ANAEROBIC TREATMENT FOR SANA'A WASTEWATER USING UASB REACTOR PILOT PLANT
|
|
|
- Ashlee Lester
- 10 years ago
- Views:
Transcription
1 Full length Research Paper ANAEROBIC TREATMENT FOR SANA'A WASTEWATER USING UASB REACTOR PILOT PLANT Al-Koli H. 1, Mahmoud N. 2, Atfa Allah M. 3, & Al-Nozaily F. A. 4 1 Institute of Environmental and Water Studies Birzeit University, Palestine. [email protected] 2 Sana a University-Water and Environment Center-WEC, Yemen, [email protected] Accepted: 15 JANUARY, ABSTRACT JOURNAL OF GEO AND ENVIRONMENTAL SCIENCE RESEARCH VOL. 4(1), pp , JANUARY 201 REF NUMBER: ONLINE: he water scarcity in Sana'a the capital of Yemen, has resulted in the increase of the T concentration of organic matter in wastewater reaching the treatment plant. The organic load in Sana a Wastewater Treatment Plant exceeds 1100 mg/l and makes the treatment process expensive. The UASB (Upflow anaerobic sludge blanket) reactor is an anaerobic wastewater treatment system which reduces the high concentration of organic matter in wastewater and produces methane gas that can be used as solution. The aim of this research is to study the efficiency of anaerobic treatment to reduce the high COD (Chemical oxygen demand) concentrations of Sana'a wastewater using the UASB reactor. A UASB reactor was designed and constructed from galvanized iron and installed as a pilot plant representing the primary and part of the secondary stage at the Sana'a WWTP site. The UASB reactor was operated for a period of 83 days; the first period of 45 days was the application of constant flow of 23.4 l/h at Hydraulic Retention Time (HRT) of hours in order to reach a steady state and allowed to run for a second period of 38 days from August 8th to September 14th, Three different HRTs were applied at, and hours, which resulted in three up flow velocities in the reactor of m/h, 0.14 m/h and m/h, respectively. 23 samples of wastewater were collected from the influent and the same number from UASB reactor effluent COD was measured. Two sludge samples were collected from the bottom of the UASB reactor to measure the total, fixed and volatile solids. The obtained results was COD removal efficiency ranged (1±8)% when the HRT was hours, (50±7)% when the HRT was hours and (45±4)% when the HRT was hours. The sludge results was TS of 5.4 ± 8.5g/L, TVS of 38.8 ± 7.5g/L, TFS of 17. ± 1.0g/L, which means that the sludge contains more than 50% as bacteria. Bubbles appeared in the upper surface of wastewater within the UASB reactor during operation as an indicator of the methane gas formation. These results enabled us to rely on this system in reducing the cost of sewage treatment in Sana'a. It is recommended that UASB application is applied in the countries of the world where sewage has high strength characteristics. KEYWORDS: UASB, anaerobic treatment, Sana'a, HRT *Corresponding Author [email protected]
2 INTRODUCTION The problem in Sana a Wastewater Treatment Plant (SWWTP) occurs due to water scarcity and a rapidly increasing population in Sana a that led Sana a Water and Sanitation Local Corporation (SWSLC) to use the intermittent supply which resulted in low water consumption and the production of strong wastewater. The wastewater that reaches to SWWTP contains a high concentration of BOD. BOD increased from 500mg/l in 1983 (design BOD of SWWTP) to 1100 mg/l in 2000, the quantity of wastewater that reaches to SWWTP is close to 50,000 m3/day. The remarkable increase in biological load led the top management of SWSLC to start thinking about establishing settlement ponds for the primary treatment and reducing the organic load, consequently reducing the cost of aerobic treatment stage. Anaerobic treatment technologies, especially UASB, could be one of the most efficient ways to reduce the organic load and remove the high loading of COD with low rate sludge production, in addition to producing biogas which could be a sustainable source of energy. The most important advantages of using a UASB reactor is the small area required for establishment in comparison with settlement ponds, which prevents the government from spending a huge amount of money as compensation to land owners. Furthermore, wastewater treatment by using UASB does not require electrical generators or complicated maintenance by a highly skilled technician (Chernicharo, 2007). The anaerobic wastewater treatment systems developed to reach the UASB reactor where the wastewater will be treated by anaerobic bacteria which digests the organic substances and covert it to gases CH4 and CO2. The UASB reactor system invented in 1970 by Gatze Lettinga showed high efficiency in reducing the concentration of organic load and decreasing the COD and BOD figures, so it spreads all over the world. Constructing a UASB reactor could be the ideal solution for reducing the high concentration of organic loading or industrial waste from milk factories and leather dying places. UASB could treat strong waste where COD exceeds 1500mg/l with COD removal efficiency reaching 90%. The main advantages of UASB systems are that it is economical in construction, operation and maintenance with no need for mechanization or energy, rather energy is produced from the methane gas. UASB provides a good contact between the wastewater which should be treated and activated sludge which is rich with anaerobic bacteria, passing the wastewater from the bottom to the top of the reactor and gas formation provides homogeneous in distributing sludge and enabling the anaerobic bacteria to consume organic substances. LITERATURE REVIEW UASB could be the ideal solution for reducing the high concentration of organic loading and an efficient way to remove contaminants. Constructing a UASB will save high operational costs. The result is saving money on buying land around SWWTP due to needing less land for UASB establishment compared with stabilization ponds [8]. There are similar experiences of using UASB reactors and digesters for enhancing the effluent of wastewater and gas utilization. SUMARE EXPERIENCE IN BRAZIL Sumare is a city 150 km from the center of Sao Paulo state. The population of Sumare is around 15,000. Sumare does not have sewage treatment that impacts the water resources and public health conditions harmfully. In order to minimize the deterioration of water resources and because of lacking funds, the city's Water and Wastewater Department (DAE) offers a proposal to low income inhabitants (235 houses). This proposal uses an anaerobic digester to treat the sewage. DAE is the financier agent for construction and management of sewage systems, in addition to plant and the inhabitants reimbursing DAE. The reactor was constructed from concrete with a fiberglass cover, the reactor design based on a UASB model of Reactor which was improved by Lettinga (the Dutch scientist), with a total cost of $29,200. The reactor started in May Page 2 PILOT By Al-Koli H., Mahmoud N.2, Atfa Allah M., & Al-Nozaily F. A.
3 1992. The volume of Sumare reactor is 7.5 m3, the HRT of UASB reactor is 7 hours, and temperature fluctuation varies from 1 degrees Celsius in winter and 23 degrees Celsius in summer. The influent and effluent Biological Oxygen Demand (BOD), Chemical Oxygen Demand (COD) and Total Suspended Solids (TSS) values were measured for 440 days. The average removal rates of BOD, COD and TSS are also higher; respectively 80%, 74% and 87%. (Vi e r i a et al., 1994) UASB for Small Population Clusters Iran Azimi and Zaman Zadehare two Iranian researchers at the environmental engineering faculty of Teheran University. The two researchers designed and implemented UASB reactor which was used as wastewater treatment plant for small population clusters, the volume of that reactor was 0.848m3 with average HRT 2,4,,8 and 10 hours, the inlet was cleaned and sand removed daily, the research was conducted for 203 days during the winter and summer seasons with the temperature fluctuation from 22 degrees Celsius in winter and 2 degrees Celsius in summer. The inlet and outlet COD values were recorded to know the treatment efficiency. Figure (1) & (2) show the COD values during winter and summer [2]. COD values(mg/l) Weeks Figure 1: Results of inlet and outlet COD values during 17 weeks of winter season COD values(mg/l) Week s Page 3 PILOT By Al-Koli H., Mahmoud N.2, Atfa Allah M., & Al-Nozaily F. A.
4 INDIA Figure 2: Results of inlet and outlet COD values during 11 weeks of summer season A study was conducted by Contamination Test and Energy Technology Center (CTEC) at BundiCheeri University in India. The study aimed to examine the efficiency of industrial wastewater treatment from a milk producing factory. The research studied the possibility of producing energy from organic disposed waste; 2-5 liters of water are required in producing each liter of milk. Two reactors of UASB were constructed in 2005 to study the industrial wastewater from milk producing factory, the volume of the reactor was 1 liter and light contaminated sludge (COD<300mg/l) was used, hours is considered as HRT from the reactor starting up, after the reactor reached stability in one month, different HRTs were applied and the COD of inlet and outlet results were recorded to know the efficiency of the reactor. Figure (3) shows the obtained results. (Sankar et al., 2007) COD values(mg/l ) Figure 3: Results of inlet and outlet COD values during the reactor of India JORDAN AND PALESTINE EXPERIENCE Week s In Jordan the results of anaerobic sewage treatment in a 4m 3 one-stage UASB reactor operated in Jordan revealed that it is quite possible to operate the reactor under the conditions of Jordan and Palestine. In this case the reactor should be operated at a prolonged hydraulic retention time of more than 22 h [7; ]. In this experiment, a pilot-scale one-stage UASB reactor and a UASB-digester system was constructed at Al-Bireh wastewater treatment plant in Palestine. The one-stage UASB reactor was started and operated for a period of more than a year at an HRT of 10 h. The reactor volume is 140L, height 325cm and diameter 23.5cm. Page 4 PILOT By Al-Koli H., Mahmoud N.2, Atfa Allah M., & Al-Nozaily F. A.
5 Figure 4: Schematic diagram of the UASB-digester system pilot plant The digester fed with domestic sewage pre-treated (activated sludge after being diluted to 20 gts/l with VS/TS ratio of 0.74 so as to achieve a SRT of 20 days) with screens and grit removal chamber content. The sewage was pumped every 5 minutes to a plastic holding tank (200 L), with a resident time of about 5 minutes, where the reactor was fed and the influent was sampled (Figure 4). Daily monitoring and analysis for influent and effluent samples to measure and grab influent and effluent wastewater sample analysis for total COD. The influent and effluent were analyzed for total COD fractions during summer and winter periods of the year, in addition to analyzing for BOD, TSS, NH4 and PO3. The one-stage UASB was operated for 389 days of which the first 42 days were considered as a startup period. The discharged sludge was collected in a bucket, from where the sludge was immediately fed to the digester by a peristaltic pump. At the same time, the digester effluent was pumped out to another bucket, while a third pump was recirculating it to the lower part of the UASB reactor at 10cm from the bottom. Sludge was never wasted during the system operation. The digester continuously mixed at around 0rpm. The UASB-digester system was operated for 107 days of which the first 57 days were considered as a start-up period. The influent and effluent of the UASB-digester system was monitored for biogas production, temperature and COD measurements. Total suspended solids (TSS), volatile suspended solids (VSS), total solids (TS), volatile solids (VS), ammonium (NH4), chemical oxygen demand (COD), biological oxygen demand (BOD), and PO4, were measured according to standard methods (APHA, 1995). Raw samples were used for measuring total COD (COD tot). Nature of Jordan and Palestine experiences and are the most similar to the nature of Sana a and Yemeni cities because of similarity of sewage influent. Tables 1 and 2 show the results achieved from Palestine experiment. Page 5 PILOT By Al-Koli H., Mahmoud N.2, Atfa Allah M., & Al-Nozaily F. A.
6 Table 1. Influent and effluent CODtot and fractions and removal efficiencies (%) during anaerobic sewage treatment in a one-stage UASB reactor operated during the cold and warm parts of the year and a UASB-digester system plant Table 2: Influent and effluent characteristics in terms of CODtot, BOD, TSS, PO4 and NH4-N during anaerobic sewage treatment in a one-stage UASB reactor and a UASB-digester system UASB-digester system THE RESEARCH OBJECTIVE The aim of this research is to study the efficiency of anaerobic wastewater treatment in Sana a WWTP by using UASB Reactor Pilot Plant. MATERIALS AND METHODS THE DESIGN PHASE OF UASB REACTOR AND ACCESSORIES The velocity of wastewater up flow Vup<3m/h, the velocity of outlet water Vout< 3 /h The tank of reactor was design for HRTs (-) hr with 2.5m depth, anaerobic bacteria was used as activated sludge. Eng. Atfa Allah and his supervisors selected the shape of the reactor according to Dutch scientist Lettinga. The reactor is made of galvanized iron, with the following measurements: Page PILOT By Al-Koli H., Mahmoud N.2, Atfa Allah M., & Al-Nozaily F. A.
7 Diameter = 4 cm Height = 250 cm The volume of reactor =0.804 m3. Figure-5 shows the main components of the reactor which was located in SWWTP. THE REACTOR CONSTRUCTING PHASE Figure 5: The main components of the pilot reactor After finishing the metal part of the reactor in a workshop, the internal side of the reactor was painted with anti-corrosive material; figure- shows more details about the reactor and accessories. The main part of reactor is installed in a place where it could be close to the inlet of raw wastewater. The reactor accessories which is the settling tank (1m 3 ) was to receive the raw wastewater, by using a pump (power of ½ HP) to send the raw wastewater to the elevated tank (1m 3 ). The elevated tank is placed on concrete block at a height of 3.m above the reactor to allow influent flow by gravity. There are three valves between the reactor and elevated tanks: the first one Valve A which is opened Page 7 PILOT By Al-Koli H., Mahmoud N.2, Atfa Allah M., & Al-Nozaily F. A.
8 Figure : The main components of the pilot reactor Partially to control the quantity, flow and retention time of the influent which feeds the reactor. Valve B which is fully opened at same time with Valve C which is fully closed during measurement to check the flow as per design. The samples were collected through Valve B. The gas collection cone which is located upside the lower part of the cone with diameter 54cm and upper part diameter 20cm. The ½ valves (tapes) of the reactor were installed every 25 cm. The construction of the reactor Figure 7: The components of UASB reactor and gas collection cone took one month to finish on the site of the plant, Figure-7 shows details of gas collection cone. THE REACTOR OPERATION PHASE To reach a status of stable operation, the reactor requires the following: Page 8 PILOT By Al-Koli H., Mahmoud N.2, Atfa Allah M., & Al-Nozaily F. A.
9 SLUDGE PREPARATION : The sludge formed due to the sedimentation of the high concentrations of wastewater in our case the sludge was obtained by filling the reactor with the raw wastewater for one whole day, then opening all the valves mentioned above A,B and C except the valve under the reactor. The process was repeated on the third day with all the valves opened (including taking sample valves) accept the valve number (1), in order to fill a third of the reactor with sludge, and the process was repeated again but this time the valve (3) kept open. 10 liters of rich bacterial sludge was added to the reactor to activate the formed sludge, the added sludge was collected from the digester producing biogas from cattle waste in the Veterinary Institute in Sana'a. Valve B Figure 8: Adding the rich bacterial sludge to the reactor The settling tank received raw wastewater by a suction pump from one inlet of the wastewater treatment plant. By other pump, wastewater is sent to elevated tanks through upvc pipes which connected the two tanks. Three valves are installed to the elevated tanks to control the flow of wastewater to the reactor. The reactor was operated while one third level of the reactor with sludge, the two tanks were filled with wastewater regularly for a period of one month with a retention time of 3h, to allow the formation of anaerobic bacteria and make the reactor stable. Then the reactor was filled with water for two weeks to dilute the concentration of organic material in wastewater. After reaching stability the reactor was operated for three different retention times h, h and h. Samples were taken from the inlet and outlet of the reactor in order to measure the COD values after one month. Calculation of required flow to the reactor (Q design) The surface area for the reactor (A) = m 2 Volume of the reactor (V) = m 3 The effective Volume of the reactor (Vac)= 0.53 m 3, assuming three retention times HRT1=hr,HRT2 =hr,hrt3=hr The flow quantity Q1=V/HRT1=23.4 l/hr, Q2= 4.92l/hr, Q3= 93.83l/hr The flow velocity (v) v1 =Q/A=0.073 m/hr, v2 = 0.14 m/hr, v3 = m/hr so if v <3m/hr (Safe) Page 9 PILOT By Al-Koli H., Mahmoud N.2, Atfa Allah M., & Al-Nozaily F. A.
10 the cross sectional area of the inlet pipe (link the elevated tank and reactor)with diameter (3/4 inch)= 2.85cm2 (A2) the surface area for the pipe (between the reactor wall and the gas collection cone) The reactor diameter = 4cm=0.4m, the gas collection cone diameter=55cm=0.55m A2= (0.4^2-0.55^2)*3.14/4=0.094 m2 The velocity in the outlet V1-2=0.257m/hr, V2-2=0.514m/hr, V2-3=1.028m/hr< (2-3) m/hr LAB ANALYSIS To measure Total Suspended Solids(TSS) by collecting sample of sludge 25ml from the lower part of reactor To measure Total Solids(TS) by collecting sample of sludge 50ml from the lower part of reactor To measure COD values Sample collection Different samples were taken: From the inlet pipe to the reactor everyday through valve B after reaching stability status From the outlet of the reactor everyday with respecting the different HRTs From the inlet of the reactor at different HRTs.(h,h and h) RESULTS W1(filter paper) Table 3: Results of Total Suspended Solids (TSS) from the lower part of reactor W2 (filter paper and TS) TSS (W2-W1)/25*10 ) 0.333g 0.418g 58mg/l Table 4: Results of Total Suspended Solids (TSS) from treated wastewater W1(filter paper) 0.34 g W2 (filter paper and TS) g TSS (W2-W1)/25*10 ) 204 mg/l Table 5: Results of Total Solids (TS) from lower part of reactor W1(empty pot) g W2 (empty pot+ TS) 4.841g W3 (empty pot+ TFS) 4.028g TS=(W2-W1)/ 25 *10 Total solids mg/l TVS=(W2-W3)/ 25 *10 Total Volatile Solids 392 mg/l TFS=(W3-W1) / 25 *10 Total Fixed Solids 11 mg/l TVS= *100% = 5.3% Page 10 PILOT By Al-Koli H., Mahmoud N.2, Atfa Allah M., & Al-Nozaily F. A.
11 Table : Results Total Solids (TS) from rich bacterial sludge (Veterinary Institute in Sana'a ) W1(empty pot) g W2 (empty pot+ TS) g W3 (empty pot+ TFS) TS=(W2-W1)/ 25 *10 Total solids 4920mg/L TVS=(W2-W3)/ 25 *10 Total Volatile Solids 4290mg/L TFS=(W3-W1) / 25 *10 Total Fixed Solids 1830mg/L TVS= *100% = 71.3% Table 7: Results of Total Solids (TS) from thickener W1(empty pot) g W2 (empty pot+ TS) 0.774g W3 (empty pot+ TFS) TS=(W2-W1)/ 25 *10 Total solids 42200mg/L TVS=(W2-W3)/ 25 *10 Total Volatile Solids 37190mg/L TFS=(W3-W1) / 25 *10 Total Fixed Solids 5010mg/L TVS= *100% = 88.1% COD values Table 8: COD for raw and treated wastewater at retention time of h No HRT Inlet COD) Outlet (COD) Treatment Efficiency 52.78% 9.05% 7.0% 49.19% 58.94% 45.14% 7.0% 58.00% 5.79% Page 11 PILOT By Al-Koli H., Mahmoud N.2, Atfa Allah M., & Al-Nozaily F. A.
12 No Table 9: COD for raw and treated wastewater at retention time of h HRT Inlet COD) Outlet (COD) Treatment Efficiency % % % % % % % % No HRT(hr) Table 10: COD for raw and treated wastewater at retention time of h Inlet COD) Outlet (COD) Treatment Efficiency 49.10% 45.83% 41.87% 34.8% 47.2% 49.10% DISCUSSION AND CONCLUSION Observing bubbles indicates Biogas formation due to the biological reactions inside the reactor, but nonavailability of gas gauges make the measuring of biogas quantity difficult. By reviewing the results in table (10), we can conclude that the efficiency of UASB reactor ranks from 34% to 7%, this efficiency ratio which indicate that UASB reactor could be considered as efficient way to treat wastewater. Using UASB reactor to treat the high strength waste water is widely spread around the world especially for wastewater in small residential clusters and industrial wastewater without needing any external energy source. Due to the close nature of reactor (size of reactor, temperature and retention time) which was used in Sana a UASB with the other used in Iran case study, then comparing the obtained results in two cases: Page PILOT By Al-Koli H., Mahmoud N.2, Atfa Allah M., & Al-Nozaily F. A.
13 Table 11: Comparing between the results obtained from our research and Iran case study Comparing UASB size (M3) HRT (Hour) Temperature (cellos) The averagecod values inlet HRT Hours The averagecod values outlet HRT Hours The average efficiency of UASB The results of this research 0.804,, 21average % The results of Iran experiment ,4,,8,10 Summer2, Winter % İf the obtained results in Sana a case study compare with India experiments in table. We found the following: Table : Comparing between the results obtained from our research and India case study Comparing UASB size (M3) HRT (Hour) Temperature (cellos) The average COD values inlet HRT Hours The average COD values outlet HRT Hours The average efficiency of UASB The results of this research 0.804,, 21 average % The results of India experiment % From table ()it is remarkable that the efficiency of UASB reactor in our case study is greater than reactor in Iran case study, we could conclude that the efficiency of the reactor increased in high values of COD of inflow wastewater, and from the table above it is clear that the efficiency of UASB in India(where COD is 00 mg/l) is greater than our research efficiency(cod value is 820mg/l) with same retention time. In Brazil other results were obtained, the table (13) below shows the comparison of Brazil reactor with our study findings: Page 13 PILOT By Al-Koli H., Mahmoud N.2, Atfa Allah M., & Al-Nozaily F. A.
14 Table 13: Comparing between the results obtained from our research and Brazil case study Comparing UASB size (M3) HRT (Hour) Temperature (cellos) The average COD values inlet HRT Hours The average COD values outlet HRT Hours The average efficiency of UASB The results of this research 0.804,, 21average % The results of India experiment winter 23summer % From table (13) above it is noticeable that the results obtained in our study are promising compared with the same results from Brazil case study. RECOMMENDATIONS 1- It is important to continue taking the samples for the influent and effluent to reach more accurate results and know more about the advantages of UASB and minimize the disadvantages of the system. 2- It is recommended to apply UASB system for wastewater treatment in weather areas with high atmospheric temperatures where this factor accelerates the time of the anaerobic treatment process; in addition to increasing the efficiency of UASB reactor treatment. 3- The importance of constructing a second UASB reactor to compare the results of the new and old reactors. 4- It is necessary to modify the operation of the reactor to be close model of a real one: - Replace the two tanks with a small pump that is used in wastewater in order to avoid pipe blockages - Avoid the direct pumping from the inlet to the reactor and construct a chamber for sand removal. 5- Doing more research in this field from related water entities to find more low-cost efficient ways to treat the wastewater. - Involving and encouraging the private sector to use the UASB systems to treat the industrial wastewater. REFERENCES [1] APHA, Standard methods for the examination of water and wastewater, 18th Ed. New York, Page 14 PILOT By Al-Koli H., Mahmoud N.2, Atfa Allah M., & Al-Nozaily F. A.
15 [2] Azimi, A. and Zamanzadeh, M. (2004) Determination of design criteria for UASB reactors as a wastewater pretreatment system in tropical small communities, Int. J. Environ. Sci. Tech, 2004, Vol. 1, No. 1, pp [3] Chernicharo, C. (2007). Anaerobic reactors, Biological wastewater treatment series, volume 4.IWA Publishing, [4] Al-Nozaily, F. Khidhr, F. and Salah, A. (2005). Evaluation of Sana'a wastewater treatment plant, Scientific Journal for Civil Engineering, Al-Azhar University, Egypt, 2005, 2, pp [5] Atf Allah, M. (20) Anaerobic treatment of Sana'a municipal wastewater by using a pilot scale UASB reactor, Master Thesis. Faculty of civil engineering, University of Sana a, Yemen, 20. [] Halalsheh, M., Sawajneh, Z., Zu bi, M., Zeeman, G., Lier, J., Fayyad M., and Lettinga, G. (2005). Treatment of strong domestic sewage in a 9 m3 UASB reactor operated at ambient temperatures: two-stage versus singlestage reactor, Bioresour. Technol. 2005,9, [7] Mahmoud, M., Zeeman, G., Gijzen, H., Lettinga, G. (2004). Anaerobic sewage treatment in a one-stage UASB reactor and a combined UASB digester system, Water Res., 2004, 38 (9), [8] Sabri, T. Using New Low Cost Technology in Wastewater Treatment Plant,. University of King Sawood, [9] Vi e r i a, S., Crvalho, J., Barijan, F. and Reeh, C. (2004) Application of the UASB technology for sewage treatment in a small community at Sumare,. Sao Paulo state water Science and technology, 1994, [10] Sankar, P., Ganesh, E., Ramasamy, S., Gajalakshmi, R., Sanjeevi E., and Abbasi, S. (207) Studies on treatment of low-strength effluents by UASB reactor and its application to dairy industry wash waters,. Indian Journal of Biotechnology, 2007, Vol, pp Page 15 PILOT By Al-Koli H., Mahmoud N.2, Atfa Allah M., & Al-Nozaily F. A.
Sewerage Management System for Reduction of River Pollution
Sewerage Management System for Reduction of River Pollution Peter Hartwig Germany Content page: 1 Introduction 1 2 Total emissions 3 3 Discharge from the wastewater treatment plants 4 4 Discharge from
Natural and Advanced Treatment Systems for Wastewater Management at Municipal Solid Waste Disposal Site in Developing Countries
Natural and Advanced Treatment Systems for Wastewater Management at Municipal Solid Waste Disposal Site in Developing Countries C. Chiemchaisri Department of Environmental Engineering, Kasetsart University
A NOVEL ION-EXCHANGE/ELECTROCHEMICAL TECHNOLOGY FOR THE TREATMENT OF AMMONIA IN WASTEWATER
A NOVEL ION-EXCHANGE/ELECTROCHEMICAL TECHNOLOGY FOR THE TREATMENT OF AMMONIA IN WASTEWATER ABSTRACT Leonard P. Seed, M.Sc., P.Eng., Enpar Technologies Inc. * Daren D. Yetman, A.Sc.T., Enpar Technologies
UASB reactor for domestic wastewater treatment at low temperatures: a comparison between a classical UASB and hybrid UASB-filter reactor
UASB reactor for domestic wastewater treatment at low temperatures: a comparison between a classical UASB and hybrid UASB-filter reactor B. Lew, S. Tarre, M. Belavski and M. Green Faculty of Civil and
Rehabilitation of Wastewater Treatment Plant of Sakhnin City in Israel by Using Advanced Technologies
Rehabilitation of Wastewater Treatment Plant of Sakhnin City in Israel by Using Advanced Technologies Yasar Avsar 1, Hussein Tarabeah 2, Shlomo Kimchie 3, Izzet Ozturk 4, Hadi Naamneh 2 1 Yildiz Technical
WASTEWATER TREATMENT OBJECTIVES
WASTEWATER TREATMENT OBJECTIVES The student will do the following: 1. Define wastewater and list components of wastewater. 2. Describe the function of a wastewater treatment plant. 3. Create a wastewater
ADVANCED LAGOON TREATMENT TECHNOLOGIES FOR WASTEWATER TREATMENT
ADVANCED LAGOON TREATMENT TECHNOLOGIES FOR WASTEWATER TREATMENT ABSTRACT by Vikram M Pattarkine*, Randall C Chann**, Charles E Tharp** *Brinjac Engineering Inc, 114 North 2 nd Street, Harrisburg, PA 1711
Experts Review of Aerobic Treatment Unit Operation and Maintenance. Bruce Lesikar Texas AgriLife Extension Service
Experts Review of Aerobic Treatment Unit Operation and Maintenance Bruce Lesikar Texas AgriLife Extension Service Overview Overview of Aerobic Treatment Units Installing for accessibility to system components
CHAPTER 8 UPGRADING EXISTING TREATMENT FACILITIES
CHAPTER 8 UPGRADING EXISTING TREATMENT FACILITIES 8-1. General. Upgrading of wastewater treatment plants may be required to handle increased hydraulic and organic loadings to meet existing effluent quality
TALLINN WATER TREATMENT AND SEWERAGE Tuuli Myllymaa
TALLINN WATER TREATMENT AND SEWERAGE Tuuli Myllymaa Tallinn is the capital of Estonia. It has approximately 450,000 inhabitants and the town area is about 150 km 2. Tallinn Water Ltd., owned by the City
PRODUCT SELECTOR Pollution Control, Pumping and Rainwater Harvesting Systems
PRODUCT SELECTOR Pollution Control, Pumping and Rainwater Harvesting Systems PACKAGE SEWAGE TREATMENT SYSTEM Clearwater treatment plants are ideal for single houses and employ the well proven aerobic biological
aquateam Aquateam - Norwegian Water Technology Centre A/S Report no: 02-051 Project no: O-02033 Project manager: Dr. Bjørn Rusten.
Feasibility study of biological wastewater treatment plants with Salsnes Filter fine mesh sieve primary treatment compared to plants without primary treatment Aquateam - Norwegian Water Technology Centre
TREATMENT OF SANITARY SEWER OVERFLOW
TREATMENT OF SANITARY SEWER OVERFLOW WITH FIXED MEDIA BIOREACTORS J. Tao, K. M. Mancl, O. H. Tuovinen ABSTRACT. Fixed media bioreactors (biofilters) are a promising and proven technology used for wastewater
Practice Tests Answer Keys
Practice Tests Answer Keys COURSE OUTLINE: Module # Name Practice Test included Module 1: Basic Math Refresher Module 2: Fractions, Decimals and Percents Module 3: Measurement Conversions Module 4: Linear,
Advanced Wastewater Treatment Process
7 th Workshop on Greenhouse Gas Inventories in Asia Possibly Co-benefit? Advanced Wastewater Treatment Process Tomonori ISHIGAKI Dept. of Environmental Solution Technology Ryukoku University, Japan Introductory
Brewery Wastewater: 2010 Water and Wastewater Conference. 11.02.2011 Page 1
Brewery Wastewater: Solutions for the Problem By Fred M. Scheer 2010 Water and Wastewater Conference Madison, WI 11.02.2011 Page 1 vr74 What We Will Discuss: Biochemical i Oxygen Demand (BOD): Where does
Holistic Aeration and Chemical Optimization Saves Big Money from 1 MGD to 600 MGD. Trevor Ghylin, PE PhD
Holistic Aeration and Chemical Optimization Saves Big Money from 1 MGD to 600 MGD Trevor Ghylin, PE PhD Outline Background Case Study: Sterno, Sweden (~1.8 MGD) 65% Aeration Energy Reduction Case Study:
The Sewage Plant. The Original! Fully biological. Small sewage. wastewater treatment for. new construction. & retrofitting
The Sewage Plant The Original! Fully biological wastewater treatment for new construction & retrofitting Ssb Small sewage treatment plant AQuato stabi-kom AQUATO STABI-KOM THE NEW GENERATION AMONG THE
A HOMEOWNERS GUIDE ON-SITE SEWAGE MANAGEMENT SYSTEMS
GEORGIA DEPARTMENT OF HUMAN RESOURCES ENVIRONMENTAL HEALTH SECTION A HOMEOWNERS GUIDE TO ON-SITE SEWAGE MANAGEMENT SYSTEMS March 12, 2002 WHAT IS AN ON-SITE SEWAGE MANAGEMENT SYSTEM An on-site sewage management
Table 1.1: Typical Characteristics of Anaerobically Digested Wastewater
Solar Detoxification of Distillery Waste Anil K. Rajvanshi and Nandini Nimbkar Nimbkar Agricultural Research Institute (NARI), P.O. Box 44, PHALTAN-415523, Maharashtra E-mail : [email protected] Introduction
RESIDENTIAL TREATMENT SYSTEMS
EFFLUENT SAMPLING FOR RESIDENTIAL TREATMENT SYSTEMS For various reasons, many wastewater treatment systems periodically require effluent sampling and characterization. Whether sampling is done to verify
AP ENVIRONMENTAL SCIENCE 2007 SCORING GUIDELINES
AP ENVIRONMENTAL SCIENCE 2007 SCORING GUIDELINES Question 1 Read the Fremont Examiner article below and answer the questions that follow. (a) Identify ONE component of the sewage that is targeted for removal
Example Calculations Evaluation for Fine Bubble Aeration System. Red Valve Company, Inc. 700 NORTH BELL AVENUE CARNEGIE, PA 15106-0548
Revision Date 6/10/02 9:52 Red Valve Company, Inc. 700 NORTH BELL AVENUE CARNEGIE, PA 15106-0548 PHONE (412) 279-0044 FAX (412) 279-5410 Red Valve Representative Sample Air Diffuser Calcs.xls Input Data
SMALL COMMUNITY TREATMENT PLANT EXPANSION WHILE IN OPERATION USING ADVANCED TECHNOLOGY
SMALL COMMUNITY TREATMENT PLANT EXPANSION WHILE IN OPERATION USING ADVANCED TECHNOLOGY Adel Bassyouni, HDR Engineering, Guillermo Garcia, HDR Engineering, Don Mc Dermott, Viejas Public Works Department
Module 16: The Activated Sludge Process - Part II Instructor Guide Answer Key
Unit 1 Process Control Strategies Exercise Module 16: The Activated Sludge Process - Part II Instructor Guide Answer Key 1. What are the six key monitoring points within the activated sludge process? Ans:
SYNERGISTIC APPLICATION OF ADVANCED PRIMARY AND SECONDARY WASTEWATER TREATMENT SYSTEMS
SYNERGISTIC APPLICATION OF ADVANCED PRIMARY AND SECONDARY WASTEWATER TREATMENT SYSTEMS Published in Water and Waste Digest membrane issue, November 2008 Miroslav Colic; Chief Scientist, Clean Water Technology
Wastewater Nutrient Removal
Wastewater Nutrient Removal An overview of phosphorus and nitrogen removal strategies Presented by: William E. Brown, P.E. Peter C. Atherton, P.E. Why are nutrients an issue in the environment? Stimulates
Oasis Clearwater ENVIRONMENTAL SYSTEMS WASTEWATER TREATMENT ENGINEERS
Oasis Clearwater ENVIRONMENTAL SYSTEMS WASTEWATER TREATMENT ENGINEERS The evolution continues in decentralised wastewater technology... The Process Decentralised wastewater treatment systems are defined
Feasibility study of crystallization process for water softening in a pellet reactor
International A. H. Mahvi, Journal et al. of Environmental Science & Technology Feasibility study of crystallization... Vol. 1, No. 4, pp. 1-4, Winter 5 Feasibility study of crystallization process for
FAST Owner s Manual. MicroFAST NitriFAST HighStrengthFAST RetroFAST
FAST Owner s Manual FOR USE WITH (NSF Std 40 & 245) MicroFAST 0.5, 0.75, 0.9, 1.5 (non-nsf certified) MicroFAST 3.0, 4.5, 9.0 (ETV/EPA tested) RetroFAST 0.150, 0.250, 0.375 NitriFAST 0.5, 0.75, 0.9, 1.5,
THE MARSHALL STREET ADVANCED POLLUTION CONTROL FACILITY (CLEARWATER, FLORIDA) CONVERSION TO 4-STAGE BARDENPHO TO IMPROVE BIOLOGICAL NITROGEN REMOVAL
THE MARSHALL STREET ADVANCED POLLUTION CONTROL FACILITY (CLEARWATER, FLORIDA) CONVERSION TO 4-STAGE BARDENPHO TO IMPROVE BIOLOGICAL NITROGEN REMOVAL ABSTRACT Timur Deniz, Ph.D., Thomas W. Friedrich, P.E.
PROPAK AquaBio Complete Water Restoration Systems
PROPAK AquaBio Complete Water Restoration Systems Conserving natural resources and lowering operating expenses is no longer an option, it is a necessity. Water, sewer and discharge fees are continuing
Septic Tank to Cistern Conversions. Saving Water & Saving Money
Florida Keys Aqueduct Authority 1100 Kennedy Drive Key West, Florida 33040 Septic Tank to Cistern Conversions Saving Water & Saving Money One of the benefits of connecting to the Central Wastewater System
Guidelines for Precast Concrete Grease Interceptors
Guidelines for Precast Concrete Grease Interceptors Purpose Provide an overview of the basic design principals that govern why gravity grease interceptors work Provide a forum for discussion of common
DATA COLLECTION FOR DESIGN OF WASTEWATER TREATMENT FACILITIES
United States Agency for International Development Ministry of Water Resources and Irrigation LIFE Integrated Water Resources Management Task Order No. 802 EPIQ II: Contract No. EPP-T-802-03-00013-00 Global
Bio-P Removal- Principles and examples in MI and elsewhere S. Joh Kang, Ph.D., P.E. Tetra Tech, Inc. Ann Arbor, MI 2010 Presentation Outline Optimization of Chemicals and Energy Bio-P Removal - Review
Septic Tank Use & Maintenance Tips
Yellowhead County Hamlet of Cadomin Septic Tank Use & Maintenance Tips This guide gives an overview of the responsibilities for property owners in Cadomin. For Seasonal, Permanent & Vacationing Cadomin
Septic System Owner s Manual
Septic System Owner s Manual Sponsored by: copyright 2013 No part of this publication may be reproduced without our consent. www.callbrownies.com Brownie s Septic and Plumbing has provided quality service
ENGINEERING REPORT Sewage Treatment System
CIVIL & STRUCTURAL ENGINEERING CONSULTANTS 7A Barbados Avenue, Kingston 5, Jamaica, Tele: (876) 754-2154/5 Fax: (876) 754-2156 E-mail: [email protected] GORE FLORENCE HALL DEVELOPMENT FCS # 0827/76/C
National Precast Concrete Association
National Precast Concrete Association NOTES 1. This manual does not claim or imply that it addresses any safety-related issues associated with its use. Operation and maintenance of precast concrete grease
FAST Owner s Manual. MicroFAST NitriFAST HighStrengthFAST RetroFAST
FAST Owner s Manual FOR USE WITH (NSF Std 40 & 245) MicroFAST 0.5, 0.625, 0.75, 0.9, 1.5 (non NSF certified) MicroFAST 3.0, 4.5, 9.0 (ETV/EPA tested) RetroFAST 0.150, 0.250, 0.375 NitriFAST 0.5, 0.625,
WEFTEC.06. *Corresponding author Department of Civil and Environmental Engineering, The University of Western Ontario
Performance of Aerobic MBR Treating High Strength Oily Wastewater at Mesophilic Thermophilic Transitional Temperatures R. Kurian, G. Nakhla* Earth Tech Canada Inc., Thornhill, L3T 7Y6 Ontario *Corresponding
1.782 Environmental Engineering Masters of Engineering Project
MIT OpenCourseWare http://ocw.mit.edu 1.782 Environmental Engineering Masters of Engineering Project Fall 2007 - Spring 2008 For information about citing these materials or our Terms of Use, visit: http://ocw.mit.edu/terms.
Development of Advanced Wastewater Treatment and Reclamation System
14 Development of Advanced Wastewater Treatment and Reclamation System TAKESHI TERAZAKI *1 HOZUMI OTOZAI *2 KOSUKE SHIGIISHI *2 HIDEO SUZUKI *3 HIROSHI NAKASHOJI *4 HIROYUKI KAWAMOTO *5 Recycling and the
Provided below is a description of the processes generating wastewater in a poultry plant and a typical pretreatment and full treatment system.
II. PROCESS OVERVIEW Provided below is a description of the processes generating wastewater in a poultry plant and a typical pretreatment and full treatment system. II.1. Wastewater Generation A typical
1.85 WATER AND WASTEWATER TREATMENT ENGINEERING FINAL EXAM DECEMBER 20, 2005
1.85 WATER AND WASTEWATER TREATMENT ENGINEERING FINAL EXAM DECEMBER 20, 2005 This is an open-book exam. You are free to use your textbook, lecture notes, homework, and other sources other than the internet.
Homeowners and Home Buyers Guide to Wells and Private Sewage Systems
Homeowners and Home Buyers Guide to Wells and Private Sewage Systems What every homeowner should know about living with a well and a private sewage system. YOUR ENVIRONMENTAL SYSTEMS Out of sight out of
Small Wastewater Treatment Systems
Small Wastewater Treatment Systems By Michael Albanese, P.Eng. H2FLOW EQUIPMENT INC. www.h2flow.com Why do you need one? Typical Reasons Enviromental Regulations New Development Failing Septic Systems
Planning, Designing, Monitoring and Inspection of Wastewater Treatment Systems of Industries
International Journal of Chemistry and Chemical Engineering. ISSN 2248-9924 Volume 3, Number 3 (2013), pp. 225-230 Research India Publications http://www.ripublication.com Planning, Designing, Monitoring
Nine Industrial Scale V SEPs. Feed Tank V SEP. Feed Pumps (Three) Concentrate. Tank. V SEP Treatment System
River Treatment for Ultrapure Production A cost-effective and environmentally-sound solution Abstract New Logic International installed its Vibratory Shear Enhanced Processing (VSEP) Phase I system in
Description of the Water Conserv II Facility
Description of the Water Conserv II Facility Introduction The Water Conserv II (WCII) Water Reclamation Facility provides service to a majority of the southwest section of Orlando. The WCII facility has
Water and Wastewater. Sample Collection and Analysis
Water and Wastewater Sample Collection and Analysis December 2011 Introduction Accurate testing of drinking water is crucial to maintaining the health and safety of Islanders who rely on this resource.
Nutrient Removal at Wastewater Treatment Facilities. Nitrogen and Phosphorus. Gary M. Grey HydroQual, Inc. [email protected] 201 529 5151 X 7167
Nutrient Removal at Wastewater Treatment Facilities Nitrogen and Phosphorus Gary M. Grey HydroQual, Inc. [email protected] 201 529 5151 X 7167 1 Agenda Nitrification and Denitrification Fundamentals
SEPTIC TANKS FOR THE COLLECTION & SETTLEMENT OF DOMESTIC SEWAGE
SEPTIC TANKS FOR THE COLLECTION & SETTLEMENT OF DOMESTIC SEWAGE Let us help! Free professional site visit with friendly support and advice. [email protected] to make the right decision or call
DOMESTIC WASTEWATER SYSTEMS
Environmental PROTECTION Systems DOMESTIC WASTEWATER SYSTEMS Highest quality sewage treatment systems from the name you can trust Hynds Aerated Wastewater Systems Hynds Lifestyle Systems are an elite range
12:10 Lysotherm : 5 jaar ervaring met innovatieve slibhydrolyse. Bert Geraats (Eliquo)
LYSOTHERM A novel approach to thermal sludge hydrolysis 01.07.2015 ELIQUO WATER GROUP FACTS AND FIGURES STAFF HISTORY FIGURES >200 employees Engineers Technicians Sales, commercial staff 1986 ELIQUO WATER
Compact Sewage Systems in France A technical and cost comparison
2010 Sewage System Approvals Introduction The methods of evaluating systems are fixed by a decree dated 7 th September 2009. All companies wishing to have a system approved must submit a file to the appropriate
Iowa DNR Wastewater Treatment Technology Assessment No. 09-01
Iowa DNR Wastewater Treatment Technology Assessment No. 09-01 Evaluation of Full-Scale LemTec Biological Treatment Facilities for Wastewater Design Review Considerations by the Iowa Department of Natural
BASIC MATH FORMULAS - CLASS I. A. Rectangle [clarifiers, ponds] I = length; w = width; A = area; area in square ft [sq ft]
WASTEWATER MATH CONVERSION FACTORS 1. 1 acre =43,560 sq ft 2. 1 acre =2.47 hectares 3. 1 cu ft [of water] = 7.48 gallons 4. 1 cu ft [of water] = 62.4 Ibs/ft 3 5. Diameter =radius plus radius, D =r + r
Energy consumption and greenhouse gas emissions in the wastewater treatment plant: a decision support system for planning and management
Energy consumption and greenhouse gas emissions in the wastewater treatment plant: a decision support system for planning and management Riccardo Gori Civil and Environmental Engineering Dept. University
Fusion Series Treatment Systems Small Scale Residential & Commercial Treatment Units
SECTION: C3.10.120 CL0052 0911 Supersedes New Fusion Series Treatment Systems Small Scale Residential & Commercial Treatment Units Clarus Environmental 3649 Cane Run Rd. Louisville, KY 40211 877-244-9340
Cambridge Wastewater Treatment Facility
Cambridge Wastewater Treatment Facility Emergency Situations If you have a water or sewer emergency that relates to the City s utility system call the Public Works office at 763-689-1800 on normal working
CERTIFIED SEPTIC EVALUATION PREPARED FOR MATT HASHEM 1673 MT. MAJOR HWY, ALTON, NH 03810
DATE: May 31, 2013 N.H. LICENSED DESIGNER OF SUBSURFACE DISPOSAL SYSTEMS 216 Hill Road Phone & Fax: 934-6206 Franklin, NH 03235 Cell: 393-3085 CERTIFIED SEPTIC EVALUATION PREPARED FOR MATT HASHEM 1673
Alberta Onsite Wastewater Management Association Installer Training Program
Alberta Onsite Wastewater Management Association Installer Training Program OWTS 100 Overview and Principles of Wastewater Treatment Systems Brief Review of All Types of Systems 1. Know the general principles
Orange County Sanitation District
Orange County Sanitation District The Orange County Sanitation District operates large wastewater treatment plants in Fountain Valley and Huntington Beach, CA. These plants treat about 230 million gallons
The City of Boulder 75 th Street Wastewater Treatment Facility
The City of Boulder 75 th Street Wastewater Treatment Facility Wastewater Collection and Treatment The Foundation of Public Health Wastewater Collection Boulder s wastewater collection system, also known
ANAEROBIC/ANOXIC TANKS
PROCESS DESCRIPTION In the anaerobic/anoxic tanks, wastewater is prepared for further treatment in the biological reactors. Denitrification and luxury uptake of phosphorus take place by mixing a food source
Facility Classification Standards
Facility Classification Standards Approval Date: April 3, 2009 Effective Date: April 3, 2009 Approved By: Nancy Vanstone, Deputy Minister Version Control: Replaces Facility Classification Standards dated
Environmental Science 101 Waste. Fall 2012. Lecture Outline: Terms You Should Know: Learning Objectives: Reading Assignment: Chlorinated.
Environmental Science 101 Waste Fall 2012 1 Lecture Outline: 17. SEWAGE DISPOSAL A. Sewage Handling B. Raw Sewage C. Wastewater Treatment Steps D. Individual Septic Systems E. Taking Stock Learning Objectives:
REMOVAL OF PHOSPHATE FROM WASTEWATER USING LOW-COST ADSORBENTS
International Journal of Engineering Inventions ISSN: 2278-7461, www.ijeijournal.com Volume 1, Issue 7 (October2012) PP: 44-50 REMOVAL OF PHOSPHATE FROM WASTEWATER USING LOW-COST ADSORBENTS Dr. C.R.Ramakrishnaiah
FLUIDO. Fully Biological Sewage Treatment Plant. We clear it for you. according to EN 12566-3. Packaged Sewage Solutions with a Future (4-300 PT)
FLUIDO Fully Biological Sewage Treatment Plant according to EN 12566-3 Packaged Sewage Solutions with a Future (4-300 PT) We clear it for you REWATEC Top Quality from Germany A sewage treatment plant is
EXISTING WASTEWATER TREATMENT FACILITIES
Chapter 5 EXISTING WASTEWATER TREATMENT FACILITIES 5.1 THERESA STREET WWTF 5.1.1 Overview The Theresa Street WWTF is the larger of the two wastewater treatment facilities owned and operated by the City
Best Practice Guide NO. BPGCS002. Wastewater Treatment Activated Sludge Process
Best Practice Guide NO. BPGCS002 Wastewater Treatment Activated Sludge Process The following is intended to provide a first check for those involved in the operation, management and monitoring of the activated
Wastewater characteristics
Wastewater characteristics Nidal Mahmoud Institute of Environmental and Water Studies, Birzeit University [email protected] Ecological Sanitation Training Course SWITCH PROJECT IEWS, Birzeit University,
OWNER S MANUAL MODEL NUMBERS M-6-A M-8-A M-1050-A M-1200-A M-2000-A
OWNER S MANUAL MODEL NUMBERS M-6-A M-8-A M-1050-A M-1200-A M-2000-A Consolidated Treatment Systems, Inc. 1501 Commerce Center Drive Franklin, OH 45005 Tel: 937-746-2727 Fax: 937-746-1446 www.consolidatedtreatment.com
MEMBRANE TECHNOLOGY TREATING OILY WASTEWATER FOR REUSE
MEMBRANE TECHNOLOGY TREATING OILY WASTEWATER FOR REUSE Jeff Peeters, P.Eng. ZENON Environmental Inc. SAWEA 2005 Workshop Al-Khobar Holiday Inn Hotel, Saudi Arabia November 29, 2005 Presentation outline
E nv i ro n m e nta l. Biotec 5-7. Sustainable, Reliable, Affordable
E nv i ro n m e nta l Biotec 5-7 Package Sewage Treatment for Residential, Business & Leisure Applications Sustainable, Reliable, Affordable ENTEC BIOTEC 5-7 FROM KINGSPAN ENVIRONMENTAL Package Sewage
ACTIFLO Process For Wet Weather and Wastewater Treatment
ACTIFLO Process For Wet Weather and Wastewater Treatment ACTIFLO Microsand Ballasted Clarification Process ACTIFLO is a high rate, compact process developed by Veolia Solutions & Technologies. The process
OPTIMIZING BIOLOGICAL PHOSPHORUS REMOVAL FROM AN SBR SYSTEM MIDDLEBURY, VT. Paul Klebs, Senior Applications Engineer Aqua-Aerobic Systems, Inc.
OPTIMIZING BIOLOGICAL PHOSPHORUS REMOVAL FROM AN SBR SYSTEM ABSTRACT MIDDLEBURY, VT Paul Klebs, Senior Applications Engineer Aqua-Aerobic Systems, Inc. The Middlebury Wastwater Treatment Plant, located
Pursuant to Department of Environmental Protection Rules Chapter 555, effective March 9, 2009
APPLICATION FOR ADDITION OF TRANSPORTED WASTES IN WASTEWATER TREATMENT FACILITIES Pursuant to Department of Environmental Protection Rules Chapter 555, effective March 9, 2009 This application is to be
Operation and Maintenance of Onsite Waster Systems in Maryland. A growing challenge for the industry and regulators
Operation and Maintenance of Onsite Waster Systems in Maryland A growing challenge for the industry and regulators Operation and Maintenance of Onsite Waster Systems in Maryland New law and regulations
Hydro International First Defense OK 110 Scour and Removal Efficiency Confirmation Tests November 9-10 2010
Hydro International First Defense OK 110 Scour and Removal Efficiency Confirmation Tests November 9-10 2010 Reported by James Houle UNH Stormwater Center On November 9-10, 2010, I witnessed scour and removal
Understanding and Living With Your Septic System
Chapter 9 Understanding and Living With Your Septic System Rural versus urban sewage treatment One of the big difference between rural and city life is how sewage is dealt with. Cities usually have community
Water Management in Helsinki. Water supply. Mikael Sillfors
Water Management in Helsinki Mikael Sillfors Helsinki is located on the northern shore of the Gulf of Finland. The main water systems in the area are the Gulf of Finland and River Vantaa, which runs through
Bay Park Sewage Treatment Plant Super Storm Sandy Recovery
County of Nassau Department of Public Works Bay Park Sewage Treatment Plant Super Storm Sandy Recovery Edward P. Mangano County Executive Shila Shah-Gavnoudias, P.E. Commissioner of Public Works Bay Park
Soluble Wastewater Treatment Using an ABR
Soluble Wastewater Treatment Using an ABR Gopala Krishna G.V.T. Department of Civil Engineering, PSNA College of Engineering and Technology, Dindigul-624622, India Abstract-- Developing countries offer
Advanced Wastewater Treatment and Disposal Systems. Water and Wastewater Utility Operation and
Advanced Wastewater Treatment and Disposal Systems Water and Wastewater Utility Operation and Management for Tribes Preliminary Treatment Primary Treatment Secondary Treatment Tertiary Treatment Disinfection
Removing Heavy Metals from Wastewater
Removing Heavy Metals from Wastewater Engineering Research Center Report David M. Ayres Allen P. Davis Paul M. Gietka August 1994 1 2 Removing Heavy Metals From Wastewater Introduction This manual provides
HUBER Vacuum Rotation Membrane VRM Bioreactor
HUBER Vacuum Rotation Membrane VRM Bioreactor VRM The rotating plate membrane for clean water applications. The future-oriented solution designed for the ever increasing requirements in wastewater treatment
A discussion of condensate removal systems for clarifier and thickener drives for water and wastewater facilities.
A discussion of condensate removal systems for clarifier and thickener drives for water and wastewater facilities. Richard L. Dornfeld, BSME, P.E. Staff Engineer September 25, 2014 Moisture can be a problem
Phosphorus Removal. Wastewater Treatment
Phosphorus Removal In Wastewater Treatment by Derek Shires (512) 940-2393 [email protected] Why do we care? Eutrophication of surface water - Especially reservoirs Maximum agronomic uptake - Limiting
SEPTIC SYSTEMS. 1. Building sewer connects the building plumbing to the septic tank.
SEPTIC SYSTEMS Who Has A Septic System? Approximately 30 percent of Connecticut s population is served by on-site subsurface sewage disposal systems (a.k.a. septic systems). This means a large percentage
Aeration Efficiency Guide
Aeration Efficiency Guide Environmental Dynamics InTernational EDI specializes in the research, development, and application of advanced technology aeration and biological treatment solutions for municipal
NAJAFGARH DRAIN-SAMPLING AND ANALYSIS
Dr. Anamika Paul* Preeti Jain* Kartikey Handa* NAJAFGARH DRAIN-SAMPLING AND ANALYSIS Abstract: Over the past years, due to rapid industrialization and advanced agricultural activities environmental deterioration
Complete. Water Solutions. for Rural India
Complete Water Solutions for Rural India More precious than gold. That s what safe drinking water is to India s rural population. Arsenic, iron, fluoride, nitrate, brackishness and pathogens in ground
This example of a completed sampling plan worksheet has been included to illustrate the information
APPENDIX B EXAMPLE OF A COMPLETED SAMPLING PLAN WORKSHEET This example of a completed sampling plan worksheet has been included to illustrate the information necessary to document a sampling program for
DAIRY WASTEWATER-A CASE STUDY
DAIRY WASTEWATER-A CASE STUDY Swati A.Patil 1, Vaishali V. Ahire 2, M.H.Hussain 3 1 Department of civil Engg, University of Pune, SITRC, Nashik, Maharashtra 2 Department of mechanical Engg, University
Reactor Clarifier Solids Contact Clarifiers
Reactor Clarifier Solids Contact Clarifiers Solids Contact and Flocculating Clarifiers for Water & Wastewater Treatment Key features & benefits Large diameter turbine producing high internal recycling
Alternative Options to Large Scales of Domestic Wastewater Treatment Facilities Management in Thailand
Alternative Options to Large Scales of Domestic Wastewater Treatment Facilities Management in Thailand By. Dr. Wijarn Simachaya Mr. Somchai Songprakob Pollution Control Department Ministry of Natural Resources
Module 9: Basics of Pumps and Hydraulics Instructor Guide
Module 9: Basics of Pumps and Hydraulics Instructor Guide Activities for Unit 1 Basic Hydraulics Activity 1.1: Convert 45 psi to feet of head. 45 psis x 1 ft. = 103.8 ft 0.433 psi Activity 1.2: Determine
