Two stage nickel development strategy, gold resource growth and copper-gold discovery upside

Size: px
Start display at page:

Download "Two stage nickel development strategy, gold resource growth and copper-gold discovery upside"

Transcription

1 A successful explorer with pathway to production Two stage nickel development strategy, gold resource growth and copper-gold discovery upside Established license to operate in the world class mining districts of the Philippines.

2 FORWARD LOOKING STATEMENTS This presentation may contain forward-looking statements including management's assessments of future plans and operations, expectations of future production, cash flow and earnings. These statements are based on current expectations that involve a number of risks and uncertainties, which could cause actual results to differ materially from those anticipated. These risks include, but are not limited to, the risks associated with the mining and exploration industry (e.g. operational risks in development, exploration and production; delays or changes in plans with respect to exploration or development projects or capital expenditures; the uncertainty of reserve estimates; the uncertainty of estimates and projections relating to production). QUALIFIED PERSONS Mindoro s exploration programs are prepared and/or designed and carried out under the supervision of Tony Climie, P.Geo., who is a Qualified Person as defined by National Instrument and is a Competent Person as defined by the JORC Code, and who has reviewed and verified the pertinent disclosure of exploration related technical information contained in this news release. Mr. Climie is an executive and a director of Mindoro and is a member of the Alberta Professional Engineers, Geologists and Geophysicists Association. Mr. Climie has more than five years of experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity which he has undertaken. Mr. Climie has consented to the release of the pertinent exploration related technical information in the form and context in which it appears. Boyd Willis, FAUSIMM, who is a Qualified Person as defined by National Instrument , and a Competent Person as defined by the JORC Code, has reviewed and verified the disclosure of a development nature contained in this news release. Mr. Willis has more than five years of experience which is relevant to the activity which he has undertaken and he has consented to the release of the pertinent development related information in the form and context in which it appears. 2

3 MINDORO RESOURCES: A VALUE INVESTMENT HIGHLIGHTS Mindoro s focus is Philippines exploration and development with assets: Nickel Resources at Agata, Meas. and Ind. >1% Ni, 430,000t Ni Nickel two-stage development strategy to be funded by strategic partner Gold Resources at Batangas, *500,000 oz with high-grade upside Copper-gold-sulphur Exploration Target at Pan de Azucar Copper-gold porphyry, ten priority targets Mindoro s focus is taking our projects from discovery to production *tonnes and grade in body of presentation 3

4 CORPORATE PROFILE CAPITALISATION ($CDN) Exchange & Symbol TSX-V: MIO, ASX: MDO, FFT: OLM Shares outstanding 252m Fully diluted 291m Share price (06/02/12) $0.12 Market capitalisation (06/02/12) $30m Current treasury (06/02/12) $2.5m SHAREHOLDERS Acorn Capital 15.8% IFC (World Bank) 9.1% (10.6% incl. Asian Lion interest) Asian Lion Ltd 7.9% Lion Selection 6.9% (10.0% incl. Asian Lion interest) US Global 1.3% Directors 3.1% Top % 4

5 BOARD & MANAGEMENT Jon Dugdale Director, President & CEO 25 years gold and nickel discovery and investment Tony Climie Director Exploration & COO 42 years mineral exploration, co-founder of MIO Rob King VP Commercial, CFO & Corp Sec. 25 years financial/commercial with Placer/Barrick Rob Garden Chairman 32 years a QC in natural resources Howard Walker Executive Vice Chairman 36 years in mining, finance and investment John Tosney Director (Non Executive) 45 years mining engineer and gold project developer Chris de Guingand Director (Non Executive) 50 years commercial and marketing experience Oscar Reyes Director (Non Executive) 38 years in business ex Chairman & CEO Shell Philippines. Doug Frondall Director (Non Executive) 35 years accounting, management consulting. 5

6 PORTFOLIO OF PROJECTS IN KEY MINING DISTRICTS GOLD Batangas Projects (100% economic interest) Archangel (Gold) Lobo (Gold) El Paso, Calo, Talahib (Cu-Au) Didipio Cu-Au (Oceana Const.) MAP KEY Mindoro project Major Deposit Recent major discovery (within last 15 years) Nickel processing plant Fault COPPER-GOLD Pan de Azucar Project (75% economic interest) Valderama massive Cu-Au-Sulphide NICKEL Agata - Surigao Projects (75% interest, options for 100%) Agata Nickel Project Cu-Au Porphyry targets (American Tunnels, Tapian-SF) Coral Bay Nickel 21,000 Ni tpa (Sumitomo/Nickel Asia) Masbate Gold 200,000oz pa (CGA Mining) Taganito Nickel Project (Const.) (Sumitomo/Nickel Asia) Co-O Gold 100,000oz pa (Medusa Mining) Tampakan, Cu-Au, BFS (Xtrata/Indophil) 6

7 SURIGAO DISTRICT: AGATA NICKEL PROJECT AGATA NICKEL (75%, Option 100%) SURIGAO CITY MAP KEY Mindoro tenements / applications Luzon Manila TAPIAN Nickel laterite mineralization Nickel laterite mine Recent porphyry copper-gold discovery Porphyry copper-gold prospects Gold mine or prospect Fault Drilled area Tapian- SanFrancisco Cu-Au SILINGAN (BOYONGAN-BAYUGO) Copper-Gold, Philex 5b lbs Cu, 9 Moz Au Philippine Sea Mindanao 0km 10km N CANAGA Lake TAPIAN Mainit KARIHATAG TAGANITO Nickel Asia Sumitomo DSO + HPAL construction AGATA RESOURCES Combined Limonite & Saprolite BOLOBOLO Measured & Indicated 42.7M 1.01% Ni Inferred 2.4M 0.99% Ni Butuan Bay AGATA NORTH American Tunnels Cu-Au (Total 45.2M 1.01% Ni) 10 defined regional targets 5 drilled to date SRMI DSO AGATA SOUTH Resource: Sept 11 Horizon ktonnes Ni % Co % Fe % Ni (kt) Meas, Indicated Limonite 13, Saprolite 29, Inferred Limonite Saprolite 1, Total 45,

8 A 300m ASL AGATA NICKEL LATERITE CROSS SECTION 8900E 9000E 9100E 9200E FERRUGINOUS LATERITE 9300E LIMONITE 250m 200m AGL-146 AGL-500 AGL-142 AGL-499 AGL-140 AGL-498 AGL m 15.1m 25.3m 19.4m 26.8m 22.15m 16m 150m SAPROLITE 100m AGL-362 Drillhole number 46m Ferruginous Laterite Limonite Boulder Saprolite Saprolitic rock Bedrock End of hole Ni% Fe% Thickness of intercept (m) 50m 50m 0 AGATA NICKEL LATERITE PROJECT Cross Section Line 9550N 8

9 AGATA NICKEL PROJECT DEVELOPMENT OPTIONS STAGE 1: DSO AND THERMALLY UPGRADED SHIPPING ORE 1 1 Direct Shipping Ore (DSO) granted ECC, scoping study viability Cash flow positive in March 2011 PEA based on Capex of $8m, pricing increases since then 9 million wet metric tonnes shipped over 4 years 1a Thermal Upgrading Scoping Study (November 2011) Roasted sinter then magnetic separation Ni-Fe concentrate: 3-4% Ni, >65% Fe Capex for 600k tpa sinter production / 175k tpa concentrate: $88m Opex for 600k sinter tpa $32/t / Opex for 175k tpa $130/t (excluding mining cost) 1a STAGE 2 : MAJOR ACID LEACH PROCESSING OPERATION 2 Pre-Feasibility Study (PFS) Nov. 2011: HPAL-Atmospheric Leach (AL)-Saprolite Neutralisation Outstanding Metallurgy: HPAL 95% - 97% Ni <30 minutes; AL 95% - 98% Ni in 2-4 hours 1.8m tpa processed for 17,200t nickel in Mixed Hydroxide (40% Ni) for years Capex $940m (Including 14% estimate but no project contingency) Opex $2.60/ Ni lb with cobalt and power generation credits; Cash flow $150m per annum; payback 5.5 years; $10/lb nickel price: $380M; IRR 14% 2 Seeking a partner to fund stage 1 development and stage 2 feasibility (Deloitte Advising) The company s production objectives are intended to provide an indication of management s current expectations and are still conceptual in nature. It is uncertain that it will be established that these resources will be converted into economically viable mining reserves. Until a feasibility study has been completed, there is no certainty that these objectives will be met. 9

10 AGATA NICKEL PROJECT DEVELOPMENT PLAN Agata MPSA Agata (North) Nickel Laterite Resource Stage 1: Direct Shipping Ore (DSO) Capex $8m (March 2011 Scoping Study) 1.5m dry / 2.25m wet tonnes pa PFS Proposed Processing Plant PFS Proposed Residue Storage Stage 1a: Thermal Upgrading (Fe-Ni) Capex $88m (Nov 2011 Scoping Study) 600kt sinter / 175kt Ni-Fe con. pa Agata South Nickel Laterite Resource Stage 2: Hydromet Processing (PFS) Capex $940m (Nov 2011 PFS) 17,200t Ni in mixed hydroxide pa Mindanao Sea 0 1km SRMI Tubay Wharf SRMI Nickel DSO The company s production objectives are intended to provide an indication of management s current expectations and are still conceptual in nature. It is uncertain that it will be established that these resources will be converted into economically viable mining reserves. Until a feasibility study has been completed, there is no certainty that these objectives will be met. 10

11 AGATA NICKEL PROJECT DEVELOPMENT PLAN AGATA NICKEL PROJECT Preliminary Economic Assessment Nickel Resource Growth Further drilling to increase resource Stage 1: Test work and Economics Feasibility, Permitting then Construction Stage 1 Stage 2: Pre-feasibility Major Hydrometallurgical Project: Pilot Testing then DFS Strategic Partner The company s production objectives are intended to provide an indication of management s current expectations and are still conceptual in nature. It is uncertain that it will be established that these resources will be converted into economically viable mining reserves. Until a feasibility study has been completed, there is no certainty that these objectives will be met. 11

12 PAN DE AZUCAR PROJECT (75%) Massive sulphide sulphur-copper-gold deposit Defined Exploration Target: million tonnes, % sulphur, % copper Asparin Hill g/t gold Metallurgy for acid (Ni) and copper-gold leach 04 Plunging shallowly 16 north, open at depth More drilling and metallurgy required for resource Pabilona Hill Caution, the Valderama massive sulphide is currently an Exploration Target only. Detailed drilling will be required to convert the Exploration Target into NI compliant Ferraris resources. There is no guarantee that these Hill resources, if delineated, will be economic or sufficient to support a commercial mining operation. Until a feasibility study has been completed there is no certainty that the company's projections will be economically viable. 12 Valderam a Hill Bebs Hill N 27 Mt. Lo-oc 200m PAN DE AZUCAR PROJECT Luzon Manila BATANGAS PROJECTS Mindanao Quaternary alluvium Andesitic flow dome SURIGAO PROJECTS Andesite and dacite tuffs & volcanics Dacitic volcanics & volcaniclastics Interpreted fault Collapsed features / ring faults Creek Valderama zone Dill hole ( ) Drill hole (2011) MPSA boundary Boundary defined from drilling Boundary defined from geophysical and geochemical data Vuggy, leached, quartz alunite altered boulders Dark grey dark red ferruginous boulders Topography MAP KEY

13 PAN DE AZUCAR MASSIVE SULPHIDE MINERALIZATION 20,900N LS 21,000N 21,100N 21,200N 21,300N LONGITUDINAL SECTION (LOOKING NW) 21,400N 21,500N 21,600N 21,700N LS' 51.90m m 50 0 PDA-01. PDH-05 ) PDA-20 PDA-21 PDA-03. ). PDA-18 PDA-28. M ) M M M 2 PDA-12 PDA PDA-25 PDA ) PDA PDA-27 ) m M M M M M M m 94.5m o 98.0m 95.55m o 95.4m o 111.6m???? 130.5m HOLE NO. FROM (m) TO (m) RUN (m) Au g/t Ag g/t Cu % Zn % Sulphur% PDA PDA PDA PDA PDA PDA Including PDA PDA m 13

14 BATANGAS GOLD PROJECT & COPPER-GOLD TARGETS Objectives: High-grade gold resource growth Scoping Study on development Porphyry copper-gold targeting Crazy Horse, Taysan Copper Project El Paso 0 MAP KEY Mindoro tenements / applications Crazy Horse Resources Porphyry copper-gold prospects Resource area Epithermal vein trends Copper showing Historical mine / workings Other prospects Porphyry Cu-Au target 4km N Calo Luzon Talahib Marita Manila LOBO LOBO PROJECT - SW BRECCIA, High grade epithermal gold veins; 5km to test NI Resource Estimate Indicated: 270, g/t (56,380 oz) Inferred: 61, g/t (10,540 oz) Sea ARCHANGEL PROJECT NI Resource Estimate Indicated: 9,879, g/t (337,500 oz) Inferred: 3,741, g/t (97,200 oz) High-grade Intercepts at depth: eg 5.1 g/t Au Mindanao 14

15 BATANGAS, ARCHANGEL PROJECT 6km gold zone with porphyry at depth Bootin Drilling high-grade feeders to build resource Resources low-strip and excellent metallurgy Biga Crazy Horse Taysan Project LOBO GOLD PROJECT BATANGAS PROJECTS EL PASO PROJECT Porphyry Copper-Gold target at depth indicated by 6km x 1km IP geophysical anomaly and drilling XS 9350N Sea Marita Kay Tanda NI Resource Estimate Indicated: 9,879, g/t (337,500 oz) Inferred: 3,741, g/t (97,200 oz) High-grade Intercepts at depth: eg 5.1 g/t Au, 3.5 g/t Au, 4.03 g/t Au TALAHIB PROJECT Archangel MPSA boundary Younger cover rocks Extensively altered volcanics intruded by diorite and dacite Advanced argillic zones Resource area Epithermal gold-silver zones Porphyry-related stockworks Vein breccia MAP KEY Boulder field of mineralized massive silicified rocks Old mine working Copper showing Strong chargeability anomalies 0 ARCHANGEL PROJECT KAY TANDA GOLD RESOURCE 1 Km N 15

16 9400E BATANGAS, KAY TANDA PROJECT 9500E 9600E 9700E 9800E PULANG LUPA CROSS SECTION 9350N: Shallow Resource and Feeder Target Batangas Projects 1.53 g/t Au 4.03 g/t Au, g/t Ag 1.46 g/t Au, g/t Ag PL g/t Au 1.09 g/t Au PL-17 PLDH-01 PL-30 PL-16 PL-23 PL-31 PL-24 MAP KEY PL-22 50m 60m 51m 70m 60m 70m 82m 105.2m g/t Au 75m KT-07 Interpreted mineralization boundaries Quartz - gold breccia vein Drill hole Mineralized intercept 1.47 g/t Au 0.75 g/t Au Mineralized intercept (spiky/high grade) 75m End of hole 50m 16

17 BATANGAS, LOBO GOLD PROJECT Nagtoctoc High-grade gold shoots targeted 5km mapped epithermal? lode structures Drilling to build resource Crazy Horse Taysan Project LOBO GOLD PROJECT BATANGAS PROJECTS EL PASO PROJECT? Pica: High grade epithermal veins in 0.18% Cu, 0.30 g/t Au Balisong TALAHIB PROJECT ARCHANGEL PROJECT KAY TANDA GOLD RESOURCE? Pica Lobo shoot? 7.42 g/t Au? Old Lobo Copper Mine Camo shoot?, at surface, 488 g/t Ag, 1.8% Cu 114 g/t Ag, 0.36% Cu MAP KEY Alluvium Limestone Mineralized and altered volcanics?? Camo Mineralization shoot Epithermal vein breccia trend Silica cap Recent results eg LB-62: 8.8 g/t Au and 12.4 g/t Au Line 10185N Line 10170N Line 10155N Old Mine High-Grade shoot target? SW Breccia Mineral Resource: High Grade Shoot Indicated - 270, g/t Au; 56,380 oz Au Inferred - 61, g/t Au; 10,540 oz Au open to SW and depth 0 500m N 17

18 BATANGAS, LOBO PROJECT 10,100N 10,125N 10,140N 10,155N 10,172N 10,185N 10,200N 10,215N SOUTHWEST BRECCIA LONGITUDINAL PROJECTION B B Batangas Projects 170m ASL 150 TR OC channel TR LB LB LB LB LB MAP KEY 100 LB LB TR OC LB Trench Outcrop Drill hole number Gold grade g/t x true vein width in meter > 50 50? LB ? LB Drill hole (2011) 20m 18

19 BATANGAS, LOBO PROJECT SOUTHWEST BRECCIA CROSS SECTION 10172N 180m ASL 9,950E Trench: 19.1 g/t Au 10,000E g/t Au LB65-11 g/t Au Batangas Projects 160 LB61-11 LB m 4.67 g/t Au inc g/t Au 9.60 g/t Au m MAP KEY g/t Au m 85.00m 57.60m 52.25m 69.40m 8.82 g/t Au 57.30m inc g/t Au and 12.4 g/t Au inc g/t Au 6.30 g/t Au Quaternary agglomerate Quartz - barite - pyrite vein breccia Quartz - pyrite clay alteration Clay - pyrite - quartz chlorite magnetite alteration Quartz - clay - pyrite alteration Propylitized andesite wallrock (chlorite - clay - pyrite quartz calcite magnetite) Fault gouge g/t Au inc g/t Au LB-07 Drill hole Mineralized intercept g/t Au 20m 75m End of hole m 19

20 PORPHYRY COPPER-GOLD: AMERICAN TUNNELS AT-3 Trench 2.3 g/t Au Estrada Tunnel 2.8 g/t Au Pabling Tunnel 2.50 g/t Au Chalcopyrite (copper) veins + Assmicor Tunnel 5.7 g/t Au & 3.1g/t MAP KEY km N 20

21 GOLD AND COPPER-GOLD RESOURCE GROWTH PLAN GOLD AND COPPER-GOLD Pan de Azucar Cu-Au drilling Metallurgy, Scope *Resource Drilling *Scoping Study Batangas Gold drilling Resource Drilling-Scoping Study *Feasibility/Permits Porphyry Cu-Au Targets Targeting, *Drilling *More Drilling *subject to financing The company s production objectives are intended to provide an indication of management s current expectations and are still conceptual in nature. It is uncertain that it will be established that these resources will be converted into economically viable mining reserves. Until a feasibility study has been completed, there is no certainty that these objectives will be met. 21

22 KEY VALUE-DRIVING MILESTONES FOR 2012 Milestone Objective Timing 1 Pan de Azucar Target and Metallurgy Exploration Target, metallurgy Q Archangel gold resource drilling Define feeder structure resources Q Strategic Partnership for Agata Nickel Fund Stage 1 development, Stage 2 FS Q Batangas gold resource upgrade Significant gold resource increase Q Lobo (Batangas) gold target drilling Locate and define high-grade shoots Q Drill Porphyry Copper-Gold Targets Test key Cu-Au targets, discovery Q Batangas gold scoping study Viable gold project for Feasibility Q Next Steps, subject to delivery of above: Agata Nickel: develop DSO cash flow, complete DFS for processing plant Batangas Gold: Increase resource, commence FS and permitting Porphyry Targets: Drill definition of key discovery The company s production objectives are intended to provide an indication of management s current expectations and are still conceptual in nature. It is uncertain that it will be established that these resources will be converted into economically viable mining reserves. Until a feasibility study has been completed, there is no certainty that these objectives will be met. 22

23 SUMMARY Mindoro Resources is a Philippines focussed exploration and development company with: Nickel Resources at Agata, Measured and Indicated 1.01% Ni, 430,000t Ni Nickel two-stage development strategy to be funded by strategic partner, (advisor Deloitte) Gold Resources of *500,000 oz at Batangas, with upside: next development target Copper-gold-sulphur (acid) Exploration Target at Pan de Azucar Ten priority copper-gold porphyry targets Market Capitalisation 6 th February 2012: $30m Mindoro s focus is taking our projects from discovery to production *note, resources tonnage and grade in body of presentation TSXV: MIO ASX: MDO FFT: OLM Contact details at 23

ASX ANNOUNCEMENT 2 December 2014 PRESENTATION

ASX ANNOUNCEMENT 2 December 2014 PRESENTATION ASX ANNOUNCEMENT 2 December 2014 PRESENTATION Red Mountain Mining is pleased to release the latest corporate presentation for December 2014, including a summary of key milestones to production and discovery;

More information

Queensland Mining Corporation L I M I T E D. Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District

Queensland Mining Corporation L I M I T E D. Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District ASX Release 12 October 2012 Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District Total mineral resource at Duck Creek Project area of 960,000t @ 1.47% Cu (0.2%

More information

Copper and Gold at Our Core

Copper and Gold at Our Core Copper and Gold at Our Core November 2015 TSX: ETG NYSE MKT: EGI FRANKFURT: EKA Cautionary Statement This presentation contains forward-looking statements within the meaning of the United States Private

More information

Developing the Tanlouka Gold Project. AGM Presentation 18th November 2015

Developing the Tanlouka Gold Project. AGM Presentation 18th November 2015 Developing the Tanlouka Gold Project AGM Presentation 18th November 2015 1 Executive Summary West African Resources Ltd is an ASX and TSXV listed gold development company focussed on Burkina Faso Largest

More information

NOVEMBER 2015. January 2013

NOVEMBER 2015. January 2013 NOVEMBER 2015 President & CEO: Wayne Reid wreid@gtaresources.com 709-699- 1733 VP Exploration: Robert Duess rduess@gtaresources.com 613-453-7947 January 2013 TSXV: GTA www.gtaresources.com DISCLAIMER This

More information

NEWS RELEASE. Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW

NEWS RELEASE. Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW NEWS RELEASE February 11, 2008 Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW INTERNATIONAL MINERALS ANNOUNCES 6.2 MILLION OUNCES OF MEASURED AND INDICATED GOLD RESOURCES AND RESULTS

More information

GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL

GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL FOR IMMEDIATE RELEASE April 26, 2012 NEWS NYSE Amex: GORO GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL COLORADO SPRINGS April 26, 2012

More information

Value and Growth in a Gold-Copper Company: Focused in Colombia. April 2012 TSX-V:BHV

Value and Growth in a Gold-Copper Company: Focused in Colombia. April 2012 TSX-V:BHV Value and Growth in a Gold-Copper Company: Focused in Colombia April 2012 TSX-V:BHV TSX- V: BHV Disclaimer 2 US Citizens & Residents The above presentation should, in no way, be construed as the solicitation

More information

For personal use only

For personal use only Investor Presentation August 2012 Disclaimer/Competent Person s Disclaimer: This presentation has been prepared by Buxton Resources ( Buxton ). The information contained in this presentation is a professional

More information

For personal use only

For personal use only ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE: 18 March 2013 Update on Bunawan and Bahayan Permit Approvals. The Directors of Sierra Mining Limited ( Sierra ) are pleased to update shareholders on

More information

RED 5 Limited The next gold producer

RED 5 Limited The next gold producer The next gold producer May 2011 Company highlights Target production Sept 2011 quarter at Siana Gold project Construction 0% complete, all plant equipment in country Forecast cash costs sub $400 per ounce,

More information

Positioned for Production: Exploring for Growth

Positioned for Production: Exploring for Growth ASX Code: AYN Positioned for Production: Exploring for Growth Andrew King, Managing Director May 2010 Pg 1 Disclaimer and Key Information Disclaimer This presentation has been prepared by the Directors

More information

Copper and Gold at Our Core

Copper and Gold at Our Core Copper and Gold at Our Core January 2016 TSX: ETG NYSE MKT: EGI FRANKFURT: EKA Cautionary Statement This presentation contains forward-looking statements within the meaning of the United States Private

More information

Corporate Presentation October 2015

Corporate Presentation October 2015 TSX.V: GBB OTC PK: GBBFF THE GRANADA GOLD PROPERTY IN ROUYN - NORANDA QUEBEC a Corporate Presentation October 2015 GoldBullionDevelopmentCorp.com A Compelling Value Proposition High-grade rolling start

More information

GOLD RESOURCE CORPORATION INTERCEPTS ADDITIONAL MULTIPLE HIGH-GRADE PARALLEL VEINS AT SWITCHBACK INCLUDING 6.32 METERS OF 5.

GOLD RESOURCE CORPORATION INTERCEPTS ADDITIONAL MULTIPLE HIGH-GRADE PARALLEL VEINS AT SWITCHBACK INCLUDING 6.32 METERS OF 5. FOR IMMEDIATE RELEASE JANUARY 26, 2016 NEWS NYSE MKT: GORO GOLD RESOURCE CORPORATION INTERCEPTS ADDITIONAL MULTIPLE HIGH-GRADE PARALLEL VEINS AT SWITCHBACK INCLUDING 6.32 METERS OF 5.87 G/T GOLD Colorado

More information

COMPANY PRESENTATION. Cape Town 2016

COMPANY PRESENTATION. Cape Town 2016 COMPANY PRESENTATION Cape Town 2016 DISCLAIMER The purpose of this presentation is to provide general information about OreCorp Limited (Company). It is not recommended that any person makes any investment

More information

For personal use only

For personal use only ASX Release 28 January 2016 QUARTERLY ACTIVITIES REPORT For the quarter ended 31 December 2015 Level 1, 672 Murray Street West Perth WA 6005 Locked Bag 8 West Perth WA 6872 t. +61 8 9322 1182 f. +61 8

More information

Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project

Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project Toronto, Ontario, November 17, 2014 - Continental Gold Limited (TSX:CNL; OTCQX:CGOOF) ("Continental" or the

More information

For personal use only

For personal use only Korab Resources Limited Gold Operations Update November 2012 Andrej K. Karpinski Executive Chairman Korab Projects BOBRIKOVO MELROSE 1 Korab Gold Projects Other Korab Projects Robust Undervalued Gold Portfolio

More information

Unprecedented Opportunities in Final Frontier of B.C. s Golden Triangle. Exploration and mineral resource development

Unprecedented Opportunities in Final Frontier of B.C. s Golden Triangle. Exploration and mineral resource development TSX.V:RG OTC-PK: RM IOF FRANKFURT: D4R Unprecedented Opportunities in Final Frontier of B.C. s Golden Triangle Exploration and mineral resource development in North America Romios Galore Project, BC Newmont

More information

Resources Rising Stars

Resources Rising Stars ASX Code: AYN Resources Rising Stars Andrew King, Managing Director September 2010 Pg 1 Disclaimer and Key Information Disclaimer This presentation has been prepared by the Directors of Alcyone Resources

More information

Press Release 30 th October 2015

Press Release 30 th October 2015 Press Release 30 th October 2015 SEPTEMBER 2015 QUARTERLY ACTIVITIES REPORT Resources Limited (ASX: WAF) is pleased to report activities on its 100%-owned and 100%- earning gold and copper-gold projects

More information

Aurvista Gold Plans Significant Exploration Program at Douay

Aurvista Gold Plans Significant Exploration Program at Douay NEWS RELEASE For Immediate Issue June 14, 2016 Aurvista Gold Plans Significant Exploration Program at Douay Ø The main gold target is the largely untested northwestern section of the Porphyry Zone; the

More information

CNSX: TV www.trevali.com

CNSX: TV www.trevali.com CNSX: TV www.trevali.com March 2010 DISCLAIMER Certain statements contained in this document, including, without limitation, those concerning the economic outlook for the mining industry, expectations

More information

FORWARD LOOKING STATEMENTS

FORWARD LOOKING STATEMENTS MPH Ventures Corp. (MPS: TSX.V) Advancing Gold and Molybdenum Projects in Canada June 2013 1 FORWARD LOOKING STATEMENTS This presentation may contain forward-looking statements including but not limited

More information

A Deep Value Copper-Gold Company in South America. September 2010

A Deep Value Copper-Gold Company in South America. September 2010 A Deep Value Copper-Gold Company in South America September 2010 SEPT 01, 2010 Forward Looking Statements This presentation includes certain forward-looking statements about future events and/or financial

More information

FIJI GOLD LION ONE METALS

FIJI GOLD LION ONE METALS FIJI GOLD LION ONE METALS Tuvatu Gold Project January 2016 Presentation Disclaimer Forward Looking Statements and Qualified Person DISCLAIMER The information provided in this presentation is not intended

More information

December 8, 2008. Visit www.ivanhoemines.com for pictures of the drill core and maps and sections of the new discovery.

December 8, 2008. Visit www.ivanhoemines.com for pictures of the drill core and maps and sections of the new discovery. December 8, 2008 Ivanhoe Mines Makes Another High-Grade Discovery of Gold and Copper at the Oyu Tolgoi Project in Mongolia Discovery Remains Open to Expansion in All Directions ULAANBAATAR, MONGOLIA John

More information

Savannah North Scoping Study Looking into the future 3 February 2016

Savannah North Scoping Study Looking into the future 3 February 2016 Savannah North Scoping Study Looking into the future 3 February 2016 ASX: PAN Disclaimer Cautionary Statements This presentation includes information extracted from Panoramic Resources Limited ASX announcement

More information

CORPORATE PRESENTATION

CORPORATE PRESENTATION FANCAMP EXPLORATION LTD March 2012 CORPORATE PRESENTATION TSX.V: Looking southwest at a distance of 3 miles, with Magpie Deposit #1 (right peak) and Magpie Deposit #2 (left peak) DISCLAIMER Forward-Looking

More information

Nueva Esperanza & the re-discovery of Chimberos

Nueva Esperanza & the re-discovery of Chimberos Nueva Esperanza & the re-discovery of Chimberos Chile Explore Congress August 2015 Laguna Resources Chile Limitada Disclaimer Forward Looking Statements: These materials include forward looking statements.

More information

Australian Stock Exchange Limited Company Announcements NO. OF PAGES : (5) Level 10, 20 Bond Street SYDNEY NSW 2000

Australian Stock Exchange Limited Company Announcements NO. OF PAGES : (5) Level 10, 20 Bond Street SYDNEY NSW 2000 6 November 2006 Australian Stock Exchange Limited Company Announcements NO. OF PAGES : (5) Level 10, 20 Bond Street SYDNEY NSW 2000 TROPICANA JV (IGO 30%) PROJECT UPDATE KEY POINTS: New significant drill

More information

How To Understand The History Of The American Gold Mine

How To Understand The History Of The American Gold Mine September 12, 2011 THE ATLANTA GOLD MINE, EASTERN NEVADA Gold Exploration in Nevada with Near-Term Production Potential TSXV: MAY OTCQX:MAYGF Atlanta Gold & Silver Mine, Nevada Atlanta is located in northeastern

More information

Bellhaven Expands the La Garrucha Discovery at the La Mina Project, Colombia

Bellhaven Expands the La Garrucha Discovery at the La Mina Project, Colombia Bellhaven Expands the La Garrucha Discovery at the La Mina Project, Colombia Denver, Colorado February 28, 2013. Bellhaven Copper & Gold Inc. (TSX-Venture: BHV) ( Bellhaven or the Company ) is pleased

More information

FALCO COMPLETES HORNE 5 CONFIRMATION DRILLING PROGRAM AND ANNOUNCES FINAL RESULTS

FALCO COMPLETES HORNE 5 CONFIRMATION DRILLING PROGRAM AND ANNOUNCES FINAL RESULTS For Immediate Release TSX.V - FPC FALCO COMPLETES HORNE 5 CONFIRMATION DRILLING PROGRAM AND ANNOUNCES FINAL RESULTS (November 23, 2015) Montreal, Québec Falco Resources (FPC: TSX-V) ( Falco ) is pleased

More information

FORWARD-LOOKING STATEMENTS

FORWARD-LOOKING STATEMENTS FORWARD-LOOKING STATEMENTS This presentation contains forward-looking information. Forward looking information contained in this presentation includes, but is not limited to, statements with respect to:

More information

Mining Indaba Presentation. Capetown, South Africa 8 th 10 th February 2016

Mining Indaba Presentation. Capetown, South Africa 8 th 10 th February 2016 Mining Indaba Presentation Capetown, South Africa 8 th 10 th February 2016 www.birimiangold.com 1 Disclaimer This presentation has been prepared by Birimian Gold Limited (BGS) for general information purposes

More information

ALCYONE REPORTS JORC SILVER RESOURCES

ALCYONE REPORTS JORC SILVER RESOURCES ASX ANNOUNCEMENT & MEDIA RELEASE 29 March 2010 ALCYONE REPORTS JORC SILVER RESOURCES +15Moz RESOURCE INVENTORY UNDERPINS PROGRAM TARGETING RESUMPTION OF SILVER PRODUCTION AT TEXAS PROJECT LATER THIS YEAR

More information

PNG Mining & Petroleum Investment Conference December 2010. Geoff Day Executive General Manager PNG and Indonesia

PNG Mining & Petroleum Investment Conference December 2010. Geoff Day Executive General Manager PNG and Indonesia PNG Mining & Petroleum Investment Conference December 2010 Geoff Day Executive General Manager PNG and Indonesia Disclaimer Competent Persons Statement The information in this presentation that relates

More information

El cinturón de oro del río Narcea: el futuro de la minería de oro en España. Dr. Vern N. Rampton Presidente y CEO de Kinbauri Gold Corp.

El cinturón de oro del río Narcea: el futuro de la minería de oro en España. Dr. Vern N. Rampton Presidente y CEO de Kinbauri Gold Corp. El cinturón de oro del río Narcea: el futuro de la minería de oro en España Dr. Vern N. Rampton Presidente y CEO de Kinbauri Gold Corp. CORPORATE PRESENTATION JUNE 16, 2009 TARGETED TO BECOME ONE OF WESTERN

More information

Lalor Project Base Metal Zones and Gold Mineralization January 2009

Lalor Project Base Metal Zones and Gold Mineralization January 2009 Lalor Project Base Metal Zones and Gold Mineralization January 2009 1 Forward-Looking Statements All monetary amounts in Canadian dollars unless otherwise stated.. This presentation contains forward-looking

More information

Focusing on Near Term Production and Exploration in Quebec

Focusing on Near Term Production and Exploration in Quebec Focusing on Near Term Production and Exploration in Quebec AGM January 2016 Forward Looking Statement Forward Looking Statement This presentation may contain forward looking statements, being statements

More information

PANORO MINERALS LTD. Management s Discussion and Analysis For the three months ended March 31, 2008 May 12, 2008

PANORO MINERALS LTD. Management s Discussion and Analysis For the three months ended March 31, 2008 May 12, 2008 This management s discussion and analysis ( MD&A ) focuses on significant factors that affected Panoro Minerals Ltd. (the Company ) during the three months ended March 31, 2008 and to the date of this

More information

Sabina Gold & Silver Corp.

Sabina Gold & Silver Corp. Sabina Gold & Silver Corp. Creating precious metals opportunities in the Canadian North November 2011 Hackett River Camp, looking to west 1 Forward Looking Statements This presentation includes certain

More information

(NYSE-MKT:XRA, TSX:XRC,

(NYSE-MKT:XRA, TSX:XRC, For Immediate Release: NR 15-08 Corporate Update Vancouver, B.C., December 17 th, 2015 Exeter Resource Corporation (NYSE-MKT:XRA, TSX:XRC, Frankfurt:EXB Exeter or the Company ) is pleased to provide the

More information

WILLAMAX PROJECT. TSX-V: DVN Reach us at 604 818 1706. Developing B.C. mining assets to create profitable gold production.

WILLAMAX PROJECT. TSX-V: DVN Reach us at 604 818 1706. Developing B.C. mining assets to create profitable gold production. WILLAMAX PROJECT Developing B.C. mining assets to create profitable gold production May 2014 Reach us at 604 818 1706 Management Team Akash Patel, President and CEO Mr. Patel has received a bachelor in

More information

f or the P ROJECT Agreement with copper-gold Bluebird. comprises a 1.6 mineralisation are often discordant to the Proterozoic deposits found in HIG

f or the P ROJECT Agreement with copper-gold Bluebird. comprises a 1.6 mineralisation are often discordant to the Proterozoic deposits found in HIG ASX ANNOUNCEMENT 30 April 2015 QUARTERLY ACTIVITIES f or the quarterr ended REPORT 31 Mar ch 2015 BARKLY COPPER-GOLD Limited is in a Farm-In Joint Venture P ROJECT Blaze International Agreement with Meteoric

More information

Quarterly Activities Report - for the period ended 31 December 2015

Quarterly Activities Report - for the period ended 31 December 2015 ASX Release: 27 January 2016 Quarterly Activities Report - for the period ended 31 December 2015 ASX Code: WRM Issued Securities Shares: 271.9 million Options: 7 million Cash on hand (31 Dec 2015) $0.4M

More information

Forward-Looking Statements

Forward-Looking Statements Forward-Looking Statements Except for historical information, this presentation may contain certain forward-looking statements. These statements may involve a number of known and unknown risks and uncertainties

More information

Growth Through Acquisition, Exploration and Development

Growth Through Acquisition, Exploration and Development Growth Through Growth Through Acquisition, Exploration Acquisition, Exploration and Development and Development CORPORATE PRESENTATION November 2011 CORPORATE PRESENTATION June 2012 Forward Looking Statement

More information

Barkerville Gold Mines Investor presentation q1 2016. The last great Canadian gold mining camp controlled by a junior mining company.

Barkerville Gold Mines Investor presentation q1 2016. The last great Canadian gold mining camp controlled by a junior mining company. Barkerville Gold Mines Investor presentation q1 2016 The last great Canadian gold mining camp controlled by a junior mining company. 1 Forward Looking statement This presentation and the material contained

More information

TARGETING +100Moz OF SILVER LA CIGARRA PROJECT, MEXICO

TARGETING +100Moz OF SILVER LA CIGARRA PROJECT, MEXICO TSX-V: INM TARGETING +100Moz OF SILVER LA CIGARRA PROJECT, MEXICO Silver Capital of the World Felipe IV, King of Spain, 1640 February 2016 FORWARD LOOKING STATEMENTS This document may contain "forward-looking

More information

INVESTOR PRESENTATION January 2014

INVESTOR PRESENTATION January 2014 INVESTOR PRESENTATION January 2014 365 Bay Street Suite 400 Toronto, ON M5H 2V1 QUE:CNSX Forward Looking Statement Except for historical information contained herein, this presentation may contain forward-looking

More information

Disclaimer. Issued by Crazy Horse Resources Inc., of Suite 800 789 West Pender Street, Vancouver, British Columbia V6C 1H2, Canada.

Disclaimer. Issued by Crazy Horse Resources Inc., of Suite 800 789 West Pender Street, Vancouver, British Columbia V6C 1H2, Canada. Disclaimer This presentation and the information contained herein, ( Presentation ) is being issued by Crazy Horse Resources Inc. (the Company ) for information purposes only. This Presentation is not

More information

Nemaska Lithium A near term lithium hydroxide supplier

Nemaska Lithium A near term lithium hydroxide supplier Nemaska Lithium A near term lithium hydroxide supplier Charging the future by Euro Pacific, Canada May 13, 2014 Guy Bourassa President and CEO Forward-looking Statements During the course of this presentation,

More information

NEW GOLD DISCOVERY IN GHANA WEST AFRICA

NEW GOLD DISCOVERY IN GHANA WEST AFRICA NEW GOLD DISCOVERY IN GHANA WEST AFRICA FEBRUARY 2016 JORC DISCLOSURE JORC 2012 This Presentation contains information extracted from the following reports which are available for viewing on the Company

More information

March, 2013 Update. A Company in Transition

March, 2013 Update. A Company in Transition March, 2013 Update A Company in Transition Forward Looking Statements Cautionary Notes and Disclaimers This presentation may contain forward-looking statements including, but not limited to, comments regarding

More information

TSX-V: CDA WKN: A0M6U5

TSX-V: CDA WKN: A0M6U5 TSX-V: CDA WKN: A0M6U5 Mill Village Gold Property, Nova Scotia MidTex Oil & Gas, Texas Cash flow Developing cash flow producing gas wells Texas, USA expansion of gas & oil wells Texas, USA Canuc-Nambija

More information

BUILDING A COPPER COMPANY IN BRAZIL. PDAC Feb - 2014 - TORONTO

BUILDING A COPPER COMPANY IN BRAZIL. PDAC Feb - 2014 - TORONTO BUILDING A COPPER COMPANY IN BRAZIL PDAC Feb - 2014 - TORONTO CORPORATE & GOALS Shares on Issue 1.355B Significant Shareholders Share Price ~Au$0.07* Glencore 15% Market Cap ~Au$95m* BlackRock 5% Cash

More information

EXPLORING WORLD CLASS MINERAL FRONTIERS

EXPLORING WORLD CLASS MINERAL FRONTIERS EXPLORING WORLD CLASS MINERAL FRONTIERS February 2015 1 Disclaimer This presentation has been prepared by Apollo Minerals Limited ( Apollo or the Company ). It should not be considered as an offer or invitation

More information

ANNUAL GENERAL MEETING. Investor Presentation 24 November 2015

ANNUAL GENERAL MEETING. Investor Presentation 24 November 2015 ANNUAL GENERAL MEETING Investor Presentation 24 November 2015 Corporate Structure ASX Code: OVR Shares on Issue 205.4 million Top 20 133.0 million (64.8%) Market Capitalisation $1.23 million (share price

More information

NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS

NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS Project Generates 32% IRR and C$33 Million NPV After-Tax; Cash Costs of US$865 per Ounce

More information

Barkly Phosphate Project Tenement Granted

Barkly Phosphate Project Tenement Granted MANTLE MINING ASX: MNM DIRECTORS Mr Martin Blakeman Non-Executive Chairman Mr Ian Kraemer Managing Director Mr Peter Anderton Non-Executive Director Mr Stephen de Belle Non-Executive Director ASX Release

More information

SALAZAR RESOURCES LTD.

SALAZAR RESOURCES LTD. TSX-V: SRL SALAZAR RESOURCES LTD. CORPORATE PRESENTATION Q3-2013 Partnered to develop Latin America s next major VMS camp Disclaimer Forward-looking statements: This report includes certain statements

More information

For personal use only

For personal use only 23 August 2013 Technical data supports copper porphyry potential Highlights: Data room initiated following unsolicited approaches from major copper resource companies Technical data supports intact high

More information

CREAM MINERALS LTD. Suite 1400 570 Granville Street Vancouver, B.C. V6C 3P1

CREAM MINERALS LTD. Suite 1400 570 Granville Street Vancouver, B.C. V6C 3P1 CREAM MINERALS LTD. Suite 1400 570 Granville Street Vancouver, B.C. V6C 3P1 www.creamminerals.com TSX Venture Exchange Symbol: CMA November 10, 2011 U.S. 20-F Registration: 000-29870 OTC BB: CRMXF Frankfurt

More information

For personal use only

For personal use only Investigator Resources Limited Date: 7 th February 2012 up to 2.25% Ag at the new Paris prospect in South Australia First assays received for new drilling on Paris Line 7 with all three holes assayed returning

More information

Barkerville Gold Mines Investor presentation q4 2015. Mines are found in the shadows of headframes

Barkerville Gold Mines Investor presentation q4 2015. Mines are found in the shadows of headframes Barkerville Gold Mines Investor presentation q4 2015 Mines are found in the shadows of headframes Forward Looking statement This presentation and the material contained herein are confidential and are

More information

For personal use only

For personal use only ASX Release 27 September 2012 OPTION TO ACQUIRE 560,000oz PEAK HILL GOLD PROJECT RESOURCE AND INVESTMENT NL (ASX: RNI) (RNI or the Company) has reached agreement with Montezuma Mining Company Limited for

More information

EXPLORATION 1.0 2.0 3.0. 4.0 5.0 6.0 TONY HOUSTON Head of Exploration 7.0 8.0 9.0

EXPLORATION 1.0 2.0 3.0. 4.0 5.0 6.0 TONY HOUSTON Head of Exploration 7.0 8.0 9.0 EXPLORATION 1.0 2.0 3.0 4.0 5.0 6.0 TONY HOUSTON Head of Exploration 7.0 8.0 9.0 OZ MINERALS NOVEMBER 2009 PAGE 54 STRATEGY SUPERIOR TOTAL SHAREHOLDER RETURNS ZERO HARM FOCUS ON COPPER MAXIMISE POTENTIAL

More information

Shaw River Manganese Ltd January 2012 Update. Vincent Algar - Managing Director

Shaw River Manganese Ltd January 2012 Update. Vincent Algar - Managing Director Shaw River Manganese Ltd January 2012 Update Vincent Algar - Managing Director Disclaimer This presentation has been prepared by Shaw River Manganese Limited ( Shaw River or the Company ). It should not

More information

Press Release 29 th January 2016

Press Release 29 th January 2016 Press Release 29 th January 2016 DECEMBER 2015 QUARTERLY REPORT West African Resources Limited (ASX: WAF) is pleased to report activities on its 100%-owned gold and copper-gold projects in Burkina Faso,

More information

Sorby Hills Silver Lead Project

Sorby Hills Silver Lead Project ASX RELEASE Sorby Hills Silver Lead Project Major Milestone Achieved with Environmental Approval As announced on 3 April, the WA Minister for Environment has approved the development of the Sorby Hills

More information

On February 3, 2016 the Company announced the appointment of Ms. Joyce Ngo as Interim Chief Financial Officer.

On February 3, 2016 the Company announced the appointment of Ms. Joyce Ngo as Interim Chief Financial Officer. VANCOUVER, BRITISH COLUMBIA--(Marketwired - May 6, 2016) - NGEx Resources Inc. (TSX:NGQ)(OMX:NGQ) ("NGEx" or the "Company") is pleased to announce that it has filed its unaudited Consolidated Financial

More information

International Lithium Corp. international lithium corp. (ILC: TSX.V)

International Lithium Corp. international lithium corp. (ILC: TSX.V) International Lithium Corp. Disclaimer The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this presentation. Statements in this presentation other

More information

De Grey Mining Ltd. Wingina Deeps Drilling Commenced (Turner River Project) Highlights. Turner River Unlocking Shareholder Value

De Grey Mining Ltd. Wingina Deeps Drilling Commenced (Turner River Project) Highlights. Turner River Unlocking Shareholder Value De Grey Mining Ltd ASX RELEASE 5 July 2016 ASX Code DEG ABN 65 094 206 292 Wingina Deeps Drilling Commenced (Turner River Project) Highlights Diamond drilling programme of approximately 1,500m has COMPANY

More information

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY 10 August 2015 ASX: AOH, FSE: A2O TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY Estimated oxide and sulphide resources within the optimum pit is 17.3

More information

AIM: KEFI 6 March 2014. KEFI Minerals Plc. ( KEFI or the Company ) SAUDI ARABIAN EXPLORATION AND DEVELOPMENT UPDATE

AIM: KEFI 6 March 2014. KEFI Minerals Plc. ( KEFI or the Company ) SAUDI ARABIAN EXPLORATION AND DEVELOPMENT UPDATE KEFI Minerals Plc Doğu Akdeniz Mineralleri San. Tic. Ltd. Şti. Cemal Gürsel Cad. Yalı Apt. No:304 K:4 D:9 Karşıyaka İZMİR Tel: +90 232 381 9431 Fax: +90 232 381 9071 Email: info@kefi-minerals.com AIM:

More information

January 2014. Developing Copper, Zinc and Gold Deposits on the Asmara Project, Eritrea. November 2010

January 2014. Developing Copper, Zinc and Gold Deposits on the Asmara Project, Eritrea. November 2010 November 2010 January 2014 Underground workings at Debarwa copper-gold deposit Developing Copper, Zinc and Gold Deposits on the Asmara Project, Eritrea Eritrea and the Asmara Project Sudan Zara Bisha Mine

More information

QUARTERLY REPORT HIGHLIGHTS. Three Months Ending: 30 September 2012 BUTCHERBIRD MANGANESE:

QUARTERLY REPORT HIGHLIGHTS. Three Months Ending: 30 September 2012 BUTCHERBIRD MANGANESE: QUARTERLY REPORT Three Months Ending: 30 September 2012 ASX CODE: MZM ISSUED SHARES: 67.66M 52 WEEK HIGH: $0.80 52 WEEK LOW: $0.16 CASH ON HAND: $6.13M CONTACT: JUSTIN BROWN Managing Director +61 8 6315

More information

Panoramic View on the Prospects & Investments in the Tapajós-Xingu Provinces. Elton L.S. Pereira 22/May/2012

Panoramic View on the Prospects & Investments in the Tapajós-Xingu Provinces. Elton L.S. Pereira 22/May/2012 Panoramic View on the Prospects & Investments in the Tapajós-Xingu Provinces Elton L.S. Pereira 22/May/2012 Tapajós Setting & Facts +30 MOz Au (since 1958) +350 garimpos 135,000 Km 2 Larger than French

More information

Miocene Metals and Carube Resources Announce Start of Drilling on Bellas Gate Copper- Gold Joint Venture Project in Jamaica

Miocene Metals and Carube Resources Announce Start of Drilling on Bellas Gate Copper- Gold Joint Venture Project in Jamaica Miocene Metals and Carube Resources Announce Start of Drilling on Bellas Gate Copper- Gold Joint Venture Project in Jamaica Toronto, Ontario February 27, 2014 Miocene Metals Limited ( Miocene ) (TSXV:MII)

More information

ALCYONE TO RAISE $5M TO UNDERPIN TRANSITION TO SILVER PRODUCTION AT TEXAS PROJECT

ALCYONE TO RAISE $5M TO UNDERPIN TRANSITION TO SILVER PRODUCTION AT TEXAS PROJECT ASX ANNOUNCEMENT & MEDIA RELEASE 25 November 2010 ALCYONE TO RAISE $5M TO UNDERPIN TRANSITION TO SILVER PRODUCTION AT TEXAS PROJECT ENTITLEMENT OFFER TO FUND FURTHER EXPLORATION, ACQUISITION OF LONG-LEAD

More information

TECHNICAL REPORT QUARTER ENDED 31st MARCH 2007

TECHNICAL REPORT QUARTER ENDED 31st MARCH 2007 ADDRESS PHONE EMAIL PO Box 7996 +61 (07) 5592 2274 info@frontierresources.com.au Gold Coast Mail Centre FAX WEBSITE Qld 9726 Australia +61 (07) 5592 2275 www.frontierresources.com.au ABN 96 095 684 389

More information

Golden Band Resources Inc.

Golden Band Resources Inc. Golden Band Resources Inc. Rodney Orr, VP Corporate Development Saskatchewan Mining Supply Chain Forum, April 4, 2012 TSX.V: GBN OTCQX: GBRIF Notices Rodney Orr, P.Geo., Golden Band s VP of Corporate Development,

More information

For personal use only. MRV Metals Launch February 2016

For personal use only. MRV Metals Launch February 2016 MRV Metals Launch February 2016 Important Information This document has been prepared by Moreton Resources Limited ( Moreton or Company ) for the purpose of providing a company and technical overview to

More information

Funds from the placement will be used for working capital requirements, including the completion of the Productora Pre-feasibility Study (PFS).

Funds from the placement will be used for working capital requirements, including the completion of the Productora Pre-feasibility Study (PFS). ASX ANNOUNCEMENT Monday 1 st February 2016 Hot Chili to Raise A$1.6m via Placement to Strategic Shareholders Hot Chili Limited (ASX Code: HCH) is pleased to announce that it has received commitments from

More information

Cummins Range Rare Earths Project

Cummins Range Rare Earths Project Cummins Range Rare Earths Project December 2011 DISCLAIMER The information contained in this presentation is not financial product advice. The presentation is for information purposes and is of a general

More information

LUPAKA GOLD ANNOUNCES JOSNITORO GOLD PROJECT OPTION WITH HOCHSCHILD MINING PLC

LUPAKA GOLD ANNOUNCES JOSNITORO GOLD PROJECT OPTION WITH HOCHSCHILD MINING PLC LUPAKA GOLD ANNOUNCES JOSNITORO GOLD PROJECT OPTION WITH HOCHSCHILD MINING PLC VANCOUVER, BRITISH COLUMBIA, November 26, 2013 -- Lupaka Gold Corp ("Lupaka Gold" or the Company") (TSX:LPK, BVL:LPK, FRA:LQP)

More information

Condor Gold plc. (''Condor'' or "the Company") Whittle Consulting's Optimisation Study Significantly Enhances Economics

Condor Gold plc. (''Condor'' or the Company) Whittle Consulting's Optimisation Study Significantly Enhances Economics RNS Number : 7465C Condor Gold PLC 20 October 2015 7.00am on 20 October 2015 Condor Gold plc 7 th Floor 39 St. James's Street London SW1A 1JD Telephone +44 020 74081067 Fax: +44 020 74938633 Condor Gold

More information

Walford Creek: New Generation Base Development

Walford Creek: New Generation Base Development Walford Creek: New Generation Base Development May, 2015 Sydney Resources Round-up ASX Code: AQR Disclaimer Important Information This document has been prepared by Aeon Metals Limited (Aeon) for the purpose

More information

SOTKAMO SILVER. A mining Investment Opportunity 6.5.2014 1

SOTKAMO SILVER. A mining Investment Opportunity 6.5.2014 1 SOTKAMO SILVER A mining Investment Opportunity 6.5.2014 1 FINLAND AS A MINING COUNTRY Ø History of mining and mining equipment manufacturing Ø Stable taxation (dropping from 32% to 20% in the last 8 years)

More information

MANAGEMENT DISCUSSION AND ANALYSIS FOR THE THREE MONTHS ENDED MAY 31, 2014

MANAGEMENT DISCUSSION AND ANALYSIS FOR THE THREE MONTHS ENDED MAY 31, 2014 MANAGEMENT DISCUSSION AND ANALYSIS FOR THE THREE MONTHS ENDED MAY 31, 2014 (2) INTRODUCTORY COMMENT Serengeti Resources Inc. is a junior mineral exploration company listed on the TSX Venture Exchange under

More information

Investor Presentation. Managing Director: Dr Mike Jones August 2015. Funded For Discovery at Three Potential Company-Making Projects

Investor Presentation. Managing Director: Dr Mike Jones August 2015. Funded For Discovery at Three Potential Company-Making Projects Investor Presentation Managing Director: Dr Mike Jones August 2015 Funded For Discovery at Three Potential Company-Making Projects Introducing Impact Minerals (ASX:IPT) Listed on ASX November 2006 Shares

More information

YAMANA GOLD ANNOUNCES SIGNIFICANT NEW DISCOVERIES AT CHAPADA AND EL PEÑÓN IMPROVE OPERATIONAL OUTLOOK

YAMANA GOLD ANNOUNCES SIGNIFICANT NEW DISCOVERIES AT CHAPADA AND EL PEÑÓN IMPROVE OPERATIONAL OUTLOOK YAMANA GOLD ANNOUNCES SIGNIFICANT NEW DISCOVERIES AT CHAPADA AND EL PEÑÓN IMPROVE OPERATIONAL OUTLOOK TORONTO, ONTARIO, December 15, 2014 YAMANA GOLD INC. (TSX:YRI; NYSE:AUY) ( Yamana or the Company )

More information

MRL GOLD PHILIPPINES INC. PANORO MINERALS LTD

MRL GOLD PHILIPPINES INC. PANORO MINERALS LTD MRL GOLD PHILIPPINES INC. and PANORO MINERALS LTD Independent Geological Report on the Surigao Property Group Northern Mindanao, Philippines By Bruce D. Rohrlach B.Sc. (Hons), Ph.D, M.AusIMM 10 Wahroonga

More information

AngloGold Ashanti La Colosa Site Visit November, 2011

AngloGold Ashanti La Colosa Site Visit November, 2011 AngloGold Ashanti La Colosa Site Visit November, 2011 Colombia Jorge Tapia Disclaimer Certain statements made in this communication, including, without limitation, those concerning the economic outlook

More information

How To Mine And Treat Ore From Castle Hill Stage 1

How To Mine And Treat Ore From Castle Hill Stage 1 ` Dated: 5 th August 2014 NORTON TAKES UP OPTION TO MINE AND TREAT ORE FROM CASTLE HILL STAGE 1 ASX: PXG, PXGOA HIGHLIGHTS Development of Castle Hill Stage 1 with Norton Gold Fields potentially adds a

More information

Gold. Grade. Infrastructure. CORPORATE PRESENTATION

Gold. Grade. Infrastructure. CORPORATE PRESENTATION Gold. Grade. Infrastructure. CORPORATE PRESENTATION Disclaimer Certain statements in this presentation constitute forward looking statements or forward looking information within the meaning of applicable

More information

ARGENT MINERALS LIMITED ASX:ARD

ARGENT MINERALS LIMITED ASX:ARD ARGENT MINERALS LIMITED ASX:ARD ARGENT AT A GLANCE Capital Structure Ordinary shares (ASX: ARD) 300.3M Share price 1 $0.027 Market capitalisation 1 Cash 2 $8.1M $1.4M Options 3 6.57M ASX Listing 3 April

More information