1 Support for Collaborative Design: Animated Electronic Meetings GertJan de Vreede Delft University of Technology School of Systems Engineering, Policy Analysis and Management P.O. Bo 5015, 2600 GA Delft, The Netherlands Abstract In an action research study at the Amsterdam Municipal Police Force, we critically evaluate the combined use of Group Support Systems, joint modeling facilities, and animation techniques to support subject matter epert (SME) involvement in organizational change processes. The SMEs involved in the study jointly constructed and evaluated static and dynamic models of the police force's current and future structure and processes. Our findings illustrate the potential of the above facilities used to support SME involvement in terms of efficiency, resulting model quality, and SME satisfaction with process and technologies. Issues for further research include group modeling strategies, techniques, and group size, as well as automatic animation generation. 1. Introduction Given the high rate of change in technology and working environments, many organizations have evolved to the point where their structure, procedures, and technologies are no longer in keeping with the needs of the future [9]. This means that organizations need to study themselves to determine what should be changed. Their components must be reshaped and rearranged to form appropriately coupled new subsystems with greater simplicity and internal cohesiveness than the eisting structures. (Information) systems need to be adapted or developed to meet the requirements of the new structures and processes. Recognition must also be given to relationships between the organization and its eternal environment. An eample of an organization that found itself in the situation described above, concerns the Criminal Investigations Department (CID) of the Amsterdam Municipal Police Force. The CID has a difficult task combating organized crime in the capital of the Netherlands. They have limited means (time, money, personnel) to employ against too many suspect criminal organizations. In 1994, the CID management decided to reorganize the functional specialized department into a multidisciplinary project based organization in order to utilize their means more effectively and efficiently. However, it was unclear (1) how this transition had to take place, (2) how the project teams, socalled units, and their progress had to be managed, and (3) which technologies should be (developed and) employed to support the future organization. The situation at the CID provided us with an ecellent opportunity to apply, evaluate, and further improve a design approach which focuses on the collaborative analysis and design of organizational structures, processes, and information technology. In earlier studies, we investigated various methods, techniques, and tools to support organizational change processes. These studies individually showed the potential of object oriented modeling, simulation and animation techniques, and Group Support Systems [8; 18; 19]. They also suggested that during an organizational change process, one of the main issues is one of interaction: 1. A lot of interaction is required between and among subject matter eperts (SMEs) from the organization and analysts to echange and discuss information and ideas with respect to the organization s current situation and various design alternatives. 2. Interaction between the people involved in the process is time consuming and difficult because of differences in background, epertise, and personal objectives. In the study described in this paper, we addressed this issue of interaction by marrying two techniques that in separate situations had shown to facilitate interaction between and among members of an organization and analysts: GSS and animated simulation models. Hence, our research objective was to eplore the possibilities of the combined employment of GSS and animation techniques to facilitate organizational change in a collaborative fashion. By collaborative fashion we mean that a group of SMEs from the organization is actively involved in the various modeling and design activities during the change process. For the study described in this paper, we used action research as our research approach. Action research aims to achieve the dual outcomes of action (or change) and research (understanding) [1]. An action researcher participates or

2 intervenes in the situation under investigation in order to apply a theory to practice and evaluate its worth [4]. The reason for employing action research is threefold [2]. First, we needed to study organizational change in its natural setting. It would be very hard to use a constructed setting, that is a valid representation of the comple reality in which our study is carried out. Second, we are interested in how and why questions. It is more important to eplore the process of applying GSS and animation techniques than the resulting products. Third, there are few previous studies and there is a lack of elaborate theoretical understanding with respect to the combined application of GSS and animation techniques in the organizational change arena. In the remainder of the paper, we first give an overview of the design approach we employed and, in particular, the way in which GSS and animation techniques support the various design activities. Then, we describe the results of our study at the CID. The paper concludes with a summary of the most important findings and issues for further research. 2. A Collaborative Design Approach to Organizational Change Eperience shows that organizational change is easier said than done. It is a comple activity. First, the goals of the people involved may conflict with those of the organization. Second, there are many possible courses of action to change an organization. Beforehand, it is not clear which course of action will be most efficient and effective. Third, there are usually many options or alternatives for change. As the effects of these change alternatives are often dangerous or impossible to test in reality, the effects of these changes are seldom known in advance. Finally, apart from `rationale', there may be other (conflicting) issues, such as political, cultural, and social issues, that influence the actual change process. It is, therefore, not surprising that a considerable number of approaches and supporting tools have been proposed to facilitate organizational change efforts Problem solving for organizational change As facilitating organizational change can be considered as solving an illstructured problem, a problem solving strategy is needed that addresses the intricate attributes of such a process. Based on literature research and on eperiences from a large number of field studies, we suggest employment of the problem solving process depicted in figure 1 [17]. The problem solving process consists of several design activities that can be carried out in an iterative fashion. First, the problem situation in an organization is conceptualized in order to structure the problem situation in such a way that the efforts for detailed, lowlevel data gathering for creating the empirical model can be focused and minimized. Net, a descriptive empirical model is build that can be eperimented with in order to analyze and diagnose the problem situation. For this purpose, the empirical model is, for eample, implemented in a simulation language. The third activity is aimed at seeking solutions and capturing them in a number of prescriptive models of possible solutions. These models can be compared in order to study the (effects of the) alternatives in more detail. The actual choice is made in the net phase and consists of a combination of possible solutions or can leave the situation as it is. Finally, in order to actually solve the problem situation, the solution has to be implemented. Current organization Conceptual model A. Conceptualize problem B. Create and validate empirical model, diagnose problem C. Construct alternative models and conduct eperiments D. Choose most preferred solution E. Implement solution Current organization Model of the Chosen Solution Empirical model and Problem Diagnosis Models of Possible Solutions Figure 1 Problem solving for organizational change 2.2. Collaboration in organizational change In practice, many people are usually involved in the various design activities described above [15; 16; 21]. First, there is a team of analysts that is responsible for building and analyzing models of current and future organizational processes. Second, there are people that actually eecute the processes, the subject matter eperts (SMEs). They have to provide the analysts with relevant information on their working situation. Finally, there are people, the decision makers, that supervise the change process in the organization. Presented with the results of the analysts, they decide which changes the organization is going to make. Frequent interaction between these parties is of vital importance for the quality of the design process and its outcome, see e.g. [22]. SMEs' opinions and perspectives regarding the functioning of the organization may change during the design process, thereby resulting in changes in organizational requirements with respect to processes and systems. Also, it is believed that SME participation enhances the acceptance of eventual changes in their work situation. Furthermore, organizational change processes are usually far too comple for a single person to understand all aspects, issues, and variables. The desire for a design process that is as much collaborative in nature as possible, presents us with a time/completeness parado. On the one hand, collaborative design efforts need to be time effective. An organization

3 cannot take too long to build models to plan changes if its competitive and financial positions are deteriorating. However, traditional methods for (participative) modeling are often time consuming [15]. They require analysts to move from small group to small group, gathering information, defining terms, resolving differences, trying to make a big picture from all the small fragments. On the other hand, collaborative design efforts pursue completeness. It can be argued to involve as many SMEs as possible. This would generate more ideas with respect to an organization s current and future situation. It would enable a more complete picture of an organizational situation. Also, broader participation promotes wider buyin to the outcomes of a study. Finally, larger groups of SMEs are able to evaluate ideas more etensively. However, the broader the SME participation, the more time is needed to carry out the design process. Hence, the participative nature of organizational change efforts sets the requirement to use techniques, methods, and automated support that facilitate the collection, organization, and communication of various types of design information. This design information includes, but is not restricted to, lists of organizational requirements, problem statements, and (dynamic) models of processes and structures. We propose the application of two technologies that together meet the requirements mentioned above: Group Support Systems and animated simulation models. We address these technologies in the net sections Group Support Systems GSS represent information technology that aims to make group meetings and group decision making more productive. Over the years a great deal of research effort has been devoted to the development and application of GSS. As a result of field studies and a large number of eperiments, a substantial body of knowledge has emerged about the effects of GSS on group processes and outcomes, especially with respect to GSS used in same time, same place settings. Compared to traditional group settings, these types of GSS meetings appear to be more efficient and more effective, while the participants are more satisfied with the results and the process, see e.g. [7; 11]. Several attributes have been identified that appear to bring about the added value of GSS meetings over nongss meetings. These attributes include: Anonymity. By being able to enter ideas, comments, and votes anonymously, silent or shy participants are more encouraged to participate. Group members are hindered from dominating by position or personality. Ideas appear to be judged on their merit, not on the personality of the person that submitted it. Parallelism. By generating ideas and communicating them in parallel, participants get equal `air time'. This prevents production blocking so that participants can spend more time on generating new ideas. Furthermore, working in parallel allows groups to generate more ideas. In this respect, it is noteworthy that the number of high quality ideas appears to be directly proportional to the total number of ideas [14]. Group memory. During an electronic meeting, all ideas, comments, and votes are stored electronically. Hence, previous meeting results are readily available in a followup meeting. There is little time needed to produce meeting minutes. Moreover, there is a fundamental difference between the quality and completeness of electronic group memory and that of `traditional' minutes [5]. First, traditional minutes are likely to be more subjective as they are written by an individual. The electronic group memory gives an objective history. Second, minutes not often describe participants' initial positions or interim postures. Group memory depicts the evolution of the group's position over time. Finally, group memory makes each comment during a meeting public, to which others can refer at a later stage. Group size. Findings suggest that GSS have a greater positive impact on large groups (8 members or more) in terms of productivity and participant satisfaction, [6]. In other words, GSS seem to facilitate the effective and efficient participation of larger number of SMEs in a collaborative design process. In table 1, we identify the way in which GSS were used to support the design activities in the CID study. The basic activities of the design approach discussed in Section 2.1 are split into a number of subactivities, see also [17]. For each subactivity, the parties involved are identified. In order to identify the type of group support we considered to be most appropriate, the nature of each subactivity was determined. Based on the meeting task taonomy of Bostrom et al. [3], we differentiated between three meetings tasks: generate, organize, and evaluate. Nonmeeting tasks are labeled `other'. Finally, we identify which GSS (GroupSystems V modules or TeamGraphics) we used for each subactivity in the CID study Animated simulation models During the process of problem solving described in Section 2.1, a number of models of organizational processes are constructed and analyzed. Modeling organizational processes is a comple activity. First, organizations can be modeled from different perspectives: the way a manager

4 Table 1 GSS for collaborative design support ACTIVITY ACTORS NATURE GSS Construct conceptual model Gather conceptual data Define problem boundaries Identify relevant object classes Define relevant object classes Construct aspect models Construct empirical model Formulate organizational requirements Construct simulation model Gather empirical data Formulate problem statements Relate problems to requirements Validate static empirical model Diagnose problem situation Formulate cause hypotheses Investigate cause hypotheses Formulate solution directions Construct models for change Identify possible solutions Select solution to elaborate Conceptualize solution Construct simulation model of solution Evaluate solution Choose change alternative Compare evaluation results Determine alternative to implement Implement solution Write policy document Introduce changes Perform post evaluation Generate Idea Organizer TeamGraphics TeamGraphics Generate Other Generate Organize Generate & Evaluate Idea Organizer Group Outliner Group Outliner Group Outliner Group Outliner Evaluate Other Generate & Evaluate Group Outliner Vote Organize Evaluate Vote Other Other Other looks at a process is usually different from the way the one who eecutes it does. Second, an organizational process usually consists of a great many activities that can be modeled. Third, carrying out activities is often timedependent: many activities are closely adjusted to one another or are being performed in parallel with one another. Consequently, modeling organizational processes requires models which can reflect different abstraction levels, parallel activities and an eplicit time dimension. In addition, for analysts, SMEs, and decision makers, models of current and future organizational processes are used as a vehicle of communication. Hence, it is imperative that these models are easy to communicate. This means, that a model has to closely resemble the mental model of the person it is communicated to [4]. Eperience suggests that traditional modeling techniques, such as ERDs, DFDs, or IDEF0 models do not meet these requirements [21]: Diagramming techniques may be able to model the dynamics of a situation, but the resulting diagrams are static in themselves. This makes it difficult to thoroughly understand and analyze the dynamic characteristics of the modeled processes. Diagramming techniques are often difficult to communicate to SMEs and decision makers. They usually lack the required training and epertise to build and understand the resulting models. Also, diagrams seldom resemble a problem situation visually. In this respect, simulation techniques appear to be more useful for developing models to analyze process dynamics [21]. However, a simulation model itself can still be considered to be nothing more than a black bo hiding the dynamics of the problem situation. It is difficult to investigate the modeled processes by only going through large sets of input and output data. We propose that using animation techniques on top of simulation models has the potential of overcoming this problem. An animation model graphically portrays the dynamic behavior of an process by showing icons that visually resemble objects from the real world, move around a computer screen, changing shape, color etc. Because of their cartoonlike behavior,

5 animation models have the potential to resemble closely the mental models of both problem owners and problem solvers. Animation models support the communication between and among analysts, SMEs, and decision makers in various ways [21]: For an analyst, the use of animation models may decrease the development time of the simulation model because of the enhanced debugging possibilities. With animation it may be quicker to find and localize mistakes than by going through output of traces or using a debugger. The fact that the visual process information in an animation model is less abstract and, therefore, easier to communicate to a group of SMEs, increases the SMEs' understanding of the organizational processes. As a result, SMEs may participate more actively in the design process. Their contribution may shift from gaining understanding to providing insight. This may lead to model improvements. Also, the SMEs may appreciate and value their involvement more. During the construction of a descriptive empirical model, using animation offers unique possibilities for facevalidity tests. Structural mistakes in the model or deviant behavior can be pointed out by the SMEs. In the solution seeking activity, animation may help to point out inadequacies of possible solutions which the SMEs or decision makers want to test. With animation these shortcomings may be presented such that the decision makers can understand and accept them. Animation models help focus on particular aspects of a process under investigation, without having to go through large amounts of printed, numerical data. This is especially useful when presenting the results of a process analysis to a decision maker. In other words, an animation model can illustrate statistical results in an easy accessible manner. At present, animation is often a standard feature of simulation environments. A survey of simulation software showed that 80% of the simulation packages had animation capabilities [13]. In the CID study, we used the simulation language Arena, which is the successor of SIMAN/Cinema [12]. Arena is a general purpose simulation language, which supports both discrete event simulation and continuous simulation. It can be used in both production and service environments. Apart from modeling and portraying the dynamics of organizational processes, it offers facilities to design simulation eperiments and to analyze numerical results. 3. The CID study The design approach described in the previous section, was applied to the CID case to support the change process that was taking place. Below we illustrate the application of the approach with respect to the construction of the conceptual model, the empirical model, and the models for change. We first give some background information on the design sessions in which these models were built and evaluated Session background In the course of the study, five sessions were organized with respect to the models of the CID s current and future processes, see table 2. The first two sessions lasted about three hours, the other sessions lasted about si hours each. In total, there were 40 participants, 27 of which were unique. The participants used GroupSystems V in each session. TeamGraphics was used to support the construction and evaluation of the conceptual model of the current situation. Arena was used for the same purpose with respect to the models for change. GSS was not a new phenomena for the majority of the participants. About 75 percent had etensive eperience using GroupSystems. There were two analysts involved in the study. Each session took place in the Group Support Facility (GSF) at Delft University of Technology (figure 2). The GSF layout consists of a meeting room with a Ushaped table facing a public screen, flanked by a number of breakout rooms. The table consists of 15 slightly wedgeshaped segments with a sunkin CRT. The public screen has been implemented using a beam projector placed overhead, powerful enough to generate a crisp image even in daylight. The GSF infrastructure serves as a platform for several GSS applications such as GroupSystems V, GroupSystems for Windows, and TeamGraphics. Figure 2 The Group Support Facility in the study Conceptual model The conceptual model of the CID s current situation was built in a number of steps following an incremental modeling strategy. First, we held a number of short

6 Table 2 Background information on the model sessions during the study. Tools used Session Participants GroupSystems TeamGraphics Arena 1. Conceptual model prototype 2. Conceptual model prototype 3. Conceptual and empirical model 4. Models for change 5. Models for change interviews with some key actors in the CID. In these interviews, information was gathered on the relevant processes in the CID. Second, during the first two sessions, we built first version (prototype) of the conceptual model in TeamGraphics together with a key CID employee. Additional information to build this model was collected using GroupSystems. Part of the prototype model is depicted in figure 3. The modeling technique used concerns process modeling where, based on a set of object definitions, the interdependencies between the constituent activities of a process are depicted together with the actors that perform these activities [8]. Finally, in the third session, we presented the prototype of the model in TeamGraphics to a group of CID employees. During this presentation, we used TeamGraphics in facilitation mode [23]. Participants could browse through the model. They did, however, not have privileges to make modifications themselves. For this purpose, we used a dedicated chauffeur, that immediately followed up on all participants requests. current situation. In addition, the CID management requested that it were to be used as a basis in other reorganization efforts in the CID. 2. It was important for the CID actors involved to have a shared view about the situation and the problems that they face. In other words, their mental models of the problem situation needed to be in harmony. This is important to arrive at a diagnosis of the problem situation and a proposed solution that everybody agrees upon. We reasoned that by discussing and improving the prototype of the conceptual model as a group, the mental models of the group members would converge. The fact that all participants epressed that the resulting model was a valid representation of the CID s processes, confirmed the fact that their mental models converged. 3. We feel that the group modeling process was more efficient that a traditional process where a model is built during a iterative series of individual interviews with SMEs. The prototype of the conceptual model was constructed in si hours. The discussion and modification of this model took another three and a half hours. During this time, a great majority of the SMEs' suggestions to modify and epand the model had been processed. 4. We epected the SMEs to have a tendency to overemphasize details with respect to their processes and hence invest a disproportionate amount of modeling efforts. However, analysis showed that the model size only increased by about 18 percent (from 101 elements to 119 elements) [18]. In other words, the modeling process remained manageable in terms of modeling focus and level of detail Empirical model Figure 3 Part of the conceptual model. Regarding the group modeling process supported by TeamGraphics, we make the following observations: 1. The active involvement of the CID employees in the modeling process effectuated the implicit verification of the resulting model. All participants agreed that the final model was a valid representation of the CID's Like the conceptual model, the empirical model of the current situation was also constructed in a number of participative steps representing an incremental modeling strategy. First, we collected a number of problems ourselves that we identified during the modeling process of the conceptual model. Second, during the same session in which the conceptual model was evaluated and modified, the CID SMEs used GroupSystems to identify and

7 prioritize a number of organizational requirements (comparable to critical success factors). Finally, the group was invited to brainstorm about known and believed problems that hindered the CID from meeting its organizational requirements. To stimulate this brainstorming activity, we entered our initial list of problems to the outline before the SMEs could enter their ideas. For the brainstorming activity, we used GroupSystems V s Group Outliner module in combination with TeamGraphics. Every SME had access to two adjoined terminals, one running TeamGraphics, the other one Group Outliner. The SMEs could use TeamGraphics to walk through the conceptual model during the brainstorming eercise. In Group Outliner we outlined the hierarchical structure of the conceptual model s process models. The SMEs were asked to enter the problems they perceived as comments to the most appropriate part of the outline. This implied that very specific problems were entered as comments to the task they related to, whereas the most general problem statements were entered at the top level of the outline. The outline representing the hierarchical structure of the conceptual model s process models is depicted in figure 4. reacted on problem statements immediately, fueling the discussion about some problems and enforcing clearer, more detailed problem descriptions. This saved the time needed to validate the analysts perception of the problems with each individual SME Models for change Based on the problem statements gathered during the previous activity, a number of potential solutions were identified by the analysts in cooperation with a number of key CID employees. These solutions entailed various structural modifications and etensions with respect to the way in which the main processes in the CID were carried out. The further design of these solution was carried out in a number of steps. First, each new or modified main process was conceptualized by the analysts. Second, these conceptual models for change were transformed into animated simulation models in Arena. These animation models portrayed the dynamic behavior of the actors in the envisioned situation in terms of the order and the interdependencies of the activities they carried out. An eample of an animation model is shown in figure 5. Figure 4 The hierarchical structure of the conceptual model in Group Outliner. Our own initial problem list consisted of 38 problems. The participants etended this list with another 71 problem statements. We found only a small overlap (9 problems) between the two sets of problems. In other words, the SMEs had a significant contribution to the analysis of the CID's current situation. The main difference between the two sets of problems related to their focus: strategy (analysts) vs. operational (SMEs). Clearly, these two focuses complemented each other well. In this sense, the SMEs did not question our perceptions, but accepted it as a basis for a more thorough assessment of the situation. Identifying the problems of CID's current situation in a group setting brought about a rich picture of the problem situation. The SMEs not only outperformed the analysts in terms of the number of problems generated. They also figure 5 An eample of an animation model depicting the proposed new processes. Third, each animated model was presented to two groups of SMEs (20 people in total) during the fourth and the fifth session. During each session, the proposed process was introduced and eplained to the SMEs and a demonstration of the animation model was given. As soon as the model and the process it depicted was clear to the SMEs, GroupSystems V module was used to discuss the proposed new or modified process. During this activity, the SMEs were encouraged to be as critical and creative as possible. The SMEs entered comments and held electronic discussions on five predefined discussion topics: epected problems with the

8 proposed process, questions about the proposed process, alternative ways to overcome the problems addressed in this process proposal, ideas regarding a project management system, and remaining comments and ideas. Finally, based on the SMEs feedback and the subsequent group discussions, the definitive design of the process was finalized immediately after the sessions. The CID management approved of the final design of the processes and initiated a number of activities required to achieve the implementation of the proposed changes. The decision to communicate the models for change to the SMEs as animation models was based on the assumption that the proposed changes would be easier to fully understand which would facilitate a critical evaluation. However, a previous study showed that SMEs may seem overwhelmed by animation models and become interested viewers rather than critical evaluators. This is referred to as the Pacman effect [10]. We anticipated this risk by keeping the models as simple as possible and by consciously stimulating the SMEs to have a critical brainstorming attitude. During the introduction of the models, we indeed witnessed a short period in which the SMEs seemed to a bit awed by the models. However, as soon as they had the opportunity to react to the model and engage in an (electronic) discussion of the model, their passiveness made way to a critical and assertive attitude. This was not only illustrated by the tone of their comments and by the drive with which they reacted to each other s comments, but also by the number of comments, ideas, and suggestions that were submitted. In total, the 20 SMEs participating generated 399 comments, nearly 60 pages of output, covering the five predefined discussion topics with respect to the proposed processes. Hence, we conclude that using animated models in a GSS environment did not seem to harm the SMEs active involvement in the design and evaluation process. However, we need to point out that the SMEs motivated participation also to some etend seemed to be related to the perceived correctness of the animation models. During the sessions, we found that small logical inconsistencies or impossibilities triggered the SMEs to study the proposed process very carefully. In other words, they were stimulated by the imperfectness of the models. With respect to the animation models themselves, we surveyed the SMEs whether they felt that the models sufficiently clarified the proposed processes. Their average response was 3.7 (standard deviation 0.9) on a five point scale, 5 between the most positive. In general, the SMEs found the animation models somewhat comple. They thought there were too many elements moving on the screen and too many interdependencies shown to comprehend the proposed situation easily. During the second session, we dealt with this problem by taking more time to eplain the models and let the participants get used to them. Still, compared to the paper conceptual process models, the SMEs liked the animation models very much. As one of them remarked: That animation model tells me more than ten pages of process models! 3.5. Participants' reflections During and after the sessions, we handed out questionnaires and held personal interviews to investigate the SMEs attitude toward the group design process and the GSS technology used. Group design process On the whole, the group design sessions left a positive impression with the participants. The results of the questionnaire are presented in table 3. (In the original (Dutch) questionnaire, not all questions were formulated with a positive orientation. For the sake of presentation, we transformed all questions in tables 3 and 4 into positive oriented questions). From the results in table 3 it follows that the SMEs were very satisfied with the sessions, see question 1. They felt comfortable with the way in which the sessions were structured and the issues that were addressed. Furthermore, they subscribed to the results of the session, see question 2, while at the same time they thought that the session helped them to gain new insights, see question 3. The participants felt a lot of consensus was reached, see question 4. This, we feel, is of critical importance to the success of participative design efforts. Notwithstanding the fact that during the models for change sessions there were some energetic discussions of various change alternatives between individual actors, the participants obviously enjoyed working together during the sessions, see question 5. The composition of the group was evaluated lower than in the previous study: 3.8 against 4.2. From comments of the participants, this turned out to be due to the fact that during one of the sessions, a lot of people canceled. Consequently, the remaining participants felt that the group was incomplete. Finally, the participants' overall positive attitude toward the sessions is illustrated by their willingness to attend future sessions, see question 7. GSS technology used During the group sessions, we employed both TeamGraphics and GroupSystems V. As TeamGraphics was only used by a few people, we did not hand out

9 Table 3 Questionnaire results with respect to the group design sessions. Question Mean * Std Are you satisfied with the session? Did the session results confirm your ideas on the session topic? Did the session help to gain new insights on the session topic? Has enough agreement been achieved among the participants? Did you enjoy the collaboration with the other group members? Do you approve of the composition of the group? Are you willing to participate in a followup session or activity? * On a five point scale, 1 being very negative and 5 being very positive. Table 4 Questionnaire results with respect to the use of GroupSystems V Question Mean * Std How do you perceive the quantity of the session results? Is a GroupSystems meeting more productive than a manual meeting? How do you perceive the quality of the session results? How well did you understand GroupSystems V? Did you find GroupSystems V user friendly? Did you find GroupSystems V interesting to use? * On a five point scale, 1 being very negative and 5 being very positive quantitative questionnaires. SMEs suggest, however, that this technology has a high learning curve and takes some time to get used to it. As a result, we used a chauffeur to translate SMEs comments and suggestions directly into the model during part of the modeling eercise. The SMEs felt very comfortable with this working procedure. The application of GroupSystems V was evaluated using questionnaires. The SMEs involved gave the same positive feedback as in previous studies [19;20]. They liked the ability of GroupSystems to focus and structure a discussion and to work simultaneously and anonymously. The questionnaire results are presented in table 4. Regarding the use GroupSystems, the SMEs gave a lot of positive feedback. The SMEs felt that the quantity of session results was high, see question 8. The SMEs clearly attributed this high productivity to GroupSystems V, see question 9. One of the participants phrased it as follows: It's more productive because there's less yacketyyack, little distraction and no endless discussions. You are forced to get to the point. With respect to the quality of the sessions' results (question 10) the participants also displayed a positive impression. Like in previous studies, the SMEs epressed great enthusiasm about GroupSystems itself. They felt they understood the technology very well (question 11), and found it very user friendly and interesting to use (questions 12 and 13). 4. Conclusions and future research In this study, we eplored the possibilities of the combined employment of GSS and animation technologies. The situation at the CID represented a realistic research environment. The results of the study clearly indicate the potential of the technologies concerned during organizational change efforts: 1. Required design information was efficiently gathered and processed. 2. The SMEs involved got highly motivated to actively take part in the design effort. 3. The constructed models were effective in the sense that they triggered detailed collaborative evaluations and resulted in implementation proposals that were accepted by the SMEs involved. 4. The SMEs were very satisfied both with the collaborative design process and the process support. Based on our eperiences, we argue that the GSS facilities and animation techniques are complimentary and that their application will be beneficial to the process of facilitating organizational change. However, we also eperienced a number of issues that require further attention: 1. Keeping the momentum. It turned to be difficult at certain stages in the project to keep the momentum. As the efficiency of SME involvement increases and the amount of contributions increases as well, the analysts need more time to process all contributions into one meaningful problem analysis and design. However, because of their good eperiences during the sessions, the SMEs epectations of the process are (too) high with respect to the momentum of the project. 2. Information management. During the various sessions with the SMEs, a lot of design information was collected. It sometimes proved to be difficult to keep this information organized and maintain relationships between pieces of information throughout the project.

10 3. Construction of animation models. Transforming a conceptual process model into an animation model can be a time consuming activity. In the CID study, three man weeks were spent building the animation models. 4. Fleible animation models. The animation environment used was not fleible enough to build and modify animation models during sessions. Also, it would have been nice if the SMEs were able to manipulate the animation models themselves. In other words, we felt the need for a group animation model. 5. Group modeling support. TeamGraphics appears to be a rather comple group modeling tool for SMEs with little drawing tool eperience to effectively use it without continuous support from eperts. At this moment eperiences with design approaches to organizational change that use the technologies described in this paper are still rare. Research is needed to further investigate the issues discussed above. In addition, we found a number of other issues for further research to achieve a more detailed understanding of technology supported collaborative design. With respect to the group modeling technology these issues include the productivity of certain group modeling strategies, the optimal group size and facilitation mode for group modeling efforts, and the modeling techniques that are most suitable to be used by groups of nonmodeling eperts. With respect to the animation technologies these issues include the automatic transformation of conceptual process models into animation models, and a detailed investigation into the added value of animation model over process models on paper or nonanimated simulation models. Although this study confirmed earlier field evidence that suggests that animation models facilitate and enhance the communication processes between people involved in an organizational change project [21], further evidence is needed to determine the eact nature of these benefits. Important questions that remain in this respect concern the levels of detail and compleity of an animation model. References [1] ARGYRIS, C., AND D.A. SCHÖN, Participatory Action Research and Action Science Compared A Commentary, American Behavioral Scientist, Vol. 32, No. 5, pp , [2] BENBASAT, I., D.K. GOLDSTEIN, AND M. MEAD, The case research strategy in studies of information systems, MIS Quarterly, Vol. 11, No. 3, pp , [3] BOSTROM, R.P., R. ANSON, AND V.K. CLAWSON, Group Facilitation and Group Support Systems, in: Jessup, L.M., J.S. Valacich (eds), Group Support Systems New Perspectives, Macmillan Publishing Company, New York, [4] CHECKLAND, P.B., Systems Thinking, Systems Practice, John Wiley & Sons, Chichester, [5] CULNAN, M.J., AND M.L. MARKUS, Information Technologies, in: Jablin, F.M., L.L. Putnam, K.H. Roberts, and L.W. Porter (eds)., Handbook of Organizational Communication An Interdisciplinary Perspective, pp , Sage Publications, London, [6] DENNIS, A.R., Electronic Support for Large Groups, Journal of Organizational Computing, Vol. 4, No. 2, pp , [7] DENNIS, A.R., AND R.B. GALLUPE, A History of Group Support Systems Empirical Research: Lessons Learned and Future Directions, in: Jessup, L.M., J.S. Valacich (eds), Group Support Systems New Perspectives, Macmillan Publishing Company, New York, [8] EIJCK, D.T.T. VAN, AND G.J. DE VREEDE, The Dynamics of Organizational Coordination, Proceedings of HICSS28, IEEE Computer Society Press, [9] HUBER, G.P., The Nature and Design of PostIndustrial Organizations, Management Science, 30(8), pp , [10] MEEL, J.W. VAN, Dynamics in Business Engineering, Doctoral dissertation, Delft University of Technology, The Netherlands, [11] NUNAMAKER, J.F. JR., A.R. DENNIS, J.S. VALACICH, D.R. VOGEL, AND J.F. GEORGE, Electronic Meeting Systems to Support Group Work, CACM, 34(7), pp. 4061, [12] PEGDEN, C.D., R.E. SHANNON, AND R.P. SADOWSKI, Introduction to Simulation using SIMAN 2nd Edition, McGraw Hill, [13] SWAIN, J., Simulation Software Survey, OR/MS Today, pp , October [14] VALACICH, J.S., A.R. DENNIS, AND T. CONNOLLY, Idea Generation in ComputerBased Groups: A New Ending to an Old Story, Organizational Behavior and Human Decision Processes, Vol. 57, pp , [15] VOGEL, D.R., N. KATIC, AND B. NEVSTRUJEV, Automated Support For Group Process Modeling, in: G.J. de Vreede, and H.G. Sol (eds), Proceedings of the INFORMS'95 Sessions on GDSS as Support for Designing Organizations and Information Systems, Delft University of Technology, [16] VOGEL, D.R., R. ORWIG, D. DEAN, J. LEE, AND C. ARTHUR, Reengineering with Enterprise Analyzer, Proceedings of HICSS26, IEEE Computer Society Press, [17] VREEDE, G.J. DE, Facilitating Organizational Change, PhDthesis, Delft University of Technology, [18] VREEDE, G.J. DE, Participative Modeling for Understanding: Facilitating Organizational Change with GSS, Proceedings of HICSS29, IEEE Computer Society Press, [19] VREEDE, G.J. DE, S.O. DEN HENGST, AND H.G. SOL, Facilitating User Involvement in Information System Design and Development with GDSS The Organized Crime Case, in: Olfman, L. (ed.), Proceedings of the ACM SIGCPR Conference, Nashville Tennessee, 68 April, [20] VREEDE, G.J. DE, P.C. MULLER, Why some GSS meetings just don't work: Eploring critical success factors for electronic meetings, working paper, Delft University of Technology, [21] VREEDE, G.J. DE, AND A. VERBRAECK, Animating Organizational Processes, Simulation Practice and Theory, Vol. 4, pp , [22] WANNINGER, L.A., AND G.W. DICKSON, GRIP Group Requirement Identification Process, Proceedings of HICSS25, IEEE Computer Society Press, [23] WATSON, R.T., M.B. ALEXANDER, C.E. POLLARD, AND R.P. BOSTROM, Perceptions of Facilitators of a KeypadBased Group Support System, Journal of Organizational Computing, Vol. 4, No. 2, pp , 1994.

Operational Level Involvement in the Collaborative Business Engineering Approach

Operational Level Involvement in the Collaborative Business Engineering Approach Operational Level Involvement in the Collaborative Business Engineering Approach Floor van Werven Delft University of Technology Systems Engineering, Policy Analysis and Management E-mail: fhvanwerven@gmail.com

More information

The IIA Global Internal Audit Competency Framework

The IIA Global Internal Audit Competency Framework About The IIA Global Internal Audit Competency Framework The IIA Global Internal Audit Competency Framework (the Framework) is a tool that defines the competencies needed to meet the requirements of the

More information

A Comparison of System Dynamics (SD) and Discrete Event Simulation (DES) Al Sweetser Overview.

A Comparison of System Dynamics (SD) and Discrete Event Simulation (DES) Al Sweetser Overview. A Comparison of System Dynamics (SD) and Discrete Event Simulation (DES) Al Sweetser Andersen Consultng 1600 K Street, N.W., Washington, DC 20006-2873 (202) 862-8080 (voice), (202) 785-4689 (fax) albert.sweetser@ac.com

More information

KNOWLEDGE-BASED MODELING OF DISCRETE-EVENT SIMULATION SYSTEMS. Henk de Swaan Arons

KNOWLEDGE-BASED MODELING OF DISCRETE-EVENT SIMULATION SYSTEMS. Henk de Swaan Arons KNOWLEDGE-BASED MODELING OF DISCRETE-EVENT SIMULATION SYSTEMS Henk de Swaan Arons Erasmus University Rotterdam Faculty of Economics, ment of Computer Science P.O. Box 1738, H9-28 3000 DR Rotterdam, The

More information

University of Nebraska Central Administration Job Description

University of Nebraska Central Administration Job Description General Information Working Job Title: PeopleSoft Testing Specialist Position Number: University of Nebraska Central Administration Job Description Job Family: IT Department Name: NeSIS Job Family Zone:

More information

Malay A. Dalal Madhav Erraguntla Perakath Benjamin. Knowledge Based Systems, Inc. (KBSI) College Station, TX 77840, U.S.A.

Malay A. Dalal Madhav Erraguntla Perakath Benjamin. Knowledge Based Systems, Inc. (KBSI) College Station, TX 77840, U.S.A. AN INTRODUCTION TO USING PROSIM FOR BUSINESS PROCESS SIMULATION AND ANALYSIS Malay A. Dalal Madhav Erraguntla Perakath Benjamin Knowledge Based Systems, Inc. (KBSI) College Station, TX 77840, U.S.A. ABSTRACT

More information

7 Conclusions and suggestions for further research

7 Conclusions and suggestions for further research 7 Conclusions and suggestions for further research This research has devised an approach to analyzing system-level coordination from the point of view of product architecture. The analysis was conducted

More information

Methodological Approaches to Evaluation of Information System Functionality Performances and Importance of Successfulness Factors Analysis

Methodological Approaches to Evaluation of Information System Functionality Performances and Importance of Successfulness Factors Analysis Gordana Platiša Neđo Balaban Methodological Approaches to Evaluation of Information System Functionality Performances and Importance of Successfulness Factors Analysis Article Info:, Vol. 4 (2009), No.

More information

How To Develop Software

How To Develop Software Software Engineering Prof. N.L. Sarda Computer Science & Engineering Indian Institute of Technology, Bombay Lecture-4 Overview of Phases (Part - II) We studied the problem definition phase, with which

More information

ISSUES OF STRUCTURED VS. OBJECT-ORIENTED METHODOLOGY OF SYSTEMS ANALYSIS AND DESIGN

ISSUES OF STRUCTURED VS. OBJECT-ORIENTED METHODOLOGY OF SYSTEMS ANALYSIS AND DESIGN ISSUES OF STRUCTURED VS. OBJECT-ORIENTED METHODOLOGY OF SYSTEMS ANALYSIS AND DESIGN Mohammad A. Rob, University of Houston-Clear Lake, rob@cl.uh.edu ABSTRACT In recent years, there has been a surge of

More information

Application development = documentation processing

Application development = documentation processing Application development = documentation processing Software is documented information about activities, that can be transformed into executable computer instructions performing the activities as documented.

More information

The Logical Framework Approach An Introduction 1

The Logical Framework Approach An Introduction 1 The Logical Framework Approach An Introduction 1 1. What is the Logical Framework Approach? 1.1. The background The Logical Framework Approach (LFA) was developed in the late 1960 s to assist the US Agency

More information

E-Learning Strategy: A Framework for Success

E-Learning Strategy: A Framework for Success E-Learning Strategy: A Framework for Success By Jennifer De Vries, CPT Chief Solutions Architect BlueStreak Learning, LLC jennifer@bluestreaklearning.com 630-842-1865 Published by the American Society

More information

Answers to Review Questions

Answers to Review Questions Tutorial 2 The Database Design Life Cycle Reference: MONASH UNIVERSITY AUSTRALIA Faculty of Information Technology FIT1004 Database Rob, P. & Coronel, C. Database Systems: Design, Implementation & Management,

More information

C. Wohlin, "Is Prior Knowledge of a Programming Language Important for Software Quality?", Proceedings 1st International Symposium on Empirical

C. Wohlin, Is Prior Knowledge of a Programming Language Important for Software Quality?, Proceedings 1st International Symposium on Empirical C. Wohlin, "Is Prior Knowledge of a Programming Language Important for Software Quality?", Proceedings 1st International Symposium on Empirical Software Engineering, pp. 27-36, Nara, Japan, October 2002.

More information

New Satisfying Tool for Problem Solving. in Group Decision-Support System

New Satisfying Tool for Problem Solving. in Group Decision-Support System Applied Mathematical Sciences, Vol. 6, 2012, no. 109, 5403-5410 New Satisfying Tool for Problem Solving in Group Decision-Support System Anas Jebreen Atyeeh Husain Information Systems Department Al Al-Bayt

More information

University of Nebraska Central Administration Job Description. Job Family: Curriculum Team. Department Name: University of Nebraska High School

University of Nebraska Central Administration Job Description. Job Family: Curriculum Team. Department Name: University of Nebraska High School General Information Working Job Title: Instructional Design Specialist Position Number: 00000162 University of Nebraska Central Administration Job Description Job Family: Curriculum Team Department Name:

More information

Framework for Case Analysis

Framework for Case Analysis Framework for Case Analysis Part I Analyzing a Case What is this document? You will be asked throughout your Graduate experience to analyze cases. Because there are many ways to approach cases, the CM

More information

Ivo Wenzler: Simulations as learning from the future

Ivo Wenzler: Simulations as learning from the future SIMULATION GAMES ARE POWERFUL PLAYFUL INTERVENTIONS. WE COME ACROSS SIMULATIONS OFTEN, IN ALL FORMS AND SHAPES. IVO WENZLER, SENIOR EXECUTIVE (PARTNER) AT ACCENTURE AND ASSOCIATE PROFESSOR AT THE DELFT

More information

IMEO International Mass Event Organization based on Recent Experience of Euro 2012

IMEO International Mass Event Organization based on Recent Experience of Euro 2012 IMEO International Mass Event Organization based on Recent Experience of Euro 2012 1. Name of the project: Project Management 2. Leader of the workshop (materials' author): Szymon Włochowicz 1 Objectives

More information

Experience Report: Using Internal CMMI Appraisals to Institutionalize Software Development Performance Improvement

Experience Report: Using Internal CMMI Appraisals to Institutionalize Software Development Performance Improvement Experience Report: Using Internal MMI Appraisals to Institutionalize Software Development Performance Improvement Dr. Fredrik Ekdahl A, orporate Research, Västerås, Sweden fredrik.p.ekdahl@se.abb.com Stig

More information

SOFTWARE ENGINEERING INTERVIEW QUESTIONS

SOFTWARE ENGINEERING INTERVIEW QUESTIONS SOFTWARE ENGINEERING INTERVIEW QUESTIONS http://www.tutorialspoint.com/software_engineering/software_engineering_interview_questions.htm Copyright tutorialspoint.com Dear readers, these Software Engineering

More information

Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire. P3M3 Project Management Self-Assessment

Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire. P3M3 Project Management Self-Assessment Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire P3M3 Project Management Self-Assessment Contents Introduction 3 User Guidance 4 P3M3 Self-Assessment Questionnaire

More information

Ten Steps to Comprehensive Project Portfolio Management Part 3 Projects, Programs, Portfolios and Strategic Direction By R.

Ten Steps to Comprehensive Project Portfolio Management Part 3 Projects, Programs, Portfolios and Strategic Direction By R. August 2007 Ten Steps to Comprehensive Project Portfolio Management Part 3 Projects, Programs, Portfolios and Strategic Direction By R. Max Wideman This series of papers has been developed from our work

More information

Visualizing news: obstacles, challenges, and solutions

Visualizing news: obstacles, challenges, and solutions Visualizing news: obstacles, challenges, and solutions Gerard Smit, Yael de Haan, Laura Buijs & Piet Bakker University of Applied Sciences Utrecht Work in progress, please do not cite without permission

More information

ABSTRACT. would end the use of the hefty 1.5-kg ticket racks carried by KSRTC conductors. It would also end the

ABSTRACT. would end the use of the hefty 1.5-kg ticket racks carried by KSRTC conductors. It would also end the E-Ticketing 1 ABSTRACT Electronic Ticket Machine Kerala State Road Transport Corporation is introducing ticket machines on buses. The ticket machines would end the use of the hefty 1.5-kg ticket racks

More information

The Turkish Online Journal of Educational Technology TOJET October 2004 ISSN: 1303-6521 volume 3 Issue 4 Article 2

The Turkish Online Journal of Educational Technology TOJET October 2004 ISSN: 1303-6521 volume 3 Issue 4 Article 2 IMPLICATIONS OF THE INTEGRATION OF COMPUTING METHODOLOGIES INTO CONVENTIONAL MARKETING RESEARCH UPON THE QUALITY OF STUDENTS UNDERSTANDING OF THE CONCEPT Umut Ayman & Mehmet Cenk Serim Faculty of Communication

More information

Simulation and Game Programming

Simulation and Game Programming Simulation and Game Programming College of Engineering & Information Sciences Careers That Fit You Create a career around your talents Do you enjoy using the math skills, spatial relationship abilities

More information

Requirements in Functional IT Management

Requirements in Functional IT Management Requirements in Functional IT Floris Blaauboer University of Twente, Department of Computer Science, Chair of Information Systems, f.a.blaauboer@student.utwente.nl Abstract. Requirements engineering and

More information

BPMN and Simulation. L. J. Enstone & M. F. Clark The Lanner Group April 2006

BPMN and Simulation. L. J. Enstone & M. F. Clark The Lanner Group April 2006 BPMN and Simulation L. J. Enstone & M. F. Clark The Lanner Group April 2006 Abstract This paper describes the experiences and technical challenges encountered by the Lanner group in building a Java based

More information

The University of Adelaide Business School

The University of Adelaide Business School The University of Adelaide Business School MBA Projects Introduction There are TWO types of project which may be undertaken by an individual student OR a team of up to 5 students. This outline presents

More information

Foundations for Systems Development

Foundations for Systems Development Foundations for Systems Development ASSIGNMENT 1 Read this assignment introduction. Then, read Chapter 1, The Systems Development Environment, on pages 2 25 in your textbook. What Is Systems Analysis and

More information

Software quality engineering. Quality assurance. Testing

Software quality engineering. Quality assurance. Testing 4 Software Quality Engineering c Jeff Tian, to be published by John Wiley, 2005 Software quality engineering Quality assurance Testing Figure 1.1. engineering Scope and content hierarchy: Testing, quality

More information

IEEE SESC Architecture Planning Group: Action Plan

IEEE SESC Architecture Planning Group: Action Plan IEEE SESC Architecture Planning Group: Action Plan Foreward The definition and application of architectural concepts is an important part of the development of software systems engineering products. The

More information

Considering the Cultural Issues of Web Design in Implementing Web-Based E-Commerce for International Customers

Considering the Cultural Issues of Web Design in Implementing Web-Based E-Commerce for International Customers Considering the Cultural Issues of Web Design in Implementing Web-Based E-Commerce for International Customers Kyeong. S. Kang The First International Conference on Electronic Business, Faculty of Information

More information

Summary and conclusions of the survey Alerting systems needs

Summary and conclusions of the survey Alerting systems needs Summary and conclusions of the survey Alerting systems needs Survey assigned by the WODC. April 2013 Authors: Drs. Jaap Bouwmeester (I&O Research), Prof. Enny Das (Radboud Universiteit Nijmegen), Drs.

More information

54 Robinson 3 THE DIFFICULTIES OF VALIDATION

54 Robinson 3 THE DIFFICULTIES OF VALIDATION SIMULATION MODEL VERIFICATION AND VALIDATION: INCREASING THE USERS CONFIDENCE Stewart Robinson Operations and Information Management Group Aston Business School Aston University Birmingham, B4 7ET, UNITED

More information

CRISP-DM, which stands for Cross-Industry Standard Process for Data Mining, is an industry-proven way to guide your data mining efforts.

CRISP-DM, which stands for Cross-Industry Standard Process for Data Mining, is an industry-proven way to guide your data mining efforts. CRISP-DM, which stands for Cross-Industry Standard Process for Data Mining, is an industry-proven way to guide your data mining efforts. As a methodology, it includes descriptions of the typical phases

More information

On One Approach to Scientific CAD/CAE Software Developing Process

On One Approach to Scientific CAD/CAE Software Developing Process ISSN (Online): 1694-0784 ISSN (Print): 1694-0814 9 On One Approach to Scientific CAD/CAE Software Developing Process George Sergia 1, Alexander Demurov 2, George Petrosyan 3, Roman Jobava 4 1 Exact and

More information

Adopting a Continuous Integration / Continuous Delivery Model to Improve Software Delivery

Adopting a Continuous Integration / Continuous Delivery Model to Improve Software Delivery Customer Success Stories TEKsystems Global Services Adopting a Continuous Integration / Continuous Delivery Model to Improve Software Delivery COMMUNICATIONS AGILE TRANSFORMATION SERVICES Executive Summary

More information

Requirements engineering

Requirements engineering Learning Unit 2 Requirements engineering Contents Introduction............................................... 21 2.1 Important concepts........................................ 21 2.1.1 Stakeholders and

More information

Onboarding and Engaging New Employees

Onboarding and Engaging New Employees Onboarding and Engaging New Employees Onboarding is the process of helping new employees become full contributors to the institution. During onboarding, new employees evolve from institutional outsiders

More information

PROJECT RISK MANAGEMENT

PROJECT RISK MANAGEMENT PROJECT RISK MANAGEMENT DEFINITION OF A RISK OR RISK EVENT: A discrete occurrence that may affect the project for good or bad. DEFINITION OF A PROBLEM OR UNCERTAINTY: An uncommon state of nature, characterized

More information

An Activity-Based Costing Assessment Task: Using an Excel Spreadsheet

An Activity-Based Costing Assessment Task: Using an Excel Spreadsheet e-journal of Business Education & Scholarship of Teaching Vol. 3, No. 1, 2009, pp:25-35. http://www.ejbest.org Instructional Note An Activity-Based Costing Assessment Task: Using an Excel Spreadsheet Damian

More information

Excellent X Good Satisfactory Not Satisfactory

Excellent X Good Satisfactory Not Satisfactory INTERNATIONAL BARCODE OF LIFE PROJECT (IBOL) INTERNATIONAL CONSORTIUM INITIATIVE (ICI) INTERIM REVIEW WRITTEN REPORT FORM ASSESSMENT 1. RESEARCH PROGRESS Progress against the original research plan is

More information

Service Blueprinting HANDBOOK Maik Seyring Dr. Utz Dornberger MBA Alfredo Suvelza MBA Trevor Byrnes

Service Blueprinting HANDBOOK Maik Seyring Dr. Utz Dornberger MBA Alfredo Suvelza MBA Trevor Byrnes International SEPT Program Service Blueprinting HANDBOOK Maik Seyring Dr. Utz Dornberger MBA Alfredo Suvelza MBA Trevor Byrnes SEPT Program May 09 Contents Prototypical process of Service Engineering...

More information

Bad designs. Chapter 1: What is interaction design? Why is this vending machine so bad? Good design. Good and bad design.

Bad designs. Chapter 1: What is interaction design? Why is this vending machine so bad? Good design. Good and bad design. Bad designs Chapter 1: What is interaction design? Elevator controls and labels on the bottom row all look the same, so it is easy to push a label by mistake instead of a control button People do not make

More information

BUILDING CONSTRUCTION PRIMARY TASK MODELS

BUILDING CONSTRUCTION PRIMARY TASK MODELS Construction Informatics Digital Library http://itc.scix.net/ paper w78-1996-319.content BUILDING CONSTRUCTION PRIMARY TASK MODELS Kangari R. and Sadri S. ABSTRACT: This paper provides a foundation for

More information

Software Engineering Introduction & Background. Complaints. General Problems. Department of Computer Science Kent State University

Software Engineering Introduction & Background. Complaints. General Problems. Department of Computer Science Kent State University Software Engineering Introduction & Background Department of Computer Science Kent State University Complaints Software production is often done by amateurs Software development is done by tinkering or

More information

Assessment of Learning Outcomes: The EASIMAP solution

Assessment of Learning Outcomes: The EASIMAP solution P027 Assessment of Learning Outcomes: The EASIMAP solution Alan Maddocks (A.P.Maddocks@lboro.ac.uk) and Prof. John Dickens Loughborough University, UK Programme leaders are epected to be able to demonstrate

More information

How To Teach A Health Theory Course

How To Teach A Health Theory Course Ellermann, Critical Thinking and Clinical Reasoning in the Health Sciences, Facione and Facione (eds.), California Academic Press. 1 Measuring Thinking Worldwide This document is a best practices essay

More information

B.Com(Computers) II Year RELATIONAL DATABASE MANAGEMENT SYSTEM Unit- I

B.Com(Computers) II Year RELATIONAL DATABASE MANAGEMENT SYSTEM Unit- I B.Com(Computers) II Year RELATIONAL DATABASE MANAGEMENT SYSTEM Unit- I 1 1. What is Data? A. Data is a collection of raw information. 2. What is Information? A. Information is a collection of processed

More information

Dong-Joo Kang* Dong-Kyun Kang** Balho H. Kim***

Dong-Joo Kang* Dong-Kyun Kang** Balho H. Kim*** Visualization Issues of Mass Data for Efficient HMI Design on Control System in Electric Power Industry Visualization in Computerized Operation & Simulation Tools Dong-Joo Kang* Dong-Kyun Kang** Balho

More information

Concept-Mapping Software: How effective is the learning tool in an online learning environment?

Concept-Mapping Software: How effective is the learning tool in an online learning environment? Concept-Mapping Software: How effective is the learning tool in an online learning environment? Online learning environments address the educational objectives by putting the learner at the center of the

More information

Monitoring and Evaluation of. Interventions

Monitoring and Evaluation of. Interventions Monitoring and Evaluation of Sports in Development (SiD) Interventions presented by: Pamela K. Mbabazi, Ph.D. Faculty of Development Studies, Department of Development Studies Mbarara University of Science

More information

Supporting Partially Distributed Groups in Electronic Meetings

Supporting Partially Distributed Groups in Electronic Meetings Supporting Partially Distributed Groups in Electronic Meetings Jeffrey J. Johnson Utah State University Logan, Utah USA Kregg J. Aytes Idaho State University Pocatello, Idaho USA Kelly Burke Idaho State

More information

White Paper Business Process Modeling and Simulation

White Paper Business Process Modeling and Simulation White Paper Business Process Modeling and Simulation WP0146 May 2014 Bhakti Stephan Onggo Bhakti Stephan Onggo is a lecturer at the Department of Management Science at the Lancaster University Management

More information

The S 3 (Strategy-Service-Support) Framework for Business Process Modelling

The S 3 (Strategy-Service-Support) Framework for Business Process Modelling The S 3 (Strategy-Service-Support) Framework for Business Process Modelling P. Loucopoulos Department of Computation University of Manchester Institute of Science & Technology P.O. Box 88, Manchester,

More information

Simulating the Structural Evolution of Software

Simulating the Structural Evolution of Software Simulating the Structural Evolution of Software Benjamin Stopford 1, Steve Counsell 2 1 School of Computer Science and Information Systems, Birkbeck, University of London 2 School of Information Systems,

More information

Crucial development areas for organizations and how to succeed in them. Leadership Development & Coaching

Crucial development areas for organizations and how to succeed in them. Leadership Development & Coaching INNONews Crucial development areas for organizations and how to succeed in them Innotiimi newsletter 2010 Leadership Development & Coaching Change Team Innovation Meaningful Meetings Global Challenges

More information

Level 1 Articulated Plan: The plan has established the mission, vision, goals, actions, and key

Level 1 Articulated Plan: The plan has established the mission, vision, goals, actions, and key S e s s i o n 2 S t r a t e g i c M a n a g e m e n t 1 Session 2 1.4 Levels of Strategic Planning After you ve decided that strategic management is the right tool for your organization, clarifying what

More information

Value Creation by Process-Oriented Project Management

Value Creation by Process-Oriented Project Management 558 CIB World Building Congress 2007 CIB2007-309 Value Creation by Process-Oriented Project Management W. Geijtenbeek 2, P. Geradts 1, B. van Eekelen 2, H. Kleine 2, R. Favié 2 and G.J. Maas 2 ABSTRACT

More information

Elite: A New Component-Based Software Development Model

Elite: A New Component-Based Software Development Model Elite: A New Component-Based Software Development Model Lata Nautiyal Umesh Kumar Tiwari Sushil Chandra Dimri Shivani Bahuguna Assistant Professor- Assistant Professor- Professor- Assistant Professor-

More information

SIX-STEP PROBLEM SOLVING MODEL

SIX-STEP PROBLEM SOLVING MODEL SIX-STEP PROBLEM SOLVING MODEL Problem solving models are used to address many issues that come up on a daily basis in the workplace. These problems may be technical or issue-based. While many of you have

More information

A Technical Writing Program Implemented in a First Year Engineering Design Course at KU Leuven

A Technical Writing Program Implemented in a First Year Engineering Design Course at KU Leuven A Technical Program Implemented in a First Year Engineering Design Course at KU Leuven C. Heylen & E. Londers Tutorial Services Faculty of Engineering Science, KU Leuven, Leuven, Belgium christel.heylen@mirw.kuleuven.be

More information

Evaluation of degree programs. Self-Evaluation Framework

Evaluation of degree programs. Self-Evaluation Framework Evaluation of degree programs Self-Evaluation Framework COVER, December 2009 FOREWORD UNIL's approach to quality emphasizes procedures based on reflection that encourage the faculties and units concerned

More information

Simulation Software: Practical guidelines for approaching the selection process

Simulation Software: Practical guidelines for approaching the selection process Practical guidelines for approaching the selection process Randall R. Gibson, Principal / Vice President Craig Dickson, Senior Analyst TranSystems I Automation Associates, Inc. Challenge Selecting from

More information

Partnering for Project Success: Project Manager and Business Analyst Collaboration

Partnering for Project Success: Project Manager and Business Analyst Collaboration Partnering for Project Success: Project Manager and Business Analyst Collaboration By Barbara Carkenord, CBAP, Chris Cartwright, PMP, Robin Grace, CBAP, Larry Goldsmith, PMP, Elizabeth Larson, PMP, CBAP,

More information

Building the EDM Roadmap An Innovation Platform for New Product Development & Regulatory Compliance. Mark Cowan mark@cowaninc.

Building the EDM Roadmap An Innovation Platform for New Product Development & Regulatory Compliance. Mark Cowan mark@cowaninc. Building the EDM Roadmap An Innovation Platform for New Product Development & Regulatory Compliance Mark Cowan mark@cowaninc.com 416 917 7531 January 16, 2008 Outline 1. Mark Cowan Quick Backgrounder 2.

More information

Stakeholder Analysis: The Key to Balanced Performance Measures

Stakeholder Analysis: The Key to Balanced Performance Measures Stakeholder Analysis: The Key to Balanced Performance Measures Robert M. Curtice Vice President, Performance Improvement Associates The Need for Balanced Performance Measures Traditional business performance

More information

Introduction to Business Process Improvement

Introduction to Business Process Improvement Introduction to Business Process Improvement Learning Objectives By the end of this chapter, you should be able to: Define a business process. State the objectives of business process improvement. Explain

More information

2.4. Factoring Quadratic Expressions. Goal. Explore 2.4. Launch 2.4

2.4. Factoring Quadratic Expressions. Goal. Explore 2.4. Launch 2.4 2.4 Factoring Quadratic Epressions Goal Use the area model and Distributive Property to rewrite an epression that is in epanded form into an equivalent epression in factored form The area of a rectangle

More information

Employee Performance Appraisal Form

Employee Performance Appraisal Form Employee Performance Appraisal Form Employee Name: Job Title: Department: Performance Review Period: From: JANUARY 1, 2013 To: DECEMBER 31, 2013 Written By: Title: Department: PERFORMANCE STANDARDS Complete

More information

through Portugal Martina McGuinness Dominic Elliott Management School, University of Liverpool, Liverpool, UK d.elliott@liverpool.ac.

through Portugal Martina McGuinness Dominic Elliott Management School, University of Liverpool, Liverpool, UK d.elliott@liverpool.ac. Developing relationships through direct marketing in a business-to-business context: the training sector in Portugal Raquel Reis Faculty of Management and Economics Sciences, Universidade Lusíada de Vila

More information

The Relationship Between Information Systems Management and

The Relationship Between Information Systems Management and The Relationship Between Information Systems Management and Organizational Culture Jakobus Smit Utrecht University of Applied Science, Netherlands kobus.smit@hu.nl Marielle Dellemijn CRM Excellence, Netherlands

More information

RESEARCH PAPER. Big data are we nearly there yet?

RESEARCH PAPER. Big data are we nearly there yet? RESEARCH PAPER Big data are we nearly there yet? A look at the degree to which big data solutions have become a reality and the barriers to wider adoption May 2013 Sponsored by CONTENTS Executive summary

More information

KNOWLEDGE FACTORING USING NORMALIZATION THEORY

KNOWLEDGE FACTORING USING NORMALIZATION THEORY KNOWLEDGE FACTORING USING NORMALIZATION THEORY J. VANTHIENEN M. SNOECK Katholieke Universiteit Leuven Department of Applied Economic Sciences Dekenstraat 2, 3000 Leuven (Belgium) tel. (+32) 16 28 58 09

More information

VISUALIZATION. Improving the Computer Forensic Analysis Process through

VISUALIZATION. Improving the Computer Forensic Analysis Process through By SHELDON TEERLINK and ROBERT F. ERBACHER Improving the Computer Forensic Analysis Process through VISUALIZATION The ability to display mountains of data in a graphical manner significantly enhances the

More information

DATABASE DEVELOPMENT LIFE CYCLE

DATABASE DEVELOPMENT LIFE CYCLE DATABASE DEVELOPMENT LIFE CYCLE Pranshu Gupta 1 Ramon A. Mata-Toledo 2 Morgan D. Monger 3 Abstract A software development life cycle model (SDLC) consists of a set of processes (planning, requirements,

More information

White Paper: Designing Resourceful Graphical User Interfaces (GUIs) for Healthcare Applications

White Paper: Designing Resourceful Graphical User Interfaces (GUIs) for Healthcare Applications Accelerate Development Reduce Time to Product Automate Critical Tasks White Paper: Designing Resourceful Graphical User Interfaces (GUIs) for Healthcare Applications The ASHVINS GROUP, Inc. 6161 Blue Lagoon

More information

Strategies and Methods for Supplier Selections - Strategic Sourcing of Software at Ericsson Mobile Platforms

Strategies and Methods for Supplier Selections - Strategic Sourcing of Software at Ericsson Mobile Platforms Strategies and Methods for Supplier Selections - Strategic Sourcing of Software at Ericsson Mobile Platforms Caroline Raning & Johanna Vallhagen February 2007 Department of Industrial Management and Logistics,

More information

Towards a more fundamental approach to Risk Management: Establishing a Safety and Fairness culture

Towards a more fundamental approach to Risk Management: Establishing a Safety and Fairness culture Towards a more fundamental approach to Risk Management: Establishing a Safety and Fairness culture Speech by Theodor Kockelkoren, acting Chairman of the AFM, on the Global Risk Regulation Summit, 2 nd

More information

Evaluating OO-CASE tools: OO research meets practice

Evaluating OO-CASE tools: OO research meets practice Evaluating OO-CASE tools: OO research meets practice Danny Greefhorst, Matthijs Maat, Rob Maijers {greefhorst, maat, maijers}@serc.nl Software Engineering Research Centre - SERC PO Box 424 3500 AK Utrecht

More information

Using Scrum to Guide the Execution of Software Process Improvement in Small Organizations

Using Scrum to Guide the Execution of Software Process Improvement in Small Organizations Using Scrum to Guide the Execution of Software Process Improvement in Small Organizations Francisco J. Pino, Oscar Pedreira*, Félix García +, Miguel Rodríguez Luaces*, Mario Piattini + IDIS Research Group

More information

School of Advanced Studies Doctor Of Health Administration. DHA 003 Requirements

School of Advanced Studies Doctor Of Health Administration. DHA 003 Requirements School of Advanced Studies Doctor Of Health Administration The mission of the Doctor of Health Administration degree program is to develop healthcare leaders by educating them in the areas of active inquiry,

More information

C. Wohlin and B. Regnell, "Achieving Industrial Relevance in Software Engineering Education", Proceedings Conference on Software Engineering

C. Wohlin and B. Regnell, Achieving Industrial Relevance in Software Engineering Education, Proceedings Conference on Software Engineering C. Wohlin and B. Regnell, "Achieving Industrial Relevance in Software Engineering Education", Proceedings Conference on Software Engineering Education & Training, pp. 16-25, New Orleans, Lousiana, USA,

More information

This alignment chart was designed specifically for the use of Red River College. These alignments have not been verified or endorsed by the IIBA.

This alignment chart was designed specifically for the use of Red River College. These alignments have not been verified or endorsed by the IIBA. Red River College Course Learning Outcome Alignment with BABOK Version 2 This alignment chart was designed specifically for the use of Red River College. These alignments have not been verified or endorsed

More information

Full Leadership Development: Building the Vital Forces in Organizations

Full Leadership Development: Building the Vital Forces in Organizations Full Leadership Development: Building the Vital Forces in Organizations Notes Critiques Gestion de Ressources Humaines MBA HEC Lausanne 2003 2004 By Rute Fernandes Index I. INTRODUCTION... 3 II. AVOLIO

More information

Creating a Jointly Sponsored Master of Science in Software Engineering

Creating a Jointly Sponsored Master of Science in Software Engineering Creating a Jointly Sponsored Master of Science in Software Engineering Gregory W. Hislop, College of Information Science and Technology Spiros Mancoridis, College of Arts and Science P. M. Shankar, College

More information

Supporting Inspections With an Electronic Meeting System

Supporting Inspections With an Electronic Meeting System Supporting Inspections With an Electronic Meeting System Michiel van Genuchten, S&P Consulting / Blenks Groupware Van Meursstraat 33-5615 JN Eindhoven, The Netherlands e-mail: bdbimg@urc.tue.nl Weger Cornelissen

More information

Visualizing the Teaching / Learning Process through Computer Graphics. Visualizing, technology, computer graphics, education

Visualizing the Teaching / Learning Process through Computer Graphics. Visualizing, technology, computer graphics, education Visualizing the Teaching / Learning Process through Computer Graphics 1 Aghware F. O.; 2 Egbuna E. O.; 3 Aghware A. and 4 Ojugo Arnold 1, 2, 3 Computer Science Department, College of Education, Agbor 4

More information

AN INFORMATION SYSTEM TO IMPROVE CUSTOMER SERVICE IN A MAJOR RETIREMENT COMMUNITY

AN INFORMATION SYSTEM TO IMPROVE CUSTOMER SERVICE IN A MAJOR RETIREMENT COMMUNITY AN INFORMATION SYSTEM TO IMPROVE CUSTOMER SERVICE IN A MAJOR RETIREMENT COMMUNITY Dr. Yousif Mustafa, Central Missouri State University, y.mustafa@usa.com ABSTRACT This paper describes a case study where

More information

1. RATIONALE AND BACKGROUND

1. RATIONALE AND BACKGROUND Collaboration on teamwork projects across borders J. Whatley Module tutor, Information Systems Institute, J.E.Whatley@salford.ac.uk, Ext 55175 F. Bell Independent evaluator, Information Systems Institute,

More information

SOME IMPORTANT NOTES ON QUALITATIVE RESEARCH. Prof. Dr. Andreas Budihardjo August, 2013

SOME IMPORTANT NOTES ON QUALITATIVE RESEARCH. Prof. Dr. Andreas Budihardjo August, 2013 SOME IMPORTANT NOTES ON QUALITATIVE RESEARCH Prof. Dr. Andreas Budihardjo August, 2013 CHECKLIST ( LOFLAND & LOFLAND, 1995) Basic organization How well is the article written or presented? Data & Methods

More information

Teaching Methodology for 3D Animation

Teaching Methodology for 3D Animation Abstract The field of 3d animation has addressed design processes and work practices in the design disciplines for in recent years. There are good reasons for considering the development of systematic

More information

CUSTOMER RELATIONSHIP MANAGEMENT SYSTEM: A CASE STUDY OF FLOOR MILLS IN BAHAWALPUR DISTRICT

CUSTOMER RELATIONSHIP MANAGEMENT SYSTEM: A CASE STUDY OF FLOOR MILLS IN BAHAWALPUR DISTRICT CUSTOMER RELATIONSHIP MANAGEMENT SYSTEM: A CASE STUDY OF FLOOR MILLS IN BAHAWALPUR DISTRICT Prof. Dr. Abdul Ghafoor Awan Dean of Faculties, Institute of Southern Punjab, Multan, Pakistan. Muhammad Salman

More information

Development models. 1 Introduction. 2 Analyzing development models. R. Kuiper and E.J. Luit

Development models. 1 Introduction. 2 Analyzing development models. R. Kuiper and E.J. Luit Development models R. Kuiper and E.J. Luit 1 Introduction We reconsider the classical development models: the Waterfall Model [Bo76], the V-Model [Ro86], the Spiral Model [Bo88], together with the further

More information

Soft Skills Requirements in Software Architecture s Job: An Exploratory Study

Soft Skills Requirements in Software Architecture s Job: An Exploratory Study Soft Skills Requirements in Software Architecture s Job: An Exploratory Study 1 Faheem Ahmed, 1 Piers Campbell, 1 Azam Beg, 2 Luiz Fernando Capretz 1 Faculty of Information Technology, United Arab Emirates

More information