Degree of Uncontrollable External Factors Impacting to NPD

Size: px
Start display at page:

Download "Degree of Uncontrollable External Factors Impacting to NPD"

Transcription

1 Degree of Uncontrollable External Factors Impacting to NPD Seonmuk Park, 1 Jongseong Kim, 1 Se Won Lee, 2 Hoo-Gon Choi 1, * 1 Department of Industrial Engineering Sungkyunkwan University, Suwon , Republic of Korea 2 College of Business Administration Dongguk University-SEOUL, Seoul , Republic of Korea roidin@skku.edu, comgram@skku.edu, swlee94@dongguk.edu, hgchoi@skku.edu *:Corresponding author Abstract: The success of new product development (NPD) project is heavily dependent upon both internal and external factors arising during the development stages. Therefore, these factors should be managed for the entire stages with scientific or logical ways. This procedure is required for a firm to expand strategically its competitive advantages by developing the successful products in less cost, time and technical risks. Although both internal and external factors are the risks affecting to NPD project performances, the internal factors can be controllable and the external factors are very difficult to be controlled by a firm. This study focuses on the uncontrollable external factors to search, collect and classify, and suggests a fuzzy method to quantify the degrees of them impacting against NPD projects. In this study, forty external factors are selected, and classified into four different success factor groups: product-level, customer-level, firm-based level and financialperformance level. Each external factor is exclusively independent, but it affects inclusively to each group. Also, this study determines the integrated impact degree for each group that can be utilized for better strategic decision-making throughout the life of NPD projects. Key-Words: New Product Development (NPD), Uncontrollable external factors, Success factor groups, Impact degrees, Fuzzy method, Integrated impact degree 1 Introduction About 80% of NPD efforts have failed before project completion and more than 50% of the efforts have made no returns on the investment of money and time [1] due to extremely complex development process and business decision-making process. These processes can be characterized by three different types of uncertainties in either internal or external forms: environmental, technical and product. The environmental uncertainties include economic shift changes, inflation rate changes, interest rate changes, oil price changes, commodity price changes, government regulation changes, etc. The technical uncertainties include customer requirement changes, technical innovation speeds, short product-life cycle, etc. Some examples of the product uncertainties are required product function changes, market changes, globalization speeds, competition toughness in price and quality, product differentiation, product liability, etc. Therefore, a firm should develop various effective and efficient strategies, plans, decision-making methodologies to search, collect, analyze and respond against these uncertainties in a timely manner. This effort needs a lot of resources such as time and budget. More uncertainties or risk mean lower probability of success for NPD projects. This study focuses on the uncontrollable external factors only. Many existing studies have dealt with the internal factors that can be measurable or controllable, not the external factors even though they have recognized the importance of analyzing the external factors. In other words, the impact of the internal factors can be measureable by various statistical methods or other scientific ways with past records and experiences. However, it is hard to analyze the external risks to be occurred unexpectedly due to the complexity and randomness. In this study, a quantitative model is proposed to measure systematically the degrees of the external factors impacting to NPD projects. The model based on fuzzy theory can provide the primitive guidelines for a project life as GO/NO-GO criteria in either early design stage or middle stages. For this purpose, this study first searches in the previous studies, collects possible external factors from them. Then, the factors are classified by the success factors to be used as evaluation criteria if a project can be declared as a success or failure. It means that the entire external factors can be grouped into four success factors on the basis of product-level, ISBN:

2 customer-level, firm-based level and financialperformance. 2 Reviews of Relevant Studies The relevant studies show that both internal and external factors affect the project s success. However, few studies have dealt with the relations between external factors and NPD project success. Brown and Eisenhardt contend that the environmental factors have been neglected from considerations for deciding the project success [2]. Ulrich and Eppinger present that those factors of competitors, customers, markets and macroeconomic environment should be considered for better decision-making on project management by the entire firm [3]. Miller presents six different types of uncontrollable factors: politics and government regulations, macro-economic factors such as natural calamities, inflation rate, and interest rate, competition factors in industry, resources and industrial structures, product market, and demand patterns. These factors influence on related markets and industries as negative aspects [4]. Werner et al. verifies Miller s classification from realistic views and redefines them as environmental uncertainties[5]. Crowford and Di Benedetto presents that various uncertain factors such as market entrance hardness and technical constraints influence on product life-cycle and profits, and classifies them into project success factors [6]. Although there are other studies that investigate the success factors for NPD projects, their studies are usually based on the internal factors. Ernst summarizes many previous studies to extract common success factors [7]. Also, Balachandra and Friar present that the success factors affect NPD projects either positively or negatively based on the characteristics of projects [8]. 3 External Factors in NPD projects 3.1 Collection and Classification of External Factors An external factor is defined as an uncontrollable variable that affects success of a NPD project in this study. The external factor can be divided into different types based on environmental characteristics such as dynamism, hostility, technical complexity, industrial life cycles and differences [9-11]. The characteristics of each external factor can be classified by factor definition. Forty independent external factors related to NPD projects are finally selected from more than 100 external factors after removal of redundant definitions. Each factor has its own definition and environmental characteristics [6][8][12-17]. Both definition and characteristics are utilized in classification. That is, each factor is further classified with respect to environment, market, and technical [8] as shown in Table Success Factor Measures Either success or failure of a NPD project can be evaluated by different points of views of a firm. For example, a new product can be regarded as a successful one from customer views in terms of its price and quality. However, the success of the same product can affect negatively to organization in terms of team leadership. In this study, four different views are set to classify each external factor as follows [18]: 1. PL (Product-Level Measure): The external factors that affect market entrance speed, technical performance satisfaction, product specification and its performances, level of innovation, quality, development cost, etc. These factors include NPD processes, number of competitors in existing markets, availability of resources such as people, budget and technologies availability, easiness of manufacturability achievement, etc. 2. CL (Customer-Level Measure): The external factors that affect high customer satisfaction, high acceptance level of customer requirements, targeted market share and its growth percentage, revenue growth rate, etc. These factors include number of potential customers, level of customer satisfaction, profit goal, market share goals, length of product life-cycle, targeted market positions, changes in product repurchasing power, etc. 3. FB (Firm-Based Measure): The external factors affect the entire firm such as technologies, patents and other precious knowledge properties owned by a firm, strategic fit with business, business environment, investment for facilities, etc. 4. FP (Financial-Performance Measure): The external factors that affect a firm s profit increase, high profit margin goals, high profitability goals, etc. These factors include break-even point or time against total amount of investment for NPD projects, internal rate of return (IRR), return on investment (ROI), etc. Some example factors are listed in Table 1 along with the characteristics and four different success factor groups. It should be noted that many external factors affects inclusively to multiple number of groups. ISBN:

3 4 Quantification Model 4.1 Impact Degree of External Factor A firm should be capable of estimating accurately and quantitatively the external factor in terms of its seriousness or the impact degree, and be prepare for better strategies or plans to respond against it. Project manager or decision maker can utilize the degree as a visible guideline to decide GO/NO-GO more effectively and efficiently on a project at the entire development stages. The impact degree of an external factor is the numeric amount of either negative or positive influences on NPD project in this study. As described in the previous sections, all external factors are classified into four different success factor groups. Therefore, those degrees related to the number of external factors within each success factor group can be integrated together to determine total impact degrees. 4.2 Membership Functions in Fuzzy Set Theory The impact degree can be strong or weak depending on the project difficulty, internal and external factors surrounding a firm, the project progress made thus far, etc. This means that the impact should be measured or evaluated by scientific methods and predicted for future purposes. Usually, subjective methods have been used to measure and evaluate the impact with experts. However, this method is too flexible to yield consistent results although an expert s evaluation is still essential for better decision-making in risk analysis. For lowering the expert s subjectivity, the AHP (analytic hierarchy process) method can be used. This method is a structured technique that provides a comprehensive and rational framework for complex decision-making problems [19]. However, this method needs significant amount of response time for respondents or experts to answer all questions. Especially, the method is almost not useful if there are many elements to be compared them in pair. This study deals with forty factors (elements) to be evaluated for their significances or impact degrees. Fuzzy set theory [20] used in this study reduces the computational time and is capable of handling those external factors. Regarding fuzzy concepts, the membership function and defuzzification are required to obtain a quantitative value for a specific decision. The most common membership function is a triangular function. A specific membership function can be defined and selected for each external factor by experts. The triangular function shape should be differently defined in terms of scale, area and slope for each factor. The experts should be careful for defining the membership function of each factor because its impact degree is changed by business environment surrounding a firm and NPD project characteristics such as project difficulty. Also, the membership function shape of each factor may be modified or adjusted for each success factor group. Table 1 Classification of external factors by success factors Factor Type a External Factor b Success Factor Measures PL CL FB FP E Availability of Resource, Raw materials O O O M/T Client Acceptance O O O M Competitive Environment O O O O M Effects on Other Business O E Exchange Rate O O M Existence of a Potential Demand O O M Few Competitors O O E Government Regulations O O E/M/T Risk Distribution O O E Inflation Rate O O E Interest Rate O O M Competitor Analysis O O O O M Number of End-User O O E Political/Social Factors O O M Rate of New Product Introduction O O M Price Competition O O O O M Probability of Commercial Success O O T Probability of Technology Success O E/T Product Liability O O a. External factors related to environmental (E), market (M), technical (T) b. This table presents some example factors only. The actual number of factors considered in this study is 40. ISBN:

4 For example, the factor Price Competition affects inclusively PL, CL, FB and FP as shown in Table 2. This factor may have different membership functions or different impact degree within each success factor group. Therefore, the experts should modify the membership function carefully. In this study, forty membership functions are initially defined and each function may be modified further on the basis of the success factor group. Unfortunately, 160 membership functions at maximum would be needed due to this modification. Each NPD project is affected differently by both internal and external factors with specific membership functions. For the case of internal (controllable) factors, it would be relatively easy to develop the membership functions in contrast to external factors because a firm may have a plenty of related methods, knowledge and experiences to handle them effectively and efficiently. For the case of external (uncontrollable) factors, they would affect many projects on common basis like inflation rate and oil price. Therefore, it would be relatively easy to evaluate the impact degree to the projects, but difficult to determine the membership functions. The membership function value obtained from the union operator is still a fuzzy value, and thus requires a defuzzification process to convert the output from the fuzzy rules into a scalar, or nonfuzzy value. There are several defuzzification methods such as the clipped center of gravity method, mean of maximum method, and maximum criterion method. The first of these methods has been regarded as the most powerful for defuzzification in which the centroid of the trapezoidal area is calculated [1]. 4.3 Calculation of Integrated Impact Degree Every external factor is inclusively related to the success factors and is classified into one of four different success factor groups shown in Table 2. After the impact degree of each external factor is quantified by using its membership function, it can be synthesized with impact degrees of other external factors within a success factor group. This value is defined as the integrated impact degree as shown in Eq. (1). Eq. (1) is a multiplication form, not an additive form because the study assumes that multiple number of external factors can be simultaneously occurred, and their impact degrees are multiplicative. However, the integrated impact degree should be finalized by either decision maker or project manager through verification and validation test. where : integrated impact degree for success factor i (i=1 for PL, i=2 for CL, i=3 for FB, i=4 for FP) : impact degree of external factor j with respect to success factor i; n: total number of external factors in success factor i 5 An Illustrated Example As shown in Table 1, four sample factors among forty external factors are considered to illustrate how to obtain the integrated impact degree. Four steps are required for this purpose. Although the impact degree is quantified by the fuzzy set theory, some inputs are required from experts, especially in Steps 1 and 2. All values appeared in the table are assumed, not from realistic observations. Step 1: Defining membership functions: As described in Section 4.2, each external factor has its own membership function defined by experts at evaluating the factor. Also, the membership function would be modified further due to different impact within each success factor group. An example is given in Fig. 1 as a triangular function. Each triangle can be defined by its own shape in terms of scale, area, slope, and decision criteria (minor, low, moderate, high, and very high). This example actually needs twelve membership functions: one for Effects on Other Business, four each for Availability of Resource, Raw Materials and Competitive Environment, and three for Client Acceptance. However, four functions are used only under the assumption of identical function being applicable for each external factor within each success factor group. Step 2: Evaluation of each external factor: This step needs for the experts to evaluate each external factor with a value between 0 and 1 that influences the success factor group. Table 2 presents the results of the experts evaluation for each factor. Again, all the values are assumed. Step 3: Defuzzification process The experts evaluation is still a fuzzy value, and should be converted into a scalar by using a defuzzification method. The clipped center of gravity method is utilized in this study. Figs. 2 and 3 show the fuzzy process based on a union operator when the impact degree of an external factor is ISBN:

5 given by the experts. Table 3 presents the defuzzification results. Fig. 3 The centroid of the trapezoidal area using a clipped center of gravity method Fig. 1 A membership function example Table 2 The evaluation results External Factors Success Factors PL CL FB FP Effects on other business Availability of resources Client acceptance Competitive environment Table 3 Defuzzification results for external factors External Factors Success Factor Measure PL CL FB FP Effects on other business Availability of resources Client acceptance Competitive environment Fig.2 Fuzzy process based on an union operator Step 4: Calculation of integrated impact degree The impact degrees of the external factors within four success factor groups are obtained in Step 3. Then, the integrated impact degree for each success factor group can be decided easily by using Eq. (1). That is, As a result, four sampled external factors affect the success factor, Firm-Based Measure most significantly in this illustrated example. The above procedure can be applied for each NPD project whenever some external factors should be considered in a specified time. At product development stages, project managers can respond to those factors with better alternatives by referring the quantified impact degrees, and can conclude if a given project should be continued or dropped. 6 Conclusions The key contributions of this study are as follows: 1. forty external factors that affect NPD project life are collected from the previous studies. 2. The collected factors are further classified into four success factor groups because either success or failure of a NPD project should be evaluated differently on the basis of product, customer, firm, and finance-performance. All the external factors are classified into the appropriate group. Then, a multiplicative model is suggested to determine the integrated impact degree. ISBN:

6 3. The impact from an external factor can be measured various methods such as subjective method and AHP. However, these methods have some disadvantages hard to overcome in terms of unambiguity, response time, structure, etc. Fuzzy method is selected for this study because of better accuracy. This study can provide either decision maker or project manager a logical method to measure or predict the impact from the external factors for NPD projects. However, this study needs some critical works further. First, the number of membership functions required in this study is very high under the fuzzy method. Also, it needs in-depth research to define each membership function. To overcome these drawbacks, different approaches such as Artificial Neural Networks (ANN), Particle Swarm Optimization (PSO) should be considered to resolve the number of membership function problem, and multidisciplinary research method should be performed for accurate definition of a membership function. Second, a NPD project is also influenced by the internal (controllable) factors. Those factors would affect the project difficulty. Therefore, a synthesized model should be developed by combining the impact degrees from both factors. Finally, the system suggested by this study should be applied to realistic cases for verification and validity. References: [1] H. G. Choi, J. O. Ahn, Risk analysis models and risk degree determination in new product development: A case study, Journal of Engineering and Technology Management, Vol.27, 2010, pp [2] S. L. Brown, K. M. Eisenhardt, Product development: past research, present findings, and future directions, Academy of Management Journal, Vol.20, No.2, 1995, pp [3] K. T. Ulrich, S. T. Eppinger, Product design and development, third edition, McGraw-Hill, New York [4] K. D. Miller, A framework for integrated risk management in international business, Journal of International Business Studies, Vol.23, No.2, 1992, pp [5] S. Werner, L. E. Brouthers, K. D. Brouthers, International risk and perceived environmental uncertainty: The dimensionality and internal consistency of Miller`s measure, Journal of International Business Studies, Third quarter, [6] M. Crawford, A. Di Benedetto, New product management, eighted, McGraw-Hill, New York, [7] H. Ernst, Success factors of new product development: a review of the empirical literature, International Journal of Management Reviews, Vol.4, Issue.1, 2002, pp [8] R. Balachandra, J. H. Friar, Factors for success in R&D projects and new product innovation: a contextual framework, IEEE Transactions on Engineering Management, Vol.44, No.3, [9] D. Miller, P. H. Friesen., Strategy making and environment: The third link, Strategic Management Journal, Vol.4, 1983, pp [10] G. J. Covin, D. P. Slevin, Strategic management of small firms in hostility and benign environments, Vol.10, 1989, pp [11] G. G. Dess, D. W. Beard, Dimensions of organizational task environments, Administrative Science Quarterly, Vol.29, 1984, pp [12] R. Balachandra, J. A. Raelin, When to kill that R&D project, Research Management, Vol.27, No.4, 1984, pp [13] J. K. Pinto, S. J. Mantel, The cause of project failure, IEEE Transaction on Engineering Management, Vol.37, No.4, 1990, pp [14] D. E. Carter, Evaluating commercial projects, Research Technology Management, Vol.25, No.6, [15] D. B. Merrifield, Selecting projects for commercial success, Research Management, Vol.24, No.6, [16] R. G. Cooper, Identifying industrial new product success: Project NewProd, Industrial Marketing Management, Vol.8, 1979, pp [17] R. G. Cooper, E. J. Kleinschmidt, New products: What separates winners from losers?, Journal of Product Innovation Management, Vol.4, 1987, pp [18] A. Griffin, A. L. Page, An interim report on measuring product development success and failure, Journal of Product Innovation Management, Vol.10, 1993, pp [19] R. W. Saaty, The analytic hierarchy process-what it is and how it is used, Mathematical Modeling, Vol.9, Issues.3-5, 1987, pp [20] L. A. Zadeh, Fuzzy sets, Information and Control, Vol.8, 1965, pp ISBN:

Evaluating Effects of External Factors on Success of NPD Projects

Evaluating Effects of External Factors on Success of NPD Projects Evaluating Effects of External Factors on Success of NPD Projects Chan-sik Kim, Jong-seong Kim, and Hoo-GonChoi Department of Systems Management Engineering, Sungkyunkwan University, Suwon, Republic of

More information

A Risk Management System Framework for New Product Development (NPD)

A Risk Management System Framework for New Product Development (NPD) 2011 International Conference on Economics and Finance Research IPEDR vol.4 (2011) (2011) IACSIT Press, Singapore A Risk Management System Framework for New Product Development (NPD) Seonmuk Park, Jongseong

More information

An Evaluation Model for Determining Insurance Policy Using AHP and Fuzzy Logic: Case Studies of Life and Annuity Insurances

An Evaluation Model for Determining Insurance Policy Using AHP and Fuzzy Logic: Case Studies of Life and Annuity Insurances Proceedings of the 8th WSEAS International Conference on Fuzzy Systems, Vancouver, British Columbia, Canada, June 19-21, 2007 126 An Evaluation Model for Determining Insurance Policy Using AHP and Fuzzy

More information

A FUZZY LOGIC APPROACH FOR SALES FORECASTING

A FUZZY LOGIC APPROACH FOR SALES FORECASTING A FUZZY LOGIC APPROACH FOR SALES FORECASTING ABSTRACT Sales forecasting proved to be very important in marketing where managers need to learn from historical data. Many methods have become available for

More information

DEVELOPMENT OF FUZZY LOGIC MODEL FOR LEADERSHIP COMPETENCIES ASSESSMENT CASE STUDY: KHOUZESTAN STEEL COMPANY

DEVELOPMENT OF FUZZY LOGIC MODEL FOR LEADERSHIP COMPETENCIES ASSESSMENT CASE STUDY: KHOUZESTAN STEEL COMPANY DEVELOPMENT OF FUZZY LOGIC MODEL FOR LEADERSHIP COMPETENCIES ASSESSMENT CASE STUDY: KHOUZESTAN STEEL COMPANY 1 MOHAMMAD-ALI AFSHARKAZEMI, 2 DARIUSH GHOLAMZADEH, 3 AZADEH TAHVILDAR KHAZANEH 1 Department

More information

A Fuzzy AHP based Multi-criteria Decision-making Model to Select a Cloud Service

A Fuzzy AHP based Multi-criteria Decision-making Model to Select a Cloud Service Vol.8, No.3 (2014), pp.175-180 http://dx.doi.org/10.14257/ijsh.2014.8.3.16 A Fuzzy AHP based Multi-criteria Decision-making Model to Select a Cloud Service Hong-Kyu Kwon 1 and Kwang-Kyu Seo 2* 1 Department

More information

Decision Making and Evaluation System for Employee Recruitment Using Fuzzy Analytic Hierarchy Process

Decision Making and Evaluation System for Employee Recruitment Using Fuzzy Analytic Hierarchy Process International Refereed Journal of Engineering and Science (IRJES) ISSN (Online) 2319-183X, (Print) 2319-1821 Volume 2, Issue 7 (July 2013), PP.24-31 Decision Making and Evaluation System for Employee Recruitment

More information

Using Analytic Hierarchy Process Method in ERP system selection process

Using Analytic Hierarchy Process Method in ERP system selection process Using Analytic Hierarchy Process Method in ERP system selection process Rima Tamošiūnienė 1, Anna Marcinkevič 2 Abstract. IT and business alignment has become of the strategic importance and the enterprise

More information

Chapter 4 SUPPLY CHAIN PERFORMANCE MEASUREMENT USING ANALYTIC HIERARCHY PROCESS METHODOLOGY

Chapter 4 SUPPLY CHAIN PERFORMANCE MEASUREMENT USING ANALYTIC HIERARCHY PROCESS METHODOLOGY Chapter 4 SUPPLY CHAIN PERFORMANCE MEASUREMENT USING ANALYTIC HIERARCHY PROCESS METHODOLOGY This chapter highlights on supply chain performance measurement using one of the renowned modelling technique

More information

Development of Virtual Lab System through Application of Fuzzy Analytic Hierarchy Process

Development of Virtual Lab System through Application of Fuzzy Analytic Hierarchy Process Development of Virtual Lab System through Application of Fuzzy Analytic Hierarchy Process Chun Yong Chong, Sai Peck Lee, Teck Chaw Ling Faculty of Computer Science and Information Technology, University

More information

SUPPLY CHAIN MANAGEMENT AND A STUDY ON SUPPLIER SELECTION in TURKEY

SUPPLY CHAIN MANAGEMENT AND A STUDY ON SUPPLIER SELECTION in TURKEY SUPPLY CHAIN MANAGEMENT AND A STUDY ON SUPPLIER SELECTION in TURKEY Pelin Alcan, Hüseyin Başlıgil, Melih Coşkun Yildiz Technical University, Besiktas, İstanbul, Turkey Abstract This study mainly focuses

More information

Vendor Evaluation and Rating Using Analytical Hierarchy Process

Vendor Evaluation and Rating Using Analytical Hierarchy Process Vendor Evaluation and Rating Using Analytical Hierarchy Process Kurian John, Vinod Yeldho Baby, Georgekutty S.Mangalathu Abstract -Vendor evaluation is a system for recording and ranking the performance

More information

Introduction to Fuzzy Control

Introduction to Fuzzy Control Introduction to Fuzzy Control Marcelo Godoy Simoes Colorado School of Mines Engineering Division 1610 Illinois Street Golden, Colorado 80401-1887 USA Abstract In the last few years the applications of

More information

Fuzzy Logic Based Revised Defect Rating for Software Lifecycle Performance. Prediction Using GMR

Fuzzy Logic Based Revised Defect Rating for Software Lifecycle Performance. Prediction Using GMR BIJIT - BVICAM s International Journal of Information Technology Bharati Vidyapeeth s Institute of Computer Applications and Management (BVICAM), New Delhi Fuzzy Logic Based Revised Defect Rating for Software

More information

Performance Management for Inter-organization Information Systems Performance: Using the Balanced Scorecard and the Fuzzy Analytic Hierarchy Process

Performance Management for Inter-organization Information Systems Performance: Using the Balanced Scorecard and the Fuzzy Analytic Hierarchy Process Performance Management for Inter-organization Information Systems Performance: Using the Balanced Scorecard and the Fuzzy Analytic Hierarchy Process Y. H. Liang Department of Information Management, I-SHOU

More information

EMPLOYEE PERFORMANCE APPRAISAL SYSTEM USING FUZZY LOGIC

EMPLOYEE PERFORMANCE APPRAISAL SYSTEM USING FUZZY LOGIC EMPLOYEE PERFORMANCE APPRAISAL SYSTEM USING FUZZY LOGIC ABSTRACT Adnan Shaout* and Mohamed Khalid Yousif** *The Department of Electrical and Computer Engineering The University of Michigan Dearborn, MI,

More information

Using Analytic Hierarchy Process (AHP) Method to Prioritise Human Resources in Substitution Problem

Using Analytic Hierarchy Process (AHP) Method to Prioritise Human Resources in Substitution Problem Using Analytic Hierarchy Process (AHP) Method to Raymond Ho-Leung TSOI Software Quality Institute Griffith University *Email:hltsoi@hotmail.com Abstract In general, software project development is often

More information

Comparative Analysis of FAHP and FTOPSIS Method for Evaluation of Different Domains

Comparative Analysis of FAHP and FTOPSIS Method for Evaluation of Different Domains International Journal of Research Studies in Computer Science and Engineering (IJRSCSE) August 2015, PP 58-62 ISSN 2349-4840 (Print) & ISSN 2349-4859 (Online) www.arcjournals.org Comparative Analysis of

More information

Selection of Database Management System with Fuzzy-AHP for Electronic Medical Record

Selection of Database Management System with Fuzzy-AHP for Electronic Medical Record I.J. Information Engineering and Electronic Business, 205, 5, -6 Published Online September 205 in MECS (http://www.mecs-press.org/) DOI: 0.585/ijieeb.205.05.0 Selection of Database Management System with

More information

An Evaluation of Strategic Networking Equipments Using. AHP(Analytic Hierarchy Process)

An Evaluation of Strategic Networking Equipments Using. AHP(Analytic Hierarchy Process) An Evaluation of Strategic Networking Equipments Using AHP(Analytic Hierarchy Process) DaeKyeong Nam, Juseong Kim bnco@etri.re.kr, juskim@etri.re.kr Abstract We analyze the evaluation of strategic networking

More information

Optimization of Fuzzy Inventory Models under Fuzzy Demand and Fuzzy Lead Time

Optimization of Fuzzy Inventory Models under Fuzzy Demand and Fuzzy Lead Time Tamsui Oxford Journal of Management Sciences, Vol. 0, No. (-6) Optimization of Fuzzy Inventory Models under Fuzzy Demand and Fuzzy Lead Time Chih-Hsun Hsieh (Received September 9, 00; Revised October,

More information

A Fuzzy Logic Based Approach for Selecting the Software Development Methodologies Based on Factors Affecting the Development Strategies

A Fuzzy Logic Based Approach for Selecting the Software Development Methodologies Based on Factors Affecting the Development Strategies Available online www.ejaet.com European Journal of Advances in Engineering and Technology, 2015, 2(7): 70-75 Research Article ISSN: 2394-658X A Fuzzy Logic Based Approach for Selecting the Software Development

More information

THE CONSTRUCTION OF THE FIRM S PERFORMANCE EVALUATION MODEL ON OUTSOURCING ACTIVITIES - APPLICATION OF THE FUZZY SYNTHESIS

THE CONSTRUCTION OF THE FIRM S PERFORMANCE EVALUATION MODEL ON OUTSOURCING ACTIVITIES - APPLICATION OF THE FUZZY SYNTHESIS Yugoslav Journal of Operations Research Volume 20 (200), Number, 87-97 0.2298/YJOR00087K THE CONSTRUCTION OF THE FIRM S PERFORMANCE EVALUATION MODEL ON OUTSOURCING ACTIVITIES - APPLICATION OF THE FUZZY

More information

USING THE ANALYTIC HIERARCHY PROCESS (AHP) TO SELECT AND PRIORITIZE PROJECTS IN A PORTFOLIO

USING THE ANALYTIC HIERARCHY PROCESS (AHP) TO SELECT AND PRIORITIZE PROJECTS IN A PORTFOLIO USING THE ANALYTIC HIERARCHY PROCESS (AHP) TO SELECT AND PRIORIZE PROJECTS IN A PORTFOLIO Ricardo Viana Vargas, MSc, IPMA-B, PMP Professor Fundação Getúlio Vargas (FGV) Brasil Professor Fundação Instituto

More information

Research on supply chain risk evaluation based on the core enterprise-take the pharmaceutical industry for example

Research on supply chain risk evaluation based on the core enterprise-take the pharmaceutical industry for example Available online www.jocpr.com Journal of Chemical and Pharmaceutical Research, 2014, 6(6):593-598 Research Article ISSN : 0975-7384 CODEN(USA) : JCPRC5 Research on supply chain risk evaluation based on

More information

Towards applying Data Mining Techniques for Talent Mangement

Towards applying Data Mining Techniques for Talent Mangement 2009 International Conference on Computer Engineering and Applications IPCSIT vol.2 (2011) (2011) IACSIT Press, Singapore Towards applying Data Mining Techniques for Talent Mangement Hamidah Jantan 1,

More information

Proposing an approach for evaluating e-learning by integrating critical success factor and fuzzy AHP

Proposing an approach for evaluating e-learning by integrating critical success factor and fuzzy AHP 2011 International Conference on Innovation, Management and Service IPEDR vol.14(2011) (2011) IACSIT Press, Singapore Proposing an approach for evaluating e-learning by integrating critical success factor

More information

Open Access Research on Application of Neural Network in Computer Network Security Evaluation. Shujuan Jin *

Open Access Research on Application of Neural Network in Computer Network Security Evaluation. Shujuan Jin * Send Orders for Reprints to reprints@benthamscience.ae 766 The Open Electrical & Electronic Engineering Journal, 2014, 8, 766-771 Open Access Research on Application of Neural Network in Computer Network

More information

Measurement Information Model

Measurement Information Model mcgarry02.qxd 9/7/01 1:27 PM Page 13 2 Information Model This chapter describes one of the fundamental measurement concepts of Practical Software, the Information Model. The Information Model provides

More information

ERP SYSTEM SELECTION BY AHP METHOD: CASE STUDY FROM TURKEY

ERP SYSTEM SELECTION BY AHP METHOD: CASE STUDY FROM TURKEY ERP SYSTEM SELECTION BY AHP METHOD: CASE STUDY FROM TURKEY Babak Daneshvar Rouyendegh (Babek Erdebilli) Atılım University Department of Industrial Engineering P.O.Box 06836, İncek, Ankara, Turkey E-mail:

More information

Systems Features Analysis (SFA) and Analytic Hierarchy Process (AHP) in Systems Design and Development

Systems Features Analysis (SFA) and Analytic Hierarchy Process (AHP) in Systems Design and Development Systems Features Analysis (SFA) and Analytic Hierarchy Process (AHP) in Systems Design and Development Felipe P. Vista IV 1, a and Kil To Chong 1, 2, b, * 1 Department of Electronic Engineering, Jeonbuk

More information

ANALYTICAL HIERARCHY PROCESS AS A TOOL FOR SELECTING AND EVALUATING PROJECTS

ANALYTICAL HIERARCHY PROCESS AS A TOOL FOR SELECTING AND EVALUATING PROJECTS ISSN 1726-4529 Int j simul model 8 (2009) 1, 16-26 Original scientific paper ANALYTICAL HIERARCHY PROCESS AS A TOOL FOR SELECTING AND EVALUATING PROJECTS Palcic, I. * & Lalic, B. ** * University of Maribor,

More information

8.1 Summary and conclusions 8.2 Implications

8.1 Summary and conclusions 8.2 Implications Conclusion and Implication V{tÑàxÜ CONCLUSION AND IMPLICATION 8 Contents 8.1 Summary and conclusions 8.2 Implications Having done the selection of macroeconomic variables, forecasting the series and construction

More information

ASSESSMENT OF THE EFFECTIVENESS OF ERP SYSTEMS BY A FUZZY LOGIC APPROACH

ASSESSMENT OF THE EFFECTIVENESS OF ERP SYSTEMS BY A FUZZY LOGIC APPROACH Journal of Information Technology Management ISSN #1042-1319 A Publication of the Association of Management ASSESSMENT OF THE EFFECTIVENESS OF ERP SYSTEMS BY A FUZZY LOGIC APPROACH ZAHIR ALIMORADI SHAHID

More information

INTERNATIONAL JOURNAL FOR ENGINEERING APPLICATIONS AND TECHNOLOGY. Ameet.D.Shah 1, Dr.S.A.Ladhake 2. ameetshah1981@gmail.com

INTERNATIONAL JOURNAL FOR ENGINEERING APPLICATIONS AND TECHNOLOGY. Ameet.D.Shah 1, Dr.S.A.Ladhake 2. ameetshah1981@gmail.com IJFEAT INTERNATIONAL JOURNAL FOR ENGINEERING APPLICATIONS AND TECHNOLOGY Multi User feedback System based on performance and Appraisal using Fuzzy logic decision support system Ameet.D.Shah 1, Dr.S.A.Ladhake

More information

Information Security and Risk Management

Information Security and Risk Management Information Security and Risk Management by Lawrence D. Bodin Professor Emeritus of Decision and Information Technology Robert H. Smith School of Business University of Maryland College Park, MD 20742

More information

Optimized Fuzzy Control by Particle Swarm Optimization Technique for Control of CSTR

Optimized Fuzzy Control by Particle Swarm Optimization Technique for Control of CSTR International Journal of Computer, Electrical, Automation, Control and Information Engineering Vol:5, No:, 20 Optimized Fuzzy Control by Particle Swarm Optimization Technique for Control of CSTR Saeed

More information

Investigation of Adherence Degree of Agile Requirements Engineering Practices in Non-Agile Software Development Organizations

Investigation of Adherence Degree of Agile Requirements Engineering Practices in Non-Agile Software Development Organizations Investigation of Adherence Degree of Agile Requirements Engineering Practices in Non-Agile Software Development Organizations Mennatallah H. Ibrahim Department of Computers and Information Sciences Institute

More information

Methodological Approaches to Evaluation of Information System Functionality Performances and Importance of Successfulness Factors Analysis

Methodological Approaches to Evaluation of Information System Functionality Performances and Importance of Successfulness Factors Analysis Gordana Platiša Neđo Balaban Methodological Approaches to Evaluation of Information System Functionality Performances and Importance of Successfulness Factors Analysis Article Info:, Vol. 4 (2009), No.

More information

Fast Fuzzy Control of Warranty Claims System

Fast Fuzzy Control of Warranty Claims System Journal of Information Processing Systems, Vol.6, No.2, June 2010 DOI : 10.3745/JIPS.2010.6.2.209 Fast Fuzzy Control of Warranty Claims System Sang-Hyun Lee*, Sung Eui Cho* and Kyung-li Moon** Abstract

More information

Optimization of the physical distribution of furniture. Sergey Victorovich Noskov

Optimization of the physical distribution of furniture. Sergey Victorovich Noskov Optimization of the physical distribution of furniture Sergey Victorovich Noskov Samara State University of Economics, Soviet Army Street, 141, Samara, 443090, Russian Federation Abstract. Revealed a significant

More information

COMBINING THE METHODS OF FORECASTING AND DECISION-MAKING TO OPTIMISE THE FINANCIAL PERFORMANCE OF SMALL ENTERPRISES

COMBINING THE METHODS OF FORECASTING AND DECISION-MAKING TO OPTIMISE THE FINANCIAL PERFORMANCE OF SMALL ENTERPRISES COMBINING THE METHODS OF FORECASTING AND DECISION-MAKING TO OPTIMISE THE FINANCIAL PERFORMANCE OF SMALL ENTERPRISES JULIA IGOREVNA LARIONOVA 1 ANNA NIKOLAEVNA TIKHOMIROVA 2 1, 2 The National Nuclear Research

More information

COMPARISON OF AHP AND ANP METHODS FOR RESILIENCE MEASUREMENT IN SUPPLY CHAINS. Pavel WICHER, Radim LENORT

COMPARISON OF AHP AND ANP METHODS FOR RESILIENCE MEASUREMENT IN SUPPLY CHAINS. Pavel WICHER, Radim LENORT COMPARISON OF AHP AND ANP METHODS FOR RESILIENCE MEASUREMENT IN SUPPLY CHAINS Abstract Pavel WICHER, Radim LENORT ŠKODA AUTO University, Na Karmeli 1457, 293 01 Mladá Boleslav, Czech Republic, EU, wicher1@is.savs.cz,

More information

QUANTITATIVE MODEL FOR INFORMATION SECURITY RISK MANAGEMENT

QUANTITATIVE MODEL FOR INFORMATION SECURITY RISK MANAGEMENT QUANTITATIVE MODEL FOR INFORMATION SECURITY RISK MANAGEMENT Rok Bojanc ZZI d.o.o. rok.bojanc@zzi.si Abstract: The paper presents a mathematical model to improve our knowledge of information security and

More information

CASE STUDIES OF USING THE ANALYTIC HIERARCHY PROCESS METHOD IN CORPORATE SOCIAL RESPONSIBILITY AND ENVIRONMENTAL RISK MANAGEMENT

CASE STUDIES OF USING THE ANALYTIC HIERARCHY PROCESS METHOD IN CORPORATE SOCIAL RESPONSIBILITY AND ENVIRONMENTAL RISK MANAGEMENT CASE STUDIES OF USING THE ANALYTIC HIERARCHY PROCESS METHOD IN CORPORATE SOCIAL RESPONSIBILITY AND ENVIRONMENTAL RISK MANAGEMENT Katarína DRIENIKOVÁ, Gabriela HRDINOVÁ, Tomáš NAŇO, Peter SAKÁL Authors:

More information

Segmentation of stock trading customers according to potential value

Segmentation of stock trading customers according to potential value Expert Systems with Applications 27 (2004) 27 33 www.elsevier.com/locate/eswa Segmentation of stock trading customers according to potential value H.W. Shin a, *, S.Y. Sohn b a Samsung Economy Research

More information

A Multi-Criteria Decision-making Model for an IaaS Provider Selection

A Multi-Criteria Decision-making Model for an IaaS Provider Selection A Multi-Criteria Decision-making Model for an IaaS Provider Selection Problem 1 Sangwon Lee, 2 Kwang-Kyu Seo 1, First Author Department of Industrial & Management Engineering, Hanyang University ERICA,

More information

CONTRACTOR SELECTION WITH RISK ASSESSMENT BY

CONTRACTOR SELECTION WITH RISK ASSESSMENT BY CONTRACTOR SELECTION WITH RISK ASSESSMENT BY USING AHP FUZZY METHOD Seyed Ali Tabatabaei Khodadadi 1, B. Dean Kumar 2 ¹Department of Civil Engineering, JNTUH CEH, Hyderabad -500085, India ²Associate Professor

More information

A Study on Software Metrics and Phase based Defect Removal Pattern Technique for Project Management

A Study on Software Metrics and Phase based Defect Removal Pattern Technique for Project Management International Journal of Soft Computing and Engineering (IJSCE) A Study on Software Metrics and Phase based Defect Removal Pattern Technique for Project Management Jayanthi.R, M Lilly Florence Abstract:

More information

Application of Fuzzy Analytic Hierarchy Process in Ranking Modern Educational Systems Success Criteria

Application of Fuzzy Analytic Hierarchy Process in Ranking Modern Educational Systems Success Criteria Application of Fuzzy Analytic Hierarchy Process in Ranking Modern Educational Systems Success Criteria Mohammad Reza Mehregan, Mona Jamporazmey, Mahnaz Hosseinzadeh, and Mohsen Mehrafrouz Abstract by advancing

More information

Short Term Electricity Price Forecasting Using ANN and Fuzzy Logic under Deregulated Environment

Short Term Electricity Price Forecasting Using ANN and Fuzzy Logic under Deregulated Environment Short Term Electricity Price Forecasting Using ANN and Fuzzy Logic under Deregulated Environment Aarti Gupta 1, Pankaj Chawla 2, Sparsh Chawla 3 Assistant Professor, Dept. of EE, Hindu College of Engineering,

More information

RISK ASSESSMENT BASED UPON FUZZY SET THEORY

RISK ASSESSMENT BASED UPON FUZZY SET THEORY RISK ASSESSMENT BASED UPON FUZZY SET THEORY László POKORÁDI, professor, University of Debrecen pokoradi@mfk.unideb.hu KEYWORDS: risk management; risk assessment; fuzzy set theory; reliability. Abstract:

More information

Corresponding Author email: s.esfandi.7@gmail.com

Corresponding Author email: s.esfandi.7@gmail.com International Research Journal of Applied and Basic Sciences 2015 Available online at www.irjabs.com ISSN 2251-838X / Vol, 9 (4): 542-546 Science Explorer Publications Review and Prioritization of the

More information

Tai Kam Fong, Jackie. Master of Science in E-Commerce Technology

Tai Kam Fong, Jackie. Master of Science in E-Commerce Technology Trend Following Algorithms in Automated Stock Market Trading by Tai Kam Fong, Jackie Master of Science in E-Commerce Technology 2011 Faculty of Science and Technology University of Macau Trend Following

More information

Real-time Risk Assessment for Aids to Navigation Using Fuzzy-FSA on Three-Dimensional Simulation System

Real-time Risk Assessment for Aids to Navigation Using Fuzzy-FSA on Three-Dimensional Simulation System http://www.transnav.eu the International Journal on Marine Navigation and Safety of Sea Transportation Volume 8 Number 2 June 2014 DOI: 10.12716/1001.08.02.04 Real-time Risk Assessment for Aids to Navigation

More information

PERFORMANCE MEASUREMENT OF INSURANCE COMPANIES BY USING BALANCED SCORECARD AND ANP

PERFORMANCE MEASUREMENT OF INSURANCE COMPANIES BY USING BALANCED SCORECARD AND ANP PERFORMANCE MEASUREMENT OF INSURANCE COMPANIES BY USING BALANCED SCORECARD AND ANP Ronay Ak * Istanbul Technical University, Faculty of Management Istanbul, Turkey Email: akr@itu.edu.tr Başar Öztayşi Istanbul

More information

Study of Lightning Damage Risk Assessment Method for Power Grid

Study of Lightning Damage Risk Assessment Method for Power Grid Energy and Power Engineering, 2013, 5, 1478-1483 doi:10.4236/epe.2013.54b280 Published Online July 2013 (http://www.scirp.org/journal/epe) Study of Lightning Damage Risk Assessment Method for Power Grid

More information

Chapter 9 Knowledge Management

Chapter 9 Knowledge Management Turban, Aronson, and Liang Decision Support Systems and Intelligent Systems, Seventh Edition Chapter 9 Knowledge Management 9-1 Learning Objectives Define knowledge. Learn the characteristics of knowledge

More information

ENHANCEMENT OF FINANCIAL RISK MANAGEMENT WITH THE AID OF ANALYTIC HIERARCHY PROCESS

ENHANCEMENT OF FINANCIAL RISK MANAGEMENT WITH THE AID OF ANALYTIC HIERARCHY PROCESS ISAHP 2005, Honolulu, Hawaii, July 8-10, 2003 ENHANCEMENT OF FINANCIAL RISK MANAGEMENT WITH THE AID OF ANALYTIC HIERARCHY PROCESS Jerzy Michnik a,b, 1, Mei-Chen Lo c a Kainan University, No.1, Kainan Rd.,

More information

How To Use Data Mining For Knowledge Management In Technology Enhanced Learning

How To Use Data Mining For Knowledge Management In Technology Enhanced Learning Proceedings of the 6th WSEAS International Conference on Applications of Electrical Engineering, Istanbul, Turkey, May 27-29, 2007 115 Data Mining for Knowledge Management in Technology Enhanced Learning

More information

Miracle Integrating Knowledge Management and Business Intelligence

Miracle Integrating Knowledge Management and Business Intelligence ALLGEMEINE FORST UND JAGDZEITUNG (ISSN: 0002-5852) Available online www.sauerlander-verlag.com/ Miracle Integrating Knowledge Management and Business Intelligence Nursel van der Haas Technical University

More information

EVALUATION OF THE EFFECTIVENESS OF ACCOUNTING INFORMATION SYSTEMS

EVALUATION OF THE EFFECTIVENESS OF ACCOUNTING INFORMATION SYSTEMS 49 International Journal of Information Science and Technology EVALUATION OF THE EFFECTIVENESS OF ACCOUNTING INFORMATION SYSTEMS H. Sajady, Ph.D. M. Dastgir, Ph.D. Department of Economics and Social Sciences

More information

Supplier Selection through Analytical Hierarchy Process: A Case Study In Small Scale Manufacturing Organization

Supplier Selection through Analytical Hierarchy Process: A Case Study In Small Scale Manufacturing Organization Supplier Selection through Analytical Hierarchy Process: A Case Study In Small Scale Manufacturing Organization Dr. Devendra Singh Verma 1, Ajitabh pateriya 2 1 Department of Mechanical Engineering, Institute

More information

The Role of Information Technology Studies in Software Product Quality Improvement

The Role of Information Technology Studies in Software Product Quality Improvement The Role of Information Technology Studies in Software Product Quality Improvement RUDITE CEVERE, Dr.sc.comp., Professor Faculty of Information Technologies SANDRA SPROGE, Dr.sc.ing., Head of Department

More information

DETERMINING CONSUMER S CHOICE AMONG VARIOUS INSURANCE POLICIES: AN ANALYTICAL HIERARCHICAL PROCESS APPROACH

DETERMINING CONSUMER S CHOICE AMONG VARIOUS INSURANCE POLICIES: AN ANALYTICAL HIERARCHICAL PROCESS APPROACH DETERMINING CONSUMER S CHOICE AMONG VARIOUS INSURANCE POLICIES: AN ANALYTICAL HIERARCHICAL PROCESS APPROACH Emmanuel Olateju Oyatoye* Department of Business Administration, University of Lagos, Nigeria.

More information

PERFORMANCE MANAGEMENT METHOD FOR CONSTRUCTION COMPANIES

PERFORMANCE MANAGEMENT METHOD FOR CONSTRUCTION COMPANIES 24th International Symposium on on Automation & Robotics in in Construction (ISARC 2007) Construction Automation Group, I.I.T. Madras PERFORMANCE MANAGEMENT METHOD FOR CONSTRUCTION COMPANIES Namho Kim

More information

Leran Wang and Tom Kazmierski {lw04r,tjk}@ecs.soton.ac.uk

Leran Wang and Tom Kazmierski {lw04r,tjk}@ecs.soton.ac.uk BMAS 2005 VHDL-AMS based genetic optimization of a fuzzy logic controller for automotive active suspension systems Leran Wang and Tom Kazmierski {lw04r,tjk}@ecs.soton.ac.uk Outline Introduction and system

More information

Employee Likelihood of Purchasing Health Insurance using Fuzzy Inference System

Employee Likelihood of Purchasing Health Insurance using Fuzzy Inference System www.ijcsi.org 112 Employee Likelihood of Purchasing Health Insurance using Fuzzy Inference System Lazim Abdullah 1 and Mohd Nordin Abd Rahman 2 1 Department of Mathematics, University Malaysia Terengganu,

More information

Decision Making on Project Selection in High Education Sector Using the Analytic Hierarchy Process

Decision Making on Project Selection in High Education Sector Using the Analytic Hierarchy Process Decision Making on Project Selection in High Education Sector Using the Analytic Hierarchy Process Nina Begičević University of Zagreb, Faculty of Organization and Informatics, Pavlinska 2, Varaždin nina.begicevic@foi.hr

More information

Big Data Analysis and the Advantages of Organizational Sustainability Modeling

Big Data Analysis and the Advantages of Organizational Sustainability Modeling The Big Data Analysis for Measuring Popularity in the Mobile Cloud Victor Chang School of Computing, Creative Technologies and Engineering, Leeds Metropolitan University, Headinley, Leeds LS6 3QR, U.K.

More information

MATERIAL PURCHASING MANAGEMENT IN DISTRIBUTION NETWORK BUSINESS

MATERIAL PURCHASING MANAGEMENT IN DISTRIBUTION NETWORK BUSINESS MATERIAL PURCHASING MANAGEMENT IN DISTRIBUTION NETWORK BUSINESS Turkka Kalliorinne Finland turkka.kalliorinne@elenia.fi ABSTRACT This paper is based on the Master of Science Thesis made in first half of

More information

Project Management Efficiency A Fuzzy Logic Approach

Project Management Efficiency A Fuzzy Logic Approach Project Management Efficiency A Fuzzy Logic Approach Vinay Kumar Nassa, Sri Krishan Yadav Abstract Fuzzy logic is a relatively new technique for solving engineering control problems. This technique can

More information

DEVELOPING THE KNOWLEDGE MANAGEMENT SYSTEM BASED ON BUSINESS PROCESS

DEVELOPING THE KNOWLEDGE MANAGEMENT SYSTEM BASED ON BUSINESS PROCESS DEVELOPING THE KNOWLEDGE MANAGEMENT SYSTEM BASED ON BUSINESS PROCESS Sung Ho Jung 1, Ki Seok Lee 1, Young Woong Song 2, Hyoung Chul Lim 3, and Yoon Ki Choi 4 * 1 Ph.D., Candidate, Department of Architectural

More information

Probability Models.S1 Introduction to Probability

Probability Models.S1 Introduction to Probability Probability Models.S1 Introduction to Probability Operations Research Models and Methods Paul A. Jensen and Jonathan F. Bard The stochastic chapters of this book involve random variability. Decisions are

More information

A Multi-attribute Decision Making Approach for Resource Allocation in Software Projects

A Multi-attribute Decision Making Approach for Resource Allocation in Software Projects A Multi-attribute Decision Making Approach for Resource Allocation in Software Projects A. Ejnioui, C. E. Otero, and L. D. Otero 2 Information Technology, University of South Florida Lakeland, Lakeland,

More information

Forecasting of Economic Quantities using Fuzzy Autoregressive Model and Fuzzy Neural Network

Forecasting of Economic Quantities using Fuzzy Autoregressive Model and Fuzzy Neural Network Forecasting of Economic Quantities using Fuzzy Autoregressive Model and Fuzzy Neural Network Dušan Marček 1 Abstract Most models for the time series of stock prices have centered on autoregressive (AR)

More information

Quantitative Inventory Uncertainty

Quantitative Inventory Uncertainty Quantitative Inventory Uncertainty It is a requirement in the Product Standard and a recommendation in the Value Chain (Scope 3) Standard that companies perform and report qualitative uncertainty. This

More information

Maintainability Estimation of Component Based Software Development Using Fuzzy AHP

Maintainability Estimation of Component Based Software Development Using Fuzzy AHP International journal of Emerging Trends in Science and Technology Maintainability Estimation of Component Based Software Development Using Fuzzy AHP Author Sengar Dipti School of Computing Science, Galgotias

More information

Design of Prediction System for Key Performance Indicators in Balanced Scorecard

Design of Prediction System for Key Performance Indicators in Balanced Scorecard Design of Prediction System for Key Performance Indicators in Balanced Scorecard Ahmed Mohamed Abd El-Mongy. Faculty of Systems and Computers Engineering, Al-Azhar University Cairo, Egypt. Alaa el-deen

More information

The Applications of Business Intelligence to the Improvement of Supply Chain Management A Case of an Electronic Company

The Applications of Business Intelligence to the Improvement of Supply Chain Management A Case of an Electronic Company JOURNAL OF SOFTWARE, VOL. 6, NO. 11, NOVEMBER 2011 2173 The Applications of Business Intelligence to the Improvement of Supply Chain Management A Case of an Electronic Company Chwei-Jen Fan Dept. of Information

More information

Random forest algorithm in big data environment

Random forest algorithm in big data environment Random forest algorithm in big data environment Yingchun Liu * School of Economics and Management, Beihang University, Beijing 100191, China Received 1 September 2014, www.cmnt.lv Abstract Random forest

More information

A REVIEW AND CRITIQUE OF HYBRID MADM METHODS APPLICATION IN REAL BUSINESS

A REVIEW AND CRITIQUE OF HYBRID MADM METHODS APPLICATION IN REAL BUSINESS Application in Real Business, 2014, Washington D.C., U.S.A. A REVIEW AND CRITIQUE OF HYBRID MADM METHODS APPLICATION IN REAL BUSINESS Jiri Franek Faculty of Economics VSB-Technical University of Ostrava

More information

Elicitation and Prioritization of Software Requirements

Elicitation and Prioritization of Software Requirements Elicitation and Prioritization of Software Requirements Mohd. Sadiq Computer Engineering Section, University Polytechnic, Faculty of Engineering and Technology Jamia Millia Islamia (A Central University),

More information

Comparison of K-means and Backpropagation Data Mining Algorithms

Comparison of K-means and Backpropagation Data Mining Algorithms Comparison of K-means and Backpropagation Data Mining Algorithms Nitu Mathuriya, Dr. Ashish Bansal Abstract Data mining has got more and more mature as a field of basic research in computer science and

More information

WestminsterResearch http://www.westminster.ac.uk/research/westminsterresearch

WestminsterResearch http://www.westminster.ac.uk/research/westminsterresearch WestminsterResearch http://www.westminster.ac.uk/research/westminsterresearch A web-based hybrid system for blended electronic, mobile and social media marketing planning Shuliang Li Jim Zheng Li School

More information

4 Testing General and Automated Controls

4 Testing General and Automated Controls 4 Testing General and Automated Controls Learning Objectives To understand the reasons for testing; To have an idea about Audit Planning and Testing; To discuss testing critical control points; To learn

More information

Customer Relationship Management based on Increasing Customer Satisfaction

Customer Relationship Management based on Increasing Customer Satisfaction International Journal of Business and Social Science Vol. 5, No. 5; April 2014 Customer Relationship Management based on Increasing Customer Satisfaction Fangfang Tao Management School Shanghai University

More information

Research on the Performance Optimization of Hadoop in Big Data Environment

Research on the Performance Optimization of Hadoop in Big Data Environment Vol.8, No.5 (015), pp.93-304 http://dx.doi.org/10.1457/idta.015.8.5.6 Research on the Performance Optimization of Hadoop in Big Data Environment Jia Min-Zheng Department of Information Engineering, Beiing

More information

Data Mining Algorithms and Techniques Research in CRM Systems

Data Mining Algorithms and Techniques Research in CRM Systems Data Mining Algorithms and Techniques Research in CRM Systems ADELA TUDOR, ADELA BARA, IULIANA BOTHA The Bucharest Academy of Economic Studies Bucharest ROMANIA {Adela_Lungu}@yahoo.com {Bara.Adela, Iuliana.Botha}@ie.ase.ro

More information

Proceedings of the 9th WSEAS International Conference on APPLIED COMPUTER SCIENCE

Proceedings of the 9th WSEAS International Conference on APPLIED COMPUTER SCIENCE Automated Futures Trading Environment Effect on the Decision Making PETR TUCNIK Department of Information Technologies University of Hradec Kralove Rokitanskeho 62, 500 02 Hradec Kralove CZECH REPUBLIC

More information

Implementing A Data Mining Solution To Customer Segmentation For Decayable Products A Case Study For A Textile Firm

Implementing A Data Mining Solution To Customer Segmentation For Decayable Products A Case Study For A Textile Firm Implementing A Data Mining Solution To Customer Segmentation For Decayable Products A Case Study For A Textile Firm Vahid Golmah and Golsa Mirhashemi Department of Computer Engineering, Islamic Azad University,

More information

FORECASTING DEMAND IN THE LOGISTICS MARKET: A CASE STUDY OF LOGISTICS CENTER VRŠAC

FORECASTING DEMAND IN THE LOGISTICS MARKET: A CASE STUDY OF LOGISTICS CENTER VRŠAC FORECASTING DEMAND IN THE LOGISTICS MARKET: A CASE STUDY OF LOGISTICS CENTER VRŠAC Milorad Kilibarda a, Milan Andrejić a*, Mladen Krstić a a University of Belgrade, Faculty of Transport and Traffic Engineering,

More information

A QoS-Aware Web Service Selection Based on Clustering

A QoS-Aware Web Service Selection Based on Clustering International Journal of Scientific and Research Publications, Volume 4, Issue 2, February 2014 1 A QoS-Aware Web Service Selection Based on Clustering R.Karthiban PG scholar, Computer Science and Engineering,

More information

Journal of Engineering Research and Studies

Journal of Engineering Research and Studies Research rticle VENOR SELETION USING NLYTIL HIERRHY PROESS IN SUPPLY HIN MNGEMENT. Elanchezhian 1,. Vijaya Ramnath 2, r. R. Kesavan 3 ddress for orrespondence 1 Research Scholar, epartment of Production

More information

Developing an Integrated Monitoring and Evaluation Flow for Sustainable Investment Projects

Developing an Integrated Monitoring and Evaluation Flow for Sustainable Investment Projects Developing an Integrated Monitoring and Evaluation Flow for Sustainable Investment Projects Florin TACHE 1 ABSTRACT Under the circumstances of certain weaknesses in the monitoring and evaluation processes

More information

Multi-Criteria Task Assignment in Workflow Management Systems

Multi-Criteria Task Assignment in Workflow Management Systems Multi-Criteria Task Assignment in Workflow Management Systems Minxin Shen Gwo-Hshiung Tzeng 2 Duen-Ren Liu 3 3 Institute of Information Management National Chiao Tung University Taiwan {shen dliu}@iim.nctu.edu.tw

More information

BestChoice SRM: A Simple and Practical Supplier Relationship Management System for e-procurement *

BestChoice SRM: A Simple and Practical Supplier Relationship Management System for e-procurement * BestChoice SRM: A Simple and Practical Supplier Relationship Management System for e-procurement * Dongjoo Lee, Seungseok Kang, San-keun Lee, Young-gon Kim, and Sang-goo Lee School of Computer Science

More information

University of Gaziantep, Department of Business Administration

University of Gaziantep, Department of Business Administration University of Gaziantep, Department of Business Administration The extensive use of information technology enables organizations to collect huge amounts of data about almost every aspect of their businesses.

More information

Business Performance Evaluation Model for the Taiwan Electronic Industry based on Factor Analysis and AHP Method

Business Performance Evaluation Model for the Taiwan Electronic Industry based on Factor Analysis and AHP Method Proceedings of the World Congress on Engineering 200 Vol III WCE 200, June 0 - July 2, 200, London, U.K. Business Performance Evaluation Model for the Taiwan Electronic Industry based on Factor Analysis

More information

Factors Affecting The Development of Engineering Consulting Firms

Factors Affecting The Development of Engineering Consulting Firms King Fahad University of Petroleum & Minerals College of Environmental Design Construction Engineering & Management Department Summary of Thesis titled: Factors Affecting The Development of Engineering

More information