WP1 Transnational project management and coordination
|
|
|
- Sophia Nelson
- 10 years ago
- Views:
Transcription
1 The Spatial Development Concept of Interregional Co-operation in the Danube Space SEE EoI/A/246/4.2/X WP1 Transnational project management and coordination WP 5 - Sectoral Strategies Development Methodology 1
2 DONAUREGIONEN+ Work Package 5 - Sectoral Strategies Development Methodology INTRODUCTION Following text represents first draft of Work Package 5 (WP5) Sectoral Strategies Development methodology in the DONAUREGIONEN+ project. Goals, tasks and work steps are defined here. Main task of this WP is identification and specification of strategic objectives, priorities and key development plans of each NUTS3 region included to the area of interest. For this purpose it will be necessary at first to identify and then to summarize the existing strategic development (spatial planning) documents at the EU, national, regional and local level. These documents will be the basic source of information for the purpose of obtaining of the needed data. According to the WP4 structure, main objectives, priorities and key planned activities will be specified in four separately fields: natural conditions, settlement structure & human resources, transport & technical infrastructure and economy. Summary list of main objectives, priorities and key development plans for each NUTS3 region of the project area will be the output of WP5. This list will be in unified structure and according to general schemes will be structured into four fields. Text outputs will be supplemented with map outputs. WP4 with WP5 outputs will serve as a basic material for the next tasks within the WP6 Crossdanube Strategies Development and WP7 Comprehensive Strategy. MAIN OBJECTIVE OF WP5 Main objective of WP5 is to map all of existing strategic spatial development plans divided in the European, national, regional and local level in all NUTS3 regions of the project area. INPUTS As basic input materials will be used existing strategic spatial planning documents at: European level, national level, regional (NUTS3) level, local level. First step of the WP5 will be to identify these documents in every NUTS3 region. Following phase will consist of the summarizing of the documents. From obtained documents will be specified data strategic development objectives, priorities and key planned activities. Outgoing from the WP4 and the 4 general schemes logic these data will be focused on the fields: natural conditions, settlement structure and human resources, transport and technical infrastructure, economy. As the second inputs will be used outputs from the WP4 Analyses completion. OUTPUTS WP5 outputs are: SWOT analysis Sectoral strategies database Map outputs 2
3 1. SWOT analysis Identification of the problem fields in individual NUTS3 regions SWOT analysis will be one of the main outputs of the WP5. It will be purpose made SWOT analysis, which will be done on the basis of the information obtained from strategic development documents specified in the section inputs. The SWOT analysis will be figured in the x/y coordinate system, where the x axis refers to strengths and weaknesses and the y axis refers to opportunities and threats. By the position of particular indicators within the coordinate system will be possible to propose type of strategy for the region development, mainly for strengthening the cross Danube linkages. 2. Complete Sectoral Strategies Database Comprehensive database of strategic development objectives, priorities and key planning activities will be the next WP5 output. This database will contain all NUTS3 regions of the project., priorities and key activities will be divided according to general schemes into four separately fields: Natural conditions, Settlement structure and human resources, Transport and technical infrastructure, Economy. Each NUTS3 region will have individual sectoral strategies database. Due to necessity of mutual comparison of obtained data in the following project phase (WP6 Crossdanube Strategies Development), these databases will be in unified structured form. Structure of final document Final document will consist of the following data for each NUTS3 region and for each general scheme: Long-term and specific objectives,, measures and activities, Key projects project pipeline,. Data structure template NUTS3 region name Natural conditions Settlement structure and human resources Transport and technical infrastructure 3
4 Economy 3. Map outputs Sectoral strategies database will be supplemented with map outputs outgoing from the text part of the document. Map outputs will be created on the basis of obtained datas from strategis development documents. According to structure of general schemes following map outpusts will be created: Natural conditions map, Spatial structure map, Transport and technical infrastructure map, Cartograms and cartodiagrams describing main socio-economic features. For the purpose of creation of quality map outputs, it will be necessary sufficient information database in GIS and its permanent updating. PROCESSING We propose following work steps: 1. Identification of key stakeholders in the field of spatial planning on national and regional level. It means authorities, which are responsible for creation of strategic and spatial planning documents in the area. 2. Identification of individual strategic development documents for each NUTS 3 region at: European level National level Regional level (NUTS3) Local level key municipalities 3. Summarization of strategic development documents listed in previous point 4. Identification of problems SWOT analysis 5. Identification and description of main objectives, priorities and key activities for individual NUTS3 regions Important role by identification of the objectives, priorities and activities will play database structure used in WP4. DonauDatenKatalog Very important data source will be metainformation system DonauDatenKatalog (DDK). DDK will serve as a database to identification and description of key stakeholders in the field of spatial planning, strategic spatial planning documents, as well as development activities. At the same time DDK will be continuously completed with data obtained within this WP. TIME SCHEDULE WP5 activities start in December 2009 and finish in May 2011, which means, that total duration of this task is 18 months. 4
5 Proposed working schedule is as follows: Activity Duration From to Documents identification 2 months Key stakeholders identification 2 months Documents summarization 1 month Data identification 5 months Final database creation 3 months SWOT analysis elaboration 3 months Map outputs creation 3 months Completion, finalization 1 month EXAMPLE OF SPATIAL DEVELOPMENT DOCUMENTS NITRA COUNTY Identification of strategic development documents from Nitra self-government county: EU level: ESPON, ESDP, Vision Planet, etc. National level: National Strategic Reference Framework (NSRF), Conception of Spatial Development of Slovakia 2001, National Development Plan, National Plan of Regional Development of Slovakia, Informatisation of Society Strategy, etc. Regional level: Action Plan of Development of Nitra County, Program of Economy and Social Develompent of Nitra County, Spatial and Function Potential of Nitra River, Situation Analysis of Nitra County, Physical Regional Plan of Nitra County, etc. Local level: Program of Economy and Social Develompent of Nitra Municipality, Physical plan of Nitra Municipality, etc. 5
General scheme Human Resources & Settlement Structure
General scheme Human Resources & Settlement Structure Julia SPIRIDONOVA Bulgaria Donauregionen Final Conference HUMAN RESOURCES General Population Data Total population: 20 millions Romania - 37% Bulgaria
3.2.2 National cluster management concepts
2CE132P1 - CNCB 3.2.2 National cluster management concepts Work Package WP3 Cluster management Action 3.2.2 Author PP08 + PP09 - Elena Stieranková, Peter Filo Version Date 2.11.2011 Status final version
RailCalc. Calculation of charges for the Use of Railway Infrastructure THE RAILCALC PROJECT OVERVIEW & RESULTS. Paulo Teixeira - CENIT
Calculation of charges for the Use of Railway Infrastructure THE RAILCALC PROJECT OVERVIEW & RESULTS Paulo Teixeira - RAILCALC WORKSHOP Brussels, February 15 th, 2008 Team European Commission: DG Energy
SOUTH EAST EUROPE TRANSNATIONAL CO-OPERATION PROGRAMME. Terms of reference Policy Learning Mechanisms in Support of Cluster Development
SOUTH EAST EUROPE TRANSNATIONAL CO-OPERATION PROGRAMME 3 rd Call for Proposals Terms of reference Policy Learning Mechanisms in Support of Cluster Development March 2011 1. Background Networking activities
Guideline. Records Management Strategy. Public Record Office Victoria PROS 10/10 Strategic Management. Version Number: 1.0. Issue Date: 19/07/2010
Public Record Office Victoria PROS 10/10 Strategic Management Guideline 5 Records Management Strategy Version Number: 1.0 Issue Date: 19/07/2010 Expiry Date: 19/07/2015 State of Victoria 2010 Version 1.0
URBACT III Programme Manual
URBACT III Programme Manual Fact Sheet 2A Action Planning Networks Table of contents Fact Sheet 2A 1. Main objectives and expected results... 1 2. Network s development... 2 3. Partnership... 3 4. Activities
Sample marketing plan template
Sample marketing plan template Table of Contents 1) Executive summary Page # 2) Situation analysis Page # 3) Marketing strategy Page # 4) Financials Page # 5) Implementation and Contingency Page # http://www.entrepreneurmag.co.za/
2014-2019 HUMAN SETTLEMENTS PRIORITIES (MTSF)
2014-2019 HUMAN SETTLEMENTS PRIORITIES (MTSF) PRESENTATION OVERVIEW A vision and mission for human settlements Transforming human settlements and National Space Identified sub-outcomes to achieve the expected
Final Project Evaluation
Version 13.03.06 project UNDP 00037059 / EC 08.ACP.MOZ.014-1 Final Project Evaluation UNDP 00037059 / EC 08.ACP.MOZ.014-1 Enterprise Mozambique Project Terms of Reference 1. PROJECT S BACKGROUND INFORMATION
Interreg CENTRAL EUROPE Programme. Application Manual. Part D: How to apply with us
Interreg CENTRAL EUROPE Programme Application Manual Part D: (amended version of 18 February 2015: section IV.2.5, page D32 correction of preparation costs) Content Part A Part B Part C Part D What is
ATTACHMENT B PROGRAM MANAGEMENT SERVICES BEXAR COUNTY FY 2007 - FY 2017 FLOOD CONTROL PROJECTS
ATTACHMENT B PROGRAM MANAGEMENT SERVICES BEXAR COUNTY FY 2007 - FY 2017 FLOOD CONTROL PROJECTS The following scope of services for program management is an effort to provide an encompassing but not all
Logan City Council. Strategic Planning and Performance Management Framework
Logan City Council Strategic Planning and Performance Management Framework 1 Table of contents 1. Overview 3 a) Purpose 3 b) Key Features 3 2. Context 4 a) National Framework for Sustainability 4 b) Elements
COHESION POLICY 2014-2020
COMMUNITY-LED LOCAL DEVELOPMENT COHESION POLICY 2014-2020 The new rules and legislation governing the next round of EU Cohesion Policy investment for 2014-2020 have been formally endorsed by the Council
Strategic Planning. Strategic Planning
4 Strategic Planning Strategic Planning 1 4 TABLE OF CONTENTS Strategic Planning 3... What is Strategic Planning? 3... Why do Strategic Planning? 4... Assessing Your Strategic Planning 5... Developing
Application form. Interreg Europe Application form 1 / 23. Sharing solutions for better regional policies
European Union European Regional Development Fund Sharing solutions for better regional policies Application form Disclaimer: This document was endorsed by the programming committee on 10 February 2015.
Management. PLANNING Internal and External Organization Environment SWOT analysis
Management PLANNING Internal and External Organization Environment SWOT analysis Planning 1. Definition 2. Contributions 3. Types of plans 4. Draw up the plan 5. Principles of planning Planning Planning
Community Led Local Development (CLLD) What is it and how could it work?
Community Led Local Development (CLLD) What is it and how could it work? Tamsin Rose, Health Gain project Proposals for Cohesion Policy 2014-2020 Closer alignment of policy commitments and investments
Terms of Reference for carrying out a Comprehensive Job Evaluation Exercise for Nile Basin Initiative (NBI)
Terms of Reference for carrying out a Comprehensive Job Evaluation Exercise for Nile Basin Initiative (NBI) 1. Background The Nile Basin Initiative (NBI) was established on 22 February 1999 by the Nile
Aging and Disability Resource Centers: Five Year Plan for Expanding ADRCs Statewide
Aging and Disability Resource Centers: Five Year Plan for Expanding ADRCs Statewide Florida Department of Elder Affairs Charles T. Corley, Interim Secretary April 1, 2011 FLORIDA DEPARTMENT OF ELDER AFFAIRS
Training Guide #1: Strategic Planning
Training Guide #1: Strategic Planning Where are we going? How will we get there? What is Strategic Planning? Strategic planning is the process of determining your program's long-term goals and identifying
The Seven-S S Model. A framework to guide and evaluate organization development to achieve vision and produce desired performance results.
The Seven-S S Model A framework to guide and evaluate organization development to achieve vision and produce desired performance results. Framework The 7 S model has its origins from the classic, 'The
STRATEGIC PLANNING BACKGROUND AND PRACTICE
Module 2 STRATEGIC PLANNING BACKGROUND AND PRACTICE 1 John Glazebrook STRATEGIC PLANNING Introducing SWAp for Environment Belgrade, 24-25 July 2012 Today Look at Why do Strategic Planning? A mixture of
CREATING YOUR LIBRARY S BUSINESS PLAN:
CREATING YOUR LIBRARY S BUSINESS PLAN: A How-To-Do-It Manual with Samples on CD-ROM JOY HP. HARRIMAN HOW-TO-DO-IT MANUALS NUMBER 163 NEAL-SCHUMAN PUBLISHERS, INC. New York London Published by Neal-Schuman
MULTI-LEVEL GOVERNANCE: CASE OF CENTROPE
MULTI-LEVEL GOVERNANCE: CASE OF CENTROPE Mihály Lados C.Sc. and László Jóna PhD candidate (WHRD CRS of CERS HAS, Győr) Territorial Cohesion in Europe The 70 th anniversary of the Transdanubian Research
INTERACT III 2014-2020 Operational Programme version 2.4 (pre-final draft), June 2014
INTERACT III 2014-2020 Operational Programme version 2.4 (pre-final draft), June 2014 CCI Title INTERACT III 2014-2020 Version First year Last year Eligible from Eligible until EC decision number EC decision
From the light to the full application form focus on work plan
Lead Applicant Training, Prague, 20 October 2015 From the light to the full application form focus on work plan Monika Schönerklee-Grasser, Head of JS Evaluation and Monitoring Unit Full application form
Where available we have reviewed preliminary documents completed as part of these studies.
1. Introduction urbanmetrics inc. has been retained by the City of Vaughan to conduct a Commercial Land Use Review (CLR). The purpose of this study is to examine the current commercial structure in the
SWOT (STRENGTHS, WEAKNESS, OPPORTUNITIES AND THREATS) ANALYSIS
INTERREG III C, ZONE SUD ROBIN WOOD : REVITALIZATION OF RURAL AREAS THROUGH SUSTAINABLE DEVELOPMENT BY MEANS OF INTEGRATED FORESTRY DEVELOPMENT. COMPONENT 2: HIDROGEOLOGY SWOT (STRENGTHS, WEAKNESS, OPPORTUNITIES
ISO 9000 QUALITY MANAGEMENT PRINCIPLES AND GUIDELINES ON THEIR APPLICATION
1.0 Introduction ISO 9000 QUALITY MANAGEMENT PRINCIPLES AND GUIDELINES ON THEIR APPLICATION This document provides an understanding of the Quality Management Principles that will facilitate a successful
THE INFLUENCE OF EXHIBITION ACTIVITIES ON REGIONAL DEVELOPMENT IN TERMS OF INTERNATIONAL COOPERATION
Olha Vdovichena Anatolii Vdovichen Chernivtsi Trade and Economics Institute of KNTEU THE INFLUENCE OF EXHIBITION ACTIVITIES ON REGIONAL DEVELOPMENT IN TERMS OF INTERNATIONAL COOPERATION Preface Nowadays
Emergency Support Function (ESF) #14 Long-Term Community Recovery
Emergency Support Function (ESF) #14 Long-Term Community Recovery Primary Department(s): St. Louis County Police Department, Office of Emergency Management Support Department(s): St. Louis County Housing
Interreg CENTRAL EUROPE Programme Announcement of the first call for proposals step 1
Interreg CENTRAL EUROPE Programme Announcement of the first call for proposals step 1 12 February 2015 1. ANNOUNCEMENT The Interreg CENTRAL EUROPE Programme invites public and private organisations established
Proposal. for the establishment of the CETC EGTC
Proposal for the establishment of the CETC EGTC Brief introduction to the CETC initiative On the 26 th May 2010, the Steering Committee of the CETC consortium in its meeting in Varaždin (Croatia) approved
EVALUATION GUIDELINES
EVALUATION GUIDELINES Introduction This document outlines the reviewing process and defines the responsibilities of the participants in the process. It details a number of important issues, such as: FCT
CROATIA - TURKEY Preparation Screening Bi-lateral meetings List of questions related to key acquis requirements
CROATIA - TURKEY Preparation Screening Bi-lateral meetings List of questions related to key acquis requirements Please describe the provisions in place, and envisaged. Please underline any problem or difficulty
Strategic Planning Process Map
Advancing Statewide Spatial Data Infrastructures in Support of the National Spatial Data Infrastructure (NSDI) Strategic Planning Process Map For use by all Stakeholders in the Geospatial Community Produced
FINLAND * 1. REGIONAL DISPARITIES AND PROBLEMS. Figure 1: Finland. Finland
FINLAND * 1. REGIONAL DISPARITIES AND PROBLEMS The south-west core regions are areas of economic and population concentration; the rest of Finland consists of sparsely-settled rural areas. The key regional
MP4 WP4.1 Retroactive evaluation of on-the-ground benefits
MP4 WP4.1 Retroactive evaluation of on-the-ground benefits Evaluation report: Gamlestaden in Gothenborg, Sweden Academics University of Copenhagen Copenhagen, Denmark Practitioner City of Gothenburg Gothenburg,
Results of Public Opinion Poll and Review of International Practice About the draft law on Vocational Education (December 2006)
Results of Public Opinion Poll and Review of International Practice About the draft law on Vocational Education (December 2006) 1.1 Focus group analysis 1 From October through November 2006 Transparency
Hunter New England Health Research Plan 2015-2016
Hunter New England Health Research Plan 2015-2016 Hunter New England Health Research Plan 2015-2016_Final Revised September 2015 Page 1 CONTENTS Foreword... 4 Glossary... 6 HNE Health Strategy Map... 7
Desegregation Plan in the Hungarian Integrated Urban Development Strategies Tagai Gergely
Patterns of Spatial and Ethnic Inequalities Workshop 3-4 th May Ostrava, Czech Republic Desegregation Plan in the Hungarian Integrated Urban Development Strategies Tagai Gergely junior research fellow
Contents and timeline of the first call of CENTRAL EUROPE 2020
CENTRAL EUROPE Annual Conference, Vienna, 1 July 2014 Contents and timeline of the first call of CENTRAL EUROPE 2020 Luca Ferrarese Joint Secretariat Contents 1. 2007-2013 vs 2014-2020: What s new? 2.
Chapter 2: Strategic Market Planning. Part b. Clear Product Management & Marketing / Shoham Eckhaus
54 Chapter 2: Strategic Market Planning Part b 55 Topic Covered 2.1. Key Strategy Decisions 2.2. Strategy Types 2.3. Market Analysis and Sizing 2.4. SWOT Analysis 2.5. The Business Mission 2.6. Ongoing
SEA AND SIA - TWO PARTICIPATIVE ASSESSMENT TOOLS FOR SUSTAINABILITY
SEA AND SIA - TWO PARTICIPATIVE ASSESSMENT TOOLS FOR SUSTAINABILITY Kerstin Arbter Published in: Conference proceedings of the EASY ECO 2 Conference, May 15-17, 2003, Vienna, p. 175-181 1 Introduction
Draft WGIG Issue paper on Affordable and Universal Access
Draft WGIG Issue paper on Affordable and Universal Access This paper is a 'draft working paper' reflecting the preliminary findings of the drafting team. It has been subject to review by all WGIG members,
How To Develop Tourism In Rural Areas
- Ente abilitato dalla ai Project acronym: COSME Programme 2014 Call for proposals COS-WP2014-3-15.03 Diversifying the EU Tourism Offer and Products Sustainable Transnational Tourism Products 2014 Karol
Dar es Salaam Masterplan 2012 2032 Ministry of Lands, Housing and Human Settlements Development
Dar es Salaam Masterplan 2012 2032 Ministry of Lands, Housing and Human Settlements Development Roma_22 April 2013 Dodi Moss Happold Group AfriArch QConsult CONTENTS PART I : MAIN REPORT Introduction FIRST
1 INTRODUCTION AND SUMMARY OF ACHIEVEMENTS... 2 2 PROJECT MANAGEMENT... 3 3 GENERAL PROGRESS IN THE PROJECT... 3
TABLE OF CONTENTS 1 INTRODUCTION AND SUMMARY OF ACHIEVEMENTS... 2 2 PROJECT MANAGEMENT... 3 3 GENERAL PROGRESS IN THE PROJECT... 3 4 DETAILED OVERVIEW OF THE PROGRESS... 4 4.1 Progress on Component 1 -
Technical guidance ADRION on-line application system ems
Technical guidance ADRION on-line application system ems Version 2.0-29 February 2016 Table of Content 1. Purpose... 3 2. Technical information and system requirements... 4 3. Access and registration...
LUKHANJI MUNICIPALITY PERFORMANCE MANAGEMENT FRAMEWORK
LUKHANJI MUNICIPALITY PERFORMANCE MANAGEMENT FRAMEWORK INTRODUCTION The Municipal Systems Act, 2000, which requires a municipality to establish a performance management system that is: Commensurate with
The Need for Long-Term Disaster Recovery Systems
Ninth LACCEI Latin American and Caribbean Conference (LACCEI 2011), Engineering for a Smart Planet, Innovation, Information Technology and Computational Tools for Sustainable Development, August 3-5, 2011,
DRAFT Enterprise Community Partners CITY OF DURHAM. Date GOALS. Karen Lado, Consultant March 10, 2016
DRAFT Enterprise Community Partners CITY OF DURHAM AFFORDABLE Title HOUSING Date GOALS Karen Lado, Consultant March 10, 2016 Useful Definitions Income Groups Low-income: 51-80% AMI Very low income: 31-50%
Frequently Asked Questions: Department of the Environment Natural Resource Management (NRM) Monitoring, Evaluation, Reporting and Improvement (MERI)
Frequently Asked Questions: Department of the Environment Natural Resource Management (NRM) Monitoring, Evaluation, Reporting and Improvement (MERI) Version: 27 November 2013. This document may be updated
Helka-Liisa Hentilä and Leena Soudunsaari. Land Use Planning Systems and Practices Oulu Skanderborg Umeå
Helka-Liisa Hentilä and Leena Soudunsaari Land Use Planning Systems and Practices Oulu Skanderborg Umeå Helka-Liisa Hentilä and Leena Soudunsaari Land Use Planning Systems and Practices Oulu Skanderborg
Guidance Note on Developing Terms of Reference (ToR) for Evaluations
Evaluation Guidance Note Series UNIFEM Evaluation Unit October 2009 Guidance Note on Developing Terms of Reference (ToR) for Evaluations Terms of Reference (ToR) What? Why? And How? These guidelines aim
Using Evaluation to Improve Programs. Strategic Planning. www.cdc.gov/healthyyouth/evaluation
Using Evaluation to Improve Programs Strategic Planning www.cdc.gov/healthyyouth/evaluation PROGRAM STRATEGIC PLANNING KIT Table of Contents Introduction Part 1: What is strategic planning? Part 2: What
Module 7 8/12/2010. What types of strategies are used by organizations? How are strategies formulated and
Module 7 Module 7 Strategy and Strategic Management What types of strategies are used by organizations? How are strategies formulated and implemented? 7.1 Types of organizational strategies Comprehensive
Step 1: Analyze Data. 1.1 Organize
A private sector assessment combines quantitative and qualitative methods to increase knowledge about the private health sector. In the analytic phase, the team organizes and examines information amassed
Summary Project Fiche
Summary Project Fiche 1. Basic Information 1.1. Désirée Number: BG 0203.13 1.2. Title: Development and Implementation of VIES requirements and EU interoperability standards in the field of VAT within the
Using the logical framework matrix
Using the logical framework matrix Defining the M&E Strategy for a programme/project A logical framework Clearly defined results and risks Performance indicators and means of verification An M&E plan for
REGIONAL DIMENSION OF THE 7th FRAMEWORK PROGRAMME. The new Call and Work Programme. Regions of Knowledge 2012-13-1
1 REGIONAL DIMENSION OF THE 7th FRAMEWORK PROGRAMME The new Call and Work Programme Regions of Knowledge 2012-13-1 Dr. Salvatore La Rosa Policy and Project officer European Commission Directorate General
Identification. Preparation and formulation. Evaluation. Review and approval. Implementation. A. Phase 1: Project identification
II. Figure 5: 6 The project cycle can be explained in terms of five phases: identification, preparation and formulation, review and approval, implementation, and evaluation. Distinctions among these phases,
JA to support the ehealth Network
JA to support the ehealth Network ehealth Network & ehgi Directive 2011/24/EU of the European Parliament and of the Council on the application of patients` rights in cross-border healtcare 08.05.2015 2
REPUBLIC OF LATVIA MINISTRY OF DEFENCE NATIONAL ARMED FORCES CYBER DEFENCE UNIT (CDU) CONCEPT
REPUBLIC OF LATVIA MINISTRY OF DEFENCE NATIONAL ARMED FORCES CYBER DEFENCE UNIT (CDU) CONCEPT Riga 2013 Introduction In accordance with the National Security Concept, information technology threats or
Office for the CEI Fund at the EBRD. CEI Know-how Exchange Programme (KEP) KEP ITALY. Financed by the CEI Fund at the EBRD contributed by Italy
Office for the CEI Fund at the EBRD CEI Know-how Exchange Programme (KEP) KEP ITALY Financed by the CEI Fund at the EBRD contributed by Italy Call for Proposals 201 Date of publication on www.cei.int 29
Black Country Local Enterprise Partnership Report of the Level 1 LEED Workshop
Black Country Local Enterprise Partnership Report of the Level 1 LEED Workshop Held on 20 March 2014 at the Black Country Consortium The Deckhouse Brierley Hill, Dudley. Produced on behalf of the Black
PART 7: OVERVIEW ON PROJECT IMPLEMENTATION PRINCIPLES
Applicants Manual for the period 2014 2020 Version 1 PART 7: OVERVIEW ON PROJECT IMPLEMENTATION PRINCIPLES edited by the Managing Authority/Joint Secretariat Budapest, Hungary, 2015 Disclaimer This document
SCHEDULE 8 Generalist Project Services Framework 2015
SCHEDULE 8 Generalist Project Services Framework 2015 Nominal Insurer And Schedule 8 (Project Services Framework) Page: 1 of 6 Schedule 8 Generalist Project Services Framework Contents Overview... 3 1.
Minnesota Health Insurance Exchange Project (MNHIX) Deliverable Definition Document (DDD) For Project Management Plan Date: 07-31-2012
Minnesota Health Insurance Exchange Project (MNHI) Deliverable Definition Document (DDD) For Project Plan Date: 07-31-2012 11/9/2012 1:18 PM Page 1 of 8 1. High Level Deliverable Description The Project
ISSN 2443-8308. EaSI performance in 2014. Executive summary of EaSI Performance Monitoring Report 2014. Social Europe
ISSN 2443-8308 EaSI performance in 2014 Executive summary of EaSI Performance Monitoring Report 2014 Social Europe The European Union Programme for Employment and Social Innovation (EaSI) aims to contribute
Screening report Croatia
8 March 2007 Screening report Croatia Chapter 22 Regional policy and coordination of structural instruments Date of screening meetings: Explanatory meeting: 11 12 September 2006 Bilateral meeting: 5 6
A Template For Marketing Strategy
A Template For Marketing Strategy This part provides a template for developing a marketing strategy for the smaller organization. The format is a workbook style with many forms to help provide a solid
Frequently Asked Questions in Project Management
Frequently Asked Questions in Project Management 1. Question: What is Project Management? Answer: Project Management is the collection and application of skills, knowledge, processes, and activities to
Official Journal of the European Union
L 132/32 COMMISSION IMPLEMTING REGULATION (EU) No 447/2014 of 2 May 2014 on the specific rules for implementing Regulation (EU) No 231/2014 of the European Parliament and of the Council establishing an
ACTION PROGRAM 2013-2015
Network of Asian River Basin Organizations () ACTION PROGRAM 2013-2015 Key Result Areas: A. Advocacy, Raising Awareness, and Exchange of Information and Good Practices on Integrated Water Resources Management
OPERATIONAL PROGRAMME REGIONAL DEVELOPMENT 2007-2013
. MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS Directorate General Programming of Regional Development OPERATIONAL PROGRAMME REGIONAL DEVELOPMENT 2007-2013 Sofia, September 2007 1 TABLE OF CONTENT
Danube Transnational Programme 2014-2020
Draft Cooperation Programme Version 2.0, 22 nd July 2014 (after PC 9) Danube Transnational Programme 2014-2020 Draft Danube Transnational Programme 2014-2020 Content Introduction to programme version
Dialogue between the Government and stakeholders a crucial factor for improving Business Environment
Dialogue between the Government and stakeholders a crucial factor for improving Business Environment Anrijs Matīss Deputy State Secretary Ministry of Economics of the Republic of Latvia Brivibas street
Deliverable 1.1 Description of Quality Management and Risk Processing Responsible partner:
Deliverable 1.1 Description of Quality Management and Risk Processing Responsible partner: BOKU - University of Natural Resources and Life Sciences, Vienna Institute for Transport Studies List of abbreviations
European Master in Official Statistics
Eurostat Luxembourg, 20 May 2014 European Master in Official Statistics At the 21 st Meeting of the European Statistical System Committee (ESSC) 1 on 14 May 2014 the ESSC agreed to following opinions:
