Defra/Environment Agency Flood and Coastal Defence R&D Programme
|
|
|
- Shavonne Preston
- 10 years ago
- Views:
Transcription
1 Defra/Environment Agency Flood and Coastal Defence R&D Programme Benchmarking Hydraulic River Modelling Software Packages Results L (Contraction & Expansion) R&D Technical Report: W5-105/TR2L
2 TECHNICAL REPORT W5-105/TR2L
3 Defra/Environment Agency Flood and Coastal Defence R&D Programme BENCHMARKING HYDRAULIC RIVER MODELLING SOFTWARE PACKAGES Results Test L (Contraction and Expansion) R&D Technical Report: W5-105/TR2L RA Crowder, AT Pepper, C Whitlow, A Sleigh, N Wright, C Tomlin Research Contractor: Bullen Consultants TECHNICAL REPORT W5-105/TR2L
4 Publishing organisation Environment Agency, Rio House, Waterside Drive, Aztec West, Almondsbury, Bristol, BS32 4UD Tel: +44 (0) Fax: +44 (0) Web: Environment Agency June 2004 ISBN: The Environment Agency will waive its normal copyright restrictions, and allow this document (or other item), excluding the logo to be reproduced free of licence or royalty charges in any form, provided that it is reproduced unaltered in its entirety and its source acknowledged as Environment Agency copyright. This waiver is limited to this document (or other item) and is not applicable to any other Environment Agency copyright material, unless specifically stated. The Environment Agency accepts no responsibility whatever for the appropriateness of any intended usage of the document, or for any conclusions formed as a result of its amalgamation or association with any other material. The views expressed in this document are not necessarily those of Defra or the Environment Agency. Its officers, servants or agents accept no liability whatsoever for any loss or damage arising from the interpretation or use of the information, or reliance on views contained herein. Dissemination Status Internal: Released to Regions and Areas External: Released to Public Domain Statement of use This document provides the results and findings from undertaking the Environment Agency s Benchmarking Test L (Contraction and Expansion) for hydraulic river modelling software. The results only relate to the ISIS, MIKE 11 and HEC-RAS software packages and inference to the likely performance to other software packages should not be made. The findings are intended to be a supplementary resource for Defra and Agency staff, research contractors and consultants, academics and students for assessing the applicability of any one of these software packages for their own modelling requirements. This report should not be considered in isolation and should be read in conjunction with the other tests reports produced as part of this R&D project. Keywords Hydraulic Modelling, River Modelling, Benchmarking, Test Specifications, Contraction and Expansion, Dam Failure Research Contractor This document was produced under R&D Project W5-105 by: Bullen Consultants Ltd, 11/12 Eldon Place, Bradford, West Yorkshire, BD1 3AZ Tel: +44 (0) Fax: +44 (0) Web: Contractor s Project Manager: Dr Richard Crowder Halcrow Group Ltd, Arndale House, Headingly, Leeds, West Yorkshire LS6 2UL Tel: +44 (0) Fax: +44 (0) Web: Environment Agency's Project Manager The Environment Agency's Project Manager: Mr Andrew Pepper, ATPEC Ltd, External Advisor to Engineering Theme Further copies of this report are available from the Environment Agency s Publications Catalogue. TECHNICAL REPORT W5-105/TR2L Product Code SCHO0305BIXZ-E-P
5 EXECUTIVE SUMMARY The test is an extreme investigation of the capabilities of the software packages due to the nature of the hydraulic condition and the scale of the study. As a result several notable nuances between the software packages have been highlighted. Due to the small time step required in order to obtain a solution for the test HEC-RAS has returned a no result for the test, as it is limited to a minimum time step of 1 second. However, it is acknowledged that HEC-RAS may well be able to model this situation if more real life prototype scaling had been used. The results from ISIS are inconclusive due to notable instabilities in the calculated water levels; however, the final calculated depth of water produced by ISIS at the downstream measuring station is exactly equal to that produced in MIKE 11. In comparison to ISIS, MIKE 11 has been shown to be more flexible in the choice of initial conditions and in the value for the implicit weighting factor used in the numerical scheme. This may suggest that the numerical scheme adopted by MIKE 11 may be more robust than that employed by ISIS for conditions where there are significant/extreme velocity or water level changes. Only MIKE 11 was able to produce stable solutions for the dam-break progressive wave; however, the results calculated by this solution were not truly representative of the problem. The calculated water levels for MIKE 11 show a delay in the arrival time of the initial surge wave, which was also an observation of the results of the two-dimensional models used to model the same dam-break in the original CADAM project. The test has not extensively attempted to improve on model accuracy through the refinement of the calculation settings and options. Hence, it is anticipated that the software packages are capable of producing results that have greater accuracy and stability then presented herein. It is recommended that any future testing should attempt to find the most appropriate and improved settings for this test and tests of this nature. The modelling approach required for this test has not provided a true real life test of the software packages, hence it is recommended that the test specification be enhanced and added to so as to consider a more real-life prototype situation. TECHNICAL REPORT W5-105/TR2L i
6 TECHNICAL REPORT W5-105/TR2L ii
7 CONTENTS EXECUTIVE SUMMARY i 1 Introduction Background Aim of Test The CADAM Project The CADAM Laboratory Configuration 2 2 Model Build Test Configuration Initial Conditions 5 3 Running The Model Introduction Running the Model in ISIS Running the Model in MIKE Results Introduction Analysis of MIKE 11 Results Applied Bed Friction, Manning s n = Analysis of ISIS Results Applied Bed Friction, Manning s n = Analysis of Applied Bed Friction with MIKE 11 (Chézy C = 70) 13 5 Discussion and Conclusions 15 6 Recommendations 17 7 References 19 Appendices Appendix A Results List of Figures Figure 1.1 Schematic Diagram of Channel with Local Constriction (m) Figure 2.1: Schematic Illustration of Test Configuration Figure 2.2 Initial water levels at time = 0.00s (from analytical solution) Figure 2.3 Initial water levels at time = 1.00s (from analytical solution) Figure 2.4 Initial water levels at time = 3.35s (from analytical solution) Figure 2.5 MIKE 11 water levels at 2.0s (from initial conditions for no wave development) Figure 3.1 Water surface profile in ISIS at approximately 3.0s Figure 3.2 Water surface profile in MIKE 11 at approximately 3.0s TECHNICAL REPORT W5-105/TR2L iii
8 TECHNICAL REPORT W5-105/TR2L iv
9 1 INTRODUCTION 1.1 Background This report presents the results and findings from Test L (Contraction and Expansion) of the Environment Agency of England and Wales (EA), Benchmarking and Scoping Study (2004). The study, which encompasses a series of tests, is intended to be an independent research investigation into the accuracy, capability and suitability of the following one-dimensional hydraulic river modelling software packages: Software Version Developer ISIS User Interface: 2.0 (13/01/01) Halcrow / Flow Engine: (27/06/01) Wallingford Software MIKE 11 User Interface: Build (2001b) DHI Water and Environment Flow Engine: HEC-RAS User Interface: (Beta) (03/02) US Corps of Engineers Pre-processor: (Beta) (03/02) Steady Flow Engine: (Beta) (03/02) Unsteady Flow Engine: (Beta) (03/02) Post-processor: (Beta) (03/02) Each of the above software packages was tested in the previously undertaken benchmarking study (Crowder et al, 1997). They are currently on the EA s BIS-A list of software packages for one-dimensional hydraulic river modelling. The test has been undertaken on behalf of the EA by the following team in accordance with the Benchmarking Test Specification - Test L (Contraction and Expansion), (Crowder et al, 2004): Role Affiliation Mr Andrew Pepper EA Project Manager ATPEC River Engineering Dr Richard Crowder Study Project Manager Bullen Consultants Ltd Dr Nigel Wright Advisor University of Nottingham Dr Chris Whitlow Advisor Eden Vale Modelling Services Dr Andrew Sleigh Advisor University of Leeds Dr Chris Tomlin Advisor Environment Agency Mr D Cross Tester/Reporter University of Leeds 1.2 Aim of Test The aim of the test is to: assess the ability of the software packages to replicate the behaviour of a surge wave, caused by the sudden collapse of a large body of water, in a channel with a local constriction and expansion; TECHNICAL REPORT W5-105/TR2L 1
10 benchmark the numerical results against laboratory results obtained in the European Commission s CADAM project the European Concerted Action on Dam-Break Modelling (Soares and Alcrudo, 1998); and present the particulars for developing and undertaking the test (Model Build) with each of the software packages and the associated results so that others can repeat the test with their own software. 1.3 The CADAM Project The CADAM project was set up and funded by the European Commission in 1998, as a two year programme of work performed by participants from over ten different European countries, to further computational modelling techniques into dam-break analysis. Due to the very irregular and unpredictable nature of dam-break surge flows, benchmark data was gathered based upon laboratory models designed to recreate a dam-break in simple channels. The physical models were used as a means by which to evaluate the quality of the hydraulic flow data generated using numerical methods and computational models. Three test cases were proposed in the CADAM report 3; Test Case 1 L Shaped Channel; Test Case 2 Local Constriction; and Test Case 3 Flood Plain. All three tests were performed in channels of uniform rectangular cross-section, and were designed to provide simplified results for a surge wave experiencing: a change in direction downstream of the reservoir; a constriction in the flow; and an expansion of the flow area respectively. The results presented within this investigation are based on Test Case 2 for a Dam-Break in a Channel with a Local Constriction To enable the future comparison with numerical results, water levels, flow velocities, and discharge were measured using staging meters and pressure gauges at specific channel locations. 1.4 The CADAM Laboratory Configuration The physical laboratory model for the Dam-Break in a Channel with a Local Constriction was built, and the test performed, at the Laboratório Nacional de Engenharia Civil in conjunction with the Instituto Superior Técnico in Portugal 3. A schematic diagram of the channel is given in Figure 1.1. The model comprises a horizontal 0.5m wide channel of uniform rectangular cross-section. The overall length of the channel was set at 19.30m, with the first 6.10m of the channel at the upstream end specified as the reservoir. A removable sluice gate was built into the channel to retain the water within the reservoir, the gate being removed in approximately 0.2s to simulate the break of the dam. A constriction was located 7.70m downstream of the sluice TECHNICAL REPORT W5-105/TR2L 2
11 gate. The constriction was given an overall length of 1.4m, the first and last 0.2m of which were tapered at 45 degree angles to the channel walls. The middle width of the constriction of 0.1m therefore remains uniform for 1.0m in length, as illustrated in Figure 1.1. Figure 1.1 Schematic Diagram of Channel with Local Constriction (m) 0.2m 0.2m 0.5m Upstream Reservoir 0.2m 1.0m m Constriction S1 Gate S2 S3 S4 6.1m 7.7m 1.4m 19.3m The initial conditions for the test were set at 0.3m depth of water in the reservoir upstream from the gate, and 0.003m in the channel downstream from the gate. The experimental data for the test was obtained by removing the gate, and measuring the depth and velocity of flow at the benchmarking stations S1 to S4 (Figure 1.1). S1 is located 1.0m upstream of the dam gate, S2, 6.10m downstream of the dam gate, S3, 8.80m downstream of the dam gate, and S4, 10.50m downstream of the dam gate. The measurements were taken every 0.04s and recorded up to a simulation time of 10.00s. TECHNICAL REPORT W5-105/TR2L 3
12 TECHNICAL REPORT W5-105/TR2L 4
13 2 MODEL BUILD 2.1 Test Configuration In order to be able to recreate the same model in the three software packages a number of different options were considered. Initially, the construction of a model that exactly replicated that of the physical model was considered, i.e. use a sluice gate unit within the software packages to simulate the gate and its operation. However, each of the software packages model sluice gates in a slightly different way. Hence, it was decided for this study that the model should be set up without a controlling gate and that initial water levels and flows should be specified at every section along the channel at some specific time after the removal of the sluice gate. By setting up the model in this way any stability/operational problems (numerical) that may have been caused by the operation of the sluice structure would be negated. The configuration for the test is illustrated schematically in Figure 2.1. Figure 2.1: Schematic Illustration of Test Configuration Downstream Boundary 81 Cross-Sections Upstream Boundary The reservoir was extended in length to 26.8m, chosen to give an arbitrary length of channel of 40m. This value was chosen as a precautionary measure to ensure the reservoir would be sufficiently long that there would be no change in water level at the extreme upstream boundary after 10s of the simulation. The recorded values are not affected by extending the tank as they are downstream and the flow is supercritical. The resulting channel was built up from 81 equally spaced cross-sections of 0.5m spacing with a further 5 used to specify the constriction, and an additional 3 to specify the location of the data benchmarking stations S1, S2, and S3. Benchmarking station S4, located 2.5m upstream of the downstream end of the channel, coincided with one of the 81 equally spaced sections. A flow/time boundary of constant zero discharge was specified at the upstream end of the channel, and a continuous head/time boundary at the downstream end of 0.003m A constant Manning s n value of has been used throughout the reach. 2.2 Initial Conditions Applying initial conditions to the model enables water levels, velocities and discharge to be set within the channel prior to commencement of the unsteady simulation. To determine the appropriate initial conditions for the test a computer program was written to obtain an analytical solution of the dam-break problem using the exact Riemann solver (Toro, 1992). TECHNICAL REPORT W5-105/TR2L 5
14 This analytical solution provides the initial stages of a developing surge wave in any given channel, with any specified number of cross-sections, and up to any chosen stage in the development of the surge wave. In this case, three stages of development for the initial conditions were chosen to determine which produced the best results for the unsteady run. The following three developments were tested: Time = 0.00s Time = 1.00s Time = 3.35s No wave development Partial wave development Full wave development prior to the constriction The analytical solution at the above three times is illustrated in Figures 2.2, 2.3 and 2.4. Initial simulations were performed using a range of time-steps (0.01s to 0.1s) with the simulation time being approximately 10s. The initial simulations of the test, based on the above three initial conditions, found that ISIS was unable to produce any stable water levels for any time-step employed, with the software failing to complete the majority of the simulations attempted. Convergence problems were indicated by the software, often resulting in divergence of the solution parameters. When the simulation was undertaken using the initial conditions at time = 0.00s (no wave development), the software could only generate water levels over the entire length of the channel equal to the downstream depth of 0.003m. Due to the very low time-step required for the dam-break model, it was discovered that this simulation could not be performed in HEC-RAS and as such HEC-RAS has produced a no result for the test. HEC-RAS is configured such that the modeller is restricted to a minimum time-step of 1.0 second, and a minimum save interval to record the data, of 1.0 minute. As the surge wave reaches the constriction in less than 5s no useful results could be generated in HEC-RAS. In comparison to ISIS and HEC-RAS, solutions for the surge wave were generated in MIKE 11 when using all three of the initial conditions. However, it must be noted that the most stable result was produced when using the initial conditions for a partly developed wave. When using the initial condition at 0.00s a very irregular water surface profile was produced in the early stages of the simulation, as can be seen in Figure 2.5. TECHNICAL REPORT W5-105/TR2L 6
15 Figure 2.2 Initial water levels at time = 0.00s (from analytical solution) Figure 2.3 Initial water levels at time = 1.00s (from analytical solution) Figure 2.4 Initial water levels at time = 3.35s (from analytical solution) TECHNICAL REPORT W5-105/TR2L 7
16 Figure 2.5 MIKE 11 water levels at 2.0s (from initial conditions for no wave development) As the most stable solutions for the surge wave were generated using MIKE 11, it was decided to use the results of the initial simulations performed in this software as a guide to select the final test configuration. It was therefore decided to begin the simulation from the partially developed wave profile given in Figure 2.3, with the run time of the simulation set at 9s. TECHNICAL REPORT W5-105/TR2L 8
17 3 RUNNING THE MODEL 3.1 Introduction Further to the investigations with the initial conditions each simulation was started from the partially developed wave profile given in Figure 2.3, with the run time of the simulation set at 9s and the time-step set to 0.04s. Results were recorded at every time-step to be consistent with the results of the original laboratory test. When running the simulations in both ISIS and MIKE 11 it was necessary to improve the stability of the results by increasing the implicit weighting factor values (θ and δ for ISIS and MIKE 11 respectively), in the advanced options of the simulation editors. If there is instability in any given model it is generally advised to improve the model geometry and/or initial conditions. However, as the tests performed within this study are designed to draw comparisons between the three different software packages the specifications of the test were kept consistent. As such, the initial conditions and geometry of the models have remained unaltered, but θ and δ were changed accordingly. 3.2 Running the Model in ISIS When the unsteady simulation was performed in ISIS, it was found that the time-step and save interval of 0.04s could not be specified simultaneously. This was partly due to the fact that the simulation time can only be entered in hours, meaning that a decimal value of had to be entered to correspond with a simulation time of 9s. Warning messages were produced by the software, stating that the specified simulation time could not be used with the given time-step, and that the time should be reset to , equivalent to s. This was tried, but the simulation diverged. The simulation was then performed with the same time-step and save-interval, but for 10s or hrs. A similar warning was again given, suggesting the time be reset to hrs, equivalent to s. Again the solution diverged. It was then considered whether a solution could be found by increasing the save-interval. This was therefore changed, and a value of 0.12s was chosen arbitrarily as a multiple of 0.04, i.e. the data would be saved every 3 timesteps. It was found that ISIS could perform the test without the solution diverging if a time-step of 0.06s, and a save-interval of 0.12s was used. It was found that Theta θ had to be increased to reduce early instabilities in the model. The best solution was achieved using θ = 1.0. However, it must be noted that the software indicated poor model convergence for the first 3.6s of the simulation. A typical graphic from ISIS showing the resultant water surface profile is given in Figure 3.1. TECHNICAL REPORT W5-105/TR2L 9
18 Figure 3.1 Water surface profile in ISIS at approximately 3.0s 3.3 Running the Model in MIKE 11 Performing the simulation in MIKE 11 was far more successful. Despite the fact that many of the solutions generated in the initial testing of the model showed relatively unstable results every simulation tried could be performed without the onset of divergence problems as experienced in ISIS. The simulation was run successfully according to the specifications for the model. However, some instability was noted in the water surface profile when the model was run using a delta δ value of 0.5. This was more than adequately smoothed by increasing δ to It can be seen from Figure 3.2, a typical MIKE 11 graphic, that the resultant water surface profile generated in MIKE 11 is significantly smoother than that produced in ISIS after the same amount of time. Figure 3.2 Water surface profile in MIKE 11 at approximately 3.0s TECHNICAL REPORT W5-105/TR2L 10
19 4 RESULTS 4.1 Introduction The analysis of results from each software package has been limited to the following: Stage versus Time at S1, S2, S3 and S4. An alternative test has also been undertaken with MIKE 11 using a Chézy C value of 70.0, which has been calculated as an approximate equivalent value to the Manning s n of 0.010, for the initial water depth of 0.3m at the upstream end of the model. The final calculated depths of water produced in both ISIS and MIKE 11 are presented in Graphs 1 to 12, Appendix A. 4.2 Analysis of MIKE 11 Results Applied Bed Friction, Manning s n = It can be seen from Graphs 1 to 4 that the water level histories produced in MIKE 11 at the benchmarking stations S1 to S4 only very approximately follow the recorded experimental data. The best calculated results are produced at station S1 where the general trend of the calculated history approximately follows that of the experimental data. Both experimental and calculated water levels start at 0.3m and quickly drop to an approximate level of 0.16m after 4.0s. After this time however, the calculated water level remains constant at approximately 0.165m while the experimental data shows a continued drop in water level until approximately 7.5s when the rate of change of water level slightly increases. The calculated water level histories at the remaining three benchmarking stations S2, S3, and S4, show different behaviour in the change in water level to that of the experimental data. It can be seen from Graph 2 that the experimental water level recorded at station S2 changes from 0.003m after 3.0s of the simulation. This change in water level corresponds to the arrival of the surge wavefront at station S2. Therefore, it can be determined that the surge wave has travelled 6.1m in 3.0s, giving rise to an approximate travelling velocity of 2.0m/s. It can then be seen from the plot of the experimental water level history that the water level only rises by a very small amount between 3.5s and 7.3s, after which time the water level increases rapidly, settling at an approximate level of 0.23m after 8.5s. The level remains approximately constant thereafter for the remainder of the simulation. This recorded rise in the water level after 7.3s is due to the superimposition of the resultant reflected wave caused by the angled walls at the front of the constriction on the travelling surge wave. It can be seen from Graph 2 that the calculated water level history produced in MIKE 11 does not follow this same process of change as that observed experimentally. The water levels do not settle at any time during the simulation, but instead fluctuate broadly about the experimental levels. This suggests that the solution is not as stable as indicated by the animated profile plot produced within MIKE 11. However, an approximate increase in the water depth equivalent to that produced experimentally is produced by the software, TECHNICAL REPORT W5-105/TR2L 11
20 demonstrating that the superimposition of the incident and reflected waves is calculated by the software. It must be noted that the final calculated depth of water in the channel at station S2 is only 0.02m higher than that recorded in the experimental data. The final calculated depths of water at stations S3 and S4 however are not so close to the experimental depths. It can be seen from Graph 3, presenting the results at station S3, that the software calculated results fluctuate around the experimental data after 8.0s, which broadly indicates instabilities with the result. The final calculated water level produced by the software at station S4 is much greater than that produced in the laboratory test. Despite the instabilities, the calculated results provide useful information regarding the speed of the propagating wave. It can be seen from Graphs 2, 3 and 4 that the calculated water levels show a delay in the arrival time of the initial surge wave. This is indicated by the time at which the water level changes from the starting level of 0.003m, the initial water depth downstream of the gate. The surge wave produced in the physical model can be observed to arrive at stations S2, S3, and S4 at 3.0s, 4.3s and 5.5s respectively. The same corresponding calculated arrival times can be observed as 4.2s in Graph 2, 6.5s in Graph 3, and 8.6s in Graph 4. This is an important finding of the software as the same delayed behaviour of the arrival time of the surge wave was observed in the calculated results of the two-dimensional models used to model the same dam-break in the original CADAM project. 4.3 Analysis of ISIS Results Applied Bed Friction, Manning s n = It can be seen from Graphs 5 to 8 that the results produced within ISIS are very unstable, as highlighted earlier. However, some approximately similar behaviour to the experimental data can be observed. Firstly, it can be seen from Graph 5 that the general trend of the fall in the calculated water level at station S1 is approximately the same as the fall recorded in the laboratory test. The water level history produced by ISIS shows that ISIS does not calculate a constant water level at station S1 after 4.0s as calculated in MIKE 11. The ISIS water levels show a similar though slightly lower and fluctuating water surface profile when compared to the experimental results. The calculated water levels produced at station S2 show very unstable results between the times of 1.0s and 4.5s. As such, it is impossible to draw any conclusive remarks from these results. However, it must be noted that the final calculated water level produced in ISIS at station S1 of 0.22m is only 0.01m different from the recorded experimental level. The calculated water level history plotted in Graph 7 also shows significant instabilities between 1.0 second and 4.5s. However, the solution can be observed to steady significantly after 5.5s. As poor model convergence was only observed in ISIS for the first 3.6s of the simulation the solution will have settled significantly by 5.5s. As such, the rise in the calculated water level just before 4.5s in Graph 7 may indicate the arrival time of the surge wave at station S3. If this is the case, then ISIS will have approximately simulated the correct propagation velocity of the initial surge wave, but calculated a slightly higher continuous depth of water between 5.5s and 10.0s of 0.14m as opposed to the experimental depth of 0.11m. TECHNICAL REPORT W5-105/TR2L 12
21 The water level history produced in ISIS at station S4 shows very irregular water levels from approximately 3.5s until the end of the simulation. As these levels at no time become steady it is also impossible to draw any conclusions from these. It should be noted that when undertaking the simulations with ISIS the default minimum water depth parameter of 0.01m was used. Alternative, smaller values were not investigated. However, inspection of the results shows that the depth of flow at time = 0.0s is less than this value (0.003m), as prescribed by the boundary data conditions. Furthermore, results at other times are also less than 0.01m. This anomaly has not been investigated further as part of the study. 4.4 Analysis of Applied Bed Friction with MIKE 11 (Chézy C = 70) In a further attempt to improve the stability of the model in MIKE 11, the test was performed a second time, but using a Chézy C = 70, calculated as an approximate equivalent Chézy value to the Manning s n = 0.010, for the initial water depth of 0.3m upstream from the virtual sluice gate. It can be seen from Graphs 9 to 12 that applying the friction in this way to the model has no obvious effect on the results (in comparison to Graphs 1 to 4), with the calculated water levels being almost exactly equal to those generated with Manning s n = TECHNICAL REPORT W5-105/TR2L 13
22 TECHNICAL REPORT W5-105/TR2L 14
23 5 DISCUSSION AND CONCLUSIONS The test is an extreme investigation of the capabilities of the software packages due to the nature of the hydraulic condition. As a result several notable nuances between the software packages have been highlighted. HEC-RAS, which is capable of setting up the test, is unable to produce any results due the limitation of a 1 second time step (minimum) that can be used for a simulation. In many modelling scenarios running a model with a small time step can assist the modeller in developing good and stable initial conditions with which to undertake subsequent simulations with larger time steps. This inability of HEC-RAS may in due course limit or hinder the modeller in undertaking studies of a much simpler nature that may have complex/tricky initial conditions. ISIS, which is capable of undertaking the simulations, has required the use of initial conditions from the partial wave development without which unstable results prevail. Conversely, MIKE 11 is capable of undertaking the simulations with either no wave or partial wave development. This may suggest that the numerical scheme adopted by MIKE 11 may be more robust than that employed by ISIS for conditions where there are significant/extreme velocity or water level changes. Having to use fractions of an hour for the simulation time in ISIS can be problematic when attempting to select an appropriate time step and save interval. The ability of MIKE 11 to use hours, minutes or seconds, and fractions thereof, is a distinct benefit. Only MIKE 11 was able to produce stable solutions for the dam-break progressive wave; however, the results calculated by this solution were not truly representative of the problem. This is likely to be due to the one-dimensional nature of the solution generated by the software. The test is not entirely appropriate for one-dimensional analysis as the water surface becomes very irregular when the surge wave hits the constriction. The calculated water levels for MIKE 11 show a delay in the arrival time of the initial surge wave. This is an important finding of the software as the same delayed behaviour of the arrival time of the surge wave was observed in the calculated results of the two-dimensional models used to model the same dam-break in the original CADAM project. The results from ISIS are inconclusive due to notable instabilities in the calculated water levels; however, the final calculated depth of water produced by ISIS at station S4 is exactly equal to that produced in MIKE 11. In both ISIS and MIKE 11 the stability of the results is improved by increasing the implicit weighting factor in the numerical scheme. Within ISIS, which uses the Preissmann 4-point implicit scheme, a value of 1.0 has been required, whereas in MIKE 11, which uses Abbott 6- point implicit scheme, a value of 0.65 has been sufficient. Again this may suggest that that the numerical scheme adopted by MIKE 11 may be more robust than that employed by ISIS for conditions where there are significant/extreme velocity or water level changes. It is anticipated that improved results could be achieved from each of the software packages through refinement of the calculation settings and options. For instance, if the Delh value TECHNICAL REPORT W5-105/TR2L 15
24 (the depth at which the slot is activated) is reduced or an alternative to the phasing of the convective term is used (i.e. by setting FroudeMax and FroudeExp to 1 and 2 respectively in the HD parameter file) then improved results could be anticipated. TECHNICAL REPORT W5-105/TR2L 16
25 6 RECOMMENDATIONS Although this test has been an extreme investigation of the capabilities of the software packages there are several notable areas where they may benefit from additional functionality, such as: Within HEC-RAS the user can only select a time step and the save interval from a predefined list of incremental values. The smallest increment for the time step is 1 second, which for this test has been a significant disadvantage. The ability to undertake a simulation with a time step and save interval of the modeller s choice would in the opinion of the testers provide much needed flexibility and functionality, especially during model development. Within ISIS the user needs to specify the run time in hours and fractions thereof. The ability to have the option to choose hours, minutes or seconds as the units for specification would, in the opinion of the testers, provide greater flexibility for the modeller. It is anticipated that improved results could be achieved from the software packages through refinement of the calculation settings and options. Hence, it is recommended that any future testing should attempt to find the most appropriate settings for this test and tests of this nature. The modelling approach required for this test has not provided a true real life test of the software packages, hence it is recommended that the test specification be enhanced and added to so as to consider a more real life prototype situation. Some of the software packages have the functionality to model dam-break and levee breach, which have not been tested within the current scope of the test specification. Hence, it is recommended that the test specification be refined so as to reflect real life conditions. This may merit the undertaking of further experimental studies so as to provide appropriate validation data. TECHNICAL REPORT W5-105/TR2L 17
26 TECHNICAL REPORT W5-105/TR2L 18
27 7 REFERENCES Crowder, R.A., Chen, Y., Falconer, R.A., (1997) Benchmarking and Scoping of Hydraulic River Models, Environment Agency Research and Technical Report, W88 Crowder, R.A., Pepper, A.T., Whitlow, C., Wright, N., Sleigh, A., Tomlinson, C., (2004) Benchmarking and Scoping of 1D Hydraulic River Models, Environment Agency Research and Technical Report, W5-105/TR1 Soares and Alcrudo., Conclusions from the 3rd meeting of the IAHR working group on dambreak modelling - Belgium, in Concerted Action on Dam-Break Modelling, European Commission. Science Research Development, 1999, Proceedings of the CADAM meeting Wallingford, United Kingdom, March 1998 Toro E.F., (15 January 1992) Riemann problems and the WAF method for solving the 2- dimensional shallow-water equations, Philosophical transactions of the royal society of London series A-mathematical physical and engineering sciences, 338 (1649): TECHNICAL REPORT W5-105/TR2L 19
28 TECHNICAL REPORT W5-105/TR2L 20
29 APPENDIX A RESULTS TECHNICAL REPORT W5-105/TR2L 21
30 TECHNICAL REPORT W5-105/TR2L 22
31 Graph 24 - MIKE11 - Calculated and Experimental Water Level Histories at Location S2 S4 Applied Bed Friction - Manning's n= W a t e r L e v e l ( m A D ) Simulation Time (secs) Calculated Water Levels Experimental Water Levels Graph 13 - MIKE11 - Calculated and Experimental Water Level Histories at Location S1 S3 Applied Bed Friction - Manning's n= W a t e r L e v e l ( m A D ) Simulation Time (secs) Calculated Water Levels Experimental Water Levels TECHNICAL REPORT W5-105/TR2L 23
32 Graph 68 - ISIS - Calculated and Experimental Water Level Histories at Location S2 S4 Applied Bed Friction - Manning's n= W a t e r L e v e l ( m A D ) Simulation Time (secs) Calculated Water Levels Experimental Water Levels Graph 75 - ISIS - Calculated and Experimental Water Level Histories at Location S3 S1 Applied Bed Friction - Manning's n= W a t e r L e v e l ( m A D ) Simulation Time (secs) Calculated Water Levels Experimental Water Levels TECHNICAL REPORT W5-105/TR2L 24
33 Graph MIKE11 - Calculated and Experimental Water Level Histories at Location S2 S4 Applied Bed Friction - Chézy C= W a t e r L e v e l ( m A D ) Simulation Time (secs) Calculated Water Levels Experimental Water Levels Graph MIKE11 -- Calculated and Experimental Water Level Histories at Location S1 S3 Applied Bed Friction - Chézy C= W a t e r L e v e l ( m A D ) Simulation Time (secs) Calculated Water Levels Experimental Water Levels TECHNICAL REPORT W5-105/TR2L 25
34 TECHNICAL REPORT W5-105/TR2L 26
35
36
Experiment (13): Flow channel
Introduction: An open channel is a duct in which the liquid flows with a free surface exposed to atmospheric pressure. Along the length of the duct, the pressure at the surface is therefore constant and
Open Channel Flow. M. Siavashi. School of Mechanical Engineering Iran University of Science and Technology
M. Siavashi School of Mechanical Engineering Iran University of Science and Technology W ebpage: webpages.iust.ac.ir/msiavashi Email: [email protected] Landline: +98 21 77240391 Fall 2013 Introduction
What is the most obvious difference between pipe flow and open channel flow????????????? (in terms of flow conditions and energy situation)
OPEN CHANNEL FLOW 1 3 Question What is the most obvious difference between pipe flow and open channel flow????????????? (in terms of flow conditions and energy situation) Typical open channel shapes Figure
Flow Through an Abrupt Constriction. 2D Hydrodynamic Model Performance and Influence of Spatial Resolution
Flow Through an Abrupt Constriction 2D Hydrodynamic Model Performance and Influence of Spatial Resolution Cathie Louise Barton BE (Civil) School of Environmental Engineering Faculty of Environmental Sciences
2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT
2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT Open channel flow is defined as flow in any channel where the liquid flows with a free surface. Open channel flow is not under pressure; gravity is the
Broad Crested Weirs. I. Introduction
Lecture 9 Broad Crested Weirs I. Introduction The broad-crested weir is an open-channel flow measurement device which combines hydraulic characteristics of both weirs and flumes Sometimes the name ramp
THE UNIVERSITY OF TRINIDAD & TOBAGO
THE UNIVERSITY OF TRINIDAD & TOBAGO FINAL ASSESSMENT/EXAMINATIONS APRIL 2014 Course Code and Title: Programme: Date and Time: Duration: HYDRAULICS FLUD2006 BASc. Civil Engineering Wednesday 16 th April,
CHAPTER 9 CHANNELS APPENDIX A. Hydraulic Design Equations for Open Channel Flow
CHAPTER 9 CHANNELS APPENDIX A Hydraulic Design Equations for Open Channel Flow SEPTEMBER 2009 CHAPTER 9 APPENDIX A Hydraulic Design Equations for Open Channel Flow Introduction The Equations presented
CEE 370 Fall 2015. Laboratory #3 Open Channel Flow
CEE 70 Fall 015 Laboratory # Open Channel Flow Objective: The objective of this experiment is to measure the flow of fluid through open channels using a V-notch weir and a hydraulic jump. Introduction:
MIKE 21 FLOW MODEL HINTS AND RECOMMENDATIONS IN APPLICATIONS WITH SIGNIFICANT FLOODING AND DRYING
1 MIKE 21 FLOW MODEL HINTS AND RECOMMENDATIONS IN APPLICATIONS WITH SIGNIFICANT FLOODING AND DRYING This note is intended as a general guideline to setting up a standard MIKE 21 model for applications
Open Channel Flow Measurement Weirs and Flumes
Open Channel Flow Measurement Weirs and Flumes by Harlan H. Bengtson, PhD, P.E. 1. Introduction Your Course Title Here Measuring the flow rate of water in an open channel typically involves some type of
...Eq(11.6) The energy loss in the jump is dependent on the two depths y 1 and y 2 3 = E =...Eq(11.7)
. Open Channel Flow Contd.5 Hydraulic Jump A hydraulic jump occurs when water in an open channel is flowing supercritical and is slowed by a deepening of the channel or obstruction in the channel. The
Appendix C - Risk Assessment: Technical Details. Appendix C - Risk Assessment: Technical Details
Appendix C - Risk Assessment: Technical Details Page C1 C1 Surface Water Modelling 1. Introduction 1.1 BACKGROUND URS Scott Wilson has constructed 13 TUFLOW hydraulic models across the London Boroughs
Multiphase Flow - Appendices
Discovery Laboratory Multiphase Flow - Appendices 1. Creating a Mesh 1.1. What is a geometry? The geometry used in a CFD simulation defines the problem domain and boundaries; it is the area (2D) or volume
Open channel flow Basic principle
Open channel flow Basic principle INTRODUCTION Flow in rivers, irrigation canals, drainage ditches and aqueducts are some examples for open channel flow. These flows occur with a free surface and the pressure
Introduction. Chapter 1. 1.1 The Motivation
Chapter 1 Introduction 1.1 The Motivation Hydroelectric power plants, like real systems, have nonlinear behaviour. In order to design turbine controllers, it was normal practice in the past, when computer
Backwater Rise and Drag Characteristics of Bridge Piers under Subcritical
European Water 36: 7-35, 11. 11 E.W. Publications Backwater Rise and Drag Characteristics of Bridge Piers under Subcritical Flow Conditions C.R. Suribabu *, R.M. Sabarish, R. Narasimhan and A.R. Chandhru
Lecture 24 Flumes & Channel Transitions. I. General Characteristics of Flumes. Flumes are often used:
Lecture 24 Flumes & Channel Transitions I. General Characteristics of Flumes Flumes are often used: 1. Along contours of steep slopes where minimal excavation is desired 2. On flat terrain where it is
HEC-RAS. River Analysis System. Applications Guide. Version 4.1 January 2010. US Army Corps of Engineers Hydrologic Engineering Center CPD-70
US Army Corps of Engineers Hydrologic Engineering Center HEC-RAS HEC-RAS River Analysis System Applications Guide Version 4.1 January 2010 Approved for Public Release. Distribution Unlimited CPD-70 REPORT
Hydraulic Jumps and Non-uniform Open Channel Flow, Course #507. Presented by: PDH Enterprises, LLC PO Box 942 Morrisville, NC 27560 www.pdhsite.
Hydraulic Jumps and Non-uniform Open Channel Flow, Course #507 Presented by: PDH Enterprises, LLC PO Box 942 Morrisville, NC 27560 www.pdhsite.com Many examples of open channel flow can be approximated
Appendix 4-C. Open Channel Theory
4-C-1 Appendix 4-C Open Channel Theory 4-C-2 Appendix 4.C - Table of Contents 4.C.1 Open Channel Flow Theory 4-C-3 4.C.2 Concepts 4-C-3 4.C.2.1 Specific Energy 4-C-3 4.C.2.2 Velocity Distribution Coefficient
EXAMPLES (OPEN-CHANNEL FLOW) AUTUMN 2015
EXAMPLES (OPEN-CHANNEL FLOW) AUTUMN 2015 Normal and Critical Depths Q1. If the discharge in a channel of width 5 m is 20 m 3 s 1 and Manning s n is 0.02 m 1/3 s, find: (a) the normal depth and Froude number
Evaluation of Open Channel Flow Equations. Introduction :
Evaluation of Open Channel Flow Equations Introduction : Most common hydraulic equations for open channels relate the section averaged mean velocity (V) to hydraulic radius (R) and hydraulic gradient (S).
NUMERICAL ANALYSIS OF OPEN CHANNEL STEADY GRADUALLY VARIED FLOW USING THE SIMPLIFIED SAINT-VENANT EQUATIONS
TASK QUARTERLY 15 No 3 4, 317 328 NUMERICAL ANALYSIS OF OPEN CHANNEL STEADY GRADUALLY VARIED FLOW USING THE SIMPLIFIED SAINT-VENANT EQUATIONS WOJCIECH ARTICHOWICZ Department of Hydraulic Engineering, Faculty
USSD Workshop on Dam Break Analysis Applied to Tailings Dams
USSD Workshop on Dam Break Analysis Applied to Tailings Dams Antecedents Newtonian / non-newtonian flows Available models that allow the simulation of non- Newtonian flows (tailings) Other models used
Chapter 13 OPEN-CHANNEL FLOW
Fluid Mechanics: Fundamentals and Applications, 2nd Edition Yunus A. Cengel, John M. Cimbala McGraw-Hill, 2010 Lecture slides by Mehmet Kanoglu Copyright The McGraw-Hill Companies, Inc. Permission required
Topic 8: Open Channel Flow
3.1 Course Number: CE 365K Course Title: Hydraulic Engineering Design Course Instructor: R.J. Charbeneau Subject: Open Channel Hydraulics Topics Covered: 8. Open Channel Flow and Manning Equation 9. Energy,
Calculating resistance to flow in open channels
Alternative Hydraulics Paper 2, 5 April 2010 Calculating resistance to flow in open channels http://johndfenton.com/alternative-hydraulics.html [email protected] Abstract The Darcy-Weisbach formulation
Flood warnings. What they are and what they do. A guide to the Environment Agency s flood warning codes
Flood warnings What they are and what they do A guide to the Environment Agency s flood warning codes We are the Environment Agency. It s our job to look after your environment and make it a better place
Designing a Basic White Water Canoe/Kayak Course using InfoWorks ICM
Designing a Basic White Water Canoe/Kayak Course using InfoWorks ICM Adam Cambridge Hydrologist, Sinclair Knight Merz Robert Morden Senior Hydrologist, Sinclair Knight Merz Summary A functional design
Performing a Steady Flow Analysis
C H A P T E R 7 Performing a Steady Flow Analysis This chapter discusses how to calculate steady flow water surface profiles. The chapter is divided into two parts. The first part discusses how to enter
OPEN-CHANNEL FLOW. Free surface. P atm
OPEN-CHANNEL FLOW Open-channel flow is a flow of liquid (basically water) in a conduit with a free surface. That is a surface on which pressure is equal to local atmospheric pressure. P atm Free surface
M6a: Open Channel Flow (Manning s Equation, Partially Flowing Pipes, and Specific Energy)
M6a: Open Channel Flow (, Partially Flowing Pipes, and Specific Energy) Steady Non-Uniform Flow in an Open Channel Robert Pitt University of Alabama and Shirley Clark Penn State - Harrisburg Continuity
Using GIS Data With HEC-RAS
C H A P T E R 14 Using GIS Data With HEC-RAS HEC-RAS has the ability to import three-dimensional (3D) river schematic and cross section data created in a GIS or CADD system. While the HEC- RAS software
Environmental Data Management Programs
Hydrologic Engineering Centre (HEC) Software CD Collection of programs, developed by the U.S. Army Corps of Engineers Environmental Data Management Programs Name: HEC-DSS Package Purpose: Data Storage
Employing Appropriate Software for Dam break Analysis and Flood Line rendering
Employing Appropriate Software for Dam break Analysis and Flood Line rendering 1. Background The specialist field of Dam Safety has been developing in SA since about the 80 s. This has led to a well-developed
The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin
The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin Dr.Phattaporn Mekpruksawong 1, Thana Suwattana 2 and Narong Meepayoong 3 1 Senior Civil Engineer, Office of Project Management,
How To Measure The Flow Rate Of The Sacramento River With An Adfm
Measuring Sacramento River Diversions with ADFM Technology in the Glenn-Colusa Irrigation District Michael A. Metcalf, Ph.D., MGD Technologies Inc., 9815 Carroll Canyon Rd., Suite 2, San Diego, CA 92131,
TVM 4155 Numerical modelling and hydraulics 10. March 2014. OpenFOAM homework
TVM 4155 Numerical modelling and hydraulics 10. March 2014 OpenFOAM homework OpenFOAM is the most popular open-source CFD program in the world today. In this homework we will use the program to determine
Modelling Flood Inundation of Urban Areas in the UK Using 2D / 1D Hydraulic Models
Modelling Flood Inundation of Urban Areas in the UK Using 2D / 1D Hydraulic Models W.J. Syme B.E., M.Eng.Sc. Associate, WBM Pty. Ltd., Australia M.G. Pinnell Bsc Msc MCIWEM Principal Hydrologist, Symonds
Simulating Sedimentation Model in Balarood Dam Reservoir Using CCHE2D Software
Bulletin of Environment, Pharmacology and Life Sciences Bull. Env. Pharmacol. Life Sci., Vol 4 [1] December 2014: 67-72 2014 Academy for Environment and Life Sciences, India Online ISSN 2277-1808 Journal
Experiment 3 Pipe Friction
EML 316L Experiment 3 Pipe Friction Laboratory Manual Mechanical and Materials Engineering Department College of Engineering FLORIDA INTERNATIONAL UNIVERSITY Nomenclature Symbol Description Unit A cross-sectional
OPTIMISE TANK DESIGN USING CFD. Lisa Brown. Parsons Brinckerhoff
OPTIMISE TANK DESIGN USING CFD Paper Presented by: Lisa Brown Authors: Lisa Brown, General Manager, Franz Jacobsen, Senior Water Engineer, Parsons Brinckerhoff 72 nd Annual Water Industry Engineers and
Part IV. Conclusions
Part IV Conclusions 189 Chapter 9 Conclusions and Future Work CFD studies of premixed laminar and turbulent combustion dynamics have been conducted. These studies were aimed at explaining physical phenomena
Civil Engineering Hydraulics Open Channel Flow. Adult: Where s your costume? What are you supposed to be?
Civil Engineering Hydraulics Calvin: Trick or treat! Adult: Where s your costume? What are you supposed to be? Calvin: I m yet another resource-consuming kid in an overpopulated planet, raised to an alarming
Session 21 Max Sheppard. Improved Complex Pier Scour Prediction Procedure
Session 21 Max Sheppard Ocean Engineering Associates, Inc. Improved Prediction Procedure Topic Description Improved Prediction Procedure Improvements: have been made in the methodology for predicting local
SIMULATION OF SEDIMENT TRANSPORT AND CHANNEL MORPHOLOGY CHANGE IN LARGE RIVER SYSTEMS. Stephen H. Scott 1 and Yafei Jia 2
US-CHINA WORKSHOP ON ADVANCED COMPUTATIONAL MODELLING IN HYDROSCIENCE & ENGINEERING September 19-21, Oxford, Mississippi, USA SIMULATION OF SEDIMENT TRANSPORT AND CHANNEL MORPHOLOGY CHANGE IN LARGE RIVER
Experimentation and Computational Fluid Dynamics Modelling of Roughness Effects in Flexible Pipelines
Experimentation and Computational Fluid Dynamics Modelling of Roughness Effects in Flexible Pipelines Sophie Yin Jeremy Leggoe School of Mechanical and Chemical Engineering Daniel Teng Paul Pickering CEED
USING DETAILED 2D URBAN FLOODPLAIN MODELLING TO INFORM DEVELOPMENT PLANNING IN MISSISSAUGA, ON
22nd Canadian Hydrotechnical Conference 22e Conférence canadienne d hydrotechnique Water for Sustainable Development : Coping with Climate and Environmental Changes L eau pour le développement durable:
. Address the following issues in your solution:
CM 3110 COMSOL INSTRUCTIONS Faith Morrison and Maria Tafur Department of Chemical Engineering Michigan Technological University, Houghton, MI USA 22 November 2012 Zhichao Wang edits 21 November 2013 revised
Exercise (4): Open Channel Flow - Gradually Varied Flow
Exercise 4: Open Channel Flow - Gradually Varied Flow 1 A wide channel consists of three long reaches and has two gates located midway of the first and last reaches. The bed slopes for the three reaches
2D Modeling of Urban Flood Vulnerable Areas
2D Modeling of Urban Flood Vulnerable Areas Sameer Dhalla, P.Eng. Dilnesaw Chekol, Ph.D. A.D. Latornell Conservation Symposium November 22, 2013 Outline 1. Toronto and Region 2. Evolution of Flood Management
Emergency Spillways (Sediment basins)
Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]
FLOODPLAIN DELINEATION IN MUGLA-DALAMAN PLAIN USING GIS BASED RIVER ANALYSIS SYSTEM
FLOODPLAIN DELINEATION IN MUGLA-DALAMAN PLAIN USING GIS BASED RIVER ANALYSIS SYSTEM Dr. Murat Ali HATİPOĞLU Fatih KESKİN Kemal SEYREK State Hydraulics Works (DSI), Investigation and Planning Department
CFD SIMULATION OF SDHW STORAGE TANK WITH AND WITHOUT HEATER
International Journal of Advancements in Research & Technology, Volume 1, Issue2, July-2012 1 CFD SIMULATION OF SDHW STORAGE TANK WITH AND WITHOUT HEATER ABSTRACT (1) Mr. Mainak Bhaumik M.E. (Thermal Engg.)
Managing sewer flood risk
Managing sewer flood risk J. Ryu 1 *, D. Butler 2 1 Environmental and Water Resource Engineering, Department of Civil and Environmental Engineering, Imperial College, London, SW7 2AZ, UK 2 Centre for Water
Lecture 25 Design Example for a Channel Transition. I. Introduction
Lecture 5 Design Example for a Channel Transition I. Introduction This example will be for a transition from a trapezoidal canal section to a rectangular flume section The objective of the transition design
Chapter 9. Steady Flow in Open channels
Chapter 9 Steady Flow in Open channels Objectives Be able to define uniform open channel flow Solve uniform open channel flow using the Manning Equation 9.1 Uniform Flow in Open Channel Open-channel flows
Columbia River Project Water Use Plan. Monitoring Program Terms of Reference
Columbia River Project Water Use Plan Revelstoke Flow Management Plan Monitoring Program Terms of Reference CLBMON-15a Middle Columbia River Physical Habitat Monitoring Revision January 29, 2015 Monitoring
Composite performance measures in the public sector Rowena Jacobs, Maria Goddard and Peter C. Smith
Policy Discussion Briefing January 27 Composite performance measures in the public sector Rowena Jacobs, Maria Goddard and Peter C. Smith Introduction It is rare to open a newspaper or read a government
Index-Velocity Rating Development (Calibration) for H-ADCP Real-Time Discharge Monitoring in Open Channels
Index-Velocity Rating Development (Calibration) for H-ADCP Real-Time Discharge Monitoring in Open Channels Hening Huang Teledyne RD Instruments, Inc., 14020 Stowe Drive, Poway, CA. 92064, USA (Tel: 858-842-2600,
EVALUATION OF UNSTEADY OPEN CHANNEL FLOW CHARACTERISTICS OVER A CRUMP WEIR
EVALUATION OF UNSTEADY OPEN CHANNEL FLOW CHARACTERISTICS OVER A CRUMP WEIR Mohd Adib Mohd Razi, Dwi Tjahjanto, Wan Afnizan Wan Mohamed, Siti Norashikin Binti Husin Department of Water Resource and Environmental
Howsham fish passage Consultation document
Howsham fish passage Consultation document Report ENVIMNE000903 Final version 30 June 2016 We are the Environment Agency. We protect and improve the environment. Acting to reduce the impacts of a changing
A Strategy for Teaching Finite Element Analysis to Undergraduate Students
A Strategy for Teaching Finite Element Analysis to Undergraduate Students Gordon Smyrell, School of Computing and Mathematics, University of Teesside The analytical power and design flexibility offered
Application of CFD Simulation in the Design of a Parabolic Winglet on NACA 2412
, July 2-4, 2014, London, U.K. Application of CFD Simulation in the Design of a Parabolic Winglet on NACA 2412 Arvind Prabhakar, Ayush Ohri Abstract Winglets are angled extensions or vertical projections
Index-Velocity Rating Development for Rapidly Changing Flows in an Irrigation Canal Using Broadband StreamPro ADCP and ChannelMaster H-ADCP
Index-Velocity Rating Development for Rapidly Changing Flows in an Irrigation Canal Using Broadband StreamPro ADCP and ChannelMaster H-ADCP HENING HUANG, RD Instruments, 9855 Businesspark Avenue, San Diego,
Hydraulics Laboratory Experiment Report
Hydraulics Laboratory Experiment Report Name: Ahmed Essam Mansour Section: "1", Monday 2-5 pm Title: Flow in open channel Date: 13 November-2006 Objectives: Calculate the Chezy and Manning coefficients
Flooding in Urban Areas - 2D Modelling Approaches for Buildings and Fences
Flooding in Urban Areas - 2D Modelling Approaches for Buildings and Fences W.J. Syme BE Civil Hons), MEngSc Res), BMT WBM Pty Ltd, 490 Upper Edward St, Brisbane, Qld, 4000, [email protected] Abstract:
The Hydrologic Engineering Center Training Course on
The Hydrologic Engineering Center Training Course on SEDIMENT TRANSPORT ANALYSIS WITH HEC-RAS Davis, California Course Objectives This course is intended to prepare engineers to perform studies using various
HEC-RAS River Analysis System
Table of Contents US Army Corps of Engineers Hydrologic Engineering Center HEC-RAS River Analysis System Hydraulic Reference Manual Version 4.1 January 010 Approved for Public Release. Distribution Unlimited
TWO-DIMENSIONAL FINITE ELEMENT ANALYSIS OF FORCED CONVECTION FLOW AND HEAT TRANSFER IN A LAMINAR CHANNEL FLOW
TWO-DIMENSIONAL FINITE ELEMENT ANALYSIS OF FORCED CONVECTION FLOW AND HEAT TRANSFER IN A LAMINAR CHANNEL FLOW Rajesh Khatri 1, 1 M.Tech Scholar, Department of Mechanical Engineering, S.A.T.I., vidisha
www.nams.au.com AN INNOVATIVE APPROACH TO LOCAL GOVERNMENT ROAD NETWORK MANAGEMENT
AN INNOVATIVE APPROACH TO LOCAL GOVERNMENT ROAD NETWORK MANAGEMENT Peter Clewer: Asset Management Officer (Roads), Mornington Peninsula Shire Amy Wade, Manager Axim - A Downer EDI Works Business Abstract
Proceeding of International Seminar on Application of Science Matehmatics 2011 (ISASM2011) PWTC, KL, Nov, 1-3, 2011
Proceeding of International Seminar on Application of Science Matehmatics 2011 (ISASM2011) PWTC, KL, Nov, 1-3, 2011 INFLUENCE OF BED ROUGHNESS IN OPEN CHANNEL Zarina Md Ali 1 and Nor Ashikin Saib 2 1 Department
Chapter 5 Adaptive Mesh, Embedded Boundary Model for Flood Modeling
in the Sacramento-San Joaquin Delta and Suisun Marsh June 2011 Chapter 5 Adaptive Mesh, Embedded Boundary Model for Flood Modeling Authors: Qiang Shu and Eli Ateljevich, Delta Modeling Section, Bay-Delta
Manage water resources for on site hydro-electricity generation
Manage water resources for on site hydro-electricity generation 18279 version 4 Page 1 of 6 Level 4 Credits 8 Purpose People credited with this unit standard are able to: demonstrate knowledge of water
Manning Friction in Steep Open-channel Flow
Seventh International Conference on Computational Fluid Dynamics (ICCFD7), Big Island, Hawaii, July 9-3, 0 ICCFD7-0-3303 ICCFD7-3303 Manning Friction in Steep Open-channel Flow Tao Wang * and Vincent H.
The guide uses the example files provided with Flood Modeller. Depending on your operating system these are located at:
Getting Started 1D Modelling This document provides a quick start guide for new users of showing how to run a 1D model and view results. The guide uses the example files provided with. Depending on your
Abaqus Technology Brief. Automobile Roof Crush Analysis with Abaqus
Abaqus Technology Brief Automobile Roof Crush Analysis with Abaqus TB-06-RCA-1 Revised: April 2007. Summary The National Highway Traffic Safety Administration (NHTSA) mandates the use of certain test procedures
(1) 2 TEST SETUP. Table 1 Summary of models used for calculating roughness parameters Model Published z 0 / H d/h
Estimation of Surface Roughness using CFD Simulation Daniel Abdi a, Girma T. Bitsuamlak b a Research Assistant, Department of Civil and Environmental Engineering, FIU, Miami, FL, USA, [email protected]
Chapter 2. Derivation of the Equations of Open Channel Flow. 2.1 General Considerations
Chapter 2. Derivation of the Equations of Open Channel Flow 2.1 General Considerations Of interest is water flowing in a channel with a free surface, which is usually referred to as open channel flow.
TUFLOW Testing and Validation
TUFLOW Testing and Validation Christopher. D. Huxley A thesis submitted in partial fulfilment Of the degree of Bachelor of Engineering in Environmental Engineering School of Environmental Engineering Griffith
How To Model A Horseshoe Vortex
Comparison of CFD models for multiphase flow evolution in bridge scour processes A. Bayón-Barrachina, D. Valero, F.J. Vallès Morán, P. A. López-Jiménez Dept. of Hydraulic and Environmental Engineering
Abaqus/CFD Sample Problems. Abaqus 6.10
Abaqus/CFD Sample Problems Abaqus 6.10 Contents 1. Oscillatory Laminar Plane Poiseuille Flow 2. Flow in Shear Driven Cavities 3. Buoyancy Driven Flow in Cavities 4. Turbulent Flow in a Rectangular Channel
HOSPICE ACCOUNTS Analysis of the accounts of UK independent voluntary hospices for the year ended 31 March 2013
Sponsored by chartered accountants & tax advisers Analysis of the accounts of UK independent voluntary hospices for the year ended 31 March 2013 Contents Introduction 3 Definitions and scope 4 Overall
CHAPTER 4 OPEN CHANNEL HYDRAULICS
CHAPTER 4 OPEN CHANNEL HYDRAULICS 4. Introduction Open channel flow refers to any flow that occupies a defined channel and has a free surface. Uniform flow has been defined as flow with straight parallel
Sharp-Crested Weirs for Open Channel Flow Measurement, Course #506. Presented by:
Sharp-Crested Weirs for Open Channel Flow Measurement, Course #506 Presented by: PDH Enterprises, LLC PO Box 942 Morrisville, NC 27560 www.pdhsite.com A weir is basically an obstruction in an open channel
Environment Agency 2014 All rights reserved. This document may be reproduced with prior permission of the Environment Agency.
Flood and coastal erosion risk management Long-term investment scenarios (LTIS) 2014 We are the Environment Agency. We protect and improve the environment and make it a better place for people and wildlife.
21. Channel flow III (8.10 8.11)
21. Channel flow III (8.10 8.11) 1. Hydraulic jump 2. Non-uniform flow section types 3. Step calculation of water surface 4. Flow measuring in channels 5. Examples E22, E24, and E25 1. Hydraulic jump Occurs
Procedure for the Determination of the Permeability of Clayey Soils in a Triaxial Cell Using the Accelerated Permeability Test
Procedure for the Determination of the Permeability of Clayey Soils in a Triaxial Cell Using the Accelerated Permeability Test R&D Technical Report P1-398/TR/2 Dr E. J Murray Research Contractor: Murray
CITY UTILITIES DESIGN STANDARDS MANUAL
CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.
WATER MEASUREMENT USING TWO INCH (50 mm) DRAIN TESTS
GAP.14.1.2.2 A Publication of Global Asset Protection Services LLC WATER MEASUREMENT USING TWO INCH (50 mm) DRAIN TESTS INTRODUCTION A hydrant or other large-volume flow test is necessary for proper water
du u U 0 U dy y b 0 b
BASIC CONCEPTS/DEFINITIONS OF FLUID MECHANICS (by Marios M. Fyrillas) 1. Density (πυκνότητα) Symbol: 3 Units of measure: kg / m Equation: m ( m mass, V volume) V. Pressure (πίεση) Alternative definition:
Module 9: Basics of Pumps and Hydraulics Instructor Guide
Module 9: Basics of Pumps and Hydraulics Instructor Guide Activities for Unit 1 Basic Hydraulics Activity 1.1: Convert 45 psi to feet of head. 45 psis x 1 ft. = 103.8 ft 0.433 psi Activity 1.2: Determine
Using CFD to improve the design of a circulating water channel
2-7 December 27 Using CFD to improve the design of a circulating water channel M.G. Pullinger and J.E. Sargison School of Engineering University of Tasmania, Hobart, TAS, 71 AUSTRALIA Abstract Computational
4.14 Netherlands. Interactive flood risk map of a part of the province of Gelderland in the Netherlands. Atlas of Flood Maps
4.14 Netherlands The Netherlands is flood prone for about 60% of its surface. 95 so-called dike-rings protect the polders from being flooded from the North Sea, rivers or lakes. The protection level has
ASSESSMENT OF VISUALIZATION SOFTWARE FOR SUPPORT OF CONSTRUCTION SITE INSPECTION TASKS USING DATA COLLECTED FROM REALITY CAPTURE TECHNOLOGIES
ASSESSMENT OF VISUALIZATION SOFTWARE FOR SUPPORT OF CONSTRUCTION SITE INSPECTION TASKS USING DATA COLLECTED FROM REALITY CAPTURE TECHNOLOGIES ABSTRACT Chris Gordon 1, Burcu Akinci 2, Frank Boukamp 3, and
Test Data Management Best Practice
Test Data Management Best Practice, Inc. 5210 Belfort Parkway, Suite 400 Author: Stephanie Chace Quality Practice Lead [email protected], Inc. 2011 www.meridiantechnologies.net Table of
