1 QUT Digital Repository: CRC for Construction Innovation (2005) Automated Scheduler The Participants of the CRC for Construction Innovation have delegated authority to the CEO of the CRC to give Participants permission to publish material created by the CRC for Construction Innovation. This delegation is contained in Clause 30 of the Agreement for the Establishment and Operation of the Cooperative Research Centre for Construction Innovation. The CEO of the CRC for Construction Innovation gives permission to the Queensland University of Technology to publish the papers/publications provided in the collection in QUT eprints provided that the publications are published in full. Icon.Net Pty Ltd retains copyright to the publications. Any other usage is prohibited without the express permission of the CEO of the CRC. The CRC warrants that Icon.Net Pty Ltd holds copyright to all papers/reports/publications produced by the CRC for Construction Innovation.
2 Automated Scheduler A prototype computer software tool that automatically prepares construction schedules together with a 4D simulation of the construction process from a 3D CAD building model. CRCs bring together researchers from universities, CSIRO and other government laboratories, and private industry or public sector agencies, in long-term collaborative arrangements which support research and development and education activities to achieve real outcomes of national economic, environmental and social significance.
3 An industry need Developing a construction plan is a critical task in the management of construction projects. The preparation of the required plans and schedules is more than a time-consuming process - it also involves significant costs; and sharing and exchange of information and ideas. A collaborative approach from the participants certainly assists the process. In the early stages of a project several plans may be developed to assess alternatives in sequencing, timing and use of resources. During construction, the higher level plans need to be defined at greater levels of detail within the constraints imposed by the initial planning process and the evolution of the process itself. The preparation of these plans using Gantt charts takes a lot of time and the process overall is often error prone because a number of factors need to be considered simultaneously. Tools such as Automated Scheduler can improve both the efficiency of specific projects and of the construction industry overall. What is Automated Scheduler? Automated Scheduler is a prototype software tool that automatically prepares a construction schedule together with a 4D simulation of the construction process from a 3D CAD building model. Information contained within a 3D CAD Building Information Model is exported as Industry Foundation Classes (IFC 1 ) data. This data is used to populate a database. Automated Scheduler uses this data and a set of knowledge rules determining which elements are constructed together, the supporting relations and precedence knowledge, to generate a simple building construction plan. Recipes including construction time and resources are used in the generation of the schedule. Automated Scheduler then prepares the files necessary to show the construction process using Microsoft Project TM, Common Point ( and the Viewer. Automated Scheduler advances beyond existing tools by providing an automated scheduling process, an object-based rule system, and a central database for data sharing and communication with other applications. Automated Scheduler currently covers the following structural elements: beams, columns, slabs, walls and footings. 1 IFCs have been developed by the International Alliance for Interoperability (IAI), a non-profit global alliance of building, construction and software industries with over 650 member organisations in 20 countries. Interoperability enables participants to share common project information across disciplines and technical applications (
4 Benefits of Using Automated Scheduler Likely users of Automated Scheduler Building contractors/subcontractors Architects/Designers Consultants Construction principals Academics/teaching institutions Cost and time savings can be achieved in all planning/scheduling stages The chance of errors is reduced Performance of less-experienced planners is enhanced Teamwork, communication and collaboration among all stakeholders is improved Management processes can be better coordinated Data exchange and feedback becomes more effi cient Visualisation of the construction process enhances understanding and issues identifi cation especially with non-technical people Visualisation may highlight constraints which the client previously had not made explicit.
5 CRC for Construction Innovation Automated Scheduler has been developed by the Cooperative Research Centre (CRC) for Construction Innovation. Construction Innovation is a national research, development and implementation centre focused on the needs of the property, design, construction and facility management sectors. It takes ideas and turns them into collaborative research to produce industry-relevant results for our partners and the whole industry. Partners in progress Automated Scheduler is a collaborative product developed by the CRC for Construction Innovation with project input from by CSIRO, University of Newcastle, Woods Bagot and John Holland Cooperative Research Centre for Construction Innovation 9th Floor, L Block, QUT Gardens Point 2 George Street, Brisbane QLD 4000 Australia [email protected] Web: Contact for further information Project Leader: Mr Robin Drogemuller Telephone: Facsimile: [email protected] Images courtesy of Construction Innovation participants May 2005
Building Information Modelling for FM using IFC
Building Information Modelling for FM using IFC John Mitchell, CQR Pty Ltd, Sydney, email: [email protected], and Hans Schevers, CMIT, CSIRO, Melbourne, email: [email protected] Abstract Facility
National Guidelines for Digital Modelling
National Guidelines for Digital Modelling Construction Innovation partners June 2008 - July 2009 Transport and Main Roads Employment, Economic Development and Innovation National Guidelines for Digital
Final Report Collaboration Platform
Final Report Collaboration Platform Research Project No: 2007-003-EP The research described in this report was carried out by Project Leader Research Leader Team Members Claudelle Taylor Ning Gu Kerry
Adopting BIM for facilities management
Adopting BIM for facilities management Solutions for managing the Sydney Opera House CRC for Construction Innovation participants I N D U S T R Y G O V E R N M E N T Department of Main Roads Department
Executive MBA. One of Australia s top ranked EMBAs for experienced managers. Business School. Brisbane Canberra
Executive MBA One of Australia s top ranked EMBAs for experienced managers Business School Brisbane Canberra What sets QUT s EMBA apart? As a leader you will be challenged on a daily basis to work with
AUTOMATED CONSTRUCTION PLANNING FOR MULTI-STORY BUILDINGS
AUTOMATED CONSTRUCTION PLANNING FOR MULTI-STORY BUILDINGS Tang-Hung Nguyen 1 ABSTRACT This paper outlines a computer-based framework that can assist construction planners and schedulers in automatically
Demonstrate and apply knowledge of project management in
Demonstrate and apply knowledge of project management in mechanical engineering 22918 version 2 Page 1 of 5 Level 6 Credits 15 Purpose This unit standard is intended primarily for use in diploma courses
Release: 1. BSBPMG503A Manage project time
Release: 1 BSBPMG503A Manage project time BSBPMG503A Manage project time Modification History Not applicable. Unit Descriptor Unit descriptor This unit describes the performance outcomes, skills and knowledge
Designing Mobile Apps: A Roadmap for Businesses
Designing Mobile Apps: A Roadmap for Businesses JAMES DELLOW PUBLISHED BY Designing Mobile Apps: A Roadmap for Businesses is published by Ark Group UK/EUROPE OFFICE Ark Conferences Ltd Paulton House 8
COST MANAGEMENT WITH EXPENSES
Welcome to the Eastwood Harris Pty Ltd Primavera P6 Version 7 COST MANAGEMENT WITH EXPENSES Copyright of Eastwood Harris Pty Ltd Page 1 Purpose of the Presentation To demonstrate the Use of Expenses and
A Project Management Toolkit for Occasional Project Managers
A Project Management Toolkit for Occasional Project Managers Gareth RT White University of Glamorgan, University of the West of England The absence of plans removes the period of anxiety which precedes
Mastering Microsoft Project 2013
This three-day, instructor-led course is intended for individuals who are interested in expanding their knowledge base and technical skills about Microsoft Project. The course begins with the basic concepts
A WORKFLOW ANALYSIS FOR BIM SOFTWARE: ARCHITECTURAL AND MECHANICAL ENGINEERING DEPARTMENT OF ARUP TURKEY
ISTANBUL TECHNICAL UNIVERSITY FACULTY OF ARCHITECTURE DEPARTMENT OF DESIGN COMPUTING BIM 2037 / BUILDING INFORMATION MODELS INSTRUCTOR: Salih OFLUOĞLU A WORKFLOW ANALYSIS FOR BIM SOFTWARE: ARCHITECTURAL
ConocoPhillips Australia Business Unit East Indigenous Content and Engagement Strategy January 2014
ConocoPhillips Australia Business Unit East Indigenous Content and Engagement Strategy January 2014 Level 1, 33 Park Road, Milton QLD 4064 PO Box 1243, Milton, QLD 4064 Business 61 (0)7 3182 7302 Facsimile
Mastering Microsoft Project 2013
Course 55054: Mastering Microsoft Project 2013 Page 1 of 9 Mastering Microsoft Project 2013 Course 55054: 2 days; Instructor-Led Introduction This two-day, instructor-led course is intended for individuals
Mastering Microsoft Project 2010
Mastering Microsoft Project 2010 Duration: 2 days Course Description This two-day instructor-led course provides students with the knowledge and skills to plan and manage projects using Microsoft Project
A Controlled Integral Product Model(IPM ) in Building and Construction
A Controlled Integral Product Model(IPM ) in Building and Construction Rob J B Reefman, Sander van Nederveen [email protected], [email protected] AEGOR-ProductdataBank B.V. PO Box
QUT Digital Repository: http://eprints.qut.edu.au/27385
QUT Digital Repository: http://eprints.qut.edu.au/27385 Mian, D., Humphreys, M and Sidwell, A. Construction projects immediate health check : a CSF & KPI approach. In : Project Management Australia Conference
A Building Life-Cycle Information System For Tracking Building Performance Metrics
LBNL-43136 LC-401 Proceedings of the 8 th International Conference on Durability of Building Materials and Components, May 30 - June 3, 1999, Vancouver, BC A Building Life-Cycle Information System For
BIM: FOR PROJECT MANAGERS. 2011 CSI Southwest Region Conference Program 1B 8:45am 11:00am
BIM: FOR PROJECT MANAGERS ANA BAKER BRANDON GARRETT 2011 CSI Southwest Region Conference Program 1B 8:45am 11:00am 1 2 3 4 BIM Overview BIM Level of Development Evolution of the Drawing Process BIM Workflow
PS.12. 4D Scheduling A Case Study
PS.12 4D Scheduling A Case Study Mr. Abhimanyu Basu PE PSP A 4D schedule is a 3 dimensional CAD model How long would it take. attached to the fourth dimension of time via a schedule. The concept of 4D
AC 2011-96: IMPLEMENTING BUILDING INFORMATION MODELING IN CONSTRUCTION ENGINEERING CURRICULA
AC 2011-96: IMPLEMENTING BUILDING INFORMATION MODELING IN CONSTRUCTION ENGINEERING CURRICULA Don Chen, University of North Carolina, Charlotte Professional Preparation Iowa State University, Ames, Iowa
QUT Digital Repository: http://eprints.qut.edu.au/27216
QUT Digital Repository: http://eprints.qut.edu.au/27216 Dong, Andy., Maher, Mary Lou and Daruwala, Yohann. Where the actions are : bring reality into virtual reality. The Participants of the CRC for Construction
Executive Master of Business in Complex Project Management (EMCPM)
Executive Master of Business in Complex Project Management (EMCPM) EMCPM Connect: Part Time Cohort commencing Feb 2013, Brisbane. Skilful leaders of complex projects and programs effectively manage ambiguity,
NE-50413B Mastering Microsoft Project 2010
NE-50413B Mastering Microsoft Project 2010 Summary Duration Vendor 3 Days Microsoft Audience This course is intended for both novice and experienced Project Managers and project support personnel who need
FM as a business enabler
FM as a business enabler Solutions for managing the built environment CRC for Construction Innovation participants I N D U S T R Y G O V E R N M E N T Department of Main Roads Department of Public Works
MASTER CLASS INTEGRATED PROJECT MANAGEMENT SOFTWARE REPORT 2009. Timo Hartmann [email protected]
Technical Paper #5 MASTER CLASS INTEGRATED PROJECT MANAGEMENT SOFTWARE REPORT 2009 Timo Hartmann [email protected] COPYRIGHT 2009 VISICO Center, University of Twente [email protected] Integrated
Audit report VET Quality Framework Continuing registration as a national VET regulator (NVR) registered training organisation
Audit report VET Quality Framework Continuing registration as a national VET regulator (NVR) registered training organisation ORGANISATION DETAILS Organisation s legal name Trading name/s REGIONAL TRAINING
DALIBuildings SQL Server System Administrator Account Management. DALI programming guide
DALIBuildings SQL Server System Administrator Account Management DALI programming guide Copyright information The information in this manual is provided in good faith. Schneider Electric (Australia) Pty
Enterprise Federation through Web Services based Contracts Architecture
Enterprise Federation through Web Services based Contracts Architecture S. Kulkarni, Z. Milosevic, {sachink, zoran}@dstc.edu.au 2002 DSTC Pty Ltd Overview Contracts in e-commerce Support for automated
An Introduction to the PRINCE2 project methodology by Ruth Court from FTC Kaplan
An Introduction to the PRINCE2 project methodology by Ruth Court from FTC Kaplan Of interest to students of Paper P5 Integrated Management. Increasingly, there seems to be a greater recognition of the
Submission to the Queensland Competition Authority. Regulated Retail Electricity Prices 2013-14 Transitional Issues & Cost Components and Other Issues
Submission to the Queensland Competition Authority Transitional Issues & Cost Components and Other Issues January 2013 Queensland Farmers Federation Ltd. A.C.N. 055 764 488 A.B.N. 44 055 764 488 PO Box
Project Management. For Microsoft Dynamics CRM WWW.ABLEBRIDGE.COM
Project Management For Microsoft Dynamics CRM Contents Solution Relationships... 3 Main Menu End User Navigation... 4 Projects... 4 Creating a New Project... 4 Shift Project... 5 Shift Project Task...
How to develop and maintain an OHSAS 180001 Health & Safety Management System faster, better, and smarter
Qudos Management Pty. Ltd. Quality Health & Safety Environmental management 320 Adelaide Street, Brisbane, QLD 4000 Tel: +61 (07) 3010 9259 3 Spring Street, Sydney, NSW 2000 Tel: +61 (02) 8249 4670 Email:
Project Management Tools
Project Management Tools 1 Name: Subject: Professor: Date: Project Management Tools Project Management Tools 2 1. Introduction Project Management is a method of organizing and managing resources in strategic
Dotrid International Training Institute
Dotrid International Training Institute Project Management Course for Donor Funded Projects 14 24 May 2013, Cape Town, South Africa 10 21 June 2013, Cape Town, South Africa 8 19 July 2013, Cape Town, SA
Microsoft Project 2007 Level 1
Microsoft Project 2007 Level 1 One Day Course Course Description You need to gather information about the various tasks involved, resources required to accomplish the tasks, and the overall cost in order
MAJOR LEARNING OUTCOMES ARCHITECTURE AND URBAN PLANNING 1ST CYCLE PROGRAMS GENERAL ACADEMIC PROFILE
MAJOR LEARNING OUTCOMES Faculty: Major: Course level: ARCHITECTURE ARCHITECTURE AND URBAN PLANNING 1ST CYCLE PROGRAMS GENERAL ACADEMIC PROFILE Positioning of major in the study area The major in Architecture
Increasing research data management capability within your university
LIBRARY SERVICES DIVISION OF TECHNOLOGY, INFORMATION AND LEARNING SUPPORT www.library.qut.edu.au LIBRARY SERVICES www.library.qut.edu.au Increasing research data management capability within your university
Thales in Australia and New Zealand
Thales in Australia and New Zealand 2015 CORPORATE PRESENTATION www.thalesgroup.com.au Thales World leader in mission critical systems and solutions Five market sectors Aerospace Space Defence Security
Use project management tools
Use project management tools Overview Using project management tools play a large role in all phases of a project - in planning, implementation, and evaluation. This resource will give you a basic understanding
QUT Digital Repository: http://eprints.qut.edu.au/ This is the author version published as:
QUT Digital Repository: http://eprints.qut.edu.au/ This is the author version published as: Jordan, Graham and Kumar, Arun and Koronios, Andy (2009) Service driven asset management. In: Proceedings of
PROJECT MANAGEMENT. Project Management Essentials Techniques for achieving 80% results with 20% effort
PROJECT MANAGEMENT Techniques for achieving 80% results with 20% effort 14 & 15 October 1 & 2 November Maximising Productivity and Efficiency in a Multi-Project Environment 8 & 9 November 18 & 19 November
Understanding and Improving Customer Focus
Understanding and Improving Customer Focus How customer focus can help sustain and grow your organisation Module 1: Introduction to Customer Focus Last updated: December 2013 For more information and details
Building Information Modeling (BIM) Requirements for PT Projects Today s Capabilities for a BIM based Design
Building Information Modeling (BIM) Requirements for PT Projects Today s Capabilities for a BIM based Design Florian Aalami CEO ADAPT Corporation [email protected] What is BIM? The ability to model
BIM and API Extensions
REVIT BUILDING INFORMATION MODELING BIM and API Extensions This whitepaper explains how the utility of BIM solutions such as Revit Structure software can be broadened through the use of specialized software
Development of an Automated Tool for Demand Forecasting in Unitywater
Development of an Automated Tool for Demand Forecasting in Unitywater Ken Goraya Unitywater Bradley Rasmussen Sizztech Pty Ltd 2013 Asia Pacific Water Industry Modelling Conference Brisbane (4-5 September,
Developing 6D BIM Energy Informatics for GDL LEED IFC Model Elements
Proceedings of the 2012 International Conference on Industrial Engineering and Operations Management Istanbul, Turkey, July 3 6, 2012 Developing 6D BIM Energy Informatics for GDL LEED IFC Model Elements
Mastering Microsoft Project 2010 50413B; 3 days, Instructor-led
Mastering Microsoft Project 2010 50413B; 3 days, Instructor-led Course Description This three-day instructor-led course provides students with the knowledge and skills plan and manage projects using Microsoft
Mastering Microsoft Project 2013 Course: 55054A Course Length: 3 Days
3 Riverchase Office Plaza Hoover, Alabama 35244 Phone: 205.989.4944 Fax: 855.317.2187 E-Mail: [email protected] Web: www.discoveritt.com Mastering Microsoft Project 2013 Course: 55054A Course Length:
Better planning and forecasting with IBM Predictive Analytics
IBM Software Business Analytics SPSS Predictive Analytics Better planning and forecasting with IBM Predictive Analytics Using IBM Cognos TM1 with IBM SPSS Predictive Analytics to build better plans and
Introduction to Software Engineering. 9. Project Management
Introduction to Software Engineering 9. Project Management Roadmap > Risk management > Scoping and estimation > Planning and scheduling > Dealing with delays > Staffing, directing, teamwork 2 Literature
Enterprise Portfolio Management
Enterprise Portfolio Management Managing large volumes of structured data Through its powerful capabilities as a structural modeling tool, ABACUS Summary provides of whitepaper a ready-to-go Summary solution
Welcome to the Eastwood Harris Pty Ltd Primavera P6 Version 7 COST MANAGEMENT WITH EXPENSES
Welcome to the Eastwood Harris Pty Ltd Primavera P6 Version 7 COST MANAGEMENT WITH EXPENSES Copyright of Eastwood Harris Pty Ltd Update 18 September 2011 Page 1 Purpose of the Presentation Companies often
ARTEMIS VIEWS ADVANCED PLANNING. With ProjectView
ARTEMIS VIEWS ADVANCED PLANNING With ProjectView ADVANCED PLANNING Advanced Planning is a powerful role-based project and resource management application. Designed for project managers, project planners
The power to consider all of your organization s projects and investments in terms of the common objective: Achieving your business goals.
The power to consider all of your organization s projects and investments in terms of the common objective: Achieving your business goals Mariner by As one of the earliest and largest users of Mariner
MICROSOFT OFFICE PROJECT - SYLLABUS
MICROSOFT OFFICE PROJECT - SYLLABUS Sessions Session 1 Description 1. INTRODUCTION a. Introduction to CADFORUM and PPM b. Project c. Examples of project d. Project Triangle e. Project Management f. Life
Customer Journey Mapping
Customer Journey Mapping John Sabatino, CEO, TMI Australia Pty Ltd Native American Indian proverb quotes To understand the man you must first walk a mile in his moccasins. What is a Customer Journey Map?
Copyright 2013 wolfssl Inc. All rights reserved. 2
- - Copyright 2013 wolfssl Inc. All rights reserved. 2 Copyright 2013 wolfssl Inc. All rights reserved. 2 Copyright 2013 wolfssl Inc. All rights reserved. 3 Copyright 2013 wolfssl Inc. All rights reserved.
NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES www.nicet.org 888-476-4238. Fire Alarm Systems
Fire Alarm Systems Level IV Content Outline Standard Model/CBT The skills and knowledge listed under each task are suggestive of those involved in that task, but are not intended to constitute an exhaustive
ESPRIT 29938 ProCure. ICT at Work for the LSE ProCurement Chain:
ESPRIT 29938 ProCure ICT at Work for the LSE ProCurement Chain: Putting Information Technology & Communications Technology to work in the Construction Industry The EU-funded ProCure project was designed
Selecting a Content Management System
9 9 SELECTING A CONTENT MANAGEMENT SYSTEM Selecting a Content Management System Better Practice Checklist Practical guides for effective use of new technologies in Government www.agimo.gov.au/checklists
Designing Mobile Apps: A Roadmap for Businesses
Designing Mobile Apps: A Roadmap for Businesses James Dellow Published by Designing Mobile Apps: A Roadmap for Businesses is published by Ark Group UK/EUROPE OFFICE Ark Conferences Ltd Paulton House 8
How To Comply With The Telecommunications Consumer Protection Code
Applied VoIP Pty Ltd Telecommunications Consumer Version 1.0 October 1, 2012 Telecommunications Consumer Part 1 General Terms and Objectives Objectives of this Policy This plan sets out the general principles
Seven steps to effective board and director evaluations
COMPANY SECRETARY Seven steps to effective board and director evaluations By Geoffrey Kiel, Professor, University of Queensland; Founder and Chairman, Competitive Dynamics Pty Ltd; and James Beck, Managing
Building Models and Effects Using IFC Model Servers
Aalborg Universitet Use of IFC Model Servers - Modelling Collaboration Possibilities in Practice Jørgensen, Kaj Asbjørn; Skauge, Jørn; Christiansson, Per Lennart; Svidt, Kjeld; Pedersen, Kristian Birch;
Use of IFC Model Servers
Aalborg University Department of Production Department of Civil Engineering Aarhus School of Architecture Department of Building Design Use of IFC Model Servers Modelling Collaboration Possibilities in
LECTURE 11 INTRODUCTION TO STRATEGIC MANAGEMENT ACCOUNTING
LECTURE 11 INTRODUCTION TO STRATEGIC MANAGEMENT ACCOUNTING Deficiencies of Traditional Management Accounting Thus far covered cost accounting referred to as traditional management accounting techniques.
Implementing Resource Scheduling Techniques
Implementing Resource Scheduling Techniques A Guide for Planners and Scheduler s By Raphael M Düa FAICD, MACS(Snr),PCP, CP, GradDISC Owner & CEO Micro Planning International Asia Pacific Pty Ltd Micro
General Comparison between 4D Software
General Comparison between 4D Software (Navisworks, Synchro professional, Vico control, itwo and Navigator) Comparison between 4D Software 4D BIM is the next generation of project management, including
A PROPOSED CONSTRUCTION DESIGN CHANGE MANAGEMENT TOOL TO AID IN MAKING INFORMED DESIGN DECISIONS
A PROPOSED CONSTRUCTION DESIGN CHANGE MANAGEMENT TOOL TO AID IN MAKING INFORMED DESIGN DECISIONS H.Hindmarch 1, A.W.Gale 1 and R.E.Harrison 2 1 Department of Mechanical, Aerospace and Civil Engineering,
INTEROPERABILITY OF BUILDING INFORMATION: MYTH OR REALITY?
INTEROPERABILITY OF BUILDING INFORMATION: MYTH OR REALITY? Dr. Guillermo Aranda-Mena and Prof. Ron Wakefield School of Property, Construction and Project Management RMIT University GPO Box 2476V Melbourne,
ECDL. European Computer Driving Licence. Project Planning Project Management Software BCS ITQ Level 2. Syllabus Version 1.0
ECDL European Computer Driving Licence Project Planning Project Management Software BCS ITQ Level 2 Using Microsoft Project 2013 Syllabus Version 1.0 This training, which has been approved by BCS, The
Designing and Managing an Intranet
14 14 DESIGNING AND MANAGING AN INTRANET Designing and Managing an Intranet Better Practice Checklist Practical guides for effective use of new technologies in Government www.agimo.gov.au/checklists version
Archived. Designing and Managing an Intranet. Better Practice Checklist. Practical guides for effective use of new technologies in Government
14 14 DESIGNING AND MANAGING AN INTRANET Designing and Managing an Intranet Better Practice Checklist Practical guides for effective use of new technologies in Government www.agimo.gov.au/checklists version
Laboratory 1 Initiating a Project
Laboratory 1 Initiating a Project Outline What is a project? What is project management? Initiating a project. Getting Starting with Project 2007? What Is a Project? A project is an activity that has a
BIM and Project Planning
REVIT BUILDING INFORMATION MODELING BIM and Project Planning This white paper explores how the Revit building information model (BIM) can be linked with project planning systems to enable 4D construction
LONG INTERNATIONAL. Long International, Inc. 10029 Whistling Elk Drive Littleton, CO 80127-6109 (303) 972-2443 Fax: (303) 972-6980
LONG INTERNATIONAL Long International, Inc. 10029 Whistling Elk Drive Littleton, CO 80127-6109 (303) 972-2443 Fax: (303) 972-6980 www.long-intl.com Scott M. Francis, P.E., PSP Table of Contents 1. INTRODUCTION...
2015 WW Australia Training Catalogue
2015 WW Australia Training Catalogue Wonderware Software Solutions for Real-Time Success Wonderware is the market leader in real-time operations management software. Wonderware software solutions enable