How to Pass an Estimating System Review. February 27, 2013

Size: px
Start display at page:

Download "How to Pass an Estimating System Review. February 27, 2013"

Transcription

1 How to Pass an Estimating System Review February 27, 2013

2 ANNOUNCEMENTS

3 Mr. James J. Gallagher Partner, McKenna Long & Aldridge LLP Ms. Jami Levy Pricing Manager, Northrop Grumman Corporation Mr. David E. Trotta Estimating Manager, ViaSat Inc.

4 The DOD Business Systems Rule February 27, 2013 Jay Gallagher McKenna Long & Aldridge LLP

5 Overview of Final Rule Applicable through clauses in DOD, CAS-covered contracts awarded after May 2011 Imposes numerous system requirements, including SOX like internal controls procedures Approval by ACO/DACO/CACO based upon DCAA opinion Applies to the contractor, meaning the legal entity Rule citations Interim rule (76 Fed. Reg. 28,856 (May 11, 2011)) Final rule (77 Fed. Reg. 11,355 (Feb. 24, 2012))

6 Overview of Final Rule (cont.) Requires existence of six approved systems Accounting (includes internal controls and billing) Purchasing Estimating Materials Management and Accounting Government Property Earned Value Management

7 Overview of System Approval Fundamentals

8 System Approval Fundamentals: No Significant Deficiency Approval requires that no significant deficiency exists Affirmative finding What if no finding? Initial assessment by DCAA Each system is to be approved by ACO/DACO/CACO Must rely on DCAA input unless basis exists to reject Rejection requires board of review Potential for rubber stamping DCAA assessment

9 No Significant Deficiency (cont.) The DFARS Rule defines a significant deficiency as: A shortcoming in the system that materially affects the ability of officials of [DOD] to rely upon information produced by the system that is needed for management purposes The DFARS Rule does not define material Focus is on DOD s perspective SOX/GAAP standards unlikely determinative Comments to Final Rule suggest any failure to comply with a system criterion is material and a significant deficiency

10 No Significant Deficiency (cont.) DCAA guidance Significant deficiency results from a material weakness Material weakness means A deficiency or combination of deficiencies, in internal control over compliance such that there is a reasonable possibility that a material noncompliance with a compliance requirement... will not be prevented, or detected and corrected on a timely basis Material noncompliance means a material noncompliance with DFARS criteria

11 No Significant Deficiency (cont.) DCAA guidance (cont.) Material A reasonable possibility that noncompliance with DFARS criteria will result in material noncompliance with... applicable government contract laws and regulations, thus materially affecting reliability of the data produced by the system Is not financial reporting standard Monetary impact not required

12 No Significant Deficiency (cont.) DCMA guidance Consistent with DCAA guidance Material weaknesses include impacts on any of the following Summary Information the government relies upon to fund contracts Information the government relies upon to price contracts Judgmental While circular in concept, the fundamentals are A noncompliance with a DFARS criterion That is a material noncompliance with law, regulation or contract That impacts the reliability of contractor data

13 No Significant Deficiency (cont.) DCAA s low materiality threshold, combined with a vague deficiency standard, means that the burden will be on the Contractor to show a deficiency is not significant Based on the facts and circumstances; e.g., System design issue Final control point vs. Initial entry subject to final control Compliance issue Number of occurrences (e.g., bad statistical sample) Amount involved Based on system criteria in the relevant system clauses in covered contracts

14 Approval Fundamentals: Key System Criteria Electronic systems that have Strong internal controls Function with minimum errors Are integrated, reconcilable and auditable Robust written policies and procedures that clearly describe the relevant systems and compliance requirements Robust practices for ensuring compliance Training Internal compliance reviews Internal controls (e.g., approval levels) Appropriate and timely resolution of deviations

15 Accounting System Includes cost accounting, cost allowability, billing and ethics Selected areas of focus CAS compliance for contract element cost allocations (among CLINs, sub-clins or units, etc.); relates to EVMS Requirements Indirect cost allocations Consistent practices Reflective of beneficial/causal relationship Cost allowability, including costs of subcontracts, bid and proposal, professional and legal services, travel and insurance

16 Accounting System (cont.) Selected areas (cont.) Internal controls Automated and integrated systems with built-in segregation of employee responsibilities Internal audit activity Functionally and organizationally independent Has requisite specialized knowledge to review government contract compliance Periodically performed System output can be and is reconciled Financial ledgers vs. contract ledgers Sub-ledgers vs. general ledger

17 Accounting System (cont.) Selected areas (cont.) Internal controls (cont.) Error correction Timely Accurate Ethics practices Billings Timely investigation of issues Documented resolution and corrective action Appropriate disclosures and follow-up Errors minimized Reconciled to ledgers

18 Purchasing System Selected areas of focus Integration of estimating and purchasing systems Enforcing TINA requirements Timely and adequate cost and price analysis Contemporaneous and written justification for lack of competition Authorized personnel make purchases based on authorized requisitions Subcontracts executed before any work is performed Update policies and procedure routinely and immediately following new requirements added to FAR/DFARS Training

19 Estimating System New requirement (DFARS (d)(1), d(3), (g)) Disclose system in writing to ACO Comply with the system as disclosed Timely disclosure to ACO of significant changes Significant deficiencies can prompt withholds in accordance with DFARS , when included in the contract Estimating system integration with Accounting system Purchasing system Budgeting process

20 Estimating System (cont.) Selected areas of focus Internal audits of estimating system Too infrequent Lack adequate scope Inadequately documented corrective action Independent management review Insufficient management oversight concerning high-risk proposals Unclear lines of authority for proposal approval Lack of documentation of review/approval process

21 Estimating System (cont.) Selected areas (cont.) Continuous system maintenance/improvement Use internal audits to identify weaknesses and implement corrective action(s); document improvements Comprehensive training plan Timely policy revisions/distribution of updates Sharp focus on proposal format and content Comply with FAR , Table 15-2 (when TINA applies)

22 Government Property System Selected areas of focus Failure to properly tag and track government property Failure to appreciate the breadth of what is government property under cost-type and T&M contracts Use of government property for commercial operations without Government approvals Comingling of contractor and government property; capital type projects that integrate government funding susceptible to challenge

23 Government Property System (cont.) Selected areas (cont.) Government property terms and conditions are not flowed down to subcontractors Lack of audits/due diligence to ensure government property systems are functioning Assumption/reliance upon accounting/purchasing systems to track government property Can result in difficult process to identify government property when questions arise during audits or closeout

24 Government Property System (cont.) Additional risks of noncompliance Cost disallowances because unable to substantiate that property was actually purchased in the quantities for which reimbursement is sought Contractor bears the risk of loss resulting from willful misconduct or lack of good faith by a contractor s managerial personnel

25 MMAS Selected areas of focus Lack of controls to timely identify unauthorized transfers/loans of materials Inadequate inventory controls to track removal of materials from inventory and use on contract Failure to ensure that loaned materials are timely repaid to lending contract Transfers/loans from cost-type contracts to commercial or fixed price work

26 EVMS Selected areas of focus Lack of necessary integration between systems (accounting, purchasing, inventory, program management) to support EVMS Failure to update budgets and schedules as a result of changes, modifications, government delays Inadequate accounting for level of effort functions in program budgets Adjustments of incurred costs lack reconciliation to accounting records

27 Potential Issues Resist temptation to accept imposition of what the government says is a better practice when the current practice is better for your business Monitor government procurement decisions Timely file appropriate bid protests If excluded from a procurement, must file preproposal If not awarded, obtain a debriefing and ascertain the impact of unapproved system(s)

28 DCMA Implementation, Business System Review Panels Established at the DCMA HQ Level Chaired by the Director, Contract Policy Members include: HQs Legal Counsel, System Policy Owner, CBS Policy Owner Purpose: To ensure regulations/policy are followed, consistently applied, action is sufficiently documented, and proper coordination has occurred 18 Reviews as of October 2012: 8 Accounting, 3 Estimating, 2 EV, 3 Property, 2 Purchasing 12 disapproved systems 3 pending further fact finding 3 panel recommended alternative course of action

29 Jami Levy Pricing Manager, Northrop Grumman Corporation

30 data driven Estimating Key to Estimating System Health Jami Levy Northrop Grumman Aerospace Systems Pricing and Estimating Compliance Systems, Training and Tools 30

31 data driven Estimating Why Basis of Estimate (BOE) Focus? BOE - Description data driven Estimating - Definition Fundamentals of data driven Estimating data driven Estimate Examples We are the Customer Non-Proprietary BOE Training Material Available to All 31

32 Background/Objectives Background: There is a significant industry effort to increase the quality of contractor estimating processes. The industry has applied the term data driven estimating to this new method of developing and documenting our estimates/boes. data driven Estimating methods have certain characteristics that are starting to emerge as standards within our industry. Objectives: What is driving our industry toward the use of data driven estimating methods and why is this a business imperative Be able to identify the characteristics of good data driven estimating processes and how they are represented in our BOEs Provide examples of data driven versus non-data driven BOEs Raise the bar by providing access to non-proprietary BOE training 32

33 Mapping of DFARS Cost Estimating System Requirements to Major Estimating System Components 13. Provide for internal review of, and accountability for, the acceptability of the estimating system, including the budgetary data supporting indirect cost estimates and comparisons of projected results to actual results, and an analysis of any differences. Roles 1. Establish clear responsibility for preparation, review, and approval of cost estimates and budgets. 2. Provide a written description of the organization and duties of the personnel responsible for preparing, reviewing, and approving cost estimates and budgets. 12. Require management review, including verification of the estimating and budgeting policies, procedures, and practices. Internal Controls Responsibilities 3. Ensure that relevant personnel have sufficient training, experience, and guidance to perform estimating and budgeting tasks in accordance with the established procedures. Estimate Approval 5. Provide for adequate supervision throughout the estimating and budgeting process. 6. Provide for consistent application of estimating and budgeting techniques. 7. Provide for detection and timely correction of errors. 8. Protect against cost duplication and omissions. 10. Require use of appropriate analytical methods. 14. Provide procedures to update cost estimates and notify the Contracting Officer in a timely manner throughout the negotiation process. 16. Provide estimating and budgeting practices that consistently generate sound proposals that are compliant with the provisions of the solicitation and are adequate to serve as basis to reach a fair and reasonable price. 17. Have an adequate system description, including policies, procedures, and estimating and budgeting practices, that comply with the Federal Acquisition Regulation and Defense Federal Acquisition Regulation Supplement. Estimate Review Estimate Preparation Estimate Data Sources Training 4. Identify and document the sources of data and the estimating methods and rationale used in developing cost estimates and budgets. 9. Provide for the use of historical experience, including historical vendor pricing information, where appropriate. 11. Integrate information available from other management systems. 15. Provide procedures that ensure subcontract prices are reasonable based on a documented review and analysis provided with the prime proposal, when practicable. Well Supported Data Driven Estimating in Key to Estimating System Health 33

34 DFARS Cost Estimating System Requirements 4. Identify and document the sources of data and the estimating methods and rationale used in developing cost estimates and budgets. 9. Provide for the use of historical experience, including historical vendor pricing information, where appropriate. 11. Integrate information available from other management systems. 6. Provide for consistent application of estimating and budgeting techniques. 10. Require use of appropriate analytical methods. 15. Provide procedures that ensure subcontract prices are reasonable based on a documented review and analysis provided with the prime proposal, when practicable. Provide for adequate supervision throughout the estimating and budgeting process. Estimate Data Sources Estimate Preparation Estimate Review 34

35 Purpose of a BOE Documents and substantiates effort required to perform tasks Documents basis and assumptions Details understanding of requirements Conveys credibility by clearly defining tasks and assumptions Demonstrates that estimates are credible, defendable and realistic (historical data) Provides evidence that estimate is consistent with other proposal volumes Time-phased resources consistent with IMP/IMS Allocates resources such as skill mix appropriate for task Aligns with Work Breakdown Structure (WBS), SOW, and other product structures Meet customer funding, timing, and/or scheduling constraints 35

36 BOEs The Components A BOE consists of the following main elements: 1. Work Element ID WBS, SOW, Location, CLIN, NRE/Rec 2. Description of the products or services delivered and the tasks to be performed 3. Estimating method, rationale, assumptions, and computations used to develop the estimate Method of quoting 4. Relevant historical data and comparability of the historical data to the current program Explanation of any adjustments made to historical cost or programmatic data (i.e., use of modifiers) 5. Estimated labor and ODC resources to perform the defined tasks 6. Expenditure profile (time-phasing) of resources 7. Other elements as required by the cost proposal instructions 36

37 BOE Estimating Methods Estimates are developed using one or more of these typical estimating methods Judgment based on subject matter expert (SME) experience with similar efforts. Level-of-Effort/Support - uses resource-based estimates that are often based on a predetermined level of support for a given period of time Analogy/Comparison Method estimate based on historical frame of reference from a similar effort with adjustments for programmatic or technical differences Standard Time Estimating - Labor Standards and Realization/ Performance Factors - time necessary to complete a defined element of work following a prescribed (recognized) technique or method. Unit Method generally a simple ratio (not always statistically validated) Follow-on Based On Actuals extrapolation of actuals (CEAC, production) Parametric Cost Models use of calibrated, internally developed, or commercially available cost models Cost Estimating Relationships (CERs) - equations developed based on historical, statistically correlated relationships (See full training package for more details) 37

38 Customer Expectations Customers/DCAA/DCMA expect contractors to begin adopting improved estimating methods to support TINA-compliant proposals and other estimating products Least Preferred Judgment Most Preferred Fact Based Estimating Methods Move To Fact Based ASAP 38

39 BOE Methodologies Credibility Scale Customer Credibility High Low Labor Follow-on Projections based on Actuals Analogy/Comparison CER s Parametric Estimates / Cost Models Standards Unit Methods Level Of Effort Judgment Historical resource based estimates are easier to support than judgmental type estimates. 39

40 Customer Consequences Poor Estimating Failure to be responsive to customer estimating processes could be grounds for Non-compliance with RFP or government regulations Rejection of proposal and possibly defective pricing Holdbacks Penalties for bad BOEs include: Questioned costs DCAA/Government Flash Report Negotiation losses Negative factor in competitive evaluations Defective pricing and fraud prosecution Suspension of bidding and debarment 40

41 data driven BOEs Basic Definition Fact Based Estimating: Estimating processes/boes that provide the supporting information and rationale necessary for accurate, credible and traceable estimates Information includes: Use of defined estimating methods Historical data from past programs Use of objective scope measures and complexity factors where appropriate Rationale addresses: Complete description of the estimating approach Explanation of the applicability of the historical information Estimating process must be documented, consistent and repeatable 41

42 Fact Based BOEs The Fundamentals 1. Estimate developed using a defined and documented estimating processes 2. Methods rely on scope measures (attributes) and complexity factors (parametrics) when applicable 3. Complete estimate development process is explained and documented in the BOE Professional judgments, modifiers/adjustment factors, and historical context is adequately explained Process is consistent and repeatable 4. Estimate relies on relevant historical data and context that is accessible and verifiable Shows use of latest and most current relevant data Supports all resource estimates with verifiable data 5. Estimating processes are monitored for learning and improvement as required to support future estimates 42

43 Objective Work-Scope Measures (OSM) Scope Measures = estimating predictive measures technical measures relating to the size of the effort (attributes) Generally physical and technical measures Sized at different product levels - system, subsystem, box, etc. Example: Work Products: # drawings by type, sheet counts, # documents & sheet count, SLOC by category, # requirements, # reviews, # test & type, weight, quantities, etc. Traits/Complexity Factors: characteristics that can improve the accuracy of relationships developed for the OSMs Example: Scope Measures = Drawings Traits: (numeric and descriptive): # Drawings, Type of Drawing; Drawing Heritage; Item Next Higher Assembly/Element; Number of Sheets; # of Revisions Example: Scope Measures = Source Lines of Code (SLOC) Traits: Software Language; New SLOC; Modified SLOC; Reuse SLOC; Actual Total Delivered SLOC, Deleted SLOC, Auto Generated Code, etc 43

44 Why Use Scope Measures and Traits in BOEs? Scope Measures - help to scope the size of the effort to be estimated Objective quantitative measures of scope to be performed Directly correlate to (predictors) resource estimates for work products and tasks Understanding the size (scope) of the proposed effort is critical to developing an accurate estimate (BOE) The BOE author should explain the derivation, source, and application of the scope measures in the BOE Traits/Complexity Modifiers address unique characteristics of the scope measures that can affect required effort to produce Capture the effects of technical and programmatic differences between historical programs and the current proposed effort. The produceability can vary widely for any scope measure - traits can be used to explain the differences Sometimes requires judgment 44

45 Explaining Adjustment to a BOE In order to use an objective or subjective adjustment, an estimator must explain it thoroughly. Provided below are some examples of adjustments that may be required to improve the accuracy of the estimate. The list is not meant to be totally inclusive of adjustments an estimator has available in their tool box. Technical Complexity ~ Labor Estimate Improvement Curves ~ Labor Estimate Schedule adjustments ~ Labor Estimate Quote Decrement ~ Material Estimate Quantity Adjustment ~ Material Estimate Escalation ~ Material Estimate Exchange Rate ~ Material Estimate 45

46 Using Historical Data in a BOE Use of Historical Data Must Address: Source of data generally from the organization s certified historical data repositories Complete identification of the nature, source and details of relevant historical data Ensure compliance with A.C.T.T.R. by documenting the following: Actual historical hours Charge numbers included Technical data used Time frame of historical data Repository or source of historical data 46

47 data driven Estimating - Examples We are all confronted in our daily lives with estimates for products and services E.g. Home remodel, auto repair We evaluate the credibility of these estimates based upon the content of the estimate We need to apply this customer mentality when we review our own proposal cost volumes and BOEs Example: Everyone has dealt with an automobile repair estimate that we struggle to feel comfortable with. Evaluate the following BOEs for automobile repair service how do we as consumers know that we are getting a fair price for these services 47

48 D&G Auto Poor, Fair or Good BOE Criteria Description of the products or services delivered and the tasks to be performed Estimated labor resources to perform the defined tasks Time-phasing of labor resources The estimating method, rationale, assumptions, and computations used to develop the estimate Identification of the relevant historical data and comparability of the historical program to the current program Explanation of any adjustments made to the historical data or estimate (i.e., use of modifiers) 48

49 D&G Auto Poor, Fair or Good BOE Criteria Description of the products or services delivered and the tasks to be performed Estimated labor resources to perform the defined tasks Time-phasing of labor resources The estimating method, rationale, assumptions, and computations used to develop the estimate Identification of the relevant historical data and comparability of the historical program to the current program Explanation of any adjustments made to the historical data or estimate (i.e., use of modifiers) 49

50 D&G Auto Poor, Fair or Good BOE Criteria Description of the products or services delivered and the tasks to be performed Estimated labor resources to perform the defined tasks Time-phasing of labor resources The estimating method, rationale, assumptions, and computations used to develop the estimate Identification of the relevant historical data and comparability of the historical program to the current program Explanation of any adjustments made to the historical data or estimate (i.e., use of modifiers) 50

51 data driven Estimating The Challenges Ahead Focus Improve estimating products across all estimating stakeholders (e.g. BOEs, EV, CAPE, ICE, Business Case Analysis) The debate as we evolve to our future At what level will we be generating estimates (e.g. subsystem, assembly) How will we document our estimating processes Historical databases, processes and strategies need to be flexible as we evolve toward the future improved estimating products Estimating, Cost Modeling and Engineering teams working together As the desired characteristics of these high quality estimating methods evolve our methods must evolve also. Immediate needs: Documented estimating process Good historical data Libraries of BOEs demonstrating data driven estimating approaches 51

52 Back Up 52

53 Estimating Method Analogy/Comparison Analogy/Comparison: This method is based on historical context or frame of reference from a similar effort. Compares items being estimated to items of similar configuration and known cost to produce estimate Includes use of historical data Addresses differences between historical data and proposed solution being estimated May use relevant estimating attributes and complexity or adjustment factors (modifiers) to reflect programmatic, technology, requirements or technical differences Clearly document in BOE why and how factors are used and validated Estimated Cost (New Design) = Historical Cost (Similar Design) + Complexity or Scaling Factor 53

54 Estimating Method - Judgment Judgment: Least preferred, least credible estimating method very subject to bias Generally not based upon historical data, scope measures or other sound estimating approaches Relies on SME estimate s of small work packages aggregated to complete hardware, software, etc tasks State author s experience from which to make an estimate Programs worked; Years in industry Decompose effort into well defined tasks and subtasks Disclose if historical methods were investigated and not used, and why they were not used Rarely are we asked to quote something that does not have some similar historical likeness! 54

55 Estimating Method - LOE Level of Effort - Use when customer specifies effort to be provide over a stated period of time on work that can be stated only in general terms Requirement for specific skills/talents that tend to be headcount driven Used when product cannot be well defined Contract is for delivery of hours not product. Payment based on effort expended not results achieved. Restricted LOE Contracts SOW that specifically calls out LOE by customer What is NOT LOE Level loading of labor not specifically directed by customer Staffing a position (i.e. Program Manager) as 155 hrs/month during period of performance on a completion type contract 55

56 David E. Trotta Estimating Manager, ViaSat, Inc.

57 Estimating Systems Overview and Audit Scope February 27, 2013 Presented by David E. Trotta 57

58

59 Agenda Estimating System Overview and Requirements What to Expect in an Audit Steps to Compliance Questions

60

61 Estimating Overview Estimating System Need to disclose system in writing Comply with the system as disclosed You must make timely disclosure to ACO of significant changes Significant deficiencies can prompt withholds in accordance with DFARS Integrate with other systems (e.g., Accounting System) Meet requirements of law and regulation

62 Cost Estimating System Requirements DFARS Estimating system means the Contractor's policies, procedures, and practices for budgeting and planning controls, and generating estimates of costs and other data included in proposals submitted to customers in the expectation of receiving contract awards. Estimating system includes the Contractor's (1) Organizational structure; (2) Established lines of authority, duties, and responsibilities; (3) Internal controls and managerial reviews; (4) Flow of work, coordination, and communication; and (5) Budgeting, planning, estimating methods, techniques, accumulation of historical costs, and other analyses used to generate cost estimates.

63 DFARS Requirement Requires all DoD contractors to have acceptable estimating systems in writing, provides guidelines concerning the characteristics of an adequate estimating system Creates the requirement of the contracting officer to determine adequacy of the cost estimating system

64 Acceptable estimating system means... system that complies with the system criteria and provides for a system that (1) Is maintained, reliable, and consistently applied; (2) Produces verifiable, supportable, documented, and timely cost estimates that are an acceptable basis for negotiation of fair and reasonable prices; (3) Is consistent with and integrated with the Contractor s related management systems; and (4) Is subject to applicable financial control systems.

65 Significant Estimating System Deficiency means Significant deficiency means a shortcoming in the system that materially affects the ability of officials of the Department of Defense to rely upon data and information produced by the system that is needed for management purposes. ( Cost Estimating System Requirements)

66 Estimating System Is different from other system because of it s unique nature Comprised of policies and procedures as well as input from other systems A fair amount of judgment can be involved on any particular estimate; what data from what systems is relevant Often times changes to the solution being proposed does not easily tie back to prior programs or organization changes complicates how past data is relevant

67 Changes in the Business Systems Rules - From Should to Shall Cost Estimating System Requirements DFARS (4) The Contractor s estimating system shall provide for the use of appropriate source data, utilize sound estimating techniques and good judgment, maintain a consistent approach, and adhere to established policies and procedures. An acceptable estimating system shall accomplish the following functions: (i) Establish clear responsibility for preparation, review, and approval of cost estimates and budgets; (ii) Provide a written description of the organization and duties of the personnel responsible for preparing, reviewing, and approving cost estimates and budgets; (iii) Ensure that relevant personnel have sufficient training, experience, and guidance to perform estimating and budgeting tasks in accordance with the Contractor's established procedures; (iv) Identify and document the sources of data and the estimating methods and rationale used in developing cost estimates and budgets; (v) Provide for adequate supervision throughout the estimating and budgeting process; (vi) Provide for consistent application of estimating and budgeting techniques; (vii) Provide for detection and timely correction of errors; (viii) Protect against cost duplication and omissions; (ix) Provide for the use of historical experience, including historical vendor pricing information, where appropriate;

68 From Should to Shall (continued) Cost Estimating System Requirements DFARS (continued) (x) Require use of appropriate analytical methods; (xi) Integrate information available from other management systems; (xii) Require management review, including verification of the company's estimating and budgeting policies, procedures, and practices; (xiii) Provide for internal review of, and accountability for, the acceptability of the estimating system, including the budgetary data supporting indirect cost estimates and comparisons of projected results to actual results, and an analysis of any differences; (xiv) Provide procedures to update cost estimates and notify the Contracting Officer in a timely manner throughout the negotiation process; (xv) Provide procedures that ensure subcontract prices are reasonable based on a documented review and analysis provided with the prime proposal, when practicable; (xvi) Provide estimating and budgeting practices that consistently generate sound proposals that are compliant with the provisions of the solicitation and are adequate to serve as a basis to reach a fair and reasonable price; and (xvii) Have an adequate system description, including policies, procedures, and estimating and budgeting practices, that comply with the Federal Acquisition Regulation and Defense Federal Acquisition Regulation Supplement.

69 Penalties associated with Significant Estimating System Deficiencies Contracts subject to withholds are contracts subject to CAS coverage that contain DFARS and the applicable clause Subject to limitation, ACO has discretion to identify contracts from which to withhold payments Amount 5% for one disapproved system or up to 10% for two or more disapproved systems, of all billings under covered contracts Pre-existing withholds should preclude or reduce further withholds for system disapproval

70 Payments subject to withhold Interim payments under Cost-reimbursement contracts; Incentive type contracts; Time and Material contracts; Laborhour contracts; Progress payments; Performance based payments Once contracting officer is notified of deficiencies correction CO will discontinue withhold if corrections are sufficient Has 90 days to make this determination or future withhold percentage is reduced by at least 50%

71

72 Pre Audit Process (Auditor s Perspective) Auditor will notify contractor of planned audit of the Estimating System Auditor will review prior work done by auditors and any flash estimating system reports Auditor will contact DCMA about any known concerns Auditor will request a listing of proposals for the last 12 months Summarized by customer, contract type and dollar amount

73 Entrance Conference will be Conducted Contractor will be asked To provide a system orientation or briefing Outline any changes to the Estimating System since the last examination Discuss the contractor s risk assessment process Discuss the contractor s monitoring process Discuss any prior weaknesses and actions or improvements steps taken to address these weaknesses Auditor will prepare an internal risk assessment

74 Control Environment/Information & Communications Auditor will evaluate the internal controls this includes looking at ICAPS, integrity and ethical values, competence, Board/Audit committee participation, management philosophy, authority and structure, HR policies and Financial capability Access overall accounting controls, IT systems, files, any recent related changes and query contractor staff on estimating system and process

75 Contractor Monitoring Process / IA /System Description Audit will then look at the contractor s ongoing monitoring process, including internal audit, any external reviews and controls in place Including recommendation and follow up as well as review frequency Review of Estimating System Description Organization charts, written policy, procedures and directives, flowcharts, lines of authority, review and approval, written instructions and integration with other Management Systems

76 Training Determine if regular training is required for those responsible for preparing estimates Includes training of the use of statistical aids and advanced estimating techniques Training covers estimating system policies and procedures Auditor will ask to examine records of training

77 Cost Estimating Development Are estimates developed using appropriate methods, compliance with CAS 401 and 402 Use of historical data, escalation methods, use of Forward Pricing factors, formula pricing methods, catalog pricing, format of proposal (Table 15-2),Certification of Cost or Pricing Data and Subcontractor policies

78 Cost Estimating Development (continued) Selective evaluation of recent pricing proposals for adherence to procedures, Determine if the following characteristics are in place Adequate supervision, management reviews both interim and final reviews that cover soundness of estimates and adherence to policy

79 Audit Conclusion Auditor does an assessment of the contractor Makes determination of adequacy Prepares a draft audit report Conducts an exit conference Finalize the audit report incorporating the contactor s response

80

81 Steps to Compliance Start now, don t wait until you are being notified of an Estimating System Audit Evaluate your Estimating System to ensure required changes are included Consider 3 rd party / consultant Ensure you have your management s support Review Guidance Provided DCAA Audit Program is posted on DCAA website under Standard Audit Programs Additional guidance is provided in DCAA s Contract Audit Manual (CAM)

82 Steps to Compliance (continued) Document your Estimating Policies and Procedures Update or create an Estimating System Manual Ensure the controls are in place but make sure you have the flexibility to respond to all proposals in a compliant manner When a deviation is required to comply with solicitation requirements document them in your proposal and review process

83 Steps to Compliance (continued) Training this will greatly reduce the risk of problems and is an audit hot button Build your controls and system around your business, there is no one size fits all Services are very different from products Larger businesses may have different policies and procedures for different business segments Auditor may not be familiar with your business, don t assume DCAA staff currently reviewing your business will conduct the audit Spend the time necessary to brief and explain your unique issues and approaches

84 Steps to Compliance (continued) During the Audit engage with your auditors Be responsive to issue Be proactive, if there is problem start mitigating it now Demonstrate mitigation steps before the final audit report is issued, request briefing and draft report before report is released If issues can t be resolved with auditor, contractor should provide the auditor with contractors written position to be included in the report

85 Conclusion Be proactive and get your management s support The proposal you are doing now will likely be looked at during the Estimating System Audit so start now Establish a Training and Communication Plan Any single failure can result in a inadequacy determination so don t create a hurdle you can t clear

86

87 For more information about our organizations visit us on our websites

DOECAA Spring Conference Presentation. Cost Reimbursement Contracting Issues - DOE Proposed Business System Rule

DOECAA Spring Conference Presentation. Cost Reimbursement Contracting Issues - DOE Proposed Business System Rule DOECAA Spring Conference Presentation Cost Reimbursement Contracting Issues - DOE Proposed Business System Rule Mary Karen Wills, CPA Director/Leader, BRG Government Contracts 2014 Berkeley Research Group

More information

Post Award Accounting System Audit at Nonmajor Contractors

Post Award Accounting System Audit at Nonmajor Contractors Activity Code 17740 B-1 Planning Considerations Post Award Accounting System Audit at Nonmajor Contractors To provide general guidance for the audit of the adequacy and suitability of nonmajor contractor

More information

Strategic Implications of the New DFARS Business System Rule Co-presented by Venable LLP and Argy, Wiltse & Robinson June 12, 2012

Strategic Implications of the New DFARS Business System Rule Co-presented by Venable LLP and Argy, Wiltse & Robinson June 12, 2012 Strategic Implications of the New DFARS Business System Rule Co-presented by Venable LLP and Argy, Wiltse & Robinson June 12, 2012 1 Panelists Robert A. ( Rob ) Burton, Partner, Venable LLP A 30-year veteran

More information

INTERNAL CONTROL MATRIX FOR AUDIT OF ESTIMATING SYSTEM CONTROLS Version No. 3.2 June 2006. 31-d Page 1 of 7

INTERNAL CONTROL MATRIX FOR AUDIT OF ESTIMATING SYSTEM CONTROLS Version No. 3.2 June 2006. 31-d Page 1 of 7 INTERNAL CONTROL MATRIX FOR AUDIT OF ESTIMATING SYSTEM CONTROLS Version No. 3.2 June 2006 Control Objectives Example Control Activities Audit Procedures 1. INTERNAL AUDITS Management should periodically

More information

DCAA Perspective: Key Subcontracting Practices for Maintaining Approved Business Systems Accounting System and Estimating System

DCAA Perspective: Key Subcontracting Practices for Maintaining Approved Business Systems Accounting System and Estimating System DCAA Perspective: Key Subcontracting Practices for Maintaining Approved Business Systems Accounting System and Estimating System Breakout Session A Alfred J. Massey, Western Region, Special Programs Manager,

More information

CONTACT: 1. Proposed rule BDO GOVERNMENT CONTRACTING PRACTICE GUIDANCE ON THE PROPOSED DOE BUSINESS SYSTEM RULE

CONTACT: 1. Proposed rule BDO GOVERNMENT CONTRACTING PRACTICE GUIDANCE ON THE PROPOSED DOE BUSINESS SYSTEM RULE BDO GOVERNMENT CONTRACTING PRACTICE GUIDANCE ON THE PROPOSED DOE BUSINESS SYSTEM RULE By Eric Sobota, Kelley Doran and Barron Avery Contractors that work for the Department of Energy (DOE) under agreements

More information

Master Document Audit Program. Version 7.4, dated November 2006 B-1 Planning Considerations. Purpose and Scope

Master Document Audit Program. Version 7.4, dated November 2006 B-1 Planning Considerations. Purpose and Scope Activity Code 24010 B-1 Planning Considerations Estimating System Survey (ICR) Purpose and Scope The major objectives of this audit are to: Evaluate the adequacy of and the contractor s compliance with

More information

Master Document Audit Program. Version 1.5, dated September 2015 B-01 Planning Considerations

Master Document Audit Program. Version 1.5, dated September 2015 B-01 Planning Considerations Activity Code 11070 Version 1.5, dated September 2015 B-01 Planning Considerations Accounting System Audit Audit Specific Independence Determination Members of the audit team and internal specialists consulting

More information

What Exactly is an Acceptable Accounting System?

What Exactly is an Acceptable Accounting System? What Exactly is an Acceptable Accounting System? Kristen Soles, CPA Member Stephanie Widzinski, CPA Senior Manager September 27, 2012 Agenda Review DFARS Business System Rule What Agency is Responsible

More information

Federal Regulatory Compliance Best Practices Washington Technology Webcast. September 27, 2012

Federal Regulatory Compliance Best Practices Washington Technology Webcast. September 27, 2012 Federal Regulatory Compliance Best Practices Washington Technology Webcast September 27, 2012 Agenda Topic Minutes Regulatory compliance overview 5 Major areas of financial compliance risk 15 Best practices

More information

July 6, 2015 11(1) CHAPTER 11

July 6, 2015 11(1) CHAPTER 11 July 6, 2015 11(1) CHAPTER 11 Table of Contents Paragraph Page 11-000 Audit of Contractor Compliance with Contract Financial Management Requirements 11-001 Scope of Chapter... 1101 11-100 Section 1 ---

More information

Property Management System (GPMS)

Property Management System (GPMS) Property Management System (GPMS) Business System Overview Sep 20, 2013 Marcia D. Whitson, CPPM, CF NPMA National President DFARS 252.242-7005 Contractor Business Systems DoD Business Systems Rule - Clarifies

More information

Government Contractor Business Systems and Overview of System Assessments

Government Contractor Business Systems and Overview of System Assessments Government Contractor Business Systems and Overview of System Assessments Agenda Overview of business systems rules and environment today 3 rd party assessments Practical solutions Contractor perspective

More information

Post Award Accounting System Audit at Nonmajor Contractors

Post Award Accounting System Audit at Nonmajor Contractors Activity Code 17741 Version 3.1, dated November 2015 B-01 Planning Considerations Post Award Accounting System Audit at Nonmajor Contractors Audit Specific Independence Determination Members of the audit

More information

Preaward Survey of Prospective Contractor Accounting System

Preaward Survey of Prospective Contractor Accounting System Activity Code 17740 B-1 Planning Considerations Preaward Survey of Prospective Contractor Accounting System Purpose and Scope The major objectives of this audit are to obtain an understanding of the accounting

More information

The Devil is in the Details Compliance with the Business Systems Rule

The Devil is in the Details Compliance with the Business Systems Rule Metropolitan Area Corporate Counsel Association WMACCA Conference on Ethics and Compliance for Government Contractors The Devil is in the Details Compliance with the Business Systems Rule April 1, 2014

More information

Material Transfers and Material Management and Accounting System (MMAS)

Material Transfers and Material Management and Accounting System (MMAS) Material Transfers and Material Management and Accounting System (MMAS) The Scenario Risk Assessment-Research and Planning: The auditor was assigned an audit of major contractor MIL s Material Management

More information

Government Accounting, Estimating, and Billing Systems: Pitfalls and Answers

Government Accounting, Estimating, and Billing Systems: Pitfalls and Answers Curtis Matthews, Managing Partner Government Accounting, Estimating, and Billing Systems: Pitfalls and Answers Findley Gillespie, Senior Manager May 18, 2011 1 The material appearing in this presentation

More information

Business Systems: Update on Proposed Rules

Business Systems: Update on Proposed Rules Business Systems: Update on Proposed Rules Presented By: Mark Burroughs, Partner Topics Review of Business System requirements Observations on areas of focus by the government Enforcement of significant

More information

Government Contract Accounting Are You DCAA Compliant? Procurement Technical Assistance Program (PTAP)

Government Contract Accounting Are You DCAA Compliant? Procurement Technical Assistance Program (PTAP) Government Contract Accounting Are You DCAA Compliant? Procurement Technical Assistance Program (PTAP) NH Presentation October 20, 2010 Presented by: Fred Kline, MBA, CPA Tom Martin MBA, CPA Malcolm Young,

More information

How To Audit A Government Contractor

How To Audit A Government Contractor Activity Code 17740 Version 6.11, dated November 2015 B-1 Planning Considerations Preaward Survey of Prospective Contractor Accounting System Audit Specific Independence Determination Members of the audit

More information

Government Contractor Accounting Issues and Contract Holders - A Review

Government Contractor Accounting Issues and Contract Holders - A Review COMMITTEE ON GOVERNMENT BUSINESS Defense Acquisition Regulations System Mr. Mark Gomersall, OUSD (AT&L) DPAP (DARS) Crystal Square 4, Suite 200A 241 18th Street Arlington, VA 22202-3402 Subject: Comments

More information

Inside The Proposed DFARS Business Systems Rule

Inside The Proposed DFARS Business Systems Rule Portfolio Media. Inc. 860 Broadway, 6th Floor New York, NY 10003 www.law360.com Phone: +1 646 783 7100 Fax: +1 646 783 7161 customerservice@law360.com Inside The Proposed DFARS Business s Rule Law360,

More information

Project Management Guidelines

Project Management Guidelines Project Management Guidelines 1. INTRODUCTION. This Appendix (Project Management Guidelines) sets forth the detailed Project Management Guidelines. 2. PROJECT MANAGEMENT PLAN POLICY AND GUIDELINES OVERVIEW.

More information

DEFENSE CONTRACT AUDIT AGENCY DEPARTMENT OF DEFENSE 8725 JOHN J. KINGMAN ROAD, SUITE 2135 FORT BELVOIR, VA 22060-6219

DEFENSE CONTRACT AUDIT AGENCY DEPARTMENT OF DEFENSE 8725 JOHN J. KINGMAN ROAD, SUITE 2135 FORT BELVOIR, VA 22060-6219 DEFENSE CONTRACT AUDIT AGENCY DEPARTMENT OF DEFENSE 8725 JOHN J. KINGMAN ROAD, SUITE 2135 FORT BELVOIR, VA 22060-6219 IN REPLY REFER TO PSP 730.8.B.1/2010-003 February 18, 2011 11-PSP-003(R) MEMORANDUM

More information

Preaward and Post Award Accounting System Audits. November 17, 2011 Pikes Peak NCMA Roland Wick

Preaward and Post Award Accounting System Audits. November 17, 2011 Pikes Peak NCMA Roland Wick Preaward and Post Award Accounting System Audits November 17, 2011 Pikes Peak NCMA Roland Wick OVERVIEW This presentation will provide: 1. The basic criteria for the Preaward and Post Award accounting

More information

The Changing Government Contractor Environment

The Changing Government Contractor Environment The Changing Government Contractor Environment 1 Federal Government Contracting DCAA FY 2014 Report to Congress DCAA Audit Guidance Business systems Federal regulatory rule changes State Contracting (Dept.

More information

DOD's Business Systems Rule: The Challenge Measuring Government Contractor Compliance Against Subjective Criteria and Perceived Risks

DOD's Business Systems Rule: The Challenge Measuring Government Contractor Compliance Against Subjective Criteria and Perceived Risks DOD's Business Systems Rule: The Challenge Measuring Government Contractor Compliance Against Subjective Criteria and Perceived Risks Breakout Session #: B04 Presented by: Michael E. Steen, CPA Date: July

More information

Direct and Indirect Labor. The Scenario

Direct and Indirect Labor. The Scenario Direct and Indirect Labor The Scenario Risk Assessment-Research and Planning: The auditor was assigned to perform a floor check audit for a medium sized contractor during the end of the third quarter of

More information

DCAA Audit R 4 Rights to Records, Requirements & Remedies

DCAA Audit R 4 Rights to Records, Requirements & Remedies San Diego Chapters Present DCAA Audit R 4 Rights to Records, Requirements & Remedies A Seminar with Panel Discussion and Audience Participation February 18, 2009 This Morning s Agenda 8:30 Introduction

More information

Project Management Using Earned Value

Project Management Using Earned Value Project Management Using Earned Value Third Edition Gary C. Humphreys Earned Value Management Consulting Training 2002, 2011, 2014 Gary C. Humphreys Humphreys & Associates, Inc. All rights reserved. No

More information

Cracking the ICE: Ensuring a Compliant Incurred Cost Submission. Carlos Alvarado, VP, FP&A

Cracking the ICE: Ensuring a Compliant Incurred Cost Submission. Carlos Alvarado, VP, FP&A Cracking the ICE: Ensuring a Compliant Incurred Cost Submission Carlos Alvarado, VP, FP&A Agenda Introduction Incurred Cost Proposal ICE Model Leveraging Reporting Applications Inadequacy Letters Q&A 2

More information

GOVERNMENT CONTRACTING MICROSOFT DYNAMICS AX AND

GOVERNMENT CONTRACTING MICROSOFT DYNAMICS AX AND GOVERNMENT CONTRACTING AND MICROSOFT DYNAMICS AX White paper on Government Contracting requirements and considerations in planning for a Dynamics AX implementation. 1 Government Contracting and Microsoft

More information

DCAA Guidelines. How the SBIR firm can work effectively with the Defense Contract Audit Agency

DCAA Guidelines. How the SBIR firm can work effectively with the Defense Contract Audit Agency DCAA Guidelines How the SBIR firm can work effectively with the Defense Contract Audit Agency Today s Presenters OUTLINE Presenter Introduction DCAA & DCMA DCAA Overview Types of DCAA Audits What it takes

More information

Summary of GAO Cost Estimate Development Best Practices and GAO Cost Estimate Audit Criteria

Summary of GAO Cost Estimate Development Best Practices and GAO Cost Estimate Audit Criteria Characteristic Best Practice Estimate Package Component / GAO Audit Criteria Comprehensive Step 2: Develop the estimating plan Documented in BOE or Separate Appendix to BOE. An analytic approach to cost

More information

Evaluation of Defense Contract Management Agency Actions on Reported DoD Contractor Business System Deficiencies

Evaluation of Defense Contract Management Agency Actions on Reported DoD Contractor Business System Deficiencies Inspector General U.S. Department of Defense Report No. DODIG-2016-001 OCTOBER 1, 2015 Evaluation of Defense Contract Management Agency Actions on Reported DoD Contractor Business System Deficiencies INTEGRITY

More information

Pre-Award Accounting Systems

Pre-Award Accounting Systems Pre-Award Accounting Systems 2013 National SBIR Conference Christopher Andrezze, CPA Special Assistant to the Deputy Director May 16, 2013 The views expressed in this presentation are DCAA's views and

More information

How to Develop a FAR-Compliant Cost or Price Proposal

How to Develop a FAR-Compliant Cost or Price Proposal How to Develop a FAR-Compliant Cost or Price Proposal May 21, 2014 Presenter: Paul H. Calabrese Rubino & Company, CPAs & Consultants Senior Manager Tel: 301-214-4137 pcalabrese@rubino.com www.linkedin.com/in/pcalabrese

More information

Activity Code 12500 Material Management and Accounting System (MMAS) Version 9.10, dated September 2015 B-1 Planning Considerations

Activity Code 12500 Material Management and Accounting System (MMAS) Version 9.10, dated September 2015 B-1 Planning Considerations Activity Code 12500 Material Management and Accounting System (MMAS) Version 9.10, dated September 2015 B-1 Planning Considerations Audit Specific Independence Determination Members of the audit team and

More information

Prepare for Self-Certification of the Government Property Management System

Prepare for Self-Certification of the Government Property Management System Prepare for Self-Certification of the Government Property Management System By Jackie Luo, CEO, E-ISG Asset Intelligence Summary: Government Property Management is one of the 6 mandatory business systems

More information

PAS 730.3.B.2.4 April 24, 2012 12-PAS-012(R)

PAS 730.3.B.2.4 April 24, 2012 12-PAS-012(R) DEFENSE CONTRACT AUDIT AGENCY DEPARTMENT OF DEFENSE 8725 JOHN J. KINGMAN ROAD, SUITE 2135 FORT BELVOIR, VA 22060-6219 IN REPLY REFER TO April 24, 2012 MEMORANDUM FOR REGIONAL DIRECTORS, DCAA DIRECTOR,

More information

Defense Contract Audit Agency: What Do They Do and How Does It Affect ME as a Resource Manager? (Breakout #63)

Defense Contract Audit Agency: What Do They Do and How Does It Affect ME as a Resource Manager? (Breakout #63) Defense Contract Audit Agency: What Do They Do and How Does It Affect ME as a Resource Manager? (Breakout #63) Pat Fitzgerald Director Defense Contract Audit Agency The views expressed in this presentation

More information

Accounting System Requirements

Accounting System Requirements Accounting System Requirements Further information is available in the Information for Contractors Manual under Enclosure 2 The views expressed in this presentation are DCAA's views and not necessarily

More information

Contractor Purchasing System Reviews (CPSRs)

Contractor Purchasing System Reviews (CPSRs) Contractor Purchasing System Reviews (CPSRs) San Diego Chapter on February 17, 2010 Panel members: Carl DeWoody Dan Kearney Lil Smith Jim Southerland Facilitator: Maurice Caskey 1 Outline Introduction

More information

THE DCAA AUDIT BECOMING DCAA COMPLIANT

THE DCAA AUDIT BECOMING DCAA COMPLIANT THE DCAA AUDIT Created to oversee government spending on behalf of the American tax-payer, the Defense Contract Audit Agency (DCAA) is responsible for supervising all Department of Defense (DoD) contracts.

More information

Business Systems Compliance Guide

Business Systems Compliance Guide McKenna Government Contracts, continuing excellence at Dentons Government Contractor Business Systems Compliance Guide 2nd Edition Thomas A. Lemmer Steven M. Masiello Michael J. McGuinn Kelly P. Garehime

More information

Master Document Audit Program

Master Document Audit Program Activity Code 11510 B-1 Planning Considerations Information Technology General System Controls Audit Specific Independence Determination Members of the audit team and internal specialists consulting on

More information

PART 6 - INTERNAL CONTROL

PART 6 - INTERNAL CONTROL PART 6 - INTERNAL CONTROL INTRODUCTION The A-102 Common Rule and OMB Circular A-110 (2 CFR part 215) require that non-federal entities receiving Federal awards (i.e., auditee management) establish and

More information

Master Document Audit Program. Version No. 2.9, updated November 2015 B-1 Planning Considerations

Master Document Audit Program. Version No. 2.9, updated November 2015 B-1 Planning Considerations Activity Code B-1 Planning Considerations Cost Realism Audit Specific Independence Determination Members of the audit team and internal specialists consulting on this audit must complete the Audit Specific

More information

Is Your Accounting System Making the Grade? Attributes of an Acceptable Accounting System April 26, 2012

Is Your Accounting System Making the Grade? Attributes of an Acceptable Accounting System April 26, 2012 Is Your Accounting System Making the Grade? Attributes of an Acceptable Accounting System April 26, 2012 2012 All Rights Reserved 805 King Farm Boulevard Suite 300 Rockville, Maryland 20850 301.231.6200

More information

SCOPE OF WORK FOR PERFORMING INTERNAL CONTROL AND STATUTORY/REGULATORY COMPLIANCE AUDITS FOR RECIPIENTS OF SPECIAL MUNICIPAL AID

SCOPE OF WORK FOR PERFORMING INTERNAL CONTROL AND STATUTORY/REGULATORY COMPLIANCE AUDITS FOR RECIPIENTS OF SPECIAL MUNICIPAL AID SCOPE OF WORK FOR PERFORMING INTERNAL CONTROL AND STATUTORY/REGULATORY COMPLIANCE AUDITS FOR RECIPIENTS OF SPECIAL MUNICIPAL AID State of New Jersey Department of Community Affairs Division of Local Government

More information

January 2004 5(1) CHAPTER 5. Table of Contents

January 2004 5(1) CHAPTER 5. Table of Contents January 2004 5(1) Paragraph CHAPTER 5 Table of Contents 5-000 Audit of Policies, Procedures, and Internal Controls Relative to Accounting and Management Systems Page 5-001 Scope of Chapter... 501 5-100

More information

UNIT 34: COST ACCOUNTING STANDARDS

UNIT 34: COST ACCOUNTING STANDARDS UNIT CERTIFICATION Statement of Completion has satisfactorily completed training in the duty of this Unit under the conditions described below and in accordance with the overall standard(s) for this Unit.

More information

Q Srnithsonian Institution

Q Srnithsonian Institution Q Srnithsonian Institution Office of the Inspector General March 3 1,2008 Audit and Review Committee Board of Regents Smithsonian Institution Washington, D.C. 20560 Dear Members of the Audit and Review

More information

CONTRACT ADMINISTRATION AND MANAGEMENT GUIDE

CONTRACT ADMINISTRATION AND MANAGEMENT GUIDE CONTRACT ADMINISTRATION AND MANAGEMENT GUIDE STATE OF IDAHO DEPARTMENT OF ADMINISTRATION DIVISION OF PURCHASING REVISED 01 01 14 Table of Contents I. Purpose... 1 II. Overview of Contract Management and

More information

Clarifies policy regarding the definition and administration of contractor business systems to improve the effectiveness of DCMA/DCAA oversight of

Clarifies policy regarding the definition and administration of contractor business systems to improve the effectiveness of DCMA/DCAA oversight of 1 By now, most of you have had exposure to DoD s interim Business Systems Rule. The intent is to improve the effectiveness of the oversight of contractor business systems by DCMA & DCAA. To quote DoD Contractor

More information

CHAPTER 23. Contract Management and Administration

CHAPTER 23. Contract Management and Administration Date Issued: June 12, 2009 Date Last Revised: September 28, 2015 CHAPTER 23. Contract Management and Administration Table of Contents CHAPTER 23. Contract Management and Administration... 23-1 23.1 Policy...

More information

Audit Issues In Government Subcontracting

Audit Issues In Government Subcontracting Audit Issues In Government Subcontracting Breakout Session E Brent A. Calhoon, CPA, Partner, Baker Tilly Virchow Krause, LLP Janie L. Maddox, CPCM, Fellow, Thursday, March 27 1:30pm 2:45pm Agenda 1. Introductions

More information

Accounting Systems: Complying with FAR Requirements. John S. Sroka, CPA Acquisition Cost/Price Analyst

Accounting Systems: Complying with FAR Requirements. John S. Sroka, CPA Acquisition Cost/Price Analyst Accounting Systems: Complying with FAR Requirements John S. Sroka, CPA Acquisition Cost/Price Analyst Background Information FAR Requirements FAR Part 9: Contractor Qualifications FAR Part 16: Cost-reimbursement

More information

Review of Consultant/Professional Services Cost Accounts

Review of Consultant/Professional Services Cost Accounts Review of Consultant/Professional Services Cost Accounts 1 Table of Contents Risk Assessment Research and Planning Entrance Conference Preliminary Analytical Procedures Results from Preliminary Analytical

More information

Current Initiatives May 2015

Current Initiatives May 2015 DHG 20 th Annual Government Contracting Update Current Initiatives May 2015 Mr. Ken Saccoccia Deputy Director Page 1 One Agency One Mission DCAA Overview Priorities and Better Buying Power Small Business

More information

The Cost Accounting Standards and Consequences of Noncompliance

The Cost Accounting Standards and Consequences of Noncompliance The Cost Accounting Standards and Consequences of Noncompliance Breakout Session E05 Greg Bingham, Vice President, The Kenrich Group LLC Mike LaCorte, Principal, The Kenrich Group LLC Tuesday, December

More information

Decision. Sygnetics, Inc. Matter of: B-404535.5. File: Date: August 25, 2011

Decision. Sygnetics, Inc. Matter of: B-404535.5. File: Date: August 25, 2011 United States Government Accountability Office Washington, DC 20548 Comptroller General of the United States Decision Matter of: File: Sygnetics, Inc. Date: August 25, 2011 Tony Tarkowski for the protester.

More information

FOREWORD. Page 2 of 88

FOREWORD. Page 2 of 88 FOREWORD Earned Value Management (EVM) is one of the DoD s and industry's most powerful program management tools. Government and industry program managers use EVM to assess cost, schedule and technical

More information

October 14, 2015 5(1)

October 14, 2015 5(1) October 14, 2015 5(1) Paragraph CHAPTER 5 Table of Contents 5-000 Audit of Policies, Procedures, and Internal Controls Relative to Accounting and Management Systems Page 5-001 Scope of Chapter... 501 5-100

More information

Government Contracting in 2015: Balancing Risks to Reap Rewards - Compliance Update

Government Contracting in 2015: Balancing Risks to Reap Rewards - Compliance Update Government Contracting in 2015: Balancing Risks to Reap Rewards - Compliance Update Baker Tilly Beers & Cutler, PLLC, is a wholly-owned subsidiary of Baker Tilly Virchow Krause, LLP. 2015 Baker Tilly Beers

More information

CONTRACTOR INVOICE REVIEW AND APPROVAL PROCESS

CONTRACTOR INVOICE REVIEW AND APPROVAL PROCESS SECTION XVI. CONTRACTOR INVOICE REVIEW AND APPROVAL PROCESS For purposes of this Guidebook, the terms "voucher" and "invoice" are used interchangeably. A. PURPOSE The purpose of this document is to provide

More information

WELCOME. Accounting Systems for DOD Contracts

WELCOME. Accounting Systems for DOD Contracts WELCOME Accounting Systems for DOD Contracts Moderator: Layli Pietri, Small Business Manager, Balfour Beatty Construction Speaker: Kay Papin, Government Compliance Manager, McCarthy Group Inc. Accounting

More information

Cost Analysis Key Components Guidance and Checklist

Cost Analysis Key Components Guidance and Checklist Cost Analysis Key Components Guidance and Checklist A Mandatory Reference for ADS Chapter 300 New Edition Date: 04/02/2013 Responsible Office: M File Name: 300mad_040213 COST ANALYSIS KEY COMPONENTS GUIDANCE

More information

TOWN OF SILVERTHORNE, COLORADO RFP for Independent Professional Auditing Services

TOWN OF SILVERTHORNE, COLORADO RFP for Independent Professional Auditing Services Nature of Services Required A. General The Town is soliciting the services of qualified firms of certified public accountants to audit its financial statements for the fiscal year ending December 31, 2011,

More information

Government Contracting and Earned Value Management (EVM)

Government Contracting and Earned Value Management (EVM) Government Contracting and Earned Value Management (EVM) Ida Davis, EVP, PMP, MBA Earned Value Manager DynPort Vaccine Company LLC, A CSC Company Note: This presentation is the property of DynPort Vaccine

More information

TREASURY INSPECTOR GENERAL FOR TAX ADMINISTRATION

TREASURY INSPECTOR GENERAL FOR TAX ADMINISTRATION TREASURY INSPECTOR GENERAL FOR TAX ADMINISTRATION The Internal Revenue Service September 14, 2010 Reference Number: 2010-10-115 This report has cleared the Treasury Inspector General for Tax Administration

More information

STATE OF MINNESOTA MINNESOTA STATE COLLEGES AND UNIVERSITIES Minnesota State University, Mankato/System Office

STATE OF MINNESOTA MINNESOTA STATE COLLEGES AND UNIVERSITIES Minnesota State University, Mankato/System Office STATE OF MINNESOTA MINNESOTA STATE COLLEGES AND UNIVERSITIES Minnesota State University, Mankato/System Office SERVICES CONTRACT/P. O. # Title: THIS CONTRACT, and amendments and supplements thereto, is

More information

GUIDANCE FOR MANAGING THIRD-PARTY RISK

GUIDANCE FOR MANAGING THIRD-PARTY RISK GUIDANCE FOR MANAGING THIRD-PARTY RISK Introduction An institution s board of directors and senior management are ultimately responsible for managing activities conducted through third-party relationships,

More information

DEFENSE CONTRACT AUDIT AGENCY GUIDE FOR DETERMINING ADEQUACY OF CONTRACTOR INCURRED COST PROPOSAL

DEFENSE CONTRACT AUDIT AGENCY GUIDE FOR DETERMINING ADEQUACY OF CONTRACTOR INCURRED COST PROPOSAL Instructions: This form should be completed for each proposal submission and maintained in the permanent file. Adequacy reviews of contractor incurred cost proposals include verification for completeness

More information

Intrigued by government contracting opportunities? What you should look at before you leap

Intrigued by government contracting opportunities? What you should look at before you leap Intrigued by government contracting opportunities? What you should look at before you leap With contracts totaling more than $5 trillion in the past decade alone, the US government is the world s largest

More information

1 1 1 2 2 2 2 3 3 3 3 3 4 4 4 4 5 back

1 1 1 2 2 2 2 3 3 3 3 3 4 4 4 4 5 back Introduction Bid Protest Business Systems Design, Evalution and Validation Contractor Accounting & Compliance Risk Assessments Contractor Purchasing System Review (CPSR) Cost Accounting Standards (CAS)

More information

UNITED STATES DEPARTMENT OF EDUCATION OFFICE OF INSPECTOR GENERAL

UNITED STATES DEPARTMENT OF EDUCATION OFFICE OF INSPECTOR GENERAL UNITED STATES DEPARTMENT OF EDUCATION OFFICE OF INSPECTOR GENERAL AUDIT SERVICES August 24, 2015 Control Number ED-OIG/A04N0004 James W. Runcie Chief Operating Officer U.S. Department of Education Federal

More information

DCAA Contract Audit Manual

DCAA Contract Audit Manual D(1) APPENDIX D Table of Contents Paragraph Page D-000 Technical Specialist Assistance D-001 Scope... D1 D-100 Section 1 --- Deciding Whether Technical Specialist Assistance is Needed D-101 General...

More information

CHAPTER 8. Table of Contents

CHAPTER 8. Table of Contents July 29, 2015 8(1) Paragraph CHAPTER 8 Table of Contents 8-000 Cost Accounting Standards Page 8-001 Scope of Chapter... 801 8-100 Section 1 --- Overview - Cost Accounting Standards Board (CASB) Rules and

More information

AF Life Cycle Management Center

AF Life Cycle Management Center AF Life Cycle Management Center Subcontract Pricing Shannon Prince AFLCMC/PZF Wright-Patterson AFB 24 March 2014 Overview Intro to Subcontracts Pertinent Thresholds PCO & Prime Responsibilities Prime Analysis

More information

MEMORANDUM OF UNDERSTANDING Between Defense Contract Audit Agency and Department of Homeland Security

MEMORANDUM OF UNDERSTANDING Between Defense Contract Audit Agency and Department of Homeland Security MEMORANDUM OF UNDERSTANDING Between Defense Contract Audit Agency and Department of Homeland Security 1. PURPOSE This memorandum sets forth an understanding of contract audit coverage and related audit

More information

GAO. Standards for Internal Control in the Federal Government. Internal Control. United States General Accounting Office.

GAO. Standards for Internal Control in the Federal Government. Internal Control. United States General Accounting Office. GAO United States General Accounting Office Internal Control November 1999 Standards for Internal Control in the Federal Government GAO/AIMD-00-21.3.1 Foreword Federal policymakers and program managers

More information

SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS. Updated through FAC 2005-86 Last updated: 02/2016

SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS. Updated through FAC 2005-86 Last updated: 02/2016 SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS Updated through FAC 2005-86 Last updated: 02/2016 This SECTION is made up of six parts as follows: 1. Annual Representations

More information

GAO DEFENSE CONTRACT AUDITS. Actions Needed to Improve DCAA's Access to and Use of Defense Company Internal Audit Reports

GAO DEFENSE CONTRACT AUDITS. Actions Needed to Improve DCAA's Access to and Use of Defense Company Internal Audit Reports GAO United States Government Accountability Office Report to the Committee on Armed Services, U.S. Senate December 2011 DEFENSE CONTRACT AUDITS Actions Needed to Improve DCAA's Access to and Use of Defense

More information

Master Document Audit Program. Version 4.14, dated November 2015 B-1 Planning Considerations

Master Document Audit Program. Version 4.14, dated November 2015 B-1 Planning Considerations Activity Code 17200 B-1 Planning Considerations Claim Audit, Other Audit Specific Independence Determination Members of the audit team and internal specialists consulting on this audit must complete the

More information

INSPECTOR GENERAL UNITED STATES POSTAL SERVICE

INSPECTOR GENERAL UNITED STATES POSTAL SERVICE OFFICE OF INSPECTOR GENERAL UNITED STATES POSTAL SERVICE Trends and Systemic Issues in Defense Contract Audit Agency Audit Work for Fiscal Years 2009-2012 Management Advisory Report Report Number March

More information

Master Document Audit Program. Version 4.7, dated November 2015 B-1 Planning Considerations

Master Document Audit Program. Version 4.7, dated November 2015 B-1 Planning Considerations Activity Code 10110 Version 4.7, dated November 2015 B-1 Planning Considerations A-133 Audit Audit Specific Independence Determination Members of the audit team and internal specialists consulting on this

More information

STATE UNIVERSITY CONSTRUCTION FUND GUIDELINES FOR AWARD OF PROCUREMENT CONTRACTS

STATE UNIVERSITY CONSTRUCTION FUND GUIDELINES FOR AWARD OF PROCUREMENT CONTRACTS STATE UNIVERSITY CONSTRUCTION FUND GUIDELINES FOR AWARD OF PROCUREMENT CONTRACTS Section I. Purpose The purpose of these Guidelines is to describe the methods and procedures governing the use, awarding,

More information

Rights upon Delivery or When? Holly Emrick Svetz i

Rights upon Delivery or When? Holly Emrick Svetz i Rights upon Delivery or When? Holly Emrick Svetz i For years, contractors have given government employees assess to technical data that is not a deliverable under the contract -- in slides at design review,

More information

Uncompensated Overtime

Uncompensated Overtime Uncompensated Overtime 1 Table of Contents Risk Assessment Research and Planning Risk Assessment Labor System Entrance Conference Preliminary Analytical Procedures Audit Team Brainstorming for Fraud Risk

More information

Basic Financial Requirements for Government Contracting

Basic Financial Requirements for Government Contracting Basic Financial Requirements for Government Contracting 2014 National SBIR/STTR Conference The views expressed in this presentation are DCAA's views and not necessarily the views of other DoD organizations

More information

A GUIDE TO BEST PRACTICES FOR CONTRACT ADMINISTRATION

A GUIDE TO BEST PRACTICES FOR CONTRACT ADMINISTRATION Page 1 of 18 A GUIDE TO BEST PRACTICES FOR CONTRACT ADMINISTRATION OFFICE OF FEDERAL PROCUREMENT POLICY (OFPP) OCTOBER 1994 TABLE OF CONTENTS FOREWORD CONTRACT ADMINISTRATION OVERVIEW OF THE CONTRACT ADMINISTRATION

More information

Peckar & Abramson. A Professional Corporation Attorneys & Counselors at Law

Peckar & Abramson. A Professional Corporation Attorneys & Counselors at Law A Professional Corporation Attorneys & Counselors at Law EXPANSION OF FEDERAL GOVERNMENT AUDIT POWERS AND PROGRAMS: WHAT TO DO WHEN THE AUDITORS ARRIVE Our earlier s described initiatives by the federal

More information

The Program Managers Guide to the Integrated Baseline Review Process

The Program Managers Guide to the Integrated Baseline Review Process The Program Managers Guide to the Integrated Baseline Review Process April 2003 Table of Contents Foreword... 1 Executive Summary... 2 Benefits... 2 Key Elements... 3 Introduction... 4 IBR Process Overview...

More information

TOPIC 12 CONTRACT COST AND PRICE ANALYSIS

TOPIC 12 CONTRACT COST AND PRICE ANALYSIS CONTRACT AUDIT GUIDE FRAMEWORK TOPIC 12 CONTRACT COST AND PRICE ANALYSIS Objective To determine whether the agency effectively conducts cost or price analysis to arrive at fair and reasonable prices for

More information

February 3, 2016 12(1) CHAPTER 12

February 3, 2016 12(1) CHAPTER 12 February 3, 2016 12(1) CHAPTER 12 Table of Contents Paragraph Page 12-000 Auditing Contract Termination, Delay/Disruption, and Other Price Adjustment Proposals or Claims 12-001 Contract Terminations and

More information

Position Classification Standard for Industrial Property Management Series, GS-1103. Table of Contents

Position Classification Standard for Industrial Property Management Series, GS-1103. Table of Contents Position Classification Standard for Industrial Property Management Series, GS-1103 Table of Contents SERIES DEFINITION... 2 EXCLUSIONS... 2 OCCUPATIONAL INFORMATION... 3 TITLES... 4 PART I - INDUSTRIAL

More information

Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards AT 2 CFR 200

Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards AT 2 CFR 200 Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards AT 2 CFR 200 November 11, 2014 WHAT S CHANGING AND WHEN? Grants Reform Office of Management and Budget Circulars

More information