PROJECT GOVERNANCE PHASES AND LIFE CYCLE
|
|
|
- Sarah Deborah Hubbard
- 10 years ago
- Views:
Transcription
1 PROJECT GOVERNANCE PHASES AND LIFE CYCLE PhD Student Werner Robbert Titus DEENEN Radboud University of Nijmegen, The Netherlands Abstract: When talking about projects, the barrier is clear: successful and failed. Some fail due to different reasons, but lack of good project and risk management played a large part. Others succeed largely because of the rigorous and disciplined application of good project practices. But both groups illustrate many points that underline and demonstrate important concepts applicable to current projects. Systematic application of good methods leads to successful outcomes in projects of all types. All projects are fundamentally dependent on people, and human beings are not very different today than we were hundreds, or even thousands, of years ago. This paper uncovers main elements in projects area such as the concepts and governance of projects, with an underline of the main characteristics and the projects phases and life cycle that erase the uncertainty that joins all the projects built at any time. Keywords: project management, life cycle of a project Introduction A project is a temporary endeavor undertaken to create a unique product or service. It can also comprise an ambitious plan to define and constrain a future by limiting it to set goals and parameters. The planning, execution and monitoring of major projects sometimes involves setting up a special temporary organization, consisting of a project team and one or more work teams. A project usually needs resources. Projects are different from standard business operational activities as they have the following characteristics. Are unique in nature. They do not involve repetitive processes. Every project undertaken is different from the last, whereas operational activities often involve undertaking repetitive (identical) processes. Have a defined timescale. Projects have a clearly specified start and end date within which the deliverables must be produced to meet a specified customer requirement. Have an approved budget. Projects are allocated a level of financial expenditure within which the deliverables are produced, to meet a specified customer requirement. Have limited resources. At the start of a project an agreed amount of labour, equipment and materials is allocated to the project. Involve an element of risk. Projects entail a level of uncertainty and therefore carry business risk. Achieve beneficial change. The purpose of a project is typically to improve an organization through the implementation of business change. The word project comes from the Latin word projectum from projicere, "to throw something forwards" which in turn comes from pro-, which denotes something that precedes the action of the next part of the word in time (paralleling the Greek πρό) and jacere, "to throw". The word "project" thus actually originally meant "something that comes before anything else is done". When the word was initially adopted, it referred to a plan of something, not to the act of actually carrying this plan out. Something performed in accordance with a project was called an object. This use of
2 "project" changed in the 1950s when several techniques for project management were introduced: with this advent the word slightly changed meaning to cover both projects and objects. However in certain projects there may still exist so called objects and object leaders, reflecting the older use of the words. One may also think in terms of platonism, where ideas from the realm of ideals are projected onto the physical world. Particularly liked by Western business, projects can subdivide into sub-projects and spawn an industrial sub-culture of project planning and project management, all oblivious to more holistic developments. Some feel this habit of shorttermism has permeated economic planning and personal growth to the detriment of cyclical and multi-cultural world views. Alternatives to projectcentric planning include trend-oriented goal-setting and directional planning. However, this view is contentious, and indeed industrial program management and portfolio management represent ways of administering a range of projects to fulfill an over-arching strategy. Notable projects include: Manhattan Project: Developed the first nuclear weapon; Human Genome Project: To map the human genome; Project Apollo: Landing a man on the moon. Once established as idea, the project should be turned to life and put into practice through different means and steps, which all together form the project governance. Project governance The term Project governance is used to describe the processes that need to exist for a successful project. 194 Project governance will outline the relationships between all internal and external groups involved in the project; describe the proper flow of information regarding the project to all stakeholder; ensure the appropriate review of issues encountered within each project; ensure that required approvals and direction for the project is obtained at each appropriate stage of the project. Important specific elements of good project governance include: a compelling business case, stating the objects of the project and specifying the in-scope and out-of-scope aspects; a mechanism to assess the compliance of the completed project to its original objectives; identifying all stakeholders with an interest in the project; a defined method of communication to each stakeholder; a set of business-level requirements as agreed by all stakeholders; an agreed specification for the project deliverables; the appointment of a project manager; clear assignment of project roles and responsibilitie; a current, published project plan that spans all project stages from project initiation through development to the transition to operations; a system of accurate upward status- and progress-reporting including time records; a central document repository for the project; a centrally-held glossary of project terms; a process for the management and resolution of issues that arise during the project; a process for the recording and communication of risks identified during the project; a standard for quality review of the key governance documents and of the project deliverables. Project management definition and characteristics Project Management is the skills, tools and management processes required to undertake a project successfully. It incorporates:
3 A set of skills. Specialist knowledge, skills and experience are required to reduce the level of risk within a project and thereby enhance its likelihood of success. A suite of tools. Various types of tools are used by project managers to improve their chances of success. Examples include document templates, registers, planning software, modeling software, audit checklists and review forms. A series of processes. Various processes and techniques are required to monitor and control time, cost, quality and scope on projects. Examples include time management, cost management, quality management, change management, risk management and issue management. In today's fast-paced business environment, the necessity of incorporating project management practices into an organization's operations has become increasingly apparent. Project Management's bestpractices and methodologies allow workers to stay on time, on budget, while wading through the sheer mass of data. Data that has increased exponentially as a result of the information revolution in what is now being called the Information Age. Project management has become a standard practice rather than an exception, and the incorporation of these key principles is often seen as the distinguishing factor in measuring success. Amid these advances in project management skills and technology, however, the fundamental benefit remains the same. Project management helps organizations respond faster, accomplish its strategic goals, and recognize return on investment. From this point of view project management bears some characteristics. Project management is inclusive, not exclusive. Project management used to be the exclusive domain of a privileged few with the skills and experience to succeed. Today everyone is a project management consumer, and many are assuming the role of project management -- some by design, some by accident. Project management is also the vehicle through which stakeholders are made aware of their assignments, interfaces, and progress. Project management must reach outside of an organization to vendors, suppliers, designers, subcontractors, to the client, and to the ever-curious public. Project management is peer-topeer, not top down. Peer-to-peer project management invites participation from the very people assigned to do the work; after all, who knows better how long something will take than the resources themselves. This peer-to-peer model removes the middleman from decisionmaking. Project teams respond more quickly to self-identified project opportunities and threats, thereby keeping the project on schedule. Information rolls up so managers can focus on resolving conflicting priorities and resource bottlenecks. Project management is collaborative, not hierarchical. Project-team collaboration is the most important factor in minimizing project risks, maximizing project quality, and eliminating wasteful efforts and unnecessary rework. Since the majority of projects rely on teams that are not co-located, project management creates touch points for soliciting input and consensus throughout the project lifecycle. Rather than enforce a rigid, hierarchical flow of information that slows down decision-making, project 195
4 management enables internal and external project team members to collaborate beyond simply coordinating calendars and circulating project-based . Project management exposes relevant project information to others involved in the project, using workflow rules and routings to ensure all have access to information they need to accomplish their work better. Project management is cooperative, not adversarial. One example of teams existing as virtual companies only to accomplish the project is demonstrated in the construction industry. They each have their own profit motivations and may actually be competitors. This cooperation is essential for getting the project done better, faster, and cheaper. They must cooperate, not fight. They must learn to trust each other, sharing information that once was "theirs and theirs alone" in order to distribute the burden of project complexity and risk. Project management raises the visibility of project risks, issues, and decisions for the mutual good of the project and its participants. Designers, contractors and managers must work together to do the right things correctly the first time on behalf of their customer, the owner. The ascendance of design/build for project delivery proves this. Project management is enterprisewide, not standalone. There isn t a CEO who wouldn t like to know what projects are underway in the organization, or to be able to evaluate the impacts of accelerating one project ahead of another. No CFO would be permitted to manage the business finances in the same standalone, disconnected, unrepeatable fashion that projects are often managed. With an enterprise-wide perspective, executives can truly 196 understand the health of their business and the ripple effects of their strategic project decisions. This enterprise-wide insight can only come from maintaining all of the projects within a centralized system, with a company-wide project structure -- the project management "chart of accounts" -- to facilitate this cross-project analysis. Project management is portfolio management, not catch-all management. Once a company has a handle on all of the projects that are underway or in the pipeline, it is in a position to decide effectively which of the many new project opportunities will compliment the project portfolio. Project management enables companies to determine which projects can be accomplished with the resources that are available (or that can be hired), which will provide the greatest payback given the opportunity and the investment the company is willing to make, and which combination of projects best achieves their strategic objectives within the required timeframe. Projects phases and life cycle Because projects are unique undertakings, they involve a degree of uncertainty. Organizations performing projects will usually divide each project into several project phases to improve management control and provide for links to the ongoing operations of the performing organization. Collectively, the project phases are known as the project life cycle. Characteristics of Project Phases Each project phase is marked by completion of one or more deliverables. A deliverable is a tangible, verifiable work product such as a feasibility study, a detail design, or a working prototype. The deliverables, and hence the
5 phases, are part of a generally sequential logic designed to ensure proper definition of the product of the project. The conclusion of a project phase is generally marked by a review of both key deliverables and project performance to date, to: a) determine if the project should continue into its next phase; b) detect and correct errors cost effectively. These phase-end reviews are often called phase exits, stage gates, or kill points. Each project phase normally includes a set of defined deliverables designed to establish the desired level of management control. The majority of these items are related to the primary phase deliverable, and the phases typically take their names from these items: requirements, design, build, test, startup, turnover, and others, as appropriate. Characteristics of the Project Life Cycle The project life cycle serves to define the beginning and the end of a project. The project life-cycle definition will also determine which transitional actions at the beginning and the end of the project are included and which are not. In this manner, the project life-cycle definition can be used to link the project to the ongoing operations of the performing organization. The phase sequence defined by most project life cycles generally involves some form of technology transfer or handoff such as requirements to design, construction to operations, or design to manufacturing. Deliverables from the preceding phase are usually approved before work starts on the next phase. However, a subsequent phase is sometimes begun prior to approval of the previous phase deliverables when the risks involved are deemed acceptable. This practice of overlapping phases is often called fast tracking. Project life cycles generally define: what technical work should be done in each phase (e.g., is the work of the architect part of the definition phase or part of the execution phase?); who should be involved in each phase (e.g., implementers who need to be involved with requirements and design). Project life-cycle descriptions may be very general or very detailed. Highly detailed descriptions may have numerous forms, charts, and checklists to provide structure and consistency. Such detailed approaches are often called project management methodologies. Most project life-cycle descriptions share a number of common characteristics: cost and staffing levels are low at the start, higher toward the end, and drop rapidly as the project draws to a conclusion; the probability of successfully completing the project is lowest, and hence risk and uncertainty are highest, at the start of the project. The probability of successful completion generally gets progressively higher as the project continues; the ability of the stakeholders to influence the final characteristics of the project's product and the final cost of the project is highest at the start and gets progressively lower as the project continues. A major contributor to this phenomenon is that the cost of changes and error correction generally increases as the project continues. Conclusions Successful projects don t happen by themselves. However, the success rate is bound to go up because project management prevents companies from inaugurating projects that are likely to fail or are poorly defined. It helps 197
6 increase speed of project delivery and efficiency of project execution. Project management helps capturing best practices so every project is more successful than the last one. It even bridges the gap between project participants so everyone is on the same page and working toward the same goals. Also, care should be taken to distinguish the project life cycle from the product life cycle. For example, a project undertaken to bring a new desktop computer to market is but one phase or stage of the product life cycle. Although many project life cycles have similar phase names with similar deliverables required, few are identical. Most have four or five phases, but some have nine or more. Even within a single application area, there can be major variations; one organization's software development life cycle may have a single design phase while another's has separate phases for functional and detail design. REFERENCES [1] Altwein, D., The Evolving Role of the Project Manager, PMBoulevard article, posted [2] Coughlan, R., Ethical Decision in Project Management, PMBoulevard article, posted 2004, [3] Fitzgerald, D., Scalable Project Portofolio Management, PMBoulevard article, posted 2006, [4] Lientz, B., Rea, K., 2000 Project Management: Planning and Implementation, Harcourt Publishing, [5] Lock, D., Project Management, John Wiley and Sons, 6 th Edition, [6] Project Management Institute, A Guide to the Project Management Body of Knowledge, Newton Square, Pa., Project Management Institute,
B.2.2. Project Management Principles
B.2.2. Project Management Principles Project management is the application of knowledge, skills, tools, and techniques to project activities in order to meet or exceed stakeholder needs and expectations
Project Management Guidebook
METHOD 12 3 empowering managers to succeed Project Management Guidebook ISBN 0-473-10445-8 A bout this e-book This e-book was created by Method123 (see www.method123.com) to help provide you with a simple
SEVEN WAYS THAT BUSINESS PROCESS MANAGEMENT CAN IMPROVE YOUR ERP IMPLEMENTATION SPECIAL REPORT SERIES ERP IN 2014 AND BEYOND
SEVEN WAYS THAT BUSINESS PROCESS MANAGEMENT CAN IMPROVE YOUR ERP IMPLEMENTATION SPECIAL REPORT SERIES ERP IN 2014 AND BEYOND CONTENTS INTRODUCTION 3 EFFECTIVELY MANAGE THE SCOPE OF YOUR IMPLEMENTATION
Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects
State of Arkansas Office of Information Technology 124 W. Capitol Ave. Suite 990 Little Rock, AR 72201 501.682.4300 Voice 501.682.4020 Fax http://www.cio.arkansas.gov/techarch Best Practices Statement
Enhance visibility into and control over software projects IBM Rational change and release management software
Enhance visibility into and control over software projects IBM Rational change and release management software Accelerating the software delivery lifecycle Faster delivery of high-quality software Software
2010 Project Management Report
2010 Project Management Report Standardized Best Practices and Technology Adoption in the AEC Industry January 2010 Cindy Jutras Page 2 Executive Summary A difficult economy and global competition leave
Resource Management. Determining and managing the people resources on projects can be complex as:
Baseline Resource Management RESOURCE MANAGEMENT Purpose To provide a procedure and associated guidelines to facilitate the management of project people resources. Overview This Phase is used to establish
PROJECT MANAGEMENT FRAMEWORK
PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to
PRINCE2:2009 Glossary of Terms (English)
accept (risk response) acceptance acceptance criteria activity agile methods approval approver assumption assurance A risk response to a threat where a conscious and deliberate decision is taken to retain
Develop Project Charter. Develop Project Management Plan
Develop Charter Develop Charter is the process of developing documentation that formally authorizes a project or a phase. The documentation includes initial requirements that satisfy stakeholder needs
APICS INSIGHTS AND INNOVATIONS ENHANCING PROJECT MANAGEMENT
APICS INSIGHTS AND INNOVATIONS ENHANCING PROJECT MANAGEMENT APICS INSIGHTS AND INNOVATIONS ABOUT THIS REPORT Supply chain project management is a process that allows you to coordinate resources and activities
Minnesota Health Insurance Exchange (MNHIX)
Minnesota Health Insurance Exchange (MNHIX) 1.2 Plan September 21st, 2012 Version: FINAL v.1.0 11/9/2012 2:58 PM Page 1 of 87 T A B L E O F C O N T E N T S 1 Introduction to the Plan... 12 2 Integration
The programming, design
Understanding Project Delivery for the Design and Construction of Public Buildings architecture The programming, design and construction of important public buildings require the coordinated efforts of
Ten Steps to Comprehensive Project Portfolio Management Part 3 Projects, Programs, Portfolios and Strategic Direction By R.
August 2007 Ten Steps to Comprehensive Project Portfolio Management Part 3 Projects, Programs, Portfolios and Strategic Direction By R. Max Wideman This series of papers has been developed from our work
Guide for the Development of Results-based Management and Accountability Frameworks
Guide for the Development of Results-based Management and Accountability Frameworks August, 2001 Treasury Board Secretariat TABLE OF CONTENTS Section 1. Introduction to the Results-based Management and
15 Principles of Project Management Success
15 Principles of Project Management Success Project management knowledge, tools and processes are not enough to make your project succeed. You need to get away from your desk and get your hands dirty.
Automating Marketing Localization
Bridging the Gap between Corporate and Distributed Marketers With traditional brand marketing channels rapidly declining in effectiveness, a successful, collaborative relationship between corporate marketing
Prepared for: Prepared by:
Executive Project Review Prepared for: Prepared by: Table of contents Introduction... 3 WHY an Executive Project Review?... 3 WHO is Involved?... 4 WHAT is an Executive Project Review?... 5 WHEN? - Schedule
Module 2: The Project Initiation Stage
Overview Initiation stage is highly instrumental in the life cycle of a project as it defines the boundaries of the project gives clarity to all participants about the objectives, scope, cost timescale
Project Management Institute. Construction. Extension to. A Guide to the Project Management Body of Knowledge. PMBOK Guide 2000 Edition.
Project Management Institute Construction Extension to A Guide to the Project Management Body of Knowledge PMBOK Guide 2000 Edition Provisional Construction Extension to A Guide to the Project Management
Project Management for Implementing the Smart Grid By Power System Engineering, Inc. Abstract PM Methodology Using a Repeatable Project Management
Project Management for Implementing the Smart Grid By Power System Engineering, Inc. Abstract PM Methodology Using a Repeatable Project Management Approach Project management solutions for the Smart Grid
serena.com Serena Change Governance Executive Brief
Change GovernancE Serena Change Governance Executive Brief Change. Your organization can t escape it. But it can take advantage of it. Globalization. Regulatory compliance. Competitive pressures. Mergers
Project Risk Management
PROJECT ADVISORY Project Risk Management Leadership Series 9 kpmg.com/nz About the Leadership Series KPMG s Leadership Series is targeted towards owners of major capital programmes, but its content is
How do you manage the growing complexity of software development? Is your software development organization as responsive to your business needs as
How do you manage the growing complexity of software development? Is your software development organization as responsive to your business needs as it could be? Borland Core SDP enables your IT organization
The Business Impact of the Cloud. According to 460 Senior Financial Decision-Makers
The Business Impact of the Cloud According to 460 Senior Financial Decision-Makers March 2012 Contents Summary of key findings 4 Finance decision-makers have a high awareness of cloud computing 4 The majority
Managing TM1 Projects
White Paper Managing TM1 Projects What You ll Learn in This White Paper: Traditional approaches to project management A more agile approach Prototyping Achieving the ideal outcome Assessing project teams
Project Time Management an essential element to project success
Project Time Management an essential element to project success Abstract This paper discusses the reasons behind the necessity to apply sound Project Time Management principles and processes to projects
ECM as a Shared Service: The New Frontier
Doculabs White Paper: ECM as a Shared Service: The New Frontier Organizations are struggling with the increasing growth of unstructured content: all the word processing files, e-mail, spreadsheets, web
Essentials of Project Management
Institut de recherche en sciences psychologiques Essentials of Project Management Stephan Van den Broucke Université catholique de Louvain EAHC Workshop on Joint Actions Luxembourg, 10 December 2012 What
Project Management: Back to Basics
About this research note: Technology Insight notes describe emerging technologies, tools, or processes as well as analyze the tactical and strategic impact they will have on the enterprise. Project Management:
Service Catalog: Dramatically Improving the IT/Business Relationship
Service Catalog: Dramatically Improving the IT/Business Relationship An ENTERPRISE MANAGEMENT ASSOCIATES (EMA ) White Paper Prepared for Numara Software February 2009 IT MANAGEMENT RESEARCH, Table of Contents
ITS Project Management Methodology
ITS Project Management Methodology Information Technology Services Project Management Group 11/17/2014 Version 2.1 Author: ITS Project Management Group Document Control Change Record Date Author Version
ENOVIA Semiconductor Accelerator for Enterprise Project Management
ENOVIA Semiconductor Accelerator for Enterprise Project Management Product overview ENOVIA Semiconductor Accelerator for Enterprise Project Management enables companies to manage global IC development
PMAP. Project Management At Penn PMAP
Project Management At Penn 1 Fundamentals Course Objective To provide you with an overview of Topics Project Management at Penn () Project Governance Phases & Project Management Activities Project Management
Your asset is your business. The more challenging the economy, the more valuable the asset becomes. Decisions are magnified. Risk is amplified.
Asset management Your asset is your business. The more challenging the economy, the more valuable the asset becomes. Decisions are magnified. Risk is amplified. Data is about more than numbers. It tells
CDC UNIFIED PROCESS PRACTICES GUIDE
Document Purpose The purpose of this document is to provide guidance on the practice of Requirements Definition and to describe the practice overview, requirements, best practices, activities, and key
Practice Overview. REQUIREMENTS DEFINITION Issue Date: <mm/dd/yyyy> Revision Date: <mm/dd/yyyy>
DEPARTMENT OF HEALTH AND HUMAN SERVICES ENTERPRISE PERFORMANCE LIFE CYCLE FRAMEWORK PRACTIICES GUIIDE REQUIREMENTS DEFINITION Issue Date: Revision Date: Document
JOURNAL OF OBJECT TECHNOLOGY
JOURNAL OF OBJECT TECHNOLOGY Online at www.jot.fm. Published by ETH Zurich, Chair of Software Engineering JOT, 2006 Vol. 5. No. 8, November-December 2006 Requirements Engineering Tasks Donald Firesmith,
SEVEN WAYS TO AVOID ERP IMPLEMENTATION FAILURE SPECIAL REPORT SERIES ERP IN 2014 AND BEYOND
SEVEN WAYS TO AVOID ERP IMPLEMENTATION FAILURE SPECIAL REPORT SERIES ERP IN 2014 AND BEYOND CONTENTS INTRODUCTION................................ 3 UNDERSTAND YOUR CURRENT SITUATION............ 4 DRAW
Managing Utility Capital Projects Using Enterprise Project Portfolio Management Solutions
An Oracle White Paper January 2012 Managing Utility Capital Projects Using Enterprise Project Portfolio Management Solutions Executive Overview Utility executives worldwide face a precarious balancing
The following is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
The following is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into any contract. It is not a commitment to deliver any material,
WORKFLOW 101 WHITE PAPER
WORKFLOW 101 WHITE PAPER WHITE PAPER WORKFLOW 101 Subject to a variety of interpretations, workflow can mean anything from the steps in a work process to Business Process Automation. It is a fairly general
IT ASSET MANAGEMENT SELECTED BEST PRACTICES. Sherry Irwin
IT ASSET MANAGEMENT SELECTED BEST PRACTICES Sherry Irwin IT ASSET MANAGEMENT SELECTED BEST PRACTICES By Sherry Irwin INTRODUCTION As the discipline of IT asset management (ITAM) began to evolve in the
Are waterfall and agile project management techniques mutually exclusive? by Eve Mitchell, PwC. 22 MARCH 2012 www.pmtoday.co.uk
Are waterfall and agile project management techniques mutually exclusive? by Eve Mitchell, PwC 22 MARCH 2012 www.pmtoday.co.uk Projects need to be managed to be successful Change is a ubiquitous feature
Developing a Public-Private Partnership Framework: Policies and PPP Units
Note 4 May 2012 Developing a Public-Private Partnership Framework: Policies and PPP Units This note is the fourth in a series of notes on developing a comprehensive policy, legal, and institution framework
COMPREHENSIVE ASSET MANAGEMENT STRATEGY
COMPREHENSIVE ASSET MANAGEMENT STRATEGY APPROVED BY SENIOR MANAGEMENT COMMITTEE ON AUGUST 23, 2012 (TO BE FINALIZED AFTER APPROVAL OF CAM POLICY BY COUNCIL) August 2012 Contents CONTENTS EXECUTIVE SUMMARY
25 Questions Top Performing Sales Teams Can Answer - Can You?
25 Questions Top Performing Sales Teams Can Answer - Can You? How high growth businesses use Sales Force Automation to drive success The best performing sales teams can answer the sales management questions
Provide access control with innovative solutions from IBM.
Security solutions To support your IT objectives Provide access control with innovative solutions from IBM. Highlights Help protect assets and information from unauthorized access and improve business
DETERMINING THE LEVEL OF CONSTRUCTION MANAGEMENT APPLICATIONS IN TURKEY COMPARED WITH CMAA STANDARDS
Fifth International Congress on Advances in Civil Engineering, 25-27 September 2002 Istanbul Technical University, Istanbul, Turkey DETERMINING THE LEVEL OF CONSTRUCTION MANAGEMENT APPLICATIONS IN TURKEY
THE RELATIONSHIP BETWEEN THE CLIENT, CLIENTS PROJECT TEAM AND THE EPCM PROJECT TEAM. Mr C. A. F. Sweet The South Institute of Mining and Metallurgy
THE RELATIONSHIP BETWEEN THE CLIENT, CLIENTS PROJECT TEAM AND THE EPCM PROJECT TEAM Mr C. A. F. Sweet The South Institute of Mining and Metallurgy The inter-relationship between these parties and the effect
Lowering business costs: Mitigating risk in the software delivery lifecycle
August 2009 Lowering business costs: Mitigating risk in the software delivery Roberto Argento IBM Rational Business Development Executive Valerie Hamilton IBM Rational Solution Marketing Manager and Certified
Project Management & Software Development Methodology
The PROJECT PERFECT White Paper Collection Project Management & Software Development Methodology Neville Turbit Overview Aside from the commercially available methodologies such as Prince 2 and Rational
building a business case for governance, risk and compliance
building a business case for governance, risk and compliance contents introduction...3 assurance: THe last major business function To be integrated...3 current state of grc: THe challenges... 4 building
ENTERPRISE RISK MANAGEMENT FRAMEWORK
ROCKHAMPTON REGIONAL COUNCIL ENTERPRISE RISK MANAGEMENT FRAMEWORK 2013 Adopted 25 June 2013 Reviewed: October 2015 TABLE OF CONTENTS 1. Introduction... 3 1.1 Council s Mission... 3 1.2 Council s Values...
A GUIDE TO THE PROJECT MANAGEMENT BODY OF KNOWLEDGE
A GUIDE TO THE PROJECT MANAGEMENT BODY OF KNOWLEDGE PMI Standards Committee William R. Duncan, Director of Standards Project Management Institute Four Campus Boulevard Newtown Square, PA 19073-3299 USA
How Non-profit Boards can Effectively Utilize Committees
How Non-profit Boards can Effectively Utilize Committees November, 2011 We transform our community together. SVP Boulder County is a fund of The Community Foundation www.svpbouldercounty.org 303.442.0436
EMC DOCUMENTUM Capital Projects Express. KEEP YOUR PROJECTS ON TRACK Flexible Document Control for Agile Teams
EMC DOCUMENTUM Capital Projects Express KEEP YOUR PROJECTS ON TRACK Flexible Document Control for Agile Teams SHARE THE CHALLENGES OF CAPITAL PROJECTS Managing capital projects, no matter their size or
PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3)
PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3) 1st February 2006 Version 1.0 1 P3M3 Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce This is a Value
Automated Firewall Change Management. Ensure continuous compliance and reduce risk with secure change management workflows
Automated Firewall Change Management Ensure continuous compliance and reduce risk with secure change management workflows JANUARY 2015 Executive Summary Firewall management has become a hot topic among
7 Best Practices for Business Process Management in Customer Service
7 Best Practices for Business Process Management in Customer Service 7 Best Practices for Business Process Management in Customer Service Table of Contents Introduction 3 Defining Your Process 3 Empowering
Recruitment and Selection
Recruitment and Selection The recruitment and selection belongs to value added HR Processes. The recruitment is about: the ability of the organization to source new employees, to keep the organization
Infrastructure Asset Management Report
Infrastructure Asset Management Report From Inspiration to Practical Application Achieving Holistic Asset Management 16th- 18th March 2015, London Supported by Table of contents Introduction Executive
Role and Skill Descriptions. For An ITIL Implementation Project
Role and Skill Descriptions For An ITIL Implementation Project The following skill traits were identified as fairly typical of those needed to execute many of the key activities identified: Customer Relationship
Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire. P3M3 Project Management Self-Assessment
Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire P3M3 Project Management Self-Assessment Contents Introduction 3 User Guidance 4 P3M3 Self-Assessment Questionnaire
The Project Management Life Cycle
The Project Management Life Cycle i ii This page intentionally left blank iii iv Publisher s note Every possible effort has been made to ensure that the information contained in this book is accurate at
ERP 101: A Primer for Busy Executives
ERP 101: A Primer for Busy Executives Arthur J. Herbert, III, PMP Edwin T. Cornelius, III, Ph.D. When considering an ERP implementation, busy institution executives need a crash course. The purpose of
One trusted platform. All your project information.
One trusted platform. All your project information. The most trusted and widely used online collaboration platform for engineering and construction projects. New York City Hall Reconstruction New York
ENTERPRISE RISK MANAGEMENT FRAMEWORK
ENTERPRISE RISK MANAGEMENT FRAMEWORK COVENANT HEALTH LEGAL & RISK MANAGEMENT CONTENTS 1.0 PURPOSE OF THE DOCUMENT... 3 2.0 INTRODUCTION AND OVERVIEW... 4 3.0 GOVERNANCE STRUCTURE AND ACCOUNTABILITY...
WHITE PAPER IT SERVICE MANAGEMENT IT SERVICE DESIGN 101
WHITE PAPER IT SERVICE MANAGEMENT IT SERVICE DESIGN 101 Prepared by: Phillip Bailey, Service Management Consultant Steve Ingall, Head of Service Management Consultancy 60 Lombard Street London EC3V 9EA
Contract management's effect on in house counsel
IBM Software Industry Solutions Industry/Product Identifier Contract management's effect on in house counsel Impacting contract visibility, analysis and compliance Emptoris Contract Management Solutions
Product Lifecycle Management in the Food and Beverage Industry. An Oracle White Paper Updated February 2008
Product Lifecycle Management in the Food and Beverage Industry An Oracle White Paper Updated February 2008 Product Lifecycle Management in the Food and Beverage Industry EXECUTIVE OVERVIEW Companies in
Knowledge Base Data Warehouse Methodology
Knowledge Base Data Warehouse Methodology Knowledge Base's data warehousing services can help the client with all phases of understanding, designing, implementing, and maintaining a data warehouse. This
Select the right configuration management database to establish a platform for effective service management.
Service management solutions Buyer s guide: purchasing criteria Select the right configuration management database to establish a platform for effective service management. All business activities rely
Role of Analytics in Infrastructure Management
Role of Analytics in Infrastructure Management Contents Overview...3 Consolidation versus Rationalization...5 Charting a Course for Gaining an Understanding...6 Visibility into Your Storage Infrastructure...7
Five Reasons why Agile Won t Scale Without Automation
Five Reasons why Agile Won t Scale Without Automation September 2011 June 2011 Introduction The Agile software development methodology is composed of a number of techniques designed to help deliver incremental
Interpreting the Management Process in IEEE/EIA 12207 with the Help of PMBOK
Interpreting the Management Process in IEEE/EIA 12207 with the Help of PMBOK Lewis Gray, Ph.D., PMP Abelia Fairfax, Virginia USA www.abelia.com Copyright 2002 by Abelia Corporation. All rights reserved
ACCELUS COMPLIANCE MANAGER FOR FINANCIAL SERVICES
THOMSON REUTERS ACCELUS ACCELUS COMPLIANCE MANAGER FOR FINANCIAL SERVICES PROACTIVE. CONNECTED. INFORMED. THOMSON REUTERS ACCELUS Compliance management Solutions Introduction The advent of new and pending
Project Knowledge Areas
From Houston S: The Project Manager s Guide to Health Information Technology Implementation. Chicago: HIMSS; 2011; pp 27 39. This book is available on the HIMSS online bookstore at www. himss.org/store.
A Practical Guide for Creating an Information Management Strategy and Strategic Information Management Roadmap
A Practical Guide for Creating an Information Management Strategy and Strategic Information Management Roadmap Principal Author Sam McCollum, CRM, MBA Director of End User Consulting Parity Research LLC
BUSINESS CONSULTING SERVICES Comprehensive practice management solutions for independent investment advisors
BUSINESS CONSULTING SERVICES Comprehensive practice management solutions for independent investment advisors Insights, tools and resources to help you Accelerate Your Growth, Scale Your Business and Elevate
Accelerating Time to Market:
Accelerating Time to Market: Application Development and Test in the Cloud Paul Speciale, Savvis Symphony Product Marketing June 2010 HOS-20100608-GL-Accelerating-Time-to-Market-Dev-Test-Cloud 1 Software
Verification of need. Assessment of options. Develop Procurement Strategy. Implement Procurement Strategy. Project Delivery. Post Project Review
Who should read this fact sheet? Many construction clients are not regular purchasers of construction work. This fact sheet is an introduction to construction procurement for occasional clients with a
Project Management Certificate (IT Professionals)
Project Management Certificate (IT Professionals) Whether your field is architecture or information technology, successful planning involves a carefully crafted set of steps to planned and measurable goals.
TDWI strives to provide course books that are content-rich and that serve as useful reference documents after a class has ended.
Previews of TDWI course books offer an opportunity to see the quality of our material and help you to select the courses that best fit your needs. The previews cannot be printed. TDWI strives to provide
Bridging the Gap: Traditional to Agile Project Management. I. S. Parente 1. Susan Parente, PMP, PMI ACP, CISSP, PMI RMP, ITIL, MSEM;
Bridging the Gap: Traditional to Agile Project Management ABSTRACT I. S. Parente 1 1 Susan Parente, PMP, PMI ACP, CISSP, PMI RMP, ITIL, MSEM; S3 Technologies, LLC, Principal Consultant; parente@s3 tec.com
Assessing the Appropriate Level of Project, Program, and PMO Structure
PMI Virtual Library 2011 Daniel D. Magruder Assessing the Appropriate Level of Project, Program, and PMO Structure By Daniel D. Magruder, PMP Executive Summary Does your organization have in-flight projects
How To Manage Social Media In The Workplace
SHRM Foundation Executive Briefing Social Media in the Workplace: Issues and Strategic Questions By Robert E. Ployhart, Ph.D. sponsored by Spherion Social media is revolutionizing the way people connect
Workflows. The Missing Link in Your Business Practice Infrastructure
Embedded Workflows The Missing Link in Your Business Practice Infrastructure IMPORTANT DISCLOSURE: This paper was developed and is published by Schwab Intelligent Technologies ( SIT ) and is intended solely
4 Keys to Driving Results from Project Governance
THOUGHT LEADERSHIP WHITE PAPER In partnership with Agile or Waterfall? 4 Keys to Driving Results from Project Governance You can t swing a project manager these days without hitting the debate of Agile
Data Center Projects: Project Management
Data Center Projects: Project Management By Neil Rasmussen Suzanne Niles White Paper #141 Executive Summary In data center design/build projects, flaws in project management and coordination are a common
New Problems, New Solutions: Making Portfolio Management More Effective
Product Innovation Best Practices Series New Problems, New Solutions: Making Portfolio Management More Effective Reference Paper # 9 By: Dr. Robert G. Cooper Dr. Scott J. Edgett Compliments of: Stage-Gate
Aligning IT to the Strategic Plan
RG Perspective Aligning IT to the Strategic Plan Why it s permanently number one on your to-do list 11 Canal Center Plaza Alexandria, VA 22314 HQ 703-548-7006 Fax 703-684-5189 www.robbinsgioia.com 2013