshop on Consultants Involvement in MRSP. March MRSP half yearly reports, Seco; Tanzania Swiss Country Programme ,
Will Shs 1.5 trillion be well managed? Findings from the performance audit of road works
Will Shs.5 trillion be well managed? Findings from the performance audit of road works. Introduction Poor transport networks are a huge obstacle to economic growth in Tanzania. To address this, significant
Establishment of REA/REF and Available Financing Opportunities for Rural Energy Projects Paper Presented on:
RURAL ENERGY AGENCY (REA) Establishment of REA/REF and Available Financing Opportunities for Rural Energy Projects Paper Presented on: Workshop on Sustainable Access to Sustainable Energy Uhuru Hostel,
Standard Summary Project Fiche IPA decentralised National programmes. Project number: TR 07 02 22
Standard Summary Project Fiche IPA decentralised National programmes Project number: TR 07 02 22 1. Basic information 1.1 CRIS Number: 1.2 Title: Capacity Building of Social Security Institution 1.3 Sector:
Training Programme 2014
C A PA C I T Y D E V E LO P M E N T P R O G R A M M E S 2 0 1 4 Training Programme 2014 Economic and Social Research Foundation (ESRF) Research Capacity Building Knowledge Management CAPACITY DEVELOPMENT
INTEGRATION OF COMMUNITY WATER POINTS MANAGEMENT WITHIN THE CONTEXT OF OVERALL PLANNING IN MVOMERO DISTRICT COUNCIL
INTEGRATION OF COMMUNITY WATER POINTS MANAGEMENT WITHIN THE CONTEXT OF OVERALL PLANNING IN MVOMERO DISTRICT COUNCIL Author: Agnes Sigareti Country: Tanzania Sector: Water, Sanitation and Hygiene Abstract
A. Block Grant. 1. Definition and purpose. 2. Selection of the Block Grant Intermediate Body
Annex 3: Rules and Procedures for Block Grants, the Project Preparation Facility, the Technical Assistance Fund and the Scholarship Fund in the Framework of the Swiss-Polish Cooperation Programme Annex
5. Industrial and sector strategies
5. Industrial and sector strategies 5.1 Issues identified by the Accelerated and Shared Growth Initiative for South Africa (AsgiSA) Industrial policy has three core aims, namely: creation and smaller enterprises.
Interim Terms of Reference for Consultancy Services
Interim Terms of Reference for Consultancy Services Design for the Centre of Excellence in Biomedical Engineering at the University of Rwanda, College of Medicine and Health Sciences, Nyarugenge Campus
Monitoring, Evaluation and Learning Plan
Monitoring, Evaluation and Learning Plan Cap-Net International Network for Capacity Building in Sustainable Water Management November 2009 The purpose of this document is to improve learning from the Cap-Net
14 Education of Personnel: the Key to Successful Community Based Rehabilitation
Education of Personnel 1 14 Education of Personnel: the Key to Successful Community Based Rehabilitation Community-Based Rehabilitation (CBR) is a relatively new strategy which is increasingly being adopted
Annex 2: Rules and Procedures for the Swiss-Polish Cooperation Programme
Annex 2: Rules and Procedures for the Swiss-Polish Cooperation Programme Annex 2 is an integral part of the Framework Agreement between the Swiss Federal Council and the Government of the Republic of Poland
Effective Debt Management. Improving Debt Management Practices Worldwide
Effective Debt Management Improving Debt Management Practices Worldwide Effective debt management is essential for economic development. As countries develop they confront increasing challenges in managing
Business Development for Youth Economic Empowerment in Moldova
Business Development for Youth Economic Empowerment in Moldova UNICEF Moldova USAID Final report May 2008 May 2010 Contribution Data Name of Project: Business Development for Youth Economic Empowerment
One- Year Master of Education (Full- Time Studies) Information for Applicants
Aga Khan University Institute of Educational Development, East Africa One- Year Master of Education (Full- Time Studies) Information for Applicants Introduction Thank you for your interest in the Master
CONSTRUCTION INDUSTRY POLICY
CONSTRUCTION INDUSTRY POLICY CONTENTS PREAMBLE 1.0 INTRODUCTION 1.1 Definition of the Construction Industry 1.2 Characteristics 1.3 Objectives of Construction Industry Development 2.0 VISION, MISSION AND
ENVIRONMENTAL MANAGEMENT STRATEGY
Jos& M. Cabral 36 1 ENVIRONMENTAL MANAGEMENT STRATEGY FOR INFRASTRUCTURE AGENCIES IN DEVELOPING COUNTRIES Jose M. Cabral' INTRODUCTION This paper describes an environmental management strategy for agencies
National Council for Construction Construction School Informational Brochure Construction School
National Council for Construction Construction School Informational Brochure Construction School NATIONAL COUNCIL FOR CONSTRUCTION (NCC) NCC is a statutory body set up under the NCC Act No 13 of 2003 with
Country Ownership of Policy Reforms and Aid Effectiveness: The Challenge of Enhancing the Policy Space for Developing Countries in Aid Relationships
Country Ownership of Policy Reforms and Aid Effectiveness: The Challenge of Enhancing the Policy Space for Developing Countries in Aid Relationships Statement by Louis Kasekende, Chief Economist, African
Terms of Reference Concurrent Monitoring of Mid Day Meal (MDM) in Odisha
Terms of Reference Concurrent Monitoring of Mid Day Meal (MDM) in Odisha 1. Background The Government of India has initiated a number of social welfare flagship schemes to enable improving status of human
Summary. ⅠOutline of the Project Project title: Project for Reinforcement of Health System Management in Tambacounda and Kedougou Regions
Summary ⅠOutline of the Project Country: Senegal Issue/Sector: Health Project title: Project for Reinforcement of Health System Management in Tambacounda and Kedougou Regions Cooperation scheme: Technical
DG ENLARGEMENT SECTOR BUDGET SUPPORT GUIDELINES
Ref. Ares(2014)571140-04/03/2014 DG ENLARGEMENT SECTOR BUDGET SUPPORT GUIDELINES EXECUTIVE SUMMARY January 2014 TABLE OF CONTENTS Introduction 1. RATIONALE FOR BUDGET SUPPORT 1.1 What is Budget Support?
I N T R O D U C T I O N THE PROCESS OF ACQUIRING GOODS WORKS AND SERVICES BY GOVERNMENT PROCURING ENTITIES.
I N T R O D U C T I O N Public Procurement means: THE PROCESS OF ACQUIRING GOODS WORKS AND SERVICES BY GOVERNMENT PROCURING ENTITIES. This process includes purchasing, hiring, leasing or any other contractual
Entrepreneurship Education and Business Practices. Experience of the University of Dar es Salaam Entrepreneurship p Centre (UDEC)
Entrepreneurship Education and Business Practices Experience of the University of Dar es Salaam Entrepreneurship p Centre (UDEC) Dr. Goodluck Charles Deputy Director, UDEC Agenda Entrepreneurship education
THE REPUBLIC OF UGANDA DPP
THE REPUBLIC OF UGANDA DPP Staff Training and Development Policy 2014 TABLE OF CONTENTS 1.0 INTRODUCTION 3 1.1 Policy and Legal Framework 4 1.2 Principles/Guidelines of the Training and Staff Development
OUTPUT: RURAL ROAD ASSET MANAGEMENT
Rural Roads Improvement Project II (RRP CAM 42334) OUTPUT: RURAL ROAD ASSET MANAGEMENT A. Introduction 1. The Project. The Royal Government of Cambodia (the Government) has requested for a loan from Asian
Terms of Reference 1. BACKGROUND
Terms of Reference Review of the European Commission s Sector Policy Support Programme in Support of Ethiopia s Roads Sector Development Programme (9 ACP ET 015 + 9.ACP.ET.30, Financing Agreement No. 9527/ET)
BSc (Hons) Construction Management Part-time Course content
BSc (Hons) Construction Management Part-time Course content Year One Year One modules: Architectural Science and Building Engineering Services This module introduces you to the principles underlying the
GHANA S LAND ADMINISTRATION PROJECT: ACCOMPLISHMENTS, IMPACT, AND THE WAY AHEAD. W. ODAME LARBI (PhD, FGhIS) CHIEF EXECUTIVE OFFICER LANDS COMMISSION
GHANA S LAND ADMINISTRATION PROJECT: ACCOMPLISHMENTS, IMPACT, AND THE WAY AHEAD W. ODAME LARBI (PhD, FGhIS) CHIEF EXECUTIVE OFFICER LANDS COMMISSION PRESENTATION OUTLINE Background The National Land Policy
MALAYSIA S GOVERNMENT PROCUREMENT REGIME
MALAYSIA S GOVERNMENT PROCUREMENT REGIME 1. INTRODUCTION The prime objective of the Malaysian Government procurement is to support Government programmes by obtaining value for money through acquisition
Section 8 Funding Options and Support Services
Resources are not unlimited and it is therefore extremely important that the resources be spent on the most important projects. Prioritising projects makes implementation easier as it is possible to start
Summary of Terminal Evaluation I Outline of the Project Project title: The Project for the Capacity Building of Road Maintenance
Summary of Terminal Evaluation I Outline of the Project Country: Kyrgyz Republic Project title: The Project for the Capacity Building of Road Maintenance Issue/Sector: Transportation Cooperation scheme:
PARASTATAL SECTOR REFORM AND PRIVATISATION IN TANZANIA
PARASTATAL SECTOR REFORM AND PRIVATISATION IN TANZANIA George Mbowe Introduction A dramatic change has taken place in Tanzania since the mid-1980s. It is observed that the cumulative process of the country's
Testimony of James W. Runcie Chief Operating Officer Federal Student Aid U.S. Department of Education
Testimony of James W. Runcie Chief Operating Officer Federal Student Aid U.S. Department of Education Before the Subcommittee on Higher Education and Workforce Training, House Education and the Workforce
Critical Success Factors in. Planning: An Institutional Perspective. Prof. Yunus D. Mgaya PhD Deputy Vice Chancellor (Administration)
Critical Success Factors in Higher Education Finance and Planning: An Institutional Perspective Prof. Yunus D. Mgaya PhD Deputy Vice Chancellor (Administration) University i of Dar es Salaam Introduction
Technical Consultant
Terms of Reference Technical Consultant Providing services in the framework of a Study for Rehabilitation of Zemo Samgori Irrigation System, Georgie (ref. ORIO13/GE/01) Introduction The Ministry of Agriculture
Realignment strategy and management plan for the ECDP. Final Document
Realignment strategy and management plan for the ECDP Final Document i 1 Introduction... 1 1.1 Objective and scope... 1 1.2 Problem Statement... 2 2 ECDP Realignment Strategy... 3 2.1 Emerging contractor
There is strong Government. Uganda: performance contracting, budget reporting and budget monitoring SUMMARY
COUNTRY LEARNING NOTES Uganda: performance contracting, budget reporting and budget monitoring Margaret Kakande & Natasha Sharma * July 2012 SUMMARY The Government of Uganda has introduced performance
Environment Committee 11 January 2016
Environment Committee 11 January 2016 Title Whole Life Costing of Footway Maintenance Treatments and Scheme Prioritisation Report of Wards Status Urgent Key Enclosures Commissioning Director, Environment
Bridge asset management Project. Project for Bridge asset Management Support Service to ERA districts ( BMSS )
Bridge asset management Project Project for Bridge asset Management Support Service to ERA districts ( BMSS ) 1 BACK GROUND INFORMATION Implementation of the Bridge Management System ( BMS ) is a new practice
COUNTRY PAPER LEVERAGING TECHNOLOGY TO ENHANCE AUDIT QUALITY AND EFFECTIVENESS NATIONAL AUDIT DEPARTMENT OF MALAYSIA
COUNTRY PAPER LEVERAGING TECHNOLOGY TO ENHANCE AUDIT QUALITY AND EFFECTIVENESS NATIONAL AUDIT DEPARTMENT OF MALAYSIA 6th ASOSAI Symposium Kuala Lumpur, Malaysia 12 February 2015 National Audit Department
LOCAL REVENUE GENERATION: UGANDAN EXPERIENCE
LOCAL REVENUE GENERATION: UGANDAN EXPERIENCE A PAPER PRESENTED AT THE ANSA-AFRICA AFRICA STAKEHOLDER CONFERENCE MAY 19 20, 2008 ADDIS ABABA, ETHIOPIA Ndifuna A. Ziria Allied Management Consultants Ltd.
DEVELOPING THE TRAINING ROLE OF AN EMPLOYERS' ORGANIZATION
INTERNATIONAL LABOUR ORGANISATION ACT/EMP PUBLICATIONS DEVELOPING THE TRAINING ROLE OF AN EMPLOYERS' ORGANIZATION by Sriyan de Silva International Labour Office January 1997 Table of Contents 1. What is
UN WOMEN WARO Communications/RM and Partnerships Programme
UN WOMEN WEST AND CENTRAL AFRICA REGIONAL OFFICE COMMUNICATIONS & ADVOCAY SECTION TERMS OF REFERENCE Communications Associate Location : Application Deadline : Type of Contract : Post Level : Languages
Public Administration Leadership and Management Academy
Vote 8 Public Administration Leadership and Management Academy Budget summary 2009/10 2010/11 2011/12 Total to be Current Transfers and Payments for R million appropriated payments subsidies capital assets
ETI PERSPECTIVE 2020: A FIVE YEAR STRATEGY
ETI PERSPECTIVE 2020: A FIVE YEAR STRATEGY Introduction This document is the final and Board approved version of ETI s strategic directions based on the ETI Board meeting discussion of 12 th March 2015.
Governments implement PPP programmes in the healthcare sector for one or more of a number of reasons:
UNECE Healthcare PPP Project Team Project Brief Introduction This is a very active time globally for the healthcare sector as demand for services continues to grow exponentially, driven by rising life
Terms of Reference for consulting services financed under a World Bank executed Trust Fund
Terms of Reference for consulting services financed under a World Bank executed Trust Fund Design and Procurement of long-term pilot contracts for the Performance-based Management and Maintenance of Roads
POSITION 1 PROCUREMENT SPECIALIST. Location: Entebbe Uganda. Reports: The Project Manager/Coordinator
MINISTRY OF AGRICULTURE, ANIMAL INDUSTRY AND FISHERIES REGIONAL PASTORAL LIVELIHOODS RESILIENCE PROJECT PROCUREMENT OF TIME BASED PROCUREMENT SPECIALIST AND CIVIL ENGINEER FOR THE NATIONAL PROJECT COORDINATION
TRANSPORT SECTOR ROADMAP AND THE INVESTMENT PROGRAM I. Roadmap
TRANSPORT SECTOR ROADMAP AND THE INVESTMENT PROGRAM I. Roadmap 1. Launched in 2008, the government s Afghanistan National Strategy (ANDS) is a Millennium Goals (MDGs) based action plan and road map for
This chapter assesses how efficient we are as a development institution. The 15 indicators show the
Chapter 7 The organisation s efficiency This chapter assesses how efficient we are as a development institution. The 15 indicators show the progress we have made in reforming and strengthening our structures
THE PRIVATE INFRASTRUCTURE DEVELOPMENT GROUP TECHNICAL ASSISTANCE FACILITY STATEMENT OF POLICIES AND PROCEDURES. Amended July 2008
THE PRIVATE INFRASTRUCTURE DEVELOPMENT GROUP TECHNICAL ASSISTANCE FACILITY STATEMENT OF POLICIES AND PROCEDURES Amended July 2008 1. Introduction 1.1 By an exchange of letters dated December 2001 and January
9 Linking farmers groups with various agricultural service providers. The MVIWAMO district network of farmers groups in Tanzania
Bull374 17-05-2006 10:30 Pagina 87 9 Linking farmers groups with various agricultural service providers. The MVIWAMO district network of farmers groups in Tanzania Richard Masandika 55 and Anselmi Mgangaluma
CURRICULUM VITAE. 1975 - Dares Salaam Teachers College (Chang ombe). Certificate in Education
CURRICULUM VITAE Name: Sola Nazar Joseph Date of Birth: July 28, 1954 Nationality: Tanzanian Name of Organization Mzumbe University Years with the Organization Full time with Mzumbe University since July
Meta-Evaluation of interventions undertaken by the Luxembourg Cooperation in the subsector of professional training in hospitality and tourism.
Meta-Evaluation of interventions undertaken by the Luxembourg Cooperation in the subsector of professional training in hospitality and tourism. In 2013, the Directorate for Development Cooperation and
ANNEX I TO REQUEST FOR PROPOSALS N PTD/09/032 TERMS OF REFERENCE FOR A
ANNEX I TO REQUEST FOR PROPOSALS N PTD/09/032 FOR A TRAINING PROGRAM TO IMPROVE ORGANIZATIONAL AND INDIVIDUAL PERFORMANCE WITHIN WIPO July 2009 TABLE OF CONTENTS 1. INTRODUCTION... 4 2. STAKEHOLDERS INVOLVEMENT...
Post-graduate Programmes in Construction. Chartered Institute of Building; Royal Institution of Chartered Surveyors
MSc Construction Management (full-time) For students entering in 2014/5 Awarding Institution: Teaching Institution: Relevant QAA subject Benchmarking group(s): Faculty: Programme length: Date of specification:
Creating professional unity for records managers and archivists: the experience of the Kenya Association of Records Managers and Archivists
Creating professional unity for records managers and archivists: the experience of the Kenya Association of Records Managers and Archivists Kenya s first professional association for records managers and
DELFT UNIVERSITY OF TECHNOLOGY THE NETHERLANDS. Office for Education and Research Policy
DELFT UNIVERSITY OF TECHNOLOGY THE NETHERLANDS Office for Education and Research Policy 1. INTRODUCTION In 1993, the Executive Board of Delft University of Technology (DUT) formulated a new strategic plan
Guide on Developing a HRM Plan
Guide on Developing a HRM Plan Civil Service Branch June 1996 Table of Contents Introduction What is a HRM Plan? Critical Success Factors for Developing the HRM Plan A Shift in Mindset The HRM Plan in
ROAD EQUIPMENT MANAGEMENT: A CHALLENGE FOR CAPACITY BUILDING OF LOCAL CONTRACTORS IN TANZANIA
ROAD EQUIPMENT MANAGEMENT: A CHALLENGE FOR CAPACITY BUILDING OF LOCAL CONTRACTORS IN TANZANIA by Magesa Bairi * and Mrs. Marcelin Benedict ** ABSTRACT The shortage of equipment and Plant needed for proper
STANDARD TWINNING LIGHT PROJECT FICHE
STANDARD TWINNING LIGHT PROJECT FICHE 1. Basic Information 1.1 Programme: IPA 2011 1.2 Twinning Number: HR/2011/IB/OT/01 TWL 1.3 Title: Capacity Building of the National School for Public Administration
Procurement Training & Certification Catalogue 2012
Procurement Training & Certification Catalogue 2012 Standard Training Courses Page Introductory Certificate in Public Procurement Accredited by CIPS, Level 2 4 Advanced Certificate in Public Procurement
WA State Road Funds to Local Government Agreement
WA State Road Funds to Local Government Agreement April 2009 Cr Bill Mitchell President WA Local Government Association Presentation Overview of WA Local Government and the WA Road network Outline of the
Prosperity Fund Creating Conditions for Global Growth Turkey Programme Strategy (2015-16)
Prosperity Fund Creating Conditions for Global Growth Turkey Programme Strategy (2015-16) Contents Introduction & Context Programme Objectives and Indicators General Guidance Notes Programme Structure
TEAM PRODUCTIVITY DEVELOPMENT PROPOSAL
DRAFT TEAM PRODUCTIVITY DEVELOPMENT PROPOSAL An initial draft proposal to determine the scale, scope and requirements of a team productivity development improvement program for a potential client Team
Evaluation Summary. Total Cost 295 mill. JPY (Estimated cost as of the end of the Project) Period of Cooperation
Evaluation Summary. Outline of the Project Country: The Lao People s Democratic Republic Issue/Sector: Healthcare and medical treatment Division in charge: Health Division 3, Human Development Department
Terms of Reference Independent Completion Report (ICR) for ADB Infrastructure Technical Assistance
Terms of Reference Independent Completion Report (ICR) for ADB Infrastructure Technical Assistance Background Program overview Timor-Leste has critical infrastructure needs given the widespread destruction
BAGAMOYO COLLEGE OF ARTS (BCA) UNIVERSITY OF STAVANGER (UiS) Department of Music and Dance STAVANGER SCHOOL OF CULTURE (SSC)
BAGAMOYO COLLEGE OF ARTS (BCA) UNIVERSITY OF STAVANGER (UiS) Department of Music and Dance STAVANGER SCHOOL OF CULTURE (SSC) Application for the Continuation of the NOTA-project Autum 2006 Spring 2011
SUMMARY: LAND TRANSPORT ASSET MANAGEMENT PLAN
SUMMARY: LAND TRANSPORT ASSET MANAGEMENT PLAN Introduction This Asset Management Plan (AMP) for Land Transport Network 2012 describes in detail how the District s land transport network will be managed
The Vermont Agency of Transportation Small Business Element of the Disadvantaged Business Enterprise (DBE) Program
The Vermont Agency of Transportation Small Business Element of the Disadvantaged Business Enterprise (DBE) Program Introduction and Overview of the Small Business Element: The Vermont Agency of Transportation
Republic of Zimbabwe. Zimbabwe Institute of Public Administration and Management (ZIPAM) ByDr. Callistus Dingiswayo Ndlovu, Director General, ZIPAM
Republic of Zimbabwe Zimbabwe Institute of Public Administration and Management (ZIPAM) ByDr. Callistus Dingiswayo Ndlovu, Director General, ZIPAM Zimbabwe 2002 1. Background The Zimbabwe Institute of
Public Finance: Consulting Opportunities for CAs on Donor Funded Engagements
307 Public Finance: Consulting Opportunities for CAs on Donor Funded Engagements The CA profession is known for its quality of work, integrity and professionalism and has turned out to be one of the most
REVIEW OF FLEET SERVICES - FINAL REPORT OF THE ENVIRONMENT SCRUTINY PANEL
REVIEW OF FLEET SERVICES - FINAL REPORT OF THE ENVIRONMENT SCRUTINY PANEL PURPOSE OF REPORT 1. To present the Environment Scrutiny Panel s findings following its examination of Middlesbrough Council s
Ministry of Justice Principles of Competition Transforming Rehabilitation Programme
Ministry of Justice Principles of Competition Transforming Rehabilitation Programme 1 Contents Introduction... 3 Part 1: Competition Fairness... 3 Fair, transparent and equal treatment of Bidders... 3
COMMISSION OF THE EUROPEAN COMMUNITIES. COMMISSION REGULATION (EC) No /..
EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XX/XX/2007 COM(2006) XXX COMMISSION REGULATION (EC) No /.. of [ ] implementing Council Regulation (EC) No 1085/2006 establishing an instrument
Employment creation in innovative public work programs: Phase III
EPr1 Employment creation in innovative public work programs: Phase III 129 130 As of the end of October 2014, Egypt was host to some 140,000 registered Syrian refugees. While the influx of refugees has
Opportunities for human resource capacity building in RTD (new calls of FP7 PEOPLE Programme)
Opportunities for human resource capacity building in RTD (new calls of FP7 PEOPLE Programme) Second Workshop of the Networking initiative for ICT related projects Possibilities for widening further partnership
EC/62/SC/CRP.31. Executive Committee of the High Commissioner s Programme
Executive Committee of the High Commissioner s Programme Standing Committee 52 nd meeting Distr. : Restricted 2 September 2011 Original: English English and French Strategic directions for human resources
MINISTRY OF TRANSPORT AND COMMUNICATIONS OF KYRGYZ REPUBLIC. CAREC Transport Corridor 1 (Bishkek-Torugart Road) Project 3
MINISTRY OF TRANSPORT AND COMMUNICATIONS OF KYRGYZ REPUBLIC CAREC Transport Corridor 1 (Bishkek-Torugart Road) Project 3 financed by the Asian Development Bank under Loan 2755-KGZ (SF) TERMS OF REFERENCE
TERMS OF REFERENCE TO DEVELOP THE MANAGEMENT INFORMATION SYSTEM AND PROVIDE TECHNICAL SUPPORT FOR THE CONDITIONAL CASH TRANSFER PROGRAM IN BANGLADESH
TERMS OF REFERENCE TO DEVELOP THE MANAGEMENT INFORMATION SYSTEM AND PROVIDE TECHNICAL SUPPORT FOR THE CONDITIONAL CASH TRANSFER PROGRAM IN BANGLADESH I. INTRODUCTION International Firm Bangladesh spent
DEPOSIT INSURANCE FUND
DEPOSIT INSURANCE FUND 1. Establishment of the Deposit Insurance Fund The Deposit Insurance Fund was established in Tanzania under Section 23(1) of the Banking and Financial Institutions Act, 1991 and
RECRUITMENT PROFILE. Profile: Community Services
Profile: Community Services RECRUITMENT PROFILE Major Duties and Responsibilities 1. Provide information and social analysis of the cultural, political and economic context of population of persons of
BSc (Hons) Construction Management Course content
BSc (Hons) Construction Management Course content Year One Year One is about active learning, with a hands-on approach to course delivery. You will learn about the basic principles of construction management.
Facilitating Remittances to Help Families and Small Businesses
G8 ACTION PLAN: APPLYING THE POWER OF ENTREPRENEURSHIP TO THE ERADICATION OF POVERTY The UN Commission on the Private Sector and Development has stressed that poverty alleviation requires a strong private
Alumni Forum 2013. Sydney, Australia 22 May EVENT SUMMARY
Alumni Forum 2013 Sydney, Australia 22 May EVENT SUMMARY The University of Western Australia and The University of Queensland are proud to be partners in the International Mining for Development Centre
Guide to Sustainable Funding and Financing Options
Voluntary Sector Support Guide to Sustainable Funding and Financing Options PROMOTING EXCELLENCE IN VOLUNTARY AND COMMUNITY SERVICES www.communityimpactbucks.org.uk Community Impact Bucks is a registered
VALUE CHAIN DEVELOPMENT Training activities & Tools
VALUE CHAIN DEVELOPMENT Training activities & Tools VALUE CHAIN DEVELOPMENT Overview The question is thus not if, but how to integrate in value chains in a way that allows for incorporation of a growing
A QUALIFICATION SYSTEM FOR BUILT HERITAGE CONSERVATION AND ANCIENT BUILDING REHABILITATION
A QUALIFICATION SYSTEM FOR BUILT HERITAGE CONSERVATION AND ANCIENT BUILDING Abstract A Web supported system intended to simplify procurement procedures in building rehabilitation and heritage conservation,
Town of Huntsville Municipal Asset Management Plan
Town of Huntsville Municipal Asset Management Plan Adopted by Council (Resolution 470-13) December 20, 2013 1 P age Table of Contents Executive Summary... 3 Introduction... 4 State of Local Infrastructure...
Preliminary Draft JOB DESCRIPTIONS AND QUALIFICATIONS OF KEY PERSONNEL. XXXXX PPP Unit
Preliminary Draft JOB DESCRIPTIONS AND QUALIFICATIONS OF KEY PERSONNEL XXXXX PPP Unit Chief Executive Officer Job Description: The CEO is tasked with the establishment of a PPP Unit for the Government
Recommended Good Practice for. contractor SAFETY CSI. World Business Council for Sustainable Development
Recommended Good Practice for contractor SAFETY CSI World Business Council for Sustainable Development Contents Introduction... 1 Part A: General Safety Considerations for Contractor Management... 3 Part
JOB DESCRIPTION PROCUREMENT DIRECTOR
JOB DESCRIPTION PROCUREMENT DIRECTOR Public Institution Millennium Challenge Account Moldova intends to recruit a Procurement Director for its Management unit to assist the implementation of the Compact
Capacity Development for Education for All (CapEFA) Programme
Complementary Additional Programme 2014-2015 / Concept note Capacity Development for Education for All (CapEFA) Programme Empowering Ministries of Education and public agencies of countries furthest from
Construction Project Management and Quantity Surveying Degree Apprenticeships
Construction Project Management and Quantity Surveying Degree Apprenticeships Programme Outline Overview The Construction Project Management and Quantity Surveying Degree Apprenticeships have been developed