1 Product and service design Source: Toyota (GB) plc Product and service design Process design Supply network design Operations strategy Layout and flow Design Operations management Improvement Process technology Product/service design Job design Planning and control 1
2 Why is design so important? UK Design Council Survey Design helps businesses connect strongly with their customers. 90% of businesses growing rapidly say design is significant to them; only 26% of static companies say the same. Design reduces costs by making processes more efficient. It can also reduce the time to market for new products and services. Almost 70% of companies seeing design as integral have developed new products and services in the last three years, compared to only a third of businesses overall. Companies that were effective users of design had financial performances 200% better than average. What is designed in a product or service? A concept The understanding of the nature, use and value of the service or product A package The group of component products and services that provide those benefits defined in the concept A process The way in which the component products and services will be created and delivered 2
3 The product and service is a process in itself Transformed resources, e.g. Technical information Market information Time information Inputs Transforming resources, e.g. Test and design equipment Design and technical staff The product / service design process whose performance is measured by its Quality Speed Dependability Flexibility Cost Outputs Fully specified products and services The stages of product / service design Concept generation Concept screening Preliminary design Evaluation and improvement Prototyping and final design 3
4 Concept generation Ideas from customers formally through marketing activities Listening to customers on a day-to-day basis Ideas from competitor activity for example reverse engineering Ideas from staff especially those who meet customers every day Ideas from research and development Concept screening Broad categories of evaluation criteria for assessing concepts Feasibility how difficult is it? What INVESTMENT, both managerial and financial, will be needed? Criteria for screening concepts Acceptability how worthwhile is it? What RETURN, in terms of benefits to the operation, will it give? Overall evaluation of the concept Vulnerability what could go wrong? What RISKS do we run if things go wrong? 4
5 Design involves progressively reducing the number of possibilities until the final design is reached Choice and evaluation screens CONCEPT Large number of design options Uncertainty regarding the final design TIME One design Certainty regarding the final design FINAL DESIGN SPECIFICATON Preliminary design Component structure for remote mouse LEVEL 0 Remote mouse LEVEL 1 Upper casing Lower casing Control unit Packing LEVEL 2 Moulding Logo Moulding Battery housing Button Spring base Outer Leaflet LEVEL 3 Lead Plug Speaker Cover 5
6 Design evaluation and improvement There are various ways of evaluating preliminary designs These include: - quality function deployment - value engineering - Taguchi methods Prototyping and final design Prototypes are needed so products and services can be tested Prototypes come in various forms: - card models - clay models - computer simulations CAD has considerably simplified the production of prototypes Source: Dyson 6
7 Delays in Time to Market usually cause far longer delays to the financial breakeven point Cash Sales revenue Cash flow Delayed sales revenue Delayed cash flow Development costs Development costs of delayed project Time Delay in Time to Market Delay in financial breakeven Simultaneous arrangement of the stages in the First stage in the Second stage in the First stage in the Third stage in the Second stage in the etc. Third stage in the Communication between stages etc. 7
8 Where should the management attention be? KNOWLEDGE ACQUISITION CONCEPT INVESTIGATION BASIC DESIGN INITIAL TESTS PILOT MANUFACTURING PRODUCTION RAMP-UP LAUNCH ABILITY TO INFLUENCE OUTCOME MANAGEMENT ACTIVITY PROFILE TIME Sorting out problems early saves greater disruption later in the Degree of agreement over design decision and changes in design Low High Early stages of the total Slow Time to Market Fast Time to Market Later stages of the total 8
9 Organization structures for the F.M. F.M. F.M. F.M. F.M. F.M. F.M. F.M. PURE FUNCTIONAL ORGANIZATION PURE PROJECT ORGANIZATION INCREASING PROJECT ORIENTATION F.M. F.M. F.M. F.M. F.M. F.M. F.M. F.M. F.M. F.M. F.M. F.M. F.M. = Functional manager = Project manager Key Terms Test Concept generation A stage in the product and service design process that formalizes the underlying idea behind a product or service. Reverse engineering The taking apart or deconstruction of a product or service in order to understand how it has been produced (often by a competing organization). Research and development (R&D) The function in the organization that develops new knowledge and ideas and operationalizes the ideas to form the underlying knowledge on which product, service and process design are based. 9
10 Key Terms Test Feasibility The ability of an operation to produce a process, product or service. Acceptability The attractiveness to the operation of a process, product or service. Vulnerability The risks taken by the operation in adopting a process, product or service. Key Terms Test Design funnel A model that depicts the design process as the progressive reduction of design options from many alternatives down to the final design. Component (or product) structure A diagram that shows the constituent component parts of a product or service package and the order in which the component parts are brought together (often called a components structure). Standardization The degree to which processes, products or services are prevented from varying over time. 10
11 Key Terms Test Commonality The degree to which a range of products or services incorporate identical components (also called parts commonality). Modularization The use of standardized sub-components of a product or service that can be put together in different ways to create a high degree of variety. Quality function deployment (QFD) A technique used to ensure that the eventual design of a product or service actually meets the needs of its customers (sometimes called house of quality). Key Terms Test Value engineering An approach to cost reduction in product design that examines the purpose of a product or service, its basic functions and its secondary functions. Taguchi methods A design technique that uses design combinations to test the robustness of a design. Virtual prototype A computer-based model of a product, process or service that can be tested for its characteristics before the actual process, product or service is produced. 11
12 Key Terms Test Computer-aided design (CAD) A system that enables designers to create and modify product, service or process drawings on a computer. Interactive design The idea that the design of products and services on one hand, and the processes that create them on the other, should be integrated. Simultaneous (or concurrent) engineering Overlapping the stages in the design process so that one stage in the can start before the preceding stage is finished, the intention being to shorten time to market and save design cost. 12
Product Design. Chapter 5. Product and Service Design. Service Design. An Effective Design Process. Stages In The Design Process
Chapter 5 Product and Service Design Product Design Specifies materials Determines dimensions & tolerances Defines appearance Sets performance standards Service Design Specifies what the customer is to
www.bowers-wilkins.com
English MM- Welcome to Bowers and Wilkins and the MM- Thank you for choosing Bowers & Wilkins. When John Bowers first established our company he did so in the belief that imaginative design, innovative
Requirements Analysis Concepts & Principles. Instructor: Dr. Jerry Gao
Requirements Analysis Concepts & Principles Instructor: Dr. Jerry Gao Requirements Analysis Concepts and Principles - Requirements Analysis - Communication Techniques - Initiating the Process - Facilitated
Model risk mitigation and cost reduction through effective design*
Model Risk Management Group Model risk mitigation and cost reduction through effective design* *connectedthinking pwc Table of contents The heart of the matter...1 What this means for your business...2
A system is a set of integrated components interacting with each other to serve a common purpose.
SYSTEM DEVELOPMENT AND THE WATERFALL MODEL What is a System? (Ch. 18) A system is a set of integrated components interacting with each other to serve a common purpose. A computer-based system is a system
A primer in Entrepreneurship. Chapter 3: Feasibility Analysis
Chapter 3 Feasibilty Analysis Prof. Dr. Institute for Strategy and Business Economics Chapter 3: Feasibility Analysis Table of Contents A. What is feasibility analysis? C. Industry/Market Feasibility D.
Kurt Gaubinger Michael Rabl. Scott Swan Thomas Werani. Innovation and Product. Management. A Holistic and Practica! Approach. to Uncertainty Reduction
Kurt Gaubinger Michael Rabl Scott Swan Thomas Werani Innovation and Product Management A Holistic and Practica! Approach to Uncertainty Reduction ^ Springer Part I Fundamentals of Innovation and Product
System/Data Requirements Definition Analysis and Design
EXECUTIVE SUMMARY This document provides an overview of the Systems Development Life-Cycle (SDLC) process of the U.S. House of Representatives. The SDLC process consists of seven tailored phases that help
PRODUCT DEVELOPMENT BEST PRACTICES AND ASSESSMENT
PRODUCT DEVELOPMENT BEST PRACTICES AND ASSESSMENT Kenneth Crow DRM Associates 310-377-5569 [email protected] BEST PRACTICES Multi-year effort by consortium to identify best practices of product
Agile Projects 7. Agile Project Management 21
Contents Contents 1 2 3 Agile Projects 7 Introduction 8 About the Book 9 The Problems 10 The Agile Manifesto 12 Agile Approach 14 The Benefits 16 Project Components 18 Summary 20 Agile Project Management
Writing a Business Plan. Dr. Michael Entzeroth CSO/COO Cennerv Pharma (S) Pte Ltd, Singapore
Writing a Business Plan Dr. Michael Entzeroth CSO/COO Cennerv Pharma (S) Pte Ltd, Singapore Agenda Reasons for writing a business plan Business plan content Executive Summary The company: description and
Principles of Software Engineering: Software Methodologies. COSI 120b, Spring 2005
Principles of Software Engineering: Software Methodologies COSI 120b, Spring 2005 Overview What are methodologies? The methodologies Traditional Incremental Evolutionary Other Conclusions Way Forward What
EUROPEAN UNION ACCOUNTING RULE 6 INTANGIBLE ASSETS
EUROPEAN UNION ACCOUNTING RULE 6 INTANGIBLE ASSETS Page 2 of 17 I N D E X 1. Objective... 3 2. Scope... 3 3. Definitions... 3 4. Definition of intangible assets... 4 5. Recognition and Measurement... 5
White Paper On Pilot Method Of ERP Implementation
White Paper On Pilot Method Of ERP Implementation Rod Clarke Rod Clarke provides guidance, advice and support to businesses in successfully applying IS/IT in support of their business goals. He brings
IBM FlashSystem and Atlantis ILIO
IBM FlashSystem and Atlantis ILIO Cost-effective, high performance, and scalable VDI Highlights Lower-than-PC cost Better-than-PC user experience Lower project risks Fast provisioning and better management
Installation and setup of remote keyboard for monitoring system Multiscreen 5.x
Installation and setup of remote keyboard for monitoring system Multiscreen 5.x Software module «Stream MultiScreen keyboard configurator» is dedicated to control of Multiscreen 5.x over the local network.
INTRODUCTION TO RAPID PRODUCT DEVELOPMENT (RPD)
INTRODUCTION TO RAPID PRODUCT DEVELOPMENT (RPD) SCHEMATIC REPRESENTATION FOR NEW INTERNATIONAL PRODUCTS DEVELOPMENT The scheme below considers the product design concept, main outlines and shape were defined
COLLEGE OF ENGINEERING
COLLEGE OF ENGINEERING Department of Industrial Engineering and Engineering Management Master of Science in Engineering Management Program Introduction Admission Requirements Program Options Program Goals
VDI 2206 Prof. Dr. Magdy M. Abdelhameed
Course Code: MDP 454, Course Name:, Second Semester 2014 VDI 2206 Mechatronics System Design The mechatronic design methodology is based on a concurrent (instead of sequential) approach to discipline design,
1. Open a web browser and navigate to:
Getting Started: Installing and initial Login 1. Open a web browser and navigate to: 2. Click on the appropriate link for your operating system and install the software according to the on-screen instructions.
Appendix A. About RailSys 3.0. A.1 Introduction
Appendix A About RailSys 3.0 This appendix describes the software system for analysis RailSys used to carry out the different computational experiments and scenario designing required for the research
QPR WorkFlow. Minimize Process Time, Maximize Process Outcome. QPR WorkFlow 1
QPR WorkFlow Minimize Process Time, Maximize Process Outcome QPR WorkFlow 1 QPR WorkFlow: Eliminate the Gap between Process Design and Process Automation Proper management and execution of your operational
Software Process Models. Xin Feng
Software Process Models Xin Feng Questions to Answer in Software Engineering? Questions to answer in software engineering What is the problem to be solved? Definition What are the characteristics of the
Chapter 3. Technology review. 3.1. Introduction
Technology review Chapter 3 3.1. Introduction Previous chapter covers detail description about problem domain. In this chapter I will discuss the technologies currently available to solve a problem in
Remote Support. User Guide 7.23
Remote Support User Guide 7.23 Copyright 1997 2011 Cisco and/or its affiliates. All rights reserved. WEBEX, CISCO, Cisco WebEx, the CISCO logo, and the Cisco WebEx logo are trademarks or registered trademarks
1 INTRODUCTION TO SYSTEM ANALYSIS AND DESIGN
1 INTRODUCTION TO SYSTEM ANALYSIS AND DESIGN 1.1 INTRODUCTION Systems are created to solve problems. One can think of the systems approach as an organized way of dealing with a problem. In this dynamic
About ERP Software Whitepaper
About ERP Software Whitepaper Many people have heard the term ERP used in a conversation but don t fully understand what it means. This whitepaper will provide information about the processes and advantages
Assignment 2: Microsoft Project Toolset. Eric Palmer & Mahindra Bheodari. Kennesaw State University. IS 8100 Spring 2015
Assignment 2: Microsoft Project Toolset 1 Assignment 2: Microsoft Project Toolset Eric Palmer & Mahindra Bheodari Kennesaw State University IS 8100 Spring 2015 Assignment 2: Microsoft Project Toolset 2
STB- 2. Installation and Operation Manual
STB- 2 Installation and Operation Manual Index 1 Unpacking your STB- 2 2 Installation 3 WIFI connectivity 4 Remote Control 5 Selecting Video Mode 6 Start Page 7 Watching TV / TV Guide 8 Recording & Playing
CircumSpect 360 Degree Imaging and Inspection Technology Overview
CircumSpect 360 Degree Imaging and Inspection Technology Overview Prepared by: Machine Vision Consulting, Inc. Contact: Joe Gugliotti 7 Old Towne Way Sturbridge, MA 01518 (978) 551-4160 [email protected]
MCQ on Management Information System. Answer Key
MCQ on Management Information System. Answer Key 1.Management information systems (MIS) 1. create and share documents that support day-today office activities 2. process business transactions (e.g., time
Business Administration (M.B.A.)
Business Administration (M.B.A.) Business Administration Admission Criteria The GMAT or GRE is required unless the applicant holds another master s level degree or advanced degree (e.g., M.D., Pharm.D.)
Agile for Project and Programme Managers
Agile for Project and Programme Managers Author Melanie Franklin Director Agile Change Management Limited Introduction I am involved in a mixture of assignments for different organisations across Europe
Project Time Management
Project Time Management Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Points to Note Please
Evaluation of Nagios for Real-time Cloud Virtual Machine Monitoring
University of Victoria Faculty of Engineering Fall 2009 Work Term Report Evaluation of Nagios for Real-time Cloud Virtual Machine Monitoring Department of Physics University of Victoria Victoria, BC Michael
UC 123 Smart Classroom
UC 123 Smart Classroom Hopefully everything you need to know to use this room UC 123 Smart Classroom Features available: 1. Desktop computer or plug in your laptop 2. Touchscreen AV controls 3. Front and
Unprecedented Performance and Scalability Demonstrated For Meter Data Management:
Unprecedented Performance and Scalability Demonstrated For Meter Data Management: Ten Million Meters Scalable to One Hundred Million Meters For Five Billion Daily Meter Readings Performance testing results
The Application Readiness Level Metric
The Application Readiness Level Metric NASA Application Readiness Levels (ARLs) The NASA Applied Sciences Program has instituted a nine-step Application Readiness Level (ARL) index to track and manage
Ensuring Reliability in Lean New Product Development. John J. Paschkewitz, P.E., CRE
Ensuring Reliability in Lean New Product Development John J. Paschkewitz, P.E., CRE Overview Introduction and Definitions Part 1: Lean Product Development Lean vs. Traditional Product Development Key Elements
CAD and Creativity. Contents
CAD and Creativity K C Hui Department of Automation and Computer- Aided Engineering Contents Various aspects of CAD CAD training in the university and the industry Conveying fundamental concepts in CAD
Project Scheduling: PERT/CPM
Project Scheduling: PERT/CPM CHAPTER 8 LEARNING OBJECTIVES After completing this chapter, you should be able to: 1. Describe the role and application of PERT/CPM for project scheduling. 2. Define a project
Why you need an Automated Asset Management Solution
solution white paper Why you need an Automated Asset Management Solution By Nicolas Renard, Support and Professional Services Manager, BMC France Table of Contents 1 OVERVIEW Automated Asset Discovery
The preliminary design of a wearable computer for supporting Construction Progress Monitoring
The preliminary design of a wearable computer for supporting Construction Progress Monitoring 1 Introduction Jan Reinhardt, TU - Dresden Prof. James H. Garrett,Jr., Carnegie Mellon University Prof. Raimar
TWIN-TURBINE CENTRIFUGAL COMPRESSOR
TWIN-TURBINE CENTRIFUGAL COMPRESSOR SERVICE MONITORING TOOLS QUICK START GUIDE October 2013 This Page Left Intentionally Blank Table of Contents 1 Service Monitoring Tools Quick Start... 4 1.1 Compatibility
ENOVIA SmarTeam Engineering Express
TechniCom 179-9 Rte 46W #175 Rockaway, NJ 07866 www.technicom.com ENOVIA SmarTeam Engineering Express: A review by TechniCom June 2008 Author: Raymond Kurland, TechniCom Group Background Introduction In
Systems Analysis and Design in a Changing World, Fifth Edition
Systems Analysis and Design in a Changing World, Fifth Edition Learning Objectives Explain the elements of project management and the responsibilities of a project manager Explain project initiation and
INSTRUCTIONS Please read all instructions carefully before using
Car Multimedia System XM-2DTSB79 AUX IR MIC RESET USB INSTRUCTIONS Please read all instructions carefully before using Touch calibration If touch calibration error occurs, you can adjust the touch coordinate
Interlocking Door Systems Automatically protecting your staff and property
Interlocking Door Systems Automatically protecting your staff and property The Electro Automation Group is widely regarded as Ireland s premier automation specialist. Formed in Dublin in 1984, Electro
Oracle Database 12c. Andy Mendelsohn. Senior Vice President, Oracle Database Server Technologies
Oracle Database 12c Andy Mendelsohn Senior Vice President, Oracle Database Server Technologies 1 Safe Harbor Statement "Safe Harbor" Statement: Statements in this presentation relating to Oracle's future
PROJECT TIME MANAGEMENT
6 PROJECT TIME MANAGEMENT Project Time Management includes the processes required to ensure timely completion of the project. Figure 6 1 provides an overview of the following major processes: 6.1 Activity
Enterprise Information Systems
Enterprise Information Systems Dr Sherif Kamel Department of Management School of Business, Economics and Communication Enterprise Information Systems DSS to provide enterprise-wide support Support to
The structure of accounting systems: how to store accounts Lincoln Stoller, Ph.D.
The structure of accounting systems: how to store accounts Lincoln Stoller, Ph.D. balances In my most recent article I considered the simplest accounting system consisting of a single file of general ledger
Bob Jones Technical Director [email protected]
Bob Jones Technical Director [email protected] CERN - August 2003 EGEE is proposed as a project to be funded by the European Union under contract IST-2003-508833 EGEE Goal & Strategy Goal: Create a wide
Simple Invoicing Desktop Database with MS Access 2013. c 2015 by David W. Gerbing School of Business Administration Portland State University
Simple Invoicing Desktop Database with MS Access 2013 c 2015 by David W. Gerbing School of Business Administration Portland State University July 2, 2015 CONTENTS 1 Contents 1 Create a New Database 1 2
Quick Start Guide. WAP371 Wireless AC/N Dual Radio Access Point with Single Point Setup Quick Start Guide. Cisco Small Business
Quick Start Guide Cisco Small Business WAP371 Wireless AC/N Dual Radio Access Point with Single Point Setup Quick Start Guide Versión en Español para México en el CD Version en français sur CD Versione
Downloading <Jumping PRO> from www.vola.fr-------------------------------------------- Page 2
Downloading from www.vola.fr-------------------------------------------- Page 2 Installation Process on your computer -------------------------------------------- Page 5 Launching
Introducing XERA TM POS
Introducing XERA TM POS Flexibility is one of the ultimate goals of any hospitality point of sale software solution on the market. Technology XERA TM enables modern hospitality software solutions to achieve
Engineering Change Management (ECM)
Engineering Change Management (ECM) RECOMMENDATION Engineering Change Order (ECO) PSI 3-2 (Draft) Version 0.9 ABSTRACT ProSTEP ivip Recommendation Abstract This Recommendation documents the ECO (Engineering
Production and Operations Management
Production and Operations Management Norman Gaither Greg Frazier 1996 Wadsworth Publishing Company Chapter 1 Production and Operations Management (POM): An Introduction Overview Introduction Factors Affecting
Lean Enablers for Managing Engineering Programs Presentation at the NDIA Program Management Systems Committee August 15 2012
Lean Enablers for Managing Engineering Programs Presentation at the NDIA Program Management Systems Committee August 15 2012 Josef Oehmen http://lean.mit.edu For Public Release Created by Josef Oehmen,
ACP ThinManager Tech Notes Troubleshooting Guide
ACP ThinManager Tech Notes Troubleshooting Guide Use the F1 button on any page of a ThinManager wizard to launch Help for that page. Visit www.thinmanager.com/technotes/ to download the manual, manual
MoneyView Online Check Deposit USER GUIDE
MoneyView Online Check Deposit USER GUIDE In MoneyView Online, one of the menu options is Remote Deposit. With this service, you can deposit a check to your PVFCU checking account by using either a scanner
OPC COMMUNICATION IN REAL TIME
OPC COMMUNICATION IN REAL TIME M. Mrosko, L. Mrafko Slovak University of Technology, Faculty of Electrical Engineering and Information Technology Ilkovičova 3, 812 19 Bratislava, Slovak Republic Abstract
The trouble with KPIs - A stepby-step guide to managing Key
The trouble with KPIs - A stepby-step guide to managing Key Performance Indicators Field ServiceWhitepaper Introduction This document presents some simple ideas that we hope will help you manage your business
Using a USB Flash Drive to Back Up Your Data Files on a Windows Computer
Using a USB Flash Drive to Back Up Your Data Files on a Windows Computer Your GWU-provided flash drive has a storage capacity of 1 GB and is provided as a means for you to back up data files, including
SNMP Manager User s Manual
SNMP Manager User s Manual Table of Contents 1. Introduction...2 2. SNMP Manager Install, Quick Start and Uninstall...2 2.1. Software Installation...2 2.2. Software Quick Start...2 2.3. Software Uninstall...2
PROJECT RISK MANAGEMENT
PROJECT RISK MANAGEMENT DEFINITION OF A RISK OR RISK EVENT: A discrete occurrence that may affect the project for good or bad. DEFINITION OF A PROBLEM OR UNCERTAINTY: An uncommon state of nature, characterized
Build (develop) and document Acceptance Transition to production (installation) Operations and maintenance support (postinstallation)
It is a well-known fact in computer security that security problems are very often a direct result of software bugs. That leads security researches to pay lots of attention to software engineering. The
THIS Target Market. SECTION Marketing. SHOULD Operations. NOT Finance
BUSINESS PLAN Title page Executive summary Table of contents (with page numbers) Promoters/Management Product/Service THIS Target Market SECTION Marketing SHOULD Operations NOT Finance BE Capital requirements
CHAPTER 9. DEVELOPING IT SY STEM S Bringing IT System s to Life
CHAPTER 9 DEVELOPING IT SY STEM S Bringing IT System s to Life 9-2 Introduction Every Organization Is Using Information Technology But IT systems don t magically appear. Organizations spend billions of
Trans-Soft Datacenter Administration Guide
Trans-Soft Datacenter Administration Guide Copyright 2009 Trans-Soft, Inc. Introduction We would like to take a moment and welcome you the Trans-Soft Datacenter. We appreciate your business and are dedicated
Setting up for Adobe Connect meetings
Setting up for Adobe Connect meetings When preparing to lead a live lecture or meeting, you probably ensure that your meeting room and materials are ready before your participants arrive. You run through
Test Run Analysis Interpretation (AI) Made Easy with OpenLoad
Test Run Analysis Interpretation (AI) Made Easy with OpenLoad OpenDemand Systems, Inc. Abstract / Executive Summary As Web applications and services become more complex, it becomes increasingly difficult
Software Development Kit
Open EMS Suite by Nokia Software Development Kit Functional Overview Version 1.3 Nokia Siemens Networks 1 (21) Software Development Kit The information in this document is subject to change without notice
An introduction to Cryptosoft
An introduction to Cryptosoft Seamless end-to-end data centric security for every IoT ecosystem Cryptosoft is building trust in the Internet of Things and M2M by simplifying the processes that a company
This presentation introduces you to the Decision Governance Framework that is new in IBM Operational Decision Manager version 8.5 Decision Center.
This presentation introduces you to the Decision Governance Framework that is new in IBM Operational Decision Manager version 8.5 Decision Center. ODM85_DecisionGovernanceFramework.ppt Page 1 of 32 The
SYMBOL MC9060 HAND HELD TERMINAL USER MANUAL
SYMBOL MC9060 HAND HELD TERMINAL USER MANUAL CORPORATE VERSION FEBRUARY 2007 TABLE OF CONTENTS Welcome... 3 Getting Started... 3 Equipment Setup... 3 Battery Installation... 4 About the Stylus... 5 Aligning
Administering and Managing Log Shipping
26_0672329565_ch20.qxd 9/7/07 8:37 AM Page 721 CHAPTER 20 Administering and Managing Log Shipping Log shipping is one of four SQL Server 2005 high-availability alternatives. Other SQL Server 2005 high-availability
Guidelines for a risk management methodology for product design
Guidelines for a risk management methodology for product design Viviane Vasconcellos Ferreira Federal University of Santa Catarina [email protected] André Ogliari Federal University of Santa Catarina
Go to Tools General Ledger Setup Ledger Codes and Tab 5: Ledger Codes
Debit Card Functionality in FMS6 The SIMS Spring 2015 release introduced functionality to assist schools to record the use of debit cards to pay for goods and services. Prior to this release, payments
Planning Software. Planning Software. Planning software for electrical installations in concrete construction. www.kaiser-elektro.
Planning Software Planning Software. Planning software for electrical installations in concrete construction. 1 K.sys Planning Software Contents 1. 1.1. 1.2. 1.3. 2. 2.1. 2.2. 2.3 3. 3.1. 3.2. 3.3. 4.
Procurement Routes. Curtin University of Technology
Procurement Routes An Overview Curtin University of Technology Overview of Principal Routes Traditional / conventional design led Design and construct Management (Fee) Traditional Client appoints consultants
Vine Server. v3.1. Manual
Vine Server v3.1 Manual Copyright 2009 TestPlant Inc. Vine Server Manual Trademarks Vine, Vine Viewer, Vine Server, the Vine logo, TestPlant, and the TestPlant logo are trademarks or registered trademarks
50% task time estimate A task time estimate that has a 50% probability of being achieved.
1 2 nd edition CC terms 50% task time estimate A task time estimate that has a 50% probability of being achieved. Perspective: The distribution of task times is generally viewed as an asymmetrical positive
How to Prepare for the Upgrade to Microsoft Dynamics CRM 2013 (On-premises)
How to Prepare for the Upgrade to Microsoft Dynamics CRM 2013 (On-premises) COMPANY: Microsoft Corporation RELEASED: September 2013 VERSION: 1.0 Copyright This document is provided "as-is". Information
How to Upload and Caption Videos on YouTube
How to Upload and Caption Videos on YouTube Criteria: Must have a gmail account to upload a video Video Sign In: Launch YouTube.com Click on Sign In and login with your gmail account and password Uploading
Successful Projects Begin with Well-Defined Requirements
Successful Projects Begin with Well-Defined Requirements Defining requirements clearly and accurately at the outset speeds software development processes and leads to dramatic savings. Executive Summary