To What Extend Is Procurement Procedure Followed Under The Inter-Ministerial Procurement- (Case Study Vihiga County, Kenya)
|
|
|
- Benedict Arnold
- 10 years ago
- Views:
Transcription
1 To What Extend Is Procurement Procedure Followed Under The Inter-Ministerial Procurement- (Case Study Vihiga County, Kenya) Wilson Juma Fwamba, Dr. Shem Juma, Dr. Douglas Musiega. ABSTRACT: Governments across the globe appear to acknowledge that Pubic Procurement is a way of transforming the lives of its constituents. Public procurement is at the forefront of most reform efforts given that it plays a significant role in promoting accountability and transparency. This study relies on survey data of procurement professionals to delineate the current status of procurement procedure in Kenya. Findings suggest that procurement procedures as enshrined in the public procurement and disposal act has not yet led to significant transformative changes. Unethical practices, weak legislations and penalty and failure to educate the general public on the dangers of corruption were identified as the primary obstacles of effectively implementing procurement procedure. These findings suggest that in order to enhance quality service delivery, top leadership of the country, policymakers, procurement professionals and general public must take an active role in adoption of the processes across political, institutional and behavioral domains. 1.0 Introduction Procurement refers to the process of contracting for the acquisition or supply of goods, works or services that an individual or organization need. Public Procurement and Disposal Act 2005 defines procurement as the acquisition by purchase, rental, lease, hire, license, tenancy, franchise, or by any other contractual means of any type of works, assets, services or goods including livestock or any combination. Procurement encompasses the whole process of acquiring property and/or services. It begins when an agency has identified a need and decided on its procurement requirement. It continues through the processes of risk assessment, seeking and evaluating alternative solutions, contract award, delivery of and payment for the property and/or services and, where relevant, the on going management of a contract and consideration of options related to the contract. Procurement also extends to the ultimate disposal of property at the end of its useful life (Waters 2004). Sound public procurement policies and practices are among the essential elements of good governance (KIPPRA, 2006). Otieno (2004) notes that the irregular procurement activities in public institutions provide the biggest loophole through which public resources are misappropriated. According to Thai (2001), the basic principles of good procurement practice include accountability, where effective mechanisms must be in place in order to enable procuring entities spend the limited resources carefully, knowing clearly that they are accountable to members of the public; competitive supply, Wilson Juma Fwamba, Dr. Shem Juma, Dr. Douglas Musiega. Tel ([email protected]) (Msc Procurement and Logistics) Jomo Kenyatta University of Agriculture and Technology, Kenya which requires the procurement be carried out by competition unless there are convincing reasons for single sourcing; and consistency, which emphasizes the equal treatment of all bidders irrespective of race, nationality or political affiliation. The process should also uphold integrity by ensuring that there are no malpractices; informed decision-making, which requires public bodies to base decisions on accurate information and ensure that requirements are being met. More still, the Procurement practice should be responsive to aspirations, expectations and needs of the target society. Finally, there is need for transparency to enhance openness and clarity on procurement policy and its delivery (World Bank, 2003). Objectives of the Study i) To establish if procurement procedure is followed under the inter-ministerial procurement? Research Question i) How is procurement procedures followed under the interministerial procurement? Literature Review 2.5 Procurement Processes Public procurement is a powerful instrument for the transformation and realization of social and economic goals since its financed from taxation, grants, public debts and fees for services. The main goal of public procurement is effective and efficient provision of public service. It is aimed at satisfaction of customers in terms of cost, quality, and timeliness of the delivered product or service, minimizing administrative operating costs, conducting business with integrity, fairness and openness. (GoK, 2005). As such, open and competitive public procurement begins with the government description of its requirements and initiation of suppliers to indicate their interest in the contract and there professional capacity to fulfill it (Sigma policy brief 2000). 222
2 Flow Chart Of Standard Procurement Procedures figure 2.0 The procurement function identifies potential suppliers and invites them to submit bids. The process must ensure that supplier meets the specification of product quality, delivery dates and continuity. After the bidding phase, most procurement system require a public declaration of competitors names and bid price of the successful bidder (Sigma policy brief 2000). Since procurement cycle is often a complex process, there is a series of closely interrelated activities between the initial identification of needs and the final delivery of quality product and services which requires coordination and quality control to achieve the best value. However this can be undermined by unethical practices by the officers in the procuring entity (Westing and jadoun 1996).Effective procurement is considered to be a key strategic management tool in driving down cost and improving operational efficiency while ineffective procurement wastes time and money resources. Successful and efficient procurement practices are those that meet the needs of a customer, achieve optimum condition and value in regard to allocation of scarce tax payers resources (J.M Ntayi 2009). The practice needs a labor force with effective management skills that develop clear and professional specifications with full knowledge of a competitive process, negotiation and monitoring skill. (Hunja Steane et al 2003) continues to say that procurement system implemented with sound management practices in place ensure successful quality and service delivery to stakeholders. The sound practices demand that those responsible for implementing procurement should ensure that the objectives are clear and that quality is sustained. (Walker and Sidwell 1996) continues to say performance quality should not be a measure on the basis of time and cost only but should provide a measure to quality of product and services as well as other relevant measures. The procurement procedures outline in detail the specific actions to be taken so as to accomplish a purchase task within the guidelines of the company. The procedure provides the framework and direction for achieving the most economical supply of materials with the maximum efficiency. It also provides the means of processing information and communicating from the time of need until the materials are delivered (Kenneth, 2003). According to Gary (2002), procurement procedure entails the following major processes; Procurement Planning, Solicitation Planning, Solicitation, Source Selection, Contract Administration and Contract Closeout. Procurement planning is the process of identifying which project needs can be best met by procuring products or services outside 223
3 the project organization and should be accomplished during the scope definition effort. It involves consideration of whether to procure, how to procure, what to procure, how much to procure, and when to procure. Procurement planning should also include consideration of potential sellers, particularly if the buyer wishes to exercise some degree of influence or control Procurement Plan at the Inter-ministerial committee It is mandatory for each department to prepare its departmental procurement plan per financial year. Once the departmental procurement plans have been done, they are all forwarded by the respective Departmental Heads to the Central Planning and Monitoring Unit, which then prioritizes the items and services to be procured after considering the finances availed by the Treasury. The prioritized list is then forwarded to the Procurement Section that carries out the procurement procedures, to ensure that all departments are supplied with the required items for effective service delivery Procurement Methods There is consensus that open tendering as a procurement method is in some sense better than all others procurement methods, but no one procurement method is likely to be better than others for any project (Love et al., 1998).Gordon (1994) suggested that selecting an appropriate procurement method could reduce construction project costs by an average of 5%. However, while an appropriate procurement system may enhance the probability of project success (Naoum, 1994; Luu et al., 2005), some decision-makers may encounter difficulties in ascertaining the suitability of various procurement approaches (RICS, 2000). This is because it is virtually impossible for them to capture a diverse continuum of procurement options, client characteristics and needs, project characteristics and external conditions through their own experiences of prior projects (Kumaraswamy, and Dissanayaka, 2001). According to the section 29 (1) of Rev (2010) PPDA, for each procurement, the procuring entity shall use open tendering unless otherwise justified. For the same to be effective, accessible publication with clear time limits for competitive procurement is mandatory. Section 54 (2) stipulates that procuring entity shall advertise at least twice in a newspaper of general nationwide circulation which has been regularly published for at least two years before the date of issue of the advertisement, and on its website in instances where the procuring entity has a website, and the advertisement shall also be posted at any conspicuous place reserved for this purpose in the premises of the procuring entity as certified by the head of the procurement unit. As such, this is to be done in both the Daily Nation Newspaper and the Standard Newspaper since they have a wide coverage or circulation and are therefore capable of reaching a large number of people. The rules on participation are based on qualitative selection whereby fairness and defined rules that rely on qualifications and ability to perform the requirement are considered. As regards tender documentation and technical specifications, the minimum content of tender documentation is specified, adhering to neutral technical specification with reference to international standards where possible. When tenders are advertised, all interested bidders are expected to purchase the tender documents from the Inter-ministerial Office, fill them and drop the dully completed documents at a designated place; which is mostly at the entrance on a specified date and before a certain time frame; which is usually before the close of business at 5.00pm. To enhance transparency and accountability in the entire procurement process, section 60 (1) states that the accounting officer shall appoint a tender opening committee specifically for the procurement. The TOC comprises of representation from each department. This committee ensures that the bidders are present at the opening stage. There is then the Ministerial Tender Committee (MTC) which has representation of senior people from each department so as to go about the evaluation and award criteria. The evaluation and award criteria are normally objective and fair because of a large and neutral representation. The tendering process is made easy by ensuring that bidders make use of standard or model tender documents so as to give the entire public an equal opportunity to bid. The methodology for evaluation of tenders is based on the price and other fully disclosed factors for instance financial and technical capacity to perform the contract; which then leads to award of contracts. Confidentiality during the evaluation process is maintained. In very limited and justified occasions, other methods of procurement other than the most preferred open tendering come into play. These alternative methods of procurement namely, the restricted tendering method, direct procurement, request for proposals and request for quotations, are applied. Section 73(1) of PPDA, Rev (2010) states that, a procuring entity may engage in procurement by means of restricted tendering in such manner as may be prescribed. This method is used when competition for contract is limited because of the complex or specialized nature of the goods, works or services and that the time and cost required to examine and evaluate a large number of tenders would be disproportionate to the value of the goods, works or services to be procured. Another consideration is where there are only a few known suppliers of the goods, works or services as may be prescribed in the regulations. Section 74 of the Rev (2010) Act states that direct procurement may be used under the circumstances where there is only one person who can supply the goods, works or services being procured; and, there is no reasonable alternative or substitute for the goods, works or services. It is also used when there is an urgent need for the goods, works or services being procured. Because of the urgency, the other available methods of procurement then would be impractical; and the circumstances that gave rise to the urgency were not foreseeable and were not the result of dilatory conduct on the part of the procuring entity. The procurement section is mandated to ensure that direct procurement is not used in a discriminatory manner. In other instances, a request for proposals for procurement is applied if the procurement is for services or a combination of goods and services; and the services to be procured are advisory or otherwise of a predominately intellectual nature. Section 88 (a) and (b) of the Act further permits the use of Request for quotations for procurement in limited or special instances. For instance, if the procurement is for goods that are readily available and for which there is an established market; and the estimated value of the goods being 224
4 procured is less than or equal to the prescribed maximum value for using requests for quotations. Section 76 (1) of PPDA Rev (2010) permits a procuring entity to use a request for proposals for a procurement if the procurement is of services or a combination of goods and services; and the services to be procured are advisory or otherwise of a predominately intellectual nature. 3.2 Research Design The design was mainly descriptive survey and involved a systematic collection of data concerning opinion of Procurement Personnel, Suppliers on the approved List and Professionals from user departments on the relationships between ethics and quality of procurements. The question asked aimed at testing the main premise while keeping in focus the purpose, objectives and the research questions relating to this study. Survey design was the basis for the formulation of empirical research instruments. According to Mugenda & Mugenda (2003), a survey is an attempt to collect data from members of a population in order to determine the current status of that population with respect to one or more variables. According to Kothari (2004), surveys are only concerned with conditions or relationships that exist, opinions that are held, processes that are going on, effects that are evident or trends that are developing. The method of data collection happens to be either observation or interviews or questionnaire (Kothari 2004). A cross-sectional survey research involves the use of structured questionnaires and/or statistical surveys to gather data about people and their thoughts and behavior (Cooper 2001). Survey research is suitable for this research because it helps to explain and explore the existing status of two or more variables at a given point in time. Surveys are also used in collecting data from large populations that are not easy to observe directly. The study employed quantitative approach. Quantitative study design using questionnaires and data analysis was deemed appropriate for this study because it facilitated the gathering of opinions from the procurement personnel, user departments and contractors on issues of ethics and their perceived influence on quality of procurements. 3.2 Methods of Data collection Due to the geographical spread of the sample, data was collected through self-administered questionnaires to the respondents and document content analysis. Follow up was done to ensure that response rate was enhanced. Since the information required involved daily operational issues encountered by the respondents, the data collected gave an insight the study sought to achieve. 3.3 Survey Population The survey population included the employees of the purchasing function, contractors on approved suppliers list and professionals from user Departments. The survey population was 300 people. The study targeted 56 % of the sample population totaling to 170 respondents. Kothari (2002) infers that a sample is a representative of total population nominated for analysis. However, 170 questionnaires were issued to cater for any eventuality and increase the degree of confidence for the final results. Kothari (2004) argues for at least 10% of the target population as representative while Ogachi (2011) says that use of a reasonable sample is appropriate because it is quick, inexpensive, efficient and accurate means of assessing information about the population. Kothari (2002) says that a sample size should neither be excessively large nor too small but optimal and representative. Systematic stratified random sampling procedure was employed in determination of respondents. Aiyabei (2013) says that this method is appropriate when getting a sample from heterogeneous population. This aimed to eliminate skewedness. In order to mitigate bias, the departments were the basic units for sample determination in which they were considered strum while the sections under the departments constituted sub-strata. Random number tables were utilized to select the sample. 3.4 Sampling Design Sampling refers to the procedure a researcher uses to gather people, places or things to study (Kombo et al, 2006). The study employed probability sampling technique. This owed to the randomized approach of the study as it was a descriptive research design study. The study gave each subject in the target population an equal chance of being selected as it aimed to draw conclusions affecting the population as a whole indiscriminately. Kombo et al (2006) argue that if the purpose of the research is to draw conclusions or make predictions affecting the whole population, probability sampling is appropriate. 3.5 Data Collection Methods The study carried out data collection through a systematic sequence of events. The sequence began by first seeking permission from the Accounting Officer in order to avoid any possible hitch that might have arisen from lack of permission to conduct the research. This was followed by sample selection based on the departments as explained in the sampling technique above. For effective approach of the respondents, the researcher made a self-introduction and requested for consent of the respondents in taking part in the exercise. The study utilized questionnaires and unstructured observation as instruments for data collection. This was because use of questionnaire has capacity to collect enormous amount of information over a large sample within reasonably little time. Besides questionnaires, unstructured observation technique was used to gather data in order to give an intuitive understanding of what is happening in the culture under study. Unstructured observation approach was premised on the strength that the researcher was unfamiliar with the organization and had limited time in the establishment. Data from observation was collected during the normal visits by the researcher. Both descriptive and inferential statistics were used to analyze the large amounts of data collected. Kothari (2002) says that inferential statistics also known as sampling statistics is concerned with the process of generalization of the sample results to the population. It addresses the problem of the estimation of population parameters and the testing of statistical hypothesis. Descriptive statistics dealt with development of indices from the raw data for the purpose of developing the inferential statistical analysis. In order to sufficiently and critically analyze the significance of each independent variable in the study and based on large data expected, stepwise regression model was utilized. This based on building 225
5 model by adding and/or removing the independent variables based on t-statistics of their estimated coefficients. Multivariate linear regression model was applied in the analysis of data. Pearson s coefficient correlation was used to determine the degree of significance between the independent and dependent variables at 95% confidence level and 5% degree of significance. Findings and Interpretation The study presented data using a combination of narrations, statistical and graphical approaches. Statistical tools such frequency distributions, measures of central tendency and measures of dispersion were used alongside graphical and tabular presentations. Narrations were used to explain and interpret the findings from the other tools. From the data collected, the study was able to receive a total of 160 questionnaires out of 170 given out to the sample population. This was approximately 94% of the sample. The response rate of 79% is significant and representative. This enabled the study to have factual reporting on the problem under consideration. Mugenda et al (2003) state that a 50% response rate is adequate, 60% good and above while 94% rated very good to enable the study to make informed findings, conclusions and recommendations. Table Showing whether PPDA procedure is followed Frequency Percent Valid Percent Cumulative Percent Valid strongly disagree Disagree not sure Agree strongly agree Total Missing System Total Source primary data From the table above 60.2% agree that PPDA procedure is followed, 5.3% strongly agree that PPDA procedures are followed, 9.9% not sure, 11.7% disagreeing and 6.4% strongly disagreeing with the statement. This implies therefore that PPDA procedure are followed. Table Showing whether procedures followed helps in procuring quality products Frequency Percent Valid Percent Cumulative Percent Valid not sure Agree strongly agree Total Missing System Total Source: primary data According to the table above, 69.6% of the respondents agree that procurement procedure followed result in procuring of quality goods, 11.7% strongly agree while 12.3% representing the respondents not sure. This implies that the procedure followed results in procuring quality products. Conclusion From the study, it s evident that procurement processes and procedure enhances quality service delivery and value for money. As such, the Oversight Authorities, top leadership of the country, policy makers, procurement professionals and general public should be educated on the dangers of violating prescribed procurement processes and therefore take an active role in adoption of the procurement act across political, institutional and behavioral domains. REFERENCES [1]. Burt D.N., Dobler D.W., Startling S.L., (2004): World Class Supply Chain, The Key to Supply Chain Management, 7 th Edition,McGraw- Hill-New York [2]. Crown Agents, (2009), Reducing Corruption through Procurement Reforms in Kenya [3]. Dobler W. D and Burt D.N (1996), Purchasing and Supply Management, 6th Ed, The McGraw Hill, London. [4]. Bailey Peter, Farmer David, (et al), (1998), Purchasing principles and management (8 th edition) pitman publishing, press UK. 226
6 [5]. Kiplagat, J., Leftie, P. (2013, June 13), Corrupt Workers put on Notice Nation Media Group, Nairobi. [6]. Kothari, C.R. (2004) Research Methodology: Methods & Techniques 2 nd Edition Revised, [7]. Public Procurement and Disposal Act (2005) 227
PART VI METHODS OF PROCUREMENT AND THEIR CONDITIONS FOR USE
PART VI METHODS OF PROCUREMENT AND THEIR CONDITIONS FOR USE Selection of a method of procure ment 63.-(1) Except as otherwise provided for by these Regulations, a procuring entity engaging in procurement
CONTRACTS STANDING ORDERS (CSOs) 2015 / 2016 CSO 2015-6 1
CONTRACTS STANDING ORDERS (CSOs) 2015 / 2016 CSO 2015-6 1 PART 3G Contracts Standing Orders 2015/16 Definitions Aggregation is the combining together of the total contract value from separate contracts
I N T R O D U C T I O N THE PROCESS OF ACQUIRING GOODS WORKS AND SERVICES BY GOVERNMENT PROCURING ENTITIES.
I N T R O D U C T I O N Public Procurement means: THE PROCESS OF ACQUIRING GOODS WORKS AND SERVICES BY GOVERNMENT PROCURING ENTITIES. This process includes purchasing, hiring, leasing or any other contractual
Factors Affecting Procurement Performance: A Case of Ministry of Energy
Factors Affecting Procurement Performance: A Case of Ministry of Energy Japheth Ocharo Kiage Department of Entrepreneurship Jomo Kenyatta University of Agriculture and Technology P.O. Box 6200, Nairobi
Procedures for Tenders and Contracts. October 2014. Huon Valley Council Procedures for Tenders and Contracts October 2014 Page 1 of 14
Procedures for Tenders and Contracts October 2014 Huon Valley Council Procedures for Tenders and Contracts October 2014 Page 1 of 14 Huon Valley Council Procedures for Tenders and Contracts October 2014
CORPORATE PROCUREMENT POLICY
DOCUMENT OF THE EUROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT CORPORATE PROCUREMENT POLICY As approved by the Board of Directors at its meeting of 29 January 2014 CORPORATE PROCUREMENT POLICY TABLE
CORRUPTION PREVENTION GUIDELINES IN PUBLIC PROCUREMENT. Department of Prevention P.O. BOX 58535-00200, P.O. BOX 61130-00200, Nairobi.
CORRUPTION PREVENTION GUIDELINES IN PUBLIC PROCUREMENT Kenya Anti Corruption Commission Public Procurement Oversight Authority Directorate of Preventive Services National Bank Building Department of Prevention
Procurement Policy. 2.1 Mosaic and all its North American subsidiary companies.
1.0 PURPOSE 1.1 This Procurement Policy ( Policy ) is intended to govern the conduct of The Mosaic Company and its subsidiaries ( Mosaic or Company ) and its Partners when doing business with Mosaic. 2.0
24 CFR PART 85 85.36 Procurement. States. Procurement standards.
85.36 Procurement. (a) States. When procuring property and services under a grant, a State will follow the same policies and procedures it uses for procurements from its non-federal funds. The State will
Code of Conduct Sourcing & Supply Chain FAU-F-SPG-2400/EN
Code of Conduct Sourcing & Supply Chain FAU-F-SPG-2400/EN Background Faurecia, a global automotive supplier, is committed to growth founded on socially-responsible actions and behaviors in all countries
An organization which employs, or is about to employ, any of the above, has a financial or other interest in the firm selected for award.
85.36 Procurement (a) States. When procuring property and services under a grant, a State will follow the same policies and procedures it uses for procurements from its non-federal funds. The State will
LSB Procurement Framework
LSB Procurement Framework Introduction Procurement covers the typical purchase of services, supplies and works required to enable project delivery and to manage the infrastructure. The Services Board (LSB)
NATIONAL TREASURY Republic of South Africa December 2003
NATIONAL TREASURY Republic of South Africa December 2003 REGULATIONS IN TERMS OF THE PUBLIC FINANCE MANAGEMENT ACT, 1999: FRAMEWORK FOR SUPPLY CHAIN MANAGEMENT AS PUBLISHED IN GAZETTE NO. 25767 DATED 5
Supplier Code of Conduct Holcim (Switzerland) AG Procurement and Sustainable Development
Strength. Performance. Passion. Supplier Code of Conduct Holcim (Switzerland) AG Procurement and Sustainable Development Table of Content 1. Introduction to Sustainable Procurement at Holcim 3 2. Our Commitment
THE CITY OF CAPE TOWN DELEGATION OF POWERS AND DUTIES - SUPPLY CHAIN MANAGEMENT MUNICIPAL SUPPLY CHAIN MANAGEMENT REGULATIONS. Notice 868 of 2005
THE CITY OF CAPE TOWN DELEGATION OF POWERS AND DUTIES - SUPPLY CHAIN MANAGEMENT MUNICIPAL SUPPLY CHAIN MANAGEMENT REGULATIONS Notice 868 of 2005 SUB- 3(1)(a) Prepare and submit a draft supply chain policy
(1 July 2005 - to date) LOCAL GOVERNMENT: MUNICIPAL FINANCE MANAGEMENT ACT 56 OF 2003
(1 July 2005 - to date) LOCAL GOVERNMENT: MUNICIPAL FINANCE MANAGEMENT ACT 56 OF 2003 (Gazette No. 26019, Notice No. 176 dated 13 February 2004. Commencement date: 1 July 2004 unless otherwise indicated)
METHODOLOGY FOR ASSESSING PROCUREMENT SYSTEMS (MAPS)
METHODOLOGY FOR ASSESSING PROCUREMENT SYSTEMS (MAPS) February 00 INTRODUCTION Increasing the effectiveness, efficiency and transparency of procurement systems is an on-going concern of governments and
PROCUREMENT PERFORMANCE IN THE PUBLIC UNIVERSITIES IN KENYA
PROCUREMENT PERFORMANCE IN THE PUBLIC UNIVERSITIES IN KENYA BY NOEL MANYENZE A Research Project Presented in Partial Fulfillment of the Requirements of the Master of Business Administration (MBA) Degree
ICAO Procurement Process Briefing
ICAO Procurement Process Briefing The following is a briefing in an effort to provide the reader with an insight into the ICAO Technical Co-operation Bureau s Procurement Process and role in relation to
Public Procurement Position Descriptions
Public Procurement Position Descriptions The following position descriptions for public procurement are an excerpt of the August 2013 NCPPC study, Identifying Position Domains in Public Sector Procurement:
Policy Brief. Public e-procurement at the local level in Albania. Challenges in the fight against corruption. Mona Xhexhaj
Policy Brief Public e-procurement at the local level in Albania Challenges in the fight against corruption Mona Xhexhaj This policy brief has been prepared in the frame of the TRAIN Programme 2014 (Think
Procurement Capability Standards
IPAA PROFESSIONAL CAPABILITIES PROJECT Procurement Capability Standards Definition Professional Role Procurement is the process of acquiring goods and/or services. It can include: identifying a procurement
All references to procurement value amounts in this Policy exclude applicable sales taxes.
Originator: Director, Financial Services Financial Policy and Procedures Approved by: Maxim Jean-Louis, President Chief Executive Officer Effective Date: August 17, 2015 Replaces: April 1, 2012 Procurement
Human Services Quality Framework. User Guide
Human Services Quality Framework User Guide Purpose The purpose of the user guide is to assist in interpreting and applying the Human Services Quality Standards and associated indicators across all service
European Journal of Business and Management ISSN 2222-1905 (Paper) ISSN 2222-2839 (Online) Vol.5, No.24, 2013
Factors Influencing Effective Talent Management Strategy in Organizations: A Case Study of Corrugated Iron Sheets Limited- Mombasa Kenya KHUDNICK MOCHORWA; CHARLES MWANGI Corresponding author [email protected]
Date of Original Policy: September 2002 Last Updated: July 2015 Mandatory Revision Date: July 2020 Assistant Vice-President (University Services)
Policy Name: Purchasing Policy Originating/Responsible Department: University Services and Purchasing Approval Authority: Senior Management Committee Date of Original Policy: September 2002 Last Updated:
Tendering to Public Sector Organisations
Tendering to Public Sector Organisations Introduction Authorities have to meet contract regulations and must ensure they provide equal opportunity and achieve the best value for money. Other factors include
Corporate Purchasing. Manual: Organizational Approved By: President & C.E.O. Section: Finance Original Date Issued: March 2011
Corporate Purchasing Manual: Organizational Approved By: President & C.E.O. Section: Finance Original Date Issued: March 2011 Reviewed/Revised Date: Revised Reviewed December 2011 PREAMBLE The Pembroke
Statement of Procurement Conduct
Statement of Procurement Conduct December 2014 Copyright of Western Power Any use of this material except in accordance with a written agreement with Western Power is prohibited. Introduction Western Power
Using Qualitative Information For Impact Assessment: Introducing The Qualitative Impact Assessment Protocol (QUIP)
Using Qualitative Information For Impact Assessment: Introducing The Qualitative Impact Assessment Protocol (QUIP) By Katie Wright-Revolledo, INTRAC Introduction Qualitative methods can provide insight
Subvented Social Welfare Non-Governmental Organisations Procurement Procedures
Subvented Social Welfare Non-Governmental Organisations Procurement Procedures Corruption Prevention Department Independent Commission Against Corruption March 2001 CONTENTS Pages Introduction 1 The Basic
Contract Standing Orders and Procedure - A Guide For Council Employees
Hampshire County Council Constitution Part 3:F Contract Standing Orders 1. Interpretation 2. Status of, and Compliance with, Contract Standing Orders 3. Approval to Commence Procurement 4. Contract Value
Influence of Instructional Resources on Secondary School Students Academic Performance in Makueni County, Kenya
Influence of Instructional Resources on Secondary School Students Academic Performance in Makueni County, Kenya 1. Ms. Ruth Mwili Kimeu; B.Ed M.Ed, PhD (Candidate) P.O. Box 66-90132, Sultan Hamud, Kenya
Effect of Business Value Chain Practices on the Supply Chain Performance of Large Manufacturing Firms in Kenya
Effect of Business Value Chain Practices on the Supply Chain Performance of Large Manufacturing Firms in Kenya TITLE Perris Wambui Chege A Research Proposal Submitted in Partial Fulfillment of Requirement
4.06 Consulting Services
MANAGEMENT BOARD SECRETARIAT AND MINISTRIES OF THE ENVIRONMENT, FINANCE, HEALTH AND LONG-TERM CARE, NATURAL RESOURCES, AND COMMUNITY SAFETY AND CORRECTIONAL SERVICES 4.06 Consulting Services (Follow-up
GUIDE ON HOW TO DO BUSINESS WITH LIVERPOOL JOHN MOORES UNIVERSITY
GUIDE ON HOW TO DO BUSINESS WITH LIVERPOOL JOHN MOORES UNIVERSITY PRODUCED BY LIVERPOOL JOHN MOORES UNIVERSITY PROCUREMENT SERVICE First Issued - ISSUED 11 th February 2011 VERSION 5.0 updated 13/04/15
CPM -100: Principles of Project Management
CPM -100: Principles of Project Management Lesson E: Risk and Procurement Management Presented by Sam Lane [email protected] Ph: 703-883-7149 Presented at the IPM 2002 Fall Conference Prepared by the Washington,
Impartiality must be maintained in selecting suppliers to fulfil Council s requirements.
Title: Type: Council Adopted: 17 December 2014 File No: SF/491 TRIM Reference: 14/35410 Attachments: Guidelines (TRIM: 14/38862) 1. Purpose The purpose of this policy is to provide principles, processes
Ch 1 - Conduct Market Research for Price Analysis
Ch 1 - Conduct Market Research for Price Analysis 1.0 - Chapter Introduction 1.1 - Reviewing The Purchase Request And Related Market Research o 1.1.1 - How Was The Estimate Made? o 1.1.2 - What Assumptions
INTRODUCTION INITIAL CONTACT BY APPOINTMENT ONLY SCHEDULING APPOINTMENTS APPOINTMENTS WITH MEDICAL STAFF
Materials Management Vendor Handbook Revised July 2013 INTRODUCTION The following is intended to act as a guide to assist suppliers in appropriately coordinating their activities while on Health Sciences
Project Procurement Management
Project Procurement Management 1 2 Procurement Planning Procurement Planning is the process of identifying which project needs can be best met by procuring products or services outside the project organization
How To Be A Supply Management Professional
PRINCIPLES AND STANDARDS OF ETHICAL SUPPLY MANAGEMENT CONDUCT WITH GUIDELINES Published by: Institute for Supply Management, Inc. Thomas Derry, Chief Executive Officer 2014 Institute for Supply Management
The Role of Project Management Information Systems towards the Success of a Project: The Case of Construction Projects in Nairobi Kenya
The Role of Project Management Information Systems towards the Success of a Project: The Case of Construction Projects in Nairobi Kenya Monica Njoki Kahura Entrepreneurship & Procurement Department School
CITY OF SAN JOSE REQUEST FOR.QUALIFICATIONS (RFQ) EVALUATOR (ATTORNEY) AND INVESTIGATOR- SAN JOSE ELECTIONS COMMISSION
CITY OF SAN JOSE REQUEST FOR.QUALIFICATIONS (RFQ) EVALUATOR (ATTORNEY) AND INVESTIGATOR- SAN JOSE ELECTIONS COMMISSION The City of San Jose is seeking to contract with a law firm or attorney licensed by
Joint Bidding Guide. 9. Opportunity Assessment. prepared for Leaders of Potential Consortia and Bid Managers
Joint Bidding Guide 9. Opportunity Assessment prepared for Leaders of Potential Consortia and Bid Managers Figure 1.1 The Joint Bidding Cycle Key Chapter for Both Sides 1. Introduction Chapter for Supply
RELATIONSHIP BETWEEN THE USE OF MANAGEMENT INFORMATION SYSTEMS AND EMPLOYEE JOB PERFORMANCE: EVIDENCE FROM KENINDIA ASSURANCE COMPANY LIMITED
RELATIONSHIP BETWEEN THE USE OF MANAGEMENT INFORMATION SYSTEMS AND EMPLOYEE JOB PERFORMANCE: EVIDENCE FROM KENINDIA ASSURANCE COMPANY LIMITED Owino Phyllis Osodo Beatrice Jemaiyo The Catholic University
National Survey of Franchisees 2015
National Survey of Franchisees 2015 An Analysis of National Survey Results FRANCHISEGRADE COM Vital Insight for your investment. FranchiseGrade.com, National Survey of Franchisees, 2015 Contents Introduction...
The Project Management Knowledge Areas as defined by PMI (PMBOK, 2004)
The Project Management Knowledge Areas as defined by PMI (PMBOK, 2004) is the processes required to ensure that the various elements of the project are properly coordinated. the processes required to ensure
Buying consultancy services
Buying consultancy services Contents Contents... 2 Introduction... 3 Planning... 3 Benefits... 3 Internal stakeholder engagement... 4 Project governance... 4 Defining the work scope... 4 Contractual terms...
DETERMINANTS OF PROJECT MANAGEMENT SUCCESS
DETERMINANTS OF PROJECT MANAGEMENT SUCCESS Gary Walker, Dr Shamil Naoum and Professor Rod Howes South Bank University, School of Construction, London. SW8 2JZ One of the features of the construction industry
Effective Date: January, 2007 Last Reviewed Date: September, 2014 Last Revised Date: September, 2014 Next Review Date: September, 2015
Policy and Procedure Section: Finance and Administration Subject: Goods and Services Procurement (including consulting services) Number: 12.20.PP.v6 Associated Document Form Number: 12.20.F Effective Date:
DRAFT. Anti-Bribery and Anti-Corruption Policy. Introduction. Scope. 1. Definitions
DRAFT Change History: Anti-Bribery and Anti-Corruption Policy Control Risks Group Ltd Commercial in confidence Introduction This document defines Control Risks policy on the avoidance of bribery and corruption.
Consulting projects: What really matters
Consulting projects: What really matters The factors that influence the success of management consulting projects Case 138: het 'Zwijsen future proof' project met de inzet van GEA Results PhD 2014, Bart
MBOMBELA LOCAL MUNICIPALITY. Supply Chain Management Policy
MBOMBELA LOCAL MUNICIPALITY Supply Chain Management Policy 2 TABLE OF CONTENTS 1. DEFINITIONS CHAPTER 1 ESTABLISHMENT AND IMPLIMENTATION OF SUPPLY CHAIN MANAGEMENT POLICIES 2. Supply Chain Management Policy
LGRF. Procurement Probity Plan. July 2012
LGRF July 2012 When to develop a : A probity plan is best used for any procurement of medium complexity and size and above. A probity plan can be implemented without use of a probity advisor/auditor. Description
Level 5 Diploma in Managing the Supply Chain (QCF) Qualification Specification
Level 5 Diploma in Managing the Supply Chain (QCF) Qualification Specification Created: May 2012 Version: 1.0 Accreditation Number: 600/5605/8 Qualification Start Date: 1 st June 2012 Qualification Last
Competency Requirements for Executive Director Candidates
Competency Requirements for Executive Director Candidates There are nine (9) domains of competency for association executives, based on research conducted by the American Society for Association Executives
INTERNAL AUDIT MANUAL
དང ལ ར ས ལ ན ཁག Internal Audit Manual INTERNAL AUDIT MANUAL Royal Government of Bhutan 2014 i i ii ii Internal Audit Manual དང ལ ར ས ལ ན ཁག ROYAL GOVERNMNET OF BHUTAN MINISTRY OF FINANCE TASHICHHO DZONG
EFFECT OF SUPPLIER RELATIONSHIP MANAGEMENT ON THE EFFECTIVENESS OF SUPPLY CHAIN MANAGEMENT IN THE KENYA PUBLIC SECTOR.
EFFECT OF SUPPLIER RELATIONSHIP MANAGEMENT ON THE EFFECTIVENESS OF SUPPLY CHAIN MANAGEMENT IN THE KENYA PUBLIC SECTOR. Ondieki John Nyamasege 1 and Oteki Evans Biraori 2 1 PhD student, Jomo Kenyatta University
INFORMATION GOVERNANCE POLICY
INFORMATION GOVERNANCE POLICY Issued by: Senior Information Risk Owner Policy Classification: Policy No: POLIG001 Information Governance Issue No: 1 Date Issued: 18/11/2013 Page No: 1 of 16 Review Date:
Outsourcing. Knowledge Summary
Knowledge Summary Outsourcing P&SM professionals should have the knowledge and skills required to manage the outsourcing process and to advise colleagues of the most appropriate solution to obtain best
AUDIT REPORT 2013/024
INTERNAL AUDIT DIVISION AUDIT REPORT 2013/024 Audit of air travel activities and related practices at UNON Overall results relating to efficient and effective management of travel services were assessed
Insurance Regulatory Authority
Insurance Regulatory Authority MARKET CONDUCT GUIDELINES FOR INSURANCE INTERMEDIARIES JUNE 2011 THE INSURANCE ACT (CAP 487) MARKET CONDUCT GUIDELINES FOR INSURANCE INTERMEDIARIES TABLE OF CONTENTS 1.0
DoE Supply Chain Management Processes
DoE Supply Chain Management Processes 16 September 2015 Presented by: Boitumelo Musi 1 Presentation overview Legislation and prescripts governing SCM in the Public Sector Supplier database registration
DOCTOR OF PHILOSOPHY DEGREE. Educational Leadership Doctor of Philosophy Degree Major Course Requirements. EDU721 (3.
DOCTOR OF PHILOSOPHY DEGREE Educational Leadership Doctor of Philosophy Degree Major Course Requirements EDU710 (3.0 credit hours) Ethical and Legal Issues in Education/Leadership This course is an intensive
Supply Chain Management Policy September 2005
Supply Chain Management Policy September 2005 MUNICIPAL SUPPLY CHAIN MANAGEMENT POLICY LOCAL GOVERNMENT: MUNICIPAL FINANCE MANAGEMENT ACT, 2003 This policy was adopted by the Council of the ethekwini Municipality
REPORT OF THE ACTING MUNICIPAL MANAGER 1. INTRODUCTION / BACKGROUND TO REPORT
GOOD GOVERNANCE: SUPPLY CHAIN MANAGEMENT REPORT: IMPLEMENTATION OF THE SUPPLY CHAIN MANAGEMENT REGULATIONS WITHIN THE PERIOD 01 JULY 2014 TO 30 JUNE 2015 (2014//2015 FINANCIAL YEAR) REPORT OF THE ACTING
BOJANALA PLATINUM DISTRICT MUNICIPALITY
BOJANALA PLATINUM DISTRICT MUNICIPALITY SUPPLY CHAIN MANAGEMENT POLICY 2012 REVIEW In terms of section 111 of the Municipal Finance Management Act, 2003 (Act No. 56 of 2003). 1 TABLE OF CONTENTS 1. CHAPTER
MBA (Master of Business Administration) Syllabus 2011 (Term 2)
MBA (Master of Business Administration) Syllabus 2011 (Term 2) Course Code: D M G T 4 0 4 Course Title: RESEARCH METHODOLOGY 1. An Introduction to Research: Meaning, Process, Defining, Research Problem:
SUPPLY CHAIN MANAGEMENT POLICY
NORTH WEST PROVINCIAL LEGISLATURE OFFICE OF THE CHIEF WHIP SUPPLY CHAIN MANAGEMENT POLICY - 1 - 1. Preamble To establish, through operational procedures, an effective system of supply chain management
SUMMER FOOD SERVICE PROGRAM Procurement Standards
OFFICE OF SUPERINTENDENT OF PUBLIC INSTRUCTION Child Nutrition Services Old Capitol Building, PO BOX 47200 OLYMPIA, WA 98504-7200 (360) 725-6200 TTY (360) 664-3631 SUMMER FOOD SERVICE PROGRAM Procurement
Corporate Code of Conduct
1. Background Corporate Code of Conduct 1.1. For over a century, the Swire group of companies has been recognised as acting responsibly in the course of achieving its commercial success. Our reputation
OFFICE OF THE REGISTRAR OF INSURANCE AND RETIREMENT FUNDS CODE OF CONDUCT FOR INSURANCE BROKERS
Form RDI 14 OFFICE OF THE REGISTRAR OF INSURANCE AND RETIREMENT FUNDS CODE OF CONDUCT FOR INSURANCE BROKERS 1. INTRODUCTION This Directive sets out the Code of Conduct for insurance brokers offering insurance
PSPSOHS602A Develop OHS information and data analysis and reporting and recording processes
PSPSOHS602A Develop OHS information and data analysis and reporting and recording processes Release: 3 PSPSOHS602A Develop OHS information and data analysis and reporting and recording processes Modification
DoE Supply Chain Management Processes. 24 February 2016 Presenter: Boitumelo Musi
DoE Supply Chain Management Processes 24 February 2016 Presenter: Boitumelo Musi 1 Presentation overview i) Legislation and prescripts governing SCM in the ii) Public Sector Central Supplier database (CSD)
ASAE s Job Task Analysis Strategic Level Competencies
ASAE s Job Task Analysis Strategic Level Competencies During 2013, ASAE funded an extensive, psychometrically valid study to document the competencies essential to the practice of association management
CORPORATE GOVERNANCE TREASURY WINE ESTATES ANNUAL REPORT FY2014 / 33
CORPORATE GOVERNANCE This corporate governance statement outlines the corporate governance framework that has been established by Treasury Wine Estates Limited (the Company) and its group of companies
Procurement of Goods, Services and Works Policy
Procurement of Goods, Services and Works Policy Policy CP083 Prepared Reviewed Approved Date Council Minute No. Procurement Unit SMT Council April 2016 2016/0074 Trim File: 18/02/01 To be reviewed: March
Financial Services Guidance Note Outsourcing
Financial Services Guidance Note Issued: April 2005 Revised: August 2007 Table of Contents 1. Introduction... 3 1.1 Background... 3 1.2 Definitions... 3 2. Guiding Principles... 5 3. Key Risks of... 14
BUSINESS CODE OF CONDUCT
BUSINESS CODE OF CONDUCT PREPARED FOR: ode March 2011 Page 1 Contents 1 BUSINESS CODE OF CONDUCT... 3 2 MISSION STATEMENT... 3 3 PRINCIPLES AND VALUES... 3 4 RELATIONSHIPS... 4 5 BRIBERY AND CORRUPTION...
ACCOUNTING OFFICERS CHIEF FINANCIAL OFFICERS HEADS OF PROCUREMENT GUIDELINE FOR BID COMMITTEE MEMBERS
ACCOUNTING OFFICERS CHIEF FINANCIAL OFFICERS HEADS OF PROCUREMENT GUIDELINE FOR BID COMMITTEE MEMBERS Supply Chain Management Office Practice Note Number SCM-03 of 2005 1 Context The Public Finance Management
Procurement Performance model
Procurement Performance model The Procurement Performance Model develops key questions as reference pointers for auditors evaluating the performance of the procurement function in public sector bodies.
Essentials of Marketing Research
Essentials of Marketing Second Edition Joseph F. Hair, Jr. Kennesaw State University Mary F. Wolfinbarger California State University-Long Beach David J. Ortinau University of South Florida Robert P. Bush
MALAYSIA S GOVERNMENT PROCUREMENT REGIME
MALAYSIA S GOVERNMENT PROCUREMENT REGIME 1. INTRODUCTION The prime objective of the Malaysian Government procurement is to support Government programmes by obtaining value for money through acquisition
General Terms of Public Procurement in Service Contracts JYSE 2014 SERVICES
General Terms of Public Procurement in Service Contracts January 2015 Contents Introduction...3 Issues to be observed in applying...5 General Terms of Public Procurement in Service Contracts ()...9 1 Definitions...9
Final Report. 2013-709 Audit of Vendor Performance and Corrective Measures. September 18, 2014. Office of Audit and Evaluation
2013-709 Audit of Vendor Performance and Corrective Measures September 18, 2014 Office of Audit and Evaluation TABLE OF CONTENTS MAIN POINTS... i INTRODUCTION... 1 FOCUS OF THE AUDIT... 7 STATEMENT OF
Supply Chain Management Forum Stellenbosch
Western Cape Construction Contact Centre Supply Chain Management Forum Stellenbosch 20 August 2010 Compliance Regulatory compliance describes the goal that corporations or public agencies aspire to in
EXTERNAL POLICY PROCUREMENT
EXTERNAL POLICY PROCUREMENT Revision: 0 Page 1 of 8 TABLE OF CONTENTS 1 SCOPE 3 2 POLICY 3 2.1 Procurement objectives 3 2.2 Broad-Based Black Economic Empowerment (BBBEE) 3 2.3 Business ethics and governance
Procurement Performance Measurement System
Public Procurement and Disposal of Public Assets Authority Procurement Performance Measurement System User's Guide August 2008 Public Procurement and Disposal of Public Assets Authority Procurement Performance
PROCUREMENT UNDER GRANTS
PROCUREMENT UNDER GRANTS PROCUREMENT UNDER GRANTS Grant Agreement Terms and Conditions Federal Grant Procurement Regulations 4 Acceptable Methods Cost and Price Analysis Allowable Contract Types Required
Enhancing Sustainability and Profitability for Utility Businesses through Effective & Efficient Supply Chain Management
Enhancing Sustainability and Profitability for Utility Businesses through Effective & Efficient Supply Chain Management Kevin Jacoby Chief Financial Officer City of Cape Town South Africa Overview Supply
INTERNATIONAL STANDARDS FOR THE PROFESSIONAL PRACTICE OF INTERNAL AUDITING (STANDARDS)
INTERNATIONAL STANDARDS FOR THE PROFESSIONAL PRACTICE OF INTERNAL AUDITING (STANDARDS) Introduction to the International Standards Internal auditing is conducted in diverse legal and cultural environments;
Outsourcing. Definitions. Outsourcing Strategy. Potential Advantages of an Outsourced Service. Procurement Process
CIPS takes the view that the outsourcing of services to specialist providers can often lead to better quality of services and increased value for money. Purchasing and supply management professionals should
AC 2009-803: ENTERPRISE RESOURCE PLANNING: A STUDY OF USER SATISFACTION WITH REFERENCE TO THE CONSTRUCTION INDUSTRY
AC 2009-803: ENTERPRISE RESOURCE PLANNING: A STUDY OF USER SATISFACTION WITH REFERENCE TO THE CONSTRUCTION INDUSTRY I. Choudhury, Texas A&M University American Society for Engineering Education, 2009 Page