Theoretical consideration in establishing the parameters of longwall panel
|
|
|
- Jemimah Oliver
- 10 years ago
- Views:
Transcription
1 GOSPODARKA SUROWCAMI MINERALNYMI Tom Zeszyt 4/2 MAREK JASZCZUK*, JAN KANIA* Theoretical consideration in establishing the parameters of longwall panel Introduction So far the level of mining production concentration was assessed on the basis of analysis of coal mine production in Poland or on the basis of tendencies in the world mining industry. New perspective as regards the problem of high mining production concentration, considered as a daily production for which the balance between the cost of coal winning and the revenue from coal selling is reached, including geological-and-mining, technical-and-organizational and economical-and-financial conditions referring to a given longwall face, was suggested in the paper. To facilitate the analysis of the economic efficiency of coal extraction from the longwall face a model enabling the designation of daily coal output was devised, securing the achievement of the assumed profit or the balance between the costs of coal production and incomes from sales for a specific longwall. The proposed procedure involves the following stages: designation of the daily coal output in relation to the economic, mining and geological conditions, designation of the daily coal output in relation to the production potential of mining machinery and organizational factors for a specific longwall, determination of the conditions of efficient extraction on the grounds of the comparison between the two coal output quantities mentioned above. * Silesian University of Technology, Faculty of Mining and Geology, Institute of Mining Mechanization, Gliwice.
2 96 If, on the grounds of the potential of the longwall system, it is impossible to designate such coal output that secures the economic efficiency, the analysis should focus on the option of reducing the costs of coal production. Such conclusion stems from the fact that after the possibilities of the longwall field are explored (resources) in consideration of a given production potential of the mining equipment at the coal company s disposal, this is the only way to improve efficiency. 1. The economic model The economic model involves the required daily output treated as an explainable variable and the coal field reserves and extraction time as explanatory variables. Other impact factors were expressed as model parameters. The selection of coal reserves and extraction time as the explanatory variables predominantly resulted from the assumed method of designating the daily coal output in consideration of the simultaneous change in the coal reserves and the extraction time. Due to the use of time factor in the analysis, two main criteria were taken into account during the cost division: relationship between costs component and production scale, relationship between costs component and duration of longwall panel mining. The inclusion of the time factor has led to the derivation of three costs categories [3]: absolutely fixed costs K BS, which are the costs of the preparation of the longwall field for mining, these costs may change rapidly, due to different technologies of driving roads and the adoption of different organization and the technical means used in moving the longwall equipment for further longwall cut-through; relatively fixed costs K WS, entailing the costs of the functioning of the spatial underground structure of the coal mine. The extraction time of the coal field depends on the achieved daily coal output and the reserves of the longwall field. Its variability may result from the intensity of mining, associated, for example, with seasonal demand for coal, or, with the occurrence of other factors limiting coal output; variable costs K Z which are proportional to the changes in coal output and to the scope of the activity of the coal mine. On the bases of the above mentioned costs categories, the devised economic model [3] makes it possible to determine the required daily coal output in relation to the reserves of the longwall field and its extraction time for the assumed profit level or for the assumed balance between the costs of coal production and the incomes from coal sales. The model takes into account the total costs of coal production, including all stages of the production process: the preparatory operations, longwall moves, extraction, closing down of the longwall. The model fulfilling the assumptions of the accepted methodology was based on economic modeling used in testing critical functional zones of longwall faces or coal mines [1, 4].
3 The economic calculations based on the designed model make it possible to select the optimal solution for the assumption of a specific level of profit. The analysis was carried out in view of operational profit. In consideration of the assumed profit level, the longwall panel resources may be determined as follows: 97 Z0 ( KBS kws t) Zp C ( Z k ) z 0 z [t] (1) or, the extraction time for the longwall panel with the assumed resources Z p. Zp[ C ( Z0 k )] Z0 K t Z k z z BS 0 ws [d] (2) Whereas, to designate the quantity of the daily output of coal that will secure the assumed profit level for given longwall panel resources, the following formula is employed: Z0 kws Q Z0 K ( Cz Z0 kz ) Zp BS [t/d] (3) where: Zp coal reserves of the longwall field [t], Z 0 assumed profit level, K BS absolutely fixed costs [PLN], k WS relatively fixed costs related to the time unit [PLN/day], t extraction time [day], C Z sale price for one ton of produced coal [PLN/t], k Z elementary variable costs, variable costs related to a ton of produced coal [PLN/t], Q daily coal output [t/day]. In Figure 1 the line of the costs balance R K (red line) and the line of coal winning costs balance in consideration of the assumed profit R kz (green line) or loss R ks (blue line) are shown. The break-even points for coal winning costs are indicated on each line. The graphs of the function of costs balance show that the assumed value of profit (points Z k1 Z k5 ) or loss (points S k1 S k5 ) exert a significant impact on the quantity of the daily output of coal, if the resources of the longwall panel are small, but, if the resources are large, such impact is definitely less significant. If the extraction time is maintained as constant, the achievement of the assumed profit level requires a substantially higher daily output of coal (point Z k2 and R kz ) in comparison
4 98 Fig. 1. Graph of the function of coal winning costs for the assumed profit or loss level Rys. 1. Wykres funkcji kosztów wydobycia wêgla dla zak³adanego poziomu zysku lub strat with the break-even point for costs and profits (point R k2 on line R k ). Moreover, in such case it is necessary to increase the resources of the longwall panel. 2. The daily coal output conditioned by the technical potential of machinery The analysis focused on the possibilities of achieving a high concentration of extraction under the mining and geological conditions of a specific longwall also requires a model that would enable the designation of the coal output in view of the technical potential of the longwall system. Assuming that the coal output is primarily conditioned by the technical parameters of the shearer loader, a model of the production process in the longwall may be utilized, as it considers: the theoretical capacity of the shearer loader, the degree of its utilization under given mining conditions, the parameters of the longwall face, actual worktime of mining machinery on a face, the cutting sequence. Considering a different course of the production process in the longwall, related to a specific nature of the two basic cutting sequences, the daily coal output from the longwall may be calculated as [2]:
5 W Q T (4) Q t T t where: Q t theoretical capacity of the shearer loader, T available work time of mining machinery on a face, T index of work time availability, t operational efficiency index. The theoretical capacity of the shearer loader under given mining conditions is derived from the following equation, in consideration of the technical parameters of the shearer loader (v max,z) and other parameters associated with the natural conditions and a given extraction system (H, ): 99 where: H longwall height, z nominal width of web, v max maximal haulage speed, coal density. Qt Hzvmax (5) The technological efficiency ratio is derived from the following equations: unidirectional cutting sequence: t kq L ( vu Llk ) 1 p z v ( 1 ) m (6) bidirectional cutting sequence t zp vp 2kQ L 1 zz v z v z ( Llk ) 1 v 1 v p ( 1 p z ) p v z (7) where: k Q index of theoretical capacity utilization of the shearer, L longwall length, L k length of shearer loader,
6 100 p z index of technological operations contribution, v u,v m haulage speed of the shearer in a course of cutting and return trip, v z,v p haulage speed of the shearer in downstream and upstream cutting trips, z z,z p width of the web of the shearer in downstream and upstream cutting trips. The index of theoretical capacity utilization of the shearer relates to the real average efficiency of the shearer, resulting from the effective width of web (z e ) and form the value of mean haulage speed achieved in the course of cutting under given operational conditions (v), to the theoretical capacity of the shearer. It reflects the utilization of potential technical possibilities of the shearer in the longwall face and is calculated for unidirectional sequences only in a cutting trip, whereas for bidirectional ones both in downstream and upstream cutting trips, from the following equation: k Q ze z v v max (8) Due to a specific nature of both cutting sequences and different state of the external load of the shearer, resulting, first and foremost, from the process of loading, the shearer achieves different haulage speeds for downstream and upstream trips. This factor is considered in the designation of the technological efficiency ratio by the quotient of the mean values of haulage speed achieved for both cutting directions (v z /v p,v p /v z for the bidirectional cutting sequence and v u /v m for the unidirectional sequence). All the above mentioned parameters (Q t,k Q,v z /v p or v u /v m ) represent the technical factors in the model. Another important aspect considered in the model is the effective production time of the shearer (the theoretical capacity utilization), which is both an organizational and a technical factor. The effective production time is the resultant of: available work time of mining machinery on a face (T) and the degree of this time utilization ( T ). The available work time of mining machinery on a face stems from the accepted form of production organization (number of shifts, number of production shifts), the requirements connected with the operational conditions prevailing in the longwall and the distance between the longwall and the shaft. Its full utilization may be limited by unplanned downtime caused by mining, technical or organizational reasons. The value of the technological efficiency index makes it possible to determine which part of the potential daily coal output, derived from the theoretical capacity of the shearer under specific mining conditions and from the real production time of the shearer during 24 hours (T T ), is the daily output that may be obtained for the applied cutting sequence. On the grounds of the values of this index, it is possible to trace the influence of particular factors associated with the utilization of the theoretical capacity of the shearer loader, the duration of the sumping operations and the length of the longwall, on the possibility of achieving a high concentration of extraction for the applied cutting sequence.
7 Procedure of designating high concentration of coal production The proposed model enables the designation of the required daily output of coal for the assumed profit level, on the basis of forecasting particular coal winning costs components. The coal output is a determinant of high concentration of production and may be used for analyzing the efficiency of working faces during extraction works, or after the completion of the longwall strip, for deriving information on the impact of particular technological and organizational factors on the classified costs categories. The algorithm of the procedure for given longwall resources and the equipment at the disposal of a coal mine is shown in Figure 2. The first stage entails the preparation of input data on: geological and mining conditions, technical equipment, economic and organizational aspects. The data on the geological and mining conditions should comprise the information on the mining technology used in the longwall, and the longwall panel parameters, as they are essential for determining the production potential of the longwall and longwall panel reserves, and for forecasting dislocations in coal seams deposition. The minimal range of information should include: the characteristics of the mining technology (longwall layout and working sequence, roof control: with caving or backfilling, advancing or retreating longwall), the geometrical parameters of the longwall panel (height, width, length, inclination), coal density, coal cutability in a given seam, occurrence of interlayers (cutability, density), forecasted natural hazards (methane, rock mass tremors), occurrence of faults (height of throw of fault, azimuth, location), washing away of the coal seam. The data on the technical equipment should entail all mining machinery used in the course of: preparatory works, longwall s support functions connected with moves of machinery and longwall shut down, extraction works. The characteristics of the mining equipment should include the specifications of the technical parameters that are essential for forecasting: the advance of headings and longwall raise, the course of the processes of disassembly, moving and assembly of machinery, the production potential of the longwall face. The economic and organizational data referring to the preparation of the longwall panel and the ensuing extraction works should include the information concerning: the given longwall face, the production level on which it is located in relation to the outlay of the mine.
8 102 Fig. 2. Procedure of daily coal output determination for given reserves of longwall field and given longwall machinery Rys. 2. Procedura okreœlania dziennego uzysku wêgla dla danych rezerw pola przodka œcianowego i danych maszyn przodka œcianowego
9 103 To estimate the costs associated with longwall faces, the following information is required: number of longwalls mined in particular months, number of months during which extraction works were carried out in the analyzed longwall panel, number of longwalls mined on a given production level in particular months, length of transport routes on a given production level, length of transport routes in the coal mine, reserves of the analyzed longwall panel, total reserves of the longwall panels mined on a given production level, total coal output won from the analyzed longwall panel in the calendar year, total coal output of the mine in the calendar year, annual capital costs of coal production related to the coal mine. The organizational aspect, involving the planning of the coal mine operation, includes the following issues: number of longwalls in the coal mine and on a given production level in the analyzed time frames, preparation of the longwall panel, system of the organization of works in roadways and longwall faces, location of the longwall panels, and, in additional, the analyses of the seasonality of coal sales. Depending on the technical equipment at the disposal of the mine, the range of preparatory operations, the length of transport routes, the system of moving longwall machinery, the system of work organization and the mining and geological conditions, the analysis should be conducted for all possible options of the longwall panel preparation in view of designating absolutely (permanently) fixed costs K BS and the duration of the above mentioned operations. In the next step, on the grounds of the data on particular costs components, the values of the parameters characterizing relatively fixed costs K WS and unitary variable costs K Z should be derived, as well as the forecasted coal sale price C Z for the analyzed time frame. To designate the production potential of the working face, a theoretical model of the course of coal production process was applied [2]. The parameter that describes the assumed technical solution of the coal shearer is the maximal haulage speed. If the factors that reduce the daily output of coal are considered, for example the seasonal nature of coal sales, or the occurrence of geological disturbances in the longwall panel, the time when the demand for coal on the market is slack should be determined and the coal output estimated for such time. On the bases of the influence factors expressed as parameters, the simulation of their impact may be conducted on the grounds of the proposed economic model. At first, the break-even point for costs and profits should be designated for given longwall panel reserves,
10 104 to check if it is possible to meet the condition of effective coal production. Such condition is fulfilled, when the production potential of the longwall is bigger than the daily output of coal designated for the break-even point of the costs balance. Then, for the assumed profit level, the concentration of coal production is designated, together with the corresponding range of extraction time of the longwall panel. After determining, for each pair of parameters Q i, t i,the technical and organizational parameters of mining the longwall, including: the option of longwall panel preparation, cutting sequence, technological efficiency index, time availability of machines, the required degree of machine utilization, the best option is selected from the point of view of planning the operation of the coal mine and minimizing the failure to reach the assumed technical objective. If the condition of effective mining is not met, the sensitivity analysis of the model should be made in view of particular influence factors, to determine an essential strategy of cost-cutting in coal winning process. While considering the periods during which the demand for coal is slack, the break even point for costs and profits in the cost balance is designated for given resources of the longwall panel and the parameters that describe such period: its duration and the quantity by which the daily output should be reduced. If the condition of effective mining is met; however, for the designated daily output of coal in reference to other periods (when the market is not slack), the range of the actual daily coal production concentration is designated. Next, the procedure adopted for the period in which the daily output is not reduced is followed. If the above mentioned condition is not met, there are two possibilities: the first one identical to the one described above, involves the determination of an essential strategy of cutting the total coal production costs from a given longwall. If this is impossible, the total coal production costs should be derived for the following cases: extraction of the longwall without any limitations, extraction with limitations in consideration of slack demand for coal. In the next step, on the bases of the foregoing, the forecasted, corrected profit or loss level is determined. Conclusions The technical and organizational conditions exert both direct and indirect impacts on the option of achieving the required daily output. The direct impact involves the production potential of the longwall face and the degree of its utilization, whereas the indirect one involves shaping the values of relatively fixed costs depending on the extraction time of the longwall panel with specific coal reserves. The economic conditions determine the required daily output providing, in consideration of specific coal reserves, the balance of the costs. The sine qua non prerequisite of achieving at least the balance between the costs is such degree of the utilization of the production potential that could provide the daily coal output determined by the economic conditions.
11 105 REFERENCES [1] J a b ³ o ñ s k a - F i r e k B., 1999 Kierunki strategii dzia³ania kopalñ w œwietle badañ modelowych. Zeszyty Naukowe Politechniki Œl¹skiej, seria Górnictwo 2000, Gliwice. [2] Jaszczuk M.,1999 Wp³ywstanuobci¹ enia kombajnu œcianowego du ej mocy na mo liwoœæ uzyskania wysokiej koncentracji wydobycia. Zeszyty Naukowe Politechniki Œl¹skiej, seria Górnictwo nr 1406, Gliwice. [3] Jaszczuk M., Kania J., 2007 Warunki skutecznego i efektywnego wybierania pok³adów wêgla systemem œcianowym. Prace Naukowe-Monografie, CMG KOMAG, Gliwice. [4] M a g d a R., 1999 Modelowanie i optymalizacja elementów kopalñ. Biblioteka Szko³y Eksploatacji Podziemnej, Kraków. TEORETYCZNE ROZWA ANIA O USTALANIU PARAMETRÓW PRZODKA ŒCIANOWEGO S³owa kluczowe Przodek œcianowy, koszty produkcji wêgla, czynniki krytyczne, efektywnoœæ ekonomiczna, dzienny uzysk wêgla, techniczny potencja³ systemów przodka œcianowego Streszczenie Proponowana metoda jest oparta na innym podejœciu do przodka œcianowego, z uwzglêdnieniem analizy kosztów etapu prac przygotowawczych przed rozpoczêciem wydobycia. Ujêcie czynnika czasu doprowadzi³o do wyodrêbnienia trzech kategorii kosztów: koszty absolutnie sta³e K BS, koszty wzglêdnie sta³e K WS, koszty zmienne K Z. THEORETICAL CONSIDERATION IN ESTABLISHING THE PARAMETERS OF LONGWALL PANEL Key words Longwall face, coal production costs, crucial factors, economic efficiency, daily coal output, technical potential of longwall systems Abstract The proposed method is based on a different approach to a longwall face, including the analysis of the costs of the preparatory works stage previous to extraction works. The inclusion of the time factor has led to the derivation of three costs categories: absolutely fixed costs K BS, relatively fixed costs K WS, variable costs K Z. On the grounds of the above mentioned three costs categories an economic model was designed, enabling the designation of daily coal output depending on the reserves of a given longwall panel and its extraction time, for the assumed profit level, or for the assumed balance between the costs of coal production and the incomes from coal sales. The model incorporates the total costs of coal production, including all stages of the production process: preparation works of the longwall panel, longwall moves, extraction works, longwall shut down. The grounds for the model, in accordance with the assumed methodology, were provided by economic modeling used in diagnosing critical functional zones of longwall faces or coalmines. The analysis of the possibilities of obtaining high concentration of extraction under definite mining and geological conditions of a given longwall face requires a model that should make it possible to designate the coal output in view of the technical potential of the longwall system. If it is assumed that the coal output is mainly conditioned by the technical parameters of the shearer loader, the model of the production process in the longwall
12 106 may be utilized, as it includes: theoretical capacity of the shearer loader, the degree of its utilization under given mining conditions, parameters of the longwall face, actual worktime of mining machinery on a face, cutting sequence. Thus, the analysis entails the technical, organizational and technological aspects. Considering a different course of the production process in the longwall, related to a specific nature of the two basic cutting sequences, the daily coal output from the longwall is function of: theoretical capacity of the shearer loader, available work time of mining machinery on a face, work time availability, operational efficiency index. The theoretical capacity of the shearer loader under given mining conditions is derived in consideration of the technical parameters of the shearer loader and other parameters associated with the natural conditions and a given extraction system. A suggested method for determination of required daily production, which is an indicator of mining production concentration in the aspect of balancing the total cost of coal winning and the revenue from coal selling, can be used for: determination of minimal daily production, which will ensure effective mining, in conditions of a given longwall (given height, length and panel) and with a use of technical equipment available in the mine, determination of longwall panel parameters and determination of mining duration for technical equipment available in the mine, selection of technical equipment which will enable effective mining in conditions of a given longwall, for assumed total costs of coal winning.
SIMULATION OF EXTRACTION RATE AND SCHEDULING BASED ON GEOLOGICAL AND QUALITY MODELS AS A METHOD OF MINE PLANNING IN MODERN MINING
Górnictwo i Geoin ynieria Rok 29 Zeszyt 3/2 2005 Krzysztof Olszówka, Filip Orzechowski * SIMULATION OF EXTRACTION RATE AND SCHEDULING BASED ON GEOLOGICAL AND QUALITY MODELS AS A METHOD OF MINE PLANNING
The successful integration of 3D seismic into the mining process: Practical examples from Bowen Basin underground coal mines
Geophysics 165 Troy Peters The successful integration of 3D seismic into the mining process: Practical examples from Bowen Basin underground coal mines This paper discusses how mine staff from a number
Depreciation of fixed assets and efficiency of investment and operation of a mining plant
GOSPODARKA SUROWCAMI MINERALNYMI Tom 23 2007 Zeszyt 4 TADEUSZ FRANIK* Depreciation of fixed assets and efficiency of investment and operation of a mining plant Key words Mining, hard coal mining, depreciation
Piotr Tofiło a,*, Marek Konecki b, Jerzy Gałaj c, Waldemar Jaskółowski d, Norbert Tuśnio e, Marcin Cisek f
Available online at www.sciencedirect.com Procedia Engineering 57 (2013 ) 1156 1165 11th International Conference on Modern Building Materials, Structures and Techniques, MBMST 2013 Expert System for Building
Summary. Chapter Five. Cost Volume Relations & Break Even Analysis
Summary Chapter Five Cost Volume Relations & Break Even Analysis 1. Introduction : The main aim of an undertaking is to earn profit. The cost volume profit (CVP) analysis helps management in finding out
PulseTerraMetrix RS Production Benefit
PulseTerraMetrix RS Production Benefit Mine management is commonly interested in assessing the potential benefit of how a shovel based payload monitoring could translate into increased production, or through
BENEFITS OF USING MOBILE CRUSHING AND SCREENING PLANTS IN QUARRYING CRUSHED STONE. 1. Introduction. Mario Klanfar*, Darko Vrkljan*
AGH Journal of Mining and Geoengineering vol. 36 No. 3 2012 Mario Klanfar*, Darko Vrkljan* BENEFITS OF USING MOBILE CRUSHING AND SCREENING PLANTS IN QUARRYING CRUSHED STONE 1. Introduction Mobile crushers
3D Model of Carbon Relief in the Czech Part of Upper Silesian Coal Basin
3D Model of Carbon Relief in the Czech Part of Upper Silesian Coal Basin Vladimír Mandrla Green Gas DPB, a.s. tř. Rudé armády 637 739 21, Paskov [email protected] Abstract. Coal mining in the Czech
REQUIREMENTS FOR REGISTRATION AS A PROFESSIONAL ENGINEER WITH THE PROFESSIONAL ENGINEERS BOARD SINGAPORE
ATTACHMENT 9 REQUIREMENTS FOR REGISTRATION AS A PROFESSIONAL ENGINEER WITH THE PROFESSIONAL ENGINEERS BOARD SINGAPORE Requirements 1 The Professional Engineers Board will register a candidate as a professional
Statistical Forecasting of High-Way Traffic Jam at a Bottleneck
Metodološki zvezki, Vol. 9, No. 1, 2012, 81-93 Statistical Forecasting of High-Way Traffic Jam at a Bottleneck Igor Grabec and Franc Švegl 1 Abstract Maintenance works on high-ways usually require installation
Total deliverability gas storage analysis methodology and case study
Risk, Reliability and Societal Safety Aven & Vinnem (eds) 2007 Taylor & Francis Group, London, ISBN 978-0-415-44786-7 Total deliverability gas storage analysis methodology and case study B. Haukelidsæter
THE LEADING MINE SCHEDULING SOLUTION
THE LEADING MINE SCHEDULING SOLUTION XPAC XPAC: Scheduling software that is truly life of mine. XPAC is a business focused mine scheduling application, designed specifically for reserve modelling, production
Many Word problems result in Quadratic equations that need to be solved. Some typical problems involve the following equations:
Many Word problems result in Quadratic equations that need to be solved. Some typical problems involve the following equations: Quadratic Equations form Parabolas: Typically there are two types of problems:
Simulation of processes in a mining enterprise with Tecnomatix Plant Simulation
Simulation of processes in a mining enterprise with Tecnomatix Plant Simulation Vladimir Medvedev Simulation of ore extraction on the open mountain works Page 2 Simulation objective To verify current control
OPTIMIZATION OF LOAD HAUL DUMP MINING SYSTEM BY OEE AND MATCH FACTOR FOR SURFACE MINING
OPTIMIZATION OF LOAD HAUL DUMP MINING SYSTEM BY OEE AND MATCH FACTOR FOR SURFACE MINING *Ram Prasad Choudhary Department of Mining Engineering, National Institute of Technology Karnataka, Surathkal-575025
The Digital Mine Concept and perspectives
The Digital Mine Concept and perspectives PSI Production GmbH, Aschaffenburg, Germany Table of Content 1. Introdu ctio n... 3 2. Targets o f a Digital Mine... 6 3. Main co ntrol fun ction s of th e Digital
Cost VOLUME RELATIONS & BREAK EVEN ANALYSIS
1. Introduction The cost volume profit (CVP) analysis helps management in finding out the relationship of costs and revenues to profit. Cost depends on various factors like Volume of production Product
By Gene Kitts, Senior Vice President-Mining Services, International Coal Group, Inc.
Why Surface Mine? By Gene Kitts, Senior Vice President-Mining Services, International Coal Group, Inc. Why do we surface mine in Central Appalachia? It s certainly not because we like the public attention
Coal preparation technology in Poland
GOSPODARKA SUROWCAMI MINERALNYMI Tom 22 2006 Zeszyt 4 WIES AW S. BLASCHKE*, LIDIA GAWLIK**, STANIS AW A. BLASCHKE*** Coal preparation technology in Poland Key words Coal preparation plant, steam coal,
Types of Mining - Expert Table
See page 6 Minerals Downunder Teacher Guide (2002) - Activity 4a Types of Mining - Expert Table How to Jigsaw Information 1. Divide the class into Home Groups of five for the five different types of mining
Application MS Access for Surveying Computations**
GEOMATICS AND ENVIRONMENTAL ENGINEERING Volume 5 Number 4 2011 Jan Ruchel*, Tomasz Adamczyk* Application MS Access for Surveying Computations** 1. Introduction The computations performed in surveying tasks
House Published on www.jps-dir.com
I. Cost - Volume - Profit (Break - Even) Analysis A. Definitions 1. Cost - Volume - Profit (CVP) Analysis: is a means of predicting the relationships among revenues, variable costs, and fixed costs at
Managerial Accounting Prof. Dr. Vardaraj Bapat Department of School of Management Indian Institute of Technology, Bombay
Managerial Accounting Prof. Dr. Vardaraj Bapat Department of School of Management Indian Institute of Technology, Bombay Lecture - 26 Cost Volume Profit Analysis Dear participations in our early session,
Accounting for stripping costs in the production phase costs of waste removal and the associated benefit
IFRIC Meeting Agenda reference 2A Staff Paper Date March 2010 Project Topic xtractive Activities Accounting for stripping costs in the production phase costs of waste removal and the associated benefit
HUMAN RESOURCE MANAGEMENT
HUMAN RESOURCE MANAGEMENT 1. a) HRM Strategies b) Difference between Recruitment and Selection 2. a) Techniques of Performance Appraisal b) Methods of Executive Development 3. a) Methods of wage determination
UG802: COST MEASUREMENT AND COST ANALYSIS
UG802: COST MEASUREMENT AND COST ANALYSIS April 6, 2014 Kanokporn Rienkhemaniyom, Ph.D. Managerial Accounting - Overview Definition: A profession that involves partnering in management decision making,
OUTSOURCING STRATEGY SELECTION FOR TRANSPORTATION SERVICES BASED ON THE MAKE-OR-BUY DECISION
TRANSPORT PROBLEMS 2015 PROBLEMY TRANSPORTU Volume 10 Issue 2 Maria CIEŚLA Faculty of Transport, Silesian University of Technology Krasiński 8, 40-019 Katowice, Poland Corresponding author. E-mail: [email protected]
Big Ideas in Mathematics
Big Ideas in Mathematics which are important to all mathematics learning. (Adapted from the NCTM Curriculum Focal Points, 2006) The Mathematics Big Ideas are organized using the PA Mathematics Standards
Hazard Identification and Risk Assessment for the Use of Booster Fans in Underground Coal Mines
Hazard Identification and Risk Assessment for the Use of Booster Fans in Underground Coal Mines Felipe Calizaya Michael G. Nelson Mahesh Shriwas Feb 26, 2013 Outline Introduction Booster Fans in U/G Coal
MapReduce Approach to Collective Classification for Networks
MapReduce Approach to Collective Classification for Networks Wojciech Indyk 1, Tomasz Kajdanowicz 1, Przemyslaw Kazienko 1, and Slawomir Plamowski 1 Wroclaw University of Technology, Wroclaw, Poland Faculty
WYBRANE PROBLEMY OPTYMALIZACJI WODY POD STĘPKĄ W TRANSPORCIE TOWARÓW DROGĄ MORSKĄ
ZESZYTY NAUKOWE POLITECHNIKI ŚLĄSKIEJ 2013 Seria: TRANSPORT z. 80 Nr kol. 1895 Waldemar UCHACZ 1, Wiesław GALOR 2 WYBRANE PROBLEMY OPTYMALIZACJI WODY POD STĘPKĄ W TRANSPORCIE TOWARÓW DROGĄ MORSKĄ Streszczenie.
Using simulation to calculate the NPV of a project
Using simulation to calculate the NPV of a project Marius Holtan Onward Inc. 5/31/2002 Monte Carlo simulation is fast becoming the technology of choice for evaluating and analyzing assets, be it pure financial
Case Package 2015. Rotman Online Trading Competition
Case Package 2015 Rotman Online Trading Competition Table of Contents Table of Contents Important Information... 3 Case Summaries... 4 Sales & Trader Case... 5 Commodities Trading Case... 8 2 Important
MINING CHAINS IN HIGH EFFICIENCY LONGWALL SYSTEMS. 1. Introduction. Maksymilian Klank* AGH Journal of Mining and Geoengineering vol. 36 No.
AGH Journal of Mining and Geoengineering vol. 36 No. 3 2012 Maksymilian Klank* MINING CHAINS IN HIGH EFFICIENCY LONGWALL SYSTEMS 1. Introduction Coal mining is one of the few human technological activity
VOLATILITY AND DEVIATION OF DISTRIBUTED SOLAR
VOLATILITY AND DEVIATION OF DISTRIBUTED SOLAR Andrew Goldstein Yale University 68 High Street New Haven, CT 06511 [email protected] Alexander Thornton Shawn Kerrigan Locus Energy 657 Mission St.
ANALYSIS OF THE POTENTIALS OF ADAPTING ELEMENTS OF LEAN METHODOLOGY TO THE UNSTABLE CONDITIONS IN THE MINING INDUSTRY
AGH Journal of Mining and Geoengineering vol. 36 No. 3 2012 Joanna Helman* ANALYSIS OF THE POTENTIALS OF ADAPTING ELEMENTS OF LEAN METHODOLOGY TO THE UNSTABLE CONDITIONS IN THE MINING INDUSTRY 1. Introduction
Deswik.Sched. Gantt Chart Scheduling
Deswik.Sched Gantt Chart Scheduling SCHEDULING SOLUTIONS THAT SET US APART A dynamic, modern approach to scheduling From interactive Gantt charts to PERT network diagrams, Deswik.Sched is tailored for
Preparatory Paper on Focal Areas to Support a Sustainable Energy System in the Electricity Sector
Preparatory Paper on Focal Areas to Support a Sustainable Energy System in the Electricity Sector C. Agert, Th. Vogt EWE Research Centre NEXT ENERGY, Oldenburg, Germany corresponding author: [email protected]
FACULTY OF MANAGEMENT. Department of Corporate Finance USING OF REAL OPTIONS IN DECISION MAKING CONCERNING LIQUIDATION OF COAL-MINES
FACULTY OF MANAGEMENT Department of Corporate Finance Cezary Mróz USING OF REAL OPTIONS IN DECISION MAKING CONCERNING LIQUIDATION OF COAL-MINES Summary of doctoral thesis Promoter: dr hab. Jacek Mizerka,
Storm Drainage Systems 11.9-1
Storm Drainage Systems 11.9-1 11.9 Gutter Flow Calculations 11.9.1 Introduction Gutter flow calculations are necessary in order to relate the quantity of flow (Q) in the curbed channel to the spread of
Krzysztof DROBNY, Mariusz HETMAŃCZYK *
S E L E C T E D E N G I N E E R I N G P R O B L E M S N U M B E R 3 I N S T I T U T E O F E N G I N E E R I N G P R O C E S S E S A U T O M A T I O N A N D I N T E G R A T E D M A N U F A C T U R I N G
Treatment Practice for Controlling Water Damage in the Annular Space of Shaft Freezing Hole
An Interdisciplinary Response to Mine Water Challenges - Sui, Sun & Wang (eds) 2014 China University of Mining and Technology Press, Xuzhou, ISBN 978-7-5646-2437-8 Treatment Practice for Controlling Water
The Trip Scheduling Problem
The Trip Scheduling Problem Claudia Archetti Department of Quantitative Methods, University of Brescia Contrada Santa Chiara 50, 25122 Brescia, Italy Martin Savelsbergh School of Industrial and Systems
Engineering Career Path
Career Path A World-Class Company Serving the Mining Industry Interested? Whatever your career goals, Joy Global + Joy Global Has a Positive Corporate Culture Joy Global Inc. is a worldwide leader in high-productivity
The usage of DEM to create the 3D cadastre
Scientific Journals Maritime University of Szczecin Zeszyty Naukowe Akademia Morska w Szczecinie 2013, 33(105) pp. 86 90 2013, 33(105) s. 86 90 ISSN 1733-8670 The usage of DEM to create the 3D cadastre
Economical modeling for identification of best drilling choice in sublevel stoping
GOSPODARKA SUROWCAMI MINERALNYMI Tom 24 2008 Zeszyt 4/2 K. ORAEE*, A.H. BANGIAN**, A. PARHIZKAR*** Economical modeling for identification of best drilling choice in sublevel stoping Introduction Basically
R&D Expenditures in Poland. Voivodship Perspective
Barometr Regionalny Tom 12 nr 2 R&D Expenditures in Poland. Voivodship Perspective Aleksandra Zygmunt Opole University of Technology, Poland Abstract The main purpose of the paper is R&D expenditures analysis
Scope and Sequence KA KB 1A 1B 2A 2B 3A 3B 4A 4B 5A 5B 6A 6B
Scope and Sequence Earlybird Kindergarten, Standards Edition Primary Mathematics, Standards Edition Copyright 2008 [SingaporeMath.com Inc.] The check mark indicates where the topic is first introduced
Chapter Managing Knowledge in the Digital Firm
Chapter Managing Knowledge in the Digital Firm Essay Questions: 1. What is knowledge management? Briefly outline the knowledge management chain. 2. Identify the three major types of knowledge management
THE INFLUENCE OF STRUCTURAL FEATURES ON VIBRATION OF THE PROPELLER ENGINE TEST BENCH
JOURNAL OF THEORETICAL AND APPLIED MECHANICS 53,1,pp.27-36,Warsaw2015 DOI: 10.15632/jtam-pl.53.1.27 THE INFLUENCE OF STRUCTURAL FEATURES ON VIBRATION OF THE PROPELLER ENGINE TEST BENCH Wiesław Ostapski,
SPINDLE ERROR MOVEMENTS MEASUREMENT ALGORITHM AND A NEW METHOD OF RESULTS ANALYSIS 1. INTRODUCTION
Journal of Machine Engineering, Vol. 15, No.1, 2015 machine tool accuracy, metrology, spindle error motions Krzysztof JEMIELNIAK 1* Jaroslaw CHRZANOWSKI 1 SPINDLE ERROR MOVEMENTS MEASUREMENT ALGORITHM
Resource Scheduler 2.0 Using VARCHART XGantt
Resource Scheduler 2.0 Using VARCHART XGantt NETRONIC Software GmbH Pascalstrasse 15 52076 Aachen, Germany Phone +49 (0) 2408 141-0 Fax +49 (0) 2408 141-33 Email: [email protected] www.netronic.com Copyright
Manufacturing Applications in Microsoft Dynamics GP 10.0
Manufacturing Applications in Microsoft Dynamics GP 10.0 8817: Manufacturing Applications in Microsoft Dynamics GP 10.0 (4 Days) About this Course This four-day instructor-led course provides students
CIVIL ENGINEERING Vol. II - Underground Mining Methods and Equipment - S. Okubo and J. Yamatomi UNDERGROUND MINING METHODS AND EQUIPMENT
UNDERGROUND MINING METHODS AND EQUIPMENT S. Okubo and J. Yamatomi University of Tokyo, Japan Keywords: Mining method, underground mining, room-and-pillar mining, sublevel stoping, cut-and-fill, longwall
Traffic Prediction in Wireless Mesh Networks Using Process Mining Algorithms
Traffic Prediction in Wireless Mesh Networks Using Process Mining Algorithms Kirill Krinkin Open Source and Linux lab Saint Petersburg, Russia [email protected] Eugene Kalishenko Saint Petersburg
An Analysis of Accidents Caused by Improper Functioning of Machine Control Systems
International Journal of Occupational Safety ANALYSIS and Ergonomics OF ACCIDENTS (JOSE) CAUSED 2004, Vol. BY CS 10, FAILURE No. 2, 129 136 An Analysis of Accidents Caused by Improper Functioning of Machine
COST & BREAKEVEN ANALYSIS
COST & BREAKEVEN ANALYSIS http://www.tutorialspoint.com/managerial_economics/cost_and_breakeven_analysis.htm Copyright tutorialspoint.com In managerial economics another area which is of great importance
Predicting outcome of soccer matches using machine learning
Saint-Petersburg State University Mathematics and Mechanics Faculty Albina Yezus Predicting outcome of soccer matches using machine learning Term paper Scientific adviser: Alexander Igoshkin, Yandex Mobile
Software for data analysis and accurate forecasting. Forecasts for Guaranteed Profits. The Predictive Analytics Software for Insurance Companies
Software for data analysis and accurate forecasting Forecasts for Guaranteed Profits The Predictive Analytics Software for Insurance Companies About Blue Yonder Blue Yonder, established in 2008, is the
The Problem of Excess and Obsolete Inventory Management on the Example of Spare Parts
Proceedings of FIKUSZ 14 Symposium for Young Researchers, 2014, 89-96 pp The Author(s). Conference Proceedings compilation Obuda University Keleti Faculty of Business and Management 2014. Published by
Process Modelling from Insurance Event Log
Process Modelling from Insurance Event Log P.V. Kumaraguru Research scholar, Dr.M.G.R Educational and Research Institute University Chennai- 600 095 India Dr. S.P. Rajagopalan Professor Emeritus, Dr. M.G.R
Modelling of Contact Problems of Rough Surfaces
Modelling of Contact Problems of Rough Surfaces N. Schwarzer, Saxonian Institute of Surface Mechanics, Am Lauchberg 2, 04838 Eilenburg, Germany, Tel. ++49 (0) 3423 656639 or 58, Fax. ++49 (0) 3423 656666,
ADVANCED CONTROL TECHNIQUE OF CENTRIFUGAL COMPRESSOR FOR COMPLEX GAS COMPRESSION PROCESSES
ADVANCED CONTROL TECHNIQUE OF CENTRIFUGAL COMPRESSOR FOR COMPLEX GAS COMPRESSION PROCESSES by Kazuhiro Takeda Research Manager, Research and Development Center and Kengo Hirano Instrument and Control Engineer,
15. How would you show your understanding of the term system perspective? BTL 3
Year and Semester FIRST YEAR II SEMESTER (EVEN) Subject Code and Name BA7201 OPERATIONS MANAGEMENT Faculty Name 1) Mrs.L.SUJATHA ASST.PROF (S.G) 2) Mr. K.GURU ASST.PROF (OG) Q.No Unit I Part A BT Level
Chapter 111. Texas Essential Knowledge and Skills for Mathematics. Subchapter B. Middle School
Middle School 111.B. Chapter 111. Texas Essential Knowledge and Skills for Mathematics Subchapter B. Middle School Statutory Authority: The provisions of this Subchapter B issued under the Texas Education
Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras
Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras Lecture - 36 Location Problems In this lecture, we continue the discussion
SUPPLEMENTARY GREEN BOOK GUIDANCE
SUPPLEMENTARY GREEN BOOK GUIDANCE ADJUSTING FOR TAXATION IN PFI vs PSC COMPARISONS 1 INTRODUCTION 1.1 This guidance looks at the differential tax receipts that arise from the use of the Private Finance
SOFTWARE FOR THE OPTIMAL ALLOCATION OF EV CHARGERS INTO THE POWER DISTRIBUTION GRID
SOFTWARE FOR THE OPTIMAL ALLOCATION OF EV CHARGERS INTO THE POWER DISTRIBUTION GRID Amparo MOCHOLÍ MUNERA, Carlos BLASCO LLOPIS, Irene AGUADO CORTEZÓN, Vicente FUSTER ROIG Instituto Tecnológico de la Energía
Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves
Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves 2001 Edition (as referred to in the Joint Ore Reserves Committee Code ( The JORC Code ) 1999 edition) Prepared
Algebra 1 2008. Academic Content Standards Grade Eight and Grade Nine Ohio. Grade Eight. Number, Number Sense and Operations Standard
Academic Content Standards Grade Eight and Grade Nine Ohio Algebra 1 2008 Grade Eight STANDARDS Number, Number Sense and Operations Standard Number and Number Systems 1. Use scientific notation to express
Template-based Eye and Mouth Detection for 3D Video Conferencing
Template-based Eye and Mouth Detection for 3D Video Conferencing Jürgen Rurainsky and Peter Eisert Fraunhofer Institute for Telecommunications - Heinrich-Hertz-Institute, Image Processing Department, Einsteinufer
Improving the Performance of Data Mining Models with Data Preparation Using SAS Enterprise Miner Ricardo Galante, SAS Institute Brasil, São Paulo, SP
Improving the Performance of Data Mining Models with Data Preparation Using SAS Enterprise Miner Ricardo Galante, SAS Institute Brasil, São Paulo, SP ABSTRACT In data mining modelling, data preparation
Application of sensitivity analysis in investment project evaluation under uncertainty and risk
International Journal of Project Management Vol. 17, No. 4, pp. 217±222, 1999 # 1999 Elsevier Science Ltd and IPMA. All rights reserved Printed in Great Britain 0263-7863/99 $ - see front matter PII: S0263-7863(98)00035-0
LIFE-CYCLE IMPACTS AND COSTS OF MANGANESE LOSSES AND RECOVERY DURING FERROMANGANESE PRODUCTION
LIFE-CYCLE IMPACTS AND COSTS OF MANGANESE LOSSES AND RECOVERY DURING FERROMANGANESE PRODUCTION L.A. Westfall 1, M.H. Cramer 1, J. Davourie 1, D. McGough 2 and M. Ali 1 1 Hatch Ltd., 2800 Speakman Drive,
EFFICIENT METHOD FOR STORAGE OF LONG CONVEYOR BELTS PASSAGES INSIDE THE BULK CONTAINERS
TRANSPORT PROBLEMS 2011 PROBLEMY TRANSPORTU Volume 6 Issue 3 Maria ŁUSZCZKIEWICZ-PIĄTEK University of Łódź, Faculty of Mathematics and Computer Science Department of Applied Computer Science Banacha St.
DECEMBER 2015 QUARTERLY REPORT
NEWS RELEASE 29 JANUARY 2016 DECEMBER 2015 QUARTERLY REPORT Prairie Mining Limited is pleased to present its quarterly report for the period ending 31 December 2015. Highlights during, and subsequent to,
Chapter. Break-even analysis (CVP analysis)
Chapter 5 Break-even analysis (CVP analysis) 1 5.1 Introduction Cost-volume-profit (CVP) analysis looks at how profit changes when there are changes in variable costs, sales price, fixed costs and quantity.
NEW MEXICO Grade 6 MATHEMATICS STANDARDS
PROCESS STANDARDS To help New Mexico students achieve the Content Standards enumerated below, teachers are encouraged to base instruction on the following Process Standards: Problem Solving Build new mathematical
CE Entrepreneurship. Investment decision making
CE Entrepreneurship Investment decision making Cash Flow For projects where there is a need to spend money to develop a product or establish a service which results in cash coming into the business in
318 DECREE. of the State Office for Nuclear Safety of 13 June 2202,
318 DECREE of the State Office for Nuclear Safety of 13 June 2202, On details for emergency preparedness assurance at nuclear installations and workplaces with ionizing radiation sources and on requirements
AN ALGORITHM FOR GENERATING BINARY PSEUDO-RANDOM SEQUENCES
ZESZYTY NAUKOWE POLITECHNIKI BIAŁOSTOCKIEJ. INFORMATYKA AN ALGORITHM FOR GENERATING BINARY PSEUDO-RANDOM SEQUENCES Wiktor Dańko Faculty of Computer Science, Bialystok University of Technology, Białystok,
Flow in data racks. 1 Aim/Motivation. 3 Data rack modification. 2 Current state. EPJ Web of Conferences 67, 02070 (2014)
EPJ Web of Conferences 67, 02070 (2014) DOI: 10.1051/ epjconf/20146702070 C Owned by the authors, published by EDP Sciences, 2014 Flow in data racks Lukáš Manoch 1,a, Jan Matěcha 1,b, Jan Novotný 1,c,JiříNožička
Printed circuit board [EDP 2005-108(0)]
Printed circuit board [EDP 2005-108(0)] 1. General 1.1. Scope and definition This requirement specifies technical considerations, declaration format and communication necessary for developing and issuing
Waste Transfer Pricing Methodology for the disposal of higher activity waste from new nuclear power stations
Waste Transfer Pricing Methodology for the disposal of higher activity waste from new nuclear power stations December 2011 Contents Contents... i Introduction... 1 Executive Summary... 1 Background...
Manufacturing Technology
Job Ready Assessment Blueprint Manufacturing Technology Test Code: 2084 / Version: 01 Copyright 2007. All Rights Reserved. General Assessment Information Blueprint Contents General Assessment Information
ICASL - Business School Programme
ICASL - Business School Programme Quantitative Techniques for Business (Module 3) Financial Mathematics TUTORIAL 2A This chapter deals with problems related to investing money or capital in a business