January. 12 Components Monitoring and Evaluation System Strengthening Tool
|
|
|
- Louisa Todd
- 10 years ago
- Views:
Transcription
1 10 January 12 Components Monitoring and Evaluation System Strengthening Tool
2
3 12 Components Monitoring and Evaluation System Strengthening Tool THE WORLD BANK
4 Contents Instruction for Using the Tool 03 Participant Information 05 M&E System Component 1: Organisational Structures with HIV M&E Functions 06 M&E System Component 2: Human Capacity for HIV M&E 12 M&E System Component 3: Partnerships to Plan Coordinate and Manage the M&E System 15 M&E System Component 4: Multi-sectoral HIV M&E Plan 19 Pre-assessment Checklist 21 HIV M&E Plan Checklist 21 Aspect of M&E Plan Being Assessed 22 M&E System Component 5: Annual Costed HIV M&E Work Plan 27 Pre-assessment Checklist 33 M&E System Component 6: Communication Advocacy and Culture for HIV M&E 34 M&E System Component 7: Routine HIV Programme Monitoring 36 M&E System Component 8: Surveys and Surveillance 40 Review Inventory (if existing) of HIV-related Surveys Conducted in the Country 42 Pre-assessment Checklist 42 M&E System Component 9: and -national HIV databases 43 M&E System Component 10: Supportive Supervision and Data Auditing 44 M&E System Component 11: HIV Evaluation and Research Agenda 46 M&E System Component 12: Data Dissemination and Use 49 AIDS Coordinating Authority 51 Ministry of Health AIDS Control Programme 51 Umbrella Organisations Civil Society and Private Sector 52 Government Ministries 52 Local Government / AIDS Coordinating 53 Health Facilities 53 Implementing Partners 54 HIV M&E Plan Checklist 54 Component 7: Routine Monitoring 55 Overall Dashboard 12 Components Across Stakeholder Categories 55 Summary of Action Points 56 02
5 Instruction for Using the Tool These instructions accompany the 12 Components Monitoring and Evaluation System Assessment Tool. Geneva: UNAIDS March What is the purpose of these instructions? The instructions provide further clarification about the individual questions in the 12 Components M&E System Strengthening Tool. They are intended to be used by the facilitator(s) of a national HIV M&E assessment as well as by individuals and organisations participating in the assessment. They aim to ensure that everyone understands what is being assessed in the same way. The assessment is intended to be a diagnostic exercise to identify strengths and weaknesses in the HIV M&E system and to agree on actions needed to enhance M&E system performance. 2. How does the assessment tool function? The 12 Components M&E System Strengthening Tool is designed as a series of statements for which there are three response scales 1. a 5-point scale (Yes-completely Mostly Partly No-not at all Not Applicable) 2. a 3-point scale (Yes No Not Applicable) 3. numerical responses For example statement: The frequency of data collection is stated for all indicators. If such frequency is stated for all indicators the response is Yes-completely. For at least 75% of indicators the answer should be Mostly. If less than 50% of indicators have frequencies of data collection the response should be Partly and if no indicators have frequency indicated the response should be No-not at all. In cases in which the statement is not applicable respondents should select Not Applicable. If the answer to a statement is anything other than Yes-completely respondents are requested to provide an explanation in the COMMENT box. This will provide important information to consider in discussing the necessary actions to take. If possible any comments that help to identify and plan for strategic interventions should also be recorded under proposed activities. The electronic version of the tool is set up to facilitate selection of the response and summarizing the assessment results at the end of the assessment. The appropriate response can be selected from a drop-down menu in the ANSWER column. The Yes-completely responses will appear in green Mostly and Partly will appear in yellow and No-not at all will appear in red. This visualization in color will help with summarizing the assessment results and with prioritizing actions. A SUMMARY DASH- BOARD of the results will be automatically generated and display the distribution of scores overall and for each of the 12 components. It provides a visual representation of gaps in the HIV M&E system at different levels. A detailed review will help to prioritize the actions to be undertaken. 03
6 04 3. General comments about the tool For group 1 (NACA) the title of the coordinating authority varies by country. Also the location of the NACA varies (e.g. within the Prime Minister s office in the Ministry of Health independent trust or parastatal); and the NACA might represent more than one coordination structure (might be a NACA and a person/unit within president s office.
7 05 Participant Information Country Stakeholder Group Name of Workshop Facilitator Workshop Date Participant List Name Organisation Title Source Documents
8 1. Check if there is an M&E unit/division/directorate at NACA and MoH 2. Number of full-time and/or part-time M&E POSTS (filled or vacant) at NACA and MoH 3. Number of M&E full-time and/or part-time posts filled (people currently working) at NACA and MoH 06 M&E System Component 1: Organisational Structures with HIV M&E Functions implementers of HIV Health Facilities Local Government / AIDS Coordinating Government Ministries/ Sectors HIV/AIDS Umbrella organisations (each one completes sheet) Ministry of Health AIDS Control Programme AIDS Coordinating Authority Respond to each statement following the instructions given (Click on the statement icon below () for statement-specific guidance.) Please validate the response given by other groups There is an M&E unit/division/ Directorate within the entity 1. The number of full-time and/or part-time M&E posts (filled or vacant) 2. Percentage of M&E full-time and/or part-time posts filled (people currently working) 3.
9 07 1. Check if there is an M&E unit/division/directorate at NACA and MoH 2. Number of full-time and/or part-time M&E POSTS (filled or vacant) at NACA and MoH 3. Number of M&E full-time and/or part-time posts filled (people currently working) at NACA and MoH implementers of HIV Health Facilities Local Government / AIDS Coordinating Government Ministries/ Sectors HIV/AIDS Umbrella organisations (each one completes sheet) Ministry of Health AIDS Control Programme AIDS Coordinating Authority Respond to each statement following the instructions given (Click on the statement icon below () for statement-specific guidance.) Government M&E employees have permanent posts (i.e. establishment posts that are reflected in the entity s official organisational structure and budget) whether filled or vacant posts 4. There are an adequate number of epidemiologists IT specialists and database managers in key agencies 5. There are an adequate number of qualified data managers at district and provincial levels 6. Please provide a commentary Each decentralised local government authority where the HIV response is coordinated has at least one qualified person who is dedicated full-time to data management 7.
10 AIDS Coordinating Authority Ministry of Health AIDS Control Programme HIV/AIDS Umbrella organisations (each one completes sheet) Government Ministries/ Sectors Local Government / AIDS Coordinating Health Facilities 1. Check if there is an M&E unit/division/directorate at NACA and MoH 2. Number of full-time and/or part-time M&E POSTS (filled or vacant) at NACA and MoH 3. Number of M&E full-time and/or part-time posts filled (people currently working) at NACA and MoH implementers of HIV 08 Respond to each statement following the instructions given (Click on the statement icon below () for statement-specific guidance.) M&E responsibilities are clearly defined in job descriptions. 8. External M&E technical support is required (at times) on an ongoing basis to fulfill routine M&E tasks usually the responsibility of government 9. Recognizing that most entities do not have the human resources needed to fulfill their mandate the technical assistance is made available when and in the quantity needed and of the type needed 10. The entity has the written mandate to execute its M&E functions 11.
11 AIDS Coordinating Authority Ministry of Health AIDS Control Programme HIV/AIDS Umbrella organisations (each one completes sheet) Government Ministries/ Sectors Local Government / AIDS Coordinating Health Facilities 1. Check if there is an M&E unit/division/directorate at NACA and MoH 2. Number of full-time and/or part-time M&E POSTS (filled or vacant) at NACA and MoH 3. Number of M&E full-time and/or part-time posts filled (people currently working) at NACA and MoH implementers of HIV 09 Respond to each statement following the instructions given (Click on the statement icon below () for statement-specific guidance.) With or without technical assistance the entity is fulfilling its M&E mandate by delivering the M&E and deliverables for which it is responsible to sufficient quality 12. Staff at the entity have in their job descriptions specific responsibilities related to: 13. Component 1 : Organizational structure Component 2: Human capacity 13.3 Component 3: Partnerships Component 4: M&E plan 13.4 Component 5: M&E work plan 13.5
12 AIDS Coordinating Authority Ministry of Health AIDS Control Programme HIV/AIDS Umbrella organisations (each one completes sheet) Government Ministries/ Sectors Local Government / AIDS Coordinating Health Facilities 1. Check if there is an M&E unit/division/directorate at NACA and MoH 2. Number of full-time and/or part-time M&E POSTS (filled or vacant) at NACA and MoH 3. Number of M&E full-time and/or part-time posts filled (people currently working) at NACA and MoH implementers of HIV 10 Respond to each statement following the instructions given (Click on the statement icon below () for statement-specific guidance.) Component 6: Advocacy communication and culture 13.6 Component 7: Routine monitoring 13.7 Component 8: Surveys and surveillance 13.8 Component 9: and sub national databases 13.9 Component 10: Supportive supervision and data auditing Component 11: Evaluation and research Component 12: Data dissemination and use M&E staff are adequately motivated through salary benefits and career prospects and qualified staff can be recruited and retained 14.
13 AIDS Coordinating Authority Ministry of Health AIDS Control Programme HIV/AIDS Umbrella organisations (each one completes sheet) Government Ministries/ Sectors Local Government / AIDS Coordinating Health Facilities 1. Check if there is an M&E unit/division/directorate at NACA and MoH 2. Number of full-time and/or part-time M&E POSTS (filled or vacant) at NACA and MoH 3. Number of M&E full-time and/or part-time posts filled (people currently working) at NACA and MoH implementers of HIV 11 Respond to each statement following the instructions given (Click on the statement icon below () for statement-specific guidance.) Summary of Key Action Points:
14 Local Government / AIDS Coordinating Health Facilities 1. Check if there is an M&E unit/division/directorate at NACA and MoH 2. Number of full-time and/or part-time M&E POSTS (filled or vacant) at NACA and MoH 3. Number of M&E full-time and/or part-time posts filled (people currently working) at NACA and MoH implementers of HIV 12 M&E System Component 2: Human Capacity for HIV M&E Government Ministries/ Sectors HIV/AIDS Umbrella organisations (each one completes sheet) Ministry of Health AIDS Control Programme AIDS Coordinating Authority Respond to each statement following the instructions given (Click on the statement icon below () for statement-specific guidance.) The HIV M&E-related skills and competencies of the M&E staff at the entity have been assessed within the past 3 years 1. Staff at the entity involved in M&E have the skills and competencies needed to fulfil the entity's HIV M&E mandate 2. The GAPS in terms of the M&Erelated skills and competencies required by the entity's staff responsible for M&E have been incorporated into the entity's Human Capacity Building Plan 3.
15 AIDS Coordinating Authority Ministry of Health AIDS Control Programme HIV/AIDS Umbrella organisations (each one completes sheet) Government Ministries/ Sectors Local Government / AIDS Coordinating Health Facilities 1. Check if there is an M&E unit/division/directorate at NACA and MoH 2. Number of full-time and/or part-time M&E POSTS (filled or vacant) at NACA and MoH 3. Number of M&E full-time and/or part-time posts filled (people currently working) at NACA and MoH implementers of HIV 13 Respond to each statement following the instructions given (Click on the statement icon below () for statement-specific guidance.) It is an under-funded priority and there are written plans to support pre-service training and/ or recruitment and retention of additional epidemiologists IT specialists and database managers in key entities 4. There is nationally-endorsed M&E training curriculum (appropriate for personnel within or supported by your entity) 5. M&E human capacity relative to the M&E system is being built through colleges universities and/or technical schools 6. M&E human capacity relative to M&E is being built through routine supervision and/or on-the-job training (OJT) and mentorship 7.
16 AIDS Coordinating Authority Ministry of Health AIDS Control Programme HIV/AIDS Umbrella organisations (each one completes sheet) Government Ministries/ Sectors Local Government / AIDS Coordinating Health Facilities 1. Check if there is an M&E unit/division/directorate at NACA and MoH 2. Number of full-time and/or part-time M&E POSTS (filled or vacant) at NACA and MoH 3. Number of M&E full-time and/or part-time posts filled (people currently working) at NACA and MoH implementers of HIV 14 Respond to each statement following the instructions given (Click on the statement icon below () for statement-specific guidance.) The HIV M&E human capacity building offered is coordinated to avoid duplication 8. There is a national database or register of who is receiving M&E training to avoid duplication and assure complementarity 9. There is a national database of trainers and other technical service providers capable of building M&E capacity 10. Summary of Key Action Points:
17 15 M&E System Component 3: Partnerships to Plan Coordinate and Manage the M&E System 1. Check if there are M&E TWGs/Committees coordinated by NAC or MoH 2. Check if there are TOR for TWGs coordinated by NACA and MoH; and compare if the TORs are in line with intended objectives of the respective TWGs 3. Check if there is an inventory of stakeholders for HIV M&E and whether it is periodically updated implementers of HIV Health Facilities Local Government / AIDS Coordinating Government Ministries/ Sectors HIV/AIDS Umbrella organisations (each one completes sheet) Ministry of Health AIDS Control Programme AIDS Coordinating Authority Respond to each statement following the instructions given (Click on the statement icon below () for statement-specific guidance.) There is a national HIV M&E technical working group/committee coordinated by NACA 1. The M&E TWG/committee coordinated by NACA meets regularly 2. The entity/ties partcipate/s actively in the M&E TWG/committee coordinated by NACA 3. International development partners actively participate in the M&E TWG/Committee coordinated by NACA 4.
18 AIDS Coordinating Authority Ministry of Health AIDS Control Programme HIV/AIDS Umbrella organisations (each one completes sheet) Government Ministries/ Sectors Local Government / AIDS Coordinating 1. Check if there are M&E TWGs/Committees coordinated by NAC or MoH 2. Check if there are TOR for TWGs coordinated by NACA and MoH; and compare if the TORs are in line with intended objectives of the respective TWGs 3. Check if there is an inventory of stakeholders for HIV M&E and whether it is periodically updated Health Facilities implementers of HIV 16 Respond to each statement following the instructions given (Click on the statement icon below () for statement-specific guidance.) TOR for the M&E TWG coordinated by NACA clarifies the TWG's role in approving documents providing technical leadership and coordinating the HIV M&E system 5. The M&E TWG/committee coordinated by NACA makes decisions via a consusus building process 6. There is a national M&E/HIS technical working group/committee coordinated by MoH 7. The M&E TWG/committee coordinated by MOH meets regularly 8. The entity/ties participate/s actively in the M&E TWG/committee coordinated by MOH 9.
19 AIDS Coordinating Authority Ministry of Health AIDS Control Programme HIV/AIDS Umbrella organisations (each one completes sheet) Government Ministries/ Sectors Local Government / AIDS Coordinating 1. Check if there are M&E TWGs/Committees coordinated by NAC or MoH 2. Check if there are TOR for TWGs coordinated by NACA and MoH; and compare if the TORs are in line with intended objectives of the respective TWGs 3. Check if there is an inventory of stakeholders for HIV M&E and whether it is periodically updated Health Facilities implementers of HIV 17 Respond to each statement following the instructions given (Click on the statement icon below () for statement-specific guidance.) International development partners actively participate in the M&E TWG/Committee coordinated by MOH 10. TOR for the M&E TWG coordinated by MOH clarifies the TWG's role in approving documents providing technical leadership and coordinating the HIV M&E system 11. The M&E TWG/committee coordinated by MOH makes decisions via a consensus building process 12. The national M&E/HIS TWG coordinated by MOH has been effective at promoting development of a national consensus on a set of practical forms for routine reporting of health data. 13.
20 AIDS Coordinating Authority Ministry of Health AIDS Control Programme HIV/AIDS Umbrella organisations (each one completes sheet) Government Ministries/ Sectors Local Government / AIDS Coordinating 1. Check if there are M&E TWGs/Committees coordinated by NAC or MoH 2. Check if there are TOR for TWGs coordinated by NACA and MoH; and compare if the TORs are in line with intended objectives of the respective TWGs 3. Check if there is an inventory of stakeholders for HIV M&E and whether it is periodically updated Health Facilities implementers of HIV 18 Respond to each statement following the instructions given (Click on the statement icon below () for statement-specific guidance.) An inventory of stakeholders for HIV M&E is periodically updated 14. There are well developed mechanisms (e.g. feedback reports newsletters) to communicate about HIV M&E activities and decisions. 15. Summary of Key Action Points:
21 1. Check if there is a Strategic Plan for HIV 2. Check if there is a M&E Plan for HIV 3. Review the M&E Plan (see below for more details) Health Facilities implementers of HIV 19 M&E System Component 4: Multi-sectoral HIV M&E Plan Local Government / AIDS Coordinating Government Ministries/ Sectors HIV/AIDS Umbrella organisations (each one completes sheet) Ministry of Health AIDS Control Programme AIDS Coordinating Authority Respond to each statement following the instructions given (Click on the statement icon below () for statement-specific guidance.) There is a national HIV multi-sec - toral M&E plan 1. Entities actively participated in development of the current national multi-sectoral HIV M&E Plan 2. During the development of the HIV M&E plan the national set of indicators in the M&E plan was assessed before finalisation against global or national indicator standards Entity-specific M&E plan(s) exist. 5. Entity-specific M&E plans are linked to national M&E plan The assessment of the adequacy of the M&E plan prepared by the facilitator and NAC M&E coordinator before the workshop and shared with all groups is accurate 6.
22 AIDS Coordinating Authority Ministry of Health AIDS Control Programme HIV/AIDS Umbrella organisations (each one completes sheet) Government Ministries/ Sectors Local Government / AIDS Coordinating 1. Check if there is a Strategic Plan for HIV 2. Check if there is a M&E Plan for HIV 3. Review the M&E Plan (see below for more details) Health Facilities implementers of HIV 20 Respond to each statement following the instructions given (Click on the statement icon below () for statement-specific guidance.) Summary of Key Action Points:
23 1. Check if there is a Strategic Plan for HIV 2. Check if there is a M&E Plan for HIV 3. Review the M&E plan and check if:»» It describe all 12 components of an HIV M&E system?;»» All the building blocks of performance for each component are described»» The M&E plan has an estimate of the resources/budget required for M&E»» The time period of M&E Plan is aligned with the time period of NSP»» It includes indicators to monitor progress & performance of the M&E system»» Indicators of the M&E Plan are aligned with objectives of the NSP»» Data sources of indicator values are specified in the M&E Plan»» Measurement of each indicator is defined in the M&E Plan»» Frequencies of data collection for indicator values are specified»» Data use plan is described»» Baseline values are included for indicators»» Targets are set for each indicator Review the M&E plan NSP or other relevant documents and calculate:»» Percentage of total HIV programme funding from government allocated for M&E plan»» Percentage of total HIV programme funding from development partners allocated for M&E plan HIV M&E Plan Checklist 1. This checklist is to be used in conjunction with the Component 4 assessment. 2. Its purpose is to rate the technical adequacy of the national HIV M&E plan by giving a rating to various aspects of the M&E plan. It requires a thorough reading of the M&E Plan and its annexes. 3. The workshop facilitator and the national HIV M&E coordinator should study the M&E Plan (if one is in existence) BEFORE the assessment workshop and answer the following questions about it 4. At the workshop the facilitator then presents the results of the M&E Plan assessment for validation by the different groups (see statement 5 of the Component 4 assessment page). This implies that copies of the completed checklist should be available at the workshop. 21
24 RATING: Is this part of the M&E plan adequate? FROM (year) TO (year) Reason / explanation for rating given 22 Time period of the country s current HIV national strategic plan Time period of the country s current HIV national monitoring and evaluation plan Aspect of HIV M&E Plan Being Assessed Criteria for adequacy 1. DEFINITIONS IN THE M&E PLAN OF WHAT TO MEASURE WITH THE M&E SYSTEM Aligned with the objectives of the NSP means that there are indicators to measure each of the main NSP objectives (or result statements) and that there are no indicators that cannot directly be linked to one or more of the NSP objectives / results. Also it means that the indicator is relevant to the NSP objective (i.e. if the NSP objective is to improve coverage of ART the indicator should not be about increased life expectancy of PLHIVs). Indicators in the HIV M&E plan are aligned with objectives of the NSP 1.1 A fully-defined indicator is one that has a clearly stated title definition purpose and rationale. Also the method of measurement for the indicator should be clearly defined including the description of the numerator denominator and calculation where applicable. Any relevant data disaggregation should be clearly defined and guidelines to interpret and use data from this indicator should be included. Strengths weaknesses and challenges in using the indicator are clearly stated. It is desirable to give the participants an example of a fullydefined indicator. 1.2 Indicators are fully defined The data collection method is the monitoring process or evaluation tool that will be used to collect indicator values on a periodic basis and may include routine programme monitoring forms national survey data or surveillance reports. The data collection method for the indicator is clearly stated 1.3
25 Criteria for adequacy RATING: Is this part of the M&E plan adequate? Reason / explanation for rating given 23 The measurement frequency for the indicator is clearly defined It should be clear in the M&E plan how often indicator values for the indicators will be collected. The frequency of measurement impacts on the frequency with which the data needs to be collected and therefore the frequency of routine programme monitoring data flow surveys and surveillance processes. 1.4 Indicators have baseline values Baseline values are indicator values that were determined before the programme started. These values provide a basis from where to measure increases or decreases in indicator values over time (i.e. trend analysis). 1.5 Indicators have midterm and end-of-nsp targets In addition to having baseline values the national set of HIV indicators given that these are meant to track progress with the NSP implementation should have targets for the midterm NSP review/evaluation process and targets for the end-of-nsp evaluation. These targets will enable countries to objectively assess the extent to which the NSP objectives / results have been achieved. 1.6 Indicators to monitor progress & performance of the M&E system (M&E of the M&E system) are included in the M&E plan The national M&E plans should include a few indicators that will help to monitor the implementation and performance of the national HIV M&E system itself. 1.7
26 24 Reason / explanation for rating given RATING: Is this part of the M&E plan adequate? Criteria for adequacy 2. DESCRIPTIONS IN THE M&E PLAN OF HOW THE M&E SYSTEM WILL FUNCTION Assess whether each of the following aspects of a fully functional HIV M&E system is described in the national HIV M&E plan. In the Criteria column a description is given of what the M&E plan should have in order to give the M&E plan specific ratings: For a Completely rating the M&E plan should show an organisational structure with specific M&E posts and define the roles and responsibilities of all M&E posts entities with M&E responsibilities (i.e. their mandate) and committees responsible for the oversight of one or more aspects of the M&E system. Component 1: Organisational structures for HIV M&E are described 2.1 For a Completely rating the institutions curricula and capacity development processes should be identified the need for databases of trainees and training service providers should be stipulated and capacity assessment processes should be described. Component 2: Processes for assessing and building human capacity for HIV M&E are defined 2.2 For a Completely rating the nature of external and internal partnerships mechanism to establish and strengthen them should be described. Component 3: Internal and external partnerships for HIV M&E are described 2.3 For a Completely rating the timeframes and procedures for the review of the M&E plan itself is included in the national HIV M&E plan as well as procedures for how entity-level M&E plans should link to the national HIV M&E plan Component 4: HIV M&E plan review and linkages are clearly described 2.4 For a Completely rating the M&E Plan should include an estimate of the M&E resource/budget requirements with a detailed costing and assignment of responsibilities for M&E functions (Component 5). Component 5: Budgets funding and resources for the national HIV M&E system are calculated and included in the HIV M&E plan 2.5
27 Criteria for adequacy RATING: Is this part of the M&E plan adequate? Reason / explanation for rating given 25 Component 6: Strategies to advocate for and communicate about HIV M&E and results are described For a Completely rating so as to create a demand for data and political will to keep the M&E system functional procedures and strategies for advocacy and communication about HIV M&E and results should be stipulated. 2.6 Component 7: In addition to stating routine monitoring as one of the types of data to be collected to measure routine monitoring data flow data collection forms and responsible institutions are described For a Completely rating the routine monitoring processes forms and guidelines should be described or referred to another guideline where this will be described. Linkages to the HIS should also be made clearly so that overlap is avoided. Data use at the decentralised levels should be given special attention. 2.7 Component 8: Survey and surveillance frequency guidelines protocols and governance structures for the surveys and surveillance are defined In addition to identifying which surveys and surveillance are needed to provide indicator values (statement 1.3 of this checklist) it is necessary for a Completely rating to identify who will carry out surveys which protocols they will use how data will flow and what are the minimum data requirements (i.e. cross tabulations) needed from surveys and surveillance to obtain indicator values as stipulated in the M&E plan. 2.8 Component 9: How national and sub national databases with HIV-related information will link and be strengthened (where needed) is defined For a Completely rating a network diagram showing how different databases will link the software used for each and the need for new database development should be stipulated. Alternatively if the country has decided to use a paper-based M&E system and not use electronic databases this should be stipulated in the M&E plan. 2.9
28 Criteria for adequacy RATING: Is this part of the M&E plan adequate? Reason / explanation for rating given 26 Component 10: Supportive supervision and data auditing procedures guidelines and M&E posts responsible are defined For a Completely rating the location and development of supervision and data auditing guidelines principles for data auditing and supervision responsibilities and feedback mechanisms (to the decentralised and national levels) should be identified Component 11: Biomedical and social science HIV-related evaluation and research processes and structures are defined For a Completely rating the process of developing a national research agenda should be identified the governance (coordination) structures for HIV-related research should be stipulated and the process of ethical approval of all types of HIV research should be identified. Procedures and guidelines for program evaluations by individual programmes should be described as well as strategies to promote getting research / evaluation results into policy and practice. Finally the involvement of and process for reviewing (evaluating) the national HIV response (i.e. NSP midterm reviews and end-of-nsp reviews) should be described (it is during these processes that the evidence generated by the M&E system will be used to assess the progress made with outcomes and impacts of the national HIV response in the country) 2.11 Component 12: Data analysis information creation information dissemination and use are clearly defined For a Completely rating the way in which data will be analysed which information products will be developed and how the information products will be disseminated should specified. Strategies to improve data use should also be defined. 2.12
29 27 M&E System Component 5: Annual Costed HIV M&E Work Plan 1. Check if there is a M&E Work Plan for HIV/AIDS 2. Check if there is a work plan for the HIV/AIDS program 3. Check if the M&E Work Plan is costed has timeline and responsible partners 4. Review the M&E work plan HIV/AIDS Program work plan or other relevant documents (see below for more details) For the national HIV M&E plan to be operationalised an annual costed national M&E work plan needs to be developed that describes the priority M&E activities for the year with defined responsibilities for implementation costs for each activity identified funding and a clear timeline for delivery of outputs. NOTE: This Component needs to be assessed LAST because the responses to statements 3.1 to 3.12 depend on a good understanding of the M&E system in the country Respond to each statement following the Ministry HIV/AIDS Umbrella Local Government Authori- Government Health implement- of Health organisations instructions given AIDS Coordinating Ministries/ Facilities ers of HIV AIDS Control Propletes Coordinating (each one comties / AIDS (Click on the statement icon below () for statement-specific guidance.) Authority Sectors gramme sheet) 1. EXISTENCE and FORMAT OF WORK PLANS There is a M&E Work Plan that includes the current year 1.1 Activities in the M&E Work Plan have been costed for the current year 1.2 Activities in the M&E Work Plan are allocated specific time frames for implementation 1.3 Activities in the M&E Work Plan are allocated to at least one lead agency for implementation 1.4
30 28 1. Check if there is a M&E Work Plan for HIV/AIDS 2. Check if there is a work plan for the HIV/AIDS program 3. Check if the M&E Work Plan is costed has timeline and responsible partners 4. Review the M&E work plan HIV/AIDS Program work plan or other relevant documents (see below for more details) For the national HIV M&E plan to be operationalised an annual costed national M&E work plan needs to be developed that describes the priority M&E activities for the year with defined responsibilities for implementation costs for each activity identified funding and a clear timeline for delivery of outputs. NOTE: This Component needs to be assessed LAST because the responses to statements 3.1 to 3.12 depend on a good understanding of the M&E system in the country Respond to each statement following the Ministry HIV/AIDS Umbrella Local Government Authori- Government Health implement- of Health organisations instructions given AIDS Coordinating Ministries/ Facilities ers of HIV AIDS Control Propletes Coordinating (each one comties / AIDS (Click on the statement icon below () for statement-specific guidance.) Authority Sectors gramme sheet) The costs of the M&E work plan are included in the official government budget (e.g. Medium Term Expenditure Framework of Government) 1.5 Entity-specific costed M&E work plans (including the current year) exist 1.6 Entity-specific costed M&E work plans (including the current year) is aligned with national M&E work plan 1.7 Resources are available to meet agencyspecific M&E work plan requirements 1.8
31 29 1. Check if there is a M&E Work Plan for HIV/AIDS 2. Check if there is a work plan for the HIV/AIDS program 3. Check if the M&E Work Plan is costed has timeline and responsible partners 4. Review the M&E work plan HIV/AIDS Program work plan or other relevant documents (see below for more details) For the national HIV M&E plan to be operationalised an annual costed national M&E work plan needs to be developed that describes the priority M&E activities for the year with defined responsibilities for implementation costs for each activity identified funding and a clear timeline for delivery of outputs. NOTE: This Component needs to be assessed LAST because the responses to statements 3.1 to 3.12 depend on a good understanding of the M&E system in the country Respond to each statement following the Ministry HIV/AIDS Umbrella Government Local Government Authori- Health implement- of Health organisations instructions given AIDS Coordinating Ministries/ Facilities ers of HIV AIDS Control Propletes Coordinating (each one comties / AIDS (Click on the statement icon below () for statement-specific guidance.) Authority gramme sheet) Sectors 2. DEVELOPMENT OF THE WORK PLAN The M&E work plan containing the current year was developed or modified based on the achievements (progress) against the previous year's activities. 2.1 Entities participated in the development of the current year national costed M&E work plan CONTENTS OF THE WORK PLAN COMMENTS Component 1 : Organizational structures for HIV M&E 3.1 Component 2: Human capacity for HIV M&E 3.2
32 1. Check if there is a M&E Work Plan for HIV/AIDS 2. Check if there is a work plan for the HIV/AIDS program 3. Check if the M&E Work Plan is costed has timeline and responsible partners 4. Review the M&E work plan HIV/AIDS Program work plan or other relevant documents (see below for more details) implementers of HIV 30 NOTE: Statements in section 3 and in section 4 needs to be answered jointly in plenary NOT in the smaller groups Respond to each statement following the instructions given AIDS Coordinating Ministry of Health AIDS HIV/AIDS Umbrella organisations Governmenment Local Govern- Health Control (each one completes (Click on the statement icon below () for Ministries/ / AIDS Coordinat- Facilities statement-specific guidance.) Authority Programme sheet) Sectors ing Component 3: Partnerships around HIV M&E Component 4: M&E plan 3.5 Component 5: M&E Work Plan reviews Component 6: Advocacy communications and culture Component 7: Routine monitoring 3.8 Component 8: Surveys and surveillance Component 9: and sub national databases 3.9 Component 10: Supportive supervision and data auditing 3.10
33 1. Check if there is a M&E Work Plan for HIV/AIDS 2. Check if there is a work plan for the HIV/AIDS program 3. Check if the M&E Work Plan is costed has timeline and responsible partners 4. Review the M&E work plan HIV/AIDS Program work plan or other relevant documents (see below for more details) implementers of HIV 31 NOTE: Statements in section 3 and in section 4 needs to be answered jointly in plenary NOT in the smaller groups Respond to each statement following the instructions given AIDS Coordinating Ministry of Health AIDS HIV/AIDS Umbrella organisations Governmenment Local Govern- Health Control (each one completes (Click on the statement icon below () for Ministries/ / AIDS Coordinat- Facilities statement-specific guidance.) Authority Programme sheet) Sectors ing Component 11: Evaluation and research 3.11 Component 12: Data dissemination and use RESOURCES TO IMPLEMENT THE WORK PLAN COMMENTS and CALCULATIONS Total cost of the current year M&E Work Plan for the current year (US Dollars) 4.1 Percentage of total cost of the current year M&E Work Plan which has been secured 4.2 Percentage of total budget for the current year M&E Work Plan which will be funded by government 4.3
34 1. Check if there is a M&E Work Plan for HIV/AIDS 2. Check if there is a work plan for the HIV/AIDS program 3. Check if the M&E Work Plan is costed has timeline and responsible partners 4. Review the M&E work plan HIV/AIDS Program work plan or other relevant documents (see below for more details) implementers of HIV 32 NOTE: Statements in section 3 and in section 4 needs to be answered jointly in plenary NOT in the smaller groups Respond to each statement following the instructions given AIDS Coordinating Ministry of Health AIDS HIV/AIDS Umbrella organisations Governmenment Local Govern- Health Control (each one completes (Click on the statement icon below () for Ministries/ / AIDS Coordinat- Facilities statement-specific guidance.) Authority Programme sheet) Sectors ing Percentage of total HIV programme funding from development partners allocated for M&E plan 4.4 Percentage of total HIV programme funding from all sources (government and development partners) allocated for M&E plan 4.5 Summary of Key Action Points:
35 1. Check if there is a M&E Work Plan for HIV/AIDS 2. Check if there is a work plan for the HIV/AIDS program 3. Check if the M&E Work Plan is costed has timeline for implementation responsible partners are identified for implementation of each activity 4. Review the M&E work plan HIV/AIDS Program work plan or other relevant documents and calculate:»» Percentage of total HIV programme funding from government allocated for M&E work plan»» Percentage of total HIV programme funding from development partners allocated for M&E work plan»» Percentage of total HIV programme funding from all sources (government and development partners) allocated for M&E work plan 33
36 1. Check if the HIV/AIDS Policy NSP or other similar document includes M&E policy issues and strategies implementers of HIV 34 M&E System Component 6: Communication Advocacy and Culture for HIV M&E Health Facilities Local Government / AIDS Coordinating Government Ministries/ Sectors HIV/AIDS Umbrella organisations (each one completes sheet) Ministry of Health AIDS Control Programme AIDS Coordinating Authority Respond to each statement following the instructions given (Click on the statement icon below () for statementspecific guidance.) There are people who strongly advocate for and support M&E within the agency/organization 1. Frequency with which the performance of the M&E system is communicated/reported to you 2. M&E system information products (reports website content s newsletters maps tables charts etc) are useful 3. Directors and managers are interested and supportive of HIV M&E activities 4. Directors and managers request HIV related information before and/or during HIV review planning and costing processes 5. M&E personnel are part of the management and planning team 6. M&E personnel have opportunities for lateral and vertical career moves within the entity 7. M&E policy and strategies are included in national HIV policy and NSP 8.
37 AIDS Coordinating Authority Ministry of Health AIDS Control Programme HIV/AIDS Umbrella organisations (each one completes sheet) Government Ministries/ Sectors Local Government / AIDS Coordinating 1. Check if the HIV/AIDS Policy NSP or other similar document includes M&E policy issues and strategies Health Facilities implementers of HIV 35 Respond to each statement following the instructions given (Click on the statement icon below () for statementspecific guidance.) Summary of Key Action Points:
38 36 M&E System Component 7: Routine HIV Programme Monitoring 1. Identify the main program areas (e.g. VCT PMTCT ARV Condoms Care & Support) in the country 2. For each program area check if there are guidelines on on data recording collecting collating and reporting NOTE: For this component the participants will be put into different groups; 7-8 groups should be formed for different programme areas. These programme areas will vary by country and should be identified before the workshop. The list of participants should also be reviewed and the composition of these groups should be decided before the workshop. Some are implemented in the community others at health facilities. Both types should be assessed here. Program Area 7: Program Area 6: Program Area 5: Program Area 4: Program Area 3: Program Area 2: Program Area 1: Respond to each statement following the instructions given Type program area in column headings at right (over-write Program Area ) (Click on the statement icon below () for statement-specific guidance.) guidelines exist that document the procedures for recording collecting collating and reporting programme monitoring data from health information system and therefore the procedures for managing routine data that is part of program areas or 5) 1. guidelines exist that document the procedures for recording collecting collating and reporting routine programme monitoring data from civil society/community-based systems for data about program areas 6 or 7 2. guidelines exist that provide instructions on how data quality should be maintained from the health information system(s) and therefore the quality of data in program areas or 5 3.
39 37 1. Identify the main program areas (e.g. VCT PMTCT ARV Condoms Care & Support) in the country 2. For each program area check if there are guidelines on on data recording collecting collating and reporting NOTE: For this component the participants will be put into different groups; 7-8 groups should be formed for different programme areas. These programme areas will vary by country and should be identified before the workshop. The list of participants should also be reviewed and the composition of these groups should be decided before the workshop. Some are implemented in the community others at health facilities. Both types should be assessed here. Program Area 7: Program Area 6: Program Area 5: Program Area 4: Program Area 3: Program Area 2: Program Area 1: Respond to each statement following the instructions given Type program area in column headings at right (over-write Program Area ) (Click on the statement icon below () for statement-specific guidance.) guidelines exist that provide instructions on how data quality should be maintained (e.g. avoiding double counting assure reliability and validity) from civil society/communitybased systems (and therefore data for program area 6 or 7) 4. guidelines and a system exist for monitoring and managing the supply of drugs related to program areas or 5 5. guidelines exist to assure that individual medical records support quality and continuity of health care related to program areas or 5) 6. guidelines exist to support reporting of health data by private sector health facilities related to program areas or 5 7. The same operational definitions of routine monitoring (program output) indicators (from the national M&E system) are systematically used by all groups delivering in program areas or 7 8.
40 38 1. Identify the main program areas (e.g. VCT PMTCT ARV Condoms Care & Support) in the country 2. For each program area check if there are guidelines on on data recording collecting collating and reporting NOTE: For this component the participants will be put into different groups; 7-8 groups should be formed for different programme areas. These programme areas will vary by country and should be identified before the workshop. The list of participants should also be reviewed and the composition of these groups should be decided before the workshop. Some are implemented in the community others at health facilities. Both types should be assessed here. Program Area 7: Program Area 6: Program Area 5: Program Area 4: Program Area 3: Program Area 2: Program Area 1: Respond to each statement following the instructions given Type program area in column headings at right (over-write Program Area ) (Click on the statement icon below () for statement-specific guidance.) Supplies and equipment are available for routine program monitoring of program areas or 7 9. Entities delivering the same use standardized data collection forms 10. Entities delivering the same use standardized reporting forms 11. People with assigned responsibilities have been assuring data quality prior to submission to the next level 12. During previous data auditing visits all source documents (e.g. completed forms) have been available for auditing purposes 13. Officers responsible for receiving reports from lower levels systematically verify their completeness timeliness and identify obvious mistakes before aggregating the data. 14. Mechanisms/procedures are in place to reconcile discrepancies in reports and to provide systematic feedback including reconciliation of discrepancies in reports etc. 15.
41 39 1. Identify the main program areas (e.g. VCT PMTCT ARV Condoms Care & Support) in the country 2. For each program area check if there are guidelines on on data recording collecting collating and reporting NOTE: For this component the participants will be put into different groups; 7-8 groups should be formed for different programme areas. These programme areas will vary by country and should be identified before the workshop. The list of participants should also be reviewed and the composition of these groups should be decided before the workshop. Some are implemented in the community others at health facilities. Both types should be assessed here. Program Area 7: Program Area 6: Program Area 5: Program Area 4: Program Area 3: Program Area 2: Program Area 1: Respond to each statement following the instructions given Type program area in column headings at right (over-write Program Area ) (Click on the statement icon below () for statement-specific guidance.) Outputs of routine program monitoring contribute to the indicators as defined in the national M&E plan 16. Financial resources/investments for HIV are monitored and reported to the NACA and MOH 17. Summary of Key Action Points:
42 Local Government / AIDS Coordinating 1. Check if there is an inventory of HIV related surveys conducted in the country 2. If existing check when the inventory was last updated 3. Prepare a summary on how frequently surveys are conducted in the country: (see below for more details) Health Facilities implementers of HIV 40 M&E System Component 8: Surveys and Surveillance Government Ministries/ Sectors HIV/AIDS Umbrella organisations (each one completes sheet) Ministry of Health AIDS Control Programme AIDS Coordinating Authority Respond to each statement following the instructions given (Click on the statement icon below () for statement-specific guidance.) An inventory of all HIV related surveys and surveillance conducted already (and to be conducted) in the country has been updated within past 12 months 1. Surveys and surveillance conducted to date have contributed to measuring indicators in the national M&E plan 2. Biological surveillance targeting the appropriate populations is conducted every 1-2 years 3. surveys or surveillance with behavioral component in the general population are conducted every 2-3 years 4. workplace surveys (public and private sectors) are conducted every 1-2 years 5.
43 AIDS Coordinating Authority Ministry of Health AIDS Control Programme HIV/AIDS Umbrella organisations (each one completes sheet) Government Ministries/ Sectors Local Government / AIDS Coordinating 1. Check if there is an inventory of HIV related surveys conducted in the country 2. If existing check when the inventory was last updated 3. Prepare a summary on how frequently surveys are conducted in the country: (see below for more details) Health Facilities implementers of HIV 41 Respond to each statement following the instructions given (Click on the statement icon below () for statement-specific guidance.) Health facility surveys at HIVrelated service delivery points are conducted every 2-3 years 6. Second generation surveillance (secondary analysis of existing biological and behavioural surveillance data and programme monitoring data) is undertaken every 2-3 years 7. surveys on condom availability and use are conducted every 1-2 years 8. Summary of Key Action Points:
44 Review Inventory (if existing) of HIV Related Surveys Conducted in the Country Gather specific survey and surveillance reports (including Biological and behavioral surveillance work place surveys school based surveys health facility surveys second generation surveillance; and surveys on condom availability/use) Pre-assessment Checklist 1. Review inventory (if existing) of HIV related surveys conducted in the country 2. Gather specific survey and surveillance reports (including Biological and behavioral surveillance work place surveys school based surveys health facility surveys second generation surveillance; and surveys on condom availability/use)»» Check if there is an inventory of HIV related surveys conducted in the country»» If existing check when the inventory was last updated»» Prepare a summary on how frequently each of the following surveys are conducted in the country: Biological surveillance surveys or surveillance with behavioral component in the general population level workplace surveys level school-based survey Health facility surveys in HIV-related Second generation surveillance Survey on condom availability and use 42
45 Local Government / AIDS Coordinating Health Facilities implementers of HIV Pre-assessment Checklist: 1. None 43 M&E System Component 9: and -national HIV Databases Government Ministries/ Sectors HIV/AIDS Umbrella organisations (each one completes sheet) Ministry of Health AIDS Control Programme AIDS Coordinating Authority Respond to each statement following the instructions given (Click on the statement icon below () for statement-specific guidance.) Database/s for electronically capturing and storing data generated for/by the national HIV M&E system is functional 1. There is a functional integrated database for electronically capturing and storing data on a wide range of health (possibly including but not limited to HIV/AIDS 2. Structures mechanisms procedures and time frame for transmitting entering extracting merging and transferring data between databases that support the national HIV M&E system exist 3. IT equipment and supplies are available for maintaining the national and sub national HIV databases 4. Quality control mechanisms are in place to ensure that data are accuratedly captured 5. Human resources for maintaining and updating the national and sub national HIV databases are adequate 6. Human resources for maintaining and updating the IT equipment and infrastructure are adequate 7. Summary of Key Action Points:
46 1. Note which stakeholders have guidelines and tools on supportive supervision and data auditing implementers of HIV 44 M&E System Component 10: Supportive Supervision and Data Auditing Health Facilities Local Government / AIDS Coordinating Government Ministries/ Sectors HIV/AIDS Umbrella organisations (each one completes sheet) Ministry of Health AIDS Control Programme AIDS Coordinating Authority Respond to each statement following the instructions given (Click on the statement icon below () for statement-specific guidance.) guidelines and tools for supportive supervision on M&E exist (as standalone or as a chapter/module of more comprehensive supervision guidelines) 1. Supportive supervision was conducted as per the national protocols in the past 6 months 2. Supportive supervision results have been recorded and feedback provided to supervisees 3. Entities can access supervision and data auditing results and follow up on recommendations made during supervision visits 4. A protocol for auditing routine HIV service data from health service delivery points exists 5. A protocol for auditing routine HIV service data from civil society/commuity-based programmes exists 6.
47 AIDS Coordinating Authority Ministry of Health AIDS Control Programme HIV/AIDS Umbrella organisations (each one completes sheet) Government Ministries/ Sectors Local Government / AIDS Coordinating 1. Note which stakeholders have guidelines and tools on supportive supervision and data auditing Health Facilities implementers of HIV 45 Respond to each statement following the instructions given (Click on the statement icon below () for statement-specific guidance.) protocol for auditing data used in the national set of HIV indicator values exists 7. Data auditing is conducted as per the time frames stipulated in the national data auditing protocol 8. Data auditing results have been recorded and feedback provided to those entities whose data were audited 9. Summary of Key Action Points:
48 1. Check if there is an inventory of HIV related research and evaluation activities (completed proposed and active) 2. If existing check when the inventory was last updated 3. Check if there a document on procedures (strategy) for coordinating and approving (new) HIV research and evaluations Health Facilities implementers of HIV 46 M&E System Component 11: HIV Evaluation and Research Agenda Local Government / AIDS Coordinating Government Ministries/ Sectors Respond to each statement following the instructions given AIDS Co- Ministry of Health HIV/AIDS Umbrella organisations AIDS Control Propletes (each one com- (Click on the statement icon below () for statement-specific ordinating guidance.) Authority gramme sheet) 1. EXISTENCE and USE OF NATIONAL HIV RESEARCH AND EVALUATION AGENDA An inventory (register/database) exists of HIV research and evaluation institutions and their activities in the country (completed proposed and active) and has been updated in past 12 months 1.1 A mandated national team/committee and procedures exists which is responsible for coordinating and approving (new) HIV research and evaluations. 1.2 The team/committee mandated for coordinating and approving HIV research and evaluations has met as scheduled in the last 12 months 1.3
49 AIDS Coordinating Authority Ministry of Health AIDS Control Programme HIV/AIDS Umbrella organisations (each one completes sheet) Government Ministries/ Sectors Local Government / AIDS Coordinating 1. Check if there is an inventory of HIV related research and evaluation activities (completed proposed and active) 2. If existing check when the inventory was last updated 3. Check if there a document on procedures (strategy) for coordinating and approving (new) HIV research and evaluations Health Facilities implementers of HIV 47 Respond to each statement following the instructions given (Click on the statement icon below () for statement-specific guidance.) Procedures exist for the mandated team/committee to coordinate (new) HIV research and evaluation 1.4 An HIV research and evaluation agenda exists that directs future HIV research and evaluation 1.5 The HIV research and evaluation agenda has been prioritised based on input from key HIV and research stakeholders 1.6 The HIV research and evaluations agenda is being used to approve new studies. 1.7 The HIV research and evaluations findings are being used in policy formulation planning and implementation 1.8 Research and evaluation findings are regularly disseminated and discussed 1.9 Financial resources are earmarked/available for conducting planned research and evaluations 1.10
50 48 1. Check if there is an inventory of HIV related research and evaluation activities (completed proposed and active) 2. If existing check when the inventory was last updated 3. Check if there a document on procedures (strategy) for coordinating and approving (new) HIV research and evaluations implementers of HIV Health Facilities Local Government / AIDS Coordinating Government Ministries/ Sectors HIV/AIDS Umbrella organisations (each one completes sheet) Ministry of Health AIDS Control Programme AIDS Coordinating Authority Respond to each statement following the instructions given (Click on the statement icon below () for statement-specific guidance.) 2. JOINT HIV RESPONSE REVIEWS (This is an evaluation of the national HIV strategy and thus grouped here with HIV research and evaluations. program outcome and process evaluations still need to be carried out by individual projects.) Joint reviews of the HIV response takes place during annual reporting mid-term and end-of term NSP reviews 2.1 International partners actively participate in joint HIV Program Reviews 2.2 Country-level stakeholders actively participate in joint HIV Program Reviews 2.3 Summary of Key Action Points:
51 Local Government / AIDS Coordinating 1. Check if there is information dissemination strategy/plan or if it is included in the M&E Plan or Work Plan Health Facilities implementers of HIV 49 M&E System Component 12: Data Dissemination and Use Government Ministries/ Sectors HIV/AIDS Umbrella organisations (each one completes sheet) Ministry of Health AIDS Control Programme AIDS Coordinating Authority Respond to each statement following the instructions given (Click on the statement icon below () for statement-specific guidance.) HIV stakeholder information needs have been assessed 1. Information products are regularly disseminated to the data providers. 2. Information products are regularly sent to a wide variety of stakeholders- other than the data providers 3. and sub national information products meet HIV stakeholders' information needs 4. There are guidelines to support the analysis presentation and use of data (e.g. graphs on walls showing cumulative coverage) at facility level 5. Stakeholders have access to the data/information products in the public domain (on line or central info center) 6.
52 AIDS Coordinating Authority Ministry of Health AIDS Control Programme HIV/AIDS Umbrella organisations (each one completes sheet) Government Ministries/ Sectors Local Government / AIDS Coordinating 1. Check if there is information dissemination strategy/plan or if it is included in the M&E Plan or Work Plan Health Facilities implementers of HIV 50 Respond to each statement following the instructions given (Click on the statement icon below () for statement-specific guidance.) Summary of Key Action Points:
53 AIDS Coordinating Authority 12-Data Use 11-Eval & Research 10-Supervision and Auditing 9-Nat l & -nat l Databases 8-Surveys & Surveillance 6-Adv. Comm. & Culture 5-Nat l M&E Work Plan 4-Nat l M&E Plan 3-Partnerships 2-Human Capacity 1-Org Structure 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Percent of Responses Completely Yes Mostly Partly Not at all No N/A Ministry of Health AIDS Control Programme 12-Data Use 11-Eval & Research 10-Supervision and Auditing 9-Nat l & -nat l Databases 8-Surveys & Surveillance 6-Adv. Comm. & Culture 5-Nat l M&E Work Plan 4-Nat l M&E Plan 3-Partnerships 2-Human Capacity 1-Org Structure 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Percent of Responses Completely Yes Mostly Partly Not at all No N/A 51
54 Umbrella organisations for civil society and private sector 12-Data Use 11-Eval & Research 10-Supervision and Auditing 9-Nat l & -nat l Databases 8-Surveys & Surveillance 6-Adv. Comm. & Culture 5-Nat l M&E Work Plan 4-Nat l M&E Plan 3-Partnerships 2-Human Capacity 1-Org Structure 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Percent of Responses Completely Yes Mostly Partly Not at all No N/A Government Ministries 12-Data Use 11-Eval & Research 10-Supervision and Auditing 9-Nat l & -nat l Databases 8-Surveys & Surveillance 6-Adv. Comm. & Culture 5-Nat l M&E Work Plan 4-Nat l M&E Plan 3-Partnerships 2-Human Capacity 1-Org Structure 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Percent of Responses Completely Yes Mostly Partly Not at all No N/A 52
55 Local Government / AIDS Coordinating 12-Data Use 11-Eval & Research 10-Supervision and Auditing 9-Nat l & -nat l Databases 8-Surveys & Surveillance 6-Adv. Comm. & Culture 5-Nat l M&E Work Plan 4-Nat l M&E Plan 3-Partnerships 2-Human Capacity 1-Org Structure 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Percent of Responses Completely Yes Mostly Partly Not at all No N/A Health Facilities 12-Data Use 11-Eval & Research 10-Supervision and Auditing 9-Nat l & -nat l Databases 8-Surveys & Surveillance 6-Adv. Comm. & Culture 5-Nat l M&E Work Plan 4-Nat l M&E Plan 3-Partnerships 2-Human Capacity 1-Org Structure 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Percent of Responses Completely Yes Mostly Partly Not at all No N/A 53
56 Implementing Partners 12-Data Use 11-Eval & Research 10-Supervision and Auditing 9-Nat l & -nat l Databases 8-Surveys & Surveillance 6-Adv. Comm. & Culture 5-Nat l M&E Work Plan 4-Nat l M&E Plan 3-Partnerships 2-Human Capacity 1-Org Structure 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Percent of Responses Completely Yes Mostly Partly Not at all No N/A HIV M&E Plan Checklist M&E Processes by Component Indicator Definitions 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Percent of Responses Completely Yes Mostly Partly Not at all N/A 54
57 Component 7: Routine Monitoring Program Area 7: Program Area 6: Program Area 5: Program Area 4: Program Area 3: Program Area 2: Program Area 1: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Percent of Responses Completely Yes Mostly Partly Not at all No N/A Overall Dashboard 12 Components Across Stakeholder Categories 12-Data Use 11-Eval & Research 10-Supervision and Auditing 9-Nat l & -nat l Databases 8-Surveys & Surveillance 6-Adv. Comm. & Culture 5-Nat l M&E Work Plan 4-Nat l M&E Plan 3-Partnerships 2-Human Capacity 1-Org Structure 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Percent of Responses Completely Yes Mostly Partly Not at all No N/A 55
58 Component 1. Organizational Structure Summary of Action Points 2. Human Capacity 3. Partnerships 4. M&E Plan 5. M&E Costed Workplan 6. Advocacy Communication and Culture 7. Routine Monitoring 8. Surveys and Surveillance 9. and national databases 10. Supervision and Data Auditing 11. Evaluation and Research 12. Data Use 56
59 List of ALL MERG Documents A Framework for Monitoring and Evaluating HIV Prevention Programmes for Most-At-Risk Populations (2007): Provides an overview of M&E methods and approaches for most at-risk populations; it covers the use of strategic information for programme planning M&E. Its focus is on the M&E of targeted HIV prevention programmem&e. Its focus is on the M&E of targeted HIV prevention programme 2. Additional Recommended Indicators. Addendum to UNGASS Monitoring the Declaration of Commitment on HIV/AIDS Guidelines on Construction of Core Indicators (2008): Presents the 40 core national indicators that provide minimum necessary information for national-level monitoring of the HIV epidemic and response and to provide detailed specifications and guidance on the 15 indicators recommended in addition to the 25 UNGASS indicators 3. Organizing Framework for a Functional HIV M&E System (2008): This framework describes 12 main M&E system components and defines a performance goal and results for each component. The framework helps countries to define an agreed set of national performance objectives and measures for the HIV M&E system and to guide strategies for building capacity where needed to reach these objectives. 4. Glossary of M&E Terminology (2008): contains an alphabetical listing of M&E terms and their definitions often with more in-depth explanations than would customarily be provided by dictionary definitions. The Glossary will facilitate and improve dialogue and understanding among all those who are involved in M&E of development activities. It should also serve as a valuable reference guide in M&E training. The selection of terms and their definitions in the attached glossary have been carefully discussed and endorsed by the Global UNAIDS Monitoring and Evaluation Reference Group (MERG) 5. Indicator Standards and Assessment Tool (2009): consists of a set of agreed indicator standards that are relevant at the national level for program managers and service providers who need to select revise and use indicators to monitor manage and implement their country s response to the epidemic effectively monitor. This will ensure that indicators provide decision-makers and key stakeholders with useful feasible and relevant information. An additional aim is to reduce the burden of global reporting on countries by harmonising global level indicators across multilateral and bilateral organisations 6. Planning Tool for Developing a Digital Library of M&E Resources (2009): A Planning Tool to help assure that users of a digital library can successfully locate resources and can make informed decisions regarding the quality of the materials. The Planning Tool has two purposes: 1) To provide guidance to current owners and future developers of a digital library on the range of issues to be addressed in usability and userfriendliness of the library and 2) To provide a list of questions to help organizations brainstorm if they can and should invest their resources in developing a digital library 7. Guidance HIV Monitoring and Evaluation Capacitybuilding (2009): provides practical advice for national AIDS programmes that are planning and implementing capacity building activities as part of their effort to develop a unified and effective national HIV monitoring and evaluation (M&E) system. The Guidance is relevant to the wide range of individuals and organisations involved in the national HIV M&E system; it is particularly relevant for the health sector given its central role in M&E of HIV Components Monitoring and Evaluation System Assessment Guidelines to support preparation implementation and follow-up activities (2009): These Guidelines provide information on the preparation for and implementation of an assessment of the national HIV monitoring and evaluation (M&E) system. It also includes key steps to take after an assessment to facilitate implementation of M&E system strengthening activities. The Guidelines are built around the 12 main components of the HIV M&E system which define the Organizing Framework for a Functional HIV Monitoring and Evaluation System (UNAIDS 2008). Consequently the Guidelines also focus on using the 12 Components Monitoring and Evaluation System Strengthening Tool (Geneva: UNAIDS 2009a) to ensure a comprehensive and successful assessment Components Monitoring and Evaluation System Strengthening Tool (2009): Is a tool is for assessing how well each of the 12 components of a national HIV M&E system is functioning. The tool facilitates the identification of strengths and weaknesses in the national HIV M&E system and the prioritization of system strengthening activities. 10. Guidelines for Developing Terms of Reference for Prevention Evaluation (2009): The Guidelines aim to foster a systematic approach to the evaluation of prevention programs by focusing on an often overlooked yet critical step in evaluation planning: the preparation of terms of reference (TOR). It can be used to facilitate the planning of evaluations for HIV prevention discussions on the design of these evaluations and the drafting of TOR to guide such assessments. It is intended for use by anyone who prepares or reviews TOR for evaluations of HIV and AIDS prevention programs and projects.
60 UNAIDS 20 AVENUE APPIA CH-1211 GENEVA 27 SWITZERLAND T (+41) F (+41) Uniting the world against AIDS
12 Components Monitoring & Evaluation System Assessment
10 January 12 Components Monitoring & Evaluation System Assessment Guidelines to Support Preparation, Implementation and Follow-Up Activities These guidelines support the use of the standardized tool:
Technical guidance note for Global Fund HIV proposals in Round 11
Technical guidance note for Global Fund HIV proposals in Round 11 UNAIDS I World Health Organization I August 2011 Rationale for including the development of a system in the proposal With the global momentum
April. Organizing Framework for a Functional National HIV Monitoring and Evaluation System
08 April Organizing Framework for a Functional National HIV Monitoring and Evaluation System Acknowledgements This document is based on the World Bank publication Eleven Components of a Fully Functional
Terms of Reference for a Short Term Consultancy to Develop Training Materials and Conduct Training on HIV M&E in Zanzibar
Zanzibar AIDS Commission Terms of Reference for a Short Term Consultancy to Develop Training Materials and Conduct Training on HIV M&E in Zanzibar Revision: 9 March 2006 1. BACKGROUND: HOW THE ZAC S ROLE
Annex 3 Tanzania Commission for AIDS TACAIDS. M&E Database User Manual
Annex 3 Tanzania Commission for AIDS TACAIDS M&E Database User Manual Version 1.02 29 November 2005 M&E Database Table of Contents INTRODUCTION...2 1. THE DATABASE SYSTEM...2 1.1 APPROACH TO THE DEVELOPMENT...2
Glossary Monitoring and Evaluation Terms
Glossary Monitoring and Evaluation Terms This glossary includes terms typically used in the area of monitoring and evaluation (M&E) and provides the basis for facilitating a common understanding of M&E.
Guidance Note on Developing Terms of Reference (ToR) for Evaluations
Evaluation Guidance Note Series UNIFEM Evaluation Unit October 2009 Guidance Note on Developing Terms of Reference (ToR) for Evaluations Terms of Reference (ToR) What? Why? And How? These guidelines aim
Monitoring and Evaluation Systems Strengthening Tool
Monitoring and Evaluation Systems Strengthening Tool MS-06-18 Printed on recycled paper This tool was made possible by support from the U.S. Agency for International Development (USAID) under terms of
Performance Monitoring Tools
Performance Monitoring Tools M&E training for MoHSW & Business Coalition on HIV/AIDS Material adapted from USDOL/ILO HIV/AIDS Workplace Education programme Session Objectives Participants will be able
Capacity Assessment Indicator. Means of Measurement. Instructions. Score As an As a training. As a research institution organisation (0-5) (0-5) (0-5)
Assessing an Organization s in Health Communication: A Six Cs Approach [11/12 Version] Name & location of organization: Date: Scoring: 0 = no capacity, 5 = full capacity Category Assessment Indicator As
ROUTINE DATA QUALITY ASSESSMENT TOOL (RDQA)
ROUTINE DATA QUALITY ASSESSMENT TOOL (RDQA) GUIDELINES FOR IMPLEMENTATION DRAFT July 30, 2008 The Global Fund to Fight Aids, Tuberculosis and Malaria, Office of the Global AIDS Coordinator, PEPFAR, USAID,
Checklist for review of the human resource development component of national plans to control tuberculosis
WHO/HTM/TB/2005.350 Checklist for review of the human resource development component of national plans to control tuberculosis Prepared by: Karin Bergström Stop TB Department World Health Organization
Five-Year Strategic Plan (2011-2015) HEALTH INFORMATION SYSTEM MYANMAR
MINISTRY OF HEALTH Five-Year Strategic Plan (2011-2015) HEALTH INFORMATION SYSTEM MYANMAR Department of Health Planning CONTENTS Acknowledgement Executive Summary i ii Introduction 1 Myanmar Health Care
Handbook for municipal finance officers Performance management Section J
1. Introduction The Department of Provincial and Local Government (DPLG) defined performance management as a strategic approach to management, which equips leaders, managers, employees and stakeholders
FRAMEWORK OF SUPPORT: SCHOOL-LEVEL PRACTICE PROFILE
FRAMEWORK OF SUPPORT: SCHOOL-LEVEL PRACTICE PROFILE S The Framework of Supports are a set of Practice Profiles that serve as an implementation overview of Support for Personalized Learning (SPL). Practice
Ghana AIDS Commission. Terms of Reference Data Quality Assessment 2014
Ghana AIDS Commission Terms of Reference Data Quality Assessment 2014 SUMMARY OF SERVICES REQUIRED The Ghana AIDS Commission (GAC) wishes to procure the services of a consultant to conduct a data quality
Using Evaluation to Improve Programs. Strategic Planning. www.cdc.gov/healthyyouth/evaluation
Using Evaluation to Improve Programs Strategic Planning www.cdc.gov/healthyyouth/evaluation PROGRAM STRATEGIC PLANNING KIT Table of Contents Introduction Part 1: What is strategic planning? Part 2: What
How To Help The Ghanian Hiv Recipe Cards
UN AID S PROGRAM M E COORDIN AT ING BO ARD UNAIDS/PCB (32)/13.CRP 3 Issue date: 07 June 2013 THIRTY-SECOND MEETING Date: 25-27 June 2013 Venue: Executive Board Room, WHO, Geneva Agenda item 4 Joint United
SADC HIV and AIDS Business Plan:
HIV AIDS Business Plan: Strategic 5-Year Business Plan 2005-2009 [ 1 ] HIV AIDS Business Plan HIV AIDS Unit, November 2004 ISBN: 99912-563 - 5-0 The contents of this publication are the sole responsibility
PEPFAR MANAGEMENT DASHBOARD SOP STANDARD OPERATING PROCEDURES FOR BUILDING AND MAINTAINING AN EFFECTIVE COMPUTER DASHBOARD
PEPFAR MANAGEMENT DASHBOARD SOP STANDARD OPERATING PROCEDURES FOR BUILDING AND MAINTAINING AN EFFECTIVE COMPUTER DASHBOARD PEPFAR MANAGEMENT DASHBOARD SOP STANDARD OPERATING PROCEDURES FOR BUILDING AND
HRM. Human Resource Management Rapid Assessment Tool. A Guide for Strengthening HRM Systems. for Health Organizations. 3rd edition
HRM Human Resource Management Rapid Assessment Tool for Health Organizations A Guide for Strengthening HRM Systems 3rd edition . Human Resource Management Rapid Assessment Tool Copyright 2005, renewed
TEAM PRODUCTIVITY DEVELOPMENT PROPOSAL
DRAFT TEAM PRODUCTIVITY DEVELOPMENT PROPOSAL An initial draft proposal to determine the scale, scope and requirements of a team productivity development improvement program for a potential client Team
Aboriginal Affairs and Northern Development Canada. Internal Audit Report. Prepared by: Audit and Assurance Services Branch.
Aboriginal Affairs and Northern Development Canada Internal Audit Report Audit of Water and Wastewater Infrastructure Prepared by: Audit and Assurance Services Branch Project # 12-10 February 2013 TABLE
Draft Programme Document
Draft Programme Document CHANGE MANAGEMENT, PUBLIC SECTOR DEVELOPMENT AND PROGRAMME SUPPORT A Programme under the National Agriculture Development Framework APRIL 2009 1 Table of Contents I. Executive
QUAๆASSURANCE IN FINANCIAL AUDITING
Table of contents Subject Page no. A: CHAPTERS Foreword 5 Section 1: Overview of the Handbook 6 Section 2: Quality Control and Quality Assurance 8 2. Quality, quality control and quality assurance 9 2.1
CALL FOR PROPOSALS FOR INSTITUTIONAL CAPACITY DEVELOPMENT 1. BACKGROUND Organizational Context: The National Federal Parliament (NFP) was inaugurated in August 2012, with the selection (by traditional
Engage Government & Community 2 PLAN REFLECT ACT
Step 6: Monitor and Evaluate 7 Improve & Revise Services 1 Engage Government & Community 2 Establish Leadership & Management Structure REFLECT PLAN 6 Monitor & Evaluate ACT 3 Adapt the Community-Based
WV School Counseling Program Audit
The program audit is used to assess the school counseling program in comparison with West Virginia s Model for School Counseling Programs. Audits serve to set the standard for the school counseling program.
World Health Organization
March 1, 2005 Proposed Networks to Support Health Decision-Making and Health Policy Formulation in Low and Lower Middle Income Countries & Considerations for Implementation World Health Organization A
Guide for the Development of Results-based Management and Accountability Frameworks
Guide for the Development of Results-based Management and Accountability Frameworks August, 2001 Treasury Board Secretariat TABLE OF CONTENTS Section 1. Introduction to the Results-based Management and
Capacity Building and Strengthening Framework
FY 2012 The President s Emergency Plan for AIDS Relief (PEPFAR) Capacity Building and Strengthening Framework Version 2.0-1 - Table of Contents 1 Background... 3 2 Purpose... 4 2.1 How to Use the Capacity
Content Introduction. Pag 3. Introduction. Pag 4. The Global Fund in Zimbabwe. Pag 5. The Global Fund Grant Portfolio in Zimbabwe.
Content Introduction The Global Fund in Zimbabwe The Global Fund Grant Portfolio in Zimbabwe Capacity Development 2009-2014 Capacity Development and Transition Planning 2014 Overview of the Capacity Development
TRAINING MODULE IV. The Department of Health REPUBLIC OF SOUTH AFRICA FOR IDEAL CLINIC REALIZATION AND MAINTENANCE
The Department of Health REPUBLIC OF SOUTH AFRICA TRAINING MODULE IV FOR IDEAL CLINIC REALIZATION AND MAINTENANCE Data capturing and report generation on IC software IDEAL CLINIC DASHBOARD Table of Contents
DRAFT ACTION PLAN FOR BETTER LOWER SECONDARY EDUCATION IN NORWAY
BETTER POLICIES FOR BETTER LIVES OECD-NORWAY IMPROVING SCHOOLS REVIEW DRAFT ACTION PLAN FOR BETTER LOWER SECONDARY EDUCATION IN NORWAY RESULT OF THE OECD SEMINAR FOR NORWEGIAN LEADERS IN EDUCATION IMPROVEMENT
LUKHANJI MUNICIPALITY PERFORMANCE MANAGEMENT FRAMEWORK
LUKHANJI MUNICIPALITY PERFORMANCE MANAGEMENT FRAMEWORK INTRODUCTION The Municipal Systems Act, 2000, which requires a municipality to establish a performance management system that is: Commensurate with
Annex II: Terms of Reference for Management and Implementation Support Consultant (Firm)
Annex II: Terms of Reference for Management and Implementation Support Consultant (Firm) a. Background: 1. The GoB in accordance with its Public Financial Management (PFM) Strategy & Vision and Medium
Performance audit report. Ministry of Education: Monitoring and supporting school boards of trustees
Performance audit report Ministry of Education: Monitoring and supporting school boards of trustees Office of the Auditor-General Private Box 3928, Wellington 6140 Telephone: (04) 917 1500 Facsimile: (04)
CHARTERED ACCOUNTANTS and ASSOCIATE CHARTERED ACCOUNTANTS TRAINING LOG
CHARTERED ACCOUNTANTS and ASSOCIATE CHARTERED ACCOUNTANTS TRAINING LOG 2007 Institute of Chartered Accountants of New Zealand This book is copyright. Apart from any fair dealing for the purposes of private
For Conducting Comprehensive Data Quality Audit among Health Facilities supported by EGPAF Mozambique
REQUEST FOR PROPOSALS #03485 For Conducting Comprehensive Data Quality Audit among Health Facilities supported by EGPAF Mozambique in support of ELIZABETH GLASER PEDIATRIC AIDS FOUNDATION (EGPAF) Firm
Audit of Project Management Governance. Audit Report
Audit of Project Management Governance Audit Report March 2015 TABLE OF CONTENTS Executive Summary... 3 What we examined... 3 Why it is important... 3 What we found... 3 Background... 5 Objective... 6
Better Skills Better Jobs Better Health. National occupational standards for the practice of public health guide
Better Skills Better Jobs Better Health National occupational standards for the practice of public health guide March 2004 Acknowledgements These national occupational standards describe good practice
Monitoring, Evaluation and Learning Plan
Monitoring, Evaluation and Learning Plan Cap-Net International Network for Capacity Building in Sustainable Water Management November 2009 The purpose of this document is to improve learning from the Cap-Net
Botswana s Integration of Data Quality Assurance Into Standard Operating Procedures
Botswana s Integration of Data Quality Assurance Into Standard Operating Procedures ADAPTATION OF THE ROUTINE DATA QUALITY ASSESSMENT TOOL MEASURE Evaluation SPECIAL REPORT Botswana s Integration of Data
CODE: E.003 Financial Services BUDGET AND BUSINESS PLANNING POLICY. 1.2 The essential activities covered by this policy include:
BUDGET AND BUSINESS PLANNING POLICY CONTENTS 1.1 Budget and business planning is undertaken to support strategic planning and decision-making and to serve accountability by enabling administration to plan
7. ASSESSING EXISTING INFORMATION SYSTEMS AND INFORMATION NEEDS: INFORMATION GAP ANALYSIS
7. ASSESSING EXISTING INFORMATION 6. COMMUNITY SYSTEMS AND LEVEL INFORMATION MONITORING NEEDS: OF THE INFORMATION RIGHT TO ADEQUATE GAP ANALYSIS FOOD 7. ASSESSING EXISTING INFORMATION SYSTEMS AND INFORMATION
KPI UN Women Response Key Actions I. UN-Women s organisational effectiveness KPI 1: Providing direction for results
KPI UN Women Response Key Actions I. UN-Women s organisational effectiveness KPI 1: Providing direction for results KPI 2: Corporate strategy and mandate KPI 3: Corporate focus on results KPI 4: Focus
Terms of Reference For The Design of a Monitoring And Evaluation Information Management System
1. BACKGROUND FANRPAN is a regional multi-stakeholder policy research and advocacy network. The network currently operates in 17 member countries 1 in Africa through an inter-sectoral platform called a
WV School Counseling Program Audit
The program audit is used to assess the school counseling program in comparison with West Virginia s Model for School Counseling Programs. Audits serve to set the standard for the school counseling program.
Item 10 Appendix 1d Final Internal Audit Report Performance Management Greater London Authority April 2010
Item 10 Appendix 1d Final Internal Audit Report Performance Management Greater London Authority April 2010 This report has been prepared on the basis of the limitations set out on page 16. Contents Page
PRO-NET. A Publication of Building Professional Development Partnerships for Adult Educators Project. April 2001
Management Competencies and Sample Indicators for the Improvement of Adult Education Programs A Publication of Building Professional Development Partnerships for Adult Educators Project PRO-NET April 2001
ADOLESCENT HEALTH SYSTEM CAPACITY ASSESSMENT TOOL
ADOLESCENT HEALTH SYSTEM CAPACITY ASSESSMENT TOOL SECTION 1: INTRODUCTION ADOLESCENT HEALTH SYSTEM CAPACITY ASSESSMENT TOOL 1 SECTION 1: INTRODUCTION Adolescent Health System Capacity Tool: A state public
SECTION B DEFINITION, PURPOSE, INDEPENDENCE AND NATURE OF WORK OF INTERNAL AUDIT
SECTION B DEFINITION, PURPOSE, INDEPENDENCE AND NATURE OF WORK OF INTERNAL AUDIT Through CGIAR Financial Guideline No 3 Auditing Guidelines Manual the CGIAR has adopted the IIA Definition of internal auditing
UNDP Programming Manual December 2000. Chapter 7: MONITORING, REPORTING AND EVALUATION Page 1
Chapter 7: MONITORING, REPORTING AND EVALUATION Page 1 Contents Page 7.0 MONITORING, REPORTING AND EVALUATION See the New M & E Framework. 7.1 Policy framework 7.1.1 General policy statements 7.1.2 Coverage
International Workshop Agreement 2 Quality Management Systems Guidelines for the application of ISO 9001:2000 on education.
ISO 2002 All rights reserved ISO / IWA 2 / WD1 N5 Date: 2002-10-25 Secretariat: SEP-MÉXICO International Workshop Agreement 2 Quality Management Systems Guidelines for the application of ISO 9001:2000
Framework for Managing Programme Performance Information
Framework for Managing Programme Performance Information Published by the National Treasury Private Bag X115 Pretoria 0001 South Africa Tel: +27 12 315 5948 Fax: +27 12 315 5126 The Framework for Managing
Quality Assurance Framework
1. Context Think s Quality Assurance Framework reflects a strong commitment to evidence-based decision making and continuous improvement. This is consistent with Think s aim to achieve excellence in all
HR WSQ Qualifications. Certified HR Professional Programmes
Human Resource WSQ HR WSQ Qualifications WSQ ADVANCED CERTIFICATE IN HUMAN RESOURCES 4 core + 4 Elective Units CORE UNITS Analyse and present research information (Level 3) Ensure compliance with relevant
A Human Resource Capacity Tool for First Nations // planning for treaty
A Human Resource Capacity Tool for First Nations // planning for treaty table of contents Introduction //...3 Tools //... 9 HR Planning Timeline... 9 Stage 1 Where are we now?...11 Stage 2 Where do we
FNS40211 CERTIFICATE IV FINANCIAL SERVICES BOOKKEEPING
FNS40211 CERTIFICATE IV FINANCIAL SERVICES BOOKKEEPING POWER UP YOUR CAREER WITH A QUALIFICATION THAT MAKES A DIFFERENCE It is a must have qualification for individuals who possess significant theoretical
2 INFORMATION/DATA MANAGEMENT STRATEGY
2 INFORMATION/DATA MANAGEMENT STRATEGY 2.1 OVERVIEW AND FUNCTION The information management strategy should be drafted and maintained by the Information Management Officer (IMO), preferably, or the Information
Sound Transit Internal Audit Report - No. 2014-3
Sound Transit Internal Audit Report - No. 2014-3 IT Project Management Report Date: Dec. 26, 2014 Table of Contents Page Background 2 Audit Approach and Methodology 2 Summary of Results 4 Findings & Management
DATA ANALYSIS AND USE
CapacityDevelopment RESOURCE GUIDE DATA ANALYSIS AND USE July 2014 The s highlight the key technical areas of expertise needed to effectively influence health policy design, implementation, and monitoring
Appendix 1e. DIRECTORATE OF AUDIT, RISK AND ASSURANCE Internal Audit Service to the GLA. Performance Management Framework
Appendix 1e DIRECTORATE OF AUDIT, RISK AND ASSURANCE Internal Audit Service to the GLA Performance Management Framework DISTRIBUTION LIST Audit Team David Esling, Head of Audit and Assurance - Risk Management
Menu of Indicators on Management and Leadership Capacity Development
Menu of Indicators on Management and Leadership Capacity Development Leadership, Management, and Sustainability Program Management Sciences for Health Monitoring, Evaluation, and Communication Team 2006
State of Louisiana s Workforce Planning Model Right People, Right Skills, Right Jobs, Right Time
State of Louisiana s Workforce Planning Model Right People, Right Skills, Right Jobs, Right Time Table of Contents Introduction 2 What is Workforce Planning?...3 Why is Workforce Planning Important?.....3
National Guide for the Health Sector Policy and Strategic plan Development
REPUBLIC OF RWANDA MINISTRY OF HEALTH P.O. Box 84 KIGALI www.moh.gov.rw National Guide for the Health Sector Policy and Strategic plan Development April 2014 i Table of Contents Acronyms... iv FOREWORD...
The Canadian Code for Volunteer Involvement: An Audit Tool
The Canadian Code for Volunteer Involvement: An Audit Tool Acknowledgments Volunteer Canada gratefully acknowledges the author, Liz Weaver, for her work on the original document Volunteer Management Audit:
BTOR: MS PROJECT TRAINING WORKSHOP, NAIVASHA, KENYA
BTOR: MS PROJECT TRAINING WORKSHOP, NAIVASHA, KENYA Tittle Reporting Officers Participation Officers Dates of Event Purpose of Mission Training on Project Management using Microsoft Project for IGAD staff
Louisiana Tech University FIVE-YEAR STRATEGIC PLAN. FY 2017-2018 through FY 2021-2022
Louisiana Tech University FIVE-YEAR STRATEGIC PLAN FY 2017-2018 through FY 2021-2022 July 1, 2016 DEPARTMENT ID: 19A Higher Education AGENCY ID: 19A-625 Louisiana Tech University Louisiana Tech University
Section 3 Module 7 Health Information Systems. Module 7
Section 3 Module 7 Health Information Systems 275 Module 7 Health Information Systems This module describes the components of a functioning health information system and provides indicators to assess the
Islamic Republic of Afghanistan, Post Disaster Need Assessment (PDNA) Training Manual
Islamic Republic of Afghanistan, Ministry of Rural Rehabilitation and Development (MRRD) Ministry of Rural Rehabilitation & Development Post Disaster Need Assessment (PDNA) Training Manual Social Protection
KEY PERFORMANCE INFORMATION CONCEPTS
Chapter 3 KEY PERFORMANCE INFORMATION CONCEPTS Performance information needs to be structured to demonstrate clearly how government uses available resources to deliver on its mandate. 3.1 Inputs, activities,
PROGRAM QUALITY ASSURANCE PROCESS
PROGRAM QUALITY ASSURANCE PROCESS Curriculum Renewal and Program Review Centre for Learning and Teaching November 23, 2007 (Revised October 31, 2013) TABLE OF CONTENTS 1. Introduction... 3 2. Goal... 3
Why are PMO s are Needed on Large Projects?
Why are PMO s are Needed on Large Projects? Keeps Project Manager focused on: Priority risks Priority issues Stakeholder alignment Technical challenges Ensures administrative tasks are completed: Projects
EMS Example Example EMS Audit Procedure
EMS Example Example EMS Audit Procedure EMS Audit Procedures must be developed and documented with goals which: Ensure that the procedures incorporated into the EMS are being followed; Determine if the
CP14 ISSUE 5 DATED 1 st OCTOBER 2015 BINDT Audit Procedure Conformity Assessment and Certification/Verification of Management Systems
Certification Services Division Newton Building, St George s Avenue Northampton, NN2 6JB United Kingdom Tel: +44(0)1604-893-811. Fax: +44(0)1604-893-868. E-mail: [email protected] CP14 ISSUE 5 DATED 1 st OCTOBER
CoE/EU Eastern Partnership Programmatic Co-operation Framework (PCF) 2015 2017. Theme II Ensuring Justice
CoE/EU Eastern Partnership Programmatic Co-operation Framework (PCF) 2015 2017 Theme II Ensuring Justice Thematic programme II.1.: Strengthening the independence and efficiency of justice Title of the
HANDBOOK PUBLIC SERVICE STAFF PERFORMANCE PLANNING PERFORMANCE REVIEW PERFORMANCE APPRAISAL AND DECISION-MAKING
HANDBOOK PUBLIC SERVICE STAFF PERFORMANCE PLANNING PERFORMANCE REVIEW PERFORMANCE APPRAISAL AND DECISION-MAKING 6/30/2010 2: TABLE OF CONTENT WHAT IS THE STAFF PERFORMANCE APPRAISAL FORM... 3 Phase One
How To Get A Project Manager Diploma
Self Assessment Checklist & Questions Diploma in Management RPL Portfolio BSB51107 Diploma of Management RPL Portfolio Self-Assessment Checklist and Questions Self Assessment Checklist & Questions Diploma
Assessing the Human Resource Capacity for Implementation of the National Plan of Action for Orphans and Vulnerable Children
Assessing the Human Resource Capacity for Implementation of the National Plan of Action for Orphans and Vulnerable Children Process Description and Tool Library June 2007 CONTEXT One of the main challenges
Final. North Carolina Procurement Transformation. Governance Model March 11, 2011
North Carolina Procurement Transformation Governance Model March 11, 2011 Executive Summary Design Approach Process Governance Model Overview Recommended Governance Structure Recommended Governance Processes
USAID/Macedonia Secondary Education Activity, Monitoring and Evaluation Plan
USAID/Macedonia Secondary Education Activity, Monitoring and Evaluation Plan January 2004 Contract Number: GDG-A-00-03-00006-00 Task Order Number: 165-00-03-00105-00 EQUIP1: Secondary Education Activity
CORPORATE PERFORMANCE MANAGEMENT GUIDELINE
-001 CORPORATE PERFORMANCE MANAGEMENT GUIDELINE -001 TABLE OF CONTENTS 1 Introduction... 3 1.1 Scope... 3 1.2 Purpose... 3 2 Performance Management Framework Overview... 4 3 Performance Management Framework...
Module 2: Introduction to M&E frameworks and Describing the program
Module 2: Introduction to M&E frameworks and Describing the program Learning Objectives Understand the 4 basic steps required to develop M & E plans Learn to develop goals and objectives Learn to develop
How To Teach Human Resources Management
Human Resources Management Training Curriculum Technical Assistance to the New Partners Initiative (TA-NPI) New Partners Initiative Technical Assistance Project (NuPITA) The New Partners Initiative Technical
Funded Peak Activities
Funded Peak Activities Triennial Service Plan Guidelines Version 2.0 Sector Development Directorate Ageing, Disability and Home Care Department of Family and Community Services NSW July 2012 Final Document
Ottawa Charter. Toolkit and Implementation Planning Guide
Ottawa Charter Toolkit and Implementation Planning Guide Information required to support the Health Promotion Plan Introduction Priority Groups. Health Goal The aim of NCSP/BSA. Regional Community Profile
Release: 1. BSBPMG510A Manage projects
Release: 1 BSBPMG510A Manage projects BSBPMG510A Manage projects Modification History Not applicable. Unit Descriptor Unit descriptor This unit describes the performance outcomes, skills and knowledge
2008-2009 Unified Budget and Workplan. Performance Monitoring and Evaluation Framework
2008-2009 Unified Budget and Workplan Performance Monitoring and Evaluation Framework Secretariat UNAIDS UNHCR UNICEF WORLD BANK WFP UNDP WHO UNFPA UNESCO ILO UNODC 2 2008-2009 UBW Performance Monitoring
APPENDIX B: FEMA 452: Risk Assessment Database V5.0. User Guide
APPENDIX B: FEMA 452: Risk Assessment Database V5.0 User Guide INTRODUCTION... 5 DATABASE ADMINISTRATOR INFORMATION... 6 INSTALLATION PROCESS... 8 USE OF THE DATABASE... 10 OPENING THE DATABASE... 12 FACILITY
Louisiana Community and Technical College System. Strategic Plan
Louisiana Community and Technical College System Strategic Plan 2015-2019 Louisiana Community and Technical College System Strategic Plan (2015-2019) Vision: Our vision is to educate and train 220,000
HEALTH SECTOR DISASTER MANAGEMENT SELF-ASSESSMENT TOOL
HEALTH SECTOR DISASTER MANAGEMENT SELF-ASSESSMENT TOOL DIPECHO VI Action Plan Strengthening Communities through Safer Health Facilities in the Caribbean February 2009 HEALTH SECTOR SELF-ASSESSMENT TOOL
Internal Audit Quality Assessment Framework
Internal Audit Quality Assessment Framework May 2013 Internal Audit Quality Assessment Framework May 2013 Crown copyright 2013 You may re-use this information (excluding logos) free of charge in any format
National Health Research Policy
National Health Research Policy The establishment of a Department of Health Research (DHR) in the Ministry of Health is recognition by the GOI of the key role that health research should play in the nation.
Auditor General s Office. Governance and Management of City Computer Software Needs Improvement
Auditor General s Office Governance and Management of City Computer Software Needs Improvement Transmittal Report Audit Report Management s Response Jeffrey Griffiths, C.A., C.F.E Auditor General, City
MONITORING AND EVALUATION TOOLKIT. HIV, Tuberculosis, Malaria and Health and Community Systems Strengthening
MONITORING AND EVALUATION TOOLKIT HIV, Tuberculosis, Malaria and Health and Community Systems Strengthening Part 1: The Global Fund M&E requirements Fourth Edition November 2011 Disclaimers The geographical
